The short answer

This sheet sets 102 classifications for heavy, highway work in Alexander, Clay, Crawford and 25 more counties, Illinois. Each line is a basic hourly rate plus a fringe rate, and the sum is the minimum you must pay for that work, from $40.65 an hour (painter: industrial - brush & roll) to $93.84 (line construction: lineman (randolph county (red bud township))). Your contract may lock an earlier modification.

Scope

Heavy Construction

Highway Construction

Rates by classification

Total is the basic rate plus the fringe. Source is the agreement or survey the rate came from; a marker means the group changed in this modification. A dagger (†) means the fringe carries a footnote or percentage the total does not include; read the group’s notes.

ClassificationBasic rateFringeTotalSource
CARP0243-007 · Carpenters agreement, May 15, 2020
CARPENTER (CRAWFORD, EFFINGHAM, AND JASPER COUNTIES)$33.54$27.97$61.51Agreement
PILEDRIVERMAN (CRAWFORD, EFFINGHAM, AND JASPER COUNTIES)$33.54$27.97$61.51Agreement
CARP0634-002 · Carpenters agreement, May 1, 2021
CARPENTER (CLAY, EDWARDS, FAYETTE, LAWRENCE, MARION, RICHLAND, AND WABASH COUNTIES)$39.02$18.90$57.92Agreement
CARP0636-001 · Carpenters agreement, May 1, 2021
CARPENTER (HAMILTON…
Full text

CARPENTER (HAMILTON, JEFFERSON, WAYNE, AND WHITE COUNTIES) DIVERS (RECEIVE 1 1/2 TIMES CARPENTER RATE PLUS FRINGES AND $25 PER DAY FOR EQUIPMENT)

$39.02$18.90$57.92Agreement
CARP0640-005 · Carpenters agreement, May 1, 2021
CARPENTER (ALEXANDER…
Full text

CARPENTER (ALEXANDER, FRANKLIN, HARDIN, MASSAC, JACKSON, PERRY, POPE, JOHNSON, GALLATIN, PULASKI, SALINE, UNION, AND WILLIAMSON COUNTIES) DIVERS (RECEIVE 1 1/2 TIMES CARPENTER'S RATE PLUS FRINGE BENEFITS AND $25.00 PER DAY FOR EQUIPMENT)

$38.52$18.90$57.42Agreement
CARP0662-001 · Carpenters agreement, May 1, 2021
CARPENTER (RANDOLPH COUNTY)$41.36$18.90$60.26Agreement
ELEC0016-002 · Electrical Workers (IBEW) agreement, June 1, 2025
ELECTRICIAN (WABASH COUNTY)$46.14$21.67$67.81Agreement
ELEC0051-004 · Electrical Workers (IBEW) agreement, January 1, 2024
LINE CONSTRUCTION: GROUNDMAN/EQUIPMENT OPERATOR…
Full text

LINE CONSTRUCTION: GROUNDMAN/EQUIPMENT OPERATOR (ALL CRAWLER TYPE EQUIPMENT LARGER THAN D-4, 15 TON CRANE OR LARGER) (FAYETTE COUNTY (NORTH OF AVENA, BEAR GROVE, SEFTON, AND SHARON TWPS))

$52.63$24.35$76.98Agreement
LINE CONSTRUCTION: GROUNDMAN/TRUCK DRIVER…
Full text

LINE CONSTRUCTION: GROUNDMAN/TRUCK DRIVER (FAYETTE COUNTY (NORTH OF AVENA, BEAR GROVE, SEFTON, AND SHARON TWPS))

$39.92$20.22$60.14Agreement
LINE CONSTRUCTION: LINEMAN AND SUBSTATION TECHNICIAN…
Full text

LINE CONSTRUCTION: LINEMAN AND SUBSTATION TECHNICIAN (FAYETTE COUNTY (NORTH OF AVENA, BEAR GROVE, SEFTON, AND SHARON TWPS))

$58.58$26.29$84.87Agreement
ELEC0146-004 · Electrical Workers (IBEW) agreement, June 1, 2022
ELECTRICIAN (EFFINGHAM…
Full text

ELECTRICIAN (EFFINGHAM (BANNER, BISHOP, DOUGLAS, LIBERTY, LUCAS, MOCCASIN, ST. FRANCIS, SUMMIT, & TEULOPOLIS TWPS), AND FAYETTE (HURRICANE, S. HURRICANE, RAMSEY, BOWLING GREEN, CARSON, & LOUDON TWPS) COUNTIES)

$41.00$20.68$61.68Agreement
ELEC0309-004 · Electrical Workers (IBEW) agreement, September 1, 2025
ELECTRICIAN (RANDOLPH COUNTY (RED BUD TWP))$52.41$30.27$82.68Agreement
ELEC0309-009 · Electrical Workers (IBEW) agreement, January 6, 2025
LINE CONSTRUCTION: CABLE SPLICER; LINEMAN WELDER (RANDOLPH COUNTY (RED BUD TOWNSHIP))$63.79$26.89$90.68Agreement
LINE CONSTRUCTION: GROUNDMAN (RANDOLPH COUNTY (RED BUD TOWNSHIP))$42.10$18.84$60.94Agreement
LINE CONSTRUCTION: GROUNDMAN EQUIPMENT OPERATOR (RANDOLPH COUNTY (RED BUD TOWNSHIP))$56.38$25.23$81.61Agreement
LINE CONSTRUCTION: GROUNDMAN TRUCK DRIVER (RANDOLPH COUNTY (RED BUD TOWNSHIP))$46.03$20.60$66.63Agreement
LINE CONSTRUCTION: LINEMAN (RANDOLPH COUNTY (RED BUD TOWNSHIP))$64.83$29.01$93.84Agreement
ELEC0702-001 · Electrical Workers (IBEW) agreement, January 1, 2025
ELECTRICIAN (ALEXANDER…
Full text

ELECTRICIAN (ALEXANDER, CLAY, EDWARDS, EFFINGHAM (EXCLUDING BANNER, BISHOP, DOUGLAS, LIBERTY, LUCAS, MOCCASIN, ST. FRANCIS, SUMMIT AND TEULOPOLIS TWPS), FAYETTE (EXCLUDING HURRICANE, S. HURRICANE, RAMSEY, BOWLING GREEN, CARSON AND LOUDON TWPS), FRANKLIN, GALLATIN, HAMILTON, HARDIN, JACKSON, JEFFERSON, JOHNSON, MARION, MASSAC, PERRY, POPE, PULASKI, SALINE, UNION, WAYNE, WHITE, AND WILLIAMSON COUNTIES)

$52.14$29.14$81.28Agreement
ELEC0702-002 · Electrical Workers (IBEW) agreement, January 6, 2025
LINE CONSTRUCTION: LINEMAN…
Full text

LINE CONSTRUCTION: LINEMAN (ALEXANDER, CLAY, CRAWFORD, EDWARDS, EFFINGHAM, FRANKLIN, FAYETTE (EXCLUDES PORTION NORTH AVENA), GALLATIN, HAMILTON, HARDIN, JACKSON, JASPER, JEFFERSON, JOHNSON, LAWRENCE, MARION, MASSAC, PERRY, POPE, PULASKI, RANDOLPH (EXCEPT RED BUD TWPS), RICHLAND, SALINE, UNION, WABASH, WAYNE, WHITE, AND WILLIAMSON COUNTIES; CLARK, COLES (SOUTHERN HALF), CUMBERLAND, MOULTRIE (WHITLEY TWP), AND SHELBY (EXCEPT WEST OF HOLLAND, PRAIRIE, RICHLAND, & WINDSOR TWPS) COU

$65.52$27.85$93.37Agreement
LINE CONSTRUCTION: GROUNDMAN - CLASS A…
Full text

LINE CONSTRUCTION: GROUNDMAN - CLASS A (ALEXANDER, CLAY, CRAWFORD, EDWARDS, EFFINGHAM, FRANKLIN, FAYETTE (EXCLUDES PORTION NORTH AVENA), GALLATIN, HAMILTON, HARDIN, JACKSON, JASPER, JEFFERSON, JOHNSON, LAWRENCE, MARION, MASSAC, PERRY, POPE, PULASKI, RANDOLPH (EXCEPT RED BUD TWPS), RICHLAND, SALINE, UNION, WABASH, WAYNE, WHITE, AND WILLIAMSON COUNTIES; CLARK, COLES (SOUTHERN HALF), CUMBERLAND, MOULTRIE (WHITLEY TWP), AND SHELBY (EXCEPT WEST OF HOLLAND, PRAIRIE, RICHLAND, & WINDSOR TWPS) COU

$38.18$19.92$58.10Agreement
LINE CONSTRUCTION: GROUNDMAN - EQUIPMENT OPERATOR CLASS II…
Full text

LINE CONSTRUCTION: GROUNDMAN - EQUIPMENT OPERATOR CLASS II (ALL OTHER EQUIPMENT) (ALEXANDER, CLAY, CRAWFORD, EDWARDS, EFFINGHAM, FRANKLIN, FAYETTE (EXCLUDES PORTION NORTH AVENA), GALLATIN, HAMILTON, HARDIN, JACKSON, JASPER, JEFFERSON, JOHNSON, LAWRENCE, MARION, MASSAC, PERRY, POPE, PULASKI, RANDOLPH (EXCEPT RED BUD TWPS), RICHLAND, SALINE, UNION, WABASH, WAYNE, WHITE, AND WILLIAMSON COUNTIES; CLARK, COLES (SOUTHERN HALF), CUMBERLAND, MOULTRIE (WHITLEY TWP), AND SHELBY (EXCEPT WEST OF HOLLAND,

$46.49$22.33$68.82Agreement
LINE CONSTRUCTION: HEAVY - EQUIPMENT OPERATOR CLASS I…
Full text

LINE CONSTRUCTION: HEAVY - EQUIPMENT OPERATOR CLASS I (ALL CRAWLER TYPE EQUIPMENT D-4 AND LARGER) (ALEXANDER, CLAY, CRAWFORD, EDWARDS, EFFINGHAM, FRANKLIN, FAYETTE (EXCLUDES PORTION NORTH AVENA), GALLATIN, HAMILTON, HARDIN, JACKSON, JASPER, JEFFERSON, JOHNSON, LAWRENCE, MARION, MASSAC, PERRY, POPE, PULASKI, RANDOLPH (EXCEPT RED BUD TWPS), RICHLAND, SALINE, UNION, WABASH, WAYNE, WHITE, AND WILLIAMSON COUNTIES; CLARK, COLES (SOUTHERN HALF), CUMBERLAND, MOULTRIE (WHITLEY TWP), AND SHELBY (EXCEPT

$52.13$23.97$76.10Agreement
ELEC0702-016 · Electrical Workers (IBEW) agreement, September 1, 2024
ELECTRICAL LOW VOLTAGE WIRING INSTALLER…
Full text

ELECTRICAL LOW VOLTAGE WIRING INSTALLER, BUILDING (ALEXANDER, BOND (EASTSIDE), CLAY, CLINTON (EASTSIDE), EDWARDS, EFFINGHAM (SOUTHWESTERN SIDE), FAYETTE (SOUTHSIDE), FRANKLIN, GALLATIN, HAMILTON, HARDIN, JACKSON, JEFFERSON, JOHNSON, MARION, MASSAC, PULASKI, PERRY, POPE, RANDOLPH (SOUTHEASTERN SIDE), SALINE, UNION, WASHINGTON (SOUTHEASTERN SIDE), WAYNE, WHITE, AND WILLIAMSON COUNTIES) Installation, service and maintenance of low-voltage systems which utilizes the transmission and/or transference of voice, sound, vision, or digital for commercial, education, security and entertainment purposes for the following: TV monitoring and surveillance, background/foreground music, intercom and telephone interconnect, field programming, inventory control systems, microwave transmission, multi-media, multiplex, radio page, school, intercom and sound burglar alarms and low voltage master clock systems

$38.44$19.37$57.81Agreement
ELEC0725-004 · Electrical Workers (IBEW) agreement, October 1, 2025
ELECTRICIAN (CRAWFORD, JASPER, LAWRENCE, AND RICHLAND COUNTIES)$45.00$26.70$71.70Agreement
ENGI0318-001 · Operating Engineers agreement, April 1, 2025
OPERATOR: POWER EQUIPMENT…
Full text

OPERATOR: POWER EQUIPMENT, CLASS A: ALL OFF ROAD MATERIAL HAULING EQUIPMENT, ALL TERRAIN CRANE, ARTICULATED DUMP, ASPHALT MACHINE SPREADER, ASPHALT PLANT ASSISTANT OPERATOR, ASPHALT PLANT OPERATOR, ASPHALT WIDENER, ASSISTANT OPERATOR ON ROTOMILLS, AUTOGRADER, AUTOMATIC SLIPFORM PAVERS, BACKEND MAN ON ASPHALT MACHINE, BACKHOES, BARREL GRAPPLER DEVICES (ALL), BLACKSMITH, BLADE OPERATORS (ALL), BOAT OPERATORS (ALL) BRIDGES, BOAT PILOTS REQUIRING CERTIFICATION AND/OR LICENSING, DAMS & WATERWAYS, BOILERS, BOOM OR WINCH CAT, BOOM OR WINCH TYPE TRUCKS, BORING MACHINES-HORIZONTAL, CLAMSHELL, ORANGE PEEL OPERATOR, CONCRETE BREAKER, CONCRETE GROOVER, CONCRETE GRINDER, CONCRETE CURB MACHINE, CONCRETE FINISH MACHINE OR SPREADER OPERATOR, CONCRETE MIXER PAVER, CONCRETE PUMP TRUCK, CONCRETE PLANT OPERATOR, CONCRETE WHEEL SAW OPERATORS, CRANES(ALL) TRUCK/TRACK/RUBBER, CRANE (OVERHEAD) OPERATOR, DERRICK GUY OR DERRICK TRUCKS, DITCHING MACHINES (ALL), DOZER OPERATORS, DRAGLINE OR SHOVEL OPERATORS, DREDGE BOOSTER PUMP, DREDGE ENGINEMAN, DREDGE OPERATOR/LEVERMAN, DRILL CAT W/COMPRESSOR MOUNTED, DRILLING OR BORING MACHINE ROTARY-SELF-PROPELLED, ENDLOADERS (ALL) TRACK/RUBBER ELEVATING GRADER, FLEXPLANE, FORKLIFTS/TELE-HANDLERS (ALL), GEOTHERMAL WELL DRILLING, GPS ON MACHINES ALREADY UNDER THE JURISDICTION OF LOCAL 318, GRADALL; GREASERS, HEAVY EQUIPMENT ROBOTICS OPERATOR, HI-LIFT, HOISTS, HOSTING ENGINE, HORIZONTAL DIRECTIONAL DRILL OPERATOR, INCINERATORS (HAZ-MAT ONLY), LASER SCREED, LOCOMOTIVE/OPERATOR, MASTER MECHANIC, MIXERS 21 CU. FT. OR OVER, MOTOR PATROL, PILE DRIVER OPERATOR, PULLS & SCRAPERS, POWER PAC & CONTROLS (PILE DRIVING), PUG MILL, PULVERIZER OR TILLERS, PUSH CATS, QUAD TRAC, ROTOMILLS, ROTATING CAB FORKLIFTS, RUBBER TIRED FARM TRACTOR WITH ATTACHMENTS OVER 1/2 YD., SELF-PROPELLED CHIP SPREADER, SELF-PROPELLED ROLLER W/ATTACHMENTS, SHOT BLASTER/BRIDGE DECK, SHUTTLE BUGGIE, SIDE BOOMS, SKID LOADER (SKID STEERS), SKIMMER SCOOP, SPYDER CRANE, STATIONARY ROCK SLINGER, TRACKHOE AND ALL ATTACHMENTS, TRENCH MACHINE OPEATOR, TUGGERS, ULTRA HIGH PRESSURE WATER JET CUTTING MACHINE, VACUUM, VACUUM BLASTING MACHINE OPERATOR, VAC JET, WELDERS, WELL OR CAISSON DRILLS, WELL POINT PUMPS-2 OR MORE, WOOD CHIPPER W/TRACTOR. (ALEXANDER, FRANKLIN, GALLATIN, HAMILTON, HARDIN, JACKSON, JOHNSON, MASSAC, POPE, PULASKI, SALINE, UNION, WHITE, AND WILLIAMSON COUNTIES)

FOOTNOTE: A - HAZARDOUS WASTE PREMIUM: LEVEL (A)-RECEIVE $3.00 ABOVE RATE; LEVEL (B)-RECEIVE $2.00 ABOVE RATE; LEVEL (C)-RECEIVE $1.50 ABOVE RATE; LEVEL (D)-RECEIVE $1.00 ABOVE RATE

$40.13$32.00$72.13Agreement
OPERATOR: POWER EQUIPMENT…
Full text

OPERATOR: POWER EQUIPMENT, CLASS B: OILERS CLASSIFIED AS ASSISTANT OPERATORS, AIR TRACK DRILL/COMPRESSOR, ALL MACHINES USED TO SWEEP, CLEAN, BROOM OR REMOVE DEBRIS OR SNOW, ANY TYPE TRACTOR PULLING ROLLER OR DISC, AUTOMATIC BINS OR SCALES W/COMPRESSOR OR GENERATOR, BULK CEMENT PLANT W/SEPARATE COMPRESSOR, CONCRETE CURB MACHINE REQUIRING ELECTRONICS, CONCRETE PLANT ASSISTANT OPERATORS, CONCRETE OR PUMP CRETE PUMPS, DECK HAND ON BOATS, DREDGE ASSISTANT OPERATOR/MATE, POWER BROOM, SELF-PROPELLED ROLLER/COMPACTOR, STRAW MULCHER BLOWER, STUMP CUTTER MACHINE, TWO AIR COMPRESSORS (220 CFM OR OVER), TWO AIR TRACK DRILLS. AIR COMPRESSOR W/VALVE DRIVING PILING, ASSISTANT OPERATOR (WHERE REQUIRED REFER TO ARTICLE VII SECTION 9), ELEVATOR OPERATOR, FORM GRADER, MAN LIFT (SCISSOR LIFT) WHEN LIFTING MATERIALS, PILDRIVER ACTIVATING AIR OR HYDRAULIC VALVE REGARDLESS OF LOCATION, RUBBER-TIRED FARM TYPE TRACTOR W/BLADE/BULLDOZER/AUGER/HI-LIFT OF 1/2 YARD OR LESS, SELF-PROPELLED CONCRETE SAW, SELF-PROPELLED ROBOTICS ROLLER IN USE TWO CONTINUOUS HOURS OR MORE SHALL BE MANNED BY AN OPERATING ENGINEER, SELF-PROPELLED VIBRATOR, TRUCK CRANE ASSISTANT OPERATOR, TWO CONVEYORS. (ALEXANDER, FRANKLIN, GALLATIN, HAMILTON, HARDIN, JACKSON, JOHNSON, MASSAC, POPE, PULASKI, SALINE, UNION, WHITE, AND WILLIAMSON COUNTIES)

FOOTNOTE: A - HAZARDOUS WASTE PREMIUM: LEVEL (A)-RECEIVE $3.00 ABOVE RATE; LEVEL (B)-RECEIVE $2.00 ABOVE RATE; LEVEL (C)-RECEIVE $1.50 ABOVE RATE; LEVEL (D)-RECEIVE $1.00 ABOVE RATE

$38.23$32.00$70.23Agreement
OPERATOR: POWER EQUIPMENT…
Full text

OPERATOR: POWER EQUIPMENT, CLASS C: AIR COMPRESSOR (220 CFM OR OVER) ONE, AIR TRACK DRILL ONE, AUTOMATIC BIN, BELT DRAG MACHINE, BULK CEMENT PLANT W/BUILT-IN COMPRESSOR RUNNING OFF SAME MOTOR OR ELECTRIC MOTOR, FIREMAN OR SWITCHMAN, MECHANIC IN PERMANENT SHOPS WITHOUT SEPARATE SIGNED COLLECTIVE BARGAINING AGREEMENTS (NOV. 1 THROUGH MARCH 31), MECHANICAL PLASTERER APPLICATOR, PIPE TRACT JACK, POWER BROOM, SELF-PROPELLED FROM TAMPER, TRAC-AIR, MIXERS - LESS THAN 21 CU.FT., MORTAR MIXER W/SKI OR PUMP, MUD JACKS, ONE WELL POINT PUMP, WOOD CHIPPER. ONE OPERATING ENGINEER MAY OPERATE OR MAINTAIN ANY COMBINATION OF THE FOLLOWING PIECES OF EQUIPMENT, NOT TO EXCEED FOUR (4), WHICH SHALL BE WITHIN REASONABLE DISTANCE; SUCH COMBINATION MAY INCLUDE THE EQUIPMENT IN THIS CLASSIFICATION: AIR COMPRESSOR (UNDER 220 CFM) FOUR, LIGHT PLANTS, GENERATORS, PUMPS, CONVEYORS, MOTOR DRIVEN HEATERS (2), WELDING MACHINES, ULMAC OR EQUAL SPREADER (ALEXANDER, FRANKLIN, GALLATIN, HAMILTON, HARDIN, JACKSON, JOHNSON, MASSAC, POPE, PULASKI, SALINE, UNION, WHITE, AND WILLIAMSON COUNTIES)

FOOTNOTE: A - HAZARDOUS WASTE PREMIUM: LEVEL (A)-RECEIVE $3.00 ABOVE RATE; LEVEL (B)-RECEIVE $2.00 ABOVE RATE; LEVEL (C)-RECEIVE $1.50 ABOVE RATE; LEVEL (D)-RECEIVE $1.00 ABOVE RATE

$30.83$32.00$62.83Agreement
OPERATOR: POWER EQUIPMENT…
Full text

OPERATOR: POWER EQUIPMENT: RIVER Class 1: All Off Road Material Hauling Equipment, All Terrain Crane, All Power Boat Operators, Articulated Dump, Asphalt Machine Spreader, Asphalt Plant Operator, Asphalt Widener, Autograder, Automatic Slipform Pavers, Backhoes, Barrel Grappler Devices (All), Blacksmith, Blade Operators (All), Boat Pilots requiring certification and or licensing, Boat Operators (all) Bridges, Dams & Waterways, Boilers, Boom or Winch Cat, Boom or Winch Type Trucks, Boring Machines-Horizontal, Clamshell, Orange Peel Operator, Concrete Breaker, Concrete Curb Machine, Concrete Finish Machine or Spreader Operator, Concrete Mixer Paver, Concrete Pump Truck, Concrete Plant Operator, Concrete Wheel Saw Operators, Cranes(All) Truck/Track/Rubber, Crane (Overhead) Operator, Derrick Guy or Derrick Trucks, Ditching Machines (All), Dozer Operators, Dragline or Shovel Operators, Dredge Booster Pump, Dredge Engineman, Dredge Operator/Leverman, Drill Cat w/Compressor Mounted, Drilling or Boring Machine Rotary-Self-Propelled, Endloaders (All) Track/Rubber Elevating Grader, Flexplane, Forklifts/Tele-Handlers (All), Geothermal Well Drilling, GPS on machines already under the jurisdiction of Local 318, Gradall; Greasers, Heavy Equipment Robotics Operator, Hi-Lift, Hoists, Hosting Engine, Horizontal Directional Drill Operator, Incinerators (Haz-Mat only), Laser Screed, Locomotive/Operator, Master Mechanic, Mixers 21 cu. ft. or over, Motor Patrol, Piledriver operator, Pulls & Scrapers, Power Pac & Controls (PileDriving), Pug mill, Pulverizer or Tillers, Push Cats, Quad Trac, Rotating Cab Forklifts, Rotomills, Rubber Tired Farm Tractor with Attachments over 1/2 yd., Self-Propelled Chip Spreader, Self-Propelled Roller w/Attachments, Shuttle Buggie, Side booms, Skid loader (Skidsteers), Skimmer Scoop, Spyder Cranes, Trackhoe and all attachments, Trench Machine Opeator, Tuggers, Ultra High Pressure Water Jet Cutting Machine, Vacuum, Vacuum Blasting Machine Operator, Vac Jet, Welders, Well or Caisson Drills, Well Point Pumps-2 or more, Wood Chipper w/Tractor. (ALEXANDER, FRANKLIN, GALLATIN, HAMILTON, HARDIN, JACKSON, JOHNSON, MASSAC, POPE, PULASKI, SALINE, UNION, WHITE, AND WILLIAMSON COUNTIES)

Footnote: A - Hazardous Waste Premium: Level (A)-receive $3.00 above rate; Level (B)-receive $2.00 above rate; Level (C)-receive $1.50 above rate; Level (D)-receive $1.00 above rate

$40.23$32.00$72.23Agreement
OPERATOR: POWER EQUIPMENT…
Full text

OPERATOR: POWER EQUIPMENT: RIVER Class 2: Assistant Operators required on All terrain cherry picker w/over 40 ton lifting capacity, Crane, Deckhand on all rivers, lakes, and tributaries, Dinky or standard locomotive, Ditching machine (80 h.p. and over), Dragline, Dredge, Gradall, Guy Derrick, Assitant operators or firman on crane, Piledriver, Shovel, Trenching Machine, Truck Crane. (ALEXANDER, FRANKLIN, GALLATIN, HAMILTON, HARDIN, JACKSON, JOHNSON, MASSAC, POPE, PULASKI, SALINE, UNION, WHITE, AND WILLIAMSON COUNTIES)

Footnote: A - Hazardous Waste Premium: Level (A)-receive $3.00 above rate; Level (B)-receive $2.00 above rate; Level (C)-receive $1.50 above rate; Level (D)-receive $1.00 above rate

$36.78$32.00$68.78Agreement
ENGI0520-002 · Operating Engineers agreement, August 1, 2025
POWER EQUIPMENT OPERATOR GROUP 03…
Full text

POWER EQUIPMENT OPERATOR GROUP 03 AIR COMPRESSORS (ONE), WATER PUMPS, REGARDLESS OF SIZE (ONE), WATER-BLASTERS (ONE), WELDING MACHINE (ONE), MIXERS (ONE BAG), CONVEYOR (ONE), SIPHON OR JET (ONE), LIGHT PLANT (ONE), HEATER (ONE), IMMOBILE TRACK AIR (ONE), AND SELF-PROPELLED WALK BEHIND ROLLERS. FAYETTE, JEFFERSON, MARION, PERRY, AND RANDOLPH COUNTIES

$41.59$39.10$80.69Agreement
POWER EQUIPMENT OPERATOR GROUP 11…
Full text

POWER EQUIPMENT OPERATOR GROUP 11 MASTER MECHANIC (FAYETTE, JEFFERSON, MARION, PERRY, AND RANDOLPH COUNTIES)

$49.20$39.10$88.30Agreement
POWER EQUIPMENT OPERATOR GROUP 12…
Full text

POWER EQUIPMENT OPERATOR GROUP 12 LICENSED BOAT PILOT (FAYETTE, JEFFERSON, MARION, PERRY, AND RANDOLPH COUNTIES)

$50.20$39.10$89.30Agreement
POWER EQUIPMENT OPERATOR: GROUP 01…
Full text

POWER EQUIPMENT OPERATOR: GROUP 01 CRANES, DRAGLINES, SHOVELS, SKIMMER SCOOPS, CLAMSHELLS OR DERRICK BOATS, PILE DRIVERS, CRANE-TYPE BACKHOES, ASPHALT PLANT OPERATORS, CONCRETE PLANT OPERATORS, DREDGES, ASPHALT SPREADING MACHINES, SCREWS ON ASPHALT SPREADING MACHINES, ALL LOCOMOTIVES, CABLE WAYS OR TOWER MACHINES, HOISTS, HYDRAULIC BACKHOES, DITCHING MACHINES, OR BACKFILLER, CHERRYPICKERS, OVERHEAD CRANES, ROLLER, STEAM OR GAS, CONCRETE PAVERS, EXCAVATOR CONCRETE BREAKERS, CONCRETE PUMPS, BULK CEMENT PLANTS, CEMENT PUMPS, DERRICK-TYPE DRILLS, BOAT OPERATORS, MOTOR GRADERS OR PUSHCATS, SCOOPS OR TOURNAPULLS, BULLDOZERS, ENDLOADERS OR FORK LIFTS, POWER BLADE OR ELEVATING GRADERS, WINCH CATS, BOOM OR WINCH TRUCKS OR BOOM TRACTORS, PIPE WRAPPING OR PAINTING MACHINES, ASPHALT PLANT ENGINEER, JOURNEYMAN LUBRICATING ENGINEER, DRILLS (OTHER THAN DERRICK TYPE), MUD JACKS, OR WELL DRILLING MACHINES, BORING MACHINES OR TRACK JACKS, MIXERS, CONVEYORS (TWO), AIR COMPRESSORS (TWO) WATER PUMPS, REGARDLESS OF SIZE (TWO), WELDING MACHINES (TWO), SIPHONS OR JETS (TWO), WINCH HEAD OR APPARATUSES (TWO), LIGHT PLANTS (TWO), WATERBLASTERS (TWO), ALL TRACTORS, REGARDLESS OF SIZE (STRAIGHT TRACTOR ONLY), FIREMAN ON STATIONARY BOILERS, AUTOMATIC ELEVATORS, FORM GRADING MACHINES, FINISHING MACHINES, POWER SUB-GRADER OR RIBBON MACHINES, LONGITUDINAL FLOATS, DISTRIBUTOR OPERATORS ON TRUCKS, WINCH HEADS OR APPARATUSES (ONE), MOBIL TRACK AIR AND HEATERS (TWO TO FIVE), HEAVY EQUIPMENT GREASER, RELIEF OPERATOR, ASSISTANT MASTER MECHANIC AND HEAVY DUTY MECHANIC, CONCRETE SAWS OF ALL TYPES AND SIZES WITH THEIR ATTACHMENTS, GOB-HOPPERS, EXCAVATORS ALL SIZES, THE REPAIR, GREASING, AND FUELING OF ALL DIESEL HAMMERS, THE OPERATION, SET-UP AND CLEANING OF BIDWELLS, CONCRETE PLACEMENT BOOMS, THE ALTERATIONS, REPAIR OF ALL BARGES, WATER BLASTERS OF ALL SIZES AND THEIR CLUTCHES, MOBILE LIFTS, HYDRAULIC JACKS WHERE USED FOR HOISTING, DIESEL OR GAS POWERED FLASHING SIGNS USED FOR TRAFFIC CONTROL, MICRO PAVERS, LOG SKIDERS, ICEOLATORS USED ON AND OFF OF PIPELINE, CONDOR CRANES, DRILL RIGS OF ALL SIZES, BOW BOATS, SURVEY BOATS, ROSS CARRIERS, BOB-CATS AND ALL THEIR ATTACHMENTS, SKID STEER LOADERS AND ALL THEIR ATTACHMENTS, CRETER CRANE, DIRECT DRIVE ELECTRIC MOTORS THE BOLTING AND UNBOLTING THE ADJUSTING AND SHIMMING, (DEWATERINGJOBS, WHIRLEY CRANE, CONVEYOR BELTS) ETC., BATCH PLANTS (ALL SIZES), ROTO MILLS, CONVEYORS SYSTEMS OF ANY SIZE AND ANY CONFIGURATION, HYDROSEEDERS AND STRAW-BLOWERS ALL SIZES, OPERATION, REPAIR, SERVICE OF ALL VIBRATORY HAMMERS, ALL POWER PACS AND THEIR CONTROLS REGARDLESS OF LOCATION, CURTAINS OR BRUSH BURNING MACHINES, STUMP CUTTER MACHINES, GROUT MACHINES REGARDLESS OF SIZE, NAIL LAUNCHERS WHEN MOUNTED ON A MACHINE OR SELF-PROPELLED, CON-COVER MACHINES, GOLDHOFER AND SIMILAR S.P.M.T. (SELF-PROPELLED MODULAR TRANSPORTERS) HEAVY TRANSPORT UNITS AND ALL OPERATORS (EXCEPT THOSE LISTED BELOW). FAYETTE, JEFFERSON, MARION, PERRY, AND RANDOLPH COUNTIES

$47.20$39.10$86.30Agreement
POWER EQUIPMENT OPERATOR: GROUP 02…
Full text

POWER EQUIPMENT OPERATOR: GROUP 02 ASSISTANT OPERATORS FAYETTE, JEFFERSON, MARION, PERRY, AND RANDOLPH COUNTIES

$46.07$39.10$85.17Agreement
POWER EQUIPMENT OPERATOR: GROUP 04…
Full text

POWER EQUIPMENT OPERATOR: GROUP 04 FIREMAN ON WHIRLIES AND HEAVY EQUIPMENT OILERS, TRUCK CRANES, DREDGES, MONIGANS, LARGE CRANES - (OVER 65-TON RATED CAPACITY) CONCRETE PLANT OILER, BLACKTOP PLANT OILER AND CRETER CRANE OILER (WHEN REQUIRED), BARGE TENDERS, OILERS ON DRILL RIGS USED FOR CAISSON OR FOR PILE DRIVING. FAYETTE, JEFFERSON, MARION, PERRY, AND RANDOLPH COUNTIES

$41.65$39.10$80.75Agreement
POWER EQUIPMENT OPERATOR: GROUP 05…
Full text

POWER EQUIPMENT OPERATOR: GROUP 05 OILERS FAYETTE, JEFFERSON, MARION, PERRY, AND RANDOLPH COUNTIES

$41.65$39.10$80.75Agreement
POWER EQUIPMENT OPERATOR: GROUP 06…
Full text

POWER EQUIPMENT OPERATOR: GROUP 06 OPERATORS ON EQUIPMENT WITH BOOMS, INCLUDING JIBS, 100 FT AND OVER, BUT LESS THAN 150 FT (FAYETTE, JEFFERSON, MARION, PERRY, AND RANDOLPH COUNTIES)

$49.75$39.10$88.85Agreement
POWER EQUIPMENT OPERATOR: GROUP 7…
Full text

POWER EQUIPMENT OPERATOR: GROUP 7: Operators on equipment with Booms, including Jibs, 150 ft and over, but less than 200 ft (FAYETTE, JEFFERSON, MARION, PERRY, AND RANDOLPH COUNTIES)

$45.30$34.95$80.25Agreement
POWER EQUIPMENT OPERATOR: GROUP 8…
Full text

POWER EQUIPMENT OPERATOR: GROUP 8: Operators on equipment with Boomns, including Jibs, 200 ft and over; Tower Cranes, and Whirley Cranes (FAYETTE, JEFFERSON, MARION, PERRY, AND RANDOLPH COUNTIES)

$45.60$34.95$80.55Agreement
POWER EQUIPMENT OPERATOR: GROUP 09…
Full text

POWER EQUIPMENT OPERATOR: GROUP 09 CERTIFIED CRANE OPERATORS, BELOW 17.5 TONS, WHEN REQUESTED BY THE CONTRACTOR OR REQUIRED BY THE OWNER. (FAYETTE, JEFFERSON, MARION, PERRY, AND RANDOLPH COUNTIES)

$48.20$39.10$87.30Agreement
POWER EQUIPMENT OPERATOR: GROUP 10…
Full text

POWER EQUIPMENT OPERATOR: GROUP 10: Certified crane Operators 17.5 tons and above, when requested by the Contractor or required by the Owner. (FAYETTE, JEFFERSON, MARION, PERRY, AND RANDOLPH COUNTIES)

$46.75$34.95$81.70Agreement
ENGI0520-004 · Operating Engineers agreement, August 1, 2022
POWER EQUIPMENT OPERATORGROUP 1…
Full text

POWER EQUIPMENT OPERATORGROUP 1: Cranes, Draglines, Shovels, Skimmer Scoops, Clamshells or Derrick Boats, Pile Drivers, Crane-Type Backhoes, Asphalt Plant Operators, Concrete Plant Operators, Dredges, Asphalt Spreading Machines, Screws on Asphalt Spreading Machines, All Locomotives, Cable Ways or Tower Machines, Hoists, Hydraulic Backhoes, Ditching Machines, or Backfiller, Cherrypickers, overhead Cranes, Roller, Steam or Gas, Concrete Pavers, Excavator Concrete Breakers, Concrete Pumps, Bulk Cement Plants, Cement Pumps, Derrick-Type Drills, Boat Operators, Motor Graders or Pushcats, Scoops or Tournapulls, Bulldozers, Endloaders or Fork Lifts, Power Blade or Elevating Graders, Winch Cats, Boom or Winch Trucks or Boom Tractors, Pipe Wrapping or Painting Machines, Asphalt Plant Engineer, Journeyman Lubricating Engineer, Drills (other than derrick type), Mud Jacks, or Well Drilling Machines, Boring Machines or Track Jacks, Mixers, Conveyors (two), Air Compressors (two) Water Pumps, regardless of size (two), Welding Machines (two), Siphons or Jets (two), Winch Head or Apparatuses (two), Light Plants (two), Waterblasters (two), all Tractors, regardless of size (straight tractor only), Fireman on Stationary Boilers, Automatic Elevators, Form Grading Machines, Finishing Machines, Power Sub-Grader or Ribbon Machines, Longitudinal Floats, Distributor Operators on Trucks, Winch Heads or Apparatuses (one), Mobil Track air and heaters (two to five), Heavy Equipment Greaser, Relief Operator, Assistant Master Mechanic and Heavy Duty Mechanic, concrete saws of all types and sizes with their attachments, gob-hoppers, excavators all sizes, the repair, greasing, and fueling of all diesel hammers, the operation, set-up and cleaning of bidwells, concrete placement booms, the alterations, repair of all barges, water blasters of all sizes and their clutches, mobile lifts, hydraulic jacks where used for hoisting, diesel or gas powered flashing signs used for traffic control, micro pavers, log skiders, iceolators used on and off of pipeline, condor cranes, drill rigs of all sizes, bow boats, survey boats, ross carriers, bob-cats and all their attachments, skid steer loaders and all their attachments, creter crane, direct drive electric motors the bolting and unbolting the adjusting and shimming, (dewateringjobs, whirley crane, conveyor belts) etc., batch plants (all sizes), roto mills, conveyors systems of any size and any configuration, hydroseeders and straw-blowers all sizes, operation, repair, service of all vibratory hammers, all power pacs and their controls regardless of location, curtains or brush burning machines, stump cutter machines, grout machines regardless of size, Nail Launchers when mounted on a machine or self-propelled, con-cover machines, Goldhofer and similar S.P.M.T. (self-propelled modular transporters) heavy transport units and all Operators (except those listed below). (FAYETTE, JEFFERSON, MARION, PERRY, AND RANDOLPH COUNTIES) (INCLUDING BUILDING CONSTRUCTION ON HEAVY INDUSTRIAL SITES & HEAVY CONSTRUCTION EXCEPT DREDGING AND RIVER WORK)

$42.45$34.95$77.40Agreement
POWER EQUIPMENT OPERATOR GROUP 10…
Full text

POWER EQUIPMENT OPERATOR GROUP 10 CERTIFIED CRANE OPERATORS 17.5 TONS AND ABOVE, WHEN REQUESTED BY THE CONTRACTOR OR REQUIRED BY THE OWNER (FAYETTE, JEFFERSON, MARION, PERRY, AND RANDOLPH COUNTIES) INCLUDING BUILDING CONSTRUCTION ON HEAVY INDUSTRIAL SITES & HEAVY CONSTRUCTION EXCEPT DREDGING AND RIVER WORK

$46.75$34.95$81.70Agreement
POWER EQUIPMENT OPERATOR GROUP 11…
Full text

POWER EQUIPMENT OPERATOR GROUP 11 MASTER MECHANIC (FAYETTE, JEFFERSON, MARION, PERRY, AND RANDOLPH COUNTIES) INCLUDING BUILDING CONSTRUCTION ON HEAVY INDUSTRIAL SITES & HEAVY CONSTRUCTION EXCEPT DREDGING AND RIVER WORK

$44.45$34.95$79.40Agreement
POWER EQUIPMENT OPERATOR GROUP 12…
Full text

POWER EQUIPMENT OPERATOR GROUP 12 LICENSED BOAT PILOT (FAYETTE, JEFFERSON, MARION, PERRY, AND RANDOLPH COUNTIES) INCLUDING BUILDING CONSTRUCTION ON HEAVY INDUSTRIAL SITES & HEAVY CONSTRUCTION EXCEPT DREDGING AND RIVER WORK

$45.45$34.95$80.40Agreement
POWER EQUIPMENT OPERATOR: GROUP 02…
Full text

POWER EQUIPMENT OPERATOR: GROUP 02 ASSISTANT OPERATORS (FAYETTE, JEFFERSON, MARION, PERRY, AND RANDOLPH COUNTIES) INCLUDING BUILDING CONSTRUCTION ON HEAVY INDUSTRIAL SITES & HEAVY CONSTRUCTION EXCEPT DREDGING AND RIVER WORK

$41.32$34.95$76.27Agreement
POWER EQUIPMENT OPERATOR: GROUP 03…
Full text

POWER EQUIPMENT OPERATOR: GROUP 03 AIR COMPRESSOR ONE; WATER PUMP REGARDLESS OF SIZE ONE; WELDING MACHINE ONE; 1-BAG MIXER ONE; CONVEYOR ONE; SIPHON OR JET; LIGHT PLANT ONE; HEATER ONE; IMMOBILE TRACK AIR ONE (FAYETTE, JEFFERSON, MARION, PERRY, AND RANDOLPH COUNTIES) INCLUDING BUILDING CONSTRUCTION ON HEAVY INDUSTRIAL SITES & HEAVY CONSTRUCTION EXCEPT DREDGING AND RIVER WORK

$36.84$34.95$71.79Agreement
POWER EQUIPMENT OPERATOR: GROUP 04…
Full text

POWER EQUIPMENT OPERATOR: GROUP 04 FIREMEN ON WHIRLIES AND ASPHALT SPREADER OILER; HEAVY EQUIPMENT OILERS; TRUCK CRANES; MONIGANS; LARGE OVER 65 TONS CAPACITY; CONCRETE PLANT OILER AND BLACK TOP PLANT OILER (FAYETTE, JEFFERSON, MARION, PERRY, AND RANDOLPH COUNTIES) INCLUDING BUILDING CONSTRUCTION ON HEAVY INDUSTRIAL SITES & HEAVY CONSTRUCTION EXCEPT DREDGING AND RIVER WORK

$43.45$34.95$78.40Agreement
POWER EQUIPMENT OPERATOR: GROUP 05…
Full text

POWER EQUIPMENT OPERATOR: GROUP 05 OILERS (FAYETTE, JEFFERSON, MARION, PERRY, AND RANDOLPH COUNTIES) INCLUDING BUILDING CONSTRUCTION ON HEAVY INDUSTRIAL SITES & HEAVY CONSTRUCTION EXCEPT DREDGING AND RIVER WORK

$44.45$34.95$79.40Agreement
POWER EQUIPMENT OPERATOR: GROUP 06…
Full text

POWER EQUIPMENT OPERATOR: GROUP 06 OPERATORS ON EQUIPMENT WITH BOOMS, INCLUDING JIBS, 100 FT AND OVER, BUT LESS THAN 150 FT (FAYETTE, JEFFERSON, MARION, PERRY, AND RANDOLPH COUNTIES) INCLUDING BUILDING CONSTRUCTION ON HEAVY INDUSTRIAL SITES & HEAVY CONSTRUCTION EXCEPT DREDGING AND RIVER WORK

$45.00$34.95$79.95Agreement
POWER EQUIPMENT OPERATOR: GROUP 07…
Full text

POWER EQUIPMENT OPERATOR: GROUP 07 OPERATORS ON EQUIPMENT WITH BOOMS, INCLUDING JIBS, 150 FT AND OVER, BUT LESS THAN 200 FT (FAYETTE, JEFFERSON, MARION, PERRY, AND RANDOLPH COUNTIES) INCLUDING BUILDING CONSTRUCTION ON HEAVY INDUSTRIAL SITES & HEAVY CONSTRUCTION EXCEPT DREDGING AND RIVER WORK

$45.30$34.95$80.25Agreement
POWER EQUIPMENT OPERATOR: GROUP 08…
Full text

POWER EQUIPMENT OPERATOR: GROUP 08 OPERATORS ON EQUIPMENT WITH BOOMNS, INCLUDING JIBS, 200 FT AND OVER; TOWER CRANES, AND WHIRLEY CRANES (FAYETTE, JEFFERSON, MARION, PERRY, AND RANDOLPH COUNTIES) INCLUDING BUILDING CONSTRUCTION ON HEAVY INDUSTRIAL SITES & HEAVY CONSTRUCTION EXCEPT DREDGING AND RIVER WORK

$45.60$34.95$80.55Agreement
POWER EQUIPMENT OPERATOR: GROUP 09…
Full text

POWER EQUIPMENT OPERATOR: GROUP 09 CERTIFIED CRANE OPERATORS, BELOW 17.5 TONS, WHEN REQUESTED BY THE CONTRACTOR OR REQUIRED BY THE OWNER. (FAYETTE, JEFFERSON, MARION, PERRY, AND RANDOLPH COUNTIES) INCLUDING BUILDING CONSTRUCTION ON HEAVY INDUSTRIAL SITES & HEAVY CONSTRUCTION EXCEPT DREDGING AND RIVER WORK

$46.25$34.95$81.20Agreement
ENGI0841-004 · Operating Engineers agreement, April 1, 2023
POWER EQUIPMENT OPERATOR: GROUP 1…
Full text

POWER EQUIPMENT OPERATOR: GROUP 1 POWER CRANES, DRAGLINES, DERRICKS, SHOVELS, GRADALLS, MECHANICS, TRACTOR HIGHLIFT, TOURNADOZER, CONCRETE MIXERS WITH SKIP, TOURNAMIXER, TWO-DRUM MACHINE, ONE-DRUM HOIST WITH TOWER OR BOOM, CABLEWAYS, TOWER MACHINES, MOTOR PATROL, BOOM TRACTOR, BOOM OR WINCH TRUCK, WINCH OR HYDRAULIC BOOM TRUCK, TRUCK CRANE, TOURNAPULL, TRACTOR OPERATING SCOOPS, BULLDOZER, PUSH TRACTOR, ASPHALT PLANER, FINISHING MACHINE ON ASPHALT, LARGE ROLLERS ON EARTH, ROLLERS ON ASPHALT MIX, ROSS CARRIER OR SIMILAR MACHINE, GRAVEL PROCESSING MACHINE, ASPHALT PLANT ENGINEER, PAVER OPERATOR, FARM TRACTOR WITH HALF YARD BUCKET AND/OR BACKHOE ATTACHMENTS, DREDGE ENGINEER, OR DREDGE OPERATOR, CENTRAL MIX PLANT ENGINEER, CMI OR SIMILAR TYPE MACHINE, TRUCK OR SKID MOUNTED CONCRETE PUMP, TOWER CRANE, ENGINE OR ROCK CRUSHER PLANT, CONCRETE PLANT ENGINEER, DITCHING MACHINE WITH DUAL ATTACHMENT, TRACTOR MOUNTED LOADERS, CHERRY PICKER, HYDRO CRANE, STANDARD OR DINKEY LOCOMOTIVES, SCOOPMOBILES, EUCLID LOADER, SOIL CEMENT MACHINE, BACK FILLER, ELEVATING MACHINE, POWER BLADE, DRILLING MACHINES INCLUDING WELL TESTING, CAISSONS, SHAFT OR ANY SIMILAR TYPE DRILLING MACHINES, MOTOR DRIVEN PAINT MACHINE, PIPE CLEANING MACHINE, PIPE WRAPPING MACHINE, PIPE BENDING MACHINE, APSCO PAVER, BORING MACHINE, (EQUIPMENT GREASED), BARBER- GREENE LOADERS, FORMLESS PAVER, (WELL POINT SYSTEM), CONCRETE SPREADER, HYDRA AX, SPAN SAW AND SIMILAR TYPES, MARINE SCOOPS, BRUSH MULCHER, BRUSH BURNER, MESH PLACER, TREE MOVER, HELICOPTER CREW (3), PILEDRIVER - SKID OR CRAWLER, STUMP REMOVER, ROOT RAKE, TUG BOAT OPERATOR, REFRIGERATING MACHINE, FREEZING OPERATOR, CHAIR CART-SELF PROPELLED, HYDRA SEEDER, STRAW BLOWER, POWER SUB GRADER, BULL FLOAT, FINISHING MACHINE, SELF-PROPELLED PAVEMENT BREAKER (BACKHOE ATTACHED), LULL (OR SIMILAR TYPE MACHINE), TWO AIR COMPRESSORS, COMPRESSORS HOOKED IN MANIFOLD, OVERHEAD CRANE, CHIP SPREADER, MUD CAT, SULL-AIR FORK LIFTS (EXCEPT WHEN USED FOR LANDSCAPING WORK), SOIL STABILAZER (SEAMAN TILLER, BO MAG, RAGO GATOR AND SIMILAR TYPES OR EQUIPMENT), TUBE FLOAT, SPRAY MACHINE, CURING MACHINE, CONCRETE OR ASPHALT MILLING MACHINE, SNOOPER TRUCK OPERATOR. (CLAY, CRAWFORD, EDWARDS, EFFINGHAM, JASPER, LAWRENCE, RICHLAND, WABASH, AND WAYNE COUNTIES)

$45.15$26.00$71.15Agreement
POWER EQUIPMENT OPERATOR: GROUP 2…
Full text

POWER EQUIPMENT OPERATOR: GROUP 2 CONCRETE MIXERS WITHOUT SKIPS, ROCK CRUSHER, DITCHING MACHINE UNDER 6', CURBING MACHINE, ONE DRUM MACHINES WITHOUT TOWER OR BOOM, AIR TUGGER, SELF-PROPELLED CONCRETE SAW, MACHINE- MOUNTED POST HOLE DIGGER, TWO TO FOUR GENERATORS, WATER PUMPS, OR WELDING MACHINES, WITHIN 400 FT, AIR COMPRESSOR 600 CU. FT. AND UNDER, ROLLERS ON AGGREGATE AND SEAL COAT SURFACES, FORK LIFTS (WHEN USED FOR LANDSCAPING WORK, CONCRETE AND BLACKTOP CURB MACHINE, FARM TRACTOR WITH LESS THAN HALF YARD BUCKET, ONE WATER PUMP, OILERS, AIR VALVES OR STEAM VALVES, ONE WELDING MACHINE, TRUCK JACK, MUD JACK, GUNNITE MACHINE, HOUSE ELEVATORS WHEN USED FOR HOISTING MATERIAL, ENGINE TENDERS, WAGON DRILL, FLEX PLANE, CONVEYOR, SIPHONS AND PULSOMETER, SWITCHMAN, FIREMAN ON PAINT POTS, FIREMAN ON ASPHALT PLANTS, DISTRIBUTOR OPERATORS ON TRUCKS, TAMPERS, SELF- PROPELLED POWER BROOM, STRIPING MACHINE (MOTOR DRIVEN), FORM TAMPER, BULK CEMENT PLANT EQUIPMENT GREASER, DECK HANDS, TRUCK CRANE OILER_DRIVER, CEMENT BLIMPS, FORM GRADER, TEMPORARY HEAT, THROTTLE VALVE, FARM TRACTOR, SUPER SUCKER (AND SIMILAR TYPE OF EQUIPMENT). (CLAY, CRAWFORD, EDWARDS, EFFINGHAM, JASPER, LAWRENCE, RICHLAND, WABASH, AND WAYNE COUNTIES)

$30.05$26.00$56.05Agreement
IRON0022-009 · Ironworkers agreement, June 1, 2025
IRONWORKER (CLAY, CRAWFORD…
Full text

IRONWORKER (CLAY, CRAWFORD, EFFINGHAM COUNTY (REMAINDER), JASPER, LAWRENCE, AND RICHLAND COUNTIES)

$38.00$26.39$64.39Agreement
IRON0046-007 · Ironworkers agreement, May 1, 2024
IRONWORKER (EFFINGHAM…
Full text

IRONWORKER (EFFINGHAM (EXCLUDING DEXTER & EAST THEREOF) AND FAYETTE (AVENUE & NORTH THEREOF) COUNTIES)

$37.60$32.94$70.54Agreement
IRON0103-005 · Ironworkers agreement, August 1, 2024
IRONWORKER (CLAY (LOUISVILLE & SOUTH THEREOF)…
Full text

IRONWORKER (CLAY (LOUISVILLE & SOUTH THEREOF), EDWARDS, FRANKLIN (NORTHEAST CORNER), GALLATIN, HAMILTON, JEFFERSON (EAST OF MT. VERNON), LAWRENCE (SOUTHERN HALF INCLUDING LAWRENCEVILLE), MARION (SOUTHEAST), RICHLAND (SOUTHERN HALF), SALINE (NORTHEASTERN 1/3), WABASH, WAYNE, AND WHITE COUNTIES)

$35.34$26.40$61.74Agreement
IRON0392-002 · Ironworkers agreement, August 1, 2024
IRONWORKER (FAYETTE…
Full text

IRONWORKER (FAYETTE (SOUTHERN HALF BELOW BROWNSTOWN), JACKSON (REMAINDER), JEFFERSON (MOUNT VERNON & AREA WEST THEREOF), MARION, PERRY, AND RANDOLPH COUNTIES)

$41.65$31.18$72.83Agreement
IRON0782-005 · Ironworkers agreement, August 1, 2025
IRONWORKER (ALEXANDER…
Full text

IRONWORKER (ALEXANDER, FRANKLIN, GALLATIN, HARDIN, JACKSON (EXCEPT AVA AND ELKVILLE TWPS), JOHNSON, MASSAC, PERRY, POPE, PULASKI, SALINE (EXCEPT VICINITY OF EL DORADO AND AREA NORTHEAST THEREOF), UNION, AND WILLIAMSON COUNTIES)

$37.66$32.10$69.76Agreement
LABO0459-002 · Laborers agreement, August 1, 2024
LABORERS, GROUP 1…
Full text

LABORERS, GROUP 1 GENERAL LABORER (RANDOLPH COUNTY).$ 34.14 30.59 LABORERS, GROUP 2 ASBESTOS ABATEMENT WORKER AND HAZARDOUS WASTE WORKER; LEAD BASE PAINT WORKER (RANDOLPH COUNTY)

$34.64$30.59$65.23Agreement
LABORERS, GROUP 3 DYNAMITE MAN (RANDOLPH COUNTY)$35.64$30.59$66.23Agreement
LABO0773-002 · Laborers agreement, April 1, 2024
LABORER (ALEXANDER…
Full text

LABORER (ALEXANDER, FRANKLIN, GALLATIN, HARDIN, JACKSON, JOHNSON, MASSAC, PERRY, POPE, PULASKI, SALINE, UNION, AND WILLIAMSON COUNTIES)

$32.75$27.64$60.39Agreement
LABO1197-001 · Laborers agreement, April 1, 2024
LABORER (CLAY, CRAWFORD…
Full text

LABORER (CLAY, CRAWFORD, EDWARDS, EFFINGHAM, FAYETTE, HAMILTON, JASPER, JEFFERSON, LAWRENCE, MARION, RICHLAND, WABASH, WAYNE, AND WHITE COUNTIES)

$32.75$27.64$60.39Agreement
PAIN0032-006 · Painters and Allied Trades agreement, September 1, 2021
PAINTER: BRIDGES, DAMS…
Full text

PAINTER: BRIDGES, DAMS (ALEXANDER, FRANKLIN, GALLATIN, HARDIN, JACKSON, JOHNSON, PERRY, POPE, PULASKI, RANDOLPH, SALINE, UNION, AND WILLIAMSON COUNTIES)

$35.51$18.78$54.29Agreement
PAINTER: JOURNEYMAN…
Full text

PAINTER: JOURNEYMAN (ALEXANDER, FRANKLIN, GALLATIN, HARDIN, JACKSON, JOHNSON, PERRY, POPE, PULASKI, RANDOLPH, SALINE, UNION, AND WILLIAMSON COUNTIES)

$33.21$18.78$51.99Agreement
PAIN0058-006 · Painters and Allied Trades agreement, May 1, 2017
PAINTER: BRIDGE EPOXY OR TOXIC-LEAD-BASED PAINT WORK-$1.00 PREMIMUM$32.45$17.12$49.57Agreement
PAIN0124-002 · Painters and Allied Trades agreement, September 1, 2021
PAINTER: JOURNEYMAN…
Full text

PAINTER: JOURNEYMAN (CLAY, HAMILTON, JEFFERSON, MARION, AND WAYNE COUNTIES) EPOXY OR TOXIC-LEAD-BASED PAINT WORK-$1.00 PREMIMUM JOURNEYMAN WORK ON BRIDGES, GRAIN ELEVATORS, WATER, RADIO & TELEVISION TOWERS, STACKS, WASTE WATER PLANTS, AND WATER TREATMENT PLANTS - $3.10 PREMIUM

$26.50$19.01$45.51Agreement
PAINTER: TAPING (ALL KINDS)…
Full text

PAINTER: TAPING (ALL KINDS) (CLAY, HAMILTON, JEFFERSON, MARION, AND WAYNE COUNTIES) EPOXY OR TOXIC-LEAD-BASED PAINT WORK-$1.00 PREMIMUM JOURNEYMAN WORK ON BRIDGES, GRAIN ELEVATORS, WATER, RADIO & TELEVISION TOWERS, STACKS, WASTE WATER PLANTS, AND WATER TREATMENT PLANTS - $3.10 PREMIUM

$27.30$19.01$46.31Agreement
PAIN0156-008 · Painters and Allied Trades agreement, April 1, 2020
PAINTER: BRUSH & ROLLER OF MASTICS…
Full text

PAINTER: BRUSH & ROLLER OF MASTICS, CREOSOTE, KWINCH KOATE, AND COAL TAR EPOXY (EDWARDS, WABASH, AND WHITE COUNTIES)

FOOTNOTE: A: ALL STRUCTURES OVER 40FT? $0.75/ HOUR ABOVE BASE WAGE ALL STRUCTURES OVER 75FT? $1.50 HOUR ABOVE BASE WAGE ALL STRUCTURES OVER 100FT? $2.50/ HOUR ABOVE BASE WAGE

$28.60$17.63$46.23Agreement
PAINTER: BRUSH, ROLLER AND PAPERHANGER (EDWARDS, WABASH, AND WHITE COUNTIES)

FOOTNOTE: A: ALL STRUCTURES OVER 40FT? $0.75/ HOUR ABOVE BASE WAGE ALL STRUCTURES OVER 75FT? $1.50 HOUR ABOVE BASE WAGE ALL STRUCTURES OVER 100FT? $2.50/ HOUR ABOVE BASE WAGE

$27.60$17.63$45.23Agreement
PAINTER: DRYWALL FINISHERS AND PLASTERERS (EDWARDS, WABASH, AND WHITE COUNTIES)

FOOTNOTE: A: ALL STRUCTURES OVER 40FT? $0.75/ HOUR ABOVE BASE WAGE ALL STRUCTURES OVER 75FT? $1.50 HOUR ABOVE BASE WAGE ALL STRUCTURES OVER 100FT? $2.50/ HOUR ABOVE BASE WAGE

$27.85$17.63$45.48Agreement
PAINTER: SPRAY OF MASTICS…
Full text

PAINTER: SPRAY OF MASTICS, CREOSOTES, KWINCH KOATE, AND COAL TAR EPOXY (EDWARDS, WABASH, AND WHITE COUNTIES)

FOOTNOTE: A: ALL STRUCTURES OVER 40FT? $0.75/ HOUR ABOVE BASE WAGE ALL STRUCTURES OVER 75FT? $1.50 HOUR ABOVE BASE WAGE ALL STRUCTURES OVER 100FT? $2.50/ HOUR ABOVE BASE WAGE

$29.60$17.63$47.23Agreement
PAINTER: SPRAY, SANDBLAST…
Full text

PAINTER: SPRAY, SANDBLAST, POWER TOOLS, WATERBLAST, AND STEAM CLEANING (EDWARDS, WABASH, AND WHITE COUNTIES)

FOOTNOTE: A: ALL STRUCTURES OVER 40FT? $0.75/ HOUR ABOVE BASE WAGE ALL STRUCTURES OVER 75FT? $1.50 HOUR ABOVE BASE WAGE ALL STRUCTURES OVER 100FT? $2.50/ HOUR ABOVE BASE WAGE

$28.60$17.63$46.23Agreement
PAIN0500-004 · Painters and Allied Trades agreement, June 1, 2023
PAINTER: BRIDGES & DAMS - BLAST & SPRAY…
Full text

PAINTER: BRIDGES & DAMS - BLAST & SPRAY (MASSAC COUNTY) SPRAY, SANDBLASTING AND WATER BLAST UNITS WITH 3500 PSI RECEIVE A $.50 PER HOUR PREMIMUM. ALL WORK FORTY FEET AND ABOVE RECEIVE A $1.00 PER HOUR PREMIMUM

$31.00$15.40$46.40Agreement
PAINTER: BRIDGES & DAMS - BRUSH & ROLL…
Full text

PAINTER: BRIDGES & DAMS - BRUSH & ROLL (MASSAC COUNTY) SPRAY, SANDBLASTING AND WATER BLAST UNITS WITH 3500 PSI RECEIVE A $.50 PER HOUR PREMIMUM. ALL WORK FORTY FEET AND ABOVE RECEIVE A $1.00 PER HOUR PREMIMUM

$30.00$15.40$45.40Agreement
PAINTER: INDUSTRIAL - BLAST & SPRAY…
Full text

PAINTER: INDUSTRIAL - BLAST & SPRAY (MASSAC COUNTY) SPRAY, SANDBLASTING AND WATER BLAST UNITS WITH 3500 PSI RECEIVE A $.50 PER HOUR PREMIMUM. ALL WORK FORTY FEET AND ABOVE RECEIVE A $1.00 PER HOUR PREMIMUM

$26.25$15.40$41.65Agreement
PAINTER: INDUSTRIAL - BRUSH & ROLL…
Full text

PAINTER: INDUSTRIAL - BRUSH & ROLL (MASSAC COUNTY) SPRAY, SANDBLASTING AND WATER BLAST UNITS WITH 3500 PSI RECEIVE A $.50 PER HOUR PREMIMUM. ALL WORK FORTY FEET AND ABOVE RECEIVE A $1.00 PER HOUR PREMIMUM

$25.25$15.40$40.65Agreement
PAIN1705-003 · Painters and Allied Trades agreement, May 1, 2017
PAINTER: BLASTING, SPRAYING & PRESSURE WASHING…
Full text

PAINTER: BLASTING, SPRAYING & PRESSURE WASHING (CRAWFORD, EFFINGHAM, JASPER, LAWRENCE, AND RICHLAND COUNTIES) EPOXY OR TOXIC-LEAD-BASED PAINT WORK-$1.00 PREMIMUM BRUSH & ROLLER WORK OVER 30FT ABOVE GROUND OR FLOOR LEVEL - $0.80 PREMIUM BRUSH & ROLLER WORK OVER 100FT ABOVE GROUND OR FLOOR LEVEL - $1.80 PREMIUM BLASTING, SPRAYING & PRESSURE WORK OVER 30FT ABOVE GROUND LEVEL - $2.30 PREMIUM BLASTING, SPRAYING & PRESSURE WORK OVER 100FT ABOVE GROUND LEVEL - $3.30 PREMIUM

$28.30$20.07$48.37Agreement
PAINTER: BRUSH & ROLLER AND WALL COVERING DRYWALL PREPARING…
Full text

PAINTER: BRUSH & ROLLER AND WALL COVERING DRYWALL PREPARING (CRAWFORD, EFFINGHAM, JASPER, LAWRENCE, AND RICHLAND COUNTIES) EPOXY OR TOXIC-LEAD-BASED PAINT WORK-$1.00 PREMIMUM BRUSH & ROLLER WORK OVER 30FT ABOVE GROUND OR FLOOR LEVEL - $0.80 PREMIUM BRUSH & ROLLER WORK OVER 100FT ABOVE GROUND OR FLOOR LEVEL - $1.80 PREMIUM BLASTING, SPRAYING & PRESSURE WORK OVER 30FT ABOVE GROUND LEVEL - $2.30 PREMIUM BLASTING, SPRAYING & PRESSURE WORK OVER 100FT ABOVE GROUND LEVEL - $3.30 PREMIUM

$27.30$20.07$47.37Agreement
PLAS0143-010 · Plasterers and Cement Masons agreement, April 1, 2017
CEMENT MASON/CONCRETE FINISHER…
Full text

CEMENT MASON/CONCRETE FINISHER (ALEXANDER, FRANKLIN, GALLATIN, HARDIN, JACKSON, JOHNSON, MASSAC, PERRY, POPE, PULASKI, RANDOLPH, SALINE, UNION, AND WILLIAMSON COUNTIES)

$29.11$16.09$45.20Agreement
PLAS0143-011 · Plasterers and Cement Masons agreement, April 1, 2016
CEMENT MASON/CONCRETE FINISHER…
Full text

CEMENT MASON/CONCRETE FINISHER (CLAY, CRAWFORD, EDWARDS, EFFINGHAM, FAYETTE, HAMILTON, JASPER, JEFFERSON, LAWRENCE, MARION, RICHLAND, WABASH, WAYNE, AND WHITE COUNTIES)

$29.22$16.31$45.53Agreement
TEAM0026-006 · Teamsters agreement, May 1, 2025
TRUCK DRIVER, GROUP 1…
Full text

TRUCK DRIVER, GROUP 1: DRIVERS ON 2 AXLES HAULING LESS THAN 9 TONS; AIR COMPRESSOR & WELDING MACHINES AND BROOMS, INCLUDING THOSE PULLED BY SEPARATE UNITS; TRUCK DRIVER HELPER, WAREHOUSE EMPLOYEES; MECHANIC HELPERS; GREASERS AND TIREMEN; PICK-UP TRUCKS WHEN HAULING MATERIAL, TOOLS, OR WORKERS TO AND FROM AND ON THE JOB SITE; AND FORKLIFTS UP TO 6,000 LB CAPACITY. (EFFINGHAM AND JASPER COUNTIES)

$45.29$25.42$70.71Agreement
TRUCK DRIVER, GROUP 2…
Full text

TRUCK DRIVER, GROUP 2: 2 or 3 axles hualing more than 9 tons but hauling less than 16 tons; A-frame winch trucks; hydrolift trucks; Vactor Trucks or similar equipment when used for transportation purposes; Forklift over 6,000 lb.capacity; winch trucks; and four axle combiation units. (EFFINGHAM AND JASPER COUNTIES)

$45.88$25.42$71.30Agreement
TRUCK DRIVER, GROUP 3…
Full text

TRUCK DRIVER, GROUP 3: 2, 3 or 4 Axles hauling 16 tons or more; 5-Axles or more combination units; drivers on water pulls; articulated dump trucks; mechanics and working forepersons.(EFFINGHAM AND JASPER COUNTIES)

$46.15$25.42$71.57Agreement
TRUCK DRIVER, GROUP 4: LOW BOY AND OIL DISTRIBUTORS. (EFFINGHAM AND JASPER COUNTIES)$46.54$25.42$71.96Agreement
TRUCK DRIVER, GROUP 5…
Full text

TRUCK DRIVER, GROUP 5: DRIVERS WHO REQUIRE SPECIAL PROTECTIVE CLOTHING WHILE EMPLOYED ON HAZARDOUS WASTE WORK. (EFFINGHAM AND JASPER COUNTIES)

$47.64$25.42$73.06Agreement
TEAM0050-004 · Teamsters agreement, May 1, 2025
TRUCK DRIVER, GROUP 1…
Full text

TRUCK DRIVER, GROUP 1: DRIVERS ON 2 AXLES HAULING LESS THAN 9 TONS; AIR COMPRESSOR & WELDING MACHINES AND BROOMS, INCLUDING THOSE PULLED BY SEPARATE UNITS; TRUCK DRIVER HELPER, WAREHOUSE EMPLOYEES; MECHANIC HELPERS; GREASERS AND TIREMEN; PICK-UP TRUCKS WHEN HAULING MATERIAL, TOOLS, OR WORKERS TO AND FROM AND ON THE JOB SITE; AND FORKLIFTS UP TO 6,000 LB CAPACITY. (CLAY, FAYETTE, JEFFERSON, MARION, RANDOLPH, AND WAYNE COUNTIES)

$45.35$25.72$71.07Agreement
TRUCK DRIVER, GROUP 2…
Full text

TRUCK DRIVER, GROUP 2: 2 or 3 axles hualing more than 9 tons but hauling less than 16 tons; A-frame winch trucks; hydrolift trucks; Vactor Trucks or similar equipment when used for transportation purposes; Forklift over 6,000 lb.capacity; winch trucks; and four axle combiation units. (CLAY, FAYETTE, JEFFERSON, MARION, RANDOLPH, AND WAYNE COUNTIES)

$45.93$25.72$71.65Agreement
TRUCK DRIVER, GROUP 3…
Full text

TRUCK DRIVER, GROUP 3: 2, 3 or 4 Axles hauling 16 tons or more; 5-Axles or more combination units; drivers on water pulls; articulated dump trucks; mechanics and working forepersons. (CLAY, FAYETTE, JEFFERSON, MARION, RANDOLPH, AND WAYNE COUNTIES)

$46.25$25.72$71.97Agreement
TRUCK DRIVER, GROUP 4…
Full text

TRUCK DRIVER, GROUP 4: LOW BOY AND OIL DISTRIBUTORS. (CLAY, FAYETTE, JEFFERSON, MARION, RANDOLPH, AND WAYNE COUNTIES)

$46.60$25.72$72.32Agreement
TRUCK DRIVER, GROUP 5…
Full text

TRUCK DRIVER, GROUP 5: DRIVERS WHO REQUIRE SPECIAL PROTECTIVE CLOTHING WHILE EMPLOYED ON HAZARDOUS WASTE WORK. (CLAY, FAYETTE, JEFFERSON, MARION, RANDOLPH, AND WAYNE COUNTIES)

$47.71$25.72$73.43Agreement
TEAM0135-009 · Teamsters agreement, May 1, 2025
TRUCK DRIVER, GROUP 1…
Full text

TRUCK DRIVER, GROUP 1: DRIVERS ON 2 AXLE TRUCKSHAULING LESS THAN 9 TON; AIR COMPRESSOR AND WELDING MACHINES AND BROOMS, INCLUDING THOSE PULLED BY SEPARATE UNITS; TRUCK DRIVER HELPERS; WAREHOUSE EMPLOYEES; MECHANIC HELPERS; GREASERS AND TIREMEN; FORK LIFTS UP TO 6,000 POUNDS CAPACITY (CRAWFORD, EDWARDS, LAWRENCE, RICHLAND, AND WABASH COUNTIES)

FOOTNOTE: A. $46.20 PER DAY

$38.55$16.11$54.66Agreement
TRUCK DRIVER, GROUP 2…
Full text

TRUCK DRIVER, GROUP 2: 2 OR 3 AXLE TRUCKS HAULING MORE THAN 9 TON BUT HAULING LESS THAN 16 TON; A-FRAME WINCH TRUCKS; HYDROLIFT TRUCKS; VACTOR TRUCKS OR SIMILAR EQUIPMENT WHEN USED FOR TRANSPORTATION PURPOSES; FORK LIFTS OVER 6,000 POUND CAPACITY; WINCH TRUCKS; 4 AXLE COMBINATION UNITS; IN THE EVENT THE EMPLOYER DESIRES TO USE TICKET WRITERS THAT CLASSIFICATION SHALL COME UNDER GROUP II

FOOTNOTE: $46.20 PER DAY IN ADDITIONAL FRINGE BENEFITS (CRAWFORD, EDWARDS, LAWRENCE, RICHLAND, AND WABASH COUNTIES)

$38.97$16.11$55.08Agreement
TRUCK DRIVER, GROUP 3…
Full text

TRUCK DRIVER, GROUP 3: 2, 3, or 4 axle trucks hauling 16 ton or more; Drivers on water pulls; Articulated Dump Trucks; Mechanics and working forepersons; 5 axle or more combination units (CRAWFORD, EDWARDS, LAWRENCE, RICHLAND, AND WABASH COUNTIES)

$39.18$16.11$55.29Agreement
TRUCK DRIVER, GROUP 4…
Full text

TRUCK DRIVER, GROUP 4: LOW BOY; OIL DISTRIBUTORS (CRAWFORD, EDWARDS, LAWRENCE, RICHLAND, AND WABASH COUNTIES)

FOOTNOTE: A. $46.20 PER DAY

$39.44$16.11$55.55Agreement
TRUCK DRIVER, GROUP 5…
Full text

TRUCK DRIVER, GROUP 5: DRIVERS WHO REQUIRE SPECIAL PROTECTIVE CLOTHING WHILE EMPLOYED ON HAZARDOUS WASTE WORK. (CRAWFORD, EDWARDS, LAWRENCE, RICHLAND, AND WABASH COUNTIES)

FOOTNOTE: A. $46.20 PER DAY

$39.44$16.11$55.55Agreement
TEAM0347-001 · Teamsters agreement, May 1, 2025
TRUCK DRIVER, GROUP 1…
Full text

TRUCK DRIVER, GROUP 1: DRIVERS ON 2 AXLES HAULING LESS THAN 9 TONS; AIR COMPRESSOR & WELDING MACHINES AND BROOMS, INCLUDING THOSE PULLED BY SEPARATE UNITS; TRUCK DRIVER HELPER, WAREHOUSE EMPLOYEES; MECHANIC HELPERS; GREASERS AND TIREMEN; PICK-UP TRUCKS WHEN HAULING MATERIAL, TOOLS, OR WORKERS TO AND FROM AND ON THE JOB SITE; AND FORKLIFTS UP TO 6,000 LB CAPACITY. (GALLATIN COUNTY)

$43.28$27.56$70.84Agreement
TRUCK DRIVER, GROUP 2…
Full text

TRUCK DRIVER, GROUP 2: 2 or 3 axles hualing more than 9 tons but hauling less than 16 tons; A-frame winch trucks; hydrolift trucks; Vactor Trucks or similar equipment when used for transportation purposes; Forklift over 6,000 lb.capacity; winch trucks; and four axle combiation units. (GALLATIN COUNTY)

$43.86$27.56$71.42Agreement
TRUCK DRIVER, GROUP 3…
Full text

TRUCK DRIVER, GROUP 3: 2, 3 or 4 Axles hauling 16 tons or more; 5-Axles or more combination units; drivers on water pulls; articulated dump trucks; mechanics and working forepersons. (GALLATIN COUNTY)

$44.15$27.56$71.71Agreement
TRUCK DRIVER, GROUP 4: LOW BOY AND OIL DISTRIBUTORS. (GALLATIN COUNTY)$44.53$27.56$72.09Agreement
TRUCK DRIVER, GROUP 5…
Full text

TRUCK DRIVER, GROUP 5: DRIVERS WHO REQUIRE SPECIAL PROTECTIVE CLOTHING WHILE EMPLOYED ON HAZARDOUS WASTE WORK. (GALLATIN COUNTY)

$45.61$27.56$73.17Agreement

Modification history

Modification 0January 2, 2026
Modification 1May 18, 2026
Modification 2July 30, 2026 (current)

Published by the Wage and Hour Division; read from sam.gov. The sheet is checked for a newer modification each day. Contracts awarded since January 1, 2017 also carry Executive Order 13706 paid sick leave (one hour per 30 worked, up to 56 a year).

Questions people ask

Which rate do I pay on IL20260016?
The line for the classification of work actually performed: the basic rate plus the fringe. You may pay the fringe into benefit plans, as cash on every hour, or a mix. Overtime after 40 hours is 1.5 times the basic rate; fringe is paid on every hour and never multiplied.
My trade is not on this sheet. What do I do?
Do not borrow the nearest name. Ask the contracting agency for a conformance on Standard Form 1444 before the first week of that work, and note it as pending on the payroll.
Does modification 2 apply to my contract?
Only if it was in force when your contract was awarded (generally at bid opening). An earlier modification locked into the contract keeps applying, except on option years, added scope and indefinite-quantity contracts. The number and modification are on the first page of the exhibit in your contract.

How to read a wage determination · Paying the fringe in cash or through plans · Overtime on these rates · Fringe credit calculator