Prevailing wage rates · Illinois · Wage determination
Prevailing wage rates: Bond, Calhoun, Clinton and 8 more counties, Illinois
Heavy, Highway construction · IL20260017 modification 5, published July 30, 2026
The short answer
This sheet sets 146 classifications for heavy, highway work in Bond, Calhoun, Clinton and 8 more counties, Illinois. Each line is a basic hourly rate plus a fringe rate, and the sum is the minimum you must pay for that work, from $49.57 an hour (painter: bridge epoxy or toxic-lead-based paint work-$1.00 premimum) to $97.54 (line construction: blaster). Your contract may lock an earlier modification.
Scope
Heavy Construction
Highway Construction
Rates by classification
Total is the basic rate plus the fringe. Source is the agreement or survey the rate came from; a marker means the group changed in this modification. A dagger (†) means the fringe carries a footnote or percentage the total does not include; read the group’s notes.
| Classification | Basic rate | Fringe | Total | Source |
|---|---|---|---|---|
| CARP0270-015 · Carpenters agreement, May 1, 2017 | ||||
| CARPENTER:MACOUPIN and MONTGOMERY COUNTIES | $32.15 | $25.97 | $58.12 | Agreement |
| PILEDRIVERMAN:MACOUPIN and MONTGOMERY COUNTIES | $33.15 | $25.97 | $59.12 | Agreement |
| CARP0270-023 · Carpenters agreement, May 15, 2020 | ||||
| CARPENTER (GREENE COUNTY) | $35.05 | $28.57 | $63.62 | Agreement |
| PILEDRIVERMAN (GREENE COUNTY) | $35.05 | $28.57 | $63.62 | Agreement |
| CARP0500-001 · Carpenters agreement, May 1, 2021 | ||||
| CARPENTER & PILEDRIVERMEN (CLINTON, MONROE, AND WASHINGTON COUNTIES) | $41.36 | $18.90 | $60.26 | Agreement |
| CARP0500-003 · Carpenters agreement, May 1, 2021 | ||||
| CARPENTER AND PILEDRIVER (ST. CLAIR COUNTY) | $41.36 | $18.90 | $60.26 | Agreement |
| CARP0664-003 · Carpenters agreement, May 1, 2021 | ||||
| CARPENTER AND PILEDRIVER (MADISON COUNTY) | $41.36 | $18.90 | $60.26 | Agreement |
| CARP0664-006 · Carpenters agreement, May 1, 2021 | ||||
| CARPENTER (BOND, CALHOUN, AND JERSEY COUNTIES) | $41.36 | $18.90 | $60.26 | Agreement |
| ELEC0146-012 · Electrical Workers (IBEW) agreement, June 1, 2022 | ||||
| ELECTRICIAN (MONTGGOMERY COUNTY (EAST OF BUTLER GROVE, GRISHAM, HILLSBORO & RAYMOND TWPS)) | $41.00 | $20.68 | $61.68 | Agreement |
| ELEC0193-003 · Electrical Workers (IBEW) agreement, June 3, 2024 | ||||
ELECTRICIAN (MACOUPIN…Full textELECTRICIAN (MACOUPIN (BARR, GIRARD, NILWOOD, NORTH & SOUTH OTTER, NORTH & SOUTH PALMYRA AAND VIRDEN TWPS), AND MONTGOMERY (BOIS D' ARC, HARVEL AND PITMAN TWPS) COUNTIES) | $39.80 | $23.08 | $62.88 | Agreement |
| ELEC0193-011 · Electrical Workers (IBEW) agreement, January 1, 2025 | ||||
LINE CONSTRUCTION: GROUNDMAN…Full textLINE CONSTRUCTION: GROUNDMAN (CLASS A) (MACOUPIN (TOWNSHIPS OF SCOTTVILLE, NORTH PALMYRA, NORTH OTTER, VIRDEN, GIRARD, BARR, SOUTH PALMYRA, SOUTH OTTER, AND NILWOOD) AND MONTGOMERY (TOWNSHIPS OF BOIS D'ARC, PITMAN, AND HARVEL) COUNTIES) | $38.38 | $18.82 | $57.20 | Agreement |
LINE CONSTRUCTION: GROUNDMAN - EQUIPMENT OPERATOR…Full textLINE CONSTRUCTION: GROUNDMAN - EQUIPMENT OPERATOR (CLASS I, ALL CRAWLER TYPE EQUIPMENT LARGER THAN D-4, 15 TON CRANE OR LARGER) (MACOUPIN (TOWNSHIPS OF SCOTTVILLE, NORTH PALMYRA, NORTH OTTER, VIRDEN, GIRARD, BARR, SOUTH PALMYRA, SOUTH OTTER, AND NILWOOD) AND MONTGOMERY (TOWNSHIPS OF BOIS D'ARC, PITMAN, AND HARVEL) COUNTIES) | $56.61 | $24.20 | $80.81 | Agreement |
LINE CONSTRUCTION: GROUNDMAN - TRUCK DRIVER…Full textLINE CONSTRUCTION: GROUNDMAN - TRUCK DRIVER (WITH WINCH, MAY OPERATE DIGGERS, 5TH WHEEL TYPE TRUCKS, CRAWLER-TYPE EQUIPMENT, D-4 AND SMALLER, BACKHOE 3/4 YARD AND UNDER, RUBBER TIRE AND CRAWLER W/END LOADER, AND MAY DRIVE BUCKET TRUCK AND LIVE BOOM TYPE LINE TRUCKS) (MACOUPIN (TOWNSHIPS OF SCOTTVILLE, NORTH PALMYRA, NORTH OTTER, VIRDEN, GIRARD, BARR, SOUTH PALMYRA, SOUTH OTTER, AND NILWOOD) AND MONTGOMERY (TOWNSHIPS OF BOIS D'ARC, PITMAN, AND HARVEL) COUNTIES) | $42.85 | $20.14 | $62.99 | Agreement |
LINE CONSTRUCTION: GROUNDMAN - TRUCK DRIVER…Full textLINE CONSTRUCTION: GROUNDMAN - TRUCK DRIVER (WITHOUT WINCH) (MACOUPIN (TOWNSHIPS OF SCOTTVILLE, NORTH PALMYRA, NORTH OTTER, VIRDEN, GIRARD, BARR, SOUTH PALMYRA, SOUTH OTTER, AND NILWOOD) AND MONTGOMERY (TOWNSHIPS OF BOIS D'ARC, PITMAN, AND HARVEL) COUNTIES) | $40.36 | $19.41 | $59.77 | Agreement |
LINE CONSTRUCTION: LINEMAN & SUBSTATION TECH…Full textLINE CONSTRUCTION: LINEMAN & SUBSTATION TECH (MACOUPIN (TOWNSHIPS OF SCOTTVILLE, NORTH PALMYRA, NORTH OTTER, VIRDEN, GIRARD, BARR, SOUTH PALMYRA, SOUTH OTTER, AND NILWOOD) AND MONTGOMERY (TOWNSHIPS OF BOIS D'ARC, PITMAN, AND HARVEL) COUNTIES) | $62.90 | $26.06 | $88.96 | Agreement |
| ELEC0309-002 · Electrical Workers (IBEW) agreement, January 6, 2025 | ||||
LINE CONSTRUCTION: GROUNDMAN…Full textLINE CONSTRUCTION: GROUNDMAN (BOND (WESTSIDE), CLINTON, GREENE (ALL WORK PERFORMED ON THE ILLINOIS POWER COMPANY PROPERTY), JERSEY (ALL WORK PERFORMED ON THE ILLINOIS POWER COMPANY PROPERTY), MACOUPIN (EXCEPT NORTH 1/3 & SOUTHWEST CORNER), MADISON (EXCEPT EAST ALTON, ALTON, WOOD RIVER & HARTFORD), MONROE, MONTGOMERY (EAST OF ROUNDTREE, IRVING & EAST FORK TWP.), RANDOLPH (PORTION OF RED BUD TOWNSHIP), ST. CLAIR, AND WASHINGTON (OKAWVILLE & VENEDY TWPS.) COUNTIES) | $42.10 | $18.84 | $60.94 | Agreement |
LINE CONSTRUCTION: GROUNDMAN EQUIPMENT OPERATOR…Full textLINE CONSTRUCTION: GROUNDMAN EQUIPMENT OPERATOR (BOND (WESTSIDE), CLINTON, GREENE (ALL WORK PERFORMED ON THE ILLINOIS POWER COMPANY PROPERTY), JERSEY (ALL WORK PERFORMED ON THE ILLINOIS POWER COMPANY PROPERTY), MACOUPIN (EXCEPT NORTH 1/3 & SOUTHWEST CORNER), MADISON (EXCEPT EAST ALTON, ALTON, WOOD RIVER & HARTFORD), MONROE, MONTGOMERY (EAST OF ROUNDTREE, IRVING & EAST FORK TWP.), RANDOLPH (PORTION OF RED BUD TOWNSHIP), ST. CLAIR, AND WASHINGTON (OKAWVILLE & VENEDY TWPS.) COUNT | $56.38 | $25.23 | $81.61 | Agreement |
LINE CONSTRUCTION: GROUNDMAN TRUCK DRIVER…Full textLINE CONSTRUCTION: GROUNDMAN TRUCK DRIVER (BOND (WESTSIDE), CLINTON, GREENE (ALL WORK PERFORMED ON THE ILLINOIS POWER COMPANY PROPERTY), JERSEY (ALL WORK PERFORMED ON THE ILLINOIS POWER COMPANY PROPERTY), MACOUPIN (EXCEPT NORTH 1/3 & SOUTHWEST CORNER), MADISON (EXCEPT EAST ALTON, ALTON, WOOD RIVER & HARTFORD), MONROE, MONTGOMERY (EAST OF ROUNDTREE, IRVING & EAST FORK TWP.), RANDOLPH (PORTION OF RED BUD TOWNSHIP), ST. CLAIR, AND WASHINGTON (OKAWVILLE & VENEDY TWPS.) COUNTIES) | $46.03 | $20.60 | $66.63 | Agreement |
LINE CONSTRUCTION: LINEMAN…Full textLINE CONSTRUCTION: LINEMAN (BOND (WESTSIDE), CLINTON, GREENE (ALL WORK PERFORMED ON THE ILLINOIS POWER COMPANY PROPERTY), JERSEY (ALL WORK PERFORMED ON THE ILLINOIS POWER COMPANY PROPERTY), MACOUPIN (EXCEPT NORTH 1/3 & SOUTHWEST CORNER), MADISON (EXCEPT EAST ALTON, ALTON, WOOD RIVER & HARTFORD), MONROE, MONTGOMERY (EAST OF ROUNDTREE, IRVING & EAST FORK TWP.), RANDOLPH (PORTION OF RED BUD TOWNSHIP), ST. CLAIR, AND WASHINGTON (OKAWVILLE & VENEDY TWPS.) COUNTIES) | $64.83 | $29.01 | $93.84 | Agreement |
| ELEC0309-003 · Electrical Workers (IBEW) agreement, September 1, 2025 | ||||
ELECTRICIAN (BOND (WESTERN HALF)…Full textELECTRICIAN (BOND (WESTERN HALF), CLINTON (EXCLUDES HUEY, HOFFMAN, & VIC.), MACOUPIN (EXCLUDES BRIGHTON TWP., ATHENVILLE, SCOTTVILLE, GIRARD & AREA N. THEREOF), MADISON (EXCLUDES ALTON, E. ALTON, HARTFORD & WOOD RIVER), MONROE, MONTGOMERY (WEST OF BUTLER GROVE, GRISHAM, HILLSBOROUGH & RAYMOND TWPS), ST. CLAIR AND WASHINGTON (VENEDY TWP) COUNTIES) | $52.41 | $30.27 | $82.68 | Agreement |
| ELEC0649-002 · Electrical Workers (IBEW) agreement, January 5, 2026 | ||||
LINE CONSTRUCTION: BLASTER…Full textLINE CONSTRUCTION: BLASTER (CALHOUN, GREENE, JERSEY, MACOUPIN (SOUTHWEST CORNER), AND MADISON (E. ALTON, ALTON, WOOD RIVER & HARTFORD) COUNTIES) | $66.70 | $30.84 | $97.54 | Agreement |
LINE CONSTRUCTION: EQUIPMENT OPERATOR…Full textLINE CONSTRUCTION: EQUIPMENT OPERATOR (CALHOUN, GREENE, JERSEY, MACOUPIN (SOUTHWEST CORNER), AND MADISON (E. ALTON, ALTON, WOOD RIVER & HARTFORD) COUNTIES) | $57.12 | $28.06 | $85.18 | Agreement |
LINE CONSTRUCTION: GROUNDMAN…Full textLINE CONSTRUCTION: GROUNDMAN (CALHOUN, GREENE, JERSEY, MACOUPIN (SOUTHWEST CORNER), AND MADISON (E. ALTON, ALTON, WOOD RIVER & HARTFORD) COUNTIES) | $36.67 | $22.13 | $58.80 | Agreement |
LINE CONSTRUCTION: GROUNDMAN - TRUCK DRIVER W/WINCH…Full textLINE CONSTRUCTION: GROUNDMAN - TRUCK DRIVER W/WINCH (CALHOUN, GREENE, JERSEY, MACOUPIN (SOUTHWEST CORNER), AND MADISON (E. ALTON, ALTON, WOOD RIVER & HARTFORD) COUNTIES) | $42.66 | $23.87 | $66.53 | Agreement |
LINE CONSTRUCTION: GROUNDMAN - TRUCK DRIVER WO/WINCH…Full textLINE CONSTRUCTION: GROUNDMAN - TRUCK DRIVER WO/WINCH (CALHOUN, GREENE, JERSEY, MACOUPIN (SOUTHWEST CORNER), AND MADISON (E. ALTON, ALTON, WOOD RIVER & HARTFORD) COUNTIES) | $37.67 | $22.42 | $60.09 | Agreement |
LINE CONSTRUCTION: LINEMAN…Full textLINE CONSTRUCTION: LINEMAN; AND LINEMAN HOLE BORING MACHINE OPERATOR (CALHOUN, GREENE, JERSEY, MACOUPIN (SOUTHWEST CORNER), AND MADISON (E. ALTON, ALTON, WOOD RIVER & HARTFORD) COUNTIES) | $66.70 | $30.84 | $97.54 | Agreement |
| ELEC0649-008 · Electrical Workers (IBEW) agreement, December 28, 2025 | ||||
ELECTRICIAN (CALHOUN…Full textELECTRICIAN (CALHOUN, GREEN, JERSEY, MACOUPIN (SOUTHWEST CORNER), AND MADISON (ALTON, E. ALTON, HARTFORD & WOOD RIVER) COUNTIES) | $54.53 | $29.46 | $83.99 | Agreement |
| ELEC0702-002 · Electrical Workers (IBEW) agreement, January 6, 2025 | ||||
LINE CONSTRUCTION: GROUNDMAN - CLASS A…Full textLINE CONSTRUCTION: GROUNDMAN - CLASS A (ALEXANDER, CLAY, CRAWFORD, EDWARDS, EFFINGHAM, FRANKLIN, FAYETTE (EXCLUDES PORTION NORTH AVENA), GALLATIN, HAMILTON, HARDIN, JACKSON, JASPER, JEFFERSON, JOHNSON, LAWRENCE, MARION, MASSAC, PERRY, POPE, PULASKI, RANDOLPH (EXCEPT RED BUD TWPS), RICHLAND, SALINE, UNION, WABASH, WAYNE, WHITE, AND WILLIAMSON COUNTIES; CLARK, COLES (SOUTHERN HALF), CUMBERLAND, MOULTRIE (WHITLEY TWP), AND SHELBY (EXCEPT WEST OF HOLLAND, PRAIRIE, RICHLAND, & WINDSOR TWPS) COU | $38.18 | $19.92 | $58.10 | Agreement |
LINE CONSTRUCTION: GROUNDMAN - EQUIPMENT OPERATOR CLASS II…Full textLINE CONSTRUCTION: GROUNDMAN - EQUIPMENT OPERATOR CLASS II (ALL OTHER EQUIPMENT) (ALEXANDER, CLAY, CRAWFORD, EDWARDS, EFFINGHAM, FRANKLIN, FAYETTE (EXCLUDES PORTION NORTH AVENA), GALLATIN, HAMILTON, HARDIN, JACKSON, JASPER, JEFFERSON, JOHNSON, LAWRENCE, MARION, MASSAC, PERRY, POPE, PULASKI, RANDOLPH (EXCEPT RED BUD TWPS), RICHLAND, SALINE, UNION, WABASH, WAYNE, WHITE, AND WILLIAMSON COUNTIES; CLARK, COLES (SOUTHERN HALF), CUMBERLAND, MOULTRIE (WHITLEY TWP), AND SHELBY (EXCEPT WEST OF HOLLAND, | $46.49 | $22.33 | $68.82 | Agreement |
LINE CONSTRUCTION: HEAVY - EQUIPMENT OPERATOR CLASS I…Full textLINE CONSTRUCTION: HEAVY - EQUIPMENT OPERATOR CLASS I (ALL CRAWLER TYPE EQUIPMENT D-4 AND LARGER) (ALEXANDER, CLAY, CRAWFORD, EDWARDS, EFFINGHAM, FRANKLIN, FAYETTE (EXCLUDES PORTION NORTH AVENA), GALLATIN, HAMILTON, HARDIN, JACKSON, JASPER, JEFFERSON, JOHNSON, LAWRENCE, MARION, MASSAC, PERRY, POPE, PULASKI, RANDOLPH (EXCEPT RED BUD TWPS), RICHLAND, SALINE, UNION, WABASH, WAYNE, WHITE, AND WILLIAMSON COUNTIES; CLARK, COLES (SOUTHERN HALF), CUMBERLAND, MOULTRIE (WHITLEY TWP), AND SHELBY (EXCEPT | $52.13 | $23.97 | $76.10 | Agreement |
| ELEC0702-017 · Electrical Workers (IBEW) agreement, January 1, 2025 | ||||
ELECTRICIAN (BOND (EASTERN HALF)…Full textELECTRICIAN (BOND (EASTERN HALF), CLINTON (HUEY, HOFFMAN, & VICINITY), AND WASHINGTON (EXCEPT VENEDY TWP) COUNTIES) | $52.14 | $29.14 | $81.28 | Agreement |
| ENGI0520-005 · Operating Engineers agreement, August 1, 2022 | ||||
POWER EQUIPMENT OPERATOR GROUP 10…Full textPOWER EQUIPMENT OPERATOR GROUP 10 CERTIFIED CRANE OPERATORS 17.5 TONS AND ABOVE, WHEN REQUESTED BY THE CONTRACTOR OR REQUIRED BY THE OWNER | $46.75 | $34.95 | $81.70 | Agreement |
| POWER EQUIPMENT OPERATOR GROUP 11 MASTER MECHANIC | $44.45 | $34.95 | $79.40 | Agreement |
| POWER EQUIPMENT OPERATOR GROUP 12 LICENSED BOAT PILOT | $45.45 | $34.95 | $80.40 | Agreement |
POWER EQUIPMENT OPERATOR…Full textPOWER EQUIPMENT OPERATOR, INCLUDING BUILDING CONSTRUCTION ON HEAVY INDUSTRIAL SITES & HEAVY CONSTRUCTION EXCEPT DREDGING AND RIVER WORK: GROUP 11 MASTER MECHANIC | $44.45 | $34.95 | $79.40 | Agreement |
POWER EQUIPMENT OPERATOR…Full textPOWER EQUIPMENT OPERATOR, INCLUDING BUILDING CONSTRUCTION ON HEAVY INDUSTRIAL SITES & HEAVY CONSTRUCTION EXCEPT DREDGING AND RIVER WORK: GROUP 12 LICENSED BOAT PILOT | $45.45 | $34.95 | $80.40 | Agreement |
POWER EQUIPMENT OPERATOR: GROUP 01…Full textPOWER EQUIPMENT OPERATOR: GROUP 01 CRANES, DRAGLINES, SHOVELS, SKIMMER SCOOPS, CLAMSHELLS OR DERRICK BOATS, PILE DRIVERS, CRANE-TYPE BACKHOES, ASPHALT PLANT OPERATORS, CONCRETE PLANT OPERATORS, DREDGES, ASPHALT SPREADING MACHINES, SCREWS ON ASPHALT SPREADING MACHINES, ALL LOCOMOTIVES, CABLE WAYS OR TOWER MACHINES, HOISTS, HYDRAULIC BACKHOES, DITCHING MACHINES, OR BACKFILLER, CHERRYPICKERS, OVERHEAD CRANES, ROLLER, STEAM OR GAS, CONCRETE PAVERS, EXCAVATOR CONCRETE BREAKERS, CONCRETE PUMPS, BULK CEMENT PLANTS, CEMENT PUMPS, DERRICKTYPE DRILLS, BOAT OPERATORS, MOTOR GRADERS OR PUSHCATS, SCOOPS OR TOUMAPULLS, BULLDOZERS, ENDLOADERS OR FORK LIFTS, POWER BLADE OR ELEVATING GRADERS, WINCH CATS, BOOM OR WINCH TRUCKS OR BOOM TRACTORS, PIPE WRAPPING OR PAINTING MACHINES, ASPHALT PLANT ENGINEER, JOURNEYMAN LUBRICATING ENGINEER, DRILLS (OTHER THAN DERRICK TYPE), MUD JACKS, OR WELL DRILLING MACHINES, BORING MACHINES OR TRACK JACKS, MIXERS, CONVEYORS (TWO), AIR COMPRESSORS (TWO) WATER PUMPS, REGARDLESS OF SIZE (TWO), WELDING MACHINES (TWO), SIPHONS OR JETS (TWO), WINCH HEAD OR APPARATUSES (TWO), LIGHT PLANTS (TWO), WATERBLASTERS (TWO), ALL TRACTORS, REGARDLESS OF SIZE (STRAIGHT TRACTOR ONLY), FIREMAN ON STATIONARY BOILERS, AUTOMATIC ELEVATORS, FORM GRADING MACHINES, FINISHING MACHINES, POWER SUB-GRADER OR RIBBON MACHINES, LONGITUDINAL FLOATS, DISTRIBUTOR OPERATORS ON TRUCKS, WINCH HEADS OR APPARATUSES (ONE), MOBIL TRACK AIR AND HEATERS (TWO TO FIVE), HEAVY EQUIPMENT GREASER, RELIEF OPERATOR, ASSISTANT MASTER MECHANIC AND HEAVY DUTY MECHANIC, CONCRETE SAWS OF ALL TYPES AND SIZES WITH THEIR ATTACHMENTS, GOBHOPPERS, EXCAVATORS ALL SIZES, THE REPAIR, GREASING, AND FUELING OF ALL DIESEL HAMMERS, THE OPERATION, SET-UP AND CLEANING OFBIDWELLS, CONCRETE PLACEMENT BOOMS, THE ALTERATIONS, REPAIR OF ALL BARGES, WATER BLASTERS OF ALL SIZES AND THEIR CLUTCHES, MOBILE LIFTS, HYDRAULIC JACKS WHERE USED FOR HOISTING, DIESEL OR GAS POWERED FLASHING SINGS USED FOR TRAFFIC CONTROL, MICRO PAVERS, LOG SKIDERS, ICEOLATORS USED ON AND OFF OF PIPELINE, CONDOR CRANES, DRILL RIGS OF ALL SIZES, BOW BOATS, SURVEY BOATS, ROSS CARRIERS, BOB-CATS AND ALL THEIR ATTACHMENTS, SKID STEER LOADERS AND ALL THEIR ATTACHMENTS, CRETER CRANE, DIRECT DRIVE ELECTRIC MOTORS THE BOLTING AND UNBOLTING THE ADJUSTING AND SHIMMING, (DEWATERINGJOBS, WHIRLEY CRANE, CONVEYOR BELTS) ETC., BATCH PLANTS (ALL SIZES), ROTO MILLS, CONVEYORS SYSTEMS OF ANY SIZE AND ANY CONFIGURATION, HYDROSEEDERS AND STRAWBLOWERS ALL SIZES, OPERATION, REPAIR, SERVICE OF ALL VIBRATORY HAMMERS, ALL POWER PACS AND THEIR CONTROLS REGARDLESS OF LOCATION, CURTAINS OR BRUSH BURNING MACHINES, STUMP CUTTER MACHINES, GROUT MACHINES REGARDLESS OF SIZE, NAIL LAUNCHERS WHEN MOUNTED ON A MACHINE OR SELF-PROPELLED, CON-COVER MACHINES, GOLDHOFER AND SIMILAR S.P.M.T. (SELF-PROPELLED MODULAR TRANSPMIERS) HEAVY TRANSPORT UNITS AND ALL OPERATORS (EXCEPT THOSE LISTED BELOW) | $42.45 | $34.95 | $77.40 | Agreement |
POWER EQUIPMENT OPERATOR: GROUP 01…Full textPOWER EQUIPMENT OPERATOR: GROUP 01 CRANES, DRAGLINES, SHOVELS, SKIMMER SCOOPS, CLAMSHELLS OR DERRICK BOATS, PILE DRIVERS, CRANE-TYPE BACKHOES, ASPHALT PLANT OPERATORS, CONCRETE PLANT OPERATORS, DREDGES, ASPHALT SPREADING MACHINES, SCREWS ON ASPHALT SPREADING MACHINES, ALL LOCOMOTIVES, CABLE WAYS OR TOWER MACHINES, HOISTS, HYDRAULIC BACKHOES, DITCHING MACHINES, OR BACKFILLER, CHERRYPICKERS, OVERHEAD CRANES, ROLLER, STEAM OR GAS, CONCRETE PAVERS, EXCAVATOR CONCRETE BREAKERS, CONCRETE PUMPS, BULK CEMENT PLANTS, CEMENT PUMPS, DERRICK-TYPE DRILLS, BOAT OPERATORS, MOTOR GRADERS OR PUSHCATS, SCOOPS OR TOURNAPULLS, BULLDOZERS, ENDLOADERS OR FORK LIFTS, POWER BLADE OR ELEVATING GRADERS, WINCH CATS, BOOM OR WINCH TRUCKS OR BOOM TRACTORS, PIPE WRAPPING OR PAINTING MACHINES, ASPHALT PLANT ENGINEER, JOURNEYMAN LUBRICATING ENGINEER, DRILLS (OTHER THAN DERRICK TYPE), MUD JACKS, OR WELL DRILLING MACHINES, BORING MACHINES OR TRACK JACKS, MIXERS, CONVEYORS (TWO), AIR COMPRESSORS (TWO) WATER PUMPS, REGARDLESS OF SIZE (TWO), WELDING MACHINES (TWO), SIPHONS OR JETS (TWO), WINCH HEAD OR APPARATUSES (TWO), LIGHT PLANTS (TWO), WATERBLASTERS (TWO), ALL TRACTORS, REGARDLESS OF SIZE (STRAIGHT TRACTOR ONLY), FIREMAN ON STATIONARY BOILERS, AUTOMATIC ELEVATORS, FORM GRADING MACHINES, FINISHING MACHINES, POWER SUB-GRADER OR RIBBON MACHINES, LONGITUDINAL FLOATS, DISTRIBUTOR OPERATORS ON TRUCKS, WINCH HEADS OR APPARATUSES (ONE), MOBIL TRACK AIR AND HEATERS (TWO TO FIVE), HEAVY EQUIPMENT GREASER, RELIEF OPERATOR, ASSISTANT MASTER MECHANIC AND HEAVY DUTY MECHANIC, CONCRETE SAWS OF ALL TYPES AND SIZES WITH THEIR ATTACHMENTS, GOB-HOPPERS, EXCAVATORS ALL SIZES, THE REPAIR, GREASING, AND FUELING OF ALL DIESEL HAMMERS, THE OPERATION, SET-UP AND CLEANING OF BIDWELLS, CONCRETE PLACEMENT BOOMS, THE ALTERATIONS, REPAIR OF ALL BARGES, WATER BLASTERS OF ALL SIZES AND THEIR CLUTCHES, MOBILE LIFTS, HYDRAULIC JACKS WHERE USED FOR HOISTING, DIESEL OR GAS POWERED FLASHING SIGNS USED FOR TRAFFIC CONTROL, MICRO PAVERS, LOG SKIDERS, ICEOLATORS USED ON AND OFF OF PIPELINE, CONDOR CRANES, DRILL RIGS OF ALL SIZES, BOW BOATS, SURVEY BOATS, ROSS CARRIERS, BOB-CATS AND ALL THEIR ATTACHMENTS, SKID STEER LOADERS AND ALL THEIR ATTACHMENTS, CRETER CRANE, DIRECT DRIVE ELECTRIC MOTORS THE BOLTING AND UNBOLTING THE ADJUSTING AND SHIMMING, (DEWATERINGJOBS, WHIRLEY CRANE, CONVEYOR BELTS) ETC., BATCH PLANTS (ALL SIZES), ROTO MILLS, CONVEYORS SYSTEMS OF ANY SIZE AND ANY CONFIGURATION, HYDROSEEDERS AND STRAW-BLOWERS ALL SIZES, OPERATION, REPAIR, SERVICE OF ALL VIBRATORY HAMMERS, ALL POWER PACS AND THEIR CONTROLS REGARDLESS OF LOCATION, CURTAINS OR BRUSH BURNING MACHINES, STUMP CUTTER MACHINES, GROUT MACHINES REGARDLESS OF SIZE, NAIL LAUNCHERS WHEN MOUNTED ON A MACHINE OR SELF-PROPELLED, CON-COVER MACHINES, GOLDHOFER AND SIMILAR S.P.M.T. (SELF-PROPELLED MODULAR TRANSPORTERS) HEAVY TRANSPORT UNITS AND ALL OPERATORS (EXCEPT THOSE LISTED BELOW). INCLUDING BUILDING CONSTRUCTION ON HEAVY INDUSTRIAL SITES & HEAVY CONSTRUCTION EXCEPT DREDGING AND RIVER WORK | $42.45 | $34.95 | $77.40 | Agreement |
| POWER EQUIPMENT OPERATOR: GROUP 02 ASSISTANT OPERATORS | $41.32 | $34.95 | $76.27 | Agreement |
POWER EQUIPMENT OPERATOR: GROUP 02…Full textPOWER EQUIPMENT OPERATOR: GROUP 02 ASSISTANT OPERATORS INCLUDING BUILDING CONSTRUCTION ON HEAVY INDUSTRIAL SITES & HEAVY CONSTRUCTION EXCEPT DREDGING AND RIVER WORK | $41.32 | $34.95 | $76.27 | Agreement |
POWER EQUIPMENT OPERATOR: GROUP 03…Full textPOWER EQUIPMENT OPERATOR: GROUP 03 AIR COMPRESSOR ONE; WATER PUMP REGARDLESS OF SIZE ONE; WELDING MACHINE ONE; 1-BAG MIXER ONE; CONVEYOR ONE; SIPHON OR JET; LIGHT PLANT ONE; HEATER ONE; IMMOBILE TRACK AIR ONE | $36.84 | $34.95 | $71.79 | Agreement |
POWER EQUIPMENT OPERATOR: GROUP 03…Full textPOWER EQUIPMENT OPERATOR: GROUP 03 AIR COMPRESSORS (ONE), WATER PUMPS, REGARDLESS OF SIZE (ONE), WATER-BLASTERS (ONE), WELDING MACHINE (ONE), MIXERS (ONE BAG), CONVEYOR (ONE), SIPHON OR JET (ONE), LIGHT PLANT (ONE), HEATER (ONE), IMMOBILE TRACK AIR (ONE), AND SELF-PROPELLED WALK BEHIND ROLLERS. INCLUDING BUILDING CONSTRUCTION ON HEAVY INDUSTRIAL SITES & HEAVY CONSTRUCTION EXCEPT DREDGING AND RIVER WORK | $36.84 | $34.95 | $71.79 | Agreement |
POWER EQUIPMENT OPERATOR: GROUP 04…Full textPOWER EQUIPMENT OPERATOR: GROUP 04 FIREMAN ON WHIRLIES AND HEAVY EQUIPMENT OILERS, TRUCK CRANES, DREDGES, MONIGANS, LARGE CRANES - (OVER 65-TON RATED CAPACITY) CONCRETE PLANT OILER, BLACKTOP PLANT OILER AND CRETER CRANE OILER (WHEN REQUIRED), BARGE TENDERS, OILERS ON DRILL RIGS USED FOR CAISSON OR FOR PILE DRIVING. INCLUDING BUILDING CONSTRUCTION ON HEAVY INDUSTRIAL SITES & HEAVY CONSTRUCTION EXCEPT DREDGING AND RIVER WORK | $43.45 | $34.95 | $78.40 | Agreement |
POWER EQUIPMENT OPERATOR: GROUP 04…Full textPOWER EQUIPMENT OPERATOR: GROUP 04 FIREMEN ON WHIRLIES AND ASPHALT SPREADER OILER; HEAVY EQUIPMENT OILERS; TRUCK CRANES; MONIGANS; LARGE OVER 65 TONS CAPACITY; CONCRETE PLANT OILER AND BLACK TOP PLANT OILER | $43.45 | $34.95 | $78.40 | Agreement |
| POWER EQUIPMENT OPERATOR: GROUP 05 OILERS | $44.45 | $34.95 | $79.40 | Agreement |
POWER EQUIPMENT OPERATOR: GROUP 05…Full textPOWER EQUIPMENT OPERATOR: GROUP 05 OILERS INCLUDING BUILDING CONSTRUCTION ON HEAVY INDUSTRIAL SITES & HEAVY CONSTRUCTION EXCEPT DREDGING AND RIVER WORK | $44.45 | $34.95 | $79.40 | Agreement |
POWER EQUIPMENT OPERATOR: GROUP 06…Full textPOWER EQUIPMENT OPERATOR: GROUP 06 OPERATORS ON EQUIPMENT WITH BOOMS, INCLUDING JIBS, 100 FT AND OVER, BUT LESS THAN 150 FT | $45.00 | $34.95 | $79.95 | Agreement |
POWER EQUIPMENT OPERATOR: GROUP 06…Full textPOWER EQUIPMENT OPERATOR: GROUP 06 OPERATORS ON EQUIPMENT WITH BOOMS, INCLUDING JIBS, 100 FT AND OVER, BUT LESS THAN 150 FT INCLUDING BUILDING CONSTRUCTION ON HEAVY INDUSTRIAL SITES & HEAVY CONSTRUCTION EXCEPT DREDGING AND RIVER WORK | $45.00 | $34.95 | $79.95 | Agreement |
POWER EQUIPMENT OPERATOR: GROUP 07…Full textPOWER EQUIPMENT OPERATOR: GROUP 07 OPERATORS ON EQUIPMENT WITH BOOMS, INCLUDING JIBS, 150 FT AND OVER, BUT LESS THAN 200 FT | $45.30 | $34.95 | $80.25 | Agreement |
POWER EQUIPMENT OPERATOR: GROUP 08…Full textPOWER EQUIPMENT OPERATOR: GROUP 08 OPERATORS ON EQUIPMENT WITH BOOMNS, INCLUDING JIBS, 200 FT AND OVER; TOWER CRANES, AND WHIRLEY CRANES | $45.60 | $34.95 | $80.55 | Agreement |
POWER EQUIPMENT OPERATOR: GROUP 09…Full textPOWER EQUIPMENT OPERATOR: GROUP 09 CERTIFIED CRANE OPERATORS, BELOW 17.5 TONS, WHEN REQUESTED BY THE CONTRACTOR OR REQUIRED BY THE OWNER INCLUDING BUILDING CONSTRUCTION ON HEAVY INDUSTRIAL SITES & HEAVY CONSTRUCTION EXCEPT DREDGING AND RIVER WORK | $46.25 | $34.95 | $81.20 | Agreement |
POWER EQUIPMENT OPERATOR: GROUP 09…Full textPOWER EQUIPMENT OPERATOR: GROUP 09 CERTIFIED CRANE OPERATORS, BELOW 17.5 TONS, WHEN REQUESTED BY THE CONTRACTOR OR REQUIRED BY THE OWNER | $46.25 | $34.95 | $81.20 | Agreement |
| ENGI0520-012 · Operating Engineers agreement, August 1, 2025 | ||||
POWER EQUIPMENT OPERATOR GROUP 01…Full textPOWER EQUIPMENT OPERATOR GROUP 01 (INCLUDING BUILDING CONSTRUCTION ON HEAVY INDUSTRIAL SITES & HEAVY CONSTRUCTION EXCEPT DREDGING AND RIVER WORK) | $47.20 | $39.10 | $86.30 | Agreement |
POWER EQUIPMENT OPERATOR GROUP 02…Full textPOWER EQUIPMENT OPERATOR GROUP 02 (INCLUDING BUILDING CONSTRUCTION ON HEAVY INDUSTRIAL SITES & HEAVY CONSTRUCTION EXCEPT DREDGING AND RIVER WORK) | $46.07 | $39.10 | $85.17 | Agreement |
POWER EQUIPMENT OPERATOR GROUP 03…Full textPOWER EQUIPMENT OPERATOR GROUP 03 (INCLUDING BUILDING CONSTRUCTION ON HEAVY INDUSTRIAL SITES & HEAVY CONSTRUCTION EXCEPT DREDGING AND RIVER WORK) | $41.59 | $39.10 | $80.69 | Agreement |
POWER EQUIPMENT OPERATOR GROUP 04…Full textPOWER EQUIPMENT OPERATOR GROUP 04 (INCLUDING BUILDING CONSTRUCTION ON HEAVY INDUSTRIAL SITES & HEAVY CONSTRUCTION EXCEPT DREDGING AND RIVER WORK) | $41.65 | $39.10 | $80.75 | Agreement |
POWER EQUIPMENT OPERATOR GROUP 05…Full textPOWER EQUIPMENT OPERATOR GROUP 05 (INCLUDING BUILDING CONSTRUCTION ON HEAVY INDUSTRIAL SITES & HEAVY CONSTRUCTION EXCEPT DREDGING AND RIVER WORK) | $41.65 | $39.10 | $80.75 | Agreement |
POWER EQUIPMENT OPERATOR GROUP 06…Full textPOWER EQUIPMENT OPERATOR GROUP 06 (INCLUDING BUILDING CONSTRUCTION ON HEAVY INDUSTRIAL SITES & HEAVY CONSTRUCTION EXCEPT DREDGING AND RIVER WORK) | $49.75 | $39.10 | $88.85 | Agreement |
POWER EQUIPMENT OPERATOR GROUP 09…Full textPOWER EQUIPMENT OPERATOR GROUP 09 (INCLUDING BUILDING CONSTRUCTION ON HEAVY INDUSTRIAL SITES & HEAVY CONSTRUCTION EXCEPT DREDGING AND RIVER WORK) | $48.20 | $39.10 | $87.30 | Agreement |
POWER EQUIPMENT OPERATOR GROUP 11…Full textPOWER EQUIPMENT OPERATOR GROUP 11 (INCLUDING BUILDING CONSTRUCTION ON HEAVY INDUSTRIAL SITES & HEAVY CONSTRUCTION EXCEPT DREDGING AND RIVER WORK) | $49.20 | $39.10 | $88.30 | Agreement |
POWER EQUIPMENT OPERATOR GROUP 12…Full textPOWER EQUIPMENT OPERATOR GROUP 12 (INCLUDING BUILDING CONSTRUCTION ON HEAVY INDUSTRIAL SITES & HEAVY CONSTRUCTION EXCEPT DREDGING AND RIVER WORK) | $50.20 | $39.10 | $89.30 | Agreement |
| IRON0046-006 · Ironworkers agreement, May 1, 2024 | ||||
IRONWORKER (GREENE…Full textIRONWORKER (GREENE (NORTHERN HALF), MACOUPIN (NORTH OF SUMMERVILLE), AND MONTGOMERY (NORTH OF LITCHFIELD & HILLSBORO) COUNTIES) | $37.60 | $32.94 | $70.54 | Agreement |
| IRON0392-003 · Ironworkers agreement, August 1, 2024 | ||||
IRONWORKER (BOND, CALHOUN…Full textIRONWORKER (BOND, CALHOUN, CLINTON, GREENE (SOUTHERN HALF), JERSEY, MACOUPIN (SUMMERVILLE & SOUTH THEREOF), MADISON, MONROE, MONTGOMERY (LITCHFIELD, HILLSBORO, & SOUTH THEREOF), ST. CLAIR, AND WASHINGTON COUNTIES) | $41.65 | $31.18 | $72.83 | Agreement |
| IRON0396-006 · Ironworkers agreement, August 6, 2025 | ||||
| IRONWORKER (BRIDGES, LOCKS, AND DAMS ON THE MISSISSIPPI RIVER) | $44.27 | $31.65 | $75.92 | Agreement |
| LABO0044-001 · Laborers agreement, August 1, 2024 | ||||
| LABORER GROUP 1 GENERAL LABORER (MADISON COUNTY (SOUTHWEST)) | $32.35 | $32.38 | $64.73 | Agreement |
LABORER GROUP 2…Full textLABORER GROUP 2 ASBESTOS ABATEMENT WORKER AND HAZARDOUS WASTE WORKER; LEAD BASE PAINT WORKER; MASON AND PLASTERER TENDER (MADISON COUNTY (SOUTHWEST)) | $32.85 | $32.38 | $65.23 | Agreement |
| LABORER GROUP 3 DYNAMITE MAN AND POWDER MAN (MADISON COUNTY (SOUTHWEST)) | $33.85 | $32.38 | $66.23 | Agreement |
| LABO0044-002 · Laborers agreement, August 1, 2024 | ||||
| LABORER GROUP 1 GENERAL LABORERS. (MADISON COUNTY (GLEN CARBON)) | $32.35 | $32.38 | $64.73 | Agreement |
LABORER GROUP 2…Full textLABORER GROUP 2 BRICK MASON AND PLASTERER TENDERS; ASBESTOS ABATEMENT WORKER, HAZARDOUS WASTE WORKER (MADISON COUNTY (GLEN CARBON)) | $32.85 | $32.38 | $65.23 | Agreement |
| LABORER GROUP 3 DYNAMITE AND POWDER MEN. (MADISON COUNTY (GLEN CARBON)) | $33.85 | $32.38 | $66.23 | Agreement |
| LABO0100-001 · Laborers agreement, August 1, 2024 | ||||
LABORERS, GROUP 1…Full textLABORERS, GROUP 1 GENERAL LABORER (ST CLAIR COUNTY (EAST ST. LOUIS,ALCOA, BROOKLYN,CAHOKIA, CASEYVILLE,CENTREVILLE, DUPO, FAIRMONT CITY, FRENCH VILLAGE, MIDWAY, MAPLEWOOD, NATIONAL CITY)) | $35.38 | $29.35 | $64.73 | Agreement |
LABORERS, GROUP 2…Full textLABORERS, GROUP 2 ASBESTOS ABATEMENT WORKER AND HAZARDOUS WASTE WORKER; LEAD BASE PAINT WORKER, HOD CARRIER (ST CLAIR COUNTY (EAST ST. LOUIS,ALCOA, BROOKLYN,CAHOKIA, CASEYVILLE,CENTREVILLE, DUPO, FAIRMONT CITY, FRENCH VILLAGE, MIDWAY, MAPLEWOOD, NATIONAL CITY)) | $35.88 | $29.35 | $65.23 | Agreement |
LABORERS, GROUP 3…Full textLABORERS, GROUP 3 DYNAMITE MAN (ST CLAIR COUNTY (EAST ST. LOUIS,ALCOA, BROOKLYN,CAHOKIA, CASEYVILLE,CENTREVILLE, DUPO, FAIRMONT CITY, FRENCH VILLAGE, MIDWAY, MAPLEWOOD, NATIONAL CITY)) | $36.88 | $29.35 | $66.23 | Agreement |
| LABO0100-002 · Laborers agreement, August 1, 2024 | ||||
LABORERS, GROUP 1…Full textLABORERS, GROUP 1 GENERAL LABORER (ST CLAIR (O'FALLON, SCOTT AIR FORCE BASE, SHILOH, LEBANON & VINCINITY), CLINTON (TRENTON & VICINITY), AND MADISON (TROY) COUNTIES) | $35.38 | $29.35 | $64.73 | Agreement |
LABORERS, GROUP 2…Full textLABORERS, GROUP 2 ASBESTOS ABATEMENT WORKER AND HAZARDOUS WASTE WORKER; LEAD BASE PAINT WORKER (ST CLAIR (O'FALLON, SCOTT AIR FORCE BASE, SHILOH, LEBANON & VINCINITY), CLINTON (TRENTON & VICINITY), AND MADISON (TROY) COUNTIES) | $35.88 | $29.35 | $65.23 | Agreement |
LABORERS, GROUP 3…Full textLABORERS, GROUP 3 DYNAMITE MAN (ST CLAIR (O'FALLON, SCOTT AIR FORCE BASE, SHILOH, LEBANON & VINCINITY), CLINTON (TRENTON & VICINITY), AND MADISON (TROY) COUNTIES) | $36.88 | $29.35 | $66.23 | Agreement |
| LABO0100-005 · Laborers agreement, August 1, 2024 | ||||
| LABORER GROUP 1 GENERAL LABORERS. (MADISON COUNTY (ST. JACOB)) | $35.38 | $29.35 | $64.73 | Agreement |
| LABORER GROUP 2 BRICK MASON AND PLASTERER TENDERS. (MADISON COUNTY (ST. JACOB)) | $35.88 | $29.35 | $65.23 | Agreement |
| LABORER GROUP 3 DYNAMITE AND POWDER MEN. (MADISON COUNTY (ST. JACOB)) | $36.88 | $29.35 | $66.23 | Agreement |
| LABO0196-001 · Laborers agreement, August 1, 2024 | ||||
| LABORERS, GROUP 1 GENERAL LABORER (MONROE COUNTY) | $32.81 | $31.92 | $64.73 | Agreement |
LABORERS, GROUP 2…Full textLABORERS, GROUP 2 ASBESTOS ABATEMENT WORKER AND HAZARDOUS WASTE WORKER; LEAD BASE PAINT WORKER (MONROE COUNTY) | $33.31 | $31.92 | $65.23 | Agreement |
| LABORERS, GROUP 3 DYNAMITE MAN AND POWDER MAN (MONROE COUNTY) | $34.31 | $31.92 | $66.23 | Agreement |
| LABO0218-001 · Laborers agreement, August 1, 2022 | ||||
LABORERS, GROUP 1…Full textLABORERS, GROUP 1 GENERAL LABORER (BOND (GREENEVILLE), CALHOUN (HARDIN), GREENE (ROADHOUSE), JERSEY (JERSEYVILLE), AND MADISON (ALTON) COUNTIES) | $32.84 | $27.89 | $60.73 | Agreement |
LABORERS, GROUP 2ASBESTOS…Full textLABORERS, GROUP 2ASBESTOS ABATEMENT WORKER AND HAZARDOUS WASTE WORKER; LEAD BASE PAINT WORKER (BOND (GREENEVILLE), CALHOUN (HARDIN), GREENE (ROADHOUSE), JERSEY (JERSEYVILLE), AND MADISON (ALTON) COUNTIES) | $33.34 | $27.89 | $61.23 | Agreement |
LABORERS, GROUP 3…Full textLABORERS, GROUP 3 DYNAMITE MAN AND POWDER MAN (BOND (GREENEVILLE), CALHOUN (HARDIN), GREENE (ROADHOUSE), JERSEY (JERSEYVILLE), AND MADISON (ALTON) COUNTIES) | $34.34 | $27.89 | $62.23 | Agreement |
| LABO0218-004 · Laborers agreement, August 1, 2022 | ||||
| LABORER GROUP 1 GENERAL LABORERS. (JERSEY COUNTY (JERSEYVILLE)) | $32.84 | $27.89 | $60.73 | Agreement |
| LABORER GROUP 2 BRICK MASON AND PLASTERER TENDERS. (JERSEY COUNTY (JERSEYVILLE)) | $33.34 | $27.89 | $61.23 | Agreement |
| LABORER GROUP 3 DYNAMITE AND POWDER MEN. (JERSEY COUNTY (JERSEYVILLE)) | $34.34 | $27.89 | $62.23 | Agreement |
| LABO0218-005 · Laborers agreement, August 1, 2022 | ||||
| LABORER GROUP 1 GENERAL LABORERS. (GREENE COUNTY (ROADHOUSE)) | $32.84 | $27.89 | $60.73 | Agreement |
| LABORER GROUP 2 BRICK MASON AND PLASTERER TENDERS. (GREENE COUNTY (ROADHOUSE)) | $33.34 | $27.89 | $61.23 | Agreement |
| LABORER GROUP 3 DYNAMITE AND POWDER MEN. (GREENE COUNTY (ROADHOUSE)) | $34.34 | $27.89 | $62.23 | Agreement |
| LABO0218-006 · Laborers agreement, August 1, 2022 | ||||
| LABORER GROUP 1 GENERAL LABORERS. (CALHOUN COUNTY (HARDIN)) | $32.84 | $27.89 | $60.73 | Agreement |
| LABORER GROUP 2 BRICK MASON AND PLASTERER TENDERS. (CALHOUN COUNTY (HARDIN)) | $33.34 | $27.89 | $61.23 | Agreement |
| LABORER GROUP 3 DYNAMITE AND POWDER MEN. (CALHOUN COUNTY (HARDIN)) | $34.34 | $27.89 | $62.23 | Agreement |
| LABO0218-007 · Laborers agreement, August 1, 2022 | ||||
LABORER: GROUP 1…Full textLABORER: GROUP 1 :: CALHOUN COUNTY (Hardin) LABORERS CLASSIFICATIONS GROUP 1 - General Laborers. GROUP 2 - Brick Mason and Plasterer Tenders GROUP 3 - Dynamite and Powder Men | $32.84 | $27.89 | $60.73 | Agreement |
LABORER: GROUP 2…Full textLABORER: GROUP 2 :: CALHOUN COUNTY (Hardin) LABORERS CLASSIFICATIONS GROUP 1 - General Laborers. GROUP 2 - Brick Mason and Plasterer Tenders GROUP 3 - Dynamite and Powder Men | $33.34 | $27.89 | $61.23 | Agreement |
LABORER: GROUP 3…Full textLABORER: GROUP 3 :: CALHOUN COUNTY (Hardin) LABORERS CLASSIFICATIONS GROUP 1 - General Laborers. GROUP 2 - Brick Mason and Plasterer Tenders GROUP 3 - Dynamite and Powder Men | $34.34 | $27.89 | $62.23 | Agreement |
| LABO0338-002 · Laborers agreement, August 1, 2024 | ||||
| LABORERS, GROUP 1 GENERAL LABORER (MADISON COUNTY (WOOD RIVER)) | $34.14 | $30.59 | $64.73 | Agreement |
LABORERS, GROUP 2…Full textLABORERS, GROUP 2 ASBESTOS ABATEMENT WORKER AND HAZARDOUS WASTE WORKER; LEAD BASE PAINT WORKER (MADISON COUNTY (WOOD RIVER)) | $34.64 | $30.59 | $65.23 | Agreement |
| LABORERS, GROUP 3 DYNAMITE MAN AND POWDER MAN (MADISON COUNTY (WOOD RIVER)) | $35.64 | $30.59 | $66.23 | Agreement |
| LABO0397-001 · Laborers agreement, August 1, 2022 | ||||
| LABORERS, GROUP 1 GENERAL LABORER (MADISON COUNTY (SOUTHEAST)) | $33.43 | $27.30 | $60.73 | Agreement |
LABORERS, GROUP 2…Full textLABORERS, GROUP 2 ASBESTOS ABATEMENT WORKER AND HAZARDOUS WASTE WORKER; LEAD BASE PAINT WORKER (MADISON COUNTY (SOUTHEAST)) | $33.93 | $27.30 | $61.23 | Agreement |
| LABORERS, GROUP 3 DYNAMITE MAN (MADISON COUNTY (SOUTHEAST)) | $34.93 | $27.30 | $62.23 | Agreement |
| LABO0397-002 · Laborers agreement, August 1, 2022 | ||||
| LABORERS, GROUP 1 GENERAL LABORER (MADISON COUNTY (GRANITE CITY AND VICINITY)) | $33.58 | $27.30 | $60.88 | Agreement |
LABORERS, GROUP 2…Full textLABORERS, GROUP 2 ASBESTOS ABATEMENT WORKER AND HAZARDOUS WASTE WORKER; LEAD BASE PAINT WORKER (MADISON COUNTY (GRANITE CITY AND VICINITY)) | $34.08 | $27.30 | $61.38 | Agreement |
| LABORERS, GROUP 3 DYNAMITE MAN (MADISON COUNTY (GRANITE CITY AND VICINITY)) | $35.08 | $27.30 | $62.38 | Agreement |
| LABO0397-003 · Laborers agreement, August 1, 2022 | ||||
| LABORER GROUP 1 GENERAL LABORERS. (MADISON COUNTY (EDWARDSVILLE, MARINE, AND LIVINGSTON)) | $33.58 | $27.30 | $60.88 | Agreement |
LABORER GROUP 3…Full textLABORER GROUP 3 BRICK MASON AND PLASTERER TENDERS. (MADISON COUNTY (EDWARDSVILLE, MARINE, AND LIVINGSTON)) | $35.08 | $27.30 | $62.38 | Agreement |
LABORER: GROUP 2…Full textLABORER: GROUP 2 BRICK MASON AND PLASTERER TENDERS. MADISON COUNTY (EDWARDSVILLE, MARINE, AND LIVINGSTON) | $34.08 | $27.30 | $61.38 | Agreement |
| LABO0459-001 · Laborers agreement, August 1, 2024 | ||||
| LABORERS, GROUP 1 GENERAL LABORER (ST. CLAIR COUNTY (SOUTH)) | $34.14 | $30.59 | $64.73 | Agreement |
LABORERS, GROUP 2…Full textLABORERS, GROUP 2 ASBESTOS ABATEMENT WORKER AND HAZARDOUS WASTE WORKER; LEAD BASE PAINT WORKER (ST. CLAIR COUNTY (SOUTH)) | $34.64 | $30.59 | $65.23 | Agreement |
| LABORERS, GROUP 3 DYNAMITE MAN (ST. CLAIR COUNTY (SOUTH)) | $35.64 | $30.59 | $66.23 | Agreement |
| LABO0459-004 · Laborers agreement, August 1, 2024 | ||||
| HOD CARRIER (ST. CLAIR COUNTY (BELLEVILLE)) | $34.14 | $30.59 | $64.73 | Agreement |
| LABO0581-002 · Laborers agreement, August 1, 2024 | ||||
| LABORERS, GROUP 1 GENERAL LABORER (CLINTON COUNTY (CARLYLE)) | $31.00 | $33.73 | $64.73 | Agreement |
LABORERS, GROUP 2…Full textLABORERS, GROUP 2 ASBESTOS ABATEMENT WORKER AND HAZARDOUS WASTE WORKER; LEAD BASE PAINT WORKER (CLINTON COUNTY (CARLYLE)) | $31.50 | $33.73 | $65.23 | Agreement |
| LABORERS, GROUP 3 DYNAMITE AND POWDER MAN (CLINTON COUNTY (CARLYLE)) | $32.50 | $33.73 | $66.23 | Agreement |
| LABO0622-002 · Laborers agreement, August 1, 2024 | ||||
| LABORERS, GROUP 1 GENERAL LABORER (BOND COUNTY (GREENVILLE)) | $29.65 | $35.08 | $64.73 | Agreement |
LABORERS, GROUP 2…Full textLABORERS, GROUP 2 ASBESTOS ABATEMENT WORKER AND HAZARDOUS WASTE WORKER; LEAD BASE PAINT WORKER (BOND COUNTY (GREENVILLE)) | $30.15 | $35.08 | $65.23 | Agreement |
| LABORERS, GROUP 3 DYNAMITE MAN (BOND COUNTY (GREENVILLE)) | $31.15 | $35.08 | $66.23 | Agreement |
| LABO0622-003 · Laborers agreement, August 1, 2024 | ||||
| LABORERS, GROUP 3 DYNAMITE MAN (BOND COUNTY (EXCEPT THE NORTHSIDE)) | $31.15 | $35.08 | $66.23 | Agreement |
| LABORERS, GROUP 1 GENERAL LABORER (BOND COUNTY (EXCEPT THE NORTHSIDE)) | $29.65 | $35.08 | $64.73 | Agreement |
LABORERS, GROUP 2…Full textLABORERS, GROUP 2 ASBESTOS ABATEMENT WORKER AND HAZARDOUS WASTE WORKER; LEAD BASE PAINT WORKER (BOND COUNTY (EXCEPT THE NORTHSIDE)) | $30.15 | $35.08 | $65.23 | Agreement |
| LABO0742-001 · Laborers agreement, August 1, 2022 | ||||
| LABORERS, GROUP 1 GENERAL LABORER (ST. CLAIR (MASCOUTAH) AND CLINTON (NEW BADEN) COUNTIES) | $29.26 | $31.47 | $60.73 | Agreement |
LABORERS, GROUP 2…Full textLABORERS, GROUP 2 ASBESTOS ABATEMENT WORKER AND HAZARDOUS WASTE WORKER; LEAD BASE PAINT WORKER (ST. CLAIR (MASCOUTAH) AND CLINTON (NEW BADEN) COUNTIES).$ 29.76 31.47 LABORERS, GROUP 3 DYNAMITE MAN (ST. CLAIR (MASCOUTAH) AND CLINTON (NEW BADEN) COUNTIES) | $30.76 | $31.47 | $62.23 | Agreement |
| LABO1084-001 · Laborers agreement, August 1, 2024 | ||||
| LABORERS, GROUP 1 GENERAL LABORER (BOND (SORENTO) AND MONTGOMERY COUNTIES) | $32.41 | $32.32 | $64.73 | Agreement |
LABORERS, GROUP 2…Full textLABORERS, GROUP 2 ASBESTOS ABATEMENT WORKER AND HAZARDOUS WASTE WORKER; LEAD BASE PAINT WORKER (BOND (SORENTO) AND MONTGOMERY COUNTIES) | $32.91 | $32.32 | $65.23 | Agreement |
| LABORERS, GROUP 3 DYNAMITE MAN (BOND (SORENTO) AND MONTGOMERY COUNTIES) | $33.91 | $32.32 | $66.23 | Agreement |
| PAIN0058-002 · Painters and Allied Trades agreement, May 1, 2017 | ||||
| PAINTER: BRIDGE EPOXY OR TOXIC-LEAD-BASED PAINT WORK-$1.00 PREMIMUM | $32.45 | $17.12 | $49.57 | Agreement |
| PLAS0090-001 · Plasterers and Cement Masons agreement, August 1, 2024 | ||||
CEMENT MASON/CONCRETE FINISHER…Full textCEMENT MASON/CONCRETE FINISHER (BOND, CALHOUN, CLINTON (WESTERN HALF EAST TO BUT NOT INCLUDE CARYLE), GREENE, JERSEY, MACOUPIN, MADISON, MONROE, MONTGOMERY, AND ST. CLAIR COUNTIES) | $39.00 | $30.60 | $69.60 | Agreement |
| PLAS0090-005 · Plasterers and Cement Masons agreement, August 1, 2024 | ||||
| CEMENT MASON/CONCRETE FINISHER (CLINTON COUNTY) | $39.00 | $30.60 | $69.60 | Agreement |
| PLAS0143-007 · Plasterers and Cement Masons agreement, April 1, 2016 | ||||
| CEMENT MASON/CONCRETE FINISHER (WASHINGTON COUNTY) | $36.43 | $20.87 | $57.30 | Agreement |
| TEAM0050-006 · Teamsters agreement, May 1, 2025 | ||||
TRUCK DRIVER, GROUP 1…Full textTRUCK DRIVER, GROUP 1 DRIVERS ON 2 AXLES HAULING LESS THAN 9 TONS; AIR COMPRESSOR & WELDING MACHINES AND BROOMS, INCLUDING THOSE PULLED BY SEPARATE UNITS; TRUCK DRIVER HELPER, WAREHOUSE EMPLOYEES; MECHANIC HELPERS; GREASERS AND TIREMEN; PICK-UP TRUCKS WHEN HAULING MATERIAL, TOOLS, OR WORKERS TO AND FROM AND ON THE JOB SITE; AND FORKLIFTS UP TO 6,000 LB CAPACITY. (BOND. CLINTON, MONROE, ST CLAIR, WASHINGTON COUNTIES) | $45.35 | $25.72 | $71.07 | Agreement |
| TRUCK DRIVER, GROUP 2 (BOND. CLINTON, MONROE, ST CLAIR, WASHINGTON COUNTIES) | $45.93 | $25.72 | $71.65 | Agreement |
| TRUCK DRIVER, GROUP 3 (BOND. CLINTON, MONROE, ST CLAIR, WASHINGTON COUNTIES) | $46.25 | $25.72 | $71.97 | Agreement |
TRUCK DRIVER, GROUP 4…Full textTRUCK DRIVER, GROUP 4 LOW BOY AND OIL DISTRIBUTORS. (BOND. CLINTON, MONROE, ST CLAIR, WASHINGTON COUNTIES) | $46.60 | $25.72 | $72.32 | Agreement |
TRUCK DRIVER, GROUP 5…Full textTRUCK DRIVER, GROUP 5 DRIVERS WHO REQUIRE SPECIAL PROTECTIVE CLOTHING WHILE EMPLOYED ON HAZARDOUS WASTE WORK. (BOND. CLINTON, MONROE, ST CLAIR, WASHINGTON COUNTIES) | $47.71 | $25.72 | $73.43 | Agreement |
| TEAM0525-004 · Teamsters agreement, May 1, 2025 | ||||
TRUCK DRIVER, GROUP 1…Full textTRUCK DRIVER, GROUP 1 DRIVERS ON 2 AXLES HAULING LESS THAN 9 TONS; AIR COMPRESSOR & WELDING MACHINES AND BROOMS, INCLUDING THOSE PULLED BY SEPARATE UNITS; TRUCK DRIVER HELPER, WAREHOUSE EMPLOYEES; MECHANIC HELPERS; GREASERS AND TIREMEN; PICK-UP TRUCKS WHEN HAULING MATERIAL, TOOLS, OR WORKERS TO AND FROM AND ON THE JOB SITE; AND FORKLIFTS UP TO 6,000 LB CAPACITY. (CALHOUN, GREENE (SOUTH OF A DIRECT LINE THAT EXTENDS EAST FROM PIKE COUNTY THROUGH HILLVIEW/WHITEHALL TO MACOUPIN COUNTY), JERSEY, MACOUPIN, MADISON, MONTGOMERY COUNTIES) | $45.35 | $25.72 | $71.07 | Agreement |
TRUCK DRIVER, GROUP 2…Full textTRUCK DRIVER, GROUP 2 (CALHOUN, GREENE (SOUTH OF A DIRECT LINE THAT EXTENDS EAST FROM PIKE COUNTY THROUGH HILLVIEW/WHITEHALL TO MACOUPIN COUNTY), JERSEY, MACOUPIN, MADISON, MONTGOMERY COUNTIES) | $45.93 | $25.72 | $71.65 | Agreement |
TRUCK DRIVER, GROUP 3…Full textTRUCK DRIVER, GROUP 3 (CALHOUN, GREENE (SOUTH OF A DIRECT LINE THAT EXTENDS EAST FROM PIKE COUNTY THROUGH HILLVIEW/WHITEHALL TO MACOUPIN COUNTY), JERSEY, MACOUPIN, MADISON, MONTGOMERY COUNTIES) | $46.25 | $25.72 | $71.97 | Agreement |
TRUCK DRIVER, GROUP 4…Full textTRUCK DRIVER, GROUP 4 LOW BOY AND OIL DISTRIBUTORS. (CALHOUN, GREENE (SOUTH OF A DIRECT LINE THAT EXTENDS EAST FROM PIKE COUNTY THROUGH HILLVIEW/WHITEHALL TO MACOUPIN COUNTY), JERSEY, MACOUPIN, MADISON, MONTGOMERY COUNTIES) | $46.60 | $25.72 | $72.32 | Agreement |
TRUCK DRIVER, GROUP 5…Full textTRUCK DRIVER, GROUP 5 DRIVERS WHO REQUIRE SPECIAL PROTECTIVE CLOTHING WHILE EMPLOYED ON HAZARDOUS WASTE WORK. (CALHOUN, GREENE (SOUTH OF A DIRECT LINE THAT EXTENDS EAST FROM PIKE COUNTY THROUGH HILLVIEW/WHITEHALL TO MACOUPIN COUNTY), JERSEY, MACOUPIN, MADISON, MONTGOMERY COUNTIES) | $47.71 | $25.72 | $73.43 | Agreement |
| TEAM0916-004 · Teamsters agreement, May 1, 2025 | ||||
TRUCK DRIVER, GROUP 1…Full textTRUCK DRIVER, GROUP 1 DRIVERS ON 2 AXLES HAULING LESS THAN 9 TONS; AIR COMPRESSOR & WELDING MACHINES AND BROOMS, INCLUDING THOSE PULLED BY SEPARATE UNITS; TRUCK DRIVER HELPER, WAREHOUSE EMPLOYEES; MECHANIC HELPERS; GREASERS AND TIREMEN; PICK-UP TRUCKS WHEN HAULING MATERIAL, TOOLS, OR WORKERS TO AND FROM AND ON THE JOB SITE; AND FORKLIFTS UP TO 6,000 LB CAPACITY. (GREENE (NORTH OF A DIRECT LINE THAT EXTENDS EAST FROM PIKE COUNTY THROUGH HILLVIEW/WHITEHALL TO MACOUPIN COUNTY) COUNTY) | $45.35 | $25.72 | $71.07 | Agreement |
TRUCK DRIVER, GROUP 2…Full textTRUCK DRIVER, GROUP 2 2 OR 3 AXLES HAULING MORE THAN 9 TONS BUT HAULING LESS THAN 16 TONS; A-FRAME WINCH TRUCKS; HYDROLIFT TRUCKS; VACTOR TRUCKS OR SIMILAR EQUIPMENT WHEN USED FOR TRANSPORTATION PURPOSES; FORKLIFT OVER 6,000 LB.CAPACITY; WINCH TRUCKS; AND FOUR AXLE COMBIATION UNITS. (GREENE (NORTH OF A DIRECT LINE THAT EXTENDS EAST FROM PIKE COUNTY THROUGH HILLVIEW/WHITEHALL TO MACOUPIN COUNTY) COUNTY) | $45.93 | $25.72 | $71.65 | Agreement |
TRUCK DRIVER, GROUP 3…Full textTRUCK DRIVER, GROUP 3 (GREENE (NORTH OF A DIRECT LINE THAT EXTENDS EAST FROM PIKE COUNTY THROUGH HILLVIEW/WHITEHALL TO MACOUPIN COUNTY) COUNTY) | $46.25 | $25.72 | $71.97 | Agreement |
TRUCK DRIVER, GROUP 4…Full textTRUCK DRIVER, GROUP 4 LOW BOY AND OIL DISTRIBUTORS. (GREENE (NORTH OF A DIRECT LINE THAT EXTENDS EAST FROM PIKE COUNTY THROUGH HILLVIEW/WHITEHALL TO MACOUPIN COUNTY) COUNTY) | $46.60 | $25.72 | $72.32 | Agreement |
TRUCK DRIVER, GROUP 5…Full textTRUCK DRIVER, GROUP 5 DRIVERS WHO REQUIRE SPECIAL PROTECTIVE CLOTHING WHILE EMPLOYED ON HAZARDOUS WASTE WORK. (GREENE (NORTH OF A DIRECT LINE THAT EXTENDS EAST FROM PIKE COUNTY THROUGH HILLVIEW/WHITEHALL TO MACOUPIN COUNTY) COUNTY) | $47.71 | $25.72 | $73.43 | Agreement |
Modification history
| Modification 3 | January 30, 2026 |
| Modification 4 | May 18, 2026 |
| Modification 5 | July 30, 2026 (current) |
Published by the Wage and Hour Division; read from sam.gov. The sheet is checked for a newer modification each day. Contracts awarded since January 1, 2017 also carry Executive Order 13706 paid sick leave (one hour per 30 worked, up to 56 a year).
Questions people ask
- Which rate do I pay on IL20260017?
- The line for the classification of work actually performed: the basic rate plus the fringe. You may pay the fringe into benefit plans, as cash on every hour, or a mix. Overtime after 40 hours is 1.5 times the basic rate; fringe is paid on every hour and never multiplied.
- My trade is not on this sheet. What do I do?
- Do not borrow the nearest name. Ask the contracting agency for a conformance on Standard Form 1444 before the first week of that work, and note it as pending on the payroll.
- Does modification 5 apply to my contract?
- Only if it was in force when your contract was awarded (generally at bid opening). An earlier modification locked into the contract keeps applying, except on option years, added scope and indefinite-quantity contracts. The number and modification are on the first page of the exhibit in your contract.
How to read a wage determination · Paying the fringe in cash or through plans · Overtime on these rates · Fringe credit calculator