Prevailing wage rates · Indiana · Wage determination
Prevailing wage rates: Brown, Clark, Dearborn and 14 more counties, Indiana
Building construction · IN20260004 modification 2, published May 18, 2026
The short answer
This sheet sets 127 classifications for building work in Brown, Clark, Dearborn and 14 more counties, Indiana. Each line is a basic hourly rate plus a fringe rate, and the sum is the minimum you must pay for that work, from $20.18 an hour (line construction:: groundman (clark, floyd, and harrison counties)) to $98.61 (elevator mechanic (brown). Your contract may lock an earlier modification.
Rates by classification
Total is the basic rate plus the fringe. Source is the agreement or survey the rate came from; a marker means the group changed in this modification. A dagger (†) means the fringe carries a footnote or percentage the total does not include; read the group’s notes.
| Classification | Basic rate | Fringe | Total | Source |
|---|---|---|---|---|
| ASBE0008-004 · Asbestos Workers and Heat & Frost Insulators agreement, July 1, 2017 | ||||
HAZARDOUS MATERIAL HANDLER…Full textHAZARDOUS MATERIAL HANDLER: INCLUDES PREPARATION, WETTINGS, STRIPPING, REMOVAL, SCRAPPING, VACUUMING, BAGGING & DISPOSING OF ALL INSULATION MATERIALS, WHETHER THEY CONTAIN ASBESTOS OR NOT, FROM MECHANICAL SYSTEMS (DEARBORN, FAYETTE, FRANKLIN, OHIO, RIPLEY SWITZERLAND AND UNION COUNTIES) | $25.00 | $13.70 | $38.70 | Agreement |
ASBESTOS WORKERS/INSULATOR…Full textASBESTOS WORKERS/INSULATOR: INCLUDES APPLICATION OF ALL INSULATING MATERIALS, PROTECTIVE COVERINGS, COATINGS & FINISHINGS TO ALL TYPES OF MECHANICAL SYSTEMS (DEARBORN, FAYETTE, FRANKLIN, OHIO, RIPLEY SWITZERLAND AND UNION COUNTIES) | $35.23 | $22.79 | $58.02 | Agreement |
| ASBE0008-004 · Asbestos Workers and Heat & Frost Insulators agreement, March 1, 2025 | ||||
HAZARDOUS MATERIAL HANDLER…Full textHAZARDOUS MATERIAL HANDLER: INCLUDES PREPARATION, WETTINGS, STRIPPING, REMOVAL, SCRAPPING, VACUUMING, BAGGING & DISPOSING OF ALL INSULATION MATERIALS, WHETHER THEY CONTAIN ASBESTOS OR NOT, FROM MECHANICAL SYSTEMS (DEARBORN, FAYETTE, FRANKLIN, OHIO, RIPLEY SWITZERLAND AND UNION COUNTIES) | $25.00 | $13.70 | $38.70 | Agreement |
ASBESTOS WORKERS/INSULATOR…Full textASBESTOS WORKERS/INSULATOR: INCLUDES APPLICATION OF ALL INSULATING MATERIALS, PROTECTIVE COVERINGS, COATINGS & FINISHINGS TO ALL TYPES OF MECHANICAL SYSTEMS (DEARBORN, FAYETTE, FRANKLIN, OHIO, RIPLEY SWITZERLAND AND UNION COUNTIES) | $35.23 | $22.79 | $58.02 | Agreement |
| ASBE0018-001 · Asbestos Workers and Heat & Frost Insulators agreement, June 1, 2017 | ||||
HAZARDOUS MATERIAL HANDLER…Full textHAZARDOUS MATERIAL HANDLER: INCLUDES PREPARATION, WETTINGS, STRIPPING, REMOVAL, SCRAPPING, VACUUMING, BAGGING & DISPOSING OF ALL INSULATION MATERIALS, WHETHER THEY CONTAIN ASBESTOS OR NOT, FROM MECHANICAL SYSTEMS (BROWN, DECATUR, HENRY AND RUSH COUNTIES) | $23.00 | $14.40 | $37.40 | Agreement |
ASBESTOS WORKER/HEAT & FROST INSULATOR…Full textASBESTOS WORKER/HEAT & FROST INSULATOR: INCLUDES APPLICATION OF ALL INSULATING MATERIALS PROTECTIVE COVERINGS, COATINGS AND FINISHES TO ALL TYPES OF MECHANCIAL SYSTEMS (BROWN, DECATUR, HENRY AND RUSH COUNTIES) | $40.20 | $25.68 | $65.88 | Agreement |
| ASBE0018-001 · Asbestos Workers and Heat & Frost Insulators agreement, June 1, 2025 | ||||
HAZARDOUS MATERIAL HANDLER…Full textHAZARDOUS MATERIAL HANDLER: INCLUDES PREPARATION, WETTINGS, STRIPPING, REMOVAL, SCRAPPING, VACUUMING, BAGGING & DISPOSING OF ALL INSULATION MATERIALS, WHETHER THEY CONTAIN ASBESTOS OR NOT, FROM MECHANICAL SYSTEMS (BROWN, DECATUR, HENRY AND RUSH COUNTIES) | $23.00 | $14.40 | $37.40 | Agreement |
ASBESTOS WORKER/HEAT & FROST INSULATOR…Full textASBESTOS WORKER/HEAT & FROST INSULATOR: INCLUDES APPLICATION OF ALL INSULATING MATERIALS PROTECTIVE COVERINGS, COATINGS AND FINISHES TO ALL TYPES OF MECHANCIAL SYSTEMS (BROWN, DECATUR, HENRY AND RUSH COUNTIES) | $40.20 | $25.68 | $65.88 | Agreement |
| ASBE0051-005 · Asbestos Workers and Heat & Frost Insulators agreement, June 1, 2017 | ||||
HAZARDOUS MATERIAL HANDLER…Full textHAZARDOUS MATERIAL HANDLER: INCLUDES PREPARATION, WETTINGS, STRIPPING, REMOVAL, SCRAPPING, VACCUMING, BAGGING & DISPOSING OF ALL INSULATION MATERIALS, WHETHER THEY CONTAIN ASBESTOS OR NOT, FROM MECHANICAL SYSTEMS (CLARK, FLOYD, HARRISON, AND JENNINGS COUNTIES) | $19.80 | $13.30 | $33.10 | Agreement |
ASBESTOS WORKER/HEAT & FROST INSULATOR…Full textASBESTOS WORKER/HEAT & FROST INSULATOR: INCLUDES APPLICATION OF ALL INSULATING MATERIALS, PROTECTIVE COVERINGS, COATINGS AND FINISHINGS TO ALL TYPES OF MECHANICAL SYSTEMS (CLARK, FLOYD, HARRISON, AND JENNINGS COUNTIES) | $30.00 | $20.89 | $50.89 | Agreement |
| ASBE0051-005 · Asbestos Workers and Heat & Frost Insulators agreement, March 1, 2025 | ||||
HAZARDOUS MATERIAL HANDLER…Full textHAZARDOUS MATERIAL HANDLER: INCLUDES PREPARATION, WETTINGS, STRIPPING, REMOVAL, SCRAPPING, VACCUMING, BAGGING & DISPOSING OF ALL INSULATION MATERIALS, WHETHER THEY CONTAIN ASBESTOS OR NOT, FROM MECHANICAL SYSTEMS (CLARK, FLOYD, HARRISON, AND JENNINGS COUNTIES) | $19.80 | $13.30 | $33.10 | Agreement |
ASBESTOS WORKER/HEAT & FROST INSULATOR…Full textASBESTOS WORKER/HEAT & FROST INSULATOR: INCLUDES APPLICATION OF ALL INSULATING MATERIALS, PROTECTIVE COVERINGS, COATINGS AND FINISHINGS TO ALL TYPES OF MECHANICAL SYSTEMS (CLARK, FLOYD, HARRISON, AND JENNINGS COUNTIES) | $30.00 | $20.89 | $50.89 | Agreement |
| ASBE0079-002 · Asbestos Workers and Heat & Frost Insulators agreement, March 1, 2024 | ||||
HAZARDOUS MATERIAL HANDLER…Full textHAZARDOUS MATERIAL HANDLER: INCLUDES PREPARATION, WETTING, STRIPPING, REMOVAL, SCRAPPING, VACUUMING, BAGGING & DISPOSING OF ALL INSULATION MATERIALS, WHETHER THEY CONTAIN ASBESTOS OR NOT, FROM MECHANICAL SYSTEMS) (RANDOLPH AND WAYNE COUNTIES) | $38.56 | $18.70 | $57.26 | Agreement |
ASBESTOS WORKER/HEAT & FROST INSULATOR…Full textASBESTOS WORKER/HEAT & FROST INSULATOR: INCLUDES APPLICATION OF ALL INSULATING MATERIALS, PROTECTIVE COVERINGS, COATINGS & FINISHINGS TO ALL TYPES OF MECHANICAL SYSTEMS (RANDOLPH AND WAYNE COUNTIES) | $38.56 | $18.70 | $57.26 | Agreement |
| ASBE0079-002 · Asbestos Workers and Heat & Frost Insulators agreement, July 1, 2024 | ||||
HAZARDOUS MATERIAL HANDLER…Full textHAZARDOUS MATERIAL HANDLER: INCLUDES PREPARATION, WETTING, STRIPPING, REMOVAL, SCRAPPING, VACUUMING, BAGGING & DISPOSING OF ALL INSULATION MATERIALS, WHETHER THEY CONTAIN ASBESTOS OR NOT, FROM MECHANICAL SYSTEMS) (RANDOLPH AND WAYNE COUNTIES) | $38.56 | $18.70 | $57.26 | Agreement |
ASBESTOS WORKER/HEAT & FROST INSULATOR…Full textASBESTOS WORKER/HEAT & FROST INSULATOR: INCLUDES APPLICATION OF ALL INSULATING MATERIALS, PROTECTIVE COVERINGS, COATINGS & FINISHINGS TO ALL TYPES OF MECHANICAL SYSTEMS (RANDOLPH AND WAYNE COUNTIES) | $38.56 | $18.70 | $57.26 | Agreement |
| BOIL0374-001 · Boilermakers agreement, May 1, 2025 | ||||
| BOILERMAKER (REMAINING COUNTIES) | $43.24 | $38.17 | $81.41 | Agreement |
| BOIL0374-005 · Boilermakers agreement, January 1, 2025 | ||||
| BOILERMAKER (DEARBORN AND SWITZERLAND COUNTIES) | $43.24 | $38.17 | $81.41 | Agreement |
| BRIN0004-019 · Bricklayers agreement, June 1, 2023 | ||||
| TILE FINISHER (LOUISVILLE CLARK, FLOYD AND HARRISON COUNTIES) | $18.58 | $6.69 | $25.27 | Agreement |
| MARBLE, TILE LAYER & TERRAZZO WORKER (LOUISVILLE CLARK, FLOYD AND HARRISON COUNTIES) | $27.26 | $8.09 | $35.35 | Agreement |
| BRICKLAYER (LOUISVILLE CLARK, FLOYD AND HARRISON COUNTIES) | $33.70 | $16.57 | $50.27 | Agreement |
| BRIN0004-019 · Bricklayers agreement, June 1, 2024 | ||||
| TILE FINISHER (LOUISVILLE CLARK, FLOYD AND HARRISON COUNTIES) | $18.58 | $6.69 | $25.27 | Agreement |
| MARBLE, TILE LAYER & TERRAZZO WORKER (LOUISVILLE CLARK, FLOYD AND HARRISON COUNTIES) | $27.26 | $8.09 | $35.35 | Agreement |
| BRICKLAYER (LOUISVILLE CLARK, FLOYD AND HARRISON COUNTIES) | $33.70 | $16.57 | $50.27 | Agreement |
| BRIN0004-022 · Bricklayers agreement, June 1, 2023 | ||||
TILE & MARBLE SETTER…Full textTILE & MARBLE SETTER; MOSAIC WORKER (BROWN, DEARBORN, DECATUR, JENNINGS,OHIO, RIPLEY AND SWITZERLAND COUNTIES) | $35.63 | $17.23 | $52.86 | Agreement |
TILE & MARBLE FINISHER…Full textTILE & MARBLE FINISHER (BROWN, DEARBORN, DECATUR, JENNINGS,OHIO, RIPLEY AND SWITZERLAND COUNTIES) | $24.33 | $13.16 | $37.49 | Agreement |
TERRAZZO WORKER/SETTER…Full textTERRAZZO WORKER/SETTER (BROWN, DEARBORN, DECATUR, JENNINGS,OHIO, RIPLEY AND SWITZERLAND COUNTIES) | $37.97 | $18.06 | $56.03 | Agreement |
TERRAZZO FINISHER (BROWN…Full textTERRAZZO FINISHER (BROWN, DEARBORN, DECATUR, JENNINGS,OHIO, RIPLEY AND SWITZERLAND COUNTIES) | $25.33 | $14.19 | $39.52 | Agreement |
BRICKLAYER, STONEMASON…Full textBRICKLAYER, STONEMASON (BROWN, DEARBORN, DECATUR, JENNINGS,OHIO, RIPLEY AND SWITZERLAND COUNTIES) | $35.21 | $18.19 | $53.40 | Agreement |
| BRIN0004-022 · Bricklayers agreement, June 1, 2024 | ||||
TILE & MARBLE SETTER…Full textTILE & MARBLE SETTER; MOSAIC WORKER (BROWN, DEARBORN, DECATUR, JENNINGS,OHIO, RIPLEY AND SWITZERLAND COUNTIES) | $35.63 | $17.23 | $52.86 | Agreement |
TILE & MARBLE FINISHER…Full textTILE & MARBLE FINISHER (BROWN, DEARBORN, DECATUR, JENNINGS,OHIO, RIPLEY AND SWITZERLAND COUNTIES) | $24.33 | $13.16 | $37.49 | Agreement |
TERRAZZO WORKER/SETTER…Full textTERRAZZO WORKER/SETTER (BROWN, DEARBORN, DECATUR, JENNINGS,OHIO, RIPLEY AND SWITZERLAND COUNTIES) | $37.97 | $18.06 | $56.03 | Agreement |
TERRAZZO FINISHER (BROWN…Full textTERRAZZO FINISHER (BROWN, DEARBORN, DECATUR, JENNINGS,OHIO, RIPLEY AND SWITZERLAND COUNTIES) | $25.33 | $14.19 | $39.52 | Agreement |
BRICKLAYER, STONEMASON…Full textBRICKLAYER, STONEMASON (BROWN, DEARBORN, DECATUR, JENNINGS,OHIO, RIPLEY AND SWITZERLAND COUNTIES) | $35.21 | $18.19 | $53.40 | Agreement |
| BRIN0019-002 · Bricklayers agreement, June 1, 2023 | ||||
TILE & MARBLE SETTER…Full textTILE & MARBLE SETTER; MOSAIC WORKER (MUNCIE FAYETTE, FRANKLIN, HENRY, RANDOLPH, RUSH, UNION AND WAYNE COUNTIES) | $35.63 | $17.23 | $52.86 | Agreement |
TILE & MARBLE FINISHER…Full textTILE & MARBLE FINISHER (MUNCIE FAYETTE, FRANKLIN, HENRY, RANDOLPH, RUSH, UNION AND WAYNE COUNTIES) | $23.38 | $13.15 | $36.53 | Agreement |
TERRAZZO WORKER/SETTER…Full textTERRAZZO WORKER/SETTER (MUNCIE FAYETTE, FRANKLIN, HENRY, RANDOLPH, RUSH, UNION AND WAYNE COUNTIES) | $36.38 | $17.24 | $53.62 | Agreement |
TERRAZZO FINISHER (MUNCIE FAYETTE…Full textTERRAZZO FINISHER (MUNCIE FAYETTE, FRANKLIN, HENRY, RANDOLPH, RUSH, UNION AND WAYNE COUNTIES) | $23.38 | $13.15 | $36.53 | Agreement |
BRICKLAYER, STONEMASON…Full textBRICKLAYER, STONEMASON, POINTER, CAULKER & CLEANER (MUNCIE FAYETTE, FRANKLIN, HENRY, RANDOLPH, RUSH, UNION AND WAYNE COUNTIES) | $33.83 | $20.14 | $53.97 | Agreement |
| CARP0002-021 · Carpenters agreement, April 1, 2025 | ||||
| CARPENTER: PILEDRIVER (DEARBORN, JENNINGS, OHIO, RIPLEY AND SWITZERLAND COUNTIES) | $33.43 | $25.78 | $59.21 | Agreement |
| CARPENTER: CARPENTER (DEARBORN, JENNINGS, OHIO, RIPLEY AND SWITZERLAND COUNTIES) | $32.43 | $25.78 | $58.21 | Agreement |
| CARP0104-001 · Carpenters agreement, October 1, 2025 | ||||
| CARPENTERS: SOFT FLOOR LAYERS (FAYETTE, HENRY, RANDOLPH, UNION AND WAYNE COUNTIES) | $35.54 | $22.12 | $57.66 | Agreement |
| CARP0175-002 · Carpenters agreement, April 1, 2025 | ||||
| CARPENTER (CLARKE, FLOYD AND HARRISON COUNTIES) | $31.38 | $26.27 | $57.65 | Agreement |
| CARP0999-009 · Carpenters agreement, June 1, 2024 | ||||
| MILLWRIGHT (CLARK, FLOYD, AND HARRISION COUNTIES) | $33.96 | $28.17 | $62.13 | Agreement |
| CARP1080-003 · Carpenters agreement, June 1, 2025 | ||||
| MILLWRIGHT (DEARBORN, JENNINGS, OHIO, RIPLEY AND SWITZERLAND COUNTIES) | $39.10 | $25.95 | $65.05 | Agreement |
| CARP1775-001 · Carpenters agreement, October 1, 2025 | ||||
| CARPENTERS: SOFT FLOOR LAYERS (BROWN, DECATUR, FRANKLIN AND RUSH COUNTIES) | $35.54 | $22.12 | $57.66 | Agreement |
| ELEC0071-006 · Electrical Workers (IBEW) agreement, January 2, 2024 | ||||
| LINE CONSTRUCTION:: LINEMAN & CABLE SPLICERS (DEARBORN, OHIO, AND SWTIZERLAND COUNTIES) | $44.52 | $18.43 | $62.95 | Agreement |
| LINE CONSTRUCTION: GROUNDMAN (DEARBORN, OHIO, AND SWTIZERLAND COUNTIES) | $25.90 | $13.97 | $39.87 | Agreement |
| LINE CONSTRUCTION: EQUIPMENT OPERATOR (DEARBORN, OHIO, AND SWTIZERLAND COUNTIES) | $39.11 | $17.13 | $56.24 | Agreement |
| ELEC0212-009 · Electrical Workers (IBEW) agreement, June 7, 2025 | ||||
| ELECTRICIAN (DEARBORN, OHIO, AND SWITZERLAND COUNTIES) | $38.05 | $22.32 | $60.37 | Agreement |
| ELEC0369-009 · Electrical Workers (IBEW) agreement, May 30, 2007 | ||||
| LINE CONSTRUCTION:: GROUNDMAN (CLARK, FLOYD, AND HARRISON COUNTIES) | $13.83 | $6.35 | $20.18 | Agreement |
| LINE CONSTRUCTION: LINEMAN; EQUIPMENT OPERATOR (CLARK, FLOYD, AND HARRISON COUNTIES) | $22.25 | $6.35 | $28.60 | Agreement |
| ELECTRICIAN (CLARK, FLOYD, AND HARRISON COUNTIES) | $40.96 | $22.44 | $63.40 | Agreement |
| ELEC0369-009 · Electrical Workers (IBEW) agreement, May 31, 2025 | ||||
| LINE CONSTRUCTION:: GROUNDMAN (CLARK, FLOYD, AND HARRISON COUNTIES) | $13.83 | $6.35 | $20.18 | Agreement |
| LINE CONSTRUCTION: LINEMAN; EQUIPMENT OPERATOR (CLARK, FLOYD, AND HARRISON COUNTIES) | $22.25 | $6.35 | $28.60 | Agreement |
| ELECTRICIAN (CLARK, FLOYD, AND HARRISON COUNTIES) | $40.96 | $22.44 | $63.40 | Agreement |
| ELEC0481-002 · Electrical Workers (IBEW) agreement, May 31, 2025 | ||||
| ELECTRICIAN (DECATUR, JENNINGS, RIPLEY AND RUSH COUNTIES) | $45.45 | $28.19 | $73.64 | Agreement |
| ELEC0725-001 · Electrical Workers (IBEW) agreement, October 1, 2024 | ||||
| ELECTRICIAN (BROWN COUNTY) | $43.30 | $25.32 | $68.62 | Agreement |
| ELEC0725-008 · Electrical Workers (IBEW) agreement, June 1, 2022 | ||||
COMMUNICATION TECHNICIAN…Full textCOMMUNICATION TECHNICIAN: INCLUDES THE INSTALLATION, OPERATION, INSPECTION, MAINTENANCE, REPAIR AND SERVICE OF RADIO, TELEVISION, RECORDING, VOICE SOUND AND VISION PRODUCTION AND REPRODUCTION APPARATUS, EQUIPMENT AND APPLIANCES USED FOR DOMESTIC, COMMERCIAL, EDUCATION, ENTERTAINMENT AND PRIVATE TELEPHONE SYTEMS. (BROWN COUNTY) | $30.00 | $18.07 | $48.07 | Agreement |
| ELEC0855-001 · Electrical Workers (IBEW) agreement, June 1, 2025 | ||||
| ELECTRICIAN (FAYETTE, FRANKLIN, HENRY, RANDOLPH, UNION AND WAYNE COUNTIES) | $40.18 | $22.15 | $62.33 | Agreement |
| ELEV0011-003 · Elevator Constructors agreement, January 1, 2025 | ||||
| ELEVATOR MECHANIC (DEARBORN, OHIO AND SWITZERLAND COUNTIES) PAID HOLIDAYS: A. NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERN'S DAY, THANKSGIVING DAY, THE FRIDAY AFTER THANKSGIVING, AND CHRISTMAS DAY. B. EMPLOYER CONTRIBUTES 8% OF REGULAR HOURLY RATE TO VACATION PAY CREDIT FOR EMPLOYEE WHO HAS WORKED IN BUSINESS MORE THAN 5 YEARS; 6% FOR LESS THAN 5 YEARS' SERVICE | $57.41 | $38.44 | $95.85 | Agreement |
| ELEV0020-002 · Elevator Constructors agreement, January 1, 2025 | ||||
| ELEVATOR MECHANIC (CLARK, FLOYD AND HARRISON COUNTIES) PAID HOLIDAYS: A. NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERN'S DAY, THANKSGIVING DAY, THE FRIDAY AFTER THANKSGIVING, AND CHRISTMAS DAY. B. EMPLOYER CONTRIBUTES 8% OF REGULAR HOURLY RATE TO VACATION PAY CREDIT FOR EMPLOYEE WHO HAS WORKED IN BUSINESS MORE THAN 5 YEARS; 6% FOR LESS THAN 5 YEARS' SERVICE | $56.57 | $38.44 | $95.01 | Agreement |
| ELEV0034-003 · Elevator Constructors agreement, January 1, 2025 | ||||
ELEVATOR MECHANIC (BROWN…Full textELEVATOR MECHANIC (BROWN, DECATUR, FAYETTE, FRANKLIN, HENRY, JENNINGS, RANDOLPH, RIPLEY, RUSH, UNION AND WAYNE COUNTIES) A) PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERN'S DAY, THANKSGIVING DAY, THE FRIDAY AFTER THANKSGIVING, AND CHRISTMAS DAY. B) EMPLOYER CONTRIBUTES 8% OF REGULAR HOURLY RATE TO VACATION PAY CREDIT FOR EMPLOYEE WITH MORE THAN 5 YEARS OF SERVICE; 6% FOR LESS THAN 5 YEARS' SERVICE | $60.17 | $38.44 | $98.61 | Agreement |
| ENGI0103-006 · Operating Engineers agreement, April 1, 2025 | ||||
POWER EQUIPMENT OPERATORS:: GROUP 4…Full textPOWER EQUIPMENT OPERATORS:: GROUP 4 AIR COMPRESSOR (LESS THAN 210 CU. FT.); CONCRETE MIXER (UNDER 21CU. FT.); CONVEYOR; GENERATOR; MECHANICAL HEATER; OILER; OPERATOR-2 PIECES OF MINER EQUIPMENT; POWER BROOM; PUMP; WELDING MACHINE (FAYETTE, HENRY, RANDOLPH, RUSH, UNION, AND WAYNE COUNTIES) | $31.78 | $22.70 | $54.48 | Agreement |
POWER EQUIPMENT OPERATORS:: GROUP 3…Full textPOWER EQUIPMENT OPERATORS:: GROUP 3 AIR COMPRESSOR (210 CU. FT. & OVER); BITUMINOUS DISTRIBUTOR; CHAIR CART; CONCRETE CURING MACHINE; CONCRETE SAW; DOPE POT POWER AGITATED; FLEX PLANE; FORM GRADER; HYDROHAMMER; JACKS-HYDRAULIC-POWER DRIVEN; MINOR EQUIPMENT OPR. 3,4, OR 5; PAVING JOINT MACHINE; POST HOLE DIGGER; ROLLER-EARTH; THROTTLE VALVE; TRACK JACK-POWER DRIVEN; TRACTOR-FARM TYPE; TRUCK CRANE DRIVER (FAYETTE, HENRY, RANDOLPH, RUSH, UNION, AND WAYNE COUNTIES) | $35.48 | $22.70 | $58.18 | Agreement |
POWER EQUIPMENT OPERATORS: GROUP 2…Full textPOWER EQUIPMENT OPERATORS: GROUP 2 A FRAME TRUCK; BATCHER PLANT (AUTOMATIC DRY BATCH); BENDING MACHINE-POWER DRIVEN; BITUMINOUS MIXER; BITUMINOUS PAVER; BITUMINOUS PLANT ENGINEER; BOATMAN; BULL FLOAT; COMPACTOR OR TAMPER-SELF PROPELLED; CONCRETE MIXER (21 CU. FT. OR OVER); CONCRETE SPREADER-POWER DRIVEN; DINKEY ENGINE; DITCHING MACHINE; DITCHING MACHINE (LESS THAN 18""); DRILLING MACHINE; FINISH MACHINE & BULL FLOAT; FINISHING MACHINE; FIREMAN-PILE DRIVING AND BOILERS; FORK LIFT-MASONRY & MATERIAL; GUNITE MACHINE; HEAD GREASER; HOIST-MATERIAL AND/OR PERSONNEL 3 FLOORS AND UNDER; MECHANIC IN SHOP; MESH DEPRESSER-MESH PLACER; P.C.C. CONCRETE BELT PLACER; RULLER-ASPHALT, STONE & SUB BASE; SHEEPSFOOT ROLLER- SELF PROPELLED; SHOP MULE; SPREADER OR BASE PAVER-SELF PROPELLED; SUB GRADER; THROTTLE VALVE WITH AIR COMPRESSOR OR BOILER; TRACTOR WITH BACKHOE (1/2 YARD & UNDER); TRACTOR-HIGH LIFT-FARM TYPE; TRACTOR-INDUSTRIAL TYPE; TRACTOR WITH WINCH; WELL POINTS; WINCH TRICK FAYETTE, HENRY, RANDOLPH, RUSH, UNION, AND WAYNE COUNTIES | $39.53 | $22.70 | $62.23 | Agreement |
POWER EQUIPMENT OPERATORS: GROUP 1…Full textPOWER EQUIPMENT OPERATORS: GROUP 1 AIR COMPRESSOR (PRESSURIZING SHAFTS, TUNNELS & DRIVERS) AIR TUGGER; AUTO PATROL; BACK FILLER; BACK HOE; BOOM CAT; BORING MACHINE; BULL DOZER; CAISSON DRILLING MACHINE; CHERRY PICKER; COMPACTOR (WITH DOZER BLADE); CONCRETE MIXER (DUAL DRUM); CONCRETE PLANT; CONCRETE PUMP; CRANE WITH ALL ATTACHMENTS; CRANE- ELECTRIC OVERHEAD; DERRICK; DITCHING MACHINE (18' AND OVER); DREDGE; ELEVATORS (WHEN HOISTING MATERIAL OR TOOLS); FORK LIFT (MACHINERY); FORMLESS PAVER; GENERATOR (POWER FOR WELDERS OF COMPRESSOR); GRADALL; HELICOPTER; HELICOPTER WINCH OPERATOR; HIGH LIFT-FRONT END LOADER; HOIST-MATERIAL AND/OR PERSONNEL OVER 3 FLOORS; LOCOMOTIVE; MECHANIC ON JOB SITE; MUCKING MACHINE; PANEL BOARD CONCRETE PLANT; PILE DRIVER; PUSH CAT; SCOOP & TRACTOR; SCRAPER-RUBBER TIRED; SPREADER-TRACTOR MOUNTED; STRADDLE CARRIER- ROSS TYPE; SUB BASE FINISH MACHINE (C.M.I. OR SMILIAR); TOWER CRANE; TRACTOR WITH BACKHOE (OVER 1/2 YARD); WELDER (CRAFT) (FAYETTE, HENRY, RANDOLPH, RUSH, UNION, AND WAYNE COUNTIES) | $40.48 | $22.70 | $63.18 | Agreement |
| ENGI0181-012 · Operating Engineers agreement, April 1, 2025 | ||||
POWER EQUIPMENT OPERATORS…Full textPOWER EQUIPMENT OPERATORS: GROUP B AIR COMPRESSOR (1 OR MORE, 600 CFM AND OVER) AIR COMPRESSOR WITH THROTTLE VALVE, BITUMINOUS DISTRIBUTOR, BRAKEMAN, BULLFLOAT, CEMENT GUN, CONRETE MIXER, CONCRETE MIXER, CONCRETE SAW, CONCRETE SPREADER OR PUDDLERS, CONVEYOR, DECK HAND OILER, DECK ENGINE, DRILL HELPER, EARTH ROLLER, ELECTRIC VIBRATOR COMPACTOR (EARTH OR ROCK), ELEVATOR (IN-PLANT, AUTOMATIC), FINISHING MACHINE, FIREMAN, FORM GRADER, GENERATOR, GUARD-RAIL DFRIVER, HEATER, OILER, INDUSTRIAL TYPE FORKLIFT (9,000 LBS AND UNDER), MATERIAL PUMP, MOTOR BOATS, PAVING JOINT MACHINE, POST HOLE DIGGER, POWER BROOM, POWER TRAFFIC SIGNALS, ROCK ROLLER, ROCKER SPREADER, ROLLER (EARTH OR ROCK), SPIKE MACHINE (RR), STEAM JENNY, SUB GRADER, TAMPING MACHINE, TRUCK CRANE OILER, TRUCK MOUNTED DRILL OILER, TUGGER (ONE-DRUM, AIR OR ELECTRIC) VIBRATOR, VIBRO-PILING HAMMER-HYDRAULIC HAMMER OR AUGER, WATER PUMP, WIDENER (APSCO OR SIMILAR TYPE) WELDING MACHINE, JLG LIFTS AND SCISSOR LIFTS OR SIMILAR MACHINE. (BROWN, CLARK, DEARBORN, DECATUR, FLOYD, FRANKLIN, HARRISON, JENNINGS, OHIO, RIPLEY, AND SWITZERLAND COUNTIES) | $35.30 | $19.60 | $54.90 | Agreement |
POWER EQUIPMENT OPERATORS…Full textPOWER EQUIPMENT OPERATORS: GROUP A A-FRAME WINCH TRUCK, ARTICULATING DUMP, AUTOGRADE (CMI), AUTO PATROL, BALLAST REGULATOR (RR), BATCHER PLANT (ELECTRICAL CONTROL CONCRETE), BENDING MACHINE (PIPE), BITUMINOUS PLANT (ENGINEER), BITUMINOUS PLANT, BITUMINOUS MIXER TRAVEL PLANT, BITUMINOUS PAVER, BITUMINOUS ROLLER, BORING MACHINE, BUCK HOIST, BULL DOZER, CABLE WAY, CHICAGO BOOM, CHIMNEY HOIST, CLAMSHELL CONCRETE MIXER (21 CU. FT. OR OVER), CONCRETE PAVER, CONCRETE PUMP (CRETE), CONSTRUCTION ELEVATOR (ALLMAC OR SIMILAR) CRANE, CRANEMAN, CRAWLER BACKHOE, CRAWLER HIGH-LIFT, CRUSHER PLANT, DERRICK, DERRICK BOAT, DINKEY, DIRECTIONAL/BORING MACHINE, DOPE POTS (PIPELINE), DOUBLE DRUM TUGGER (ELECTRIC OR AIR), DRAGLINE, DREDGE OPERATOR, DREDGE ENGINEER, DRILL OPERATOR, ELEVATING GRADER, EXTENDABLE BOOM FORKLIFT, FORMLESS PAVER, GANTRY CREANE, GATOR (OR SIMILAR TYPE TILLER), GRADEALL, GRADER, GRADEMAN, GREASER (ON GREASE FACILITY SERVICING HEAVY EQUIPMENT), G.P.S SYSTEM (ON EQUIPMENT WITHIN THE CLASSIFICATIONS), GROUT PUMP, HEAD GREASER, HELICOPTER CREW, HETHERINGTON PAVER, HOIST (MOTROIZED, GAS OR DISEL), HYDRAULIC CRANE, HYDRO BLASTER, INDUSTRIAL TYPE FORKLIFT (OVER 9,000 LBS), LASER CONCRETE SCREED, LASER OR REMOTE CONTROLLED EQUIPMENT (WITHIN THE CLASSIFICATIONS), LOCOMOTIVE CRANE, LOCOMOTIVE, MECHANIC, MOBILE MIXER, MOTOR CRANE, MUCKING MACHINE, MULTIPLE TAMPING MACHINE (RR) OVERHEAD CRANE, PILE DRIVER, PULLS PUSH DOZER, PUSH BOATS, ROLLER (SHEEP FOOT), ROUGH TERRAIN CRANE, R.T. BACKHOE, R.T. ENDLOADER, ROSS CARRIER, SCOOP, SHOVEL, SIDE BOOM, SKIDSTEER LOADER (BOBCAT OR SIMILAR TYPE), SWING CRANE, TAIL BOOM, TAR MACHINE (PIPELINE), TOWER CRANE, TRENCH MACHINE, WELDER (HEAVY DUTY), TRUCK MOUNTED CONCRETE PUMP, TRUCK-MOUNTED DRILL, VACUUM TRUCK, WELL POINT, WHIRLEYS. (BROWN, CLARK, DEARBORN, DECATUR, FLOYD, FRANKLIN, HARRISON, JENNINGS, OHIO, RIPLEY, AND SWITZERLAND COUNTIES) | $43.43 | $19.60 | $63.03 | Agreement |
| IRON0022-002 · Ironworkers agreement, June 1, 2025 | ||||
IRONWORKER (BROWN, DECATUR…Full textIRONWORKER (BROWN, DECATUR (W 3/4), FAYETTE (W 1/2), FRANKLIN (NW TIP), HENRY, JENNINGS (NW TIP), RANDOLPH (SW TIP), AND RUSH COUNTIES) | $38.00 | $26.39 | $64.39 | Agreement |
| IRON0044-007 · Ironworkers agreement, June 1, 2025 | ||||
IRONWORKER: STRUCTURAL & ORNAMENTAL…Full textIRONWORKER: STRUCTURAL & ORNAMENTAL (DEARBORN, DECATUR (REMAINDER OF COUNTY), FAYETTE (SE CORNER), FRANKLIN (S. 3/4), OHIO, RIPLEY (REM. OF COUNTY), SWITZERLAND (REM. OF COUNTY), & JENNINGS (NE TIP) COUNTIES) | $37.77 | $23.90 | $61.67 | Agreement |
IRONWORKER: FENCE ERECTORS…Full textIRONWORKER: FENCE ERECTORS (DEARBORN, DECATUR (REMAINDER OF COUNTY), FAYETTE (SE CORNER), FRANKLIN (S. 3/4), OHIO, RIPLEY (REM. OF COUNTY), SWITZERLAND (REM. OF COUNTY), & JENNINGS (NE TIP) COUNTIES) | $35.88 | $23.90 | $59.78 | Agreement |
| IRON0070-007 · Ironworkers agreement, June 1, 2025 | ||||
IRONWORKER (CLARK, FLOYD…Full textIRONWORKER (CLARK, FLOYD, HARRISON, JENNINGS (S 2/3), SWITZERLAND (SW TIP), AND RIPLEY (SW TIP) COUNTIES) | $36.17 | $25.80 | $61.97 | Agreement |
| IRON0070-019 · Ironworkers agreement, June 1, 2025 | ||||
IRONWORKER, REINFORCING…Full textIRONWORKER, REINFORCING (DEARBORN, DECATUR (REM. OF COUNTY), FAYETTE (SE CORNER), FRANKLIN (S. 3/4), OHIO, RIPLEY (REM. OF COUNTY), SWITZERLAND (REM. OF COUNTY) AND JENNINGS (NE TIP) COUNTIES) | $36.17 | $25.80 | $61.97 | Agreement |
| IRON0147-003 · Ironworkers agreement, June 1, 2025 | ||||
| IRONWORKER (RANDOLPH COUNTY) | $35.40 | $26.92 | $62.32 | Agreement |
| IRON0290-003 · Ironworkers agreement, June 1, 2023 | ||||
IRONWORKER (FAYETTE…Full textIRONWORKER (FAYETTE (REMAINDER OF COUNTY), RANDOLPH (S. PART OF COUNTY EXCLUDING WINCHESTER BUT INCLUDING UNION CITY) UNION AND WAYNE COUNTIES) | $32.69 | $24.50 | $57.19 | Agreement |
| LABO0741-002 · Laborers agreement, June 1, 2025 | ||||
LABORERS: GROUP 3…Full textLABORERS: GROUP 3 DYNAMITE MEN, MASON TENDERS, DRILLERS-AIR TRACK OR WAGON DRILLING FOR EXPLOSIVES. (BROWN, DEARBORN, DECATUR, FRANKLIN, JENNINGS, OHIO, AND RIPLEY COUNTIES) | $30.38 | $18.55 | $48.93 | Agreement |
LABORERS: GROUP 2…Full textLABORERS: GROUP 2 PLASTER TENDERS; MORTAR MIXERS; WELDERS (ACETYLENE OR ELECTRIC); CUTTING TORCH OR BURNER; CEMENT NOZZLE LABORERS; CEMENT GUN OPERATORS; SCAFFOLD BUILDERS FOR PLASTERERS; SCAFFOLD BUILDERS FOR MASONS; WATER BLAST MACHINE OPERATORS; AIR TOOL OPERATORS AND ALL PNEUMATIC TOOL OPERATORS; AIR AND ELECTRIC VIBRATORS AND CHIPPING HAMMER OPERATORS; ASBESTOS REMOVAL; HAZARDOUS WASTE REMOVAL; ALL BOILER SETTERS LABORERS, INCLUDING EXPEDITERS, BOTTOM MEN AND BELL MEN. (BROWN, DEARBORN, DECATUR, FRANKLIN, JENNINGS, OHIO, AND RIPLEY COUNTIES) | $29.13 | $18.55 | $47.68 | Agreement |
LABORERS: GROUP 1…Full textLABORERS: GROUP 1 BUILDING AND CONSTRUCTION LABORERS; SCAFFOLD BUILDERS (OTHER THAN FOR MASONS OR PLASTERSRS); RAILROAD WORKERS; MASONRY WALL WASHERS (INTERIOR & EXTERIOR); PORTABLE WATER PUMPS WITH DISCHARGE UP TO 3 INCHES; HANDLING OF CREOSOTE LUMBER OR LIKE TREATED MATERIAL (EXCLUDING RAILROAD MATERIAL); ASPHALT RAKERS AND LUTEMEN; EARTH COMPACTORS; JACKMEN AND SHEETMEN WORKING DITCHES DEEPER THAN SIX (6) FEET IN DEPTH; LABORERS IN DITCHES SIX (6) FEET IN DEPTH OR DEEPER; ASSEMBLY OF UNICRETE PUMP; TILE LAYERS (SEWER OR FIELD) AND SEWER PIPE LAYERS (METALLIC OR NON-METALLIC); MOTOR DRIVEN WHEELBARROWS AND CONCRETE BUGGIES; HYSTER OPERATORS; PUMP CRETE ASSEMBLERS; CORE DRILL OPERATORS; CEMENT, LIME OR SILICA CLAY HANDLER (BULK OR BAG); HANDLING OF TOXIC MATERIAL DAMAGING TO CLOTHING; PNEUMATIC SPIKERS; DECK ENGINE AND WINCH OPERATORS; WATER MAIN AND CABLE DUCKING (METALLIC AND NON-METALLIC); SCREED MAN OR SCREW OPERATOR ON ASPHALT PAVER; CHAIN SAW AND DEMOLITION SAW OPERATORS; CONCRETE SAW; CONCRETE CONVEYOR ASSEMBLERS; APPLYING OF CURING COMPOUND; SINKING OF WELLPOINTS; DEWATERING HEADER SYSTEMS. (BROWN, DEARBORN, DECATUR, FRANKLIN, JENNINGS, OHIO, AND RIPLEY COUNTIES) | $28.38 | $18.55 | $46.93 | Agreement |
| LABO0795-001 · Laborers agreement, June 1, 2025 | ||||
LABORERS: GROUP 3…Full textLABORERS: GROUP 3 DYNAMITE MEN, MASON TENDERS, DRILLERS-AIR TRACK OR WAGON DRILLING FOR EXPLOSIVES. (CLARK, FLOYD, HARRISON, AND SWITZERLAND COUNTIES) | $28.15 | $18.90 | $47.05 | Agreement |
LABORERS: GROUP 2…Full textLABORERS: GROUP 2 PLASTER TENDERS, MORTAR MIXERS, WELDERS (ACETYLENE OR ELECTRIC), CUTTING TORCH OR BURNER, CEMENT NOZZLE LABORERS, CEMENT GUN OPERATORS, SCAFFOLD BUILDERS WHEN WORKING FOR PLASTERERS, SCAFFOLD BUILDERS WHEN WORKING FOR MASONS WATER BLAST MACHINE OPERATORS. (CLARK, FLOYD, HARRISON, AND SWITZERLAND COUNTIES) | $27.40 | $18.90 | $46.30 | Agreement |
LABORERS: GROUP 1…Full textLABORERS: GROUP 1 BUILDING AND CONSTRUCTION LABORERS, SCAFFOLD BUILDERS (OTHER THAN FOR MASONS OR PLASTERERS), MECHANIC TENDERS, RODMEN & CHAINMEN, SIGNALMEN & FLAGMEN, WINDOW WASHERS & CLEANERS, WATERBOYS & TOOLHOUSEMEN, RAILROAD WORKERS, MASONRY WALL WASHERS (INTERIOR & EXTERIOR), ALL PORTABLE WATER PUMPS WITH DISCHARGE UP TO THREE (3) INCHES, WATERPROOFING, HANDLING OF CREOSOTE LUMBER OR LIKE TREATED MATERIAL (EXCLUDING RAILROAD MATERIAL), ASPHALT RAKERS & LUTEMAN, KETTLEMEN, AIR TOOL OPERATORS AND ALL PNEUMATIC TOOL OPERATORS, AIR AND ELECTRIC VIBRATORS AND CHIPPING HAMMER OPERATORS, EARTH COMPACTORS, JACKMAN & SHEETMEN WORKING DITCHES DEEPER THAN SIX (6) FEET IN DEPTH, LABORERS WORKING DITCHES SIX (6) FEET IN DEPTH OR DEEPER, ASSEMBLY OF UNICRETE PUMP, TILE LAYERS (SEWER OR FIELD) & SEWER PIPE LAYERS (METALLIC OR NON- METALLIC), MOTOR DRIVEN WHEELBARROWS AND CONCRETE BUGGIES HYSTER OPERATORS, PUMP CRETE ASSEMBLERS, CORE DRILL OPERATORS, CEMENT, LIME OR SILICA CLAY HANDERS (BULK OR BAG), HANDLING OF TOXIC MATERIALS DAMAGING TO CLOTHING, PNEUMATIC SPIKERS, DECK ENGINE & WINCH OPERATORS, WATER MAIN & CABLE DUCKING (METALLIC AND NON-METALLIC), SCREED MAN OR SCREW OPERATOR ON ASPHALT PAVER, CHAIN SAW AND DEMOLITION SAW OPERATORS, CONCRETE CONVEYOR ASSEMBLERS, ASBESTOS REMOVAL, HAZARDOUS WASTE REMOVAL. (CLARK, FLOYD, HARRISON, AND SWITZERLAND COUNTIES) | $26.40 | $18.90 | $45.30 | Agreement |
| LABO1112-002 · Laborers agreement, June 1, 2025 | ||||
LABORERS: GROUP 3…Full textLABORERS: GROUP 3 PLASTER TENDERS; MORTAR MIXERS; WELDERS (ACETYLENE OR ELECTRIC); CUTTING TORCH OR BURNER; CEMENT NOZZLE LABORERS; CEMENT GUN OPERATORS; SCAFFOLD BUILDERS FOR PLASTERERS; SCAFFOLD BUILDERS; WATER BLAST MACHINE OPERATOR (RANDOLPH COUNTY) | $30.06 | $18.55 | $48.61 | Agreement |
LABORERS: GROUP 2…Full textLABORERS: GROUP 2 WATERPROOFING; HAULING OF CREOSOTE LUMBER OR LIKE TREATED MATERIAL (EXCLUDING RAILROAD MATERIAL); ASPHLAT RAKERS AND LUTEMEN; KETTLEMEN; AIR TOOL OPERATOR; PNEUMATIC TOOL OPERATOR; AIR & ELECTRIC VIBRATORS AND CHIPPING HAMMER OPERATOR; EARTH COMPACTORS; JACKMAN & SHEETMEN IN DITCHES MORE THAN 6 FEET DEEP; LABORERS IN DITCHES 6' DEEP OR DEEPER; ASSEMBLY OF UNICRETE PUMP; TILE LAYERS (SEWER OR FIELD); SEWER PIPE LAYERS; MOTOR- DRIVEN WHEELBARROWS AND CONCRETE BUGGIES; HYSTER OPERATOR; PUMPCRETE ASSEMBLERS; CORE DRILL OPERATOR; CEMENT, LIME OR SILICA CLAY HANDLERS; HANDLING OF TOXIC MATERIALS DAMAGING TO CLOTHING; PNEUMATIC SPIKERS; DECK ENGINE & WINCH OPERATOR; WATER MAIN & CABLE DUCKING; SCREED MAN OR SCREW OPERATOR ON ASPHALT PAVER; CHAIN SAW & DEMOLITION SAW OPERATOR; CONCRETE CONVEYOR ASSEMBLER; ASBESTOS REMOVAL; HAZARDOUS WASTE REMOVAL (RANDOLPH COUNTY) | $28.81 | $18.55 | $47.36 | Agreement |
LABORERS: GROUP 1…Full textLABORERS: GROUP 1 BUILDING AND CONSTRUCTION LABORERS; SCAFFOLD BUILDERS (OTHER THAN FOR MASONS OF PLASTERERS); MECHANIC TENDERS; WINDOW WASHERS AND CLEANERS; RAILROAD WORKERS; MASONRY WALL WASHERS; FORTABLE WATER PUMPS WITH DISCHARGE UP TO 3 INCHES; SIGNAL & FLAG PERSON (RANDOLPH COUNTY) | $28.06 | $18.55 | $46.61 | Agreement |
| LABO1112-004 · Laborers agreement, June 1, 2025 | ||||
LABORERS: GROUP 3…Full textLABORERS: GROUP 3 DYNAMITE MEN; MASON TENDERS; DRILLERS-AIR TRACK OR WAGON DRILLING FOR EXPLOSIVES. (FAYETTE, HENRY, RUSH, WAYNE, AND UNION COUNTIES) | $30.06 | $18.55 | $48.61 | Agreement |
LABORERS: GROUP 2…Full textLABORERS: GROUP 2 PLASTER TENDERS; MORTAR MIXERS; WELDERS (ACETYLENE OR ELECTRIC); CUTTING TORCH OR BURNER; CEMENT NOZZLE LABORERS; CEMENT GUN OPERATORS; SCAFFOLD BUILDERS WHEN WORKING FOR PLASTERERS; SCAFFOLD BUILDERS WHEN WORKING FOR MASONS; WATER BLAST MACHINE OPERATORS. (FAYETTE, HENRY, RUSH, WAYNE, AND UNION COUNTIES) | $28.81 | $18.55 | $47.36 | Agreement |
LABORERS: GROUP 1…Full textLABORERS: GROUP 1 BUILDING AND CONSTRUCTION LABORERS; SCAFFOLD BUILDERS (OTHER THAN FOR MASONS OR PLASTERERS); MECHANIC TENDERS; CIVIL ENGINEER TENDERS AND SURVEYOR TENDERS; RODMEN & CHAINMEN; SIGNALMEN & FLAGMEN; WINDOW WASHERS & CLEANERS; WATERBOYS & TOOLHOUSEMEN; RAILROAD WORKERS; MASONRY WALL WASHERS (INTERIOR & EXTERIOR); CEMENT FINISHER HELPERS; ALL PORTABLE WATER PUMPS WITH DISCHARGE UP TO THREE (3) INCHES, WATERPROOFING; HANDLING OF CREOSOTE LUMBER OR LIKE TREATED MATERIAL (EXCLUDING RAILROAD MATERIAL); ASPHALT RAKERS & LUTEMEN; KETTLEMEN; AIR TOOL OPERATORS AND ALL PNEUMATIC TOOL OPERATORS, AIR AND ELECTRIC VIBRATORS AND CHIPPING HAMMER OPERATORS); EARTH COMPACTORS; JACKMEN & SHEETMEN WORKING DITCHES DEEPER THAN SIX (6) FEET IN DEPTH; LABORERS WORKING DITCHES SIX (6) FEET IN DEPTH OR DEEPER; ASSEMBLY OF UNICRETE PUMP; TILE LAYERS (SEWER OR FIELD) & SEWER PIPE LAYERS (METALLIC OR NON- METALLIC); MOTOR DRIVEN WHEELBARROWS AND CONCRETE BUGGIES; HYSTER OPERATORS; PUMP CRETE ASSEMBLERS; CORE DRILL OPERATORS; CEMENT, LIME OR SILICA CLAY HANDLERS (BULK OR BAG); HANDLING OF TOXIC MATERIALS DAMAGING TO CLOTHING; PNEUMATIC SPIKERS; DECK ENGINE & WINCH OPERATORS; WATER MAIN & CABLE DUCKING (METALLIC AND NON-METALLIC); SCREED MAN OR SCREW OPERATOR ON ASPHALT PAVER; CHAIN SAW AND DEMOLITION SAW OPERATORS; CONCRETE CONVEYOR ASSEMBLERS; ASBESTOS REMOVAL; HAZARDOUS WASTE REMOVAL. (FAYETTE, HENRY, RUSH, WAYNE, AND UNION COUNTIES) | $28.06 | $18.55 | $46.61 | Agreement |
| PAIN0012-006 · Painters and Allied Trades agreement, May 1, 2024 | ||||
PAINTER: SPRAY (COMMERCIAL AND INDUSTRIAL)…Full textPAINTER: SPRAY (COMMERCIAL AND INDUSTRIAL) (DEARBORN, OHIO, RIPLEY AND SWITZERLAND COUNTIES) | $28.79 | $14.46 | $43.25 | Agreement |
PAINTER: SANDBLASTING…Full textPAINTER: SANDBLASTING, WATERBLASTING (COMMERCIAL AND INDUSTRIAL) (DEARBORN, OHIO, RIPLEY AND SWITZERLAND COUNTIES) | $31.68 | $14.46 | $46.14 | Agreement |
PAINTER: BRUSH & ROLLER…Full textPAINTER: BRUSH & ROLLER, PAPERHANGER, DRYWALL TAPING (COMMERCIAL AND INDUSTRIAL) (DEARBORN, OHIO, RIPLEY AND SWITZERLAND COUNTIES) | $30.34 | $14.46 | $44.80 | Agreement |
PAINTER: BRIDGES, LEAD ABATEMENT…Full textPAINTER: BRIDGES, LEAD ABATEMENT (COMMERCIAL AND INDUSTRIAL) (DEARBORN, OHIO, RIPLEY AND SWITZERLAND COUNTIES) | $31.68 | $14.46 | $46.14 | Agreement |
| PAIN0047-001 · Painters and Allied Trades agreement, June 1, 2024 | ||||
| PAINTER: SPRAY AND SAND-BLASTING (BROWN, DECATUR AND JENNINGS COUNTIES) | $32.02 | $16.86 | $48.88 | Agreement |
| PAINTER: BRUSH, ROLLER (BROWN, DECATUR AND JENNINGS COUNTIES) | $31.02 | $16.86 | $47.88 | Agreement |
| PAIN0118-007 · Painters and Allied Trades agreement, June 1, 2024 | ||||
PAINTER: BRUSH, ROLLER…Full textPAINTER: BRUSH, ROLLER, PAPERHANGER, SPRAY, SANDBLAST & WATERBLAST (CLARK, FLOYD AND HARRISON COUNTIES) | $23.21 | $15.85 | $39.06 | Agreement |
| PAIN0387-004 · Painters and Allied Trades agreement, November 1, 2023 | ||||
| GLAZIER (DEARBORN, FRANKLIN, OHIO, RIPLEY, AND SWITZERLAND COUNTIES) | $31.95 | $17.75 | $49.70 | Agreement |
| PAIN0669-002 · Painters and Allied Trades agreement, May 1, 2024 | ||||
PAINTERS: SPRAY/WATERBLASTING…Full textPAINTERS: SPRAY/WATERBLASTING; SANDBLASTING (FAYETTE, FRANKLIN, HENRY, RANDOLPH, RUSH, UNION AND WAYNE) | $26.10 | $16.39 | $42.49 | Agreement |
PAINTERS: BRUSH; ROLLER…Full textPAINTERS: BRUSH; ROLLER; PAPERHANGING; DRYWALL FINISHERS (FAYETTE, FRANKLIN, HENRY, RANDOLPH, RUSH, UNION AND WAYNE) | $25.10 | $16.39 | $41.49 | Agreement |
| PAIN1165-008 · Painters and Allied Trades agreement, July 1, 2025 | ||||
| GLAZIER (CLARK, FLOYD, HARRISON COUNTIES) | $35.13 | $19.57 | $54.70 | Agreement |
| PAIN1165-015 · Painters and Allied Trades agreement, January 1, 2025 | ||||
GLAZIER (BROWN, DECATUR…Full textGLAZIER (BROWN, DECATUR, FAYETTE, HENRY, JENNINGS, RANDOLPH, RUSH, UNION, AND WAYNE COUNTIES) | $36.03 | $20.55 | $56.58 | Agreement |
| PLAS0132-007 · Plasterers and Cement Masons agreement, June 22, 2018 | ||||
PLASTERER (DEARBORN…Full textPLASTERER (DEARBORN, FRANKLIN (SOUTHERN HALF, SOUTH OF A LINE RUNNING EAST AND WEST ESTABLISHED SOUTH OF BROOKVILLE), OHIO, RIPLEY AND SWITZERLAND COUNTIES) | $24.25 | $14.65 | $38.90 | Agreement |
| PLAS0692-003 · Plasterers and Cement Masons agreement, June 1, 2025 | ||||
| PLASTERER: AREA #46 (BROWN AND CLARK COUNTIES) | $31.50 | $18.32 | $49.82 | Agreement |
| PLAS0692-011 · Plasterers and Cement Masons agreement, April 1, 2025 | ||||
CEMENT MASON/CONCRETE FINISHER…Full textCEMENT MASON/CONCRETE FINISHER: AREA #83 (DECATUR, FAYETTE, FRANKLIN, HENRY, RANDOLPH, RUSH, UNION AND WAYNE COUNTIES) | $32.55 | $22.04 | $54.59 | Agreement |
PLASTERER: AREA #83…Full textPLASTERER: AREA #83 (DECATUR, FAYETTE, FRANKLIN, HENRY, RANDOLPH, RUSH, UNION AND WAYNE COUNTIES) | $30.60 | $17.19 | $47.79 | Agreement |
| PLAS0692-011 · Plasterers and Cement Masons agreement, June 1, 2025 | ||||
CEMENT MASON/CONCRETE FINISHER…Full textCEMENT MASON/CONCRETE FINISHER: AREA #83 (DECATUR, FAYETTE, FRANKLIN, HENRY, RANDOLPH, RUSH, UNION AND WAYNE COUNTIES) | $32.55 | $22.04 | $54.59 | Agreement |
PLASTERER: AREA #83…Full textPLASTERER: AREA #83 (DECATUR, FAYETTE, FRANKLIN, HENRY, RANDOLPH, RUSH, UNION AND WAYNE COUNTIES) | $30.60 | $17.19 | $47.79 | Agreement |
| PLAS0692-027 · Plasterers and Cement Masons agreement, April 1, 2025 | ||||
CEMENT MASON/CONCRETE FINISHER…Full textCEMENT MASON/CONCRETE FINISHER: AREA #566 (CRAWFORD, DAVIESS, DUBOIS, GIBSON, HARRISON, KNOX, MARTIN, PERRY, PIKE, POSEY, SPENCER, VANDERBURGH AND WARRICK COUNTIES) | $32.50 | $20.77 | $53.27 | Agreement |
| PLAS0692-033 · Plasterers and Cement Masons agreement, May 1, 2025 | ||||
CEMENT MASON/CONCRETE FINISHER…Full textCEMENT MASON/CONCRETE FINISHER: AREA #821 (BROWN, CLARKE, DEARBORN, FLOYD, FRANKLIN (SOUTHERN 1/2), JENNINGS, OHIO, RIPLEY AND SWITZERLAND COUNTIES) | $30.02 | $18.20 | $48.22 | Agreement |
| PLUM0136-002 · Plumbers and Pipefitters agreement, April 1, 2025 | ||||
| PLUMBERS AND PIPEFITTERS (REMAINING COUNTIES) | $46.42 | $21.33 | $67.75 | Agreement |
| PLUM0392-006 · Plumbers and Pipefitters agreement, June 1, 2024 | ||||
| PLUMBERS AND PIPEFITTERS (DEARBORN, OHIO, RIPLEY, AND SWITZERLAND COUNTIES) | $40.70 | $29.52 | $70.22 | Agreement |
| PLUM0440-004 · Plumbers and Pipefitters agreement, June 1, 2025 | ||||
PLUMBER AND STEAMFITTER…Full textPLUMBER AND STEAMFITTER (FAYETTE, FRANKLIN, HENRY, RANDOLPH, RUSH, UNION AND WAYNE COUNTIES) | $50.05 | $20.39 | $70.44 | Agreement |
| PLUM0502-001 · Plumbers and Pipefitters agreement, August 1, 2016 | ||||
| PLUMBER/PIPEFITTER (CLARK, FLOYD AND HARRISON COUNTIES) | $32.00 | $20.13 | $52.13 | Agreement |
| ROOF0042-005 · Roofers agreement, August 1, 2024 | ||||
| ROOFER (DEARBORN, OHIO AND RIPLEY COUNTIES) | $33.00 | $19.51 | $52.51 | Agreement |
| ROOF0106-013 · Roofers agreement, July 1, 2025 | ||||
| ROOFER (CLARK, FLOYD, HARRISON AND SWITZERLAND COUNTIES) | $30.97 | $14.66 | $45.63 | Agreement |
| ROOF0119-005 · Roofers agreement, September 1, 2025 | ||||
| ROOFER | $32.00 | $16.61 | $48.61 | Agreement |
| SHEE0020-012 · Sheet Metal Workers agreement, July 1, 2025 | ||||
SHEET METAL WORKER…Full textSHEET METAL WORKER (BROWN, DECATUR, FAYETTE, FRANKLIN, HENRY, JENNINGS, RIPLEY, RUSH AND UNION) | $45.81 | $26.57 | $72.38 | Agreement |
| SHEE0024-006 · Sheet Metal Workers agreement, June 1, 2023 | ||||
| SHEET METAL WORKER (RANDOLPH AND WAYNE COUNTIES) | $31.23 | $25.79 | $57.02 | Agreement |
| SHEE0024-012 · Sheet Metal Workers agreement, June 1, 2023 | ||||
| SHEET METAL WORKER (DEARBORN AND OHIO COUNTIES) | $34.32 | $22.82 | $57.14 | Agreement |
| SHEE0110-007 · Sheet Metal Workers agreement, December 1, 2013 | ||||
| SHEET METAL WORKER (CLARK, FLOYD, HARRISON AND SWITZERLAND COUNTIES) | $28.66 | $18.03 | $46.69 | Agreement |
| TEAM0135-002 · Teamsters agreement, April 1, 2025 | ||||
TRUCK DRIVERS: GROUP 5…Full textTRUCK DRIVERS: GROUP 5 MECHANIC, WITH HIS OWN TOOLS. (BROWN, CLARK, DEARBORN, DECATUR, FAYETTE, FLOYD, FRANKLIN, HENRY, JENNINGS, OHIO, RANDOLPH, RIPLEY, RUSH, SWITZERLAND, UNION, AND WAYNE COUNTIES) | $34.02 | $0.42 | $34.44 | Agreement |
TRUCK DRIVERS: GROUP 4…Full textTRUCK DRIVERS: GROUP 4 DRIVERS ON HEAVY EQUIPMENT OVER SIXTEEN (16) CU.YDS. OR TWENTY-FOUR TON, SUCH AS KOEHRING OR SIMILAR DUMPSTERS, TRACT TRUCKS, EUCLIDS, HUG BOTTOM DUMPS, TROUNAPULLS, TROUNAROCKERS OR SIMILAR EQUIPMENT WHEN USED FOR TRANSPORTATION PURPOSES, POLE TRAILERS OVER SIX (6) WHEELS, WATER PULLS, LOW-BOY TRAILERS TANDEM AXLES, QUAD AXLE OR MORE NO-WEIGHT LIMITATION, DISEL AND /OR HEAVY EQUIPMENT MECHANICS WHEN WORKING ON EQUIPMENT OPERATED BY EMPLOYEES WITHIN THE BARGAINING UNIT. (BROWN, CLARK, DEARBORN, DECATUR, FAYETTE, FLOYD, FRANKLIN, HENRY, JENNINGS, OHIO, RANDOLPH, RIPLEY, RUSH, SWITZERLAND, UNION, AND WAYNE COUNTIES) | $33.52 | $0.42 | $33.94 | Agreement |
TRUCK DRIVERS: GROUP 3…Full textTRUCK DRIVERS: GROUP 3 KOEHRING OR SIMILAR DUMPSTERS, TRACT TRUCKS, SEM-TRAILER WATER TRUCKS, EUCLIDS, HUG BOTTOM DUMPS, TOURNAPULLS, TOURNATRAILERS, TOURNAROCKERS, TRACTOR TRAILERS, TANDEMS Q FRAME WINCH TRUCKS, HYDROLIFT TRUCKS OR SIMILAR EQUIPMENT WHEN USED FOR TRANSPORTATION PURPOSES, MIXER TRUCKS OVER SIX AND ONE-HALF (6 1/2) CU.YDS. BATCH TRUCKS WET OR DRY OVER 4-""34-E""BATCHES SINGLE AXLE LOW BOY TRAILERS, AND CONTRACTOR'S MECHANICS WHEN WORKING ON EQUIPMENT OPERATED BY EMPLOYEES WITHIN THE BARGAINING UNIT; SIX (6) WHEEL POLE TRAILERS AND ONE (1) MAN OIL DISTRIBUTORS, FORK-LIFT OVER FOUR (4) TON AND MOBILE MIXERS (BROWN, CLARK, DEARBORN, DECATUR, FAYETTE, FLOYD, FRANKLIN, HENRY, JENNINGS, OHIO, RANDOLPH, RIPLEY, RUSH, SWITZERLAND, UNION, AND WAYNE COUNTIES) | $33.37 | $0.42 | $33.79 | Agreement |
TRUCK DRIVERS: GROUP 2…Full textTRUCK DRIVERS: GROUP 2 DRIVERS ON TANDEM AXLE EIGHTEEN (18) CU.YDS. OR TWENTY-FOUR (24) TONS GROSS, SIX (6) WHEEL TRUCKS, KOEHRING OR SIMILAR DUMPSTERS, TRACT TRUCKS, EUCLIDS, HUG BOTTOM DUMPS, TOURNAPULLS, TOURNATRAILERS, TOURNAROCKERS, OR SIMILAR EQUIPMENT WHEN USED FOR TRANSPORTATION PURPOSES UNDER NINE (9) CU.YDS. OR LESS THAN THIRTEEN AND ONE-HALF (13 1/2) TONS, TANDEMS AND SEMI-TRAILER SERVICE TRUCKS, MIXER TRUCKS OVER THREE (3) CU.YDS. AND INCLUDING SIX AND ONE-HALF (6 1/2) CU.YDS., FORK LIFT, FOUR (4) WHEEL A FRAME TRUCKS WHEN USED FOR TRANSPORTATION PURPOSES, FOUR (4) WHEEL WINCH TRUCKS, PAVEMENT BREAKERS, BATCH TRUCKS-WET OR DRY-OVER 2 UP TO AND INCLUDING 4-""34-E"" BATCHES, TWO (2) MEN OIL DISTRIBUTORS, FORK-LIFT UNDER FOUR (4) TON AND VACUUM TRUCKS. (BROWN, CLARK, DEARBORN, DECATUR, FAYETTE, FLOYD, FRANKLIN, HENRY, JENNINGS, OHIO, RANDOLPH, RIPLEY, RUSH, SWITZERLAND, UNION, AND WAYNE COUNTIES) | $33.17 | $0.42 | $33.59 | Agreement |
TRUCK DRIVERS: GROUP 1…Full textTRUCK DRIVERS: GROUP 1 SINGLE AXLE TRUCKS SEVEN(7) CU.YDS. OR LESS THAN TEN AND ONE-HALF (10 1/2) TONS, DUMPSTERS, SCOOP-MOBILES FIVE (5) CU. YDS. AND UNDER OR LESS THAN SEVEN AND ONE-HALF (7 1/2) TONS, MIXER TRUCKS THREE (3) CU.YDS. AND UNDER, AIR COMPRESSORS AND WELDING MACHINES, INCLUDING THOSE PULLED BY SEPARATE UNITS, BATCH TRUCKS - WET OR DRY - 2""34-E BATCHES OR LESS, TRUCK DRIVER HELPERS, WAREHOUSEMEN, MECHANIC'S HELPERS, GREASERS AND TIREMEN, ALL PICK-UP TRUCKS AND OTHER VEHICLES. DRIVERS ON DUMPSTERS OR SIMILAR DUMPSTERS, MOUNTED ON A FOUR (4) WHEEL TRUCK RATE TWO (2) CU.YDS. OR LESS AND SMALL PALLET TYPE FORK-LIFT OPERATOR AND DRIVERS ON PALLET JACKS OR SIMILAR TYPE EQUIPMENT. (BROWN, CLARK, DEARBORN, DECATUR, FAYETTE, FLOYD, FRANKLIN, HENRY, JENNINGS, OHIO, RANDOLPH, RIPLEY, RUSH, SWITZERLAND, UNION, AND WAYNE COUNTIES) | $32.67 | $0.42 | $33.09 | Agreement |
| TEAM0215-006 · Teamsters agreement, April 1, 2025 | ||||
TRUCK DRIVERS: GROUP 3…Full textTRUCK DRIVERS: GROUP 3 MIXER TRUCKS, ALL TYPES; LOWBOYS, ALL TYPES; SEMI-TRUCKS, ALL TYPES; ALL TRI-AXLE DUMP TRUCKS; ARTICULATED END DUMPS; END DUMPS; HEAVY EQUIPMENT TYPE WATER WAGONS; HAZARDOUS WASTE WAREHOUSEMAN; HAZARDOUS WASTE DRIVER; AND DRIVERS ON EQUIPMENT WHEN NOT SELF-LOADED OR PUSHER LOADED, SUCH AS KOEHRING OR SIMILAR DUMPSTERS, TRACK TRUCKS, EUCLID BOTTOM DUMP AND HUG BOTTOM DUMP, TOURNATRAILERS, TOURNAROCKERS OR SIMILAR EQUIPMENT HARRISON COUNTY | $27.76 | $21.52 | $49.28 | Agreement |
TRUCK DRIVERS: GROUP 2…Full textTRUCK DRIVERS: GROUP 2 TANDEM TRUCKS OR DUMP TRUCKS; FARM TRACTOR-PULLING TRAILER; BITUMINOUS DISTRIBUTORS, PAVEMENT BREAKERS HARRISON COUNTY | $27.54 | $21.52 | $49.06 | Agreement |
TRUCK DRIVERS: GROUP 1…Full textTRUCK DRIVERS: GROUP 1 PICKUP TRUCKS, WINCH TRUCKS,WAREHOUSEMAN, MECHANIC, STREET SWEEPERS, SINGLE AXLE TRUCKS HARRISON COUNTY | $27.08 | $21.52 | $48.60 | Agreement |
Modification history
| Modification 1 | January 30, 2026 |
| Modification 2 | May 18, 2026 (current) |
Published by the Wage and Hour Division; read from sam.gov. The sheet is checked for a newer modification each day. Contracts awarded since January 1, 2017 also carry Executive Order 13706 paid sick leave (one hour per 30 worked, up to 56 a year).
Questions people ask
- Which rate do I pay on IN20260004?
- The line for the classification of work actually performed: the basic rate plus the fringe. You may pay the fringe into benefit plans, as cash on every hour, or a mix. Overtime after 40 hours is 1.5 times the basic rate; fringe is paid on every hour and never multiplied.
- My trade is not on this sheet. What do I do?
- Do not borrow the nearest name. Ask the contracting agency for a conformance on Standard Form 1444 before the first week of that work, and note it as pending on the payroll.
- Does modification 2 apply to my contract?
- Only if it was in force when your contract was awarded (generally at bid opening). An earlier modification locked into the contract keeps applying, except on option years, added scope and indefinite-quantity contracts. The number and modification are on the first page of the exhibit in your contract.
How to read a wage determination · Paying the fringe in cash or through plans · Overtime on these rates · Fringe credit calculator