Prevailing wage rates · Indiana · Wage determination
Prevailing wage rates: Adams, Allen, Bartholomew and 85 more counties, Indiana
Heavy, Highway construction · IN20260006 modification 3, published July 30, 2026
The short answer
This sheet sets 271 classifications for heavy, highway work in Adams, Allen, Bartholomew and 85 more counties, Indiana. Each line is a basic hourly rate plus a fringe rate, and the sum is the minimum you must pay for that work, from $33.10 an hour (hazardous material handler) to $98.43 (glazier (newton county, west of highway #41)). Your contract may lock an earlier modification.
Scope
Heavy Construction
Highway Construction
Rates by classification
Total is the basic rate plus the fringe. Source is the agreement or survey the rate came from; a marker means the group changed in this modification. A dagger (†) means the fringe carries a footnote or percentage the total does not include; read the group’s notes.
| Classification | Basic rate | Fringe | Total | Source |
|---|---|---|---|---|
| ASBE0008-004 · Asbestos Workers and Heat & Frost Insulators agreement, July 1, 2017 | ||||
HAZARDOUS MATERIAL HANDLER…Full textHAZARDOUS MATERIAL HANDLER: INCLUDES PREPARATION, WETTINGS, STRIPPING, REMOVAL, SCRAPPING, VACUUMING, BAGGING & DISPOSING OF ALL INSULATION MATERIALS, WHETHER THEY CONTAIN ASBESTOS OR NOT, FROM MECHANICAL SYSTEMS (DEARBORN, FAYETTE, FRANKLIN, OHIO, RIPLEY SWITZERLAND AND UNION COUNTIES) | $25.00 | $13.70 | $38.70 | Agreement |
| ASBE0008-004 · Asbestos Workers and Heat & Frost Insulators agreement, March 1, 2025 | ||||
ASBESTOS WORKERS/INSULATOR…Full textASBESTOS WORKERS/INSULATOR: INCLUDES APPLICATION OF ALL INSULATING MATERIALS, PROTECTIVE COVERINGS, COATINGS & FINISHINGS TO ALL TYPES OF MECHANICAL SYSTEMS (DEARBORN, FAYETTE, FRANKLIN, OHIO, RIPLEY SWITZERLAND AND UNION COUNTIES) | $35.23 | $22.79 | $58.02 | Agreement |
| ASBE0017-008 · Asbestos Workers and Heat & Frost Insulators agreement, June 1, 2025 | ||||
| ASBESTOS WORKER/HEAT & FROST INSULATOR (NEWTON COUNTY) | $56.02 | $37.24 | $93.26 | Agreement |
HAZARDOUS MATERIAL HANDLER…Full textHAZARDOUS MATERIAL HANDLER: INCLUDES PREPARATION, WETTING, STRIPPING REMOVAL SCRAPPING, VACUUMING, BAGGING AND DISPOSAL OF ALL INSULATION MATERIALS, WHETHER THEY CONTAIN ASBESTOS OR NOT, FROM MECHAINCAL SYSTEMS (NEWTON COUNTY) | $44.82 | $34.00 | $78.82 | Agreement |
| ASBE0018-005 · Asbestos Workers and Heat & Frost Insulators agreement, June 1, 2017 | ||||
HAZARDOUS MATERIAL HANDLER…Full textHAZARDOUS MATERIAL HANDLER: INCLUDES PREPARATION, WETTINGS, STRIPPING, REMOVAL, SCRAPPING, VACUUMING, BAGGING & DISPOSING OF ALL INSULATION MATERIALS, WHETHER THEY CONTAIN ASBESTOS OR NOT, FROM MECHANICAL SYSTEMS (BROWN, BARTHOLOMEW, BENTON, BOONE, CARROLL, CASS, CLAY, CLINTON, DECATUR, DELAWARE, ELKHART. FOUNTAIN, FULTON, GREENE, HAMILTON, HANCOCK, HENDRICKS, HENRY, HOWARD, JASPER, JOHNSON, KOSCIUSKO, LAGRANGE, MARSHALL, MADISON, MARION, MONROE, MONTGOMERY, MORGAN, OWEN, PARKE, PULASKI, P | $23.00 | $14.40 | $37.40 | Agreement |
| ASBE0018-005 · Asbestos Workers and Heat & Frost Insulators agreement, June 1, 2025 | ||||
ASBESTOS WORKER/HEAT &…Full textASBESTOS WORKER/HEAT & FROST INSULATOR: INCLUDES APPLICATION OF ALL INSULATING MATERIALS, PROTECTIVE COVERINGS, COATINGS AND FINISHINGS TO ALL TYPES OF MECHANICAL SYSTEMS (BROWN, BARTHOLOMEW, BENTON, BOONE, CARROLL, CASS, CLAY, CLINTON, DECATUR, DELAWARE, ELKHART. FOUNTAIN, FULTON, GREENE, HAMILTON, HANCOCK, HENDRICKS, HENRY, HOWARD, JASPER, JOHNSON, KOSCIUSKO, LAGRANGE, MARSHALL, MADISON, MARION, MONROE, MONTGOMERY, MORGAN, OWEN, PARKE, PULASKI, PUTNAM, RUSH, SHELBY, STARKE, TIPPECANOE, TI | $40.20 | $25.68 | $65.88 | Agreement |
| ASBE0037-004 · Asbestos Workers and Heat & Frost Insulators agreement, June 1, 2023 | ||||
HAZARDOUS MATERIAL HANDLER…Full textHAZARDOUS MATERIAL HANDLER: INCLUDES PREPARATION, WETTING, STRIPPING, REMOVAL, SCRAPPING, VACUUMING, BAGGING AND DISPOSING OF ALL INSULATION MATERIALS, WHETHER THEY CONTAIN ASBESTOS OR NOT, FROM MECHANICAL SYSTEMS (DAVIESS, DUBOIS, GIBSON, KNOX, MARTIN, PIKE, POSEY, SPENCER, SULLIVAN, VANDERBURGH AND WARRICK COUNTIES) | $33.44 | $21.84 | $55.28 | Agreement |
| ASBE0037-004 · Asbestos Workers and Heat & Frost Insulators agreement, April 5, 2025 | ||||
ASBESTOS WORKER/HEAT & FROST INSULATOR…Full textASBESTOS WORKER/HEAT & FROST INSULATOR: INCLUDES APPLICATION OF ALL INSULATING MATERIALS PROTECTIVE COVERINGS, COATINGS AN FINISHES TO ALL TYPES OF MECHANICAL SYSTEMS. ALSO THE APPLICATION OF FIRESTOPPING, MATERIAL OPENINGS AND PENETRATIONS IN WALLS, FLOORS, CEILINGS, CURTAIN WALLS AND ALL LEAD ABATEMENT. (DAVIESS, DUBOIS, GIBSON, KNOX, MARTIN, PIKE, POSEY, SPENCER, SULLIVAN, VANDERBURGH AND WARRICK COUNTIES) | $38.19 | $23.59 | $61.78 | Agreement |
| ASBE0041-002 · Asbestos Workers and Heat & Frost Insulators agreement, June 1, 2024 | ||||
HAZARDOUS MATERIAL HANDLER…Full textHAZARDOUS MATERIAL HANDLER: INCLUDES PREPARATION, WETTINGS, STRIPPING, REMOVAL, SCRAPPING, VACCUMING, BAGGING & DISPOSING OF ALL INSULATION MATERIALS, WHETHER THEY CONTAIN ASBESTOS OR NOT, FROM MECHANICAL SYSTEMS (ADAMS, ALLEN, BLACKFORD, DE KALB, GRANT, HUNTINGTON, JAY, MIAMI, NOBLE, STEUBEN, WABASH, WELLS AND WHITLEY COUNTIES:) | $35.10 | $19.39 | $54.49 | Agreement |
| ASBE0041-002 · Asbestos Workers and Heat & Frost Insulators agreement, March 1, 2025 | ||||
ASBESTOS WORKER/HEAT & FROST INSULATOR…Full textASBESTOS WORKER/HEAT & FROST INSULATOR: INCLUDES APPLICATION OF ALL INSULATING MATERIALS, PROTECTIVE COVERINGS, COATINGS AND FINISHINGS TO ALL TYPES OF MECHANICAL SYSTEMS (ADAMS, ALLEN, BLACKFORD, DE KALB, GRANT, HUNTINGTON, JAY, MIAMI, NOBLE, STEUBEN, WABASH, WELLS AND WHITLEY COUNTIES:) | $37.25 | $19.85 | $57.10 | Agreement |
| ASBE0051-003 · Asbestos Workers and Heat & Frost Insulators agreement, June 1, 2017 | ||||
HAZARDOUS MATERIAL HANDLER…Full textHAZARDOUS MATERIAL HANDLER: INCLUDES PREPARATION, WETTINGS, STRIPPING, REMOVAL, SCRAPPING, VACCUMING, BAGGING & DISPOSING OF ALL INSULATION MATERIALS, WHETHER THEY CONTAIN ASBESTOS OR NOT, FROM MECHANICAL SYSTEMS (CLARK, CRAWFORD. FLOYD, HARRISON, JACKSON, JEFFERSON, JENNINGS, LAWRENCE, ORANGE, PERRY, SCOTT, AND WASHINGTON COUNTIES) | $19.80 | $13.30 | $33.10 | Agreement |
| ASBE0051-003 · Asbestos Workers and Heat & Frost Insulators agreement, March 1, 2025 | ||||
ASBESTOS WORKER/HEAT & FROST INSULATOR…Full textASBESTOS WORKER/HEAT & FROST INSULATOR: INCLUDES APPLICATION OF ALL INSULATING MATERIALS, PROTECTIVE COVERINGS, COATINGS AND FINISHINGS TO ALL TYPES OF MECHANICAL SYSTEMS (CLARK, CRAWFORD. FLOYD, HARRISON, JACKSON, JEFFERSON, JENNINGS, LAWRENCE, ORANGE, PERRY, SCOTT, AND WASHINGTON COUNTIES) | $30.00 | $20.89 | $50.89 | Agreement |
| ASBE0079-002 · Asbestos Workers and Heat & Frost Insulators agreement, March 1, 2024 | ||||
HAZARDOUS MATERIAL HANDLER…Full textHAZARDOUS MATERIAL HANDLER: INCLUDES PREPARATION, WETTING, STRIPPING, REMOVAL, SCRAPPING, VACUUMING, BAGGING & DISPOSING OF ALL INSULATION MATERIALS, WHETHER THEY CONTAIN ASBESTOS OR NOT, FROM MECHANICAL SYSTEMS) (RANDOLPH AND WAYNE COUNTIES) | $38.56 | $18.70 | $57.26 | Agreement |
| ASBE0079-002 · Asbestos Workers and Heat & Frost Insulators agreement, July 1, 2024 | ||||
ASBESTOS WORKER/HEAT & FROST INSULATOR…Full textASBESTOS WORKER/HEAT & FROST INSULATOR: INCLUDES APPLICATION OF ALL INSULATING MATERIALS, PROTECTIVE COVERINGS, COATINGS & FINISHINGS TO ALL TYPES OF MECHANICAL SYSTEMS (RANDOLPH AND WAYNE COUNTIES) | $38.56 | $18.70 | $57.26 | Agreement |
| BRIN0003-001 · Bricklayers agreement, June 1, 2023 | ||||
BRICKLAYER, STONE MASON…Full textBRICKLAYER, STONE MASON, POINTER, CAULKING (INDIANAPOLIS BOONE, HANCOCK, HENDRICKS, JOHNSON, MARION, MONTGOMERY, MORGAN AND SHELBY COUNTIES) | $36.24 | $17.39 | $53.63 | Agreement |
TERRAZZO FINISHER (INDIANAPOLIS BOONE…Full textTERRAZZO FINISHER (INDIANAPOLIS BOONE, HANCOCK, HENDRICKS, JOHNSON, MARION, MONTGOMERY, MORGAN AND SHELBY COUNTIES) | $23.38 | $13.15 | $36.53 | Agreement |
TERRAZZO WORKER/SETTER…Full textTERRAZZO WORKER/SETTER (INDIANAPOLIS BOONE, HANCOCK, HENDRICKS, JOHNSON, MARION, MONTGOMERY, MORGAN AND SHELBY COUNTIES) | $36.38 | $17.24 | $53.62 | Agreement |
TILE & MARBLE FINISHER…Full textTILE & MARBLE FINISHER (INDIANAPOLIS BOONE, HANCOCK, HENDRICKS, JOHNSON, MARION, MONTGOMERY, MORGAN AND SHELBY COUNTIES) | $24.33 | $13.16 | $37.49 | Agreement |
TILE, MARBLE SETTER…Full textTILE, MARBLE SETTER (INDIANAPOLIS BOONE, HANCOCK, HENDRICKS, JOHNSON, MARION, MONTGOMERY, MORGAN AND SHELBY COUNTIES) | $35.63 | $17.23 | $52.86 | Agreement |
| BRIN0004-004 · Bricklayers agreement, June 1, 2024 | ||||
BRICKLAYER: STONE MASON…Full textBRICKLAYER: STONE MASON, MARBLE MASONS, POINTER, CLEANER, AND CAULKER (FORT WAYNE ADAMS, ALLEN, DEKALB, HUNTINGTON, NOBLE, STEUBEN, WELLS AND WHITLEY COUNTIES:) | $35.00 | $21.60 | $56.60 | Agreement |
TERRAZZO GRINDER FINISHER…Full textTERRAZZO GRINDER FINISHER (FORT WAYNE ADAMS, ALLEN, DEKALB, HUNTINGTON, NOBLE, STEUBEN, WELLS AND WHITLEY COUNTIES:) | $31.00 | $17.89 | $48.89 | Agreement |
TERRAZZO WORKER MECHANIC…Full textTERRAZZO WORKER MECHANIC (FORT WAYNE ADAMS, ALLEN, DEKALB, HUNTINGTON, NOBLE, STEUBEN, WELLS AND WHITLEY COUNTIES:) | $36.30 | $22.04 | $58.34 | Agreement |
TILE SETTER & MARBLE MASON MECHANIC…Full textTILE SETTER & MARBLE MASON MECHANIC (FORT WAYNE ADAMS, ALLEN, DEKALB, HUNTINGTON, NOBLE, STEUBEN, WELLS AND WHITLEY COUNTIES:) | $31.55 | $19.08 | $50.63 | Agreement |
TILE, MARBLE & TERRAZZO FINISHER…Full textTILE, MARBLE & TERRAZZO FINISHER (FORT WAYNE ADAMS, ALLEN, DEKALB, HUNTINGTON, NOBLE, STEUBEN, WELLS AND WHITLEY COUNTIES:) | $31.55 | $19.08 | $50.63 | Agreement |
| BRIN0004-005 · Bricklayers agreement, June 1, 2024 | ||||
| BRICKLAYER (CRAWFORD, DUBOIS, PERRY, POSEY, SPENCER, VANDERBURGH, AND WARRICK COUNTIES) | $35.34 | $21.72 | $57.06 | Agreement |
| TILE FINISHER (CRAWFORD, DUBOIS, PERRY, POSEY, SPENCER, VANDERBURGH, AND WARRICK COUNTIES) | $29.08 | $17.32 | $46.40 | Agreement |
| TILE SETTER (CRAWFORD, DUBOIS, PERRY, POSEY, SPENCER, VANDERBURGH, AND WARRICK COUNTIES) | $29.08 | $17.32 | $46.40 | Agreement |
| BRIN0004-009 · Bricklayers agreement, June 1, 2024 | ||||
BRICKLAYER, STONEMASON…Full textBRICKLAYER, STONEMASON (BARTHOLOMEW, BROWN, DEARBORN, DECATUR, JENNINGS, MONROE, OHIO, OWENS, RIPLEY AND SWITZERLAND COUNTIES) | $35.21 | $18.19 | $53.40 | Agreement |
TERRAZZO FINISHER (BARTHOLOMEW…Full textTERRAZZO FINISHER (BARTHOLOMEW, BROWN, DEARBORN, DECATUR, JENNINGS, MONROE, OHIO, OWENS, RIPLEY AND SWITZERLAND COUNTIES) | $25.33 | $14.19 | $39.52 | Agreement |
TERRAZZO WORKER/SETTER…Full textTERRAZZO WORKER/SETTER (BARTHOLOMEW, BROWN, DEARBORN, DECATUR, JENNINGS, MONROE, OHIO, OWENS, RIPLEY AND SWITZERLAND COUNTIES) | $37.97 | $18.06 | $56.03 | Agreement |
TILE & MARBLE FINISHER…Full textTILE & MARBLE FINISHER (BARTHOLOMEW, BROWN, DEARBORN, DECATUR, JENNINGS, MONROE, OHIO, OWENS, RIPLEY AND SWITZERLAND COUNTIES) | $25.33 | $14.19 | $39.52 | Agreement |
TILE, MARBLE SETTER…Full textTILE, MARBLE SETTER (BARTHOLOMEW, BROWN, DEARBORN, DECATUR, JENNINGS, MONROE, OHIO, OWENS, RIPLEY AND SWITZERLAND COUNTIES) | $37.22 | $18.05 | $55.27 | Agreement |
| BRIN0004-010 · Bricklayers agreement, June 1, 2024 | ||||
BRICKLAYER: BRICKLAYERS…Full textBRICKLAYER: BRICKLAYERS, STONEMASONS AND CEMENT MASONS (CLARK, FLOYD, AND HARRISON COUNTIES) | $33.70 | $16.57 | $50.27 | Agreement |
| BRIN0004-015 · Bricklayers agreement, June 1, 2024 | ||||
BRICKLAYER: BRICKLAYERS…Full textBRICKLAYER: BRICKLAYERS, STONE MASONS AND POINTER/ CLEANER/CAULKER (TERRE HAUTE CLAY, DAVIESS, GIBSON, GREENE, KNOX, MARTIN, PARKE, PIKE, PUTNAM, SULLIVAN, VERMILLION AND VIGO COUNTIES) | $38.16 | $18.22 | $56.38 | Agreement |
BRICKLAYER: CEMENT MASON…Full textBRICKLAYER: CEMENT MASON (REMAINING COUNTIES) (TERRE HAUTE CLAY, DAVIESS, GIBSON, GREENE, KNOX, MARTIN, PARKE, PIKE, PUTNAM, SULLIVAN, VERMILLION AND VIGO COUNTIES) | $37.16 | $18.22 | $55.38 | Agreement |
BRICKLAYER: TERRAZO FINISHER…Full textBRICKLAYER: TERRAZO FINISHER (TERRE HAUTE CLAY, DAVIESS, GIBSON, GREENE, KNOX, MARTIN, PARKE, PIKE, PUTNAM, SULLIVAN, VERMILLION AND VIGO COUNTIES) | $25.33 | $14.19 | $39.52 | Agreement |
BRICKLAYER: TERRAZZO WORKER…Full textBRICKLAYER: TERRAZZO WORKER (TERRE HAUTE CLAY, DAVIESS, GIBSON, GREENE, KNOX, MARTIN, PARKE, PIKE, PUTNAM, SULLIVAN, VERMILLION AND VIGO COUNTIES) | $37.97 | $18.06 | $56.03 | Agreement |
BRICKLAYER: TILE LAYER…Full textBRICKLAYER: TILE LAYER, MARBLE MASON, MOSAIC WORKER (TERRE HAUTE CLAY, DAVIESS, GIBSON, GREENE, KNOX, MARTIN, PARKE, PIKE, PUTNAM, SULLIVAN, VERMILLION AND VIGO COUNTIES) | $38.16 | $18.22 | $56.38 | Agreement |
| BRIN0004-016 · Bricklayers agreement, June 1, 2024 | ||||
BRICKLAYER, STONEMASON…Full textBRICKLAYER, STONEMASON, POINTER, CAULKER & CLEANER (MUNCIE BLACKFORD, DELAWARE, FAYETTE, FRANKLIN, HAMILTON, HENRY, JAY, MADISON, RANDOLPH, RUSH, TIPTON, UNION AND WAYNE COUNTIES) | $35.83 | $20.89 | $56.72 | Agreement |
TERRAZZO FINISHER (MUNCIE BLACKFORD…Full textTERRAZZO FINISHER (MUNCIE BLACKFORD, DELAWARE, FAYETTE, FRANKLIN, HAMILTON, HENRY, JAY, MADISON, RANDOLPH, RUSH, TIPTON, UNION AND WAYNE COUNTIES) | $25.33 | $14.19 | $39.52 | Agreement |
TERRAZZO WORKER/SETTER…Full textTERRAZZO WORKER/SETTER (MUNCIE BLACKFORD, DELAWARE, FAYETTE, FRANKLIN, HAMILTON, HENRY, JAY, MADISON, RANDOLPH, RUSH, TIPTON, UNION AND WAYNE COUNTIES) | $37.97 | $18.06 | $56.03 | Agreement |
TILE & MARBLE FINISHER…Full textTILE & MARBLE FINISHER (MUNCIE BLACKFORD, DELAWARE, FAYETTE, FRANKLIN, HAMILTON, HENRY, JAY, MADISON, RANDOLPH, RUSH, TIPTON, UNION AND WAYNE COUNTIES) | $25.33 | $14.19 | $39.52 | Agreement |
TILE & MARBLE SETTER…Full textTILE & MARBLE SETTER; MOSAIC WORKER (MUNCIE BLACKFORD, DELAWARE, FAYETTE, FRANKLIN, HAMILTON, HENRY, JAY, MADISON, RANDOLPH, RUSH, TIPTON, UNION AND WAYNE COUNTIES) | $35.83 | $20.89 | $56.72 | Agreement |
| BRIN0006-001 · Bricklayers agreement, June 1, 2023 | ||||
BRICKLAYER: INCLUDING STONEMASON…Full textBRICKLAYER: INCLUDING STONEMASON, AND POINTER, CAULKER & CLEANER (JASPER, NEWTON & STARKE COUNTIES) | $42.05 | $28.22 | $70.27 | Agreement |
| TILE, MARBLE & TERRAZZO WORKER (JASPER, NEWTON & STARKE COUNTIES) | $42.05 | $28.22 | $70.27 | Agreement |
| BRIN0011-001 · Bricklayers agreement, June 1, 2023 | ||||
BRICKLAYER, STONEMASON…Full textBRICKLAYER, STONEMASON, POINTER, CAULKER & CLEANER (LAFAYETTE BENTON, CARROLL, CLINTON, FOUNTAIN, TIPPECANOE, WARREN AND WHITE COUNTIES) | $33.75 | $20.12 | $53.87 | Agreement |
TERRAZZO FINISHER (LAFAYETTE BENTON…Full textTERRAZZO FINISHER (LAFAYETTE BENTON, CARROLL, CLINTON, FOUNTAIN, TIPPECANOE, WARREN AND WHITE COUNTIES) | $23.38 | $13.15 | $36.53 | Agreement |
TERRAZZO WORKER/SETTER…Full textTERRAZZO WORKER/SETTER (LAFAYETTE BENTON, CARROLL, CLINTON, FOUNTAIN, TIPPECANOE, WARREN AND WHITE COUNTIES) | $36.38 | $17.24 | $53.62 | Agreement |
TILE & MARBLE FINISHER…Full textTILE & MARBLE FINISHER (LAFAYETTE BENTON, CARROLL, CLINTON, FOUNTAIN, TIPPECANOE, WARREN AND WHITE COUNTIES) | $24.33 | $13.16 | $37.49 | Agreement |
TILE & MARBLE SETTER…Full textTILE & MARBLE SETTER; MOSAIC WORKER (LAFAYETTE BENTON, CARROLL, CLINTON, FOUNTAIN, TIPPECANOE, WARREN AND WHITE COUNTIES) | $35.63 | $17.23 | $52.86 | Agreement |
| BRIN0018-002 · Bricklayers agreement, June 1, 2023 | ||||
BRICKLAYER, CAULKER…Full textBRICKLAYER, CAULKER, CLEANER, POINTER (CASS, ELKHART, FULTON, GRANT, HOWARD, KOSCUISKO, LAGRANGE, MARSHALL, MIAMI, PULASKI, WABASH) | $34.00 | $19.71 | $53.71 | Agreement |
| CARP0002-023 · Carpenters agreement, April 1, 2025 | ||||
| CARPENTER (DEARBORN, JACKSON, JENNINGS, OHIO, RIPLEY AND SWITZERLAND COUNTIES) | $31.09 | $28.53 | $59.62 | Agreement |
| CARP0133-001 · Carpenters agreement, April 1, 2025 | ||||
CARPENTER (BOONE, CLAY…Full textCARPENTER (BOONE, CLAY, FOUNTAIN, MONROE, MONTGOMERY, MORGAN, OWEN, PARKE, PUTNAM, VERMILLION AND VIGO COUNTIES) | $34.69 | $25.59 | $60.28 | Agreement |
| CARP0133-003 · Carpenters agreement, April 1, 2025 | ||||
CARPENTER (HAMILTON…Full textCARPENTER (HAMILTON, HANCOCK, HENDRICKS, JOHNSON (TOWNSHIPS OF CLARK, CAMP ATTERBURY NORTH OF HOSPITAL ROAD, PLEASANT, WHITE RIVER), AND MARION COUNTIES) | $35.80 | $25.59 | $61.39 | Agreement |
| CARP0175-004 · Carpenters agreement, April 1, 2025 | ||||
| CARPENTER (CLARK, FLOYD, HARRISON, JEFFERSON,SCOTT AND WASHINGTON COUNTIES) | $30.52 | $29.11 | $59.63 | Agreement |
| CARP0215-002 · Carpenters agreement, April 1, 2025 | ||||
| CARPENTER (BENTON, CARROLL, CLINTON, PULASKI, TIPPECANOE, WARREN AND WHITE COUNTIES) | $35.14 | $25.10 | $60.24 | Agreement |
| CARP0224-011 · Carpenters agreement, April 1, 2025 | ||||
CARPENTER (CRAWFORD…Full textCARPENTER (CRAWFORD, DUBOIS, PERRY, PIKE, POSEY, SPENCER, VANDERBURGH AND WARRICK COUNTIES:) | $30.59 | $29.03 | $59.62 | Agreement |
| CARP0224-012 · Carpenters agreement, April 1, 2025 | ||||
| CARPENTER (DAVIESS, GIBSON, GREENE, KNOX, LAWRENCE, MARTIN, ORANGE AND SULLIVAN COUNTIES:) | $30.94 | $29.08 | $60.02 | Agreement |
| CARP0232-003 · Carpenters agreement, April 1, 2025 | ||||
| CARPENTER (ALLEN, DEKALB, LAGRANGE, NOBLE, STEUBEN AND WHITLEY COUNTIES) | $33.74 | $25.84 | $59.58 | Agreement |
| CARP0301-001 · Carpenters agreement, April 1, 2025 | ||||
CARPENTER (BARTHOLOMEW…Full textCARPENTER (BARTHOLOMEW, BROWN,(CAMP ATTERBURY SOUTH OF HOSPITAL ROAD), DECATUR, FRANKLIN, JOHNSON (TOWNSHIPS OF BLUE RIVER, FRANKLIN, HENSLEY, NEEDHAM, NINEVEH, UNION) , RUSH AND SHELBY COUNTIES) | $34.25 | $25.59 | $59.84 | Agreement |
| CARP0413-003 · Carpenters agreement, April 1, 2025 | ||||
CARPENTER (ADAMS, CASS…Full textCARPENTER (ADAMS, CASS, ELKHART, FULTON, GRANT, HOWARD, HUNTINGTON, KOSCIUSKO, MARSHALL, MIAMI, TIPTON, WABASH AND WELLS COUNTIES:) | $34.06 | $25.67 | $59.73 | Agreement |
| CARP0999-001 · Carpenters agreement, June 1, 2025 | ||||
| CARPENTER (JASPER, NEWTON, AND STARKE COUNTIES) | $45.91 | $35.90 | $81.81 | Agreement |
| CARP1016-001 · Carpenters agreement, April 1, 2025 | ||||
CARPENTER (BLACKFORD…Full textCARPENTER (BLACKFORD, DELAWARE, FAYETTE, HENRY, JAY, MADISON, RANDOLPH, UNION AND WAYNE COUNTIES) | $34.55 | $25.59 | $60.14 | Agreement |
| CARP1076-004 · Carpenters agreement, April 1, 2016 | ||||
MILLWRIGHT (HAMILTON AND MARION COUNTIES…Full textMILLWRIGHT (HAMILTON AND MARION COUNTIES, AND THE FOLLOWING TOWNSHIPS IN JOHNSON COUNTY: CAMP ATTERBURY (NORTH OF HOSPITAL RD.), CLARK, PLEASANT, AND WHITE RIVER) | $26.81 | $19.28 | $46.09 | Agreement |
| CARP1076-005 · Carpenters agreement, June 1, 2025 | ||||
| MILLWRIGHT (JASPER, NEWTON, PULASKI, AND STARKE COUNTIES) | $47.92 | $37.23 | $85.15 | Agreement |
| CARP1076-006 · Carpenters agreement, June 1, 2025 | ||||
MILLWRIGHT (BARTHOLOMEW…Full textMILLWRIGHT (BARTHOLOMEW, BLACKFORD, BOONE, BROWN, CLAY, DECATUR, DELAWARE, FAYETTE, FOUNTAIN, FRANKLIN, HAMILTON, HANCOCK, HENDRICKS, HENRY, JAY, JOHNSON, MADISON, MARION, MONROE, MONTGOMERY, MORGAN, OWEN, PARKE, PUTNAM, RANDOLPH, RUSH, SHELBY, UNION, VERMILLION, VIGO, AND WAYNE COUNTIES) | $39.10 | $26.94 | $66.04 | Agreement |
| CARP1080-001 · Carpenters agreement, April 1, 2025 | ||||
| MILLWRIGHT: ZONE 1: POSEY, VANDERBURGH AND WARRICK COUNTIES | $36.30 | $28.37 | $64.67 | Agreement |
| MILLWRIGHT: ZONE 2: GIBSON, GREENE AND SULLIVAN COUNTIES | $35.00 | $29.33 | $64.33 | Agreement |
| ELEC0016-003 · Electrical Workers (IBEW) agreement, April 1, 2023 | ||||
ELECTRICIAN (CRAWFORD…Full textELECTRICIAN (CRAWFORD, DAVIESS, DUBOIS, GIBSON, LAWRENCE, MARTIN, ORANGE, PERRY, PIKE, POSEY, SPENCER, VANDERBURGH, WARRICK) | $41.04 | $18.94 | $59.98 | Agreement |
| ELEC0016-006 · Electrical Workers (IBEW) agreement, August 31, 2024 | ||||
ELECTRICIAN (COMMUNICATION TECHNICIAN ONLY)…Full textELECTRICIAN (COMMUNICATION TECHNICIAN ONLY) (CRAWFORD, DAVIESS, DUBOIS, GIBSON, LAWRENCE, MARTIN, ORANGE, PERRY, PIKE, POSEY, SPENCER, VANDERBURGH, WARRICK) | $33.98 | $18.04 | $52.02 | Agreement |
| ELEC0071-006 · Electrical Workers (IBEW) agreement, January 2, 2024 | ||||
| LINE CONSTRUCTION: EQUIPMENT OPERATOR (DEARBORN, OHIO, AND SWTIZERLAND COUNTIES) | $39.11 | $17.13 | $56.24 | Agreement |
| LINE CONSTRUCTION: GROUNDMAN (DEARBORN, OHIO, AND SWTIZERLAND COUNTIES) | $25.90 | $13.97 | $39.87 | Agreement |
| LINE CONSTRUCTION:: LINEMAN & CABLE SPLICERS (DEARBORN, OHIO, AND SWTIZERLAND COUNTIES) | $44.52 | $18.43 | $62.95 | Agreement |
| ELEC0153-003 · Electrical Workers (IBEW) agreement, June 3, 2019 | ||||
| COMMUNICATION TECHNICIAN (ELKHART, KOSCIUSKO AND MARSHALL COUNTIES) | $26.50 | $18.33 | $44.83 | Agreement |
| ELEC0153-003 · Electrical Workers (IBEW) agreement, June 1, 2025 | ||||
| ELECTRICIAN (ELKHART, KOSCIUSKO AND MARSHALL COUNTIES) | $46.00 | $29.23 | $75.23 | Agreement |
| ELEC0212-002 · Electrical Workers (IBEW) agreement, November 30, 2023 | ||||
| ELECTRICIAN (COMMUNICATION TECHNICIAN ONLY) (DEARBORN, OHIO, AND SWITZERLAND COUNTIES) | $27.20 | $14.54 | $41.74 | Agreement |
| ELEC0212-009 · Electrical Workers (IBEW) agreement, June 7, 2025 | ||||
| ELECTRICIAN (DEARBORN, OHIO, AND SWITZERLAND COUNTIES) | $38.05 | $22.32 | $60.37 | Agreement |
| ELEC0305-003 · Electrical Workers (IBEW) agreement, December 1, 2024 | ||||
ELECTRICIAN (ADAMS…Full textELECTRICIAN (ADAMS, ALLEN, DE KALB, HUNTINGTON, LAGRANGE, NOBLE, STEUBEN, WELLS, AND WHITLEY COUNTIES) | $40.18 | $23.18 | $63.36 | Agreement |
| ELEC0305-004 · Electrical Workers (IBEW) agreement, August 31, 2024 | ||||
ELECTRICIAN (COMMUNICATION TECHNICIAN ONLY)…Full textELECTRICIAN (COMMUNICATION TECHNICIAN ONLY) (ADAMS, ALLEN, DE KALB, HUNTINGTON, LAGRANGE, NOBLE, STEUBEN, WELLS, AND WHITLEY COUNTIES) | $36.00 | $21.51 | $57.51 | Agreement |
| ELEC0369-005 · Electrical Workers (IBEW) agreement, May 29, 2025 | ||||
| ELECTRICIAN (CLARK, FLOYD, HARRISON, JACKSON, JEFFERSON, SCOTT, AND WASHINGTON COUNTIES) | $40.96 | $22.44 | $63.40 | Agreement |
| ELEC0481-003 · Electrical Workers (IBEW) agreement, March 31, 2025 | ||||
ELECTRICIAN (BARTHOLOMEW…Full textELECTRICIAN (BARTHOLOMEW, BOONE, DECATUR, HAMILTON, HANCOCK, HENDRICKS, JENNINGS, JOHNSON, MADISON, MARION, MONTGOMERY, MORGAN, PUTNAM, RIPLEY, RUSH AND SHELBY COUNTIES) | $45.45 | $28.19 | $73.64 | Agreement |
| ELEC0481-004 · Electrical Workers (IBEW) agreement, January 1, 2023 | ||||
ELECTRICIAN (COMMUNICATION TECHNICIAN ONLY)…Full textELECTRICIAN (COMMUNICATION TECHNICIAN ONLY) (BARTHOLOMEW, BOONE, DECATUR, HAMILTON, HANCOCK, HENDRICKS, JENNINGS, JOHNSON, MADISON, MARION, MONTGOMERY, MORGAN, PUTNAM, RIPLEY, RUSH AND SHELBY COUNTIES) | $35.76 | $18.96 | $54.72 | Agreement |
| ELEC0531-002 · Electrical Workers (IBEW) agreement, May 31, 2025 | ||||
| ELECTRICIAN (JASPER, PULASKI, AND STARKE COUNTIES) | $49.00 | $32.89 | $81.89 | Agreement |
| ELEC0531-003 · Electrical Workers (IBEW) agreement, May 28, 2018 | ||||
| ELECTRICIAN (COMMUNICATION TECHNICIAN ONLY) (JASPER, PULASKI, AND STARKE COUNTIES) | $27.64 | $13.23 | $40.87 | Agreement |
| ELEC0538-005 · Electrical Workers (IBEW) agreement, June 1, 2025 | ||||
| ELECTRICIAN (FOUNTAIN, VERMILLION, AND WARREN COUNTIES) | $41.00 | $27.36 | $68.36 | Agreement |
| ELEC0538-009 · Electrical Workers (IBEW) agreement, September 1, 2025 | ||||
| ELECTRICIAN (COMMUNICATION TECHNICIAN ONLY) (FOUNTAIN, VERMILLION, AND WARREN COUNTIES) | $40.64 | $20.46 | $61.10 | Agreement |
| ELEC0668-001 · Electrical Workers (IBEW) agreement, June 1, 2023 | ||||
ELECTRICIAN (COMMUNICATION TECHNICIAN ONLY)…Full textELECTRICIAN (COMMUNICATION TECHNICIAN ONLY) (BENTON, CARROLL, CASS, FULTON, TIPPECANOE AND WHITE COUNTIES) | $33.02 | $16.10 | $49.12 | Agreement |
| ELEC0668-002 · Electrical Workers (IBEW) agreement, June 1, 2025 | ||||
| ELECTRICIAN (BENTON, CARROLL, CASS, FULTON, TIPPECANOE AND WHITE COUNTIES) FOOTNOTE: A. PAID HOLIDAYS: NEW YEARS DAY, MEMORIAL DAY, JULY 4TH, LABOR DAY, VETERANS DAY THANKSGIVING DAY AND CHRISTMAS DAY | $42.00 | $24.15 | $66.15 | Agreement |
| ELEC0697-003 · Electrical Workers (IBEW) agreement, August 31, 2025 | ||||
| ELECTRICIAN (COMMUNICATION TECHNICIAN ONLY) (NEWTON COUNTY) | $41.50 | $31.23 | $72.73 | Agreement |
| ELEC0697-006 · Electrical Workers (IBEW) agreement, June 1, 2024 | ||||
| ELECTRICIAN (NEWTON COUNTY) | $48.10 | $31.28 | $79.38 | Agreement |
| ELEC0702-003 · Electrical Workers (IBEW) agreement, January 2, 2025 | ||||
LINE CONSTRUCTION: GROUNDMAN…Full textLINE CONSTRUCTION: GROUNDMAN, CLASS A (DUBOIS, GIBSON, PERRY, PIKE, POSEY, SPENCER AND VANDERBURGH COUNTIES) | $33.96 | $19.04 | $53.00 | Agreement |
LINE CONSTRUCTION: GROUNDMAN-EQUIPMENT OPERATOR…Full textLINE CONSTRUCTION: GROUNDMAN-EQUIPMENT OPERATOR (ALL OTHER EQUIPMENT) (DUBOIS, GIBSON, PERRY, PIKE, POSEY, SPENCER AND VANDERBURGH COUNTIES) | $43.19 | $21.81 | $65.00 | Agreement |
LINE CONSTRUCTION: HEAVY-EQUIPMENT OPERATOR…Full textLINE CONSTRUCTION: HEAVY-EQUIPMENT OPERATOR: ALL CRAWLER TYPE EQUIPMENT D-4 AND LARGER) (DUBOIS, GIBSON, PERRY, PIKE, POSEY, SPENCER AND VANDERBURGH COUNTIES) | $49.30 | $23.64 | $72.94 | Agreement |
LINE CONSTRUCTION: LINEMAN…Full textLINE CONSTRUCTION: LINEMAN (DUBOIS, GIBSON, PERRY, PIKE, POSEY, SPENCER AND VANDERBURGH COUNTIES) | $60.15 | $26.90 | $87.05 | Agreement |
| ELEC0725-007 · Electrical Workers (IBEW) agreement, June 1, 2022 | ||||
COMMUNICATION TECHNICIAN…Full textCOMMUNICATION TECHNICIAN (BROWN, CLAY, GREENE, KNOX, MONROE, OWEN, PARKE, SULLIVAN AND VIGO COUNTIES) | $30.00 | $18.07 | $48.07 | Agreement |
| ELEC0725-014 · Electrical Workers (IBEW) agreement, October 1, 2024 | ||||
| ELECTRICIAN (BROWN, CLAY, GREENE, KNOX, MONROW, OWEN, PARKE, SULLIVAN AND VIGO COUNTIES) | $43.30 | $25.32 | $68.62 | Agreement |
| ELEC0855-002 · Electrical Workers (IBEW) agreement, June 1, 2025 | ||||
ELECTRICIAN (COMMUNICATION TECHNICIAN ONLY)…Full textELECTRICIAN (COMMUNICATION TECHNICIAN ONLY) (BLACKFORD, DELAWARE, FAYETTE, FRANKLIN, HENRY, JAY, RANDOLPH, UNION AND WAYNE COUNTIES) | $39.20 | $17.95 | $57.15 | Agreement |
| ELEC0855-004 · Electrical Workers (IBEW) agreement, June 1, 2025 | ||||
ELECTRICIAN (BLACKFORD…Full textELECTRICIAN (BLACKFORD, DELAWARE, FAYETTE, FRANKLIN, HENRY, JAY, RANDOLPH, UNION AND WAYNE COUNTIES) | $40.18 | $22.15 | $62.33 | Agreement |
| ELEC0873-001 · Electrical Workers (IBEW) agreement, June 1, 2021 | ||||
ELECTRICIAN (COMMUNICATION TECHNICIAN ONLY)…Full textELECTRICIAN (COMMUNICATION TECHNICIAN ONLY) (CLINTON, GRANT, HOWARD, MIAMI, TIPTON, AND WABASH COUNTIES) | $30.08 | $17.23 | $47.31 | Agreement |
| ELEC0873-002 · Electrical Workers (IBEW) agreement, March 1, 2025 | ||||
| ELECTRICIAN (CLINTON, GRANT, HOWARD, MIAMI, TIPTON AND WABASH COUNTIES:) | $42.02 | $23.07 | $65.09 | Agreement |
| ELEC1393-001 · Electrical Workers (IBEW) agreement, December 2, 2025 | ||||
| LINE CONSTRUCTION: GROUNDMAN TRUCK DRIVER (REMAINING COUNTIES) | $31.49 | $16.93 | $48.42 | Agreement |
| LINE CONSTRUCTION:: LINEMAN (REMAINING COUNTIES) | $50.28 | $22.38 | $72.66 | Agreement |
| ENGI0103-003 · Operating Engineers agreement, April 1, 2025 | ||||
POWER EQUIPMENT OPERATORS: GROUP 1…Full textPOWER EQUIPMENT OPERATORS: GROUP 1- AIR COMPRESSORS IN MANIFOLD WITH THROTTLE VALVE; ASPHALT PLANT ENGINEER; AUTO GRADE OR SIMILAR TYPE MACHINE; AUTO PATROL; BACKHOE OR FARM-TYPE TRACTOR, 45 HP AND OVER; BALLAST REGULATOR (RR); BITUMINOUS MIXER; BITUMINOUS PAVER; BITUMINOUS PLANT ENGINEER; BULLDOZER; CAISSON DRILLING MACHINE; CHERRY PICKER, 15 TON OR OVER; CHIP SPREADER; CONCRETE MIXER 21 CU. FT. OR OVER; CORE DRILLING MACHINE; CRANE OR DERRICK WITH ANY ATTACHMENT (INCLUDING CLAMSHELL, DRAGLINE, SHOVEL, BACKHOE, ETC.); DREDGE ENGINEER; DREDGE OPERATOR; DRILLING MACHINE ON WHICH THE DRILL IS AN INTEGRAL PART; EARTH MOVER, RUBBER-TIRED (PADDLE WHEEL, 616, 631, TS-24 OR SIMILAR TYPE); EARTH MOVER, RUBBER-TIRED, TANDEM ($0.50 PER HOUR ADDITIONAL FOR EACH BOWL); ELEVATING GRADER; FORK LIFT, 10 TON OR OVER; P.C.C. FORMLESS PAVER POST DRIVER; HIGHLIFT SHOVEL, 1 1/2 CU. YD. OR OVER; HOIST, 2 DRUMS AND OVER; HELICOPTER, CREW; HYDRAULIC BOOM TRUCK; KEYSTONE, SKIMMER SCOOP; LOADER, SELF-PROPELLED (BELT, CHAIN, WHEEL); LOCOMOTIVE OPERATOR; MECHANIC; MUCKING MACHINE; PANEL BOARD CONCRETE PLANT, CENTRAL MIX TYPE; PAVER, HETHERINGTON; PILE DRIVER, SKID OR CRAWLER; ROAD PAVING MIXER; ROCK BREAKING PLANT; ROCK CRUSHING PLANT, PORTABLE; ROLLER (ASPHALT, WATERBOUND MACADAM, BITUMINOUS MACADAM, BRICK SURFACE); ROLLER WITH DOZER BLADE; ROOT RAKE, TRACTOR-MOUNTED; SELF-PROPELLED WIDENER; STUMP REMOVER, TRACTOR-MOUNTED; SURFACE HEATER AND PLANER; TANDEM PUSH TRACTOR ($0.50 PER HOUR ADDITIONAL); TRACTOR, BOOM; WINCH OR HOE HEAD; TRACTOR, PUSH; TRACTOR WITH SCOOP; TRACTOR-MOUNTED SPREADER; TREE MOVER; TRENCH MACHINE, OVER 24""; TUG BOAT OPERATOR; WELL DRILLING MACHINE; WINCH TRUCK WITH A-FRAME (ADAMS, ALLEN, BENTON, BLACKFORD, CARROLL, CASS, CLINTON, DEKALB, DELAWARE, FAYETTE, GRANT, HAMILTON, HANCOCK, HENRY, HOWARD, HUNTINGTON, JAY, JOHNSON, MADISON, MARION, MIAMI, RANDOLPH, RUSH, SHELBY, STEUBEN, TIPPECANOE, TIPTON, UNION, WABASH, WAYNE, WELLS, WHITE AND WHITLEY COUNTIES) | $44.60 | $23.35 | $67.95 | Agreement |
POWER EQUIPMENT OPERATORS: GROUP 2…Full textPOWER EQUIPMENT OPERATORS: GROUP 2- AIR COMPRESSOR WITH THROTTLE VALVE OR CLEVER BROOKS-TYPE COMBINATION; BACKFILLER; BACKHOE ON FARM-TYPE TRACTOR, UNDER 45 HP; BULL FLOAT; CHERRY PICKER UNDER 15 TON; CHIP SPREADER, SELF-PROPELLED; CONCRETE PUMP; CONCRETE MESH DEPRESSOR, INDEPENDENTLY OPERATED; CONCRETE SPREADER, POWER-DRIVEN; END LOADER UNDER 1 1/2 CU. YD.; EXCAVATING LOADER, PORTABLE; FINISHING MACHINE AND BULL FLOAT; GUNITE MACHINE; HEAD GREASER; MESH OR STEEL PLACER; MULTIPLE TAMPING MACHINE (RR); P.C.C. CONCRETE BELT PLACER; PULL GRADER, POWER CONTROL; REFRIGERATING MACHINE, FREEZING OPERATION; ROSS CARRIER; SHEEPFOOT ROLLER (SELF-PROPELLED); TAMPER (MULTIPLE VIBRATING, ASPHALT, WATERBOUND MACADAM, BITUMINOUS MACADAM, BRICK SURFACE); TRENCH MACHINE, 24"" AND UNDER; TUBE FLOAT; WELDER (ADAMS, ALLEN, BENTON, BLACKFORD, CARROLL, CASS, CLINTON, DEKALB, DELAWARE, FAYETTE, GRANT, HAMILTON, HANCOCK, HENRY, HOWARD, HUNTINGTON, JAY, JOHNSON, MADISON, MARION, MIAMI, RANDOLPH, RUSH, SHELBY, STEUBEN, TIPPECANOE, TIPTON, UNION, WABASH, WAYNE, WELLS, WHITE AND WHITLEY COUNTIES) | $42.88 | $23.35 | $66.23 | Agreement |
POWER EQUIPMENT OPERATORS: GROUP 3…Full textPOWER EQUIPMENT OPERATORS: GROUP 3- ASSISTANT PLANT ENGINEER; BASE PAVER (JERSEY OR SIMILAR TYPE MACHINE); CONCRETE FINISHING MACHINE; CONCRETE MIXER, LESS THAN 21 CU. FT.; CURB MACHINE; FARM TRACTOR, INCLUDING FARM TRACTOR WITH ALL ATTACHMENTS EXCEPT BACKHOE AND INCLUDING HIGH LIFT END LOADERS OF 1 CU. YD. CAPACITY OR LESS; FIRE TENDER ON BOILER; HOIST, 1 DRUM; OPERATOR, 5 PIECES OF MINOR EQUIPMENT; PAVING BREAKER; POWER BROOM, SELF-PROPELLED; ROLLER, EARTH AND SUB-BASE MATERIAL; SLURRY SEAL MACHINE; SPIKE MACHINE (RR); TAMPER (MULTIPLE VIBRATING, EARTH AND SUB-BASE MATERIAL); THROTTLE VALVE AND FIRE TENDER COMBINATION ON HORIZONTAL OR UPRIGHT BOILER; TRACTAIRE WITH DRILL; TRACTOR, 50 H.P. OR OVER; WELL POINT SYSTEM; WIDENER, APSCO OR SIMILAR TYPE (ADAMS, ALLEN, BENTON, BLACKFORD, CARROLL, CASS, CLINTON, DEKALB, DELAWARE, FAYETTE, GRANT, HAMILTON, HANCOCK, HENRY, HOWARD, HUNTINGTON, JAY, JOHNSON, MADISON, MARION, MIAMI, RANDOLPH, RUSH, SHELBY, STEUBEN, TIPPECANOE, TIPTON, UNION, WABASH, WAYNE, WELLS, WHITE AND WHITLEY COUNTIES) | $41.96 | $23.35 | $65.31 | Agreement |
POWER EQUIPMENT OPERATORS: GROUP 4…Full textPOWER EQUIPMENT OPERATORS: GROUP 4- AIR COMPRESSOR; ASSISTANT TO ENGINEER, OILER; AUTOMATIC DRY BATCH PLANT; BITUMINOUS DISTRIBUTOR; BITUMINOUS PATCHING TAMPER; BELT SPREADER; BROOM AND BELT MACHINE; CHAIR CART, SELF-PROPELLED; COLEMAN-TYPE SCREEN; CONVEYOR, PORTABLE; DIGGER POST HOLE, POWER-DRIVEN; FORK LIFT, UNDER 10 TON; FORM GRADER; FORM TAMPER, MOTOR-DRIVEN; GENERATOR; HETHERINGTON DRIVER; HYDRA SEEDER; OPERATOR, 1 THROUGH 4 PIECES OF MINOR EQUIPMENT; OUTBOARD OR INBOARD MOTOR BOAT; POWER CURING SPRAYING MACHINE; POWER SAW, CONCRETE, POWER-DRIVEN; PUG MILL; PULL BROOM, POWER-TYPE; SEAMAN TILLER; STRAW BLOWER OR BRUSH MULCHER; STRIPING MACHINE PAINT, MOTOR-DRIVEN; SUB GRADER; TRACTAIRE, TRACTOR, BELOW 50 H.P.; TRUCK CRANE OILER, DRIVER; SPREADER; WATER PUMP; WELDING MACHINE, 2 OF 300 AMPS OR OVER (ADAMS, ALLEN, BENTON, BLACKFORD, CARROLL, CASS, CLINTON, DEKALB, DELAWARE, FAYETTE, GRANT, HAMILTON, HANCOCK, HENRY, HOWARD, HUNTINGTON, JAY, JOHNSON, MADISON, MARION, MIAMI, RANDOLPH, RUSH, SHELBY, STEUBEN, TIPPECANOE, TIPTON, UNION, WABASH, WAYNE, WELLS, WHITE AND WHITLEY COUNTIES) | $40.46 | $23.35 | $63.81 | Agreement |
| ENGI0150-009 · Operating Engineers agreement, April 1, 2025 | ||||
POWER EQUIPMENT OPERATOR, HEAVY, HIGHWAY AND RAILROAD CONSTRUCTION: GROUP 4…Full textPOWER EQUIPMENT OPERATOR, HEAVY, HIGHWAY AND RAILROAD CONSTRUCTION: GROUP 4 AIR COMPRESSOR; ASSISTANT TO ENGINEER, OILER; BITUMINOUS PATCHING TAMPER; BELT SPREADER; BROOM AND BELT MACHINE; CHAIR CART, SELF-PROPELLED; COLEMAN-TYPE SCREEN; CONVEYOR, PORTABLE; DECK-HAND DIGGER POST HOLE, POWER-DRIVEN; FORKLIFT, UNDER 10 TON; FORM GRADER; FORM TAMPER, MOTOR-DRIVEN; GENERATOR; HETHERINGTON DRIVER; HYDRA SEEDER; MECHANIC HEATER; OPERATOR, 2 PIECES OF MINOR EQUIPMENT; OUTBOARD OR INBOARD MOTOR BOAT; POWER CURING SPRAYING MACHINE; PUG MILL; PULL BROOM, POWER TYPE; SEAMAN TILLER; SKID STEER LOADER OVER 3/4 CU. YD.; STRAW BLOWER OR BRUSH MULCHER; STRIPING MACHINE PAINT, MOTOR-DRIVEN; SUB-GRADER; TRACTAIRE; TRACTOR, BELOW 50 H.P.; TRUCK CRANE OILER; SPREADER; WATER PUMP (ELKHART, FULTON, JASPER, KOSCIUSKO, LAGRANGE, MARSHALL, NEWTON, NOBLE, PULASKI, AND STARKE COUNTIES) | $34.55 | $36.65 | $71.20 | Agreement |
POWER EQUIPMENT OPERATOR, HEAVY, HIGHWAY AND RAILROAD CONSTRUCTION: GROUP 5…Full textPOWER EQUIPMENT OPERATOR, HEAVY, HIGHWAY AND RAILROAD CONSTRUCTION: GROUP 5 SKID STEER LOADER UNDER 3/4 CU. YDS (ELKHART, FULTON, JASPER, KOSCIUSKO, LAGRANGE, MARSHALL, NEWTON, NOBLE, PULASKI, AND STARKE COUNTIES) | $24.30 | $30.85 | $55.15 | Agreement |
POWER EQUIPMENT OPERATOR, HEAVY, HIGHWAY AND RAILROAD CONSTRUCTION:GROUP 3…Full textPOWER EQUIPMENT OPERATOR, HEAVY, HIGHWAY AND RAILROAD CONSTRUCTION:GROUP 3 PLANT ENGINEER; BASE PAVER (JERSEY OR SIMILAR TYPE MACHINE); CONCRETE FINISHING MACHINE; CONCRETE MIXER, LESS THAN 21 CU. FT.; CURB MACHINE; FARM TRACTOR, INCLUDING FARM TRACTOR WITH ALL ATTACHMENTS EXCEPT BACKHOE AND INCLUDING HIGH LIFT END LOADERS OF 1 CU. YD. CAPACITY OR LESS; FIREMAN, ON BOILER; HOIST, 1 DRUM; OPERATOR, 3-5 PIECES OF MINOR EQUIPMENT; PAVING BREAKER; POWER BROOM, SELF-PROPELLED; ROLLER, EARTH AND SUB-BASE MATERIAL; POWER SAW-CONCRETE (POWER DRIVEN); SLURRY SEAL MACHINE; SPIKE MACHINE (RR); SUB-SURFACE MATERIAL DISTRIBUTOR; TAMPER (MULTIPLE VIBRATING, EARTH AND SUB-BASE MATERIAL); THROTTLE VALVE; THROTTLE VALVE AND FIREMAN COMBINATION ON HORIZONTAL OR UPRIGHT BOILER; TRACTAIRE WITH DRILL; WELL POINT (ELKHART, FULTON, JASPER, KOSCIUSKO, LAGRANGE, MARSHALL, NEWTON, NOBLE, PULASKI, AND STARKE COUNTIES) | $35.95 | $36.65 | $72.60 | Agreement |
POWER EQUIPMENT OPERATOR: HEAVY, HIGHWAY AND RAILROAD CONSTRUCTION: GROUP 1…Full textPOWER EQUIPMENT OPERATOR: HEAVY, HIGHWAY AND RAILROAD CONSTRUCTION: GROUP 1 AIR COMPRESSORS IN MANIFOLD WITH THROTTLE VALVE; ASPHALT PLANT ENGINEER; AUTO GRADE OR SIMILAR TYPE MACHINE; AUTO PATROL; AUTOMATIC SUB-GRADE; BACKHOE OR FARM TYPE TRACTOR, 45 HP AND OVER; BALLAST REGULATOR (RR); BARRIER WALL MACHINE; BATCH PLANTS (CONCRETE & ASPHALT); B ITUMINOUS MIXER; BITUMINOUS PAVER; BITUMINOUS PLANT ENGINEER; BORING MACHINE; BULLDOZER; CAISSON DRILLING MACHINE; CHERRY PICKER, 15 TON OR OVER; CHIP SPREADER; CONCRETE MIXER, 21 CU. FT. OR OVER; CONCRETE BELT PLACER; CONCRETE PAVER; CONCRETE PUMP (TRUCK MOUNTED); CONCRETE SAW (TRACK MOUNTED); CONCRETE SPREADER (POWER DRIVEN); CORE DRILLING MACHINE; CRANE OR DERRICK WITH ANY ATTACHMENT (INCLUDING CLAMSHELL, DRAGLINE, SHOVEL, BACKHOE, ETC.); CURB MACHINE; GUTTER MACHINE; DREDGE ENGINEER; DREDGE OPERATOR; DRILLING MACHINE ON WHICH THE DRILL IS AN INTEGRAL PART; EARTHMOVER, RUBBER-TIRED (PADDLE WHEEL, 616, 631, TS-24 OR SIMILAR TYPE); EARTHMOVER, RUBBER-TIRED, TANDEM (.50 PER HR. ADDITIONAL FOR EACH BOWL); ELEVATING GRADER; FORKLIFT (10 TON OR OVER); P.C.C. FORMLESS PAVER; GRADALL; GRAVEL PROCESSING PLANT (PORTABLE); OPERATOR OF GUARD RAIL POST DRIVER; HIGHLIFT SHOVEL 1-1/2 CU.YD. OR OVER) FRAME; HOIST (2 DRUM & OVER); HELICOPTER CREW; HYDRAULIC BOOM TRUCK; HYDRAULIC EXCAVATOR; LOADED-SELF PROPELLED (BELT CHAIN WHEEL); LASER SCREED; LOCOMOTIVE OPERATOR; MECHANIC; MUCKING MACHINE; P.C.C. CONCRETE BELT PLACER; PANEL BOARD CONCRETE PLANT (CENTRAL MIX TYPE); PAVER (HETHERINGTON); PAVEMENT BREAKER; PILE DRIVER, SKID OR CRAWLER; ROAD PAVING MIXER; ROCK BREAKING PLANT; ROCK CRUSHING PLANT (PORTABLE); ROLLER (ASPHALT, WATERBOUND MACADAM, BITUMINOUS MACADAM, BRICK SURFACE); ROLLER WITH DOZER BLADE; ROAD WIDENER; ROOT RAKE (TRACTOR-MOUNTED); ROTO MILL GRINDER; SELF-PROPELLED WIDENER; STUMP REMOVER; SURFACE HEATER AND PLANER; TANDEM PUSH TRACTOR ($0.50 PER HOUR ADDITIONAL); TRACTOR, BOOM; WINCH OR HOE HEAD; TRACTOR (PUSH); TRACTOR WITH SCOOP; TRACTOR-MOUNTED SPREADER; TREE MOVER; TRENCH MACHINE, OVER 24""; TUG BOAT OPERATOR; WELL DRILLING MACHINE; WIDENER (APSCO OR SIMILAR TYPE); WINCH TRUCK WITH A-FRAME (ELKHART, FULTON, JASPER, KOSCIUSKO, LAGRANGE, MARSHALL, NEWTON, NOBLE, PULASKI, AND STARKE COUNTIES) | $38.85 | $36.65 | $75.50 | Agreement |
POWER EQUIPMENT OPERATOR: HEAVY, HIGHWAY AND RAILROAD CONSTRUCTION: GROUP 2…Full textPOWER EQUIPMENT OPERATOR: HEAVY, HIGHWAY AND RAILROAD CONSTRUCTION: GROUP 2 AIR COMPRESSOR WITH THROTTLE VALVE OR CLEVER BROOKS TYPE COMBINATION; BACKFILLER; FARM TYPE TRACTOR (UNDER 45 H.P.); CHERRY PICKER UNDER 15 TON; CHIP SPREADER (SELF-PROPELLED); CONCRETE PUMP (TRAILER TYPE); CONCRETE MESH DEPRESSOR, INDEPENDENTLY OPERATED; END LOADER UNDER 1 1/2 CU. YD.; EXCAVATING LOADER (PORTABLE); FINISHING MACHINE AND BULL FLOAT; GUNITE MACHINE; HYDRAULIC POWER UNIT; HEAD GREASER; MESH OR STEEL PLACER; MULTIPLE TAMPING BACKHOE ON MACHINE (RR); BULL FLOAT (BIDWELL MACHINE); REFRIGERATING MACHINE-OPERATION; ROSS CARRIER; SHEEPFOOT ROLLER (SELF-PROPELLED); TAMPER-MULTIPLE VIBRATING (ASPHALT, WATERBOUND, MACADAM, BITUMINOUS MACADAM, BRICK SURFACE); TRENCH MACHINE (24"" AND UNDER); TUBE FLOAT; WATER PULL/WAGON; WELDER (ELKHART, FULTON, JASPER, KOSCIUSKO, LAGRANGE, MARSHALL, NEWTON, NOBLE, PULASKI, AND STARKE COUNTIES) | $37.25 | $36.65 | $73.90 | Agreement |
| ENGI0150-039 · Operating Engineers agreement, June 1, 2025 | ||||
POWER EQUIPMENT OPERATOR, UNDERGROUND & UTILITY CONSTRUCTION: GROUP 3…Full textPOWER EQUIPMENT OPERATOR, UNDERGROUND & UTILITY CONSTRUCTION: GROUP 3 BACK FILLER, BITUMINOUS DISTRIBUTOR, BROOM AND BELT MACHINE, BULL FLOAT, COMPRESSOR (COMMON RECEIVER 2), CONCRETE CUTTER WHEEL TYPE (ROCKWELL), CONCRETE FINISHING MACHINE, CONCRETE SPREADER (POWER DRIVEN), DIGGER, POST HOLE (POWER DRIVEN), FINISHING MACHINE AND BULL FLOAT, FORKLIFT, FORM GRADER, FORM TAMPER (MOTOR DRIVEN), HYDRAULIC (BOOM TRUCK) WHEN USED FOR HAULING MATERIALS, LASER SCREED, MUTIPLE TAMPING MACHINE, PAVING BREAKER, ROLLER (EARTH AND SUBBASE MATERIAL), ROLLER SHEEPFOOT (SELF-PROPELLED), SUB-GRADER, TAMPER, MUTIPILE VIBRATING (EARTH AND SUBBASE MATERIAL), TRACTAIRE WITH DRILL, TRACTOR (WITH ALL DRAWN ATTACHEMENTS EXCEPT BACKHOE AND INCLUDING HIGHLIFT, ENDLOADER OF 1 CU. YD. CAPACITY AND LESS. (JASPER, NEWTON, PULASKI AND STARKE COUNTIES) | $43.60 | $45.93 | $89.53 | Agreement |
POWER EQUIPMENT OPERATOR, UNDERGROUND & UTILITY CONSTRUCTION: GROUP 1…Full textPOWER EQUIPMENT OPERATOR, UNDERGROUND & UTILITY CONSTRUCTION: GROUP 1 ASPHALT PLANTS (CONSTRUCTION), ASPHALT PLANT (PERMANENT), AUTO PATROL (MAINTAINER), AUTOMATIC DRY BATCH PLANT, AUTOMATED CONCRETE PLACER, AUTOMATED SUB-GRADER, AUTOMATED SLIP FORM PAVER, AUTOMATED FINISH MACHINE, COMBINATION BACKHOE FRONT, END LOADER MACHINE (1/2 CU. YD.), BACKHOE BUCKET OR OVER OR WITH ATTACHMENTS), COMBINATION BACKHOE 1 CU YD, BACKHOE BUCKET OR OVER OR WITH ATTACHMENTS, BALLAST REGULATOR (RR), BELT LOADER (STATIONARY), BORING MACHINE (ROAD), BULLDOZER, CONCRETE MIXER(27 CU. FT. OR OVER), CONCRETE PUMP (TRUCK MOUNTED), CONCRETE BREAKER (TRUCK MOUNTED AND SELF-PROPELLED), CORE DRILLING MACHINE, CRANES AND BACKHOES (ALL ATTACHMENTS), CRANES, HAMMERHEAD, CRETER CRANE, CRUSHERS (CONCRETE, ROCK, RECYCLING, ETC.), DERRICKS , DERRICKS (TRAVELING), DREDGE OPERATOR, FORMLESS CURB AND GUTTER MACHINE (36 INCHES AND OVER), FORMLESS CURB AND GUTTER MACHINE UNDER 36 INCHES, GRADALL AND MACHINES (OF A LIKE NATURE), GUARDRAIL POST DRIVER (TRUCK MOUNTED), LEAD GREASER, HELICOPTER, HIGHLIFT SHOVEL (3 YD. AND OVER), HOIST (1 DRUM), HOIST (2, AND 3 DRUMS), HYDRAULIC POWER UNITS (GROUTING, PILEDRIVING AND EXTRACTING) HYDRO OR WATER BLASTER (SELF-PROPELLED), LOCOMOTIVE OPERATORS, MECHANIC, WELDER, MUCKING MACHINE, PANELBOARD CONCRETE PLANT (CENTRAL MIX TYPE), PAVER (HETHERINGTON), PILE DRIVER (SKID OR CRAWLER), ROAD PAVING MIXER, ROCK DRILL CRAWLER OR SKID RIG, ROCK DRILL (TRUCK MOUNTED), ROSS CARRIER, ROTO MILL GRINDER (36"" AND OVER), ROTO MILL GRINDER (LESS THAN 36""), THROTTLE VALVE AND COMPRESSOR OR CLEVER BROOKS TYPE COMBINATION, THROTTLE VALVE AND FIREMAN COMBINATION OR HORIZONTAL OR UPRIGHT BOILER, TOURNAPULL OR SIMILAR TYPE EQUIPMENT, TRACTOR (BOOM), TRACTOR DRAWN BELT LOADER WITH ATTACHED PUSHER (REQUIRES TWO ENGINEERS), TRENCH MACHINE, TUG BOAT OPERATOR, WHEEL EXCAVATOR, WINCH TRACTOR WITH ""A"" FRAME, SCOOPS, TURNAPULL OR SIMILAR TYPES MACHINE USED IN TANDEM (ADD $1.00 TO CLASS L HOURLY RATE FOR EACH MACHINE ATTACHED THERE TO). (JASPER, NEWTON, PULASKI AND STARKE COUNTIES) | $48.70 | $45.93 | $94.63 | Agreement |
POWER EQUIPMENT OPERATOR, UNDERGROUND & UTILITY CONSTRUCTION: GROUP 2…Full textPOWER EQUIPMENT OPERATOR, UNDERGROUND & UTILITY CONSTRUCTION: GROUP 2 COMBINATION BACKHOE FRONT END LOADER MACHINE WITH LESS THAN 1/2 CU. YD., BACKHOE BUCKET OR WITH ATTACHMENTS, BITUMINOUS MIXER, BITUMINOUS PAVER, BRIDGE DECK FINISHER, CONCRETE MIXER (LESS THAN 27 CU. FT.), COMPRESSOR AND THROTTLE VALVE, COMPRESSOR (COMMON RECEIVER 3), GREASER, HIGHLIFT SHOVELS (UNDER 3 CU. YDS.), JERSEY SPREADER OR BASE PAVER, PAVEMENT BUMP GRINDER (SELF-PROPELLED), ROLLER (ASPHALT, WATERBOUND, MACADAM, BITUMINOUS MACADAM, BRICK SURFACE, SHEEPFOOT ROLLER (SELF- PROPELLED WITH BLADE), SURFACE HEATER AND PLANER, TAMPER (MUTIPLE VIBRATING, ASPHALT WATERBOUND MACADAM, BITUMINOUUS MACADAM, BRICK SURFACE), TRACTOR (PUSH), TRACTOR WITH SCOOP, WIDENER, APSCO OR SIMILAR TYPE. (JASPER, NEWTON, PULASKI AND STARKE COUNTIES) | $47.90 | $45.93 | $93.83 | Agreement |
POWER EQUIPMENT OPERATOR, UNDERGROUND & UTILITY CONSTRUCTION: GROUP 4…Full textPOWER EQUIPMENT OPERATOR, UNDERGROUND & UTILITY CONSTRUCTION: GROUP 4 AIR COMPRESSORS, CONVEYOR (ALL), FIREMAN ON BOILER, GENERATOR, GROUT MACHINE, POWER CURING SPRAYING MACHINE (SELF-PROPELLED), BROOM (SELF-PROPELLED), SEAMAN TILLER, SKID STEER LOADERS, SPIKE MACHINE (RR), STRIPPING MACHINE (PAINT, SELF-PROPELLED), THROTTLE VALVE, WELDING MACHINE, WELL POINTS SYSTEM. (JASPER, NEWTON, PULASKI AND STARKE COUNTIES) | $41.40 | $45.93 | $87.33 | Agreement |
POWER EQUIPMENT OPERATOR, UNDERGROUND & UTILITY CONSTRUCTION: GROUP 5…Full textPOWER EQUIPMENT OPERATOR, UNDERGROUND & UTILITY CONSTRUCTION: GROUP 5 DECK HAND, HETHERINGTON DRIVER, MECHANICAL HEATER (1 TO 5), OUTBOARD OR INBOARD MOTOR BOAT, OILER, POWER SAW (CONCRETE POWER DRIVEN), WATER PUMP, GRASSCUTTER. (JASPER, NEWTON, PULASKI AND STARKE COUNTIES) | $35.95 | $45.93 | $81.88 | Agreement |
| ENGI0181-014 · Operating Engineers agreement, April 1, 2025 | ||||
POWER EQUIPMENT OPERATORS…Full textPOWER EQUIPMENT OPERATORS: HEAVY AND HIGHWAY CONSTRUCTION: GROUP C- AIR COMPRESSOR, OILER; AUTOMATIC DRY BATCH PLANT; BITUMINOUS DISTRIBUTOR; BITUMINOUS PATCHING TAMPER; BELT SPREADER; BROOM AND BELT MACHINE; BRUSH BURNER; CHAIR CART, SELF- PROPELLED; COLEMAN-TYPE SCREEN; COLD GRINDER OILER; CONCRETE MIXER, LESS THAN 21 CU. FT.; CONVEYOR, PORTABLE; CURB MACHINE; DECKHAND; DIGGER (POST HOLE, POWER-DRIVEN); FARM TRACTOR, INCLUDING FARM TRACTOR WITH ALL ATTACHMENTS (EXCEPT BACKHOE, HI- LIFT ENDLOADERS); FORM GRADER; FORM TAMPER, MOTOR-DRIVEN; GENERATOR; GUNITE MACHINE; HETHERINGTON DRIVER; HYDRA SEEDER; MECHANICAL HEATER; MINOR EQUIPMENT OPERATOR, 1 THROUGH 4 PIECES; CURING SPRAYING MACHINE; POWER SAW, CONCRETE (POWER-DRIVEN); PUG MILL PULL BROOM, POWER TYPE; SEAMAN TILLER; SLURRY SEAL MACHINE; SPIKE MACHINE; STRAW BLOWER OR BRUSH MULCHER; STRIPPING MACHINE (PAINT, MOTOR-DRIVEN); SUB GRADER; THROTTLE VALVE; TRACTAIRE WITH DRILL; TRUCK CRANE AND MULTI-DRILL OILER, DRIVER; SPREADER; WATER PUMP. (BARTHOLOMEW, BROWN, CLARK, CRAWFORD, DEARBORN, DECATUR, DUBOIS, FLOYD, FRANKLIN, GIBSON, HARRISON, JACKSON, JEFFERSON, JENNINGS, LAWRENCE, MARTIN, OHIO, ORANGE, PERRY, PIKE, POSEY, RIPLEY, SCOTT, SPENCER, SWITZERLAND, VANDERBURGH, WARRICK, AND WASHINGTON COUNTIES) | $42.02 | $19.60 | $61.62 | Agreement |
POWER EQUIPMENT OPERATORS…Full textPOWER EQUIPMENT OPERATORS:: GROUP A (BARTHOLOMEW, BROWN, CLARK, CRAWFORD, DEARBORN, DECATUR, DUBOIS, FLOYD, FRANKLIN, GIBSON, HARRISON, JACKSON, JEFFERSON, JENNINGS, LAWRENCE, MARTIN, OHIO, ORANGE, PERRY, PIKE, POSEY, RIPLEY, SCOTT, SPENCER, SWITZERLAND, VANDERBURGH, WARRICK, AND WASHINGTON COUNTIES) (HEAVY AND HIGHWAY CONSTRUCTION:) | $46.80 | $19.60 | $66.40 | Agreement |
POWER EQUIPMENT OPERATORS…Full textPOWER EQUIPMENT OPERATORS:: GROUP B (BARTHOLOMEW, BROWN, CLARK, CRAWFORD, DEARBORN, DECATUR, DUBOIS, FLOYD, FRANKLIN, GIBSON, HARRISON, JACKSON, JEFFERSON, JENNINGS, LAWRENCE, MARTIN, OHIO, ORANGE, PERRY, PIKE, POSEY, RIPLEY, SCOTT, SPENCER, SWITZERLAND, VANDERBURGH, WARRICK, AND WASHINGTON COUNTIES) (HEAVY AND HIGHWAY CONSTRUCTION:) | $44.15 | $19.60 | $63.75 | Agreement |
| ENGI0181-015 · Operating Engineers agreement, April 1, 2025 | ||||
Group definitions, zones and premiums for ENGI0181-015POWER EQUIPMENT OPERATORS:: GROUP A (BARTHOLOMEW, BROWN, CLARK, CRAWFORD, DEARBORN, DECATUR, DUBOIS, FLOYD, FRANKLIN, GIBSON, HARRISON, JACKSON, JEFFERSON, JENNINGS, LAWRENCE, MARTIN, OHIO, ORANGE, PERRY, PIKE, POSEY, RIPLEY, SCOTT, SPENCER, SWITZERLAND, VANDERBURGH, WARRICK, AND WASHINGTON COUNTIES) (SEWER WATERLINE & UTILITY CONSTRUCTION:).$ 43.43 19.60 POWER EQUIPMENT OPERATORS:: GROUP B (BARTHOLOMEW, BROWN, CLARK, CRAWFORD, DEARBORN, DECATUR, DUBOIS, FLOYD, FRANKLIN, GIBSON, HARRISON, JACKSON, JEFFERSON, JENNINGS, LAWRENCE, MARTIN, OHIO, ORANGE, PERRY, PIKE, POSEY, RIPLEY, SCOTT, SPENCER, SWITZERLAND, VANDERBURGH, WARRICK, AND WASHINGTON COUNTIES) (SEWER WATERLINE & UTILITY CONSTRUCTION:).$ 35.30 19.60 | ||||
| ENGI0841-011 · Operating Engineers agreement, April 1, 2024 | ||||
POWER EQUIPMENT OPERATORS: HEAVY, HIGHWAY AND UTILITY CONSTRUCTION: GROUP 1…Full textPOWER EQUIPMENT OPERATORS: HEAVY, HIGHWAY AND UTILITY CONSTRUCTION: GROUP 1 (AIR COMPRESSOR OVER 600 CU FT, AIR COMPRESSORS (2), COMPRESSORS HOOKED IN MANIFOLD, ASPHALT PLANT ENGINEER, AUTO GRADE AND/OR C.M.I. OR SIMILAR TYPE MACHINE, AUTO PATROL, MOTOR PATROL, POWER BLADE, ASPCO PAVER, ASPHALT PLANER, ASPHALT ROLLERS, ASPHALT PAVER OPERATOR, CONCRETE OR ASPHALT MILLING MACHINE, SELF PROPELLED WIDENER, BACKHOE AND/OR PAVEMENT BREAKER ATTACHMENT, SELF PROPELLED PAVEMENT BREAKER, BALLAST REGULATOR (R.R), BITUMINOUS MIXER, BITUMINOUS PAVER, BITUMINOUS PLANT ENGINEER, BULK CEMENT PLANT ENGINEER, BULLDOZER, ONE DRUM HOIST WITH TOWER OR BOOM, CABLEWAYS, TOWER MACHINES, BACK FILLER, BOOM TRACTOR, BOOM OR WINCH TRUCK, WINCH OR HYDRAULIC BOOM TRUCK, BORING MACHINE, BOLIER OPERATOR, BRUSH MULCHER, BULL FLOAT, FINISHING MACHINE, POWER CRANES, OVERHEAD CRANES, TRUCK CRANES, PILEDRIVER, SKID OR CRAWLER, GUARD RAIL POST DRIVER, TOWER CRANES, HYDRO CRANE, CHERRY PICKER, DRAGLINES, DERRICKS, SHOVELS, CLAM, GRADALLS, TWO DRUM MACHINE, CONCRETE OR ASPHALT CURB MACHINE, SELF PROPELLED, CONCRETE MIXERS WITH SKID, TOURNAMIXER, CONCRETE PUMP (TRUCK OR SKID MOUNTED), CONCRETE PLANT ENGINEER, SOIL CEMENT MACHINE, FORMLESS PAVER, CONCRETE SPREADER, SPAN SAW (AND SIMILAR TYPES), CHIP SPREADER, MESH PLACER, DREDGING EQUIPMENT OR DREDGE ENGINEER OR DREDGE OPERATOR, TUG BOAT OPERATOR, MARINE SCOOPS, DITCHING MACHINE WITH DUAL ATTACHMENT, STANDARD OR DINKEY LOCOMOTIVES, DRILLING MACHINE, INCLUDING WELL TESTING, CAISSONS, SHAFT OR ANY SIMILAR TYPE DRILLING MACHINE (WELL POINT SYSTEMS), 4 POINT LIFE SYSTEM (POWER LIFT OR SIMILAR TYPE), MUD CAT, MUCKING MACHINE, SULL-AIR, MECHANICS, WELDER, HEAD EQUIPMENT GREASER, TOURNAPULL, TRACTOR OPERATING SCOOPS, PUSH TRACTORS, LARGE ROLLERS ON EARTH, LOADERS (TRACK OR RUBBER MOUNTED), OR SIMILAR TYPE MACHINE, LULL, TOURNADOZER, SCOOPMOBILES, ELEVATING MACHINES, POWER BROOM (SELF PROPELLED), POWER SUB GRADER, HYDRA AX, FARM TRACTOR WITH ATTACHMENTS, SOIL STABILIZER (SEAMAN TILLER, BO MAG, RAGO GATOR AND SIMILAR TYPES OF EQUIPMENT), TREE MOVER, STUMP REMOVER, ROOT RAKE, HYDRA SEEDER, STRAW BLOWER, REFRIGERATING MACHINE, FREEZING OPERATOR, CHAIR CART-SELF PROPELLED, HELICOPTER CREW (3), ROSS CARRIER OR STRADDLE BUGGY OR SIMILAR MACHINE, ROCK CRUSHER PLANT, GRAVEL PROCESSING MACHINE, PIPE CLEANING MACHINE, PIPE WRAPPING MACHINE, PIPE BENDING MACHINE, PUG MILL, CONCRETE BUMP GRINDER MACHINE, POWER CURING SPRAY MACHINE, FORKLIFT (EXCEPT WHEN USED FOR LANDSCAPING), SNOOPER TRUCK OPERATOR. (BOONE, CLAY, DAVIESS, FOUNTAIN, GREENE, HENDRICKS, KNOX, MONROE, MONTGOMERY, MORGAN OWEN, PARKE, PUTNAM, SULLIVAN, VERMILLIAN, VIGO, AND WARREN COUNTIES) FOOTNOTES: A. EMPLOYEES OPERATING BOOMS FROM 149FT. TO 199 FT. INCLUDING JIB, SHALL RECECEIVE AN ADDITIONAL SEVENTY-FIVE CENTS (.75) PER HOUR ABOVE THE RATE. EMPLOYEES OPERATING BOOMS OVER 199 FT. INCLUDING JIB, SHALL RECEIVE AN ADDITIONAL ONE DOLLAR AND TWENTY- FIVE CENTS ($1.25) PER HOUR ABOVE THE REGULAR RATE. B. EMPLOYEES OPERATING SCOOPS, PULLS, OR TRACTORS HOOKED IN TANDEM SHALL RECEIVE AN ADDITIONAL ONE DOLLAR ($1.00) PER HOUR ABOVE THE REGULAR RATE. C. EMPLOYEES OPERATING SCOOPS, PULLS, OR TRACTORS PULLING ANY OTHER HAULING UNIT IN TANDEM SHALL RECEIVE AN ADDITIONAL ONE DOLLAR ($1.00) PER HOUR ABOVE THE REGULAR RATE. D. UNDERGROUND WORK - EMPLOYEES WORKING IN TUNNELS, SHAFTS, ETC. SHALL BE PAID A THIRTY PERCENT (30%) PREMIUM ABOVE THE WAGE RATE | $38.80 | $27.15 | $65.95 | Agreement |
POWER EQUIPMENT OPERATORS: HEAVY, HIGHWAY AND UTILITY CONSTRUCTION: GROUP 2…Full textPOWER EQUIPMENT OPERATORS: HEAVY, HIGHWAY AND UTILITY CONSTRUCTION: GROUP 2 AIR COMPRESSOR 600 CU. FT. AND UNDER, AIR TUGGER, AIR VALVES, ASSISTANT CONCRETE PLANT ENGINEER, ASSISTANT ASPHALT PLANT ENGINEER, ASPHALT PLANT FIREMAN, BULK CEMENT PLANT EQUIPMENT GREASER, CONCRETE MIXERS WITHOUT SKIPS, CURBING MACHINE, CONCRETE SAW (SELF PROPELLED), CONVEYORS,CEMENT BLIMPS, DITCHING MACHINE UNDER 6"", DISTRIBUTOR OPERATOR ON TRUCKS, DECK HANDS, ELEVATORS WHEN USED FOR HOISTING MATERIAL, ENGINE TENDERS, FORK LIFT (WHEN USED FOR LANDSCAPING), FARM TRACTOR, FIREMAN, FIREMAN ON PAINT OR DOPE POTS, FORM TAMPER, FORM GRADER, FLEX PLANE, GENERATORS (TWO TO FOUR), OR WELDING MACHINES OR WATER PUMPS, WITHIN 400 FEET, GUNITE MACHINE, MACHINE MOUNTED POST HOLE DIGGER, MUDE JACK, ONE DRUM MACHINES WITHOUT TOWER OR BOOM, ONE WATER PUMP, ONE WELDING MACHINE, OUTBOARD OR INBOARD MOTOR BOAT, PULL BROOM (POWER TYPE, SIPHONS AND PULSOMETER, SWITCHMAN, STRIPING AND OR PAINTING MACHINE (MOTOR DRIVEN), SLURRY SEAL MACHINE, TRACK JACK, TEMPORARY HEAT, THROTTLE VALVE, TUBE FLOAT, TRACTAIRE, WAGON DRILL, MULTIPLE TAMPING MACHINE (R.R.), SPIKE MACHINE (R.R.), MECHANICAL HEATERS, BRUSH BURNER, VACUUM TRUCK (SUPER SUCKER AND SIMILAR TYPES). (BOONE, CLAY, DAVIESS, FOUNTAIN, GREENE, HENDRICKS, KNOX, MONROE, MONTGOMERY, MORGAN OWEN, PARKE, PUTNAM, SULLIVAN, VERMILLIAN, VIGO, AND WARREN COUNTIES) FOOTNOTES: A. EMPLOYEES OPERATING BOOMS FROM 149FT. TO 199 FT. INCLUDING JIB, SHALL RECECEIVE AN ADDITIONAL SEVENTY-FIVE CENTS (.75) PER HOUR ABOVE THE RATE. EMPLOYEES OPERATING BOOMS OVER 199 FT. INCLUDING JIB, SHALL RECEIVE AN ADDITIONAL ONE DOLLAR AND TWENTY- FIVE CENTS ($1.25) PER HOUR ABOVE THE REGULAR RATE. B. EMPLOYEES OPERATING SCOOPS, PULLS, OR TRACTORS HOOKED IN TANDEM SHALL RECEIVE AN ADDITIONAL ONE DOLLAR ($1.00) PER HOUR ABOVE THE REGULAR RATE. C. EMPLOYEES OPERATING SCOOPS, PULLS, OR TRACTORS PULLING ANY OTHER HAULING UNIT IN TANDEM SHALL RECEIVE AN ADDITIONAL ONE DOLLAR ($1.00) PER HOUR ABOVE THE REGULAR RATE. D. UNDERGROUND WORK - EMPLOYEES WORKING IN TUNNELS, SHAFTS, ETC. SHALL BE PAID A THIRTY PERCENT (30%) PREMIUM ABOVE THE WAGE RATE | $32.55 | $27.15 | $59.70 | Agreement |
| IRON0022-001 · Ironworkers agreement, June 1, 2025 | ||||
IRONWORKER (BARTHOLOMEW…Full textIRONWORKER (BARTHOLOMEW, BENTON, BOONE, BROWN, CARROLL, CASS, CLAY, CLINTON, DAVIESS (REMAINDER OF COUNTY), DECATUR (W 3/4), DELAWARE (REMAINDER OF COUNTY), FAYETTE (W 1/3), FOUNTAIN,FRANKLIN (NW TIP), FULTON (REMAINDER OF COUNTY), GRANT (REMAINDER OF COUNTY), GREENE, HAMILTON, HANCOCK, HENDRICKS, HENRY, HOWARD, JACKSON, JASPER (SOUTHEASTERN 1/2), JENNINGS (NORTHWEST 2/3), JOHNSON, KNOX (REMAINDER OF COUNTY), LAWRENCE, MADISON, MARION, MARTIN (NW 2/3), MIAMI (REMAINDER OF COUNTY), MONROE, MONTG | $38.00 | $26.39 | $64.39 | Agreement |
| IRON0044-010 · Ironworkers agreement, June 1, 2025 | ||||
IRONWORKERS: FENCE ERECTORS…Full textIRONWORKERS: FENCE ERECTORS (DEARBORN, DECATUR (REMAINDER OF COUNTY), FAYETTE (REMAINDER OF COUNTY), FRANKLIN (REMAINDER OF COUNTY), JEFFERSON (REMAINDER OF COUNTY), JENNINGS (REMAINDER OF COUNTY), OHIO, RIPLEY, RUSH (SOUTHEASTERN TIP), SWITZERLAND, AND UNION (SOUTHERN 1/3)) | $35.88 | $23.90 | $59.78 | Agreement |
IRONWORKERS: ORNAMENTAL…Full textIRONWORKERS: ORNAMENTAL (DEARBORN, DECATUR (REMAINDER OF COUNTY), FAYETTE (REMAINDER OF COUNTY), FRANKLIN (REMAINDER OF COUNTY), JEFFERSON (REMAINDER OF COUNTY), JENNINGS (REMAINDER OF COUNTY), OHIO, RIPLEY, RUSH (SOUTHEASTERN TIP), SWITZERLAND, AND UNION (SOUTHERN 1/3)) | $37.77 | $23.90 | $61.67 | Agreement |
IRONWORKERS: STRUCTURAL…Full textIRONWORKERS: STRUCTURAL, MACHINERY MOVERS, RIGGERS (DEARBORN, DECATUR (REMAINDER OF COUNTY), FAYETTE (REMAINDER OF COUNTY), FRANKLIN (REMAINDER OF COUNTY), JEFFERSON (REMAINDER OF COUNTY), JENNINGS (REMAINDER OF COUNTY), OHIO, RIPLEY, RUSH (SOUTHEASTERN TIP), SWITZERLAND, AND UNION (SOUTHERN 1/3)) | $37.77 | $23.90 | $61.67 | Agreement |
| IRON0070-002 · Ironworkers agreement, June 1, 2025 | ||||
IRONWORKER (CLARK, CRAWFORD…Full textIRONWORKER (CLARK, CRAWFORD, FLOYD, HARRISON, JACKSON (SOUTHERN 3/4); JEFFERSON (EXCLUDING NORTHEASTERN TIP); JENNINGS (SOUTHERN 3/4), LAWRENCE (SOUTHERN 2/3), MARTIN (SOUTHEASTERN 2/3), ORANGE, PERRY (EASTERN 3/4); SCOTT AND WASHINGTON COUNTIES:) | $36.17 | $25.80 | $61.97 | Agreement |
| IRON0070-016 · Ironworkers agreement, June 1, 2025 | ||||
IRONWORKER: REINFORCING…Full textIRONWORKER: REINFORCING (DEARBORN, DECATUR (REMAINDER OF COUNTY), FAYETTE (SE CORNER), FRANKLIN (S 3/4), OHIO, RIPLEY (REM. OF COUNTY), SWITZERLAND (REMAINDER OF COUNTY) AND JENNINGS (NE TIP) COUNTIES) | $36.17 | $25.80 | $61.97 | Agreement |
| IRON0103-001 · Ironworkers agreement, April 1, 2024 | ||||
IRONWORKER (DAVIESS…Full textIRONWORKER (DAVIESS (S 1/2), DUBOIS, GIBSON, KNOX (S 1/2), MARTIN (SW 1/3), PERRY (W 1/4), PIKE, POSEY, SPENCER, VANDERBURGH, AND WARRICK) | $35.34 | $25.75 | $61.09 | Agreement |
| IRON0147-004 · Ironworkers agreement, June 1, 2025 | ||||
IRONWORKER (ADAMS, ALLEN…Full textIRONWORKER (ADAMS, ALLEN, BLACKFORD, DEKALB, DELAWARE (NORTHEAST THIRD OF COUNTY), FULTON (EASTERN PART), GRANT (EXCLUDING SOUTHWEST PORTION), HUNTINGTON, JAY, MIAMI (NORTHEAST HALF), NOBLE (EXCLUDING NORTHEAST TIP), STEUBEN, WABASH, WELLS, AND WHITLEY COUNTIES) | $35.40 | $26.92 | $62.32 | Agreement |
| IRON0290-004 · Ironworkers agreement, June 1, 2024 | ||||
IRONWORKERS: (FAYETTE…Full textIRONWORKERS: (FAYETTE (NE 1/4), RANDOLPH (S. PART OF COUNTY EXCLUDING WINCHESTER BUT INCLUDING UNION CITY) UNION (NORTHERN 2/3) AND WAYNE (REMAINDER OF COUNTY) COUNTIES) | $35.39 | $24.35 | $59.74 | Agreement |
| IRON0292-005 · Ironworkers agreement, June 1, 2025 | ||||
IRONWORKER (ELKHART…Full textIRONWORKER (ELKHART, FULTON (NORTH 2/3), KOSCIUSKO (REMAINDER OF COUNTY), LAGRANGE (WEST 1/3), MARSHALL, MIAMI (NORTHWESTERN TIP), NOBLE (NORTHWESTERN TIP), PULASKI (NORTHEAST HALF), AND STARKE COUNTIES) | $39.76 | $25.00 | $64.76 | Agreement |
| IRON0395-002 · Ironworkers agreement, June 1, 2025 | ||||
IRONWORKER (JASPER…Full textIRONWORKER (JASPER (NORTHERN 1/2), NEWTON (NORTHERN 1/2), PULASKI (NORTHWESTERN TIP) COUNTIES) | $47.75 | $41.28 | $89.03 | Agreement |
IRONWORKER: SHEETER…Full textIRONWORKER: SHEETER (JASPER (NORTHERN 1/2), NEWTON (NORTHERN 1/2), PULASKI (NORTHWESTERN TIP) COUNTIES) | $48.00 | $41.28 | $89.28 | Agreement |
| LABO0041-003 · Laborers agreement, April 1, 2025 | ||||
LABORERS: HEAVY & HIGHWAY CONSTRUCTION: GROUP 1…Full textLABORERS: HEAVY & HIGHWAY CONSTRUCTION: GROUP 1 CONSTRUCTION LABORER, CARPENTER TENDER, FENCE ERECTOR, GRADE CHECKER, GUARD RAIL ERECTOR, CONTINUOUS STEEL ROD OR MAT INSTALLER, WIRE MESH LAYER, JOINT MAN (MORTAR, MASTIC, AND ALL OTHER TYPES), LIGHTING INSTALLER (PERMANENT OR TEMPORARY), LINEMAN FOR AUTOMATIC GRADE MAKER ON PAVING MACHINES, MORTAR MAN, MULTI-PLANT ERECTOR, RIP-RAP INSTALLER (ALL PRODUCTS AND MATERIALS), ROAD MARKING AND DELINEATION LABORER, SETTING AND PLACING OF ALL PRECAST CONCRETE PRODUCTS, SING INSTALLATION INCLUDING SUPPORTING STRUCTURE, SPRAYING OF ALL EPOXY, CURING COMPOUND, OR LIKE MATERIAL, FLAGPERSON, AIR TOOL, POWER TOOL OPERATOR, ASPHALT RAKER MAN, BATCH TRUCK DUMPER, BRIDGE HAND RAIL ERECTOR, HANDLER (BULK OR BAG CEMENT), CHAIN SAW MAN, CONCRETE PUDDLER, CONCRETE RUBBER, CONCRETE SAW OPERATOR, CORE DRILL OPERATOR, EYE LEVEL, HAND BLADE OPERATOR HYDRO SEEDER MAN, MOTOR DRIVEN GEORGIA BUGGY OPERATOR, POWER DRIVEN COMPACTOR OR TAPER OPERATOR, POWER SAW OPERATOR, PUMP CRETE ASSEMBLY MAN, SREED MAN OR SCREW MAN ON ASPHALT PAVER, REGAR INSTALLER, SANDBLASTER MAN, SEALER APPLICATOR FOR ASPHALT (TOXIC), SETTING AND PLACING PRE-STRESSED ON PRE-CAST CONCRETE STRUCTURAL MEMBERS, SIDE RAIL SETTERS (FOR SIDEWALK, SIDE DITCHES, RADII, AND PAVEMENT), SPREADER BOX TENDER (MANUA OR POWER DRIVEN), STRAW BLOWER MAN, SUBSUREFACE DRAIN AND CULVERT PIPE LAYER, CONCRETE CONVEYOR, HORIZONAL BORING AND JACKMAN AND SHEETMAN, PIPE GREADE MAN, WINCH AND WINDLESS OPERATOR CONDUIT INSTALLER, SOD LAYER (NEWTON COUNTY) | $33.45 | $27.50 | $60.95 | Agreement |
LABORERS: HEAVY & HIGHWAY CONSTRUCTION: GROUP 2…Full textLABORERS: HEAVY & HIGHWAY CONSTRUCTION: GROUP 2 CUTTING TORCH BURNER, LASER BEAM ALIGNER, MANHOLE ERECTOR, SEWER PIPE LAYER, WATER LINE INSTALLER, TEMPORARY OR PERMANENT WELDERS (ELECTRIC OR OXY ACETYLENE) (NEWTON COUNTY) | $33.75 | $27.50 | $61.25 | Agreement |
LABORERS: HEAVY & HIGHWAY CONSTRUCTION: GROUP 3…Full textLABORERS: HEAVY & HIGHWAY CONSTRUCTION: GROUP 3 AIR TRACK AND WAGON DRILLMAN, DYNAMITE AND POWDER MAN, CONCRETE BARRIER RAIL FORM SETTER, CONCRETE SAW JOINT CONTROL CUTTING (NEWTON COUNTY) | $34.45 | $27.50 | $61.95 | Agreement |
| LABO0041-005 · Laborers agreement, April 1, 2025 | ||||
LABORERS: UTILITY CONSTRUCTION: GROUP 1…Full textLABORERS: UTILITY CONSTRUCTION: GROUP 1 (JASPER & NEWTON COUNTIES) CONSTRUCTION LABORER; FENCE ERECTOR; FLAGGER; GRADE CHECKER; GUARD RAIL ERECTOR; WIRE MESH LAYER; JOINT MAN (MORTAR, MASTIC AND ALL OTHER TYPES); LIGHTING INSTALLER (PERMANENT OR TEMPORARY); LINEMAN FOR AUTOMATIC GRADE MAKER ON PAVING MACHINES; MORTAR MAN; MULTI-PLATE ERECTOR; RIP-RAP INSTALLER (ALL PRODUCTS AND MATERIALS); ROAD MARKING AND DELINEATION LABORER; SETTING AND PLACING OF ALL PRECAST CONCRETE PRODUCTS; SIGN INSTALLATION INCLUDING SUPPORTING STRUCTURE; SPRAYING OF ALL EPOXY, CURING COMPOUND, OR LIKE MATERIAL; SOD LAYER; AIR TOOL, POWER TOOL, AND POWER EQUIPMENT OPERATOR; ASPHALT LUTE MAN; ASPHALT RAKER MAN; BATCH TRUCK DUMPER; BRIDGE HANDRAIL ERECTOR; HANDLER (BULK OR BAG CEMENT); CHAIN SAW MAN; CONCRETE PUDDLER; CONCRETE RUBBER; CONCRETE SAW OPERATOR; CORE DRILL OPERATOR, EYE LEVEL; HAND BLADE OPERATOR; HYDRO SEEDER MAN; MOTOR-DRIVEN GEORGIA BUGGY OPERATOR; POWER-DRIVEN COMPACTOR OR TAMPER OPERATOR; POWER SAW OPERATOR; PUMPCRETE ASSEMBLY MAN; SCREED MAN OR SCREW MAN ON ASPHALT PAVER; REBAR INSTALLER; SANDBLASTER MAN; SEALER APPLICATOR FOR ASPHALT (TOXIC); SETTING AND PLACING PRESTRESSED OR PRECAST CONCRETE STRUCTURAL MEMEBERS; SIDE RAIL SETTER (FOR SIDEWALKS, SIDE DITCHES, RADII, AND PAVEMENTS); SPREADER BOX TENDER (MANUAL OR POWER-DRIVEN); STRAW BLOWER MAN; SUBSURFACE DRAIN AND CULVERT PIPE LAYER; TRANSVERSE AND LONGITUDINAL HAND BULL FLOAT MAN; CONCRETE CONVEYOR ASSEMBLY MAN; HORIZONTAL BORING AND JACKING MAN; JACKMAN AND SHEETMAN; PIPE GRADE MAN; WINCH AND WINDLASS OPERATOR | $33.45 | $27.50 | $60.95 | Agreement |
LABORERS: UTILITY CONSTRUCTION: GROUP 2…Full textLABORERS: UTILITY CONSTRUCTION: GROUP 2 CUTTING TORCH BURNER; LASER BEAM ALIGNER; MANHOLE ERECTOR; SEWER PIPE LAYER; WATER LINE INSTALLER, TEMPORARY OR PERMANENT; WELDER (ELECTRIC OR EXY-ACETYLENE) IN CONNECTION WITH WATERLINE AND SEWER WORK, HOD CARRIER (TENDING BRICKLAYERS); TVING AND ASSOCIATED GROUTING OF UTILITY LINES (JASPER & NEWTON COUNTIES) | $33.75 | $27.50 | $61.25 | Agreement |
LABORERS: UTILITY CONSTRUCTION: GROUP 3…Full textLABORERS: UTILITY CONSTRUCTION: GROUP 3 AIR TRACK AND WAGON DRILLMAN; CONCRETE BARRIER RAIL FORM SETTER; DYNAMITE AND POWDER MAN; GENERAL LEADMAN; CONCRETE SAW JOINT CONTROL CUTTING (JASPER & NEWTON COUNTIES) | $34.45 | $27.50 | $61.95 | Agreement |
| LABO0041-006 · Laborers agreement, April 1, 2025 | ||||
LABORERS: HEAVY & HIGHWAY CONSTRUCTION: GROUP 1…Full textLABORERS: HEAVY & HIGHWAY CONSTRUCTION: GROUP 1 CONSTRUCTION LABORER, CARPENTER TENDER, FENCE ERECTOR, GRADE CHECKER, GUARD RAIL ERECTOR, CONTINUOUS STEEL ROD OR MAT INSTALLER, WIRE MESH LAYER, JOINT MAN (MORTAR, MASTIC, AND ALL OTHER TYPES), LIGHTING INSTALLER (PERMANENT OR TEMPORARY), LINEMAN FOR AUTOMATIC GRADE MAKER ON PAVING MACHINES, MORTAR MAN, MULTI-PLANT ERECTOR, RIP-RAP INSTALLER (ALL PRODUCTS AND MATERIALS), ROAD MARKING AND DELINEATION LABORER, SETTING AND PLACING OF ALL PRECAST CONCRETE PRODUCTS, SING INSTALLATION INCLUDING SUPPORTING STRUCTURE, SPRAYING OF ALL EPOXY, CURING COMPOUND, OR LIKE MATERIAL, FLAGPERSON, AIR TOOL, POWER TOOL OPERATOR, ASPHALT RAKER MAN, BATCH TRUCK DUMPER, BRIDGE HAND RAIL ERECTOR, HANDLER (BULK OR BAG CEMENT), CHAIN SAW MAN, CONCRETE PUDDLER, CONCRETE RUBBER, CONCRETE SAW OPERATOR, CORE DRILL OPERATOR, EYE LEVEL, HAND BLADE OPERATOR HYDRO SEEDER MAN, MOTOR DRIVEN GEORGIA BUGGY OPERATOR, POWER DRIVEN COMPACTOR OR TAPER OPERATOR, POWER SAW OPERATOR, PUMP CRETE ASSEMBLY MAN, SREED MAN OR SCREW MAN ON ASPHALT PAVER, REGAR INSTALLER, SANDBLASTER MAN, SEALER APPLICATOR FOR ASPHALT (TOXIC), SETTING AND PLACING PRE-STRESSED ON PRE-CAST CONCRETE STRUCTURAL MEMBERS, SIDE RAIL SETTERS (FOR SIDEWALK, SIDE DITCHES, RADII, AND PAVEMENT), SPREADER BOX TENDER (MANUA OR POWER DRIVEN), STRAW BLOWER MAN, SUBSUREFACE DRAIN AND CULVERT PIPE LAYER, CONCRETE CONVEYOR, HORIZONAL BORING AND JACKMAN AND SHEETMAN, PIPE GREADE MAN, WINCH AND WINDLESS OPERATOR CONDUIT INSTALLER, SOD LAYER (JASPER & STARKE COUNTIES) | $30.68 | $27.50 | $58.18 | Agreement |
LABORERS: HEAVY & HIGHWAY CONSTRUCTION: GROUP 2…Full textLABORERS: HEAVY & HIGHWAY CONSTRUCTION: GROUP 2 CUTTING TORCH BURNER, LASER BEAM ALIGNER, MANHOLE ERECTOR, SEWER PIPE LAYER, WATER LINE INSTALLER, TEMPORARY OR PERMANENT WELDERS (ELECTRIC OR OXY ACETYLENE) (JASPER & STARKE COUNTIES) | $30.98 | $27.50 | $58.48 | Agreement |
LABORERS: HEAVY & HIGHWAY CONSTRUCTION: GROUP 3…Full textLABORERS: HEAVY & HIGHWAY CONSTRUCTION: GROUP 3 AIR TRACK AND WAGON DRILLMAN, DYNAMITE AND POWDER MAN, CONCRETE BARRIER RAIL FORM SETTER, CONCRETE SAW JOINT CONTROL CUTTING (JASPER & STARKE COUNTIES) | $31.68 | $27.50 | $59.18 | Agreement |
| LABO0081-003 · Laborers agreement, April 1, 2025 | ||||
LABORERS: UTILITY CONSTRUCTION: GROUP 1…Full textLABORERS: UTILITY CONSTRUCTION: GROUP 1 CONSTRUCTION LABORER; FENCE ERECTOR; FLAGGER; GRADE CHECKER; GUARD RAIL ERECTOR; WIRE MESH LAYER; JOINT MAN (MORTAR, MASTIC AND ALL OTHER TYPES); LIGHTING INSTALLER (PERMANENT OR TEMPORARY); LINEMAN FOR AUTOMATIC GRADE MAKER ON PAVING MACHINES; MORTAR MAN; MULTI-PLATE ERECTOR; RIP-RAP INSTALLER (ALL PRODUCTS AND MATERIALS); ROAD MARKING AND DELINEATION LABORER; SETTING AND PLACING OF ALL PRECAST CONCRETE PRODUCTS; SIGN INSTALLATION INCLUDING SUPPORTING STRUCTURE; SPRAYING OF ALL EPOXY, CURING COMPOUND, OR LIKE MATERIAL; SOD LAYER; AIR TOOL, POWER TOOL, AND POWER EQUIPMENT OPERATOR; ASPHALT LUTE MAN; ASPHALT RAKER MAN; BATCH TRUCK DUMPER; BRIDGE HANDRAIL ERECTOR; HANDLER (BULK OR BAG CEMENT); CHAIN SAW MAN; CONCRETE PUDDLER; CONCRETE RUBBER; CONCRETE SAW OPERATOR; CORE DRILL OPERATOR, EYE LEVEL; HAND BLADE OPERATOR; HYDRO SEEDER MAN; MOTOR-DRIVEN GEORGIA BUGGY OPERATOR; POWER-DRIVEN COMPACTOR OR TAMPER OPERATOR; POWER SAW OPERATOR; PUMPCRETE ASSEMBLY MAN; SCREED MAN OR SCREW MAN ON ASPHALT PAVER; REBAR INSTALLER; SANDBLASTER MAN; SEALER APPLICATOR FOR ASPHALT (TOXIC); SETTING AND PLACING PRESTRESSED OR PRECAST CONCRETE STRUCTURAL MEMEBERS; SIDE RAIL SETTER (FOR SIDEWALKS, SIDE DITCHES, RADII, AND PAVEMENTS); SPREADER BOX TENDER (MANUAL OR POWER-DRIVEN); STRAW BLOWER MAN; SUBSURFACE DRAIN AND CULVERT PIPE LAYER; TRANSVERSE AND LONGITUDINAL HAND BULL FLOAT MAN; CONCRETE CONVEYOR ASSEMBLY MAN; HORIZONTAL BORING AND JACKING MAN; JACKMAN AND SHEETMAN; PIPE GRADE MAN; WINCH AND WINDLASS OPERATOR (STARKE COUNTY) | $30.68 | $27.50 | $58.18 | Agreement |
LABORERS: UTILITY CONSTRUCTION: GROUP 2…Full textLABORERS: UTILITY CONSTRUCTION: GROUP 2 CUTTING TORCH BURNER; LASER BEAM ALIGNER; MANHOLE ERECTOR; SEWER PIPE LAYER; WATER LINE INSTALLER, TEMPORARY OR PERMANENT; WELDER (ELECTRIC OR EXY-ACETYLENE) IN CONNECTION WITH WATERLINE AND SEWER WORK, HOD CARRIER (TENDING BRICKLAYERS); TVING AND ASSOCIATED GROUTING OF UTILITY LINES (STARKE COUNTY) | $30.98 | $27.50 | $58.48 | Agreement |
LABORERS: UTILITY CONSTRUCTION: GROUP 3…Full textLABORERS: UTILITY CONSTRUCTION: GROUP 3 AIR TRACK AND WAGON DRILLMAN; CONCRETE BARRIER RAIL FORM SETTER; DYNAMITE AND POWDER MAN; GENERAL LEADMAN; CONCRETE SAW JOINT CONTROL CUTTING (STARKE COUNTY) | $31.68 | $27.50 | $59.18 | Agreement |
| LABO0120-003 · Laborers agreement, April 1, 2025 | ||||
LABORERS: UTILITY CONSTRUCTION: GROUP 1…Full textLABORERS: UTILITY CONSTRUCTION: GROUP 1 CONSTRUCTION LABORER; FENCE ERECTOR; FLAGGER; GRADE CHECKER; GUARD RAIL ERECTOR; WIRE MESH LAYER; JOINT MAN (MORTAR, MASTIC AND ALL OTHER TYPES); LIGHTING INSTALLER (PERMANENT OR TEMPORARY); LINEMAN FOR AUTOMATIC GRADE MAKER ON PAVING MACHINES; MORTAR MAN; MULTI-PLATE ERECTOR; RIP-RAP INSTALLER (ALL PRODUCTS AND MATERIALS); ROAD MARKING AND DELINEATION LABORER; SETTING AND PLACING OF ALL PRECAST CONCRETE PRODUCTS; SIGN INSTALLATION INCLUDING SUPPORTING STRUCTURE; SPRAYING OF ALL EPOXY, CURING COMPOUND, OR LIKE MATERIAL; SOD LAYER; AIR TOOL, POWER TOOL, AND POWER EQUIPMENT OPERATOR; ASPHALT LUTE MAN; ASPHALT RAKER MAN; BATCH TRUCK DUMPER; BRIDGE HANDRAIL ERECTOR; HANDLER (BULK OR BAG CEMENT); CHAIN SAW MAN; CONCRETE PUDDLER; CONCRETE RUBBER; CONCRETE SAW OPERATOR; CORE DRILL OPERATOR, EYE LEVEL; HAND BLADE OPERATOR; HYDRO SEEDER MAN; MOTOR-DRIVEN GEORGIA BUGGY OPERATOR; POWER-DRIVEN COMPACTOR OR TAMPER OPERATOR; POWER SAW OPERATOR; PUMPCRETE ASSEMBLY MAN; SCREED MAN OR SCREW MAN ON ASPHALT PAVER; REBAR INSTALLER; SANDBLASTER MAN; SEALER APPLICATOR FOR ASPHALT (TOXIC); SETTING AND PLACING PRESTRESSED OR PRECAST CONCRETE STRUCTURAL MEMEBERS; SIDE RAIL SETTER (FOR SIDEWALKS, SIDE DITCHES, RADII, AND PAVEMENTS); SPREADER BOX TENDER (MANUAL OR POWER-DRIVEN); STRAW BLOWER MAN; SUBSURFACE DRAIN AND CULVERT PIPE LAYER; TRANSVERSE AND LONGITUDINAL HAND BULL FLOAT MAN; CONCRETE CONVEYOR ASSEMBLY MAN; HORIZONTAL BORING AND JACKING MAN; JACKMAN AND SHEETMAN; PIPE GRADE MAN; WINCH AND WINDLASS OPERATOR (MARION & SHELBY COUNTIES) | $30.65 | $18.00 | $48.65 | Agreement |
LABORERS: UTILITY CONSTRUCTION: GROUP 2…Full textLABORERS: UTILITY CONSTRUCTION: GROUP 2 CUTTING TORCH BURNER; LASER BEAM ALIGNER; MANHOLE ERECTOR; SEWER PIPE LAYER; WATER LINE INSTALLER, TEMPORARY OR PERMANENT; WELDER (ELECTRIC OR EXY-ACETYLENE) IN CONNECTION WITH WATERLINE AND SEWER WORK, TVING AND ASSOCIATED GROUTING OF UTILITY LINES (MARION & SHELBY COUNTIES) | $31.15 | $18.00 | $49.15 | Agreement |
LABORERS: UTILITY CONSTRUCTION: GROUP 3…Full textLABORERS: UTILITY CONSTRUCTION: GROUP 3 AIR TRACK AND WAGON DRILLMAN; CONCRETE BARRIER RAIL FORM SETTER; DYNAMITE AND POWDER MAN; GENERAL LEADMAN; CONCRETE SAW JOINT CONTROL CUTTING; HOD CARRIER (TENDING BRICKLAYERS) (MARION & SHELBY COUNTIES) | $31.65 | $18.00 | $49.65 | Agreement |
| LABO0204-003 · Laborers agreement, April 1, 2025 | ||||
LABORERS: UTILITY CONSTRUCTION: GROUP 1…Full textLABORERS: UTILITY CONSTRUCTION: GROUP 1 CONSTRUCTION LABORER; FENCE ERECTOR; FLAGGER; GRADE CHECKER; GUARD RAIL ERECTOR; WIRE MESH LAYER; JOINT MAN (MORTAR, MASTIC AND ALL OTHER TYPES); LIGHTING INSTALLER (PERMANENT OR TEMPORARY); LINEMAN FOR AUTOMATIC GRADE MAKER ON PAVING MACHINES; MORTAR MAN; MULTI-PLATE ERECTOR; RIP-RAP INSTALLER (ALL PRODUCTS AND MATERIALS); ROAD MARKING AND DELINEATION LABORER; SETTING AND PLACING OF ALL PRECAST CONCRETE PRODUCTS; SIGN INSTALLATION INCLUDING SUPPORTING STRUCTURE; SPRAYING OF ALL EPOXY, CURING COMPOUND, OR LIKE MATERIAL; SOD LAYER; AIR TOOL, POWER TOOL, AND POWER EQUIPMENT OPERATOR; ASPHALT LUTE MAN; ASPHALT RAKER MAN; BATCH TRUCK DUMPER; BRIDGE HANDRAIL ERECTOR; HANDLER (BULK OR BAG CEMENT); CHAIN SAW MAN; CONCRETE PUDDLER; CONCRETE RUBBER; CONCRETE SAW OPERATOR; CORE DRILL OPERATOR, EYE LEVEL; HAND BLADE OPERATOR; HYDRO SEEDER MAN; MOTOR-DRIVEN GEORGIA BUGGY OPERATOR; POWER-DRIVEN COMPACTOR OR TAMPER OPERATOR; POWER SAW OPERATOR; PUMPCRETE ASSEMBLY MAN; SCREED MAN OR SCREW MAN ON ASPHALT PAVER; REBAR INSTALLER; SANDBLASTER MAN; SEALER APPLICATOR FOR ASPHALT (TOXIC); SETTING AND PLACING PRESTRESSED OR PRECAST CONCRETE STRUCTURAL MEMEBERS; SIDE RAIL SETTER (FOR SIDEWALKS, SIDE DITCHES, RADII, AND PAVEMENTS); SPREADER BOX TENDER (MANUAL OR POWER-DRIVEN); STRAW BLOWER MAN; SUBSURFACE DRAIN AND CULVERT PIPE LAYER; TRANSVERSE AND LONGITUDINAL HAND BULL FLOAT MAN; CONCRETE CONVEYOR ASSEMBLY MAN; HORIZONTAL BORING AND JACKING MAN; JACKMAN AND SHEETMAN; PIPE GRADE MAN; WINCH AND WINDLASS OPERATOR (CLAY, FOUNTAIN, GREENE, HENDRICKS, OWEN, PARKE, PUTNAM, SULLIVAN, VERMILLION, VIGO, & WARREN COUNTIES) | $30.65 | $18.00 | $48.65 | Agreement |
LABORERS: UTILITY CONSTRUCTION: GROUP 2…Full textLABORERS: UTILITY CONSTRUCTION: GROUP 2 CUTTING TORCH BURNER; LASER BEAM ALIGNER; MANHOLE ERECTOR; SEWER PIPE LAYER; WATER LINE INSTALLER, TEMPORARY OR PERMANENT; WELDER (ELECTRIC OR EXY-ACETYLENE) IN CONNECTION WITH WATERLINE AND SEWER WORK, TVING AND ASSOCIATED GROUTING OF UTILITY LINES (CLAY, FOUNTAIN, GREENE, HENDRICKS, OWEN, PARKE, PUTNAM, SULLIVAN, VERMILLION, VIGO, & WARREN COUNTIES) | $31.15 | $18.00 | $49.15 | Agreement |
LABORERS: UTILITY CONSTRUCTION: GROUP 3…Full textLABORERS: UTILITY CONSTRUCTION: GROUP 3 AIR TRACK AND WAGON DRILLMAN; CONCRETE BARRIER RAIL FORM SETTER; DYNAMITE AND POWDER MAN; GENERAL LEADMAN; HOD CARRIER (TENDING BRICKLAYERS); CONCRETE SAW JOINT CONTROL CUTTING (CLAY, FOUNTAIN, GREENE, HENDRICKS, OWEN, PARKE, PUTNAM, SULLIVAN, VERMILLION, VIGO, & WARREN COUNTIES) | $31.65 | $18.00 | $49.65 | Agreement |
| LABO0213-003 · Laborers agreement, April 1, 2025 | ||||
LABORERS: UTILITY CONSTRUCTION: GROUP 1…Full textLABORERS: UTILITY CONSTRUCTION: GROUP 1 CONSTRUCTION LABORER; FENCE ERECTOR; FLAGGER; GRADE CHECKER; GUARD RAIL ERECTOR; WIRE MESH LAYER; JOINT MAN (MORTAR, MASTIC AND ALL OTHER TYPES); LIGHTING INSTALLER (PERMANENT OR TEMPORARY); LINEMAN FOR AUTOMATIC GRADE MAKER ON PAVING MACHINES; MORTAR MAN; MULTI-PLATE ERECTOR; RIP-RAP INSTALLER (ALL PRODUCTS AND MATERIALS); ROAD MARKING AND DELINEATION LABORER; SETTING AND PLACING OF ALL PRECAST CONCRETE PRODUCTS; SIGN INSTALLATION INCLUDING SUPPORTING STRUCTURE; SPRAYING OF ALL EPOXY, CURING COMPOUND, OR LIKE MATERIAL; SOD LAYER; AIR TOOL, POWER TOOL, AND POWER EQUIPMENT OPERATOR; ASPHALT LUTE MAN; ASPHALT RAKER MAN; BATCH TRUCK DUMPER; BRIDGE HANDRAIL ERECTOR; HANDLER (BULK OR BAG CEMENT); CHAIN SAW MAN; CONCRETE PUDDLER; CONCRETE RUBBER; CONCRETE SAW OPERATOR; CORE DRILL OPERATOR, EYE LEVEL; HAND BLADE OPERATOR; HYDRO SEEDER MAN; MOTOR-DRIVEN GEORGIA BUGGY OPERATOR; POWER-DRIVEN COMPACTOR OR TAMPER OPERATOR; POWER SAW OPERATOR; PUMPCRETE ASSEMBLY MAN; SCREED MAN OR SCREW MAN ON ASPHALT PAVER; REBAR INSTALLER; SANDBLASTER MAN; SEALER APPLICATOR FOR ASPHALT (TOXIC); SETTING AND PLACING PRESTRESSED OR PRECAST CONCRETE STRUCTURAL MEMEBERS; SIDE RAIL SETTER (FOR SIDEWALKS, SIDE DITCHES, RADII, AND PAVEMENTS); SPREADER BOX TENDER (MANUAL OR POWER-DRIVEN); STRAW BLOWER MAN; SUBSURFACE DRAIN AND CULVERT PIPE LAYER; TRANSVERSE AND LONGITUDINAL HAND BULL FLOAT MAN; CONCRETE CONVEYOR ASSEMBLY MAN; HORIZONTAL BORING AND JACKING MAN; JACKMAN AND SHEETMAN; PIPE GRADE MAN; WINCH AND WINDLASS OPERATOR (ADAMS, ALLEN, DEKALB, HUNTINGTON, NOBLE, STEUBEN, WABASH, WELLS, & WHITLEY COUNTIES) | $30.65 | $18.00 | $48.65 | Agreement |
LABORERS: UTILITY CONSTRUCTION: GROUP 2…Full textLABORERS: UTILITY CONSTRUCTION: GROUP 2 CUTTING TORCH BURNER; LASER BEAM ALIGNER; MANHOLE ERECTOR; SEWER PIPE LAYER; WATER LINE INSTALLER, TEMPORARY OR PERMANENT; WELDER (ELECTRIC OR EXY-ACETYLENE) IN CONNECTION WITH WATERLINE AND SEWER WORK, TVING AND ASSOCIATED GROUTING OF UTILITY LINES (ADAMS, ALLEN, DEKALB, HUNTINGTON, NOBLE, STEUBEN, WABASH, WELLS, & WHITLEY COUNTIES) | $31.15 | $18.00 | $49.15 | Agreement |
LABORERS: UTILITY CONSTRUCTION: GROUP 3…Full textLABORERS: UTILITY CONSTRUCTION: GROUP 3 AIR TRACK AND WAGON DRILLMAN; CONCRETE BARRIER RAIL FORM SETTER; DYNAMITE AND POWDER MAN; GENERAL LEADMAN; HOD CARRIER (TENDING BRICKLAYERS); CONCRETE SAW JOINT CONTROL CUTTING (ADAMS, ALLEN, DEKALB, HUNTINGTON, NOBLE, STEUBEN, WABASH, WELLS, & WHITLEY COUNTIES) | $31.65 | $18.00 | $49.65 | Agreement |
| LABO0274-005 · Laborers agreement, April 1, 2025 | ||||
LABORERS: UTILITY CONSTRUCTION: GROUP 1…Full textLABORERS: UTILITY CONSTRUCTION: GROUP 1 CONSTRUCTION LABORER; FENCE ERECTOR; FLAGGER; GRADE CHECKER; GUARD RAIL ERECTOR; WIRE MESH LAYER; JOINT MAN (MORTAR, MASTIC AND ALL OTHER TYPES); LIGHTING INSTALLER (PERMANENT OR TEMPORARY); LINEMAN FOR AUTOMATIC GRADE MAKER ON PAVING MACHINES; MORTAR MAN; MULTI-PLATE ERECTOR; RIP-RAP INSTALLER (ALL PRODUCTS AND MATERIALS); ROAD MARKING AND DELINEATION LABORER; SETTING AND PLACING OF ALL PRECAST CONCRETE PRODUCTS; SIGN INSTALLATION INCLUDING SUPPORTING STRUCTURE; SPRAYING OF ALL EPOXY, CURING COMPOUND, OR LIKE MATERIAL; SOD LAYER; AIR TOOL, POWER TOOL, AND POWER EQUIPMENT OPERATOR; ASPHALT LUTE MAN; ASPHALT RAKER MAN; BATCH TRUCK DUMPER; BRIDGE HANDRAIL ERECTOR; HANDLER (BULK OR BAG CEMENT); CHAIN SAW MAN; CONCRETE PUDDLER; CONCRETE RUBBER; CONCRETE SAW OPERATOR; CORE DRILL OPERATOR, EYE LEVEL; HAND BLADE OPERATOR; HYDRO SEEDER MAN; MOTOR-DRIVEN GEORGIA BUGGY OPERATOR; POWER-DRIVEN COMPACTOR OR TAMPER OPERATOR; POWER SAW OPERATOR; PUMPCRETE ASSEMBLY MAN; SCREED MAN OR SCREW MAN ON ASPHALT PAVER; REBAR INSTALLER; SANDBLASTER MAN; SEALER APPLICATOR FOR ASPHALT (TOXIC); SETTING AND PLACING PRESTRESSED OR PRECAST CONCRETE STRUCTURAL MEMEBERS; SIDE RAIL SETTER (FOR SIDEWALKS, SIDE DITCHES, RADII, AND PAVEMENTS); SPREADER BOX TENDER (MANUAL OR POWER-DRIVEN); STRAW BLOWER MAN; SUBSURFACE DRAIN AND CULVERT PIPE LAYER; TRANSVERSE AND LONGITUDINAL HAND BULL FLOAT MAN; CONCRETE CONVEYOR ASSEMBLY MAN; HORIZONTAL BORING AND JACKING MAN; JACKMAN AND SHEETMAN; PIPE GRADE MAN; WINCH AND WINDLASS OPERATOR (BENTON, BOONE, CARROLL, CASS, CLINTON, FULTON, HOWARD, MIAMI, MONTGOMERY, PULASKI, TIPPECANOE, TIPTON, AND WHITE COUNTIES) | $30.65 | $18.00 | $48.65 | Agreement |
LABORERS: UTILITY CONSTRUCTION: GROUP 2…Full textLABORERS: UTILITY CONSTRUCTION: GROUP 2 CUTTING TORCH BURNER; LASER BEAM ALIGNER; MANHOLE ERECTOR; SEWER PIPE LAYER; WATER LINE INSTALLER, TEMPORARY OR PERMANENT; WELDER (ELECTRIC OR EXY-ACETYLENE) IN CONNECTION WITH WATERLINE AND SEWER WORK, TVING AND ASSOCIATED GROUTING OF UTILITY LINES (BENTON, BOONE, CARROLL, CASS, CLINTON, FULTON, HOWARD, MIAMI, MONTGOMERY, PULASKI, TIPPECANOE, TIPTON, AND WHITE COUNTIES) | $31.15 | $18.00 | $49.15 | Agreement |
LABORERS: UTILITY CONSTRUCTION: GROUP 3…Full textLABORERS: UTILITY CONSTRUCTION: GROUP 3 AIR TRACK AND WAGON DRILLMAN; CONCRETE BARRIER RAIL FORM SETTER; DYNAMITE AND POWDER MAN; GENERAL LEADMAN; HOD CARRIER (TENDING BRICKLAYERS); CONCRETE SAW JOINT CONTROL CUTTING (BENTON, BOONE, CARROLL, CASS, CLINTON, FULTON, HOWARD, MIAMI, MONTGOMERY, PULASKI, TIPPECANOE, TIPTON, AND WHITE COUNTIES) | $31.65 | $18.00 | $49.65 | Agreement |
| LABO0561-015 · Laborers agreement, April 1, 2025 | ||||
LABORERS: UTILITY CONSTRUCTION: GROUP 1…Full textLABORERS: UTILITY CONSTRUCTION: GROUP 1 CONSTRUCTION LABORER; FENCE ERECTOR; FLAGGER; GRADE CHECKER; GUARD RAIL ERECTOR; WIRE MESH LAYER; JOINT MAN (MORTAR, MASTIC AND ALL OTHER TYPES); LIGHTING INSTALLER (PERMANENT OR TEMPORARY); LINEMAN FOR AUTOMATIC GRADE MAKER ON PAVING MACHINES; MORTAR MAN; MULTI-PLATE ERECTOR; RIP-RAP INSTALLER (ALL PRODUCTS AND MATERIALS); ROAD MARKING AND DELINEATION LABORER; SETTING AND PLACING OF ALL PRECAST CONCRETE PRODUCTS; SIGN INSTALLATION INCLUDING SUPPORTING STRUCTURE; SPRAYING OF ALL EPOXY, CURING COMPOUND, OR LIKE MATERIAL; SOD LAYER; AIR TOOL, POWER TOOL, AND POWER EQUIPMENT OPERATOR; ASPHALT LUTE MAN; ASPHALT RAKER MAN; BATCH TRUCK DUMPER; BRIDGE HANDRAIL ERECTOR; HANDLER (BULK OR BAG CEMENT); CHAIN SAW MAN; CONCRETE PUDDLER; CONCRETE RUBBER; CONCRETE SAW OPERATOR; CORE DRILL OPERATOR, EYE LEVEL; HAND BLADE OPERATOR; HYDRO SEEDER MAN; MOTOR-DRIVEN GEORGIA BUGGY OPERATOR; POWER-DRIVEN COMPACTOR OR TAMPER OPERATOR; POWER SAW OPERATOR; PUMPCRETE ASSEMBLY MAN; SCREED MAN OR SCREW MAN ON ASPHALT PAVER; REBAR INSTALLER; SANDBLASTER MAN; SEALER APPLICATOR FOR ASPHALT (TOXIC); SETTING AND PLACING PRESTRESSED OR PRECAST CONCRETE STRUCTURAL MEMEBERS; SIDE RAIL SETTER (FOR SIDEWALKS, SIDE DITCHES, RADII, AND PAVEMENTS); SPREADER BOX TENDER (MANUAL OR POWER-DRIVEN); STRAW BLOWER MAN; SUBSURFACE DRAIN AND CULVERT PIPE LAYER; TRANSVERSE AND LONGITUDINAL HAND BULL FLOAT MAN; CONCRETE CONVEYOR ASSEMBLY MAN; HORIZONTAL BORING AND JACKING MAN; JACKMAN AND SHEETMAN; PIPE GRADE MAN; WINCH AND WINDLASS OPERATOR (DAVIESS, DUBOIS, GIBSON, KNOX, PIKE, POSEY, SPENCER, VANDERBURGH, & WARRICK COUNTIES) | $30.65 | $18.00 | $48.65 | Agreement |
LABORERS: UTILITY CONSTRUCTION: GROUP 2…Full textLABORERS: UTILITY CONSTRUCTION: GROUP 2 CUTTING TORCH BURNER; LASER BEAM ALIGNER; MANHOLE ERECTOR; SEWER PIPE LAYER; WATER LINE INSTALLER, TEMPORARY OR PERMANENT; WELDER (ELECTRIC OR EXY-ACETYLENE) IN CONNECTION WITH WATERLINE AND SEWER WORK, HOD CARRIER (TENDING BRICKLAYERS); TVING AND ASSOCIATED GROUTING OF UTILITY LINES (DAVIESS, DUBOIS, GIBSON, KNOX, PIKE, POSEY, SPENCER, VANDERBURGH, & WARRICK COUNTIES) | $31.15 | $18.00 | $49.15 | Agreement |
LABORERS: UTILITY CONSTRUCTION: GROUP 3…Full textLABORERS: UTILITY CONSTRUCTION: GROUP 3 AIR TRACK AND WAGON DRILLMAN; CONCRETE BARRIER RAIL FORM SETTER; DYNAMITE AND POWDER MAN; GENERAL LEADMAN; CONCRETE SAW JOINT CONTROL CUTTING (DAVIESS, DUBOIS, GIBSON, KNOX, PIKE, POSEY, SPENCER, VANDERBURGH, & WARRICK COUNTIES) | $31.65 | $18.00 | $49.65 | Agreement |
| LABO0645-005 · Laborers agreement, April 1, 2025 | ||||
LABORERS: UTILITY CONSTRUCTION: GROUP 1…Full textLABORERS: UTILITY CONSTRUCTION: GROUP 1 CONSTRUCTION LABORER; FENCE ERECTOR; FLAGGER; GRADE CHECKER; GUARD RAIL ERECTOR; WIRE MESH LAYER; JOINT MAN (MORTAR, MASTIC AND ALL OTHER TYPES); LIGHTING INSTALLER (PERMANENT OR TEMPORARY); LINEMAN FOR AUTOMATIC GRADE MAKER ON PAVING MACHINES; MORTAR MAN; MULTI-PLATE ERECTOR; RIP-RAP INSTALLER (ALL PRODUCTS AND MATERIALS); ROAD MARKING AND DELINEATION LABORER; SETTING AND PLACING OF ALL PRECAST CONCRETE PRODUCTS; SIGN INSTALLATION INCLUDING SUPPORTING STRUCTURE; SPRAYING OF ALL EPOXY, CURING COMPOUND, OR LIKE MATERIAL; SOD LAYER; AIR TOOL, POWER TOOL, AND POWER EQUIPMENT OPERATOR; ASPHALT LUTE MAN; ASPHALT RAKER MAN; BATCH TRUCK DUMPER; BRIDGE HANDRAIL ERECTOR; HANDLER (BULK OR BAG CEMENT); CHAIN SAW MAN; CONCRETE PUDDLER; CONCRETE RUBBER; CONCRETE SAW OPERATOR; CORE DRILL OPERATOR, EYE LEVEL; HAND BLADE OPERATOR; HYDRO SEEDER MAN; MOTOR-DRIVEN GEORGIA BUGGY OPERATOR; POWER-DRIVEN COMPACTOR OR TAMPER OPERATOR; POWER SAW OPERATOR; PUMPCRETE ASSEMBLY MAN; SCREED MAN OR SCREW MAN ON ASPHALT PAVER; REBAR INSTALLER; SANDBLASTER MAN; SEALER APPLICATOR FOR ASPHALT (TOXIC); SETTING AND PLACING PRESTRESSED OR PRECAST CONCRETE STRUCTURAL MEMEBERS; SIDE RAIL SETTER (FOR SIDEWALKS, SIDE DITCHES, RADII, AND PAVEMENTS); SPREADER BOX TENDER (MANUAL OR POWER-DRIVEN); STRAW BLOWER MAN; SUBSURFACE DRAIN AND CULVERT PIPE LAYER; TRANSVERSE AND LONGITUDINAL HAND BULL FLOAT MAN; CONCRETE CONVEYOR ASSEMBLY MAN; HORIZONTAL BORING AND JACKING MAN; JACKMAN AND SHEETMAN; PIPE GRADE MAN; WINCH AND WINDLASS OPERATOR (ELKHART COUNTY) | $30.65 | $18.00 | $48.65 | Agreement |
LABORERS: UTILITY CONSTRUCTION: GROUP 2…Full textLABORERS: UTILITY CONSTRUCTION: GROUP 2 CUTTING TORCH BURNER; LASER BEAM ALIGNER; MANHOLE ERECTOR; SEWER PIPE LAYER; WATER LINE INSTALLER, TEMPORARY OR PERMANENT; WELDER (ELECTRIC OR EXY-ACETYLENE) IN CONNECTION WITH WATERLINE AND SEWER WORK, HOD CARRIER (TENDING BRICKLAYERS); TVING AND ASSOCIATED GROUTING OF UTILITY LINES (ELKHART COUNTY) | $31.15 | $18.00 | $49.15 | Agreement |
LABORERS: UTILITY CONSTRUCTION: GROUP 3…Full textLABORERS: UTILITY CONSTRUCTION: GROUP 3 AIR TRACK AND WAGON DRILLMAN; CONCRETE BARRIER RAIL FORM SETTER; DYNAMITE AND POWDER MAN; GENERAL LEADMAN; CONCRETE SAW JOINT CONTROL CUTTING (ELKHART COUNTY) | $31.65 | $18.00 | $49.65 | Agreement |
| LABO0645-006 · Laborers agreement, April 1, 2025 | ||||
LABORERS: UTILITY CONSTRUCTION: GROUP 1…Full textLABORERS: UTILITY CONSTRUCTION: GROUP 1 CONSTRUCTION LABORER; FENCE ERECTOR; FLAGGER; GRADE CHECKER; GUARD RAIL ERECTOR; WIRE MESH LAYER; JOINT MAN (MORTAR, MASTIC AND ALL OTHER TYPES); LIGHTING INSTALLER (PERMANENT OR TEMPORARY); LINEMAN FOR AUTOMATIC GRADE MAKER ON PAVING MACHINES; MORTAR MAN; MULTI-PLATE ERECTOR; RIP-RAP INSTALLER (ALL PRODUCTS AND MATERIALS); ROAD MARKING AND DELINEATION LABORER; SETTING AND PLACING OF ALL PRECAST CONCRETE PRODUCTS; SIGN INSTALLATION INCLUDING SUPPORTING STRUCTURE; SPRAYING OF ALL EPOXY, CURING COMPOUND, OR LIKE MATERIAL; SOD LAYER; AIR TOOL, POWER TOOL, AND POWER EQUIPMENT OPERATOR; ASPHALT LUTE MAN; ASPHALT RAKER MAN; BATCH TRUCK DUMPER; BRIDGE HANDRAIL ERECTOR; HANDLER (BULK OR BAG CEMENT); CHAIN SAW MAN; CONCRETE PUDDLER; CONCRETE RUBBER; CONCRETE SAW OPERATOR; CORE DRILL OPERATOR, EYE LEVEL; HAND BLADE OPERATOR; HYDRO SEEDER MAN; MOTOR-DRIVEN GEORGIA BUGGY OPERATOR; POWER-DRIVEN COMPACTOR OR TAMPER OPERATOR; POWER SAW OPERATOR; PUMPCRETE ASSEMBLY MAN; SCREED MAN OR SCREW MAN ON ASPHALT PAVER; REBAR INSTALLER; SANDBLASTER MAN; SEALER APPLICATOR FOR ASPHALT (TOXIC); SETTING AND PLACING PRESTRESSED OR PRECAST CONCRETE STRUCTURAL MEMEBERS; SIDE RAIL SETTER (FOR SIDEWALKS, SIDE DITCHES, RADII, AND PAVEMENTS); SPREADER BOX TENDER (MANUAL OR POWER-DRIVEN); STRAW BLOWER MAN; SUBSURFACE DRAIN AND CULVERT PIPE LAYER; TRANSVERSE AND LONGITUDINAL HAND BULL FLOAT MAN; CONCRETE CONVEYOR ASSEMBLY MAN; HORIZONTAL BORING AND JACKING MAN; JACKMAN AND SHEETMAN; PIPE GRADE MAN; WINCH AND WINDLASS OPERATOR (KOSCIUSKO, LAGRANGE, & MARSHALL COUNTIES) | $30.65 | $18.00 | $48.65 | Agreement |
LABORERS: UTILITY CONSTRUCTION: GROUP 2…Full textLABORERS: UTILITY CONSTRUCTION: GROUP 2 CUTTING TORCH BURNER; LASER BEAM ALIGNER; MANHOLE ERECTOR; SEWER PIPE LAYER; WATER LINE INSTALLER, TEMPORARY OR PERMANENT; WELDER (ELECTRIC OR EXY-ACETYLENE) IN CONNECTION WITH WATERLINE AND SEWER WORK, HOD CARRIER (TENDING BRICKLAYERS); TVING AND ASSOCIATED GROUTING OF UTILITY LINES (KOSCIUSKO, LAGRANGE, & MARSHALL COUNTIES) | $31.15 | $18.22 | $49.37 | Agreement |
LABORERS: UTILITY CONSTRUCTION: GROUP 3…Full textLABORERS: UTILITY CONSTRUCTION: GROUP 3 AIR TRACK AND WAGON DRILLMAN; CONCRETE BARRIER RAIL FORM SETTER; DYNAMITE AND POWDER MAN; GENERAL LEADMAN; CONCRETE SAW JOINT CONTROL CUTTING (KOSCIUSKO, LAGRANGE, & MARSHALL COUNTIES) | $31.65 | $18.00 | $49.65 | Agreement |
| LABO0741-007 · Laborers agreement, April 1, 2025 | ||||
LABORERS: UTILITY CONSTRUCTION: GROUP 1…Full textLABORERS: UTILITY CONSTRUCTION: GROUP 1 CONSTRUCTION LABORER; FENCE ERECTOR; FLAGGER; GRADE CHECKER; GUARD RAIL ERECTOR; WIRE MESH LAYER; JOINT MAN (MORTAR, MASTIC AND ALL OTHER TYPES); LIGHTING INSTALLER (PERMANENT OR TEMPORARY); LINEMAN FOR AUTOMATIC GRADE MAKER ON PAVING MACHINES; MORTAR MAN; MULTI-PLATE ERECTOR; RIP-RAP INSTALLER (ALL PRODUCTS AND MATERIALS); ROAD MARKING AND DELINEATION LABORER; SETTING AND PLACING OF ALL PRECAST CONCRETE PRODUCTS; SIGN INSTALLATION INCLUDING SUPPORTING STRUCTURE; SPRAYING OF ALL EPOXY, CURING COMPOUND, OR LIKE MATERIAL; SOD LAYER; AIR TOOL, POWER TOOL, AND POWER EQUIPMENT OPERATOR; ASPHALT LUTE MAN; ASPHALT RAKER MAN; BATCH TRUCK DUMPER; BRIDGE HANDRAIL ERECTOR; HANDLER (BULK OR BAG CEMENT); CHAIN SAW MAN; CONCRETE PUDDLER; CONCRETE RUBBER; CONCRETE SAW OPERATOR; CORE DRILL OPERATOR, EYE LEVEL; HAND BLADE OPERATOR; HYDRO SEEDER MAN; MOTOR-DRIVEN GEORGIA BUGGY OPERATOR; POWER-DRIVEN COMPACTOR OR TAMPER OPERATOR; POWER SAW OPERATOR; PUMPCRETE ASSEMBLY MAN; SCREED MAN OR SCREW MAN ON ASPHALT PAVER; REBAR INSTALLER; SANDBLASTER MAN; SEALER APPLICATOR FOR ASPHALT (TOXIC); SETTING AND PLACING PRESTRESSED OR PRECAST CONCRETE STRUCTURAL MEMEBERS; SIDE RAIL SETTER (FOR SIDEWALKS, SIDE DITCHES, RADII, AND PAVEMENTS); SPREADER BOX TENDER (MANUAL OR POWER-DRIVEN); STRAW BLOWER MAN; SUBSURFACE DRAIN AND CULVERT PIPE LAYER; TRANSVERSE AND LONGITUDINAL HAND BULL FLOAT MAN; CONCRETE CONVEYOR ASSEMBLY MAN; HORIZONTAL BORING AND JACKING MAN; JACKMAN AND SHEETMAN; PIPE GRADE MAN; WINCH AND WINDLASS OPERATOR (BARTHOLOMEW, BROWN, DEARBORN, DECATUR, FRANKLIN, JACKSON, JENNINGS, JOHNSON, LAWRENCE, MARTIN, MONROE, MORGAN, OHIO, ORANGE & RIPLEY COUNTIES) | $30.65 | $18.00 | $48.65 | Agreement |
LABORERS: UTILITY CONSTRUCTION: GROUP 2…Full textLABORERS: UTILITY CONSTRUCTION: GROUP 2 CUTTING TORCH BURNER; LASER BEAM ALIGNER; MANHOLE ERECTOR; SEWER PIPE LAYER; WATER LINE INSTALLER, TEMPORARY OR PERMANENT; WELDER (ELECTRIC OR EXY-ACETYLENE) IN CONNECTION WITH WATERLINE AND SEWER WORK, TVING AND ASSOCIATED GROUTING OF UTILITY LINES (BARTHOLOMEW, BROWN, DEARBORN, DECATUR, FRANKLIN, JACKSON, JENNINGS, JOHNSON, LAWRENCE, MARTIN, MONROE, MORGAN, OHIO, ORANGE & RIPLEY COUNTIES) | $31.15 | $18.00 | $49.15 | Agreement |
LABORERS: UTILITY CONSTRUCTION: GROUP 3…Full textLABORERS: UTILITY CONSTRUCTION: GROUP 3 AIR TRACK AND WAGON DRILLMAN; CONCRETE BARRIER RAIL FORM SETTER; DYNAMITE AND POWDER MAN; GENERAL LEADMAN; HOD CARRIER (TENDING BRICKLAYERS); CONCRETE SAW JOINT CONTROL CUTTING (BARTHOLOMEW, BROWN, DEARBORN, DECATUR, FRANKLIN, JACKSON, JENNINGS, JOHNSON, LAWRENCE, MARTIN, MONROE, MORGAN, OHIO, ORANGE & RIPLEY COUNTIES) | $31.65 | $18.00 | $49.65 | Agreement |
| LABO0795-004 · Laborers agreement, April 1, 2025 | ||||
LABORERS: UTILITY CONSTRUCTION: GROUP 1…Full textLABORERS: UTILITY CONSTRUCTION: GROUP 1 CONSTRUCTION LABORER; FENCE ERECTOR; FLAGGER; GRADE CHECKER; GUARD RAIL ERECTOR; WIRE MESH LAYER; JOINT MAN (MORTAR, MASTIC AND ALL OTHER TYPES); LIGHTING INSTALLER (PERMANENT OR TEMPORARY); LINEMAN FOR AUTOMATIC GRADE MAKER ON PAVING MACHINES; MORTAR MAN; MULTI-PLATE ERECTOR; RIP-RAP INSTALLER (ALL PRODUCTS AND MATERIALS); ROAD MARKING AND DELINEATION LABORER; SETTING AND PLACING OF ALL PRECAST CONCRETE PRODUCTS; SIGN INSTALLATION INCLUDING SUPPORTING STRUCTURE; SPRAYING OF ALL EPOXY, CURING COMPOUND, OR LIKE MATERIAL; SOD LAYER; AIR TOOL, POWER TOOL, AND POWER EQUIPMENT OPERATOR; ASPHALT LUTE MAN; ASPHALT RAKER MAN; BATCH TRUCK DUMPER; BRIDGE HANDRAIL ERECTOR; HANDLER (BULK OR BAG CEMENT); CHAIN SAW MAN; CONCRETE PUDDLER; CONCRETE RUBBER; CONCRETE SAW OPERATOR; CORE DRILL OPERATOR, EYE LEVEL; HAND BLADE OPERATOR; HYDRO SEEDER MAN; MOTOR-DRIVEN GEORGIA BUGGY OPERATOR; POWER-DRIVEN COMPACTOR OR TAMPER OPERATOR; POWER SAW OPERATOR; PUMPCRETE ASSEMBLY MAN; SCREED MAN OR SCREW MAN ON ASPHALT PAVER; REBAR INSTALLER; SANDBLASTER MAN; SEALER APPLICATOR FOR ASPHALT (TOXIC); SETTING AND PLACING PRESTRESSED OR PRECAST CONCRETE STRUCTURAL MEMEBERS; SIDE RAIL SETTER (FOR SIDEWALKS, SIDE DITCHES, RADII, AND PAVEMENTS); SPREADER BOX TENDER (MANUAL OR POWER-DRIVEN); STRAW BLOWER MAN; SUBSURFACE DRAIN AND CULVERT PIPE LAYER; TRANSVERSE AND LONGITUDINAL HAND BULL FLOAT MAN; CONCRETE CONVEYOR ASSEMBLY MAN; HORIZONTAL BORING AND JACKING MAN; JACKMAN AND SHEETMAN; PIPE GRADE MAN; WINCH AND WINDLASS OPERATOR (CLARK, CRAWFORD, FLOYD, HARRISON, JEFFERSON, PERRY, SCOTT, SWITZERLAND, & WASHINGTON COUNTIES) | $30.65 | $18.00 | $48.65 | Agreement |
LABORERS: UTILITY CONSTRUCTION: GROUP 2…Full textLABORERS: UTILITY CONSTRUCTION: GROUP 2 CUTTING TORCH BURNER; LASER BEAM ALIGNER; MANHOLE ERECTOR; SEWER PIPE LAYER; WATER LINE INSTALLER, TEMPORARY OR PERMANENT; WELDER (ELECTRIC OR EXY-ACETYLENE) IN CONNECTION WITH WATERLINE AND SEWER WORK, HOD CARRIER (TENDING BRICKLAYERS); TVING AND ASSOCIATED GROUTING OF UTILITY LINES (CLARK, CRAWFORD, FLOYD, HARRISON, JEFFERSON, PERRY, SCOTT, SWITZERLAND, & WASHINGTON COUNTIES) | $31.15 | $18.00 | $49.15 | Agreement |
LABORERS: UTILITY CONSTRUCTION: GROUP 3…Full textLABORERS: UTILITY CONSTRUCTION: GROUP 3 AIR TRACK AND WAGON DRILLMAN; CONCRETE BARRIER RAIL FORM SETTER; DYNAMITE AND POWDER MAN; GENERAL LEADMAN; CONCRETE SAW JOINT CONTROL CUTTING (CLARK, CRAWFORD, FLOYD, HARRISON, JEFFERSON, PERRY, SCOTT, SWITZERLAND, & WASHINGTON COUNTIES) | $31.65 | $18.00 | $49.65 | Agreement |
| LABO0999-001 · Laborers agreement, April 1, 2023 | ||||
LABORERS: HEAVY AND HIGHWAY CONSTRUCTION: GROUP 1…Full textLABORERS: HEAVY AND HIGHWAY CONSTRUCTION: GROUP 1 CONSTRUCTION LABORER; FENCE ERECTOR; FLAGGER; GRADE CHECKER; GUARD RAIL ERECTOR; WIRE MESH LAYER; JOINT MAN (MORTAR, MASTIC AND ALL OTHER TYPES); LIGHTING INSTALLER (PERMANENT OR TEMPORARY); LINEMAN FOR AUTOMATIC GRADE MAKER ON PAVING MACHINES; MORTAR MAN; MULTI-PLATE ERECTOR; RIP-RAP INSTALLER (ALL PRODUCTS AND MATERIALS); ROAD MARKING AND DELINEATION LABORER; SETTING AND PLACING OF ALL PRECAST CONCRETE PRODUCTS; SIGN INSTALLATION INCLUDING SUPPORTING STRUCTURE; SPRAYING OF ALL EPOXY, CURING COMPOUND, OR LIKE MATERIAL; SOD LAYER; AIR TOOL, POWER TOOL, AND POWER EQUIPMENT OPERATOR; ASPHALT LUTE MAN; ASPHALT RAKER MAN; BATCH TRUCK DUMPER; BRIDGE HANDRAIL ERECTOR; HANDLER (BULK OR BAG CEMENT); CHAIN SAW MAN; CONCRETE PUDDLER; CONCRETE RUBBER; CONCRETE SAW OPERATOR; CORE DRILL OPERATOR, EYE LEVEL; HAND BLADE OPERATOR; HYDRO SEEDER MAN; MOTOR-DRIVEN GEORGIA BUGGY OPERATOR; POWER-DRIVEN COMPACTOR OR TAMPER OPERATOR; POWER SAW OPERATOR; PUMPCRETE ASSEMBLY MAN; SCREED MAN OR SCREW MAN ON ASPHALT PAVER; REBAR INSTALLER; SANDBLASTER MAN; SEALER APPLICATOR FOR ASPHALT (TOXIC); SETTING AND PLACING PRESTRESSED OR PRECAST CONCRETE STRUCTURAL MEMEBERS; SIDE RAIL SETTER (FOR SIDEWALKS, SIDE DITCHES, RADII, AND PAVEMENTS); SPREADER BOX TENDER (MANUAL OR POWER-DRIVEN); STRAW BLOWER MAN; SUBSURFACE DRAIN AND CULVERT PIPE LAYER; TRANSVERSE AND LONGITUDINAL HAND BULL FLOAT MAN; CONCRETE CONVEYOR ASSEMBLY MAN; HORIZONTAL BORING AND JACKING MAN; JACKMAN AND SHEETMAN; PIPE GRADE MAN; WINCH AND WINDLASS OPERATOR (ALL COUNTIES EXCEPT: JASPER, NEWTON, & STARKE) | $28.50 | $17.72 | $46.22 | Agreement |
LABORERS: HEAVY AND HIGHWAY CONSTRUCTION: GROUP 2…Full textLABORERS: HEAVY AND HIGHWAY CONSTRUCTION: GROUP 2 CUTTING TORCH BURNER; LASER BEAM ALIGNER; MANHOLE ERECTOR; SEWER PIPE LAYER; WATER LINE INSTALLER, TEMPORARY OR PERMANENT; WELDER (ELECTRIC OR EXY-ACETYLENE) IN CONNECTION WITH WATERLINE AND SEWER WORK, TVING AND ASSOCIATED GROUTING OF UTILITY LINES (ALL COUNTIES EXCEPT: JASPER, NEWTON, & STARKE) | $29.00 | $17.72 | $46.72 | Agreement |
LABORERS: HEAVY AND HIGHWAY CONSTRUCTION: GROUP 3…Full textLABORERS: HEAVY AND HIGHWAY CONSTRUCTION: GROUP 3 AIR TRACK AND WAGON DRILLMAN; CONCRETE BARRIER RAIL FORM SETTER; DYNAMITE AND POWDER MAN; GENERAL LEADMAN; HOD CARRIER (TENDING BRICKLAYERS); CONCRETE SAW JOINT CONTROL CUTTING (ALL COUNTIES EXCEPT: JASPER, NEWTON, & STARKE) | $29.50 | $17.72 | $47.22 | Agreement |
| LABO1112-003 · Laborers agreement, April 1, 2025 | ||||
LABORERS: UTILITY CONSTRUCTION: GROUP 2…Full textLABORERS: UTILITY CONSTRUCTION: GROUP 2 CUTTING TORCH BURNER; LASER BEAM ALIGNER; MANHOLE ERECTOR; SEWER PIPE LAYER; WATER LINE INSTALLER, TEMPORARY OR PERMANENT; WELDER (ELECTRIC OR EXY-ACETYLENE) IN CONNECTION WITH WATERLINE AND SEWER WORK, TVING AND ASSOCIATED GROUTING OF UTILITY LINES (BLACKFORD, DELAWARE, FAYETTE, GRANT, HAMILTON, HANCOCK, HENRY, JAY, MADISON, RANDOLPH, RUSH, UNION & WAYNE COUNTIES) | $31.15 | $18.00 | $49.15 | Agreement |
LABORERS: UTILITY CONSTRCTION: GROUP 1…Full textLABORERS: UTILITY CONSTRCTION: GROUP 1 CONSTRUCTION LABORER; FENCE ERECTOR; FLAGGER; GRADE CHECKER; GUARD RAIL ERECTOR; WIRE MESH LAYER; JOINT MAN (MORTAR, MASTIC AND ALL OTHER TYPES); LIGHTING INSTALLER (PERMANENT OR TEMPORARY); LINEMAN FOR AUTOMATIC GRADE MAKER ON PAVING MACHINES; MORTAR MAN; MULTI-PLATE ERECTOR; RIP-RAP INSTALLER (ALL PRODUCTS AND MATERIALS); ROAD MARKING AND DELINEATION LABORER; SETTING AND PLACING OF ALL PRECAST CONCRETE PRODUCTS; SIGN INSTALLATION INCLUDING SUPPORTING STRUCTURE; SPRAYING OF ALL EPOXY, CURING COMPOUND, OR LIKE MATERIAL; SOD LAYER; AIR TOOL, POWER TOOL, AND POWER EQUIPMENT OPERATOR; ASPHALT LUTE MAN; ASPHALT RAKER MAN; BATCH TRUCK DUMPER; BRIDGE HANDRAIL ERECTOR; HANDLER (BULK OR BAG CEMENT); CHAIN SAW MAN; CONCRETE PUDDLER; CONCRETE RUBBER; CONCRETE SAW OPERATOR; CORE DRILL OPERATOR, EYE LEVEL; HAND BLADE OPERATOR; HYDRO SEEDER MAN; MOTOR-DRIVEN GEORGIA BUGGY OPERATOR; POWER-DRIVEN COMPACTOR OR TAMPER OPERATOR; POWER SAW OPERATOR; PUMPCRETE ASSEMBLY MAN; SCREED MAN OR SCREW MAN ON ASPHALT PAVER; REBAR INSTALLER; SANDBLASTER MAN; SEALER APPLICATOR FOR ASPHALT (TOXIC); SETTING AND PLACING PRESTRESSED OR PRECAST CONCRETE STRUCTURAL MEMEBERS; SIDE RAIL SETTER (FOR SIDEWALKS, SIDE DITCHES, RADII, AND PAVEMENTS); SPREADER BOX TENDER (MANUAL OR POWER-DRIVEN); STRAW BLOWER MAN; SUBSURFACE DRAIN AND CULVERT PIPE LAYER; TRANSVERSE AND LONGITUDINAL HAND BULL FLOAT MAN; CONCRETE CONVEYOR ASSEMBLY MAN; HORIZONTAL BORING AND JACKING MAN; JACKMAN AND SHEETMAN; PIPE GRADE MAN; WINCH AND WINDLASS OPERATOR (BLACKFORD, DELAWARE, FAYETTE, GRANT, HAMILTON, HANCOCK, HENRY, JAY, MADISON, RANDOLPH, RUSH, UNION & WAYNE COUNTIES) | $30.65 | $18.22 | $48.87 | Agreement |
LABORERS: UTILITY CONSTRUCTION: GROUP 3…Full textLABORERS: UTILITY CONSTRUCTION: GROUP 3 AIR TRACK AND WAGON DRILLMAN; CONCRETE BARRIER RAIL FORM SETTER; DYNAMITE AND POWDER MAN; HOD CARRIER (TENDING BRICKLAYERS); GENERAL LEADMAN; CONCRETE SAW JOINT CONTROL CUTTING (BLACKFORD, DELAWARE, FAYETTE, GRANT, HAMILTON, HANCOCK, HENRY, JAY, MADISON, RANDOLPH, RUSH, UNION & WAYNE COUNTIES) | $31.65 | $18.00 | $49.65 | Agreement |
| PAIN0012-006 · Painters and Allied Trades agreement, May 1, 2024 | ||||
PAINTER: BRIDGES, LEAD ABATEMENT…Full textPAINTER: BRIDGES, LEAD ABATEMENT (COMMERCIAL AND INDUSTRIAL) (DEARBORN, OHIO, RIPLEY AND SWITZERLAND COUNTIES) | $31.68 | $14.46 | $46.14 | Agreement |
PAINTER: BRUSH & ROLLER…Full textPAINTER: BRUSH & ROLLER, PAPERHANGER, DRYWALL TAPING (COMMERCIAL AND INDUSTRIAL) (DEARBORN, OHIO, RIPLEY AND SWITZERLAND COUNTIES) | $30.34 | $14.46 | $44.80 | Agreement |
PAINTER: SANDBLASTING…Full textPAINTER: SANDBLASTING, WATERBLASTING (COMMERCIAL AND INDUSTRIAL) (DEARBORN, OHIO, RIPLEY AND SWITZERLAND COUNTIES) | $31.68 | $14.46 | $46.14 | Agreement |
PAINTER: SPRAY (COMMERCIAL AND INDUSTRIAL)…Full textPAINTER: SPRAY (COMMERCIAL AND INDUSTRIAL) (DEARBORN, OHIO, RIPLEY AND SWITZERLAND COUNTIES) | $28.79 | $14.46 | $43.25 | Agreement |
| PAIN0027-005 · Painters and Allied Trades agreement, June 1, 2025 | ||||
| GLAZIER (NEWTON COUNTY, WEST OF HIGHWAY #41) | $53.55 | $44.88 | $98.43 | Agreement |
| PAIN0047-005 · Painters and Allied Trades agreement, June 1, 2024 | ||||
| PAINTER BRUSH, ROLLER (NON-BRIDGE WORK) | $31.02 | $16.89 | $47.91 | Agreement |
| PAINTER SPRAY AND SAND-BLASTING (NON-BRIDGE WORK) | $30.52 | $15.89 | $46.41 | Agreement |
| PAIN0080-001 · Painters and Allied Trades agreement, June 1, 2025 | ||||
PAINTER: BRUSH AND ROLLER…Full textPAINTER: BRUSH AND ROLLER (BENTON, CARROLL, CASS, CLINTON, FOUNTAIN, MONTGOMERY TIPPECANOE AND WARREN COUNTIES) | $31.15 | $18.76 | $49.91 | Agreement |
PAINTER: SPRAY AND SANDBLASTING…Full textPAINTER: SPRAY AND SANDBLASTING (BENTON, CARROLL, CASS, CLINTON, FOUNTAIN, MONTGOMERY TIPPECANOE AND WARREN COUNTIES) | $32.10 | $18.76 | $50.86 | Agreement |
| PAIN0091-007 · Painters and Allied Trades agreement, June 1, 2025 | ||||
PAINTER: BRUSH & ROLLER…Full textPAINTER: BRUSH & ROLLER, DRYWALL TAPING & FINISHING, VINYL/PAPER HANGING (ELKHART, FULTON, KOSCIUSKO AND MARSHALL COUNTIES) | $32.50 | $19.86 | $52.36 | Agreement |
| PAINTER: SPRAY (ELKHART, FULTON, KOSCIUSKO AND MARSHALL COUNTIES) | $33.00 | $19.86 | $52.86 | Agreement |
| PAIN0118-005 · Painters and Allied Trades agreement, June 1, 2025 | ||||
PAINTERS: BRUSH, ROLLER & PAPERHANGER…Full textPAINTERS: BRUSH, ROLLER & PAPERHANGER (HIGHWAY CONSTRUCTION & RAILROAD BRIDGES) (CLARK, CRAWFORD, FLOYD, HARRISON JEFFERSON, SCOTT AND WASHINGTON COUNTIES) | $37.42 | $15.99 | $53.41 | Agreement |
PAINTERS: SPRAY, SANDBLAST & WATERBLAST…Full textPAINTERS: SPRAY, SANDBLAST & WATERBLAST (HIGHWAY CONSTRUCTION & RAILROAD BRIDGES) (CLARK, CRAWFORD, FLOYD, HARRISON JEFFERSON, SCOTT AND WASHINGTON COUNTIES) | $37.42 | $15.99 | $53.41 | Agreement |
| PAIN0156-001 · Painters and Allied Trades agreement, April 1, 2025 | ||||
PAINTERS: BRUSH & ROLLER…Full textPAINTERS: BRUSH & ROLLER (DAVIESS, DUBOIS, GIBZSON, KNOX, PERRY, PIKE, POSSEY, SPENCER, VANDERBURGH, AND WARRICK COUNTIES) FOOTNOTE: A: ALL STRUCTURES OVER 40FT? $0.75/ HOUR ABOVE BASE WAGE ALL STRUCTURES OVER 75FT? $1.50/ HOUR ABOVE BASE WAGE ALL STRUCTURES OVER 100FT? $2.50/ HOUR ABOVE BASE WAGE | $31.12 | $21.20 | $52.32 | Agreement |
PAINTERS: BRUSH & ROLLER OF MASTICS…Full textPAINTERS: BRUSH & ROLLER OF MASTICS, CREOSOTES, KEWINCH KOATE, & COAL TAR EPOXY (DAVIESS, DUBOIS, GIBZSON, KNOX, PERRY, PIKE, POSSEY, SPENCER, VANDERBURGH, AND WARRICK COUNTIES) FOOTNOTE: A: ALL STRUCTURES OVER 40FT? $0.75/ HOUR ABOVE BASE WAGE ALL STRUCTURES OVER 75FT? $1.50/ HOUR ABOVE BASE WAGE ALL STRUCTURES OVER 100FT? $2.50/ HOUR ABOVE BASE WAGE | $31.12 | $21.20 | $52.32 | Agreement |
PAINTERS: DRYWALL FINISHERS…Full textPAINTERS: DRYWALL FINISHERS (DAVIESS, DUBOIS, GIBZSON, KNOX, PERRY, PIKE, POSSEY, SPENCER, VANDERBURGH, AND WARRICK COUNTIES) FOOTNOTE: A: ALL STRUCTURES OVER 40FT? $0.75/ HOUR ABOVE BASE WAGE ALL STRUCTURES OVER 75FT? $1.50/ HOUR ABOVE BASE WAGE ALL STRUCTURES OVER 100FT? $2.50/ HOUR ABOVE BASE WAGE | $31.87 | $21.20 | $53.07 | Agreement |
PAINTERS:: SPRAY OF MASTICS CREOSOTES…Full textPAINTERS:: SPRAY OF MASTICS CREOSOTES, KWINCH KOATE, COAL TAR EPOXY (DAVIESS, DUBOIS, GIBZSON, KNOX, PERRY, PIKE, POSSEY, SPENCER, VANDERBURGH, AND WARRICK COUNTIES) FOOTNOTE: A: ALL STRUCTURES OVER 40FT? $0.75/ HOUR ABOVE BASE WAGE ALL STRUCTURES OVER 75FT? $1.50/ HOUR ABOVE BASE WAGE ALL STRUCTURES OVER 100FT? $2.50/ HOUR ABOVE BASE WAGE | $32.12 | $21.20 | $53.32 | Agreement |
PAINTERS:: SPRAY, SANDBLAST…Full textPAINTERS:: SPRAY, SANDBLAST, POWER TOOLS, WATERBLAST & STEAM CLEANING (DAVIESS, DUBOIS, GIBZSON, KNOX, PERRY, PIKE, POSSEY, SPENCER, VANDERBURGH, AND WARRICK COUNTIES) FOOTNOTE: A: ALL STRUCTURES OVER 40FT? $0.75/ HOUR ABOVE BASE WAGE ALL STRUCTURES OVER 75FT? $1.50/ HOUR ABOVE BASE WAGE ALL STRUCTURES OVER 100FT? $2.50/ HOUR ABOVE BASE WAGE | $32.12 | $21.20 | $53.32 | Agreement |
| PAIN0197-001 · Painters and Allied Trades agreement, June 1, 2025 | ||||
PAINTERS: BRUSH & ROLLER…Full textPAINTERS: BRUSH & ROLLER (CLAY, GREENE, OWEN, PARKE, PUTNAM, SULLIVAN, VERMILLION AND VIGO COUNTIES) FOOTNOTE: A: $1.00 PREMIUM FOR WORK ON STRUCTURES OVER 40 FT. ABOVE FLOOR/GROUND LEVEL $2.00 PREMIUM FOR WORK ON STRUCTURES OVER 100 FT ABOVE FLOOR/GROUND LEVEL | $31.20 | $15.55 | $46.75 | Agreement |
PAINTERS: SANDBLASTING…Full textPAINTERS: SANDBLASTING (CLAY, GREENE, OWEN, PARKE, PUTNAM, SULLIVAN, VERMILLION AND VIGO COUNTIES) FOOTNOTE: A: $1.00 PREMIUM FOR WORK ON STRUCTURES OVER 40 FT. ABOVE FLOOR/GROUND LEVEL $2.00 PREMIUM FOR WORK ON STRUCTURES OVER 100 FT ABOVE FLOOR/GROUND LEVEL | $34.20 | $15.55 | $49.75 | Agreement |
PAINTERS: SPRAY & POT MAN…Full textPAINTERS: SPRAY & POT MAN (CLAY, GREENE, OWEN, PARKE, PUTNAM, SULLIVAN, VERMILLION AND VIGO COUNTIES) FOOTNOTE: A: $1.00 PREMIUM FOR WORK ON STRUCTURES OVER 40 FT. ABOVE FLOOR/GROUND LEVEL $2.00 PREMIUM FOR WORK ON STRUCTURES OVER 100 FT ABOVE FLOOR/GROUND LEVEL | $32.20 | $15.55 | $47.75 | Agreement |
| PAIN0387-004 · Painters and Allied Trades agreement, November 1, 2023 | ||||
| GLAZIER (DEARBORN, FRANKLIN, OHIO, RIPLEY, AND SWITZERLAND COUNTIES) | $31.95 | $17.75 | $49.70 | Agreement |
| PAIN0460-004 · Painters and Allied Trades agreement, June 1, 2025 | ||||
| PAINTERS: BRUSH & ROLLER (BUILDING) (JASPER, NEWTON, PULASKI, STARKE AND WHITE COUNTIES) | $41.00 | $31.26 | $72.26 | Agreement |
PAINTERS: BRUSH AND ROLLER…Full textPAINTERS: BRUSH AND ROLLER (HEAVY AND HIGHWAY) (JASPER, NEWTON, PULASKI, STARKE AND WHITE COUNTIES) | $41.00 | $31.26 | $72.26 | Agreement |
| PAINTERS: DRYWALL TAPING & FINISHING (JASPER, NEWTON, PULASKI, STARKE AND WHITE COUNTIES) | $41.80 | $31.26 | $73.06 | Agreement |
| PAIN0469-002 · Painters and Allied Trades agreement, June 1, 2025 | ||||
PAINTERS: BRUSH, ROLLER…Full textPAINTERS: BRUSH, ROLLER, PAPERHANGER, & DRYWALL FINISHING (ADAMS, ALLEN, DEKALB, GRANT, HUNTINGTON, LAGRANGE, NOBLE, STEUBEN, WABASH, WELLS, AND WHITLEY COUNTIES) | $27.04 | $16.27 | $43.31 | Agreement |
PAINTERS: LEAD ABATEMENT…Full textPAINTERS: LEAD ABATEMENT (ADAMS, ALLEN, DEKALB, GRANT, HUNTINGTON, LAGRANGE, NOBLE, STEUBEN, WABASH, WELLS, AND WHITLEY COUNTIES) | $32.24 | $16.27 | $48.51 | Agreement |
PAINTERS: SPRAY & SANDBLAST POT TENDERS AND GROUND PERSONNEL…Full textPAINTERS: SPRAY & SANDBLAST POT TENDERS AND GROUND PERSONNEL (ADAMS, ALLEN, DEKALB, GRANT, HUNTINGTON, LAGRANGE, NOBLE, STEUBEN, WABASH, WELLS, AND WHITLEY COUNTIES) | $27.04 | $16.27 | $43.31 | Agreement |
PAINTERS: SPRAY, SANDBLAST…Full textPAINTERS: SPRAY, SANDBLAST, POWER TOOLS, WATERBLAST, & STEAM CLEANING (ADAMS, ALLEN, DEKALB, GRANT, HUNTINGTON, LAGRANGE, NOBLE, STEUBEN, WABASH, WELLS, AND WHITLEY COUNTIES) | $27.04 | $16.27 | $43.31 | Agreement |
| PAIN0669-001 · Painters and Allied Trades agreement, May 1, 2024 | ||||
PAINTERS: BRUSH; ROLLER…Full textPAINTERS: BRUSH; ROLLER; PAPERHANGING; DRYWALL FINISHERS (BLACKFORD, DELAWARE, FAYETTE, FRANKLIN, HENRY, HOWARD, JAY, MADISON, MIAMI, RANDOLPH, RUSH, TIPTON, UNION AND WAYNE COUNTIES) | $25.10 | $16.39 | $41.49 | Agreement |
PAINTERS: SPRAY/WATERBLASTING…Full textPAINTERS: SPRAY/WATERBLASTING; SANDBLASTING (BLACKFORD, DELAWARE, FAYETTE, FRANKLIN, HENRY, HOWARD, JAY, MADISON, MIAMI, RANDOLPH, RUSH, TIPTON, UNION AND WAYNE COUNTIES) | $26.10 | $16.39 | $42.49 | Agreement |
| PAIN1165-014 · Painters and Allied Trades agreement, July 1, 2025 | ||||
GLAZIER (CLARK, CRAWFORD…Full textGLAZIER (CLARK, CRAWFORD, DAVIESS, DUBOIS, FLOYD, GIBSON, HARRISION, JEFFERSON, KNOX, MARTIN, ORANGE, PERRY, PIKE, POSEY, SCOTT, SPENCER, VANDERBURGH, WARRICK AND WASHINGTON) | $35.13 | $19.57 | $54.70 | Agreement |
| PAIN1165-017 · Painters and Allied Trades agreement, July 1, 2025 | ||||
GLAZIER (ADAMS, ALLEN…Full textGLAZIER (ADAMS, ALLEN, BLACKFORD, DE KALB, GRANT, HUNTINGTON, JAY, NOBLE, STEUBEN, WABASH, WELLS AND WHITLEY COUNTIES) | $29.50 | $19.02 | $48.52 | Agreement |
| PAIN1165-018 · Painters and Allied Trades agreement, July 1, 2025 | ||||
| GLAZIER (JASPER AND NEWTON (EAST OF HIGHWAY #41) COUNTIES) | $44.09 | $30.73 | $74.82 | Agreement |
| PAIN1165-019 · Painters and Allied Trades agreement, July 1, 2025 | ||||
| GLAZIER (ELKHART, FULTON, KOSCIUSKO, LAGRANGE, MARSHALL, PULASKI, AND STARKE COUNTY) | $34.22 | $24.67 | $58.89 | Agreement |
| PAIN1165-022 · Painters and Allied Trades agreement, January 1, 2025 | ||||
GLAZIER (BARTHOLOMEW…Full textGLAZIER (BARTHOLOMEW, BENTON, BOONE, BROWN, CARROLL, CASS, CLAY, CLINTON, DECATUR, DELEWARE, FAYETTE, FOUNTAIN, GREENE,HAMILTON, HANCOCK, HENDRICKS, HENRY, HOWARD, JACKSON, JENNINGS, JOHNSON, LAWRENCE, MADISON, MARION, MIAMI, MONROE, MONTGOMERY, MORGAN, OWEN, PARKE, PUTNAM, RANDOLPH, RUSH, SHELBY, SULLIVAN, TIPPECANOE, TIPTON, UNION, VIGO, VERMILLION, WARREN, WAYNE, AND WHITE COUNTIES) | $36.03 | $20.55 | $56.58 | Agreement |
| PLAS0075-001 · Plasterers and Cement Masons agreement, June 1, 2017 | ||||
| CEMENT MASON/CONCRETE FINISHER (CLAY, OWEN, PARKE, PUTNAM, VERMILLION AND VIGO COUNTIES:) | $25.75 | $13.50 | $39.25 | Agreement |
| PLAS0075-002 · Plasterers and Cement Masons agreement, June 1, 2017 | ||||
| CEMENT MASON/CONCRETE FINISHER (GREENE AND SULLIVAN COUNTIES) | $28.50 | $13.50 | $42.00 | Agreement |
| PLAS0101-001 · Plasterers and Cement Masons agreement, June 1, 2018 | ||||
CEMENT MASON/CONCRETE FINISHER…Full textCEMENT MASON/CONCRETE FINISHER (ELKHART, FULTON AND MARSHALL COUNTIES; PULASKI COUNTY (SOUTHERN 1/2)) | $31.50 | $14.30 | $45.80 | Agreement |
| PLAS0101-008 · Plasterers and Cement Masons agreement, June 1, 2014 | ||||
CEMENT MASON/CONCRETE FINISHER…Full textCEMENT MASON/CONCRETE FINISHER (ADAMS, ALLEN, DEKALB, HUNTINGTON, KOSCIUSKO, LAGRANGE, NOBLE, STEUBEN, WELLS AND WHITLEY COUNTIES) | $23.38 | $11.94 | $35.32 | Agreement |
PLASTERER (ADAMS, ALLEN…Full textPLASTERER (ADAMS, ALLEN, DEKALB, HUNTINGTON, KOSCIUSKO, LAGRANGE, NOBLE, STEUBEN, WELLS AND WHITLEY COUNTIES) | $25.69 | $11.75 | $37.44 | Agreement |
| PLAS0438-003 · Plasterers and Cement Masons agreement, June 1, 2018 | ||||
CEMENT MASON/CONCRETE FINISHER…Full textCEMENT MASON/CONCRETE FINISHER (PULASKI (NOTHERN 2/3), JASPER (N. EASTERN PORTION OF WEST TO BUT NOT INCLUDING WHEATFIELD), ALL OF STARKE COUNTY) | $36.01 | $25.40 | $61.41 | Agreement |
| PLAS0692-002 · Plasterers and Cement Masons agreement, June 1, 2025 | ||||
PLASTERER: AREA #46…Full textPLASTERER: AREA #46 (BARTHOLOMEW, BOONE, BROWN, CLARK, CLAY, CRAWFORD, DAVIESS, DUBOIS, GIBSON, HENDRICKS, JACKSON, JEFFERSON, JENNINGS, JOHNSON, KNOX, LAWRENCE, MARION, MARTIN, MONROE, MORGAN, ORANGE, OWEN, PARKE, PERRY, PIKE, POSEY, PUTNAM, SCOTT, SHELBY, SPENCER, VANDERBURGH, VERMILLION, VIGO AND WARRICK COUNTIES) | $31.50 | $18.32 | $49.82 | Agreement |
| PLAS0692-008 · Plasterers and Cement Masons agreement, May 1, 2025 | ||||
CEMENT MASON/CONCRETE FINISHER…Full textCEMENT MASON/CONCRETE FINISHER: AREA #821 (BARTHOLOMEW, BROWN, CLARK, DEARBORN, FLOYD, JACKSON, JEFFERSON, JENNINGS, LAWRENCE, OHIO, ORANGE, RIPLEY, SCOTT, SHELBY, SWITZERLAND, AND WASHINGTON COUNTIES) | $30.02 | $18.20 | $48.22 | Agreement |
| PLAS0692-009 · Plasterers and Cement Masons agreement, April 1, 2025 | ||||
CEMENT MASON/CONCRETE FINISHER…Full textCEMENT MASON/CONCRETE FINISHER: AREA #83 (BLACKFORD, DELAWARE, GRANT, HAMILTON (NORTHERN PART), HANCOCK (NORTHERN PART), JAY, MADISON, TIPTON, AND WABASH COUNTIES) | $32.55 | $22.04 | $54.59 | Agreement |
| PLAS0692-009 · Plasterers and Cement Masons agreement, June 1, 2025 | ||||
PLASTERER: AREA #83…Full textPLASTERER: AREA #83 (BLACKFORD, DELAWARE, GRANT, HAMILTON (NORTHERN PART), HANCOCK (NORTHERN PART), JAY, MADISON, TIPTON, AND WABASH COUNTIES) | $30.60 | $17.19 | $47.79 | Agreement |
| PLAS0692-011 · Plasterers and Cement Masons agreement, April 1, 2025 | ||||
CEMENT MASON/CONCRETE FINISHER…Full textCEMENT MASON/CONCRETE FINISHER: AREA #83 (DECATUR, FAYETTE, FRANKLIN, HENRY, RANDOLPH, RUSH, UNION AND WAYNE COUNTIES) | $32.55 | $22.04 | $54.59 | Agreement |
| PLAS0692-011 · Plasterers and Cement Masons agreement, June 1, 2025 | ||||
PLASTERER: AREA #83…Full textPLASTERER: AREA #83 (DECATUR, FAYETTE, FRANKLIN, HENRY, RANDOLPH, RUSH, UNION AND WAYNE COUNTIES) | $30.60 | $17.19 | $47.79 | Agreement |
| PLAS0692-015 · Plasterers and Cement Masons agreement, June 1, 2024 | ||||
PLASTERER: AREA #121…Full textPLASTERER: AREA #121 (BENTON, CARROLL, CASS, CLINTON, FOUNTAIN, HOWARD, MIAMI, MONTGOMERY, TIPPECANOE, WARREN, WHITE AND VERMILLION (NORTHERN PART) COUNTIES) | $33.76 | $20.05 | $53.81 | Agreement |
| PLAS0692-015 · Plasterers and Cement Masons agreement, June 1, 2025 | ||||
CEMENT MASON/CONCRETE FINISHER…Full textCEMENT MASON/CONCRETE FINISHER: AREA #121 (BENTON, CARROLL, CASS, CLINTON, FOUNTAIN, HOWARD, MIAMI, MONTGOMERY, TIPPECANOE, WARREN, WHITE AND VERMILLION (NORTHERN PART) COUNTIES) | $33.50 | $21.95 | $55.45 | Agreement |
| PLAS0692-018 · Plasterers and Cement Masons agreement, June 1, 2025 | ||||
| CEMENT MASON/CONCRETE FINISHER: AREA #165 (NEWTON COUNTIES) | $41.24 | $24.55 | $65.79 | Agreement |
| PLAS0692-022 · Plasterers and Cement Masons agreement, June 1, 2025 | ||||
CEMENT MASON/CONCRETE FINISHER…Full textCEMENT MASON/CONCRETE FINISHER: AREA #406 (SOUTHWARD ON RT. NO. 49 TO THE JASPER, BENTON AND WHITE COUNTY LINES, INCLUDING THE CITY LIMITS OF WHEATFIELD, RENSSELAER AND REMINGTON, INDIANA. TO THE WEST, THE BOUNDARY OF NEWTON COUNTY) | $43.72 | $35.59 | $79.31 | Agreement |
| PLAS0692-023 · Plasterers and Cement Masons agreement, June 1, 2025 | ||||
CEMENT MASON/CONCRETE FINISHER…Full textCEMENT MASON/CONCRETE FINISHER: AREA #532 (BOONE, HAMILTON (SOUTH HALF OF COUNTY NORTH TO NEW ROUTE INDIANA #32 INCLUDING NOBLESVILLE); HANCOCK COUNTY (SOUTHERN AND WESTERN PART OF HANCOCK COUNTY, NORTH TO BUT NOT INCLUDING FORTVILLE); HENDRICKS, JOHNSON, MARION AND MORGAN COUNTIES) | $35.00 | $20.61 | $55.61 | Agreement |
| PLAS0692-027 · Plasterers and Cement Masons agreement, April 1, 2025 | ||||
CEMENT MASON/CONCRETE FINISHER…Full textCEMENT MASON/CONCRETE FINISHER: AREA #566 (CRAWFORD, DAVIESS, DUBOIS, GIBSON, HARRISON, KNOX, MARTIN, PERRY, PIKE, POSEY, SPENCER, VANDERBURGH AND WARRICK COUNTIES) | $32.50 | $20.77 | $53.27 | Agreement |
| PLUM0136-003 · Plumbers and Pipefitters agreement, April 1, 2025 | ||||
PLUMBERS AND PIPEFITTERS…Full textPLUMBERS AND PIPEFITTERS (BROWN, DAVIESS, DUBOIS, GIBSON, JACKSON, LAWRENCE, MARTIN, MONROE, ORANGE, OWEN, PERRY, PIKE, POSEY, SPENCER, VANDERBURGH, WARRICK, AND WASHINGTON COUNTIES) | $46.42 | $21.33 | $67.75 | Agreement |
| PLUM0157-002 · Plumbers and Pipefitters agreement, July 1, 2025 | ||||
PLUMBERS AND PIPEFITTERS…Full textPLUMBERS AND PIPEFITTERS (BENTON, CARROLL, CLINTON, FOUNTAIN, MONTGOMERY, TIPPECANOE, WARREN AND WHITE COUNTIES) | $46.65 | $23.45 | $70.10 | Agreement |
| PLUM0166-001 · Plumbers and Pipefitters agreement, June 1, 2025 | ||||
PLUMBER AND STEAMFITTER…Full textPLUMBER AND STEAMFITTER (ADAMS, ALLEN, BLACKFORD, DE KALB, GRANT, HUNTINGTON, NOBLE, STEUBEN, WABASH, WELLS, AND WHITLEY COUNTIES) | $45.06 | $23.16 | $68.22 | Agreement |
| PLUM0166-002 · Plumbers and Pipefitters agreement, June 1, 2025 | ||||
Group definitions, zones and premiums for PLUM0166-002PLUMBER (ELKHART, KOSCIUSKO, AND LAGRANGE COUNTIES).$ 45.06 23.16 | ||||
| PLUM0172-001 · Plumbers and Pipefitters agreement, June 1, 2025 | ||||
PLUMBER, PIPEFITTER…Full textPLUMBER, PIPEFITTER, STEAMFITTER (JASPER (S OF THE N. SIDE OF THE CITY OF RENSSELEAR), MARSHALL, PULASKI AND STARKE COUNTIES) | $44.93 | $23.03 | $67.96 | Agreement |
| PLUM0210-003 · Plumbers and Pipefitters agreement, June 1, 2025 | ||||
| PLUMBER (JASPER (TO THE CITY OF RENSSELAER) AND NEWTON COUNTIES) | $49.77 | $28.56 | $78.33 | Agreement |
| PLUM0392-006 · Plumbers and Pipefitters agreement, June 1, 2024 | ||||
| PLUMBERS AND PIPEFITTERS (DEARBORN, OHIO, RIPLEY, AND SWITZERLAND COUNTIES) | $40.70 | $29.52 | $70.22 | Agreement |
| PLUM0440-002 · Plumbers and Pipefitters agreement, June 4, 2025 | ||||
PLUMBERS AND PIPEFITTERS…Full textPLUMBERS AND PIPEFITTERS (BARTHOLOMEW, BOONE, HAMILTON, HANCOCK, HENDRICKS, HOWARD, JOHNSON AND MARION COUNTIES; MIAMI COUNTY (SOUTH OF A STRAIGHT LINE WHERE ROUTE 218 ENTERS W. BOUNDARY); MORGAN, SHELBY AND TIPTON COUNTIES) | $50.05 | $20.39 | $70.44 | Agreement |
| PLUM0440-004 · Plumbers and Pipefitters agreement, June 1, 2025 | ||||
PLUMBER AND STEAMFITTER…Full textPLUMBER AND STEAMFITTER (FAYETTE, FRANKLIN, HENRY, RANDOLPH, RUSH, UNION AND WAYNE COUNTIES) | $50.05 | $20.39 | $70.44 | Agreement |
| PLUM0502-001 · Plumbers and Pipefitters agreement, August 1, 2016 | ||||
| PLUMBER/PIPEFITTER (CLARK, FLOYD AND HARRISON COUNTIES) | $32.00 | $20.13 | $52.13 | Agreement |
| PLUM0597-004 · Plumbers and Pipefitters agreement, June 1, 2018 | ||||
| PIPEFITTER (JASPER (EXCLUDING THE CITY LIMITS OF RENSSELEAR), AND NEWTON (ENTIRE COUNTY)) | $48.50 | $31.12 | $79.62 | Agreement |
| ROOF0023-004 · Roofers agreement, June 1, 2024 | ||||
ROOFER: COMPOSITION…Full textROOFER: COMPOSITION (ADAMS, ALLEN, DEKALB, ELKHART, FULTON, HUNTINGTON, KOSCIUSKO, LAGRANGE, MARSHALL, MIAMI, NOBLE, PULASKI, STARKE, STEUBEN, WABASH, WELLS, AND WHITLEY COUNTIES) | $34.55 | $21.04 | $55.59 | Agreement |
ROOFER: SLATE & TILE…Full textROOFER: SLATE & TILE (ADAMS, ALLEN, DEKALB, ELKHART, FULTON, HUNTINGTON, KOSCIUSKO, LAGRANGE, MARSHALL, MIAMI, NOBLE, PULASKI, STARKE, STEUBEN, WABASH, WELLS, AND WHITLEY COUNTIES) | $36.05 | $21.04 | $57.09 | Agreement |
| ROOF0026-002 · Roofers agreement, June 1, 2023 | ||||
| ROOFER (JASPER AND NEWTON COUNTIES) | $42.50 | $25.76 | $68.26 | Agreement |
| ROOF0042-002 · Roofers agreement, August 1, 2024 | ||||
| ROOFER (DEARBORN, OHIO AND RIPLEY COUNTIES) | $33.00 | $19.51 | $52.51 | Agreement |
| ROOF0075-001 · Roofers agreement, May 1, 2024 | ||||
| ROOFER: COMPOSITION (FAYETTE, RANDOLPH, UNION, AND WAYNE COUNTIES) | $28.73 | $20.81 | $49.54 | Agreement |
| ROOFER: SLATE & TILE (FAYETTE, RANDOLPH, UNION, AND WAYNE COUNTIES) | $28.95 | $20.81 | $49.76 | Agreement |
| ROOF0075-002 · Roofers agreement, May 1, 2021 | ||||
| ROOFER: COMPOSITION (CLINTON COUNTY) | $24.38 | $20.09 | $44.47 | Agreement |
| ROOFER: SLATE & TILE (CLINTON COUNTY) | $24.60 | $20.09 | $44.69 | Agreement |
| ROOF0106-006 · Roofers agreement, April 1, 2023 | ||||
ROOFER: COMPOSITION…Full textROOFER: COMPOSITION (CRAWFORD, DAVIESS, DUBOIS, GIBSON KNOX, MARTIN, ORANGE PERRY, PIKE, POSEY, SPENCER, VANDERBURGH AND WARRICK) | $31.60 | $19.43 | $51.03 | Agreement |
ROOFER: SLATE & TILE…Full textROOFER: SLATE & TILE (CRAWFORD, DAVIESS, DUBOIS, GIBSON KNOX, MARTIN, ORANGE PERRY, PIKE, POSEY, SPENCER, VANDERBURGH AND WARRICK) | $31.60 | $19.43 | $51.03 | Agreement |
| ROOF0106-012 · Roofers agreement, July 1, 2025 | ||||
| ROOFER (CLARK, FLOYD, HARRISON JEFFERSON, SCOTT, SWITZERLAND, AND WASHINGTON COUNTIES) | $30.97 | $14.66 | $45.63 | Agreement |
| ROOF0119-002 · Roofers agreement, September 1, 2025 | ||||
ROOFER (BARTHOLOMEW…Full textROOFER (BARTHOLOMEW, BLACKFORD, BOONE, BROWN, DECATUR, DELAWARE, FRANKLIN, GRANT, HAMILTON, HANCOCK, HENDRICKS, HENRY, HOWARD, JACKSON, JAY, JENNINGS, JOHNSON, LAWRENCE, MADISON, MARION, MONROE, MONTGOMERY, MORGAN, PUTNAM, RUSH, SHELBY, AND TIPTON COUNTIES) | $32.00 | $16.61 | $48.61 | Agreement |
| ROOF0150-002 · Roofers agreement, July 1, 2024 | ||||
| ROOFER (CLAY, GREENE, OWEN, PARKE, SULLIVAN, VERMILLION AND VIGO COUNTIES) | $30.00 | $18.30 | $48.30 | Agreement |
| SHEE0020-003 · Sheet Metal Workers agreement, July 1, 2025 | ||||
| SHEET METAL WORKER (HVAC DUCT WORK) | $40.19 | $27.33 | $67.52 | Agreement |
| SHEE0020-010 · Sheet Metal Workers agreement, July 1, 2025 | ||||
SHEET METAL WORKER…Full textSHEET METAL WORKER (BARTHOLOMEW, BOONE, BROWN, DECATUR, DELAWARE, FAYETTE, FRANKLIN, HAMILTON, HANCOCK, HENDRICKS, HENRY, JACKSON, JENNINGS, JOHNSON, LAWRENCE, MADISON, MARION, MONROE, MONTGOMERY, MORGAN, ORANGE, RIPLEY, RUSH, SHELBY, TIPTON, UNION AND WASHINGTON COUNTIES) | $45.81 | $26.57 | $72.38 | Agreement |
| SHEE0020-011 · Sheet Metal Workers agreement, July 1, 2023 | ||||
| SHEET METAL WORKER (CLINTON COUNTY) | $37.82 | $26.37 | $64.19 | Agreement |
| SHEE0020-024 · Sheet Metal Workers agreement, July 1, 2023 | ||||
SHEET METAL WORKER…Full textSHEET METAL WORKER (CLAY, GREENE, MARTIN, OWEN, PARKE, PUTNAM, SULLIVAN, VERMILLION, AND VIGO COUNTIES) | $40.91 | $25.22 | $66.13 | Agreement |
| TEAM0135-003 · Teamsters agreement, April 1, 2025 | ||||
TRUCK DRIVER: GROUP 1…Full textTRUCK DRIVER: GROUP 1 SINGLE/BATCHES AXLE STRAIGHT TRUCKS; BATCH TRUCKS, WET OR DRY 3 (34E) AXLE OR LESS; SINGLE AXLE GREASE AND MAINTENANCE TRUCK (REMAINING COUNTIES) | $34.69 | $20.51 | $55.20 | Agreement |
| TRUCK DRIVER: GROUP 2 SINGLE AXLE FUEL AND WATER TRUCKS (REMAINING COUNTIES) | $34.74 | $20.51 | $55.25 | Agreement |
TRUCK DRIVER: GROUP 3…Full textTRUCK DRIVER: GROUP 3 SINGLE AXLE ""DOG-LEGS"", AND TANDEM TRUCK OR DOG- LEGS; WINCH TRUCKS OR A-FRAMES WHEN USED FOR TRANSPORTATION PURPOSES; DRIVERS ON BATCH TRUCKS, WET OR DRY OVER 3 (34E) BATCHES AND TANDEM AXLE GREASE AND MAINTENANCE TRUCK (REMAINING COUNTIES) | $34.79 | $20.51 | $55.30 | Agreement |
TRUCK DRIVER: GROUP 4…Full textTRUCK DRIVER: GROUP 4 TANDEM AXLE FUEL TRUCKS; TANDEM AXLE WATER TRUCKS; BUTUMINOUS DISTRIBUTORS (TWO-MAN) (REMAINING COUNTIES) | $34.84 | $20.51 | $55.35 | Agreement |
TRUCK DRIVER: GROUP 5…Full textTRUCK DRIVER: GROUP 5 TANDEM TRUCKS OVER 15 TONS PAYLOAD; SINGLE AXLE SEMI TRUCKS; FARM TRACTORS HAULING MATERIAL; MIXER TRUCKS (ALL TYPES); TRUCKS PULLING TILT-TOP TRAILER SINGLE AXLE; SINGLE AXLE LOW- BOYS; TRUCK-MOUNTED PAVEMENT BREAKERS (REMAINING COUNTIES) | $34.89 | $20.51 | $55.40 | Agreement |
TRUCK DRIVER: GROUP 6…Full textTRUCK DRIVER: GROUP 6 TANDEM TRUCKS OR ""DOG-LEGS""; SEMI-WATER TRUCK; SPRINKLER TRUCK; HEAVY EQUIPMENT-TYPE WATER WAGONS, 5,000 GALLONS AND UNDER; BUTUMINOUS DISTRIBUTORS (ONE-MAN) (REMAINING COUNTIES) | $34.94 | $20.51 | $55.45 | Agreement |
TRUCK DRIVER: GROUP 7…Full textTRUCK DRIVER: GROUP 7 TRI-AXLE TRUCKS; TANDEM AXLE SEMI TRUCKS; EQUIPMENT WHEN NOT SELF-LOADED OR PUSHER LOADED, SUCH AS KOEHRING OR SIMILAR DUMPSTERS, TRACK TRUCKS, EUCLID BOTTOM DUMP AND HUG BOTTOM DUMP, TOURNATRAILERS, TOURNAROCKERS, ACEY WAGONS OR FOR SIMILAR EQUIPMENT (12 CU YDS OR LESS); MOBILE MIXER TRUCK; TANDEM AXLE TRUCKS PULLING TILT-TOP TRAILER; TANDEM - AXLE LOWBOY; TRI- AXLE BATCH TRUCK; TRI-AXLE GREASE AND MAINTENANCE TRUCK (REMAINING COUNTIES) | $34.99 | $20.51 | $55.50 | Agreement |
TRUCK DRIVER: GROUP 8…Full textTRUCK DRIVER: GROUP 8 TANDEM-TANDEM SEMI TRUCKS; TRUCK MECHANICS AND WELDERS; HEAVY EQUIPMENT-TYPE WATER WAGON OVER 5,000 GALLONS; TRI-AXLE TRUCKS PULLING TILT-TOP TRAILER; LOW-BOYS, TANDEM-TANDEM AXLE (REMAINING COUNTIES) | $35.04 | $20.51 | $55.55 | Agreement |
TRUCK DRIVER: GROUP 9…Full textTRUCK DRIVER: GROUP 9 LOW-BOYS, TANDEM TRI-AXLE; ACEY WAGONS UP TO AND INCLUDING 3 BUCKETS; EQUIPMENT WHEN NOT SELF-LOADED OR PUSHER LOADED, SUCH AS KOEHRING OR SIMILAR DUMPSTERS, TRACK TRUCKS, EUCLID BOTTOM DUMP AND HUG BOTTOM DUMP, TOURNATRAILERS, TOURNAROCKERS, ACEY WAGONS OR FOR SIMILAR EQUIPMENT (OVER 12 CU YDS.) (REMAINING COUNTIES) | $35.09 | $20.51 | $55.60 | Agreement |
| TRUCK DRIVER: GROUP10 PICK-UP TRUCKS REMAINING COUNTIES | $34.54 | $20.51 | $55.05 | Agreement |
TRUCK DRIVER: GROUP11…Full textTRUCK DRIVER: GROUP11 HELPERS; GREASERS; TIRE MEN; BATCH BOARD TENDERS; WAREHOUSEMAN REMAINING COUNTIES | $35.09 | $20.51 | $55.60 | Agreement |
TRUCK DRIVER: GROUP12…Full textTRUCK DRIVER: GROUP12 ACEY WAGON (OVER 3 BUCKETS); QUAD AXLE TRUCKS; ARTICULATING DUMP REMAINING COUNTIES | $35.19 | $20.51 | $55.70 | Agreement |
Modification history
| Modification 1 | January 30, 2026 |
| Modification 2 | May 18, 2026 |
| Modification 3 | July 30, 2026 (current) |
Published by the Wage and Hour Division; read from sam.gov. The sheet is checked for a newer modification each day. Contracts awarded since January 1, 2017 also carry Executive Order 13706 paid sick leave (one hour per 30 worked, up to 56 a year).
Questions people ask
- Which rate do I pay on IN20260006?
- The line for the classification of work actually performed: the basic rate plus the fringe. You may pay the fringe into benefit plans, as cash on every hour, or a mix. Overtime after 40 hours is 1.5 times the basic rate; fringe is paid on every hour and never multiplied.
- My trade is not on this sheet. What do I do?
- Do not borrow the nearest name. Ask the contracting agency for a conformance on Standard Form 1444 before the first week of that work, and note it as pending on the payroll.
- Does modification 3 apply to my contract?
- Only if it was in force when your contract was awarded (generally at bid opening). An earlier modification locked into the contract keeps applying, except on option years, added scope and indefinite-quantity contracts. The number and modification are on the first page of the exhibit in your contract.
How to read a wage determination · Paying the fringe in cash or through plans · Overtime on these rates · Fringe credit calculator