Prevailing wage rates · Kansas · Wage determination
Prevailing wage rates: Seward County, Kansas
Building construction · KS20260043 modification 1, published May 18, 2026
The short answer
This sheet sets 24 classifications for building work in Seward County, Kansas. Each line is a basic hourly rate plus a fringe rate, and the sum is the minimum you must pay for that work, from $11.40 an hour (laborer: common or general) to $99.13 (elevator mechanic a. vacation pay). Your contract may lock an earlier modification.
What changed this year
First published January 2, 2026, this sheet is now on modification 1, and its rates have changed in 1 modification. Of the 23 rates we can follow line by line from the first publication to today, 1 is higher.
If you bid the job or set pay from an earlier copy, find your trades below. The rates that bind you are the ones in the modification written into your contract.
Latest change
May 18, 2026 · modification 1
1 rate raised, 1 fringe formula changed; 1 classification added
- Asbestos worker/heat & frost insulator: 1 rate raised by $3.95 an hour
- Elevator mechanic a. vacation pay: 1 fringe formula changed
Every line that changed (2)
| Classification | Was | Now | Change |
|---|---|---|---|
| ASBESTOS WORKER/HEAT & FROST INSULATOR | $43.60 + $33.52 | $45.60 + $35.47 | +$3.95 (+5.1%) |
| ELEVATOR MECHANIC A. VACATION PAY: 6% FOR 6 MONTHS TO 5 YEARS SERVICE; 8% WITH 5 OR MORE… | $60.69 + 38.435+a+b | $60.69 + $38.44 | changed |
Classifications added or removed
- Added: ELECTRICIAN (HVAC/TEMPERATURE CONTROLS INSTALLATION ONLY) $38.75 + $18.52
Compared line by line from each modification as published on SAM.gov. A line we could not pair with certainty is left out rather than guessed.
Rates by classification
These are the rates in modification 1 as published on SAM.gov. The determination and modification written into your contract are the ones that bind you; check that number before relying on this table. Total is the basic rate plus the fringe. Source is the agreement or survey the rate came from and its year; a survey year long past means the rate has not been surveyed since. A marker means the group changed in this modification. In the Since column, a dash means SAM.gov reworded the line during the year and it cannot be matched to the first publication with certainty. A dagger (†) means the fringe carries a footnote or percentage the total does not include; read the group’s notes.
| Classification | Basic rate | Fringe | Total | Since Jan 2 | Source |
|---|---|---|---|---|---|
| ASBE0027-002 · Asbestos Workers and Heat & Frost Insulators agreement, October 6, 2025 | |||||
| ASBESTOS WORKER/HEAT & FROST INSULATOR | $45.60 | $35.47 | $81.07 | +$3.95 (+5.1%) | Agreement, 2025 |
| BRKS0015-015 · Bricklayers agreement, May 1, 2025 | |||||
| BRICKLAYER | $29.07 | $15.61 | $44.68 | no change | Agreement, 2025 |
| ELEV0012-004 · Elevator Constructors agreement, January 1, 2025 | |||||
ELEVATOR MECHANIC A. VACATION PAY…Full textELEVATOR MECHANIC A. VACATION PAY: 6% FOR 6 MONTHS TO 5 YEARS SERVICE; 8% WITH 5 OR MORE YEARS OF SERVICE. B. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS DAY, THANKSGIVING DAY AND FRIDAY AFTER, AND CHRISTMAS DAY | $60.69 | $38.44 | $99.13 | changed | Agreement, 2025 |
| IRON0010-031 · Ironworkers agreement, April 1, 2025 | |||||
| IRONWORKER, REINFORCING | $39.00 | $34.25 | $73.25 | no change | Agreement, 2025 |
| PAIN2012-007 · Painters and Allied Trades agreement, April 1, 2025 | |||||
| PAINTER: BRUSH AND ROLLER | $36.18 | $19.97 | $56.15 | no change | Agreement, 2025 |
| PLUM0441-015 · Plumbers and Pipefitters agreement, June 30, 2025 | |||||
| PIPEFITTER (EXCLUDES HVAC PIPE AND UNIT INSTALLATION) | $45.90 | $19.94 | $65.84 | no change | Agreement, 2025 |
| PLUM0441-016 · Plumbers and Pipefitters agreement, June 30, 2025 | |||||
| PIPEFITTER (HVAC PIPE INSTALLATION ONLY) | $45.90 | $19.94 | $65.84 | no change | Agreement, 2025 |
| SFKS0669-002 · SFKS, April 1, 2025 | |||||
| SPRINKLER FITTER: FIRE SPRINKLER | $41.83 | $27.60 | $69.43 | no change | SFKS |
| SHEE0002-016 · Sheet Metal Workers agreement, July 1, 2024 | |||||
| SHEET METAL WORKER (EXCLUDES HVAC DUCT AND UNIT INSTALLATION) | $52.18 | $27.15 | $79.33 | no change | Agreement, 2024 |
| SUKS2015-012 · Survey of contractors in KS, July 8, 2015 | |||||
| SHEET METAL WORKER (HVAC UNIT INSTALLATION ONLY) | $28.20 | $10.85 | $39.05 | no change | Survey, 2015 |
| SHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY) | $23.18 | $5.83 | $29.01 | no change | Survey, 2015 |
| ROOFER | $14.48 | $2.96 | $17.44 | no change | Survey, 2015 |
| PLUMBER, EXCLUDES HVAC PIPE AND UNIT INSTALLATION | $27.79 | $10.85 | $38.64 | no change | Survey, 2015 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $15.72 | $1.95 | $17.67 | no change | Survey, 2015 |
| METAL BUILDING ERECTOR | $11.19 | $1.83 | $13.02 | no change | Survey, 2015 |
| LABORER: COMMON OR GENERAL | $11.40 | $0.00 | $11.40 | no change | Survey, 2015 |
| IRONWORKER, STRUCTURAL | $23.02 | $15.09 | $38.11 | no change | Survey, 2015 |
| GLAZIER | $18.92 | $6.64 | $25.56 | no change | Survey, 2015 |
| FORM WORKER | $13.33 | $0.00 | $13.33 | no change | Survey, 2015 |
| ELECTRICIAN, EXCLUDES INSTALLATION OF HVAC/TEMPERATURE CONTROLS | $27.63 | $10.96 | $38.59 | no change | Survey, 2015 |
| CEMENT MASON/CONCRETE FINISHER | $18.01 | $3.33 | $21.34 | no change | Survey, 2015 |
| CARPENTER, EXCLUDES DRYWALL HANGING, AND FORM WORK | $19.04 | $3.95 | $22.99 | no change | Survey, 2015 |
| CARPENTER (DRYWALL HANGING ONLY) | $17.92 | $2.09 | $20.01 | no change | Survey, 2015 |
| UAVGKS0001 · Union average, January 1, 2025 | |||||
| ELECTRICIAN (HVAC/TEMPERATURE CONTROLS INSTALLATION ONLY) | $38.75 | $18.52 | $57.27 | — | Union average |
Modification history
| Modification 0 | January 2, 2026 |
| Modification 1 | May 18, 2026 (current) |
Published by the Wage and Hour Division; read from sam.gov. The sheet is checked for a newer modification each day. Contracts awarded since January 1, 2017 also carry Executive Order 13706 paid sick leave (one hour per 30 worked, up to 56 a year).
Questions people ask
- Which rate do I pay on KS20260043?
- The line for the classification of work actually performed: the basic rate plus the fringe. You may pay the fringe into benefit plans, as cash on every hour, or a mix. Overtime after 40 hours is 1.5 times the basic rate; fringe is paid on every hour and never multiplied.
- My trade is not on this sheet. What do I do?
- Do not borrow the nearest name. Ask the contracting agency for a conformance on Standard Form 1444 before the first week of that work, and note it as pending on the payroll.
- Does modification 1 apply to my contract?
- Only if it was in force when your contract was awarded (generally at bid opening). An earlier modification locked into the contract keeps applying, except on option years, added scope and indefinite-quantity contracts. The number and modification are on the first page of the exhibit in your contract.
How to read a wage determination · Paying the fringe in cash or through plans · Overtime on these rates · Fringe credit calculator
Put these rates on a certified payroll.
Start here and KS20260043 is already filled in when you set up the job. CertifiedHours loads this sheet, checks every line against it as you type hours, and prints the WH-347. Free for one payroll a month.
Start a payroll on this sheetOn this sheet
- 24 classifications in 11 rate groups
- 8 from agreements, 1 from surveys
- Counties: Seward