CertifiedHours

Prevailing wage rates · Indiana · Wage determination

Prevailing wage rates: Elkhart, Jasper, Kosciusko and 5 more counties, Indiana

Building construction · IN20260005 modification 2, published May 18, 2026

The short answer

This sheet sets 102 classifications for building work in Elkhart, Jasper, Kosciusko and 5 more counties, Indiana. Each line is a basic hourly rate plus a fringe rate, and the sum is the minimum you must pay for that work, from $32.67 an hour (truck drivers: group 1) to $100.71 (elevator mechanic (elkhart, kosciusko, lagrange, marshall and starke counties) a)). Your contract may lock an earlier modification.

Rates by classification

Total is the basic rate plus the fringe. Source is the agreement or survey the rate came from; a marker means the group changed in this modification. A dagger (†) means the fringe carries a footnote or percentage the total does not include; read the group’s notes.

ClassificationBasic rateFringeTotalSource
ASBE0017-008 · Asbestos Workers and Heat & Frost Insulators agreement, June 1, 2025
HAZARDOUS MATERIAL HANDLER…
Full text

HAZARDOUS MATERIAL HANDLER: INCLUDES PREPARATION, WETTING, STRIPPING REMOVAL SCRAPPING, VACUUMING, BAGGING AND DISPOSAL OF ALL INSULATION MATERIALS, WHETHER THEY CONTAIN ASBESTOS OR NOT, FROM MECHAINCAL SYSTEMS (NEWTON COUNTY)

$44.82$34.00$78.82Agreement
ASBESTOS WORKER/HEAT & FROST INSULATOR (NEWTON COUNTY)$56.02$37.24$93.26Agreement
ASBE0041-001 · Asbestos Workers and Heat & Frost Insulators agreement, June 1, 2025
HAZARDOUS MATERIAL HANDLER…
Full text

HAZARDOUS MATERIAL HANDLER: INCLUDES PREPARATION, WETTINGS, STRIPPING, REMOVAL, SCRAPPING, VACCUMING, BAGGING & DISPOSING OF ALL INSULATION MATERAILS, WHETHER THEY CONTAIN ASBESTOS OR NOT, FROM MECHANICAL SYSTEMS (LAGRANGE COUNTY)

$37.25$19.85$57.10Agreement
INSULATOR/ASBESTOS WORKER…
Full text

INSULATOR/ASBESTOS WORKER: INCLUDES APPLICATION OF ALL INSULATING MATERIALS, PROTECTIVE COVERINGS, COATINGS AND FINISHINGS TO ALL TYPES OF MECHANICAL SYSTEMS

$37.25$19.85$57.10Agreement
ASBE0041-001 · Asbestos Workers and Heat & Frost Insulators agreement, July 1, 2025
HAZARDOUS MATERIAL HANDLER…
Full text

HAZARDOUS MATERIAL HANDLER: INCLUDES PREPARATION, WETTINGS, STRIPPING, REMOVAL, SCRAPPING, VACCUMING, BAGGING & DISPOSING OF ALL INSULATION MATERAILS, WHETHER THEY CONTAIN ASBESTOS OR NOT, FROM MECHANICAL SYSTEMS (LAGRANGE COUNTY)

$37.25$19.85$57.10Agreement
INSULATOR/ASBESTOS WORKER…
Full text

INSULATOR/ASBESTOS WORKER: INCLUDES APPLICATION OF ALL INSULATING MATERIALS, PROTECTIVE COVERINGS, COATINGS AND FINISHINGS TO ALL TYPES OF MECHANICAL SYSTEMS

$37.25$19.85$57.10Agreement
ASBE0075-001 · Asbestos Workers and Heat & Frost Insulators agreement, June 1, 2025
HAZARDOUS MATERIAL HANDLER…
Full text

HAZARDOUS MATERIAL HANDLER: INCLUDES PREPARATION, WETTING, STRIPPING, REMOVAL, SCRAPPING, VACCUMING, BAGGING, AND DISPOSAL OF ALL INSULATION MATERIALS, WHETHER THEY CONTAIN ASBESTOS OR NOT, FROM MECHANICAL SYSTEMS (REMAINING COUNTIES)

$41.20$30.93$72.13Agreement
ASBESTOS WORKER/HEAT & FROST INSULATOR (REMAINING COUNTIES)$41.20$30.93$72.13Agreement
BOIL0374-004 · Boilermakers agreement, May 1, 2025
BOILERMAKER$43.24$38.17$81.41Agreement
BRIN0006-001 · Bricklayers agreement, June 1, 2023
TILE, MARBLE & TERRAZZO WORKER (JASPER, NEWTON & STARKE COUNTIES)$42.05$28.22$70.27Agreement
BRICKLAYER: INCLUDING STONEMASON…
Full text

BRICKLAYER: INCLUDING STONEMASON, AND POINTER, CAULKER & CLEANER (JASPER, NEWTON & STARKE COUNTIES)

$42.05$28.22$70.27Agreement
BRIN0018-003 · Bricklayers agreement, June 1, 2023
TILE, MARBLE SETTER…
Full text

TILE, MARBLE SETTER (MARSHALL AND PULASKI COUNTIES).$ 34.50 23.62 TILE & MARBLE FINISHER (MARSHALL AND PULASKI COUNTIES)

$32.50$21.11$53.61Agreement
TERRAZZO WORKER/SETTER (MARSHALL AND PULASKI COUNTIES)$34.50$23.62$58.12Agreement
TERRAZZO WORKER FINISHER (MARSHALL AND PULASKI COUNTIES)$32.50$21.11$53.61Agreement
BRICKLAYER, CAULKER, CLEANER, POINTER (MARSHALL AND PULASKI COUNTIES)$34.00$19.71$53.71Agreement
BRIN0018-004 · Bricklayers agreement, June 1, 2021
BRICKLAYER (TILE AND MARBLE WORKERS)$33.00$22.33$55.33Agreement
BRICKLAYER (TILE AND MARBLE FINISHERS)$31.00$19.16$50.16Agreement
BRICKLAYER (BRICKLAYERS, POINTER, CLEANER & CAULKERS)$31.11$18.40$49.51Agreement
CARP0232-002 · Carpenters agreement, June 1, 2025
CARPENTER & PILEDRIVERMEN (LAGRANGE COUNTY)$33.42$25.93$59.35Agreement
CARP0413-001 · Carpenters agreement, June 1, 2025
CARPENTER & PILEDRIVERMEN (ELKHART, KOSCIUSKO AND MARSHALL COUNTIES)$35.51$25.51$61.02Agreement
CARP1010-001 · Carpenters agreement, June 1, 2024
CARPENTER (JASPER, NEWTON, PULASKI & STARKE COUNTIES)$43.58$34.66$78.24Agreement
MILLWRIGHT (JASPER, NEWTON, PULASKI & STARKE COUNTIES)$47.92$36.93$84.85Agreement
CARP1010-001 · Carpenters agreement, June 1, 2025
CARPENTER (JASPER, NEWTON, PULASKI & STARKE COUNTIES)$43.58$34.66$78.24Agreement
MILLWRIGHT (JASPER, NEWTON, PULASKI & STARKE COUNTIES)$47.92$36.93$84.85Agreement
CARP1029-001 · Carpenters agreement, June 1, 2025
MILLWRIGHT (ADAMS, ALLEN…
Full text

MILLWRIGHT (ADAMS, ALLEN, CASS, DEKALB, ELKHART, FULTON, GRANT, HOWARD, HUNTINGTON, KOSCIUSKO, LAGRANGE, MARSHALL, MIAMI, NOBLE, ST. JOSEPH, STEUBEN, TIPTON, WABASH, WELLS AND WHITLEY COUNTIES)

$35.89$30.52$66.41Agreement
ELEC0153-003 · Electrical Workers (IBEW) agreement, June 3, 2019
COMMUNICATION TECHNICIAN (ELKHART, KOSCIUSKO AND MARSHALL COUNTIES)$26.50$18.33$44.83Agreement
ELECTRICIAN (ELKHART, KOSCIUSKO AND MARSHALL COUNTIES)$46.00$29.23$75.23Agreement
ELEC0153-003 · Electrical Workers (IBEW) agreement, June 1, 2025
COMMUNICATION TECHNICIAN (ELKHART, KOSCIUSKO AND MARSHALL COUNTIES)$26.50$18.33$44.83Agreement
ELECTRICIAN (ELKHART, KOSCIUSKO AND MARSHALL COUNTIES)$46.00$29.23$75.23Agreement
ELEC0305-001 · Electrical Workers (IBEW) agreement, December 1, 2024
ELECTRICIAN (LAGRANGE COUNTIES)$40.18$23.18$63.36Agreement
ELEC0531-002 · Electrical Workers (IBEW) agreement, May 31, 2025
ELECTRICIAN (JASPER, PULASKI, AND STARKE COUNTIES)$49.00$32.89$81.89Agreement
ELEC0697-002 · Electrical Workers (IBEW) agreement, June 1, 2025
ELECTRICIAN (NEWTON COUNTY)$52.00$32.85$84.85Agreement
ELEC0697-005 · Electrical Workers (IBEW) agreement, August 31, 2025
TELECOMMUNICATION TECHNICIAN…
Full text

TELECOMMUNICATION TECHNICIAN: WORK COVERS LOW VOLTAGE INSTALLATION, MAINTENANCE AND REMOVAL OF TELECOMMUNICATION FACILITIES (VOICE, SOUND, DATA AND VIDEO) INCLUDING, TELEPHONE AND DATA INSIDE WIRE, INTERCONNECT, TERMINAL EQUIPMENT, CENTRAL OFFICES, PABX, FIBER OPTIC CABLE AND EQUIPMENT, MICRO WAVES, V/SAT, BYPASS, CATV, WAN (WIDE AREA NETWORKS), LAN (LOCAL AREA NETWORKS), AND ISDN (INTEGRATED SYSTEM DIGITAL NETWORK). WORK DOES NOT COVER ANY WORK WHICH PROPERLY COMES UNDER THE WORK DESCRIPTION OF INSIDE JW (JOURNEYMAN WIREMAN), BUT SHALL COVER THE PULLING OF WIRE IN REACEWAYS, UT NOT THE INSTALLATION OF RACEWAYS. (NEWTON COUNTY)

$41.50$31.23$72.73Agreement
ELEV0034-005 · Elevator Constructors agreement, January 1, 2025
ELEVATOR MECHANIC (JASPER, NEWTON AND PULASKI COUNTIES) A)

PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERN'S DAY, THANKSGIVING DAY, THE FRIDAY AFTER THANKSGIVING, AND CHRISTMAS DAY. B) EMPLOYER CONTRIBUTES 8% OF REGULAR HOURLY RATE TO VACATION PAY CREDIT FOR EMPLOYEE WITH MORE THAN 5 YEARS OF SERVICE; 6% FOR LESS THAN 5 YEARS' SERVICE

$60.17$38.44$98.61Agreement
ELEV0044-003 · Elevator Constructors agreement, January 1, 2025
ELEVATOR MECHANIC (ELKHART, KOSCIUSKO, LAGRANGE, MARSHALL AND STARKE COUNTIES) A)

PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS' DAY, THANKSGIVING DAY, THE FRIDAY AFTER THANKSGIVING, AND CHRISTMAS DAY. B) EMPLOYER CONTRIBUTES 8% OF REGULAR HOURLY RATE TO VACATION PAY CREDIT FOR EMPLOYEE WITH MORE THAN 5 YEARS OF SERVICE; 6% FOR LESS THAN 5 YEARS' SERVICE

$62.27$38.44$100.71Agreement
ENGI0150-002 · Operating Engineers agreement, June 1, 2025
POWER EQUIPMENT OPERATOR GROUP 5…
Full text

POWER EQUIPMENT OPERATOR GROUP 5 GROUP 5: BOBCATS AND FORKLIFTS (COMMERCIAL OR RESIDENTIAL) (ELKHART, KOSCIUSKO, LAGRANGE AND MARSHALL COUNTIES)

$30.60$38.65$69.25Agreement
POWER EQUIPMENT OPERATOR GROUP 5 FORKLIFTS (JASPER, NEWTON, PULASKI & STARKE COUNTIES)$35.95$38.65$74.60Agreement
POWER EQUIPMENT OPERATOR GROUP 4…
Full text

POWER EQUIPMENT OPERATOR GROUP 4: BOBCAT (UP TO AND INCLUDING 3/4 CU. YD.). COMPRESSOR (OVER 210 CU. FT. AND LESS THAN 600 CU. FT.), GENERATOR (OVER 50 KW.), HEATERS, MECHANICAL, HOISTS (ALL ELEVATOR, PERMANENT INSTALLATION), HOIST (AUTOMATIC), HOIST (TUGGER SINGLE DRUM), OILERS, PUMPS, WELL POINTS AND ELECTRIC SUBMERSIBLE, SMALL RUBBER TIRED END LOADERS (1/4 CU. YD. AND UNDER), TRACTORS (FARM TYPE) WELDING MACHINES (2 THROUGH 8). (ELKHART, KOSCIUSKO, LAGRANGE AND MARSHALL COUNTIES)

$33.20$38.65$71.85Agreement
POWER EQUIPMENT OPERATOR GROUP 4…
Full text

POWER EQUIPMENT OPERATOR GROUP 4 HEATERS, MECHANICAL (1 TO 5), OILERS, SWITHMEN, BULL GANG (CRANE ERECTION CREW). (JASPER, NEWTON, PULASKI & STARKE COUNTIES)

$41.40$38.65$80.05Agreement
POWER EQUIPMENT OPERATOR GROUP 3…
Full text

POWER EQUIPMENT OPERATOR GROUP 3: BUCK HOIST, COMBINATION (SMALL EQUIPMENT OPERATOR), CONVEYOR (PORTABLE), GROUTING MACHINE, HOIST ELEVATORS (MATERIAL AND PERSONNEL), HYDRAULIC POWER UNITS, GROUTING AND PILE DRIVING, STUD WELDER, TRENCHING MACHINES LESS THAN 12 INCHES IN WIDTH, WELDING MACHINES (8 THROUGH 15). (ELKHART, KOSCIUSKO, LAGRANGE AND MARSHALL COUNTIES)

$34.00$38.65$72.65Agreement
POWER EQUIPMENT OPERATOR GROUP 3…
Full text

POWER EQUIPMENT OPERATOR GROUP 3 CONCRETE MIXER (2 BAG AND OVER), CONVEYOR, PORTABLE, STEAM GENERATORS, TRACTORS (FARM AND SIMILAR TYPE), AIR COMPRESSOR (SMALL 150 AND UNDER - 1 TO 5 TO EXCEED A TOTAL OF 300 FT., AIR COMPRESSOR (LARGE OVER 150), COMBINATION (SMALL EQUIPMENT OPERATOR), FORKLIFT (UNDER 10 TONS), GENERATOR, PUMPS (1 TO 3 NOT TO EXCEED A TOTAL OF 300 FT., PUMPS (WELL POINTS), WELDING MACHINES (2 THROUGH 5, WINCHES (4 ELECTRIC DRILL WINCHES). (JASPER, NEWTON, PULASKI & STARKE COUNTIES)

$43.60$38.65$82.25Agreement
POWER EQUIPMENT OPERATOR GROUP 2…
Full text

POWER EQUIPMENT OPERATOR GROUP 2: AIR COMPRESSOR (600 CU. FT. AND OVER), BOB CAT (OVER 3/4 CU. YD.), BOILERS, BROOM (ALL POWERED PROPELLED), BULL DOZERS WITH ENGINES LESS THAN 140 NET HORSEPOWER, COMBINATION BACKHOE FRONTEND MACHINE 1/2 CU YD BACKHOE BUCKET OIR UNDER OR WITH ATTACHMENTS COMPRESSOR AND THROTTLE VALVE, CONCRETE BREAKER (TRUCK MOUNTED), CONCRETE MIXER (OF MOORE THAN 21 CU. FT. CAPACITY), FORKLIFT (WITH FIXED OR TILT MAST), GREASER, HIGHLIFT SHOVEL OR FRONTEND LOADER (3 YD BUCKET AND UNDER), HOISTS (1 DRUM), HYDRULIC BOOM TRUCK, POST HOLE DIGGER (VEHICLE MOUNTED), PUMPS CRETES (SQUEZE CRETE TYPE PUMPS, GYPSUM BULKER AND PUMP), ROLLERS (ALL), STEAM GENERATORS, STONE CRUSHERS, STRADDLE BUGGIES, TRACTORS, WINCH TRUCKS (WITH ""A"" FRAME). (ELKHART, KOSCIUSKO, LAGRANGE AND MARSHALL COUNTIES)

$34.80$38.65$73.45Agreement
POWER EQUIPMENT OPERATOR GROUP 2…
Full text

POWER EQUIPMENT OPERATOR GROUP 2 AIR COMPRESSORS (30 FEEDING AND COMMON RECEIVERS, ASPHALT SPREADER, BOILERS, BULLDOZERS, COMBINATION BACKHOE-END LOADER WITH BACKHOE BUCKET 1/2 CU. FT. AN UNDER, GRADER-ELEVATING, GREASER ENGINEER, GUARD RAIL POST DRIVER, GROUTING MACHINES; HIGHLIFT SHOVELS OR FRONT ENDLOADER HOIST (AUTOMATIC), CORBOY DRILLING MACHINES, HOIST (ALL ELEVATORS), HOISTS DRAWN, STONE CRUSHERS, TOUNAPULL, WINCH TRUCKS, TUGGER SINGLE FRUM, POST HOLE DIGGER, ROLLERS (ALL), SCOOPS, TRACTOR DRAWN . (JASPER, NEWTON, PULASKI & STARKE COUNTIES)

$47.90$38.65$86.55Agreement
POWER EQUIPMENT OPERATOR GROUP 1…
Full text

POWER EQUIPMENT OPERATOR GROUP 1: MECHANIC, ASPHALT PLANT, ASPHLAT SPREADER, AUTO GRADER; BATCH PLANT, BENOTO (REQUIRES 2 ENGINEERS), BOILER AND THROTTLE VALVE, BORING MACHINE (ROAD), BULLDOZERS WITH ENGINES OF 140NET HORSEPOWER OR MORE, CAISSON RIGS, CENTRAL REDI-MIX PLANT, CONCRETE CONVEYOR SYSTEMS, CONCRETE PAVER (OVER 27E CU. FT.), CONCTETE PAVER (27E CU. FT. AND UNDER), CONCRETE PLACER, CONCRETE PLACING BOOM, CONCRETE PUMPS (TRUCK MOUNTED), CONCRETE TOWER, CRANES AND BACKHOES (ALL ATTACHMENTS), CRANES, HAMMERHEAD, CRETER CRANE, DERRICKS (ALL), FORKLIFT (CAPBLE OF HOISTING AND MECHANICALLY MOVING FORKS HORIZONTALLY), GRADER, ELEVATING, HIGHLIFT SHOVELS OR FRONT END LOADERS, HOISTS (2 OR MORE DRUMS), LAZER SCREED, LOCOMOTIVES (ALL), MOTOR PATROL, PILE DRIVERS AND SKID RIG, PRE-STRESS MACHINES, ROCK DRILL (SELF- PROPELLED), ROCK DRILL (TRUCK MOUNTED), SCOOPS (TRACTOR DRAWN), SLIP-FORM PAVER, TOURNAPULL, TRACTOR WITH BOOM & SIDE BOOM, TRENCHING MACHINE (12 OR MORE INCHES IN WIDTH), COMBINATION BACKHOE FRONT END LOADER MACHINE WITH 1/2 CU. YD. OR ATTACHMENTS. (ELKHART, KOSCIUSKO, LAGRANGE AND MARSHALL COUNTIES)

$36.15$38.65$74.80Agreement
POWER EQUIPMENT OPERATOR GROUP 1…
Full text

POWER EQUIPMENT OPERATOR GROUP 1 MECHANIC, ASPHALT PLANT, AUTO GRADER; BATC PLANT, BENOTO (REQUIRES 2 ENGINEERS), BOILER AND THROTTLE VALVE, BORING MACHINE, (MINING MACHINE CAISSON RIGS, CENTRAL REDI-MIX PLANT, COMBINATION BACKHOE, ENDLOADER WITH BACKHOE BUCKET OVER 1/2 CU. YD., COMBINATION TUGGER HOIST AND AIR COMPRESSOR, COMPRESSOR AND THROTTLE, CONCRETE BREAKER (TRUCK MOUNTED), CONCRETE CONVEYOR (TRUCK MOUNTED), CONCRETE PAVER 27E CU. FT. AND UNDER, CONCRETE PAVER OVER 27E CU. FT., CONCRETE PUMP/GROUT PUMP WITH BOOM (TRUCK MOUNTED), CONCRETE TOWER, CRANES AND BACKHOES (ALL), CRANES, HAMMERHEAD TOWER, CRETE CRANE, DERRICKS (ALL), DERRICKS (TRAVELING) FORKLIFT, LULL TYPE, FORKLIFT (10 TON & OVER, HOIST 1, 2, AND 3 DRUMS, HOIST, 2 TUGGER ONE FLOOR, HYDRAULIC BOOM TRUCK, :ASER SCREED, LOCOMOTIVES, ALL MOTOR PATROL, MUCKING MACHINE, PILE DRIVING & SKID RIG, PIT MACHINES, PRE-STRESS MACHINES, PUMP CRETES & SIMILAR TYPES, ROCK DRILL (SELF- PROPELLED), ROCK DRILL (TRUCK MOUNTED), SLIP-FORM PAVER, STRADDLE BUGGIES, TRACTOR WITH BOOM & SIDE BOOM, TRENCHING MACHINE, WINCH TRACTOR (JASPER, NEWTON, PULASKI & STARKE COUNTIES)

$48.70$38.65$87.35Agreement
IRON0022-007 · Ironworkers agreement, June 1, 2025
IRONWORKER (JASPER…
Full text

IRONWORKER (JASPER (SOUTHEASTERN 1/2), NEWTON (SOUTHERN HALF), PULASKI (REMAINDER OF COUNTY)) THE FOLLOWING HOLIDAYS SHALL BE OBSERVED: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND THE DAY AFTER THANKSGIVING AND CHRISTMAS DAY. ANY HOLIDAY WHICH OCCURS ON A SUNDAY SHALL BE OBSERVED THE FOLLOWING MONDAY, UNLESS THE LEGAL OBSERVANCE OF THESE HOLIDAYS IS CHANGED BY LAW

$38.00$26.39$64.39Agreement
IRON0147-005 · Ironworkers agreement, June 1, 2025
IRONWORKER (KOSCIUSKO (REMAINDER OF COUNTY) AND LAGRANGE (REMAINDER OF COUNTY))$35.40$26.92$62.32Agreement
IRON0292-004 · Ironworkers agreement, June 1, 2025
IRONWORKER (ELKHART…
Full text

IRONWORKER (ELKHART, KOSCIUSKO (NORTHWEST HALF EXCLUDING WARSAW), LAGRANGE (WESTERN HALF ENCLUDING CITY OF LAGRANGE), MARSHALL, MIAMI (NORTHWESTERN TIP), NOBLE (NORTHWESTERN TIP), PULASKI (NORTHEAST HALF), AND STARKE COUNTIES)

$39.76$25.00$64.76Agreement
IRON0395-002 · Ironworkers agreement, June 1, 2025
IRONWORKER: SHEETER…
Full text

IRONWORKER: SHEETER (JASPER (NORTHERN 1/2), NEWTON (NORTHERN 1/2), PULASKI (NORTHWESTERN TIP) COUNTIES)

$48.00$41.28$89.28Agreement
IRONWORKER (JASPER…
Full text

IRONWORKER (JASPER (NORTHERN 1/2), NEWTON (NORTHERN 1/2), PULASKI (NORTHWESTERN TIP) COUNTIES)

$47.75$41.28$89.03Agreement
LABO0041-002 · Laborers agreement, June 1, 2025
LABORERS: GROUP 3…
Full text

LABORERS: GROUP 3 DYNAMITE MEN; DRILLERS, AIR TRACK OR WAGON DRILLING FOR EXPLOSIVES; LABORER SPECIALIST (JASPER AND NEWTON COUNTIES)

$40.89$30.30$71.19Agreement
LABORERS: GROUP 2…
Full text

LABORERS: GROUP 2 PLASTER TENDERS, MASONS TENDERS; MORTAR MIXERS; WELDERS (ACETYLENE OR ELECTRIC); CUTTING TORCH OR BURNER; CEMENT NOZZLE; CEMENT GUN; SCAFFOLD BUILDERS WHEN WORKING FOR PLASTERERS, AND MASON; WATER BLAST MACHINE OPERATOR; AIR TOOL OPERATORS AND ALL PHEUMATIC TOOL OPERATORS; AIR AND ELECTRIC VIBRATORS AND CHIPPING HAMMER OPERATORS; ASBESTOS REMOVAL; HAZARDOUS WASTE REMOVAL (JASPER AND NEWTON COUNTIES)

$40.64$30.30$70.94Agreement
LABORERS: GROUP 1…
Full text

LABORERS: GROUP 1 BUILDING AND CONSTRUCTION LABORERS; SCAFFOLD BUILDERS (OTHER THAN FOR MASON OR PLASTERERS); MECHANIC TENDERS; RODMEN AND CHAINMEN, RAILROAD WORKERS, MASONRY WALL WORKERS, (INTERIOR & EXTERIOR); ROOFER TENDERS, CEMENT FINISHER TENDERS, CARPENTER TENDERS, PORTABLE WATER, PUMPS WITH DISCHARGE UP TO 3 INCHES; WATERPROOFING; HAULING OF CREOSOTE LUMBER OR LUTEMEN; ASPHALT RAKERS; KETTLEM, EARTH COMPACTORS; JACKMAN AND SHEETMEN IN DITCHES MORE THAN 6 FT. DEEP; LABORERS IN DITCHES 6' DEEP OR DEEPER; ASSEMBLY OF UNCRETE PUMP; TILE LAYERS (SEWER OR FIELD); SEWER PIPE LAYERS; MOTOR DRIVEN WHEELBARROWS AND CONCRETE BUGGIES; HYSTER OPERATOR; PUMP CRETE ASSEMBLERS; CORE DRILL OPERATOR; CEMENT, LINE OR SILICA CLAY HANDERS; HANDLING OF TOXIC MATERIALS DAMAGING TO CLOTHING; PNEUMATIC SPIKERS; DECK ENGINE AND WINCH OPERATOR; WATER MAIN AND CABLE DUCKING; SCREED MAN OR SCREW OPERATOR ON ASPHALT PAVER; CHAIN SAW AND DEMOLITION SAW OPERATOR; CONCRETE CONVEYOR ASSEMBLER. (JASPER AND NEWTON COUNTIES)

$39.89$30.30$70.19Agreement
LABO0081-005 · Laborers agreement, June 1, 2025
LABORERS: GROUP 3…
Full text

LABORERS: GROUP 3 DYNAMITE MEN; DRILLERS, AIR TRACK OR WAGON DRILLING FOR EXPLOSIVES; LABORER SPECIALIST (STARKE COUNTY)

$40.89$30.30$71.19Agreement
LABORERS: GROUP 2…
Full text

LABORERS: GROUP 2 PLASTER TENDERS, MASONS TENDERS; MORTAR MIXERS; WELDERS (ACETYLENE OR ELECTRIC); CUTTING TORCH OR BURNER; CEMENT NOZZLE; CEMENT GUN; SCAFFOLD BUILDERS WHEN WORKING FOR PLASTERERS, AND MASON; WATER BLAST MACHINE OPERATOR; AIR TOOL OPERATORS AND ALL PHEUMATIC TOOL OPERATORS; AIR AND ELECTRIC VIBRATORS AND CHIPPING HAMMER OPERATORS; ASBESTOS REMOVAL; HAZARDOUS WASTE REMOVAL (STARKE COUNTY)

$40.64$30.30$70.94Agreement
LABORERS: GROUP 1…
Full text

LABORERS: GROUP 1 BUILDING AND CONSTRUCTION LABORERS; SCAFFOLD BUILDERS (OTHER THAN FOR MASON OR PLASTERERS); MECHANIC TENDERS; RODMEN AND CHAINMEN, RAILROAD WORKERS, MASONRY WALL WORKERS, (INTERIOR & EXTERIOR); ROOFER TENDERS, CEMENT FINISHER TENDERS, CARPENTER TENDERS, PORTABLE WATER, PUMPS WITH DISCHARGE UP TO 3 INCHES; WATERPROOFING; HAULING OF CREOSOTE LUMBER OR LUTEMEN; ASPHALT RAKERS; KETTLEM, EARTH COMPACTORS; JACKMAN AND SHEETMEN IN DITCHES MORE THAN 6 FT. DEEP; LABORERS IN DITCHES 6' DEEP OR DEEPER; ASSEMBLY OF UNCRETE PUMP; TILE LAYERS (SEWER OR FIELD); SEWER PIPE LAYERS; MOTOR DRIVEN WHEELBARROWS AND CONCRETE BUGGIES; HYSTER OPERATOR; PUMP CRETE ASSEMBLERS; CORE DRILL OPERATOR; CEMENT, LINE OR SILICA CLAY HANDERS; HANDLING OF TOXIC MATERIALS DAMAGING TO CLOTHING; PNEUMATIC SPIKERS; DECK ENGINE AND WINCH OPERATOR; WATER MAIN AND CABLE DUCKING; SCREED MAN OR SCREW OPERATOR ON ASPHALT PAVER; CHAIN SAW AND DEMOLITION SAW OPERATOR; CONCRETE CONVEYOR ASSEMBLER. (STARKE COUNTY)

$39.89$30.30$70.19Agreement
LABO0274-002 · Laborers agreement, June 1, 2024
LABORERS: GROUP 3…
Full text

LABORERS: GROUP 3 DYNAMITE MEN; DRILLERS, MASON TENDERS; AIR TRACK OR WAGON DRILLING FOR EXPLOSIVES; LABORER SPECIALIST. (PULASKI COUNTY)

$28.48$18.00$46.48Agreement
LABORERS: GROUP 2…
Full text

LABORERS: GROUP 2 PLASTER TENDERS, MORTAR MIXERS; WELDERS (ACETYLENE OR ELECTRIC); CUTTING TORCH OR BURNER; CEMENT NOZZLE; CEMENT GUN; SCAFFOLD BUILDERS WHEN WORKING FOR PLASTERERS, AND MASON; WATER BLAST MACHINE OPERATOR; AIR TOOL OPERATORS AND ALL PHEUMATIC TOOL OPERATORS; AIR AND ELECTRIC VIBRATORS AND CHIPPING HAMMER OPERATORS; ASBESTOS REMOVAL; HAZARDOUS WASTE REMOVAL. (PULASKI COUNTY)

$27.73$18.00$45.73Agreement
LABORERS: GROUP 1…
Full text

LABORERS: GROUP 1 BUILDING AND CONSTRUCTION LABORERS; SCAFFOLD BUILDERS (OTHER THAN FOR MASON OR PLASTERERS); MECHANIC TENDERS; RODMEN AND CHAINMEN, RAILROAD WORKERS, MASONRY WALL WORKERS, (INTERIOR & EXTERIOR); ROOFER TENDERS, CEMENT FINISHER TENDERS, CARPENTER TENDERS, PORTABLE WATER, PUMPS WITH DISCHARGE UP TO 3 INDCHES; WATERPROOFING; HAULING OF CREOSOTE LUMBER OR LUTEMEN; ASPHALT RAKERS; KETTLEM, EARTH COMPACTORS; JACKMAN AND SHEETMEN IN DITCHES MORE THAN 6 FT. DEEP; LABORERS IN DITCHES 6'DEEP OR DEEPER; ASSEMBLY OF UNCRETE PUMP; TILE LAYERS (SEWER OR FIELD); SEWER PIPE LAYERS; MOTOR DRIVEN WHEELBARROWS AND CONCRETE BUGGIES; HYSTER OPERATOR; PUMP CRETE ASSEMBLERS; CORE DRILL OPERATOR; CEMENT, LINE OR SILICA CLAY HANDERS; HANDLING OF TOXIC MATERIALS DAMAGING TO CLOTHING; PNEUMATIC SPIKERS; DECK ENGINE AND WINCH OPERATOR; WATER MAIN AND CABLE DUCKING; SCREED MAN OR SCREW OPERATOR ON ASPHALT PAVER; CHAIN SAW AND DEMOLITION SAW OPERATOR; CONCRETE CONVEYOR ASSEMBLER. (PULASKI COUNTY)

$26.98$18.00$44.98Agreement
LABO0645-003 · Laborers agreement, June 1, 2025
LABORERS: BUILDING CONSTRUCTION: GROUP 3…
Full text

LABORERS: BUILDING CONSTRUCTION: GROUP 3 WATER BLAST MACHINE OPERATOR; MORTAR MIXERS; WELDERS (ACETYLENE OR ELECTRIC); CUTTING TORCH OR BURNER; CEMENT NOZZLE. LABORERS; CEMENT GUN OPERATOR; SCAFFOLD BUILDERS WHEN WORKING FOR PLASTERERS. DYNAMITE MEN; DRILLERS - AIR TRACK OR WAGON DRILLING FOR EXPLOSIVES HAZARDOUS AND TOXIC MATERIAL HANDLER, MASON TENDERS, ASBESTOS REMOVAL OR HANDLER. (REMAINING COUNTIES)

$31.88$18.70$50.58Agreement
LABORERS: BUILDING CONSTRUCTION: GROUP 2…
Full text

LABORERS: BUILDING CONSTRUCTION: GROUP 2 WATERPROOFING; HANDLING OF CREOSOT LUMBER OR LIKE TREATED MATERIAL (EXCLUDING RAILROAD MATERIAL); ASPHALT RAKERS AND LUTEMEN; KETTLEMEN; AIR TOOL OPERATORS AND ALL PNEUMATIC TOOL OPERATORS; AIR AND ELECTRIC VIBRATORS AND CHIPPING HAMMER OPERATORS; EARTH COMPACTORS JACKMEN AND SHEETMEN WORKING DITCHES DEEPER THAN (6) FT.IN DEPTH; LABORERS WORKING IN DITCHES (6) FT.IN DEPTH OR DEEPER; ASSEMBLY OF UNICRETE PUMP; TILE LAYERS (SEWER OR FIELD) AND SEWER PIPE LAYER (METALLIC OR NON-METALLIC); MOTOR DRIVEN WHEELBARROWS AND CONCRETE BUGGIES; HYSTER OPERATORS; PUMP CRETE ASSEMBLERS; CORE DRILL OPERATORS; CEMENT, LIME OR SILICA CLAY HANDLERS (BULK OR BAG); HANDLING OF TOXIC MATERIALS DAMAGING TO CLOTHING; PNEUMATIC SPIKERS; DECK ENGINE AND WINCH OPERATORS; WATER MAIN AND CABLE DUCKING (METALLIC AND NON-METALLIC); SCREED MAN OR SCREW OPERATOR ON ASPHALT PAVER; CHAIN AND DEMOLITION SAW OPERATORS; CONCRETE CONVEYOR ASSEMBLERS. (REMAINING COUNTIES)

$30.38$18.70$49.08Agreement
LABORERS: BUILDING CONSTRUCTION: GROUP 1…
Full text

LABORERS: BUILDING CONSTRUCTION: GROUP 1 BUILDING AND CONSTRUCTION LABORERS; SCAFFOLD BUILDERS (OTHER THAN FOR PLASTERERS); MECHANIC TENDERS; WINDOW WASHERS AND CLEANERS; WATERBOYS AND TOOLHOUSEMEN; ROOFERS TENDERS; RAILROAD WORKERS; MASONRY WALL WASHERS (INTERIOR AND EXTERIOR); CEMENT FINISHER TENDERS; CARPENTER TENDERS; ALL PORTABLE WATER PUMPS WITH DISCHARGE UP TO (3) INCHES; PLASTER TENDERS; FLAG & SIGNAL PERSON. (REMAINING COUNTIES)

$29.88$18.70$48.58Agreement
PAIN0027-005 · Painters and Allied Trades agreement, June 1, 2025
GLAZIER (NEWTON COUNTY, WEST OF HIGHWAY #41)$53.55$44.88$98.43Agreement
PAIN0091-006 · Painters and Allied Trades agreement, June 1, 2025
PAINTER: SPRAY$33.00$19.86$52.86Agreement
PAINTER (BRUSH & ROLLER, DRYWALL TAPING & FINISHING, VINYL/PAPER HANGING)$32.50$19.86$52.36Agreement
PAIN0460-001 · Painters and Allied Trades agreement, June 1, 2025
PAINTERS: DRYWALL FINISHER (JASPER, NEWTON, PULASKI AND STARKE COUNTIES)$41.80$31.26$73.06Agreement
PAINTERS: BRUSH & ROLLER (JASPER, NEWTON, PULASKI AND STARKE COUNTIES)$41.00$31.26$72.26Agreement
PAIN0469-003 · Painters and Allied Trades agreement, June 1, 2025
PAINTERS: SPRAY, SANDBLAST, POWER TOOLS, WATERBLAST, & STEAM CLEANING (LAGRANGE COUNTY)$27.04$16.27$43.31Agreement
PAINTERS: SPRAY & SANDBLAST POT TENDERS AND GROUND PERSONNEL (LAGRANGE COUNTY)$27.04$16.27$43.31Agreement
PAINTERS: LEAD ABATEMENT (LAGRANGE COUNTY)$32.24$16.27$48.51Agreement
PAINTERS: BRUSH, ROLLER, PAPERHANGER, & DRYWALL FINISHING (LAGRANGE COUNTY)$25.04$15.32$40.36Agreement
PAIN1165-006 · Painters and Allied Trades agreement, July 1, 2025
GLAZIER (JASPER, NEWTON (EAST OF HIGHWAY #41))$44.09$30.73$74.82Agreement
PAIN1165-011 · Painters and Allied Trades agreement, July 1, 2025
GLAZIER (ELKHART, KOSCIUSKO, LAGRANGE, MARSHALL, PULASKI, AND STARKE COUNTY)$34.22$24.67$58.89Agreement
PLAS0101-004 · Plasterers and Cement Masons agreement, June 1, 2014
PLASTERER (MARSHALL COUNTY AND PULASKI (SOUTHERN 1/2))$26.81$12.40$39.21Agreement
CEMENT MASON/CONCRETE FINISHER (MARSHALL COUNTY AND PULASKI (SOUTHERN 1/2))$28.84$14.48$43.32Agreement
PLAS0101-004 · Plasterers and Cement Masons agreement, June 1, 2018
PLASTERER (MARSHALL COUNTY AND PULASKI (SOUTHERN 1/2))$26.81$12.40$39.21Agreement
CEMENT MASON/CONCRETE FINISHER (MARSHALL COUNTY AND PULASKI (SOUTHERN 1/2))$28.84$14.48$43.32Agreement
PLAS0101-005 · Plasterers and Cement Masons agreement, June 1, 2014
PLASTERER (ELKHART, KOSCIUSKO AND LAGRANGE COUNTIES)$25.69$11.75$37.44Agreement
CEMENT MASON/CONCRETE FINISHER (ELKHART, KOSCIUSKO AND LAGRANGE COUNTIES)$28.84$14.48$43.32Agreement
PLAS0101-005 · Plasterers and Cement Masons agreement, June 1, 2018
PLASTERER (ELKHART, KOSCIUSKO AND LAGRANGE COUNTIES)$25.69$11.75$37.44Agreement
CEMENT MASON/CONCRETE FINISHER (ELKHART, KOSCIUSKO AND LAGRANGE COUNTIES)$28.84$14.48$43.32Agreement
PLAS0165-002 · Plasterers and Cement Masons agreement, June 1, 2011
CEMENT MASON/CONCRETE FINISHER (NEWTON COUNTY)$37.28$18.53$55.81Agreement
PLASTERER (NEWTON COUNTY)$32.70$17.70$50.40Agreement
PLAS0165-002 · Plasterers and Cement Masons agreement, July 1, 2018
CEMENT MASON/CONCRETE FINISHER (NEWTON COUNTY)$37.28$18.53$55.81Agreement
PLASTERER (NEWTON COUNTY)$32.70$17.70$50.40Agreement
PLAS0406-002 · Plasterers and Cement Masons agreement, June 1, 2012
CEMENT MASON/CONCRETE FINISHER…
Full text

CEMENT MASON/CONCRETE FINISHER (JASPER (REMAINDER OF COUNTY, INCLUDING WHEATFIELD), PULASKI (N 1/2) AND STARKE COUNTIES)

$35.48$21.68$57.16Agreement
PLASTERER (JASPER (REMAINDER OF COUNTY…
Full text

PLASTERER (JASPER (REMAINDER OF COUNTY, INCLUDING WHEATFIELD), PULASKI (N 1/2) AND STARKE COUNTIES)

$33.28$17.32$50.60Agreement
PLAS0406-002 · Plasterers and Cement Masons agreement, July 1, 2018
CEMENT MASON/CONCRETE FINISHER…
Full text

CEMENT MASON/CONCRETE FINISHER (JASPER (REMAINDER OF COUNTY, INCLUDING WHEATFIELD), PULASKI (N 1/2) AND STARKE COUNTIES)

$35.48$21.68$57.16Agreement
PLASTERER (JASPER (REMAINDER OF COUNTY…
Full text

PLASTERER (JASPER (REMAINDER OF COUNTY, INCLUDING WHEATFIELD), PULASKI (N 1/2) AND STARKE COUNTIES)

$33.28$17.32$50.60Agreement
PLAS0438-002 · Plasterers and Cement Masons agreement, June 1, 2018
CEMENT MASON/CONCRETE FINISHER…
Full text

CEMENT MASON/CONCRETE FINISHER (PULASKI (NORTHERN 2/3), JASPER (N. EASTERN PORTION OF, WEST TO, BUT NOT INCLUDING WHEATFIELD), STARKE (ENTIRETY))

$36.01$25.40$61.41Agreement
PLUM0166-002 · Plumbers and Pipefitters agreement, June 1, 2025
Group definitions, zones and premiums for PLUM0166-002
PLUMBER (ELKHART, KOSCIUSKO, AND LAGRANGE COUNTIES).$ 45.06 23.16
PLUM0172-001 · Plumbers and Pipefitters agreement, June 1, 2025
PLUMBER, PIPEFITTER…
Full text

PLUMBER, PIPEFITTER, STEAMFITTER (JASPER (S OF THE N. SIDE OF THE CITY OF RENSSELEAR), MARSHALL, PULASKI AND STARKE COUNTIES)

$44.93$23.03$67.96Agreement
PLUM0210-003 · Plumbers and Pipefitters agreement, June 1, 2025
PLUMBER (JASPER (TO THE CITY OF RENSSELAER) AND NEWTON COUNTIES)$49.77$28.56$78.33Agreement
PLUM0597-004 · Plumbers and Pipefitters agreement, June 1, 2018
PIPEFITTER (JASPER (EXCLUDING THE CITY LIMITS OF RENSSELEAR), AND NEWTON (ENTIRE COUNTY))$48.50$31.12$79.62Agreement
ROOF0023-001 · Roofers agreement, June 1, 2024
ROOFER: SLATE & TILE…
Full text

ROOFER: SLATE & TILE (ELKHART, KOSCIUSKO, LAGRANGE, MARSHALL, PULASKI, AND STARKE COUNTIES)

$36.05$21.04$57.09Agreement
ROOFER: COMPOSITION (ELKHART, KOSCIUSKO, LAGRANGE, MARSHALL, PULASKI, AND STARKE COUNTIES)$34.55$21.04$55.59Agreement
ROOF0026-001 · Roofers agreement, June 1, 2025
ROOFER (JASPER AND NEWTON COUNTIES)$47.47$27.81$75.28Agreement
SFIN0669-002 · SFIN, April 1, 2025
SPRINKLER FITTER$44.20$27.88$72.08SFIN
SHEE0020-006 · Sheet Metal Workers agreement, July 1, 2025
Group definitions, zones and premiums for SHEE0020-006
SHEET METAL WORKER (ELKHART, KOSCIUSKO, & MARSHALL).$ 44.45 30.43
TEAM0135-005 · Teamsters agreement, April 1, 2025
TRUCK DRIVERS: GROUP 5 MECHANIC FURNISHING HIS OWN TOOLS. (JASPER AND NEWTON COUNTIES)$34.02$0.00$34.02Agreement
TRUCK DRIVERS: GROUP 4…
Full text

TRUCK DRIVERS: GROUP 4 DRIVERS ON HEAVY EQUIPMENT OVER SIXTEEN (16) CU.YDS. OR TWENTY-FOUR TON, SUCH AS KOEHRING OR SIMILAR DUMPSTERS, TRACT TRUCKS, EUCLIDS, HUG BOTTOM DUMPS, TROUNAPULLS, TOURNAROCKERS OR SIMILAR EQUIPMENT WHEN USED FOR TRANSPORTATION PURPOSES, POLE TRAILERS OVER SIX (6) WHEELS, WATER PULLS, LOW-BOY TRAILERS, TANDEM AXLES, QUAD AXLE OR MORE NO-WEIGHT LIMITATION, DISEAL AND/OR HEAVY EQUIPMENT MECHANICS WHEN WORKING ON EQUIPMENT OPERATED BY EMPLOYEES WITH THIS BARGAINING UNIT. (JASPER AND NEWTON COUNTIES).$ 33.52 0.00 TRUCK DRIVERS: GROUP 3 KOEHRING OR SIMILAR DUMPSTERS, TRACT TRUCKS, SEMI-TRAILER WATER TRUCKS, EUCLIDS, HUG BOTTOM DUMPS, TOURNAPULLS, TOURNATRAILERS, TOURNAROCKERS, TRACTOR-TRAILERS, TANDEMS Q-FRAME WINCH TRUCKS, HYDROLIFT TRUCKS OR SIMILAR EQUIPMENT WHEN USED FOR TRANSPORTATION PURPOSES, MIXER TRUCKS OVER SIX AND ONE-HALF (6 1/2) CU.YDS. BATCH TRUCKS WET OR DRY OVER 4 - ""34-E"" BATCHES SINGLE AXLE LOW BOY TRAILERS, AND CONTRACTOR'S MECHANICS WHEN WORKING ON EQUIPMENT OPERATED BY EMPLOYEES WITHIN THIS BARGAINING UNIT. SIX (6) WHEEL POLE TRAILERS AND ONE (1) MAN OIL DISTRIBUTORS, FORK-LIFT OVER FOUR (4) TON AND MOBILE MIXERS. (JASPER AND NEWTON COUNTIES)

$33.37$0.00$33.37Agreement
TRUCK DRIVERS: GROUP 2…
Full text

TRUCK DRIVERS: GROUP 2 DRIVERS ON TANDEM AXLE EIGHTEEN (18) CU.YDS. OR TWENTY-FOUR (24) TONS GROSS, SIX (6) WHEEL TRUCKS, KOEHRING OR SIMILAR DUMPSTERS, TRACT RUCKS, EUCLIDS, HUG BOTTOM DUMPS, TOURNAPULLS, TOURNATRAILERS, TROURNAROCKERS, OR SIMILAR EQUIPMENT WHEN USED FOR TRANSPORTATION PURPOSES UNDER NINE (9) CU.YDS. OR LESS THAN THIRTEEN AND ONE-HALF (13 1/2) TONS, TANDEMS AND SEMI-TRAILER SERVICE TRUCKS, MIXER TRUCKS OVER THREE (3) CU.YDS.,FORK LIFT, FOUR (4) WHEEL A-FRAME TRUCKS WHEN USED FOR TRANSPORTATION PURPOSES, FOUR (4) WHEEL WINCH TRUCKS, PAVEMENT BREAKERS, BATCH TRUCKS-WET OR DRY-OVER 2 UP TO AND INCLUDING 4 - ""34-E"" BATCHES TWO (2) MEN OIL DISTRIBUTORS, FORK-LIFT UNDER FOUR (4) TON AND VACUUM TRUCKS. (JASPER AND NEWTON COUNTIES)

$33.17$0.00$33.17Agreement
TRUCK DRIVERS: GROUP 1…
Full text

TRUCK DRIVERS: GROUP 1 SINGLE AXLE TRUCKS SEVEN (7) CU.YDS. OR LESS THAN TEN AND ONE-HALF (10 1/2/) TONS, DUMPSTERS, SCOOP-MOBILES FIVE (5) CU.YDS. AND UNDER OR LESS THAN SEVEN AND ONE-HALF (7 1/2) TONS, MIXER TRUCKS THREE (3) CU.YDS. AND UNDER, AIR COMPRESSORS AND WELDING MACHINES, INCLUDING THOSE PULLED BY SEPARATE UNITS, BATCH TRUCKS-WET OR DRY-2 ""34-E"" BATCHES OR LESS, TRUCK DRIVER HELPERS, WAREHOUSEMEN, MECHANIC'S HELPERS, GREASERS AND TIREMEN, ALL PICK- UP TRUCKS AND OTHER VEHICLES. DRIVERS ON DUMPSTERS OR SIMILAR DUMPSTERS, MOUNTED ON FOUR (4) WHEEL TRUCK RATED TWO (2) CU.YDS. OR LESS, AND SMALL PALLET TYPE FORK-LIFT OPERATOR AND DRIVERS ON PALLET JACKS OR SIMILAR TYPE EQUIPMENT. (JASPER AND NEWTON COUNTIES)

$32.67$0.00$32.67Agreement
TEAM0364-001 · Teamsters agreement, June 1, 2025
TRUCK DRIVER: GROUP 4…
Full text

TRUCK DRIVER: GROUP 4 SEMI TRAILER TRUCKS (ELKHART, KOSCIUSKO, LAGRANGE & MARSHALL COUNTIES)

FOOTNOTE: A. FRINGE BENEFITS: $422.50 PER WEEK B. HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY.$ 34.75 0.00 TRUCK DRIVER: GROUP 3 TANDEM, TRIAXLE AND FUEL TRUCKS (ELKHART, KOSCIUSKO, LAGRANGE & MARSHALL COUNTIES) FOOTNOTE: A. FRINGE BENEFITS: $422.50 PER WEEK B. HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY

$34.25$0.00$34.25Agreement
Group definitions, zones and premiums for TEAM0364-001
TRUCK DRIVER: GROUP 2 SINGLE AXLE TRUCKS (ELKHART, KOSCIUSKO, LAGRANGE & MARSHALL COUNTIES) FOOTNOTE: A. FRINGE BENEFITS: $422.50 PER WEEK B. HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY.$ 33.95 0.00 TRUCK DRIVER: GROUP 1 PICKUP TRUCKS (ELKHART, KOSCIUSKO, LAGRANGE & MARSHALL COUNTIES) FOOTNOTE: A. FRINGE BENEFITS: $422.50 PER WEEK B. HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY.$ 33.75 0.00

Modification history

Modification 1January 30, 2026
Modification 2May 18, 2026 (current)

Published by the Wage and Hour Division; read from sam.gov. The sheet is checked for a newer modification each day. Contracts awarded since January 1, 2017 also carry Executive Order 13706 paid sick leave (one hour per 30 worked, up to 56 a year).

Questions people ask

Which rate do I pay on IN20260005?
The line for the classification of work actually performed: the basic rate plus the fringe. You may pay the fringe into benefit plans, as cash on every hour, or a mix. Overtime after 40 hours is 1.5 times the basic rate; fringe is paid on every hour and never multiplied.
My trade is not on this sheet. What do I do?
Do not borrow the nearest name. Ask the contracting agency for a conformance on Standard Form 1444 before the first week of that work, and note it as pending on the payroll.
Does modification 2 apply to my contract?
Only if it was in force when your contract was awarded (generally at bid opening). An earlier modification locked into the contract keeps applying, except on option years, added scope and indefinite-quantity contracts. The number and modification are on the first page of the exhibit in your contract.

How to read a wage determination · Paying the fringe in cash or through plans · Overtime on these rates · Fringe credit calculator