Prevailing wage rates · Indiana · Wage determination
Prevailing wage rates: Clay, Gibson, Greene and 9 more counties, Indiana
Building construction · IN20260003 modification 2, published May 18, 2026
The short answer
This sheet sets 79 classifications for building work in Clay, Gibson, Greene and 9 more counties, Indiana. Each line is a basic hourly rate plus a fringe rate, and the sum is the minimum you must pay for that work, from $23.38 an hour (bricklayer: terrazzo finisher) to $101.17 (elevator mechanic (gibson, posey, vanderburgh and warrick counties)). Your contract may lock an earlier modification.
Rates by classification
Total is the basic rate plus the fringe. Source is the agreement or survey the rate came from; a marker means the group changed in this modification. A dagger (†) means the fringe carries a footnote or percentage the total does not include; read the group’s notes.
| Classification | Basic rate | Fringe | Total | Source |
|---|---|---|---|---|
| ASBE0018-003 · Asbestos Workers and Heat & Frost Insulators agreement, June 1, 2017 | ||||
HAZARDOUS MATERIAL HANDLER…Full textHAZARDOUS MATERIAL HANDLER: INCLUDES PREPARATION, WETTINGS STRIPPING, REMOVAL, SCRAPPING, VACUUMING, BAGGING & DISPOSING OF ALL INSULATION MATERIALS, WHETHER THEY CONTAIN ASBESTOS OR NOT, FROM MECHANICAL SYSTEMS (CLAY, GREENE, OWEN, PARKE, PUTNAM, VERMILLION AND VIGO COUNTIES) | $23.00 | $14.40 | $37.40 | Agreement |
ASBESTOS WORKER/HEAT & FROST INSULATOR…Full textASBESTOS WORKER/HEAT & FROST INSULATOR: INCLUDES APPLICATION OF ALL INSULATING MATERIALS PROTECTIVE COVERINGS, COATINGS AND FINISHES TO ALL TYPES OF MECHANCIAL SYSTEMS (CLAY, GREENE, OWEN, PARKE, PUTNAM, VERMILLION AND VIGO COUNTIES) | $40.20 | $25.68 | $65.88 | Agreement |
| ASBE0018-003 · Asbestos Workers and Heat & Frost Insulators agreement, June 1, 2025 | ||||
HAZARDOUS MATERIAL HANDLER…Full textHAZARDOUS MATERIAL HANDLER: INCLUDES PREPARATION, WETTINGS STRIPPING, REMOVAL, SCRAPPING, VACUUMING, BAGGING & DISPOSING OF ALL INSULATION MATERIALS, WHETHER THEY CONTAIN ASBESTOS OR NOT, FROM MECHANICAL SYSTEMS (CLAY, GREENE, OWEN, PARKE, PUTNAM, VERMILLION AND VIGO COUNTIES) | $23.00 | $14.40 | $37.40 | Agreement |
ASBESTOS WORKER/HEAT & FROST INSULATOR…Full textASBESTOS WORKER/HEAT & FROST INSULATOR: INCLUDES APPLICATION OF ALL INSULATING MATERIALS PROTECTIVE COVERINGS, COATINGS AND FINISHES TO ALL TYPES OF MECHANCIAL SYSTEMS (CLAY, GREENE, OWEN, PARKE, PUTNAM, VERMILLION AND VIGO COUNTIES) | $40.20 | $25.68 | $65.88 | Agreement |
| ASBE0037-002 · Asbestos Workers and Heat & Frost Insulators agreement, April 2, 2025 | ||||
ASBESTOS WORKER/HEAT & FROST INSULATOR…Full textASBESTOS WORKER/HEAT & FROST INSULATOR: INCLUDES APPLICATION OF ALL INSULATING MATERIALS PROTECTIVE COVERINGS, COATINGS AN FINISHES TO ALL TYPES OF MECHANICAL SYSTEMS. ALSO THE APPLICATION OF FIRESTOPPING MATERIAL OPENINGS AND PENETRATIONS IN WALLS, FLOORS, CEILINGS, CURTAIN WALLS AND ALL LEAD ABATEMENT (GIBSON, POSEY, SULLIVAN, VANDERBURGH AND WARRICK COUNTIES) | $38.19 | $23.59 | $61.78 | Agreement |
| BOIL0374-002 · Boilermakers agreement, May 1, 2025 | ||||
| BOILERMAKER | $43.24 | $38.17 | $81.41 | Agreement |
| BRIN0001-001 · Bricklayers agreement, June 1, 2023 | ||||
| MARBLE, TILE & TERRAZZO WORKERS (EVANSVILLE POSEY, VANDERBURGH AND WARRICK COUNTIES) | $28.49 | $16.46 | $44.95 | Agreement |
| MARBLE, TILE & TERRAZZO FINISHER (EVANSVILLE POSEY, VANDERBURGH AND WARRICK COUNTIES) | $22.09 | $16.34 | $38.43 | Agreement |
| BRICKLAYER, STONEMASON (EVANSVILLE POSEY, VANDERBURGH AND WARRICK COUNTIES) | $34.17 | $20.14 | $54.31 | Agreement |
| BRIN0004-012 · Bricklayers agreement, June 1, 2024 | ||||
| TILE, MARBLE SETTER (BLOOMINGTON OWEN COUNTY) | $37.22 | $18.05 | $55.27 | Agreement |
| TILE & MARBLE FINISHER (BLOOMINGTON OWEN COUNTY) | $25.33 | $14.19 | $39.52 | Agreement |
| TERRAZZO WORKER/SETTER (BLOOMINGTON OWEN COUNTY) | $37.97 | $18.06 | $56.03 | Agreement |
| TERRAZZO FINISHER (BLOOMINGTON OWEN COUNTY) | $25.33 | $14.19 | $39.52 | Agreement |
| BRICKLAYER, STONEMASON (BLOOMINGTON OWEN COUNTY) | $35.21 | $18.19 | $53.40 | Agreement |
| BRIN0005-001 · Bricklayers agreement, September 21, 2023 | ||||
BRICKLAYER: TILE, MARBLE…Full textBRICKLAYER: TILE, MARBLE, MOSAIC (TERRE HAUTE CLAY, GIBSON, REENE, PARKE, SULLIVAN, VERMILLION AND VIGO COUNTIES) | $35.63 | $17.23 | $52.86 | Agreement |
BRICKLAYER: TERRAZZO FINISHER…Full textBRICKLAYER: TERRAZZO FINISHER (TERRE HAUTE CLAY, GIBSON, REENE, PARKE, SULLIVAN, VERMILLION AND VIGO COUNTIES) | $23.38 | 1,315.00 | $23.38† | Agreement |
BRICKLAYER: TERRAZZO…Full textBRICKLAYER: TERRAZZO (TERRE HAUTE CLAY, GIBSON, REENE, PARKE, SULLIVAN, VERMILLION AND VIGO COUNTIES) | $27.50 | $15.20 | $42.70 | Agreement |
| CARP0088-001 · Carpenters agreement, October 1, 2025 | ||||
| CARPENTERS: SOFT FLOOR LAYERS (CLAY, OWEN, PARKE, PUTNAM, VERMILLION AND VIGO COUNTIES) | $35.54 | $22.12 | $57.66 | Agreement |
| CARP0224-004 · Carpenters agreement, April 1, 2025 | ||||
| CARPENTER: PILEDRIVER (POSEY, VANDERBURGH AND WARRICK COUNTIES) | $34.04 | $26.50 | $60.54 | Agreement |
| CARPENTER: CARPENTER (POSEY, VANDERBURGH AND WARRICK COUNTIES) | $33.09 | $26.50 | $59.59 | Agreement |
| CARP0224-005 · Carpenters agreement, April 1, 2025 | ||||
| CARPENTER: PILEDRIVER (GREENE, GIBSON AND SULLIVAN COUNTIES) | $34.08 | $26.46 | $60.54 | Agreement |
| CARPENTER: CARPENTER (GREENE, GIBSON AND SULLIVAN COUNTIES) | $33.08 | $26.46 | $59.54 | Agreement |
| CARP1080-002 · Carpenters agreement, April 1, 2025 | ||||
| MILLWRIGHT, ZONE 2 (GIBSON, GREENE AND SULLIVAN COUNTIES) | $35.00 | $29.33 | $64.33 | Agreement |
| MILLWRIGHT, ZONE 1 (POSEY, VANDERBURGH AND WARRICK COUNTIES) | $36.30 | $28.37 | $64.67 | Agreement |
| ELEC0016-004 · Electrical Workers (IBEW) agreement, April 1, 2025 | ||||
| ELECTRICIAN (GIBSON, POSEY, VANDERBURGH AND WARRICK COUNTIES) | $46.14 | $21.90 | $68.04 | Agreement |
| ELEC0481-001 · Electrical Workers (IBEW) agreement, May 31, 2025 | ||||
| ELECTRICIAN (PUTNAM COUNTY) | $45.45 | $28.19 | $73.64 | Agreement |
| ELEC0538-002 · Electrical Workers (IBEW) agreement, June 1, 2025 | ||||
| ELECTRICIAN (VERMILLION COUNTY) | $40.00 | $27.36 | $67.36 | Agreement |
| ELEC0725-003 · Electrical Workers (IBEW) agreement, October 1, 2024 | ||||
| ELECTRICIAN (CLAY, GREENE, OWEN, PARKE, SULLIVAN AND VIGO COUNTIES) | $43.30 | $25.32 | $68.62 | Agreement |
| ELEC0725-010 · Electrical Workers (IBEW) agreement, June 1, 2022 | ||||
COMMUNICATION TECHNICIAN…Full textCOMMUNICATION TECHNICIAN: INCLUDES THE INSTALLATION, OPERATION, INSPECTION, MAINTENANCE, REPAIR AND SERVICE OF RADIO, TELEVISION, RECORDING, VOICE SOUND AND VISION PRODUCTION AND REPRODUCTION APPARATUS, EQUIPMENT AND APPLIANCES USED FOR DOMESTIC, COMMERCIAL, EDUCATION, ENTERTAINMENT AND PRIVATE TELEPHONE SYSTEMS. (CLAY, GREENE, OWEN, PARKE, SULLIVAN AND VIGO COUNTIES) | $30.00 | $18.07 | $48.07 | Agreement |
| ELEV0003-002 · Elevator Constructors agreement, January 1, 2025 | ||||
| ELEVATOR MECHANIC (GIBSON, POSEY, VANDERBURGH AND WARRICK COUNTIES) FOOTNOTES: A) EMPLOYER CONTRIBUTES AS A VACATION PAY CREDIT 8% BASIC HOURLY RATE FOR MORE THAN 5 YEARS OF SERVICE AND 6% BASIC HOURLY RATE FOR LESS THAN 5 YEARS OF SERVICE. B) EIGHT PAID HOLIDAYS: THANKSGIVING DAY; NEW YEAR'S DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERAN'S DAY, THANKSGIVING DAY, THE FRIDAY AFTER THANKSGIVING DAY AND CHRISTMAS DAY | $62.73 | $38.44 | $101.17 | Agreement |
| ELEV0034-002 · Elevator Constructors agreement, January 1, 2025 | ||||
ELEVATOR MECHANIC (CLAY…Full textELEVATOR MECHANIC (CLAY, GREENE, OWEN, PARKE, PUTNAM, SULLIVAN, VERMILLION AND VIGO COUNTIES) A) PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERN'S DAY, THANKSGIVING DAY, THE FRIDAY AFTER THANKSGIVING, AND CHRISTMAS DAY. B) EMPLOYER CONTRIBUTES 8% OF REGULAR HOURLY RATE TO VACATION PAY CREDIT FOR EMPLOYEE WITH MORE THAN 5 YEARS OF SERVICE; 6% FOR LESS THAN 5 YEARS' SERVICE | $60.17 | $38.44 | $98.61 | Agreement |
| ENGI0181-013 · Operating Engineers agreement, April 1, 2025 | ||||
POWER EQUIPMENT OPERATORS…Full textPOWER EQUIPMENT OPERATORS: GROUP B AIR COMPRESSOR (1 OR MORE, 600 CFM AND OVER), AIR COMPRESSOR WITH THROTTLE VALVE, BITUMINOUS DISTRUBTOR, BRAKEMAN, BULLFLOAT, CEMENT GUN, CONCRETE MIXER, CONCRETE MIXER, CONCRETE SAW, CONCRETE SPREADER OR PUDDLERS, CONVEYOR, DECK HAND OILER, DECK ENGINE, DRILL HELPER, EARTH ROLLER, ELECTRIC VIBRATOR COMPACTOR (EARTH OR ROCK), ELEVATOR (IN-PLANT, AUTOMATIC), FINISHING MACHINE, FIREMAN, FORM GRADER, GENERATOR, GUARD-RAIL DRIVER, HEATER, OILER, INDUSTRIAL TYPE FORKLIFT (9,000 LBS AND UNDER), MATERIAL PUMP, MOTOR BOATS, PAVING JOINT MACHINE, POST HOLE DIGGER, POWER BROOM, POWER TRAFFIC SIGNALS, ROCK ROLLER, ROCK SPREADER, ROLLER (EARTH OR ROCK), SPIKE MACHINE (RR), STEAM JENNY, SUB GRADER, TAMPING MACHINE, TRUCK CRANE OILER, TRUCK MOUNTED DRILL OILER, TUGGER (ONE-DRUM, AIR OR ELECTRIC) VIBRATOR, VIBRO-PILING HAMMER-HYDRAULIC HAMMER OR AUGER, WATER PUMP, WIDENER (APSCO OR SIMILAR TYPE) WELDING MACHINE, JLG LIFTS AND SCISSOR LIFTS OR SIMILAR MACHINE. (GIBSON, POSEY, VANDERBURGH, AND WARRICK COUNTIES) | $35.30 | $19.60 | $54.90 | Agreement |
POWER EQUIPMENT OPERATORS…Full textPOWER EQUIPMENT OPERATORS: GROUP A A-FRAME WINCH TRUCK, ARTICULATING DUMP, AUTOGRADE (CMI), AUTO PATROL, BALLAST REGULATOR (RR), BATCHER PLANT (ELECTRICAL CONTROL CONCRETE), BENDING MACHINE (PIPE), BITUMINOUS PLANT (ENGINEER), BITUMINOUS PLANT, BITUMINOUS MIXER TRAVEL PLANT, BITUMINOUS PAVER, BITUMINOUS ROLLER, BORING MACHINE, BUCK HOIST, BULL DOZER, CABLE WAY, CHICAGO BOOM, CHIMNEY HOIST, CLAMSHELL, CONCRETE MIXER (21 CU. FT. OR OVER), CONCRETE PAVER, CONCRETE PUMP (CRETE), CONSTRUCTION ELEVATOR (ALLMAC OR SIMILAR) CRANE, CRANEMAN, CRAWLER BACKHOE, CRAWLER HIGH-LIFT, CRUSHER PLANT, DERRICK, DERRICK BOAT, DINKEY, DIRECTIONAL/BORING MACHINE, DOPE POTS (PIPELINE), DOUBLE DRUM TUGGER (ELECTRIC OR AIR), DRAGLINE, DREDGE OPERATOR, DREDGE ENGINEER, DRILL OPERATOR, ELEVATING GRADER, EXTENDABLE BOOM FORKLIFT, FORMLESS PAVER, GANTRY CRANE, GATOR (OR SIMILAR TYPE TILLER), GRADEALL, GRADER, GRADEMAN, GREASER ( ON GREASE FACILITY SERVICING HEAVY EQUIPMENT), G.P.S SYSTEM (ON EQUIPMENT WITH THE CLASSIFICATIONS), GROUT PUMP, HEAD GREASER, HELICOPTER CREW, HETHERINGTON PAVER, HOIST (MOTORIZED, GAS OR DIESEL), HYDRAULIC CRANE, HYDRO BLASTER, INDUSTRIAL TYPE FORKLIFT (OVER 9,000 LBS), LASER CONCRETE SCREED, LASER OR REMOTE CONTRLLED EQUIPMENT (WITHIN THE CLASSIFICATIONS), LOCOMOTIVE CRANE, LOCOMOTIVE, MECHANIC, MOBILE MIXER, MOTOR CRANE, MUCKING MACHINE, MULTIPLE TAMPING MACHINE (RR) OVERHEAD CRANE, PILE DRIVER, PULLS, PUSH DOZER, PUSH BOATS, ROLLER (SHEEP FOOT), ROUGH TERRAIN CRANE, R.T. BACKHOE, R.T. ENDLOADER, ROSS CARRIER, SCOOP, SHOVEL, SIDE BOOM, SKIDSTTER LOADER (OBCAT OR SIMILAR TYPE), SWING CRANE, TAIL BOOM, TAR MACHINE (PIPELINE), TOWER CRANE, TRENCH MACHINE, WELDER (HEAVEY DUTY), TRUCK MOUNTED CONCRETE PUMP, TRUCK-MOUNTED DRILL, VACUUM TRUCK, WELL POINT WHIRLEYS. (GIBSON, POSEY, VANDERBURGH, AND WARRICK COUNTIES) | $43.43 | $19.60 | $63.03 | Agreement |
| ENGI0841-001 · Operating Engineers agreement, April 1, 2023 | ||||
POWER EQUIPMENT OPERATORS: GROUP 2…Full textPOWER EQUIPMENT OPERATORS: GROUP 2 CONCRETE MIXERS WITHOUT SKIPS, ROCK CRUSHER, DITCHING MACHINE UNDER 6', CURBING MACHINE, ONE DRUM MACHINES WITHOUT TOWER OR BOOM, AIR TUGGER, SELF-PROPELLED CONCRETE SAW, MACHINE-MOUNTED POST HOLE DIGGER, TWO TO FOUR GENERATORS, WATER PUMPS, OR WELDING MACHINES WITHIN 400 FT., AIR COMPRESSOR 600 CU. FT. AND UNDER, ROLLERS ON AGGREGATE AND SEAL COAT SURFACES, FORK LIFTS (WHEN USED FOR LANDSCAPING WORK, CONCRETE AND BLACKTOP CURB MACHINE, FARM TRACTOR WITH LESS THAN HALF YARD BUCKET, ONE WATER PUMP, IOLERS, AIR VALVES OR STEAM VALVES, ONE WELDING MACHINE, TRUCK JACK, MUD JACK, GUNNITE MACHINE, HOUSE ELEVATORS WHEN USED FOR HOISTING MATERIAL, ENGINE TENDERS, WAGON DRILL, FLEX PLANE, CONVEYOR, SIPHONS AND PULSOMETER, SWITCHMAN, FIREMAN ON PAINT POTS, FIREMAN ON ASPHALT PLANTS, DISTRIBUTOR OPERATORS ON TRUCKS, TAMPERS, SELF-PROPELLED POWER BROOM, STRIPING MACHINE (MOTOR DRIVEN), FORM TAMPER, BULK CEMENT PLAN EQUIPMENT GREASER, DECK HANDS, TRUCK CRANE OILER DRIVER, CEMENT BLIMPS, FORM GRADER, TEMPORARY HEAT, THROTTLE VALVE, FARM TRACTOR, SUPER SUCKER (AND SIMILAR TYPE OF EQUIPMENT). (REMAINING COUNTIES) FOOTNOTE: EMPLOYEES OPERATING BOOMS FROM 149 FT. TO 199 FT. INCLUDING JIB, SHALL RECEIVE AN ADDITIONAL SEVENTY FIVE CENTS (.75) PER HOUR ABOVE THE RATE. EMPLOYEES OPERATING BOOMS OVER 199 FT. INCLUDING JIB, SHALL RECEIVE AN ADDITIONAL ONE DOLLAR AND TWENTY FIVE CENTS ($1.25) PER HOUR ABOVE THE REGULAR RATE | $26.75 | $23.00 | $49.75 | Agreement |
POWER EQUIPMENT OPERATORS: GROUP 1…Full textPOWER EQUIPMENT OPERATORS: GROUP 1 POWER CRANES, DRAGLINES, DERRICKS, SHOVELS, GRADALLS, MECHANICS, TRACTOR HIGHLIFT, TOURNADOZER, CONCRETE MIXERS WITH SKIP, TOURNAMIXER, TWO-DRUM MACHINE, ONE-DRUM HOIST WITH TOWER OR BOOM, CABLEWAYS, TOWER MACHINES, MOTOR PATROL, BOOM TRACTOR, BOOM OR WINCH TRUCK, WINCH OR HYDRAULIC BOOM TRUCK, TRUCK CRANE, TOURNAPULL, TRACTOR OPERATING SCOOPS, BULLDOZER, PUSH TRACTOR, ASPHALT PLANER, FINISHING MACHINE ON ASPHALT, LARGE ROLLERS ON EARTH, ROLLERS ON ASPHALT MIX, ROSS CARRIER OR SIMILAR MACHINE, GRAVEL PROCESSING MACHINE, ASPHALT PLANT ENGINEER, PAVER OPERATOR, FARM TRACTOR WITH HALF YARD BUCKET AND/OR BACKHOE ATTACHMENTS, DREDGE ENGINEER, OR DREDGE OPERATOR, CENTRAL MIX PLANT ENGINEER, CMI OR SIMILAR TYPE MACHINE, TRUCK OR SKID MOUNTED CONCRETE PUMP, TOWER CRANE, ENGINE OR ROCK CRUSHER PLANT, CONCRETE PLANT ENGINEER, DITCHING MACHINE WITH DUAL ATTACHMENT, TRACTOR MOUNTED LOADERS, CHERRY PICKER, HYDRO CRANE, STANDARD OR DINKEY LOCOMOTIVES, SCOOPMOBILES, EUCLID LOADER, SOIL CEMENT MACHINE, BACK FILLER, ELEVATING MACHINE, POWER BLADE, DRILLING MACHINES INCLUDING WELL TESTING, CAISSONS, SHAFT OR ANY SIMILAR TYPE DRILLING MACHINES, MOTOR DRIVEN PAINT MACHINE, PIPE CLEANING MACHINE, PIPE WRAPPING MACHINE, PIPE BENDING MACHINE, APSCO PAVER, BORING MACHINE, (EQUIPMENT GREASED), BARBER-GREENE LOADERS, FORMLESS PAVER, (WELL POINT SYSTEM), CONCRETE SPREADER, HYDRA AX, SPAN SAW AND SIMILAR TYPES, MARINE SCOOPS, BRUSH MULCHER, BRUSH BURNER, MESH PLACER, TREE MOVER, HELICOPTER CREW (3), PILEDRIVER - SKID OR CRAWLER, STUMP REMOVER, ROOT RAKE, TUG BOAT OPERATOR, REFRIGERATING MACHINE, FREEZING OPERATOR, CHAIR CART-SELF PROPELLED, HYDRA SEEDER, STRAW BLOWER POWER SUB GRADER, BULL FLOAT, FINISHING MACHINE, SELF-PROPELLED PAVEMENT BREAKER (BACKHOE ATTACHED), LULL (OR SIMILAR TYPE MACHINE), TWO AIR COMPRESSORS, COMPRESSORS HOOKED IN MAIFOLD, OVERHEAD CRANE, CHIP SPREADER, MUD CAT, SULL-AIR FORK LIFTS (EXCEPT WHEN USED FOR LANDSCAPING WORK), SOIL STABILAZER (SEAMAN TILLER, BO MAG, RAGO GATOR AND SIMILAR TYPES OR EQUIPMENT), TUBE FLOAT, SPRAY MACHINE, CURING MACHINE, CONCRETE OR ASPHALT MILLING MACHINE, SNOOPER TRUCK OPERATOR. (REMAINING COUNTIES) FOOTNOTE: EMPLOYEES OPERATING BOOMS FROM 149 FT. TO 199 FT. INCLUDING JIB, SHALL RECEIVE AN ADDITIONAL SEVENTY FIVE CENTS (.75) PER HOUR ABOVE THE RATE. EMPLOYEES OPERATING BOOMS OVER 199 FT. INCLUDING JIB, SHALL RECEIVE AN ADDITIONAL ONE DOLLAR AND TWENTY FIVE CENTS ($1.25) PER HOUR ABOVE THE REGULAR RATE | $33.90 | $23.00 | $56.90 | Agreement |
| IRON0022-003 · Ironworkers agreement, June 1, 2025 | ||||
IRONWORKER (CLAY, DAVIESS…Full textIRONWORKER (CLAY, DAVIESS, GREENE, KNOX, LAWRENCE, MARTIN, MONROE, MONTGOMERY, OWEN, PARKE, PUTNAM, SULLIVAN, VERMILLION AND VIGO COUNTIES) | $38.00 | $26.39 | $64.39 | Agreement |
| IRON0103-003 · Ironworkers agreement, April 1, 2024 | ||||
| IRONWORKER (GIBSON, POSEY, VANDERBURGH AND WARRICK COUNTIES) | $35.34 | $25.75 | $61.09 | Agreement |
| LABO0204-002 · Laborers agreement, June 1, 2025 | ||||
LABORERS: CAISSON AND TUNNEL WORK IN COMPRESSED AND FREE AIR: GROUP 1…Full textLABORERS: CAISSON AND TUNNEL WORK IN COMPRESSED AND FREE AIR: GROUP 1: Cage Tenders, Dump Men, Flagman, Signalman, Top Laborers, Rod Men (CLAY, GREENE, OWEN, PARKE, PUTNAM, SULLIVAN, VERMILLION, VIGO COUNTIES) | $23.18 | $16.00 | $39.18 | Agreement |
LABORERS: CAISSON AND TUNNEL WORK IN COMPRESSED AND FREE AIR: GROUP 2…Full textLABORERS: CAISSON AND TUNNEL WORK IN COMPRESSED AND FREE AIR: GROUP 2: Concrete Repairmen, Lock Tenders (pressure side), Motor men, Muckers, Grout Machine, Track Layers, Air Hoist, Key Board, Agitator Car, Car Pushers, Concrete Laborers, Grout Laborers, Lock Tenders (free air side), Steel Setters, Tuggers, Tuggers, Switchmen. (CLAY, GREENE, OWEN, PARKE, PUTNAM, SULLIVAN, VERMILLION, VIGO COUNTIES) | $23.93 | $16.00 | $39.93 | Agreement |
LABORERS: CAISSON AND TUNNEL WORK IN COMPRESSED AND FREE AIR: GROUP 3…Full textLABORERS: CAISSON AND TUNNEL WORK IN COMPRESSED AND FREE AIR: GROUP 3: Mucking Machine, Laser Beam, Liner Plate & Ring Setter, Shield Drivers, Power Knife, Welders Burners, Pipe Jacking Machine, Skinners, Maintenance Technician, Miner, Bricklayer Tenders, Concrete Blowers, Drillers, Erectors, Form Men, Jackhammermen, Mining Machine. (CLAY, GREENE, OWEN, PARKE, PUTNAM, SULLIVAN, VERMILLION, VIGO COUNTIES) | $24.18 | $16.00 | $40.18 | Agreement |
LABORERS: CAISSON AND TUNNEL WORK IN COMPRESSED AND FREE AIR: GROUP 4…Full textLABORERS: CAISSON AND TUNNEL WORK IN COMPRESSED AND FREE AIR: GROUP 4: Dynamite Men, Drillers air track or wagon drilling for explosives. (CLAY, GREENE, OWEN, PARKE, PUTNAM, SULLIVAN, VERMILLION, VIGO COUNTIES) | $24.18 | $16.00 | $40.18 | Agreement |
LABORERS: GROUP 3…Full textLABORERS: GROUP 3 DYNAMITE MEN; MASON TENDERS; DRILLERS-AIR TRACK OR WAGON DRILLING FOR EXPLOSIVES LABORERS CLASSIFICATIONS FOR CAISSON AND TUNNEL WORK IN COMPRESSED AND FREE AIR (CLAY, GREENE, OWEN, PARKE, PUTNAM, SULLIVAN, VERMILLION, AND VIGO COUNTIES) | $30.43 | $18.55 | $48.98 | Agreement |
LABORERS: GROUP 2…Full textLABORERS: GROUP 2 PLASTERERS' TENDERS; MORTAR MIXERS; WELDERS (ACETYLENE OR ELECTRIC); CUTTING TORCH OR BURNER; CEMENT NOZZLE LABORERS; CEMENT GUN OPERATORS; SCAFFOLD BUILDERS WHEN WORKING FOR PLASTERERS AND FOR MASONS; WATER BLAST MACHINE OPERATORS. (CLAY, GREENE, OWEN, PARKE, PUTNAM, SULLIVAN, VERMILLION, AND VIGO COUNTIES) | $29.18 | $18.55 | $47.73 | Agreement |
LABORERS: GROUP 1…Full textLABORERS: GROUP 1 BUILDING AND CONSTRUCTION LABORERS; SCAFFOLD BUILDERS (OTHER THAN FOR MASONS OR PLASTERERS); MECHANIC TENDERS; FLAG & SIGNAL PERSON; WINDOW WASHERS & CLEANERS; WATERBOYS & TOOLHOUSEMEN; RAILROAD WORKERS; MASONRY WALL WASHERS (INTERIOR & EXTERIOR); CURING COMPOUND; ALL PORTABLE WATER PUMPS WITH DISCHARGE UP TO 3 INCHES; WATERPROOFING; HANDLING OF CREOSOTE LUMBER OR LIKE TREATED MATERIAL (EXCLUDING RAILROAD MATERIAL); ASPHALT RAKERS & LUTEMEN; KETTLEMEN; AIR TOOL OPERATORS AND ALL PNEUMATIC TOOL OPERATORS; AIR & ELECTRIC VIBRATORS & CHIPPING HAMMER OPERATORS: EARTH COMPACTORS; JACKMEN & SHEET MEN WORKING DITCHES DEEPER THAN 6 FT. IN DEPTH; LABORERS WORKING DITCHES 6 FT. IN DEPTH OR DEEPER; ASSEMBLY OF UNICRETE PUMP; TILE LAYERS (SEWER OR FIELD) & SEWER PIPE LAYER (METALLIC OR NON-METALLIC); MOTOR-DRIVEN WHEELBARROWS & CONCRETE BUGGIES; HYSTER OPERATORS; PUMPCRETE ASSEMBLERS; CORE DRILL OPERATOR; CEMENT, LIME OR SILIA CLAY HANDLERS (BULK OR BAG); HANDLING OF TOXIC MATERIALS DAMAGING TO CLOTHING; PNEUMATIC SPIKERS; DECK ENGINE & WINCH OPERATORS: WATER MAIN & CABLE DUCKING (METALLIC/NON-METALLIC); SCREED MAN OR SCREW OPERATOR ON ASPHALT PAVER; CHAIN SAW AND DEMOLITION SAW OPERATORS; CONCRETE CONVEYOR ASSEMBLERS; ASBESTOS REMOVAL; HAZARDOUS WASTE REMOVAL. (CLAY, GREENE, OWEN, PARKE, PUTNAM, SULLIVAN, VERMILLION, AND VIGO COUNTIES) | $28.43 | $18.55 | $46.98 | Agreement |
| LABO0561-005 · Laborers agreement, April 1, 2025 | ||||
| LABORERS: GROUP 4 DYNAMITE MAN (GIBSON, POSEY, VANDERBURGH AND WARRICK COUNTIES) | $33.97 | $19.20 | $53.17 | Agreement |
LABORERS: GROUP 3…Full textLABORERS: GROUP 3 PLASTERER TENDER; MASON TENDER; MORTAR MIXER; WELDER (ACETYLENE OR ELECTRIC); CUTTING TORCH OR BURNER; CEMENT GUN OPERATOR; SCAFFOLD BUILDER (WHEN WORKING FOR PLASTERER OR MASON) (GIBSON, POSEY, VANDERBURGH AND WARRICK COUNTIES) | $33.47 | $19.20 | $52.67 | Agreement |
LABORERS: GROUP 2…Full textLABORERS: GROUP 2 WATERPROOFING; HANDLING OF CREOSOTE LUMBER OR LIKE TREATED MATERIAL (EXCLUDING RAILROAD MATERIAL); ASPHALT RAKER & LUTEMAN; KETTLEMAN; HANDLING AND REMOVAL HAZARDOUS MATERIALS DAMAGING TO CLOTHING; AIR TOOL OPERATOR; VIBRATOR; CHIPPING HAMMER OPERATOR AND ALL PNEUMATIC TOOL OPERATOR AND EARTH COMPACTOR; JACK MAN & SHEETING MAN WORKING IN DITCHES 6 FEET IN DEPTH OR DEEPER; LABORERS WORKING DITCHES SIX (6) FEET IN DEPTH OR DEEPER; ASSEMBLY OF UNICRETE PUMP; CHAIN SAW OPERATOR; WATER LINE LAYERS, FIVE (5) FEET OUTSIDE THE BUILDING FOUNDATION; TILE LAYERS (SEWER OR FIELD); SEWER PIPE LAYER (METALLIC AND NON-METALLIC) FIVE (5) FEET OUTSIDE THE BUILDING; MOTOR DRIVEN WHEELBARROW & CONCRETE BUGGY; HYSTER OPERATOR; GROUT PUMP OPERATOR; PUMP CRETE ASSEMBLER; CONVEYOR ASSEMBLER; CORE DRILL OPERATOR; CEMENT/LIME/SILICA CLAY HANDLER (BULK OR BAR); PNEUMATIC SPIKER; DECK/ENGINE/WINCH OPERATOR; WATER MAIN & CABLE DECKING (METALLIC OR NON-METALLIC); REMOTE CONTROLLED COMPACTOR (GIBSON, POSEY, VANDERBURGH AND WARRICK COUNTIES) | $31.07 | $19.20 | $50.27 | Agreement |
LABORERS: GROUP 1…Full textLABORERS: GROUP 1 BUILDING & CONSTRUCTION LABORERS; SCAFFOLD BUILDERS (OTHER THAN FOR MASONS OR PLASTERERS); IRONWORKER TENDER; MECHANIC TENDER; CIVIL ENGINEER TENDER; RODMEN AND CHAINMEN; SIGNALMEN AND FLAGMAN, WINDOW WASHER & CLEANER; WATERBOY AND TOOLHOUSEMAN; ROOFER TENDER; RAILROAD WORKER; MASONRY WALL WASHER (INTERIOR & EXTERIOR); CEMENT FINISHER TENDER; CARPENTER TENDER; ALL OTHER TENDERS NOT LISTED; PORTABLE WATER PUMP WITH DISCHARGE UP TO 3""; WIREMESH; FIRE PREVENTION; FIRE WATCH; FIRE STOP TENDER (GIBSON, POSEY, VANDERBURGH AND WARRICK COUNTIES) | $30.47 | $19.20 | $49.67 | Agreement |
| PAIN0156-002 · Painters and Allied Trades agreement, April 1, 2025 | ||||
PAINTERS: SPRAY, SANDBLAST…Full textPAINTERS: SPRAY, SANDBLAST, POWER TOOLS, WATERBLAST & STEAM CLEANING (GIBSON, POSEY, VANDERBURGH AND WARRICK COUNTIES) FOOTNOTE: A: ALL STRUCTURES OVER 40FT? $0.75/ HOUR ABOVE BASE WAGE ALL STRUCTURES OVER 75FT? $1.50/ HOUR ABOVE BASE WAGE ALL STRUCTURES OVER 100FT? $2.50/ HOUR ABOVE BASE WAGE | $32.12 | $21.20 | $53.32 | Agreement |
| PAINTERS: DRYWALL FINISHERS (GIBSON, POSEY, VANDERBURGH AND WARRICK COUNTIES) FOOTNOTE: A: ALL STRUCTURES OVER 40FT? $0.75/ HOUR ABOVE BASE WAGE ALL STRUCTURES OVER 75FT? $1.50/ HOUR ABOVE BASE WAGE ALL STRUCTURES OVER 100FT? $2.50/ HOUR ABOVE BASE WAGE | $31.87 | $21.20 | $53.07 | Agreement |
| PAINTERS: BRUSH & ROLLER (GIBSON, POSEY, VANDERBURGH AND WARRICK COUNTIES) FOOTNOTE: A: ALL STRUCTURES OVER 40FT? $0.75/ HOUR ABOVE BASE WAGE ALL STRUCTURES OVER 75FT? $1.50/ HOUR ABOVE BASE WAGE ALL STRUCTURES OVER 100FT? $2.50/ HOUR ABOVE BASE WAGE | $31.12 | $21.20 | $52.32 | Agreement |
| PAIN0197-002 · Painters and Allied Trades agreement, June 1, 2025 | ||||
PAINTERS: SPRAY & POT MAN…Full textPAINTERS: SPRAY & POT MAN (CLAY, GREENE, OWEN, PARKE, PUTNAM, SULLIVAN, VERMILLION AND VIGO COUNTIES) FOOTNOTE: A: $1.00 PREMIUM FOR WORK ON STRUCTURES OVER 40 FT. ABOVE FLOOR/GROUND LEVEL $2.00 PREMIUM FOR WORK ON STRUCTURES OVER 100 FT ABOVE FLOOR/GROUND LEVEL | $32.20 | $15.55 | $47.75 | Agreement |
PAINTERS: SANDBLASTING…Full textPAINTERS: SANDBLASTING (CLAY, GREENE, OWEN, PARKE, PUTNAM, SULLIVAN, VERMILLION AND VIGO COUNTIES) FOOTNOTE: A: $1.00 PREMIUM FOR WORK ON STRUCTURES OVER 40 FT. ABOVE FLOOR/GROUND LEVEL $2.00 PREMIUM FOR WORK ON STRUCTURES OVER 100 FT ABOVE FLOOR/GROUND LEVEL | $34.20 | $15.55 | $49.75 | Agreement |
PAINTERS: DRYWALL & PAPER HANGERS…Full textPAINTERS: DRYWALL & PAPER HANGERS (WITH TOOLS) (CLAY, GREENE, OWEN, PARKE, PUTNAM, SULLIVAN, VERMILLION AND VIGO COUNTIES) FOOTNOTE: A: $1.00 PREMIUM FOR WORK ON STRUCTURES OVER 40 FT. ABOVE FLOOR/GROUND LEVEL $2.00 PREMIUM FOR WORK ON STRUCTURES OVER 100 FT ABOVE FLOOR/GROUND LEVEL | $33.20 | $15.55 | $48.75 | Agreement |
PAINTERS: BRUSH & ROLLER…Full textPAINTERS: BRUSH & ROLLER (CLAY, GREENE, OWEN, PARKE, PUTNAM, SULLIVAN, VERMILLION AND VIGO COUNTIES) FOOTNOTE: A: $1.00 PREMIUM FOR WORK ON STRUCTURES OVER 40 FT. ABOVE FLOOR/GROUND LEVEL $2.00 PREMIUM FOR WORK ON STRUCTURES OVER 100 FT ABOVE FLOOR/GROUND LEVEL | $31.20 | $15.55 | $46.75 | Agreement |
| PAIN1165-007 · Painters and Allied Trades agreement, June 1, 2025 | ||||
| GLAZIER (GIBSON, POSEY, VANDERBURGH, WARRICK COUNTIES) | $35.13 | $19.57 | $54.70 | Agreement |
| PAIN1165-012 · Painters and Allied Trades agreement, January 1, 2025 | ||||
| GLAZIER (CLAY; GREENE; OWEN; PARKE; PUTNAM; SULLIVAN; VERMILLION AND VIGO COUNTIES) | $36.03 | $20.55 | $56.58 | Agreement |
| PLAS0075-001 · Plasterers and Cement Masons agreement, June 1, 2017 | ||||
| CEMENT MASON/CONCRETE FINISHER (CLAY, OWEN, PARKE, PUTNAM, VERMILLION AND VIGO COUNTIES:) | $25.75 | $13.50 | $39.25 | Agreement |
| PLAS0075-002 · Plasterers and Cement Masons agreement, June 1, 2017 | ||||
| CEMENT MASON/CONCRETE FINISHER (GREENE AND SULLIVAN COUNTIES) | $28.50 | $13.50 | $42.00 | Agreement |
| PLAS0566-001 · Plasterers and Cement Masons agreement, April 1, 2018 | ||||
| CEMENT MASON/CONCRETE FINISHER (GIBSON, POSEY, VANDERBURGH AND WARRICK COUNTIES) | $26.30 | $16.91 | $43.21 | Agreement |
| PLAS0692-001 · Plasterers and Cement Masons agreement, June 1, 2025 | ||||
PLASTERER: AREA #46…Full textPLASTERER: AREA #46 (CLAY, GIBSON, GREENE, OWEN, PARKE, POSEY, PUTNAM, SULLIVAN, VANDERBURGH, VERMILLION, VIGO AND WARRICK COUNTIES) | $31.50 | $18.32 | $49.82 | Agreement |
| PLUM0136-002 · Plumbers and Pipefitters agreement, April 1, 2025 | ||||
| PLUMBERS AND PIPEFITTERS (REMAINING COUNTIES) | $46.42 | $21.33 | $67.75 | Agreement |
| PLUM0157-001 · Plumbers and Pipefitters agreement, July 1, 2025 | ||||
PLUMBERS AND PIPEFITTERS…Full textPLUMBERS AND PIPEFITTERS (CLAY, GREENE, PARKE, PUTNAM (PART), SULLIVAN, VERMILLION AND VIGO COUNTIES) | $46.65 | $21.95 | $68.60 | Agreement |
| PLUM0440-001 · Plumbers and Pipefitters agreement, June 4, 2025 | ||||
PLUMBERS AND PIPEFITTERS…Full textPLUMBERS AND PIPEFITTERS (PUTNAM COUNTY (EAST OF ROAD 43 EXCEPT TERRITORY ON A EAST MILE RADIUS FROM THE COURT HOUSE)) | $50.05 | $20.39 | $70.44 | Agreement |
| ROOF0106-001 · Roofers agreement, April 1, 2023 | ||||
| ROOFERS: SLATE & TILE (REMAINING COUNTIES) | $31.60 | $19.43 | $51.03 | Agreement |
| ROOFERS: COMPOSITION (REMAINING COUNTIES) | $31.60 | $19.43 | $51.03 | Agreement |
| ROOF0119-001 · Roofers agreement, September 1, 2025 | ||||
| ROOFERS: (PUTNAM COUNTY) | $32.00 | $16.61 | $48.61 | Agreement |
| ROOF0150-002 · Roofers agreement, July 1, 2024 | ||||
| ROOFER (CLAY, GREENE, OWEN, PARKE, SULLIVAN, VERMILLION AND VIGO COUNTIES) | $30.00 | $18.30 | $48.30 | Agreement |
| SFIN0669-002 · SFIN, April 1, 2025 | ||||
| SPRINKLER FITTER | $44.20 | $27.88 | $72.08 | SFIN |
| SHEE0020-018 · Sheet Metal Workers agreement, July 1, 2023 | ||||
SHEET METAL WORKER HVAC DUCT WORK…Full textSHEET METAL WORKER HVAC DUCT WORK (CLAY, GREENE, OWEN, PARKE, PUTNAM, SULLIVAN, VERMILLION, AND VIGO COUNTIES) | $39.53 | $22.92 | $62.45 | Agreement |
| SHEE0020-019 · Sheet Metal Workers agreement, July 1, 2025 | ||||
| SHEET METAL WORKER HVAC DUCT WORK (GIBSON, POSEY, VANDERBURGH, AND WARRICK COUNTIES) | $40.19 | $27.33 | $67.52 | Agreement |
| TEAM0135-006 · Teamsters agreement, April 1, 2025 | ||||
TRUCK DRIVERS: GROUP 5…Full textTRUCK DRIVERS: GROUP 5 MECHANIC FURNISHING HIS OWN TOOLS. (CLAY, GREENE OWEN, PARKE, PUTNAM, SULLIVAN, VERMILLION, AND VIGO COUNTIES) A: $36.40 PER DAY & 450.00 PER WEEK | $34.02 | $0.42 | $34.44 | Agreement |
TRUCK DRIVERS: GROUP 4…Full textTRUCK DRIVERS: GROUP 4 DRIVERS ON HEAVY EQUIPMENT OVER SIXTEEN (16) CU.YDS. OR TWENTY-FOUR TON, SUCH AS KOEHRING OR SIMILAR DUMPSTERS, TRACT TRUCKS, EUCLIDS, HUG BOTTOM DUMPS, TOURNAPULLS, TOURNAROCKERS OR SIMILAR EQUIPMENT WEN USED FOR TRANSPORTATION PURPOSES, POLE TRAILERS OVER SIX (6) WHEELS, WATER PULLS, LOW-BOY TRAILERS TANDEM AXLES, QUAD AXLE OR MORE NO-WEIGHT LIMITATION, DISEAL AND/OR HEAVY EQUIPMENT MECHANICS WHEN WORKING ON EQUIPMENT OPERATED BY EMPLOYEES WITH THIS BARGAINING UNIT. (CLAY, GREENE OWEN, PARKE, PUTNAM, SULLIVAN, VERMILLION, AND VIGO COUNTIES) A: $36.40 PER DAY & 450.00 PER WEEK | $33.52 | $0.42 | $33.94 | Agreement |
TRUCK DRIVERS: GROUP 3…Full textTRUCK DRIVERS: GROUP 3 KOEHRING OR SIMILAR DUMPSTERS, TRACT TRUCKS, SEMI- TRAILER WATER TRUCKS, EUCLIDS, HUG BOTTOM DUMPS, TOURNAPULLS, TOURNATRAILERS, TOURNAROCKERS, TRACTOR TRAILERS, TANDEMS Q FRAME WINCH TRUCKS, HYDROLIFT TRUCKS OR SIMILAR EQUIPMENT WHEN USED FOR TRANSPORTATION PURPOSES, MIXER TRUCKS OVER SIX AND ONE-HALF (6 1/2) CU.YDS. BATCH TRUCKS WET OR DRY OVER 4-""34-E"" BATCHES SINGLE AXLE LOW BOY TRAILERS, AND CONTRACTOR'S MECHANICS WHEN WORKING ON EQUIPMENT OPERATED BY EMPLOYEES WITHIN THIS BARGAINING UNIT. SIX (6) WHEEL POLE TRAILERS AND ONE (1) MAN OIL DISTRIBUTORS, FORK- LIFT OVER FOUR (4) TON AND MOBILE MIXERS. (CLAY, GREENE OWEN, PARKE, PUTNAM, SULLIVAN, VERMILLION, AND VIGO COUNTIES) A: $36.40 PER DAY & 450.00 PER WEEK | $33.37 | $0.42 | $33.79 | Agreement |
TRUCK DRIVERS: GROUP 2…Full textTRUCK DRIVERS: GROUP 2 DRIVERS ON TANDEM AXLE EIGHTEEN (18) CU.YDS.OR TWENTY- FOUR (24) TONS GROSS, SIX (6) WHEEL TRUCKS, KOEHRING OR SIMILAR DUMPSTERS, TRACT TRUCKS, EUCLIDS, HUG BOTTOM DUMPS, TOURNAPULLS, TOURNATRAILERS, TOURNAROCKERS, OR SIMILAR EQUIPMENT WHEN USED FOR TRANSPORTATION PURPOSES UNDER NINE (9) CU.YDS. OR LESS THAN THIRTEEN AND ONE-HALF (13 1/2) TONS, TANDEMS AND SEMI-TRAILER SERVICE TRUCKS, MIXER TRUCKS OVER THREE (3) CU. YDS. AND INCLUDING SIX AND ONE-HALF (6 1/2) CU.YDS., FORK LIFT, FOUR (4) WHEEL A FRAME TRUCKS WHEN USED FOR TRANSPORTATION PURPOSES, FOUR (4) WHEEL WINCH TRUCKS, PAVEMENT BREAKERS, BATCH TRUCKS - WET OR DRY - OVER 2 UP TO AND INCLUDING 4-""34-E"" BATCHES TWO (2) MEN OIL DISTRIBUTORS, FORK-LIFT UNDER FOUR (4) TON AND VACUUM TRUCKS. (CLAY, GREENE OWEN, PARKE, PUTNAM, SULLIVAN, VERMILLION, AND VIGO COUNTIES) A: $36.40 PER DAY & 450.00 PER WEEK | $33.17 | $0.42 | $33.59 | Agreement |
TRUCK DRIVERS: GROUP 1…Full textTRUCK DRIVERS: GROUP 1 SINGLE AXLE TRUCKS SEVEN (7) CU.YDS. OR LESS THAN TEN AND 0NE-HALF (10 1/2) TONS, DUMPSTERS, SCOOP-MOBILES FIVE (5) CU. YDS. AND UNDER OR LESS THAN SEVEN AND ONE-HALF (7 1/2) TONS, MIXER TRUCKS THREE (3) CU.YDS. AND UNDER, AIR COMPRESSORS AND WELDING MACHINES, INCLUDING THOSE PULLED BY SEPARATE UNITS, BATCH TRUCKS-WET OR DRY-2""34-E BATCHES OR LESS, TRUCK DRIVER HELPERS, WAREHOUSEMEN, MECHANIC'S HELPERS, GREASERS AND TIREMEN, ALL PICK-UP TRUCKS AND OTHER VEHICLES. DRIVERS ON DUMPSTERS OR SIMILAR DUMPSTERS, MOUNTED ON FOUR (4) WHEEL TRUCK RATED TWO (2) CU.YDS. OR LESS, AND SMALL PALLET TYPE FORK-LIFT OPERATOR AND DRIVERS ON PALLET JACKS OR SIMILAR TYPE EQUIPMENT. (CLAY, GREENE OWEN, PARKE, PUTNAM, SULLIVAN, VERMILLION, AND VIGO COUNTIES) A: $36.40 PER DAY & 450.00 PER WEEK | $32.67 | $0.42 | $33.09 | Agreement |
| TEAM0215-005 · Teamsters agreement, April 1, 2025 | ||||
TRUCK DRIVERS: GROUP 3…Full textTRUCK DRIVERS: GROUP 3 MIXER TRUCKS, ALL TYPES; LOWBOYS, ALL TYPES; SEMI- TRUCKS, ALL TYPES; ALL TRI-AXLE DUMP TRUCKS; ARTICULATED END DUMPS; END DUMPS; HEAVY EQUIPMENT TYPE WATER WAGONS; HAZARDOUS WASTE WAREHOUSEMAN; HAZARDOUS WASTE DRIVER; AND DRIVERS ON EQUIPMENT WHEN NOT SELF-LOADED OR PUSHER LOADED, SUCH AS KOEHRING OR SIMILAR DUMPSTERS, TRACK TRUCKS, EUCLID BOTTOM DUMP AND HUG BOTTOM DUMP, TOURNATRAILERS, TOURNAROCKERS OR SIMILAR EQUIPMENT. (GIBSON, POSEY, VANDERBURGH AND WARRICK COUNTIES) | $27.76 | $21.52 | $49.28 | Agreement |
TRUCK DRIVERS: GROUP 2…Full textTRUCK DRIVERS: GROUP 2 TANDEM TRUCKS OR DUMP TRUCKS; FARM TRACTOR PULLING TRAILER; BITUMINOUS DISTRIBUTORS, PAVEMENT BREAKERS (GIBSON, POSEY, VANDERBURGH AND WARRICK COUNTIES) | $27.54 | $21.52 | $49.06 | Agreement |
TRUCK DRIVERS: GROUP 1…Full textTRUCK DRIVERS: GROUP 1 PICKUP TRUCKS, WINCH TRUCKS, WAREHOUSEMAN, MECHANIC, STREET SWEEPERS, SINGLE AXLE TRUCKS (GIBSON, POSEY, VANDERBURGH AND WARRICK COUNTIES) | $27.08 | $21.52 | $48.60 | Agreement |
Modification history
| Modification 1 | January 30, 2026 |
| Modification 2 | May 18, 2026 (current) |
Published by the Wage and Hour Division; read from sam.gov. The sheet is checked for a newer modification each day. Contracts awarded since January 1, 2017 also carry Executive Order 13706 paid sick leave (one hour per 30 worked, up to 56 a year).
Questions people ask
- Which rate do I pay on IN20260003?
- The line for the classification of work actually performed: the basic rate plus the fringe. You may pay the fringe into benefit plans, as cash on every hour, or a mix. Overtime after 40 hours is 1.5 times the basic rate; fringe is paid on every hour and never multiplied.
- My trade is not on this sheet. What do I do?
- Do not borrow the nearest name. Ask the contracting agency for a conformance on Standard Form 1444 before the first week of that work, and note it as pending on the payroll.
- Does modification 2 apply to my contract?
- Only if it was in force when your contract was awarded (generally at bid opening). An earlier modification locked into the contract keeps applying, except on option years, added scope and indefinite-quantity contracts. The number and modification are on the first page of the exhibit in your contract.
How to read a wage determination · Paying the fringe in cash or through plans · Overtime on these rates · Fringe credit calculator