Prevailing wage rates · Kansas · Wage determination
Prevailing wage rates: Pottawatomie County, Kansas
Building construction · KS20260055 modification 1, published May 18, 2026
The short answer
This sheet sets 38 classifications for building work in Pottawatomie County, Kansas. Each line is a basic hourly rate plus a fringe rate, and the sum is the minimum you must pay for that work, from $15.04 an hour (laborer: common or general) to $99.13 (elevator mechanic a. vacation pay). Your contract may lock an earlier modification.
Rates by classification
Total is the basic rate plus the fringe. Source is the agreement or survey the rate came from; a marker means the group changed in this modification. A dagger (†) means the fringe carries a footnote or percentage the total does not include; read the group’s notes.
| Classification | Basic rate | Fringe | Total | Source |
|---|---|---|---|---|
| ASBE0027-005 · Asbestos Workers and Heat & Frost Insulators agreement, October 6, 2025 | ||||
ASBESTOS WORKER/HEAT & FROST INSULATOR…Full textASBESTOS WORKER/HEAT & FROST INSULATOR (MECHANICAL (DUCT, PIPE & MECHANICAL SYSTEM INSULATION)) | $45.60 | $35.47 | $81.07 | Agreement |
| BRKS0015-011 · Bricklayers agreement, June 1, 2025 | ||||
| TILE SETTER | $42.73 | $18.39 | $61.12 | Agreement |
| BRKS0015-013 · Bricklayers agreement, April 1, 2020 | ||||
| BRICKLAYER | $28.34 | $10.33 | $38.67 | Agreement |
| BRKS0015-014 · Bricklayers agreement, June 1, 2025 | ||||
| TILE FINISHER | $20.74 | $1.46 | $22.20 | Agreement |
| CARP0918-002 · Carpenters agreement, May 1, 2024 | ||||
| CARPENTER (DRYWALL HANGING ONLY) | $28.34 | $14.08 | $42.42 | Agreement |
| ELEC0226-003 · Electrical Workers (IBEW) agreement, September 1, 2025 | ||||
| ELECTRICIAN | $44.05 | $20.25 | $64.30 | Agreement |
| ELEV0012-004 · Elevator Constructors agreement, January 1, 2025 | ||||
ELEVATOR MECHANIC A. VACATION PAY…Full textELEVATOR MECHANIC A. VACATION PAY: 6% FOR 6 MONTHS TO 5 YEARS SERVICE; 8% WITH 5 OR MORE YEARS OF SERVICE. B. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS DAY, THANKSGIVING DAY AND FRIDAY AFTER, AND CHRISTMAS DAY | $60.69 | $38.44 | $99.13 | Agreement |
| ENGI0101-041 · Operating Engineers agreement, April 1, 2025 | ||||
| POWER EQUIPMENT OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | $45.48 | $22.42 | $67.90 | Agreement |
| POWER EQUIPMENT OPERATOR: OILER | $39.93 | $22.42 | $62.35 | Agreement |
| IRON0010-034 · Ironworkers agreement, April 1, 2025 | ||||
| IRONWORKER: ORNAMENTAL | $36.00 | $34.25 | $70.25 | Agreement |
| LABO1290-017 · Laborers agreement, April 1, 2023 | ||||
| LABORER: MASON TENDER - BRICK | $17.20 | $10.27 | $27.47 | Agreement |
| PAIN2012-009 · Painters and Allied Trades agreement, April 1, 2025 | ||||
| PAINTER (SPRAY) | $36.18 | $19.97 | $56.15 | Agreement |
| PLUM0441-017 · Plumbers and Pipefitters agreement, June 30, 2025 | ||||
| PLUMBER | $45.90 | $19.94 | $65.84 | Agreement |
| PLUM0441-018 · Plumbers and Pipefitters agreement, June 30, 2025 | ||||
| PIPEFITTER | $45.90 | $19.94 | $65.84 | Agreement |
| SFKS0669-002 · SFKS, April 1, 2025 | ||||
| SPRINKLER FITTER: FIRE SPRINKLER | $41.83 | $27.60 | $69.43 | SFKS |
| SHEE0002-011 · Sheet Metal Workers agreement, July 1, 2024 | ||||
| SHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY) | $52.18 | $27.15 | $79.33 | Agreement |
| SUKS2015-024 · Survey of contractors in KS, July 8, 2015 | ||||
| TRUCK DRIVER: DUMP (ALL TYPES) | $17.05 | $0.00 | $17.05 | Survey |
| SHEET METAL WORKER, EXCLUDES HVAC DUCT AND UNIT INSTALLATION | $29.93 | $13.32 | $43.25 | Survey |
| ROOFER | $22.87 | $6.84 | $29.71 | Survey |
| PAINTER (BRUSH AND ROLLER) | $22.07 | $0.97 | $23.04 | Survey |
| OPERATOR: ROLLER | $33.78 | $13.64 | $47.42 | Survey |
| OPERATOR: LOADER | $26.30 | $11.62 | $37.92 | Survey |
| OPERATOR: GRADER/BLADE | $28.79 | $12.73 | $41.52 | Survey |
| OPERATOR: FORKLIFT | $37.92 | $0.00 | $37.92 | Survey |
| OPERATOR: CRANE | $33.19 | $14.16 | $47.35 | Survey |
| OPERATOR: BULLDOZER | $33.12 | $13.96 | $47.08 | Survey |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $27.78 | $12.58 | $40.36 | Survey |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $31.56 | $11.28 | $42.84 | Survey |
| LABORER: MASON TENDER - CEMENT/CONCRETE | $17.86 | $1.01 | $18.87 | Survey |
| LABORER: COMMON OR GENERAL | $13.19 | $1.85 | $15.04 | Survey |
| IRONWORKER, STRUCTURAL | $29.00 | $25.35 | $54.35 | Survey |
| IRONWORKER, REINFORCING | $27.22 | $21.91 | $49.13 | Survey |
| CEMENT MASON/CONCRETE FINISHER | $19.88 | $0.00 | $19.88 | Survey |
| CARPENTER, EXCLUDES DRYWALL HANGING, AND FORM WORK | $16.31 | $0.00 | $16.31 | Survey |
| CARPENTER (FORM WORK ONLY) | $15.08 | $0.00 | $15.08 | Survey |
| TEAM0541-010 · Teamsters agreement, April 1, 2025 | ||||
| TRUCK DRIVER: LOWBOY TRUCK | $39.89 | $15.85 | $55.74 | Agreement |
| TEAM0541-011 · Teamsters agreement, April 1, 2025 | ||||
| TRUCK DRIVER: SEMI-TRAILER TRUCK | $39.89 | $15.85 | $55.74 | Agreement |
| UAVGKS0003 · Union average, January 1, 2025 | ||||
| SHEET METAL WORKER (HVAC UNIT INSTALLATION ONLY) | $41.57 | $20.60 | $62.17 | Union average |
Modification history
| Modification 0 | January 2, 2026 |
| Modification 1 | May 18, 2026 (current) |
Published by the Wage and Hour Division; read from sam.gov. The sheet is checked for a newer modification each day. Contracts awarded since January 1, 2017 also carry Executive Order 13706 paid sick leave (one hour per 30 worked, up to 56 a year).
Questions people ask
- Which rate do I pay on KS20260055?
- The line for the classification of work actually performed: the basic rate plus the fringe. You may pay the fringe into benefit plans, as cash on every hour, or a mix. Overtime after 40 hours is 1.5 times the basic rate; fringe is paid on every hour and never multiplied.
- My trade is not on this sheet. What do I do?
- Do not borrow the nearest name. Ask the contracting agency for a conformance on Standard Form 1444 before the first week of that work, and note it as pending on the payroll.
- Does modification 1 apply to my contract?
- Only if it was in force when your contract was awarded (generally at bid opening). An earlier modification locked into the contract keeps applying, except on option years, added scope and indefinite-quantity contracts. The number and modification are on the first page of the exhibit in your contract.
How to read a wage determination · Paying the fringe in cash or through plans · Overtime on these rates · Fringe credit calculator