Prevailing wage rates · Kansas · Wage determination
Prevailing wage rates: Johnson County, Kansas
Building construction · KS20260052 modification 1, published May 18, 2026
The short answer
This sheet sets 42 classifications for building work in Johnson County, Kansas. Each line is a basic hourly rate plus a fringe rate, and the sum is the minimum you must pay for that work, from $12.48 an hour (laborer: landscape) to $99.13 (elevator mechanic a. vacation pay). Your contract may lock an earlier modification.
Rates by classification
Total is the basic rate plus the fringe. Source is the agreement or survey the rate came from; a marker means the group changed in this modification. A dagger (†) means the fringe carries a footnote or percentage the total does not include; read the group’s notes.
| Classification | Basic rate | Fringe | Total | Source |
|---|---|---|---|---|
| ASBE0027-005 · Asbestos Workers and Heat & Frost Insulators agreement, October 6, 2025 | ||||
ASBESTOS WORKER/HEAT & FROST INSULATOR…Full textASBESTOS WORKER/HEAT & FROST INSULATOR (MECHANICAL (DUCT, PIPE & MECHANICAL SYSTEM INSULATION)) | $45.60 | $35.47 | $81.07 | Agreement |
| BRKS0015-011 · Bricklayers agreement, June 1, 2025 | ||||
| TILE SETTER | $42.73 | $18.39 | $61.12 | Agreement |
| BRKS0015-012 · Bricklayers agreement, April 1, 2025 | ||||
| BRICKLAYER | $43.57 | $23.02 | $66.59 | Agreement |
| BRKS0015-014 · Bricklayers agreement, June 1, 2025 | ||||
| TILE FINISHER | $20.74 | $1.46 | $22.20 | Agreement |
| CARP0315-003 · Carpenters agreement, May 1, 2023 | ||||
| CARPENTER (ACOUSTICAL CEILING INSTALLATION ONLY) | $43.28 | $21.25 | $64.53 | Agreement |
| CARP0315-004 · Carpenters agreement, May 1, 2024 | ||||
CARPENTER (EXCLUDES ACOUSTICAL CEILING INSTALLATION…Full textCARPENTER (EXCLUDES ACOUSTICAL CEILING INSTALLATION, DRYWALL HANGING AND FLOOR LAYING CARPET) | $44.63 | $22.40 | $67.03 | Agreement |
| CARP1181-001 · Carpenters agreement, May 1, 2023 | ||||
| CARPENTER (FLOOR LAYING-CARPET ONLY) | $40.94 | $21.25 | $62.19 | Agreement |
| ELEC0124-010 · Electrical Workers (IBEW) agreement, November 25, 2019 | ||||
| ELECTRICIAN (LOW VOLTAGE WIRING ONLY) | $37.61 | $22.60 | $60.21 | Agreement |
| ELEC0124-011 · Electrical Workers (IBEW) agreement, August 26, 2024 | ||||
| ELECTRICIAN (EXCLUDES LOW VOLTAGE WIRING) | $51.01 | $26.25 | $77.26 | Agreement |
| ELEV0012-004 · Elevator Constructors agreement, January 1, 2025 | ||||
ELEVATOR MECHANIC A. VACATION PAY…Full textELEVATOR MECHANIC A. VACATION PAY: 6% FOR 6 MONTHS TO 5 YEARS SERVICE; 8% WITH 5 OR MORE YEARS OF SERVICE. B. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS DAY, THANKSGIVING DAY AND FRIDAY AFTER, AND CHRISTMAS DAY | $60.69 | $38.44 | $99.13 | Agreement |
| ENGI0101-042 · Operating Engineers agreement, April 1, 2025 | ||||
| POWER EQUIPMENT OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | $45.48 | $22.42 | $67.90 | Agreement |
| POWER EQUIPMENT OPERATOR: OILER | $39.93 | $22.42 | $62.35 | Agreement |
| POWER EQUIPMENT OPERATOR: GRADER/BLADE | $45.48 | $22.42 | $67.90 | Agreement |
| POWER EQUIPMENT OPERATOR: FORKLIFT | $44.14 | $22.42 | $66.56 | Agreement |
| POWER EQUIPMENT OPERATOR: CRANE | $45.89 | $22.42 | $68.31 | Agreement |
| POWER EQUIPMENT OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $45.48 | $22.42 | $67.90 | Agreement |
| POWER EQUIPMENT OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $45.48 | $22.42 | $67.90 | Agreement |
| IRON0010-032 · Ironworkers agreement, April 1, 2025 | ||||
| IRONWORKER: ORNAMENTAL, REINFORCING AND STRUCTURAL | $39.00 | $34.25 | $73.25 | Agreement |
| LABO1290-011 · Laborers agreement, April 1, 2019 | ||||
| LABORERS: ASPHALT, INCLUDES RAKER, SHOVELER, SPREADER AND DISTRIBUTOR | $31.99 | $16.03 | $48.02 | Agreement |
| LABO1290-012 · Laborers agreement, April 1, 2023 | ||||
| LABORER: COMMON OR GENERAL | $31.60 | $16.95 | $48.55 | Agreement |
| LABO1290-018 · Laborers agreement, April 1, 2023 | ||||
| LABORER: MASON TENDER - BRICK | $32.25 | $16.95 | $49.20 | Agreement |
| PAIN0558-006 · Painters and Allied Trades agreement, April 1, 2025 | ||||
| GLAZIER | $39.32 | $22.34 | $61.66 | Agreement |
| PAIN2012-008 · Painters and Allied Trades agreement, April 1, 2025 | ||||
| PAINTER: BRUSH, ROLLER, AND SPRAY | $36.18 | $19.97 | $56.15 | Agreement |
| PAIN2012-010 · Painters and Allied Trades agreement, April 1, 2025 | ||||
| PAINTER: DRYWALL FINISHING/TAPING | $36.18 | $19.97 | $56.15 | Agreement |
| PLAS0518-009 · Plasterers and Cement Masons agreement, April 1, 2025 | ||||
| CEMENT MASON/CONCRETE FINISHER | $40.13 | $20.50 | $60.63 | Agreement |
| PLUM0008-020 · Plumbers and Pipefitters agreement, June 1, 2023 | ||||
| PLUMBER | $54.28 | $23.79 | $78.07 | Agreement |
| PLUM0533-013 · Plumbers and Pipefitters agreement, June 1, 2024 | ||||
PIPEFITTER (INCLUDING HVAC PIPE…Full textPIPEFITTER (INCLUDING HVAC PIPE, UNIT, AND INSTALLATION OF HVAC ELECTRICIAL/TEMPERATURE CONTROLS) | $55.56 | $25.80 | $81.36 | Agreement |
| ROOF0020-021 · Roofers agreement, June 1, 2024 | ||||
| ROOFER | $38.45 | $22.29 | $60.74 | Agreement |
| SHEE0002-011 · Sheet Metal Workers agreement, July 1, 2024 | ||||
| SHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY) | $52.18 | $27.15 | $79.33 | Agreement |
| SHEE0002-012 · Sheet Metal Workers agreement, July 1, 2024 | ||||
| SHEET METAL WORKER (EXCLUDES HVAC DUCT INSTALLATION) | $52.18 | $27.15 | $79.33 | Agreement |
| SUKS2015-021 · Survey of contractors in KS, July 8, 2015 | ||||
| SPRINKLER FITTER (FIRE SPRINKLERS) | $26.68 | $11.61 | $38.29 | Survey |
| PLASTERER | $29.85 | $13.29 | $43.14 | Survey |
| OPERATOR: ROLLER | $32.68 | $13.57 | $46.25 | Survey |
| OPERATOR: LOADER | $30.35 | $12.04 | $42.39 | Survey |
| OPERATOR: BULLDOZER | $33.12 | $13.96 | $47.08 | Survey |
| LABORER: MASON TENDER - CEMENT/CONCRETE | $17.86 | $1.01 | $18.87 | Survey |
| LABORER: LANDSCAPE | $12.48 | $0.00 | $12.48 | Survey |
| LABORER: CONCRETE SAW (HAND HELD/WALK BEHIND) | $31.51 | $11.60 | $43.11 | Survey |
| CARPENTER (DRYWALL HANGING ONLY) | $30.00 | $1.62 | $31.62 | Survey |
| TEAM0541-010 · Teamsters agreement, April 1, 2025 | ||||
| TRUCK DRIVER: LOWBOY TRUCK | $39.89 | $15.85 | $55.74 | Agreement |
| TEAM0541-011 · Teamsters agreement, April 1, 2025 | ||||
| TRUCK DRIVER: SEMI-TRAILER TRUCK | $39.89 | $15.85 | $55.74 | Agreement |
| TEAM0541-012 · Teamsters agreement, April 1, 2025 | ||||
| TRUCK DRIVER: DUMP (ALL TYPES) | $39.89 | $15.85 | $55.74 | Agreement |
Modification history
| Modification 0 | January 2, 2026 |
| Modification 1 | May 18, 2026 (current) |
Published by the Wage and Hour Division; read from sam.gov. The sheet is checked for a newer modification each day. Contracts awarded since January 1, 2017 also carry Executive Order 13706 paid sick leave (one hour per 30 worked, up to 56 a year).
Questions people ask
- Which rate do I pay on KS20260052?
- The line for the classification of work actually performed: the basic rate plus the fringe. You may pay the fringe into benefit plans, as cash on every hour, or a mix. Overtime after 40 hours is 1.5 times the basic rate; fringe is paid on every hour and never multiplied.
- My trade is not on this sheet. What do I do?
- Do not borrow the nearest name. Ask the contracting agency for a conformance on Standard Form 1444 before the first week of that work, and note it as pending on the payroll.
- Does modification 1 apply to my contract?
- Only if it was in force when your contract was awarded (generally at bid opening). An earlier modification locked into the contract keeps applying, except on option years, added scope and indefinite-quantity contracts. The number and modification are on the first page of the exhibit in your contract.
How to read a wage determination · Paying the fringe in cash or through plans · Overtime on these rates · Fringe credit calculator