Prevailing wage rates: Riley County, Kansas

Building construction · KS20260056 modification 1, published May 18, 2026

The short answer

This sheet sets 38 classifications for building work in Riley County, Kansas. Each line is a basic hourly rate plus a fringe rate, and the sum is the minimum you must pay for that work, from $15.04 an hour (laborer: common or general) to $99.13 (elevator mechanic a. vacation pay). Your contract may lock an earlier modification.

Rates by classification

Total is the basic rate plus the fringe. Source is the agreement or survey the rate came from; a marker means the group changed in this modification. A dagger (†) means the fringe carries a footnote or percentage the total does not include; read the group’s notes.

ClassificationBasic rateFringeTotalSource
BRKS0015-011 · Bricklayers agreement, June 1, 2025
TILE SETTER$42.73$18.39$61.12Agreement
BRKS0015-013 · Bricklayers agreement, April 1, 2020
BRICKLAYER$28.34$10.33$38.67Agreement
BRKS0015-014 · Bricklayers agreement, June 1, 2025
TILE FINISHER$20.74$1.46$22.20Agreement
CARP0918-002 · Carpenters agreement, May 1, 2024
CARPENTER (DRYWALL HANGING ONLY)$28.34$14.08$42.42Agreement
ELEC0226-003 · Electrical Workers (IBEW) agreement, September 1, 2025
ELECTRICIAN$44.05$20.25$64.30Agreement
ELEV0012-004 · Elevator Constructors agreement, January 1, 2025
ELEVATOR MECHANIC A. VACATION PAY…
Full text

ELEVATOR MECHANIC A. VACATION PAY: 6% FOR 6 MONTHS TO 5 YEARS SERVICE; 8% WITH 5 OR MORE YEARS OF SERVICE. B.

PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS DAY, THANKSGIVING DAY AND FRIDAY AFTER, AND CHRISTMAS DAY

$60.69$38.44$99.13Agreement
ENGI0101-041 · Operating Engineers agreement, April 1, 2025
POWER EQUIPMENT OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE)$45.48$22.42$67.90Agreement
POWER EQUIPMENT OPERATOR: OILER$39.93$22.42$62.35Agreement
IRON0010-034 · Ironworkers agreement, April 1, 2025
IRONWORKER: ORNAMENTAL$36.00$34.25$70.25Agreement
LABO0663-017 · Laborers agreement, April 1, 2025
LABORER: CONCRETE SAW (HAND HELD/WALK BEHIND)$37.45$15.87$53.32Agreement
PAIN2012-009 · Painters and Allied Trades agreement, April 1, 2025
PAINTER (SPRAY)$36.18$19.97$56.15Agreement
PLUM0441-017 · Plumbers and Pipefitters agreement, June 30, 2025
PLUMBER$45.90$19.94$65.84Agreement
PLUM0441-018 · Plumbers and Pipefitters agreement, June 30, 2025
PIPEFITTER$45.90$19.94$65.84Agreement
SFKS0669-002 · SFKS, April 1, 2025
SPRINKLER FITTER: FIRE SPRINKLER$41.83$27.60$69.43SFKS
SHEE0002-011 · Sheet Metal Workers agreement, July 1, 2024
SHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY)$52.18$27.15$79.33Agreement
SUKS2015-025 · Survey of contractors in KS, July 8, 2015
TRUCK DRIVER: DUMP (ALL TYPES)$17.05$0.00$17.05Survey
SHEET METAL WORKER, EXCLUDES HVAC DUCT AND UNIT INSTALLATION$29.93$13.32$43.25Survey
ROOFER$22.87$6.84$29.71Survey
PAINTER (BRUSH AND ROLLER)$22.07$0.97$23.04Survey
OPERATOR: ROLLER$33.78$13.64$47.42Survey
OPERATOR: LOADER$26.30$11.62$37.92Survey
OPERATOR: GRADER/BLADE$28.79$12.73$41.52Survey
OPERATOR: FORKLIFT$37.92$0.00$37.92Survey
OPERATOR: CRANE$33.19$14.16$47.35Survey
OPERATOR: BULLDOZER$33.12$13.96$47.08Survey
OPERATOR: BOBCAT/SKID STEER/SKID LOADER$27.78$12.58$40.36Survey
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE$31.56$11.28$42.84Survey
LABORER: MASON TENDER - CEMENT/CONCRETE$17.86$1.01$18.87Survey
LABORER: COMMON OR GENERAL$13.19$1.85$15.04Survey
IRONWORKER, STRUCTURAL$29.00$25.35$54.35Survey
IRONWORKER, REINFORCING$27.50$21.45$48.95Survey
CEMENT MASON/CONCRETE FINISHER$19.88$0.00$19.88Survey
CARPENTER, EXCLUDES DRYWALL HANGING, AND FORM WORK$16.31$0.00$16.31Survey
CARPENTER (FORM WORK ONLY)$15.08$0.00$15.08Survey
ASBESTOS WORKER/HEAT & FROST INSULATOR - MECHANICAL…
Full text

ASBESTOS WORKER/HEAT & FROST INSULATOR - MECHANICAL (DUCT, PIPE & MECHANICAL SYSTEM INSULATION)

$18.04$6.04$24.08Survey
TEAM0541-010 · Teamsters agreement, April 1, 2025
TRUCK DRIVER: LOWBOY TRUCK$39.89$15.85$55.74Agreement
TEAM0541-011 · Teamsters agreement, April 1, 2025
TRUCK DRIVER: SEMI-TRAILER TRUCK$39.89$15.85$55.74Agreement
UAVGKS0003 · Union average, January 1, 2025
SHEET METAL WORKER (HVAC UNIT INSTALLATION ONLY)$41.57$20.60$62.17Union average

Modification history

Modification 0January 2, 2026
Modification 1May 18, 2026 (current)

Published by the Wage and Hour Division; read from sam.gov. The sheet is checked for a newer modification each day. Contracts awarded since January 1, 2017 also carry Executive Order 13706 paid sick leave (one hour per 30 worked, up to 56 a year).

Questions people ask

Which rate do I pay on KS20260056?
The line for the classification of work actually performed: the basic rate plus the fringe. You may pay the fringe into benefit plans, as cash on every hour, or a mix. Overtime after 40 hours is 1.5 times the basic rate; fringe is paid on every hour and never multiplied.
My trade is not on this sheet. What do I do?
Do not borrow the nearest name. Ask the contracting agency for a conformance on Standard Form 1444 before the first week of that work, and note it as pending on the payroll.
Does modification 1 apply to my contract?
Only if it was in force when your contract was awarded (generally at bid opening). An earlier modification locked into the contract keeps applying, except on option years, added scope and indefinite-quantity contracts. The number and modification are on the first page of the exhibit in your contract.

How to read a wage determination · Paying the fringe in cash or through plans · Overtime on these rates · Fringe credit calculator