Prevailing wage rates · Illinois · Wage determination
Prevailing wage rates: Adams, Brown, Cass and 21 more counties, Illinois
Heavy, Highway construction · IL20260015 modification 2, published July 30, 2026
The short answer
This sheet sets 97 classifications for heavy, highway work in Adams, Brown, Cass and 21 more counties, Illinois. Each line is a basic hourly rate plus a fringe rate, and the sum is the minimum you must pay for that work, from $48.42 an hour (painter: brush & roller and wall covering drywall preparing) to $91.21 (operator: power equipment, group 1). Your contract may lock an earlier modification.
Scope
Heavy Construction
Highway Construction
Rates by classification
Total is the basic rate plus the fringe. Source is the agreement or survey the rate came from; a marker means the group changed in this modification. A dagger (†) means the fringe carries a footnote or percentage the total does not include; read the group’s notes.
| Classification | Basic rate | Fringe | Total | Source |
|---|---|---|---|---|
| BRIL0008-011 · Bricklayers agreement, May 1, 2020 | ||||
| CEMENT MASON/CONCRETE FINISHER (LOGAN, MORGAN AND SCOTT COUNTIES) | $31.91 | $21.93 | $53.84 | Agreement |
| CARP0237-012 · Carpenters agreement, May 15, 2020 | ||||
| CARPENTER (MASON COUNTY) | $33.55 | $30.07 | $63.62 | Agreement |
| PILEDRIVERMAN (MASON COUNTY) | $33.55 | $30.07 | $63.62 | Agreement |
| CARP0237-021 · Carpenters agreement, May 1, 2021 | ||||
| CARPENTER (DE WITT COUNTY) | $37.06 | $31.16 | $68.22 | Agreement |
| PILEDRIVERMAN (DE WITT COUNTY) | $37.06 | $31.16 | $68.22 | Agreement |
| CARP0243-001 · Carpenters agreement, May 15, 2020 | ||||
| CARPENTER (CHAMPAIGN, EDGAR, AND VERMILION COUNTIES) | $37.85 | $25.77 | $63.62 | Agreement |
| PILEDRIVERMAN (CHAMPAIGN, EDGAR, AND VERMILION COUNTIES) | $37.85 | $25.77 | $63.62 | Agreement |
| CARP0243-006 · Carpenters agreement, May 15, 2020 | ||||
| CARPENTER (COLES, CUMBERLAND, MOULTRIE, AND SHELBY COUNTIES) | $35.65 | $27.97 | $63.62 | Agreement |
| PILEDRIVERMAN (COLES, CUMBERLAND, MOULTRIE, AND SHELBY COUNTIES) | $35.65 | $27.97 | $63.62 | Agreement |
| CARP0243-009 · Carpenters agreement, May 15, 2020 | ||||
| CARPENTER (DOUGLAS COUNTY) | $35.65 | $27.97 | $63.62 | Agreement |
| PILEDRIVERMAN (DOUGLAS COUNTY) | $35.65 | $27.97 | $63.62 | Agreement |
| CARP0243-014 · Carpenters agreement, May 1, 2017 | ||||
| CARPENTER (CLARK COUNTY) | $36.20 | $21.92 | $58.12 | Agreement |
| PILEDRIVERMAN (CLARK COUNTY) | $37.20 | $21.92 | $59.12 | Agreement |
| CARP0270-004 · Carpenters agreement, May 1, 2017 | ||||
| CARPENTER (CHRISTIAN, MENARD, AND SANGAMON (EXCEPT ILLIOPOLIS) COUNTIES) | $32.15 | $25.97 | $58.12 | Agreement |
| PILEDRIVERMAN (CHRISTIAN, MENARD, AND SANGAMON (EXCEPT ILLIOPOLIS) COUNTIES) | $33.15 | $25.97 | $59.12 | Agreement |
| CARP0270-007 · Carpenters agreement, May 1, 2017 | ||||
| CARPENTER (ADAMS COUNTY) | $31.55 | $25.97 | $57.52 | Agreement |
| PILEDRIVERMAN (ADAMS COUNTY) | $32.55 | $25.97 | $58.52 | Agreement |
| CARP0270-016 · Carpenters agreement, May 15, 2020 | ||||
CARPENTER (MACON, MOULTRIE…Full textCARPENTER (MACON, MOULTRIE (NORTH OF RT #133), PIATT (SOUTHWESTERN HALF), SANGAMON (ILLIOPOLIS) AND SHELBY (MOWEAQUA & NORTH THEREOF) COUNTIES) | $35.05 | $28.57 | $63.62 | Agreement |
PILEDRIVERMAN (MACON…Full textPILEDRIVERMAN (MACON, MOULTRIE (NORTH OF RT #133), PIATT (SOUTHWESTERN HALF), SANGAMON (ILLIOPOLIS) AND SHELBY (MOWEAQUA & NORTH THEREOF) COUNTIES) | $35.05 | $28.57 | $63.62 | Agreement |
| CARP0270-021 · Carpenters agreement, May 15, 2020 | ||||
| CARPENTER (LOGAN COUNTY) | $35.05 | $28.57 | $63.62 | Agreement |
| PILEDRIVERMAN (LOGAN COUNTY) | $35.05 | $28.57 | $63.62 | Agreement |
| CARP0270-024 · Carpenters agreement, May 15, 2020 | ||||
| CARPENTER (BROWN, CASS, MORGAN, PIKE, AND SCOTT COUNTIES) | $35.05 | $28.57 | $63.62 | Agreement |
| PILEDRIVERMAN (BROWN, CASS, MORGAN, PIKE, AND SCOTT COUNTIES) | $35.05 | $28.57 | $63.62 | Agreement |
| CARP0270-026 · Carpenters agreement, May 1, 2017 | ||||
| CARPENTER (SCHUYLER COUNTY) | $32.15 | $25.97 | $58.12 | Agreement |
| ELEC0034-012 · Electrical Workers (IBEW) agreement, March 1, 2019 | ||||
ELECTRICIAN (MASON…Full textELECTRICIAN (MASON (EXCEPT BATH, CRANE CREEK, KILBOURNE, LYNCHBURG, MASON CITY, & SALT CREEK TWPS) COUNTY) | $37.51 | $21.67 | $59.18 | Agreement |
| ELEC0034-015 · Electrical Workers (IBEW) agreement, March 1, 2023 | ||||
| ELECTRICIAN (ADAMS COUNTY) | $35.00 | $20.67 | $55.67 | Agreement |
| ELEC0051-003 · Electrical Workers (IBEW) agreement, January 1, 2024 | ||||
LINE CONSTRUCTION: GROUNDMAN/EQUIPMENT OPERATOR…Full textLINE CONSTRUCTION: GROUNDMAN/EQUIPMENT OPERATOR (ALL CRAWLER TYPE EQUIPMENT LARGER THAN D-4, 15 TON CRANE OR LARGER) (ADAMS, BROWN, CASS, CHAMPAIGN, CHRISTIAN, DEWITT, DOUGLAS, EDGAR, LOGAN, MACON, MASON, MENARD, PIATT, SCHUYLER, SCOTT, VERMILION, COLES (EAST OAKLAND, HUMBOLDT, MORGAN, NORTH OKAW, AND SEVEN HICKORY TWPS), MORGAN, MOULTRIE (EXCEPT WHITLEY TWP), PIKE, SANGAMON, & SHELBY (THAT PORTION WEST OF HOLLAND, PRAIRIE, RICHLAND, AND WINDSOR TWPS) COUNTIES) | $52.63 | $24.35 | $76.98 | Agreement |
LINE CONSTRUCTION: GROUNDMAN/TRUCK DRIVER…Full textLINE CONSTRUCTION: GROUNDMAN/TRUCK DRIVER (ADAMS, BROWN, CASS, CHAMPAIGN, CHRISTIAN, DEWITT, DOUGLAS, EDGAR, LOGAN, MACON, MASON, MENARD, PIATT, SCHUYLER, SCOTT, VERMILION, COLES (EAST OAKLAND, HUMBOLDT, MORGAN, NORTH OKAW, AND SEVEN HICKORY TWPS), MORGAN, MOULTRIE (EXCEPT WHITLEY TWP), PIKE, SANGAMON, & SHELBY (THAT PORTION WEST OF HOLLAND, PRAIRIE, RICHLAND, AND WINDSOR TWPS) COUNTIES) | $39.92 | $20.22 | $60.14 | Agreement |
LINE CONSTRUCTION: LINEMAN AND SUBSTATION TECHNICIAN…Full textLINE CONSTRUCTION: LINEMAN AND SUBSTATION TECHNICIAN (ADAMS, BROWN, CASS, CHAMPAIGN, CHRISTIAN, DEWITT, DOUGLAS, EDGAR, LOGAN, MACON, MASON, MENARD, PIATT, SCHUYLER, SCOTT, VERMILION, COLES (EAST OAKLAND, HUMBOLDT, MORGAN, NORTH OKAW, AND SEVEN HICKORY TWPS), MORGAN, MOULTRIE (EXCEPT WHITLEY TWP), PIKE, SANGAMON, & SHELBY (THAT PORTION WEST OF HOLLAND, PRAIRIE, RICHLAND, AND WINDSOR TWPS) COUNTIES) | $58.58 | $26.29 | $84.87 | Agreement |
| ELEC0146-003 · Electrical Workers (IBEW) agreement, June 1, 2022 | ||||
ELECTRICIAN (CHRISTIAN…Full textELECTRICIAN (CHRISTIAN, COLES, CUMBERLAND, DE WITT (HARP, WAPELLA, BARNETT, CLINTONIA, DE WITT, TURNBRIDGE, TEXAS, CREEK & NIXON TWPS), DOUGLAS (ARCOLA, BURBON, GARRETT TWPS & THE PORTION OF TUSCOLA LYING WEST OF THE CITY OF TUSCOLA & ILLINOIS CENTRAL RAILROAD TRACKS), MACON, MOULTRIE, PIATT (GOOSE CREEK, WILLOW BRANCH, CERRO GORDO, BEMENT & UNITY TWPS), AND SHELBY COUNTIES) | $41.00 | $20.68 | $61.68 | Agreement |
| ELEC0193-004 · Electrical Workers (IBEW) agreement, June 3, 2024 | ||||
ELECTRICIAN (CASS, LOGAN…Full textELECTRICIAN (CASS, LOGAN, MASON (BATH, CRANE CREEK, KILBOURNE, LYNCHBURG, MASON CITY & SALT CREEK TWPS), MORGAN, SANGAMON AND SCOTT COUNTIES) | $39.80 | $23.08 | $62.88 | Agreement |
| ELEC0193-010 · Electrical Workers (IBEW) agreement, January 1, 2025 | ||||
LINE CONSTRUCTION: GROUNDMAN - EQUIPMENT OPERATOR…Full textLINE CONSTRUCTION: GROUNDMAN - EQUIPMENT OPERATOR (CLASS I, ALL CRAWLER TYPE EQUIPMENT LARGER THAN D-4, 15 TON CRANE OR LARGER) (CASS, LOGAN, MASON (TOWNSHIPS OF LYNCHBURG, BATH, KILBOURNE, CRANE CREEK, SALT CREEK, AND MASON), MORGAN, SCOTT, AND SANGAMON COUNTIES) | $56.61 | $24.20 | $80.81 | Agreement |
LINE CONSTRUCTION: GROUNDMAN - TRUCK DRIVER…Full textLINE CONSTRUCTION: GROUNDMAN - TRUCK DRIVER (WITH WINCH, MAY OPERATE DIGGERS, 5TH WHEEL TYPE TRUCKS, CRAWLER-TYPE EQUIPMENT, D-4 AND SMALLER, BACKHOE 3/4 YARD AND UNDER, RUBBER TIRE AND CRAWLER W/END LOADER, AND MAY DRIVE BUCKET TRUCK AND LIVE BOOM TYPE LINE TRUCKS) (CASS, LOGAN, MASON (TOWNSHIPS OF LYNCHBURG, BATH, KILBOURNE, CRANE CREEK, SALT CREEK, AND MASON), MORGAN, SCOTT, AND SANGAMON COUNTIES) | $42.85 | $20.14 | $62.99 | Agreement |
LINE CONSTRUCTION: GROUNDMAN - TRUCK DRIVER…Full textLINE CONSTRUCTION: GROUNDMAN - TRUCK DRIVER (WITHOUT WINCH) (CASS, LOGAN, MASON (TOWNSHIPS OF LYNCHBURG, BATH, KILBOURNE, CRANE CREEK, SALT CREEK, AND MASON), MORGAN, SCOTT, AND SANGAMON COUNTIES) | $40.36 | $19.41 | $59.77 | Agreement |
LINE CONSTRUCTION: GROUNDMAN…Full textLINE CONSTRUCTION: GROUNDMAN (CLASS A) (CASS, LOGAN, MASON (TOWNSHIPS OF LYNCHBURG, BATH, KILBOURNE, CRANE CREEK, SALT CREEK, AND MASON), MORGAN, SCOTT, AND SANGAMON COUNTIES) | $38.38 | $18.82 | $57.20 | Agreement |
LINE CONSTRUCTION: LINEMAN & SUBSTATION TECH…Full textLINE CONSTRUCTION: LINEMAN & SUBSTATION TECH (CASS, LOGAN, MASON (TOWNSHIPS OF LYNCHBURG, BATH, KILBOURNE, CRANE CREEK, SALT CREEK, AND MASON), MORGAN, SCOTT, AND SANGAMON COUNTIES) | $62.90 | $26.06 | $88.96 | Agreement |
| ELEC0197-003 · Electrical Workers (IBEW) agreement, December 1, 2021 | ||||
| ELECTRICIANS: | $41.25 | $21.30 | $62.55 | Agreement |
| ELEC0538-008 · Electrical Workers (IBEW) agreement, June 1, 2025 | ||||
| ELECTRICIAN (VERMILION COUNTY) | $41.00 | $27.36 | $68.36 | Agreement |
| ELEC0702-002 · Electrical Workers (IBEW) agreement, January 6, 2025 | ||||
LINE CONSTRUCTION: GROUNDMAN - CLASS A…Full textLINE CONSTRUCTION: GROUNDMAN - CLASS A (ALEXANDER, CLAY, CRAWFORD, EDWARDS, EFFINGHAM, FRANKLIN, FAYETTE (EXCLUDES PORTION NORTH AVENA), GALLATIN, HAMILTON, HARDIN, JACKSON, JASPER, JEFFERSON, JOHNSON, LAWRENCE, MARION, MASSAC, PERRY, POPE, PULASKI, RANDOLPH (EXCEPT RED BUD TWPS), RICHLAND, SALINE, UNION, WABASH, WAYNE, WHITE, AND WILLIAMSON COUNTIES; CLARK, COLES (SOUTHERN HALF), CUMBERLAND, MOULTRIE (WHITLEY TWP), AND SHELBY (EXCEPT WEST OF HOLLAND, PRAIRIE, RICHLAND, & WINDSOR TWPS) COU | $38.18 | $19.92 | $58.10 | Agreement |
LINE CONSTRUCTION: GROUNDMAN - EQUIPMENT OPERATOR CLASS II…Full textLINE CONSTRUCTION: GROUNDMAN - EQUIPMENT OPERATOR CLASS II (ALL OTHER EQUIPMENT) (ALEXANDER, CLAY, CRAWFORD, EDWARDS, EFFINGHAM, FRANKLIN, FAYETTE (EXCLUDES PORTION NORTH AVENA), GALLATIN, HAMILTON, HARDIN, JACKSON, JASPER, JEFFERSON, JOHNSON, LAWRENCE, MARION, MASSAC, PERRY, POPE, PULASKI, RANDOLPH (EXCEPT RED BUD TWPS), RICHLAND, SALINE, UNION, WABASH, WAYNE, WHITE, AND WILLIAMSON COUNTIES; CLARK, COLES (SOUTHERN HALF), CUMBERLAND, MOULTRIE (WHITLEY TWP), AND SHELBY (EXCEPT WEST OF HOLLAND, | $46.49 | $22.33 | $68.82 | Agreement |
LINE CONSTRUCTION: HEAVY - EQUIPMENT OPERATOR CLASS I…Full textLINE CONSTRUCTION: HEAVY - EQUIPMENT OPERATOR CLASS I (ALL CRAWLER TYPE EQUIPMENT D-4 AND LARGER) (ALEXANDER, CLAY, CRAWFORD, EDWARDS, EFFINGHAM, FRANKLIN, FAYETTE (EXCLUDES PORTION NORTH AVENA), GALLATIN, HAMILTON, HARDIN, JACKSON, JASPER, JEFFERSON, JOHNSON, LAWRENCE, MARION, MASSAC, PERRY, POPE, PULASKI, RANDOLPH (EXCEPT RED BUD TWPS), RICHLAND, SALINE, UNION, WABASH, WAYNE, WHITE, AND WILLIAMSON COUNTIES; CLARK, COLES (SOUTHERN HALF), CUMBERLAND, MOULTRIE (WHITLEY TWP), AND SHELBY (EXCEPT | $52.13 | $23.97 | $76.10 | Agreement |
| ENGI0649-006 · Operating Engineers agreement, April 1, 2025 | ||||
OPERATOR: POWER EQUIPMENT, GROUP 1…Full textOPERATOR: POWER EQUIPMENT, GROUP 1 CRANES: OVERHEAD CRANES; HYDRO CRANE; SHOVELS; CRANE TYPE BACKFILLER; TOWER CRANES-MOBILE, CRAWLER, STATIONARY; DERRICKS, HOIST (3 DRUM); DRAGLINES; DROTT YUMBO & SIMILAR TYPES CONSIDERED AS CRANES; 360 DEGREES SWING EXCAVATOR, BACKHOE; DERRICK BOATS; PILE DRIVER AND SKID RIGS; CLAM SHELL; LOCOMOTIVE CRANES; ROAD PAVERS (SINGLE DRUM, DUAL DRUM, TRI BATCHER); MOTOR PATROL & POWER BLADES (DUNMORE, ELEVATING & SIMILAR TYPES); MECHANICS; CENTRAL CONCRETE MIXING PLANT OPERATOR; ASPHALT BATCH PLANT OPERATOR AND PLANT ENGINEER; GRADALL; CAISSON RIGS; SKIMMER SCOOP, KOEHRING SCOOPER; DREDGES (ALL TYPES); HOPTOE; ALL CHERRY PICKERS; WORK BOAT; ROSS CARRIER; HELICOPTER; DOZER; TOURNADOZER; TOURNAPULLS (ALL & SIMILAR TYPES); CONCRETE AND ALL RECYCLE MACHINES, MULTIPLE UNIT EARTH MOVERS; 75 CENTS PER HOUR FOR EACH SCOOP OVER ONE; SCOOPS (ALL SIZES); PUSHCATS; ENDLOADERS (ALL TYPES); ASPHALT SURFACING MACHINE; SLIP FORM PAVER; ROCK CRUSHER; MATERIAL CRUSHER (OUTSIDE PITS AND QUARRIES); SCREENING PLANTS (OUTSIDE PITS AND QUARRIES); TUNNEL BORING MACHINE; HEAVY EQUIPMENT GREASER (TOP GREASER ON SPREAD); CMI, AUTO GRADE, CMI BELT PLACER (3 TRACK & SIMILAR TYPES); SIDE BOOMS; STARTING ENGINEER ON PIPELINE OR CONSTRUCTION (ELEVEN 11 PIECES OR MORE); ASPHALT HEATER & PLANER COMBINATION; WHEEL TRACTORS WITH DOZER, HOE OR END LOADER ATTACHEMENTS; CAT EARTHWORK COMPACTORS AND SIMILAR TYPES; BLAW KNOX SPREADER & SIMILAR TYPES; TRENCH MACHINES; PUMP CRETE, BELT CRETE, SQUEEZE CRETE, SCREW TYPE PUMPS & GYPSUM; CRETER CRANE; CONCRETE PUMP TRUCK; FORMLESS FINISHING MACHINES; FLAHERTY SPREADER OR SIMILAR TYPES; SCREEDMAN ON LAYDOWN MACHINE; VERMEER CONCRETE SAW; LASER SCREED; SPAN SAW; DREDGE LEVERMAN; DREDGE ENGINEER; LULL OR SIMILAR TYPE; HYDRO-BOOM TRUCK; GUARD RAIL MACHINE. (MASON COUNTY) - ESCALATED RATE ON CRANE, DERRICK BOOMS, AND TOWER CRANES: ADDITIONAL $1.00 PER HOUR OVER SCALE WHEN CRANE OR DERRICK IS POSITIONED 50 FT. OR MORE ABOVE ADJACENT GROUND LEVEL OR WATER LEVEL. $.05 PER HOUR, PER FOOT, OVER 90 FEET INCLUDING JIB. $0.02 PER HOUR, PER TON - OVER 50-TON CAPACITY. - OPERATING ENGINEERS WHO OPERATE LATTICE BOOM CRAWLER CRANES, LATTICE BOOM TRUCK CRANES, TELESCOPIC BOOM CRANES LESS THAN 17.5 TONS, TOWER CRANES, OVERHEAD CRANES AND HAVE BEEN CERTIFIED BY HTE NATIONAL COMMISSION FOR THE CERTIFICATION OF CRANE OPERATORS ON THE EQUIPMENT THEY OPERATE SHALL RECEIVE $1.60 PER HOUR OVER SCALE. A. ON DESIGNATED HAZARDOUS WASTE JOBS, OPERATORS SHALL RECEIVE: LEVEL A ADD $4.00 TO THE APPROPRIATE GROUP RATE; LEVELS B AND C ADD $3.00 TO THE APPROPRIATE GROUP RATE; AND LEVEL D ADD $2.00 TO THE APPROPRIATE GROUP RATE | $47.79 | $43.42 | $91.21 | Agreement |
OPERATOR: POWER EQUIPMENT, GROUP 2…Full textOPERATOR: POWER EQUIPMENT, GROUP 2 BULKER & PUMP; POWER LAUNCHES; BORING MACHINE & PIPE JACKING MACHINE; DINKEYS; CARTS, POWERED HAUL UNIT FOR A BORING MACHINE; P-H ONE PASS SOIL CEMENT MACHINES AND SIMILAR TYPES: WHEEL TRACTOR; BACK FILLERS; EUCLID LOADER; FORK LIFTS; JEEP WITH DITCHING MACHINES OR OTHER ATTACHMENTS; TUNELUGER; AUTOMATIC CEMENT & GRAVEL BATCHING PLANTS; MOBILE DRILLS SOIL TESTING AND SIMILAR TYPES); PUGMILL WITH PUMP; ALL 1 AND 2 DRUM HOISTS; DE-WATERING SYSTEMS; STRAW BLOWER; HYDRO SEEDER; BUMP GRINDERS, SELF PROPELLED; ASSISTANT HEAVY EQUIPMENT GREASER; APSCO SPREADER TRACTORS (TRACK-TYPE W/O POWER UNITS PULLING ROLLERS); ROLLERS ON ASPHALT, BRICK, OR MACADAM; CONCRETE BREAKERS; CONCRETE SPREADERS; CEMENT STRIPPERS; CEMENT FINISHING MACHINES & CMI TEXTURE & REEL CURING MACHINES; VIBRO-TAMPERS & SIMILAR TYPES SELF-PROPELLED; MECHANICAL BULL-FLOATS; SELF-PROPELLED CONCRETE SAW; TRUCK MOUNTED POWER SAWS; CURB CUTTERS; MIXERS OVER 3 BAGS TO 27E; WINCH & BOOM TRUCKS; TRACTOR PULLING POWER BLADE OR ELEVATING GRADER; PORTER REX RAIL; CLARY SCREED; MULE PULLING ROLLERS; PUGMILL W/O PUMP; BARBER GREENE OR SIMILAR LOADERS; TRACK TYPE TRACTOR WITH POWER UNIT ATTACHED; FIREMAN; SPRAY MACHINE ON PAVING; CURB MACHINE; PAVED DITCH MACHINE; POWER BROOM; SELF-PROPELLED SWEEPERS; SELF- PROPELLED CONVEYORS; POWER SUBGRADER; OIL DISTRIBUTOR; STRAIGHT TRACTOR; TRUCK CRANE OILER; TRUCK TYPE OILERS; DIRECTIONAL BORING MACHINE; HORIZONTAL DIRECTIONAL DRILL; ARTICULATING END DUMP VEHICLES; STARTING ENGINEER (6 TO 10 PIECES). (MASON COUNTY) - ESCALATED RATE ON CRANE, DERRICK BOOMS, AND TOWER CRANES: ADDITIONAL $1.00 PER HOUR OVER SCALE WHEN CRANE OR DERRICK IS POSITIONED 50 FT. OR MORE ABOVE ADJACENT GROUND LEVEL OR WATER LEVEL. $.05 PER HOUR, PER FOOT, OVER 90 FEET INCLUDING JIB. $0.02 PER HOUR, PER TON - OVER 50-TON CAPACITY. - OPERATING ENGINEERS WHO OPERATE LATTICE BOOM CRAWLER CRANES, LATTICE BOOM TRUCK CRANES, TELESCOPIC BOOM CRANES LESS THAN 17.5 TONS, TOWER CRANES, OVERHEAD CRANES AND HAVE BEEN CERTIFIED BY HTE NATIONAL COMMISSION FOR THE CERTIFICATION OF CRANE OPERATORS ON THE EQUIPMENT THEY OPERATE SHALL RECEIVE $1.60 PER HOUR OVER SCALE. A. ON DESIGNATED HAZARDOUS WASTE JOBS, OPERATORS SHALL RECEIVE: LEVEL A ADD $4.00 TO THE APPROPRIATE GROUP RATE; LEVELS B AND C ADD $3.00 TO THE APPROPRIATE GROUP RATE; AND LEVEL D ADD $2.00 TO THE APPROPRIATE GROUP RATE | $44.09 | $43.42 | $87.51 | Agreement |
OPERATOR: POWER EQUIPMENT, GROUP 3…Full textOPERATOR: POWER EQUIPMENT, GROUP 3 STRAIGHT FRAMED TRUCK AND TRUCK MOUNTED VAC UNIT, STARTING ENGINEER (3 TO 5 PIECES); TRAC AIR MACHINE W/O ATTACHMENTS; ROLLERS, 5 TONS & UNDER ON EARTH & GRAVEL; FORM GRADER; BULK CEMENT PLANT; OILERS. (MASON COUNTY) - ESCALATED RATE ON CRANE, DERRICK BOOMS, AND TOWER CRANES: ADDITIONAL $1.00 PER HOUR OVER SCALE WHEN CRANE OR DERRICK IS POSITIONED 50 FT. OR MORE ABOVE ADJACENT GROUND LEVEL OR WATER LEVEL. $.05 PER HOUR, PER FOOT, OVER 90 FEET INCLUDING JIB. $0.02 PER HOUR, PER TON - OVER 50-TON CAPACITY. - OPERATING ENGINEERS WHO OPERATE LATTICE BOOM CRAWLER CRANES, LATTICE BOOM TRUCK CRANES, TELESCOPIC BOOM CRANES LESS THAN 17.5 TONS, TOWER CRANES, OVERHEAD CRANES AND HAVE BEEN CERTIFIED BY HTE NATIONAL COMMISSION FOR THE CERTIFICATION OF CRANE OPERATORS ON THE EQUIPMENT THEY OPERATE SHALL RECEIVE $1.60 PER HOUR OVER SCALE. A. ON DESIGNATED HAZARDOUS WASTE JOBS, OPERATORS SHALL RECEIVE: LEVEL A ADD $4.00 TO THE APPROPRIATE GROUP RATE; LEVELS B AND C ADD $3.00 TO THE APPROPRIATE GROUP RATE; AND LEVEL D ADD $2.00 TO THE APPROPRIATE GROUP RATE | $38.03 | $43.42 | $81.45 | Agreement |
| ENGI0841-003 · Operating Engineers agreement, April 1, 2023 | ||||
OPERATOR: POWER EQUIPMENT, GROUP 1…Full textOPERATOR: POWER EQUIPMENT, GROUP 1 POWER CRANES, DRAGLINES, DERRICKS, SHOVELS, GRADALLS, MECHANICS, TRACTOR HIGHLIFT, TOURNADOZER, CONCRETE MIXERS WITH SKIP, TOURNAMIXER, TWO-DRUM MACHINE, ONE-DRUM HOIST WITH TOWER OR BOOM, CABLEWAYS, TOWER MACHINES, MOTOR PATROL, BOOM TRACTOR, BOOM OR WINCH TRUCK, WINCH OR HYDRAULIC BOOM TRUCK, TRUCK CRANE, TOURNAPULL, TRACTOR OPERATING SCOOPS, BULLDOZER, PUSH TRACTOR, ASPHALT PLANER, FINISHING MACHINE ON ASPHALT, LARGE ROLLERS ON EARTH, ROLLERS ON ASPHALT MIX, ROSS CARRIER OR SIMILAR MACHINE, GRAVEL PROCESSING MACHINE, ASPHALT PLANT ENGINEER, PAVER OPERATOR, FARM TRACTOR WITH HALF YARD BUCKET AND/OR BACKHOE ATTACHMENTS, DREDGE ENGINEER, OR DREDGE OPERATOR, CENTRAL MIX PLANT ENGINEER, CMI OR SIMILAR TYPE MACHINE, TRUCK OR SKID MOUNTED CONCRETE PUMP, TOWER CRANE, ENGINE OR ROCK CRUSHER PLANT, CONCRETE PLANT ENGINEER, DITCHING MACHINE WITH DUAL ATTACHMENT, TRACTOR MOUNTED LOADERS, CHERRY PICKER, HYDRO CRANE, STANDARD OR DINNEY LOCOMOTIVES, SCOOPMOBILES, EUCLID LOADER, SOIL CEMENT MACHINE, BACK FILLER, ELEVATING MACHINE, POWER BLADE, DRILLING MACHINES INCLUDING WELL TESTING, CAISSONS, SHAFT OR ANY SIMILAR TYPE DRILLING MACHINES, MOTOR DRIVEN PAINT MACHINE, PIPE CLEANING MACHINE, PIPE WRAPPING MACHINE, PIPE BENDING MACHINE, APSCO PAVER, BORING MACHINE, (HEAD EQUIPMENT GREASED), BARBER- GREENE LOADERS, FORMLESS PAVER, (WELL POINT SYSTEM), CONCRETE SPREADER, HYDRA AX, SPAN SAW AND SIMILAR TYPES, MARINE SCOOPS, BRUSH MULCHER, BRUSH BURNER, MESH PLACER, TREE MOVER, HELICOPTER CREW (3), PILEDRIVER - SKID OR CRAWLER, STUMP REMOVER, ROOT RAKE, TUG BOAT OPERATOR, REFRIGERATING MACHINE, FREEZING OPERATOR, CHAIR CART-SELF PROPELLED, HYDRA SEEDER, STRAW BLOWER, POWER SUB GRADER, BULL FLOAT, FINISHING MACHINE, SELF-PROPELLED PAVEMENT BREAKER (BACKHOE ATTACHED), LULL (OR SIMILAR TYPE MACHINE), TWO AIR COMPRESSORS, COMPRESSORS HOOKED IN MANIFOLD, OVERHEAD CRANE, CHIP SPREADER, MUD CAT, SULL-AIR FORK LIFTS (EXCEPT WHEN USED FOR LANDSCAPING WORK), SOIL STABILAZER (SEAMAN TILLER, BO MAG, RAGO GATOR AND SIMILAR TYPES OR EQUIPMENT), TUBE FLOAT, SPRAY MACHINE, CURING MACHINE, CONCRETE OR ASPHALT MILLING MACHINE, SNOOPER TRUCK OPERATOR. (CHAMPAIGN, CLARK, COLES, CUMBERLAND, DOUGLAS EDGAR, MOULTRIE, AND VERMILION COUNTIES) | $45.15 | $26.00 | $71.15 | Agreement |
OPERATOR: POWER EQUIPMENT, GROUP 2…Full textOPERATOR: POWER EQUIPMENT, GROUP 2 CONCRETE MIXERS WITHOUT SKIPS, ROCK CRUSHER, DITCHING MACHINE UNDER 6', CURBING MACHINE, ONE DRUM MACHINES WITHOUT TOWER OR BOOM, AIR TUGGER, SELF-PROPELLED CONCRETE SAW, MACHINE- MOUNTED POST HOLE DIGGER, TWO TO FOUR GENERATORS, WATER PUMPS, OR WELDING MACHINES, WITHIN 400FT., AIR COMPRESSOR 600 CU. FT. AND UNDER, ROLLERS ON AGGREGATE AND SEAL COAT SURFACES, FORK LIFTS (WHEN USED FOR LANDSCAPING WORK, CONCRETE AND BLACKTOP CURB MACHINE, FARM TRACTOR WITH LESS THAN HALF YARD BUCKET, ONE WATER PUMP, OILERS, AIR VALVES OR STEAM VALVES, ONE WELDING MACHINE, TRUCK JACK, MUD JACK, GUNNITE MACHINE, HOUSE ELEVATORS WHEN USED FOR HOISTING MATERIAL, ENGINE TENDERS, WAGON DRILL, FLEX PLANE, CONVEYOR, SIPHONS AND PULSOMETER, SWITCHMAN, FIREMAN ON PAINT POTS, FIREMAN ON ASPHALT PLANTS, DISTRIBUTOR OPERATORS ON TRUCKS, TAMPERS, SELF- PROPELLED POWER BROOM, STRIPING MACHINE (MOTOR DRIVEN), FORM TAMPER, BULK CEMENT PLANT EQUIPMENT GREASER, DECK HANDS, TRUCK CRANE OILER_DRIVER, CEMENT BLIMPS, FORM GRADER, TEMPORARY HEAT, THROTTLE VALVE, FARM TRACTOR, SUPER SUCKER (AND SIMILAR TYPE OF EQUIPMENT). (CHAMPAIGN, CLARK, COLES, CUMBERLAND, DOUGLAS EDGAR, MOULTRIE, AND VERMILION COUNTIES) | $30.05 | $26.00 | $56.05 | Agreement |
| ENGI0965-002 · Operating Engineers agreement, May 1, 2023 | ||||
POWER EQUIPMENT OPERATOR GROUP 1…Full textPOWER EQUIPMENT OPERATOR GROUP 1 ASPHALT PLANT ENGINEER; ASPHALT SCREED MAN; APSCO CONCRETE SPREADER; ASPHALT PAVER; ASPHALT ROLLER ON BITUMINOUS CONTRETE; ATHEY LOADERS; CABLEWAYS; CHERRY PICKER; CLAM SHELL; C.M.I. & SIMILAR TYPE AUTOGRADE FORMLESS PAVER, AUTGRADE PLACER & FINISHER; CONCRETE BREAKER; CONCRETE PLANT OPER; CONCRETE PUMPS; CRANES; DERRICKS; DERRICK BOATS; DRAGLINES; EARTH AUGER BORING MACHINE, ELEVATING GRADERS; ENGINEERS ON DREDGE; GRAVEL PROCESSING MACHINES; HEAD EQUIPMENT GREASER; HIGH LIFT OR FORK LIFT; HOIST WITH TWO DRUMS OR 2 OR MORE LOADLINES; LOCOMOTIVE; MECHANICS; MOTOR GRADERS OR AUTO PATROLS; OPERATORS OR LEVELMAN ON DREDGES; POWER BOAT OPER; PUG MILL OPERATOR; (ASPHALT PLAT); ORANGE PEELS; OVERHEAD CRANES; PAVING MIXER; PILEDRIVERS; PIPE WRAPER & PAINTING MACHINES; PUSH DOZERS, OR PUSH CATS; ROCK CRUSHER; ROSS CARRIER OR SIMILAR MACHINE; SCOOPS; SKIMMERS 2 CU YD CAPACITY & UNDER: SHEEP FOOT ROLLER (SELF PROPELLED); SHOVELS; SKIMMER; SCOOPS; TEST HOLE DRILLING MACHINES; TOWER MACHINE; TOWER MIXER; TRACK TUPE & LOADERS; TRACK TYPE FORKLIFTS OR HIGH LIFTS; TRACK JACKS & TAMPERS; TRACKORS; SIDEBOOM; TRENCHING MACHINE; DITCHING MACHINE; TUNNEL LUGGER; WHEEL TYPE END LOADER; WINCH CAT; SCOOPS (ALL OR TOURNAPULL). (ADAMS, BROWN, CASS, CHRISTIAN, DE WITT, LOGAN, MACON, MENARD, MORGAN, PIATT, PIKE, SANGAMON, SCHUYLER, SCOTT, AND SHELBY COUNTIES) PREMIUM PAY: - CRANES WITH BOOMS 120-200 FT. 1.00 PER HOUR; .02 PER FOOT FOR EACH FOOT ABOVE 200 MULTIPLE UNIT MACHINE - 1.00 PER HOUR; UNDERGROUND WORK - 1.00 PER HOUR; UNDER AIR PRESSURE - 1.00 PER HOUR; HAZARDOUS WASTE OR ASBESTOS REMOVAL PROJECTS - 1.00 PER HOUR FOR LEVEL C WORK; 1.50 PER HOUR FOR LEVEL B WORK; 2.00 PER HOUR FOR LEVEL A WORK; LONG BOOM ON A STATIONARY CRANE 1.00 PER HOUR ABOVE LONG BOOM SCALE LEVEL A: (HIGHEST LEVEL OF REPIRATORY, SKIN, AND EYE PROTECTION) LEVEL B: (SAME AS LEVEL A, BUT A LOWER LEVEL OF SKIN PROTECTION) LEVEL C: (SAME AS LEVEL B, BUT A LOWER LEVEL OF RESPIRATORY PROTECTION) | $47.21 | $30.20 | $77.41 | Agreement |
POWER EQUIPMENT OPERATOR GROUP 2…Full textPOWER EQUIPMENT OPERATOR GROUP 2 ASPHALT BOOSTER & HEATER; ASPHALT DISTRIBUTOR; ASPHALT PLANT FIREMAN;BUILDING ELEVATOR; BULL FLOAT OR FLEXPLANE; CONCRETE FINSHING MACHINE; CONCRETE SAW, SELF PROPELLED; CONCRETE SPREADER MACHINE; GRAVEL OR STONE SPREADER, POWER OPERATED; HOIST AUTOMATIC; HOIST WITH ONE DRUM & ONE LOAD LINE; OILER ON 2 PAVING MIXERS WHEN USED IN TANDEM BOOM OR WINCH TRUCK; OST HOLE DIGGERS; MECHANICAL; ROAD OR STREET SWEEPER, SELF-PROPELLED; SCISSORS HOIST; SEAMAN TILLER; STRAW MACHINE; VIBRATORY COMPACTOR; WELL DRILL MACHINE; & MUD JACKS. (ADAMS, BROWN, CASS, CHRISTIAN, DE WITT, LOGAN, MACON, MENARD, MORGAN, PIATT, PIKE, SANGAMON, SCHUYLER, SCOTT, AND SHELBY COUNTIES) PREMIUM PAY: - CRANES WITH BOOMS 120-200 FT. 1.00 PER HOUR; .02 PER FOOT FOR EACH FOOT ABOVE 200 MULTIPLE UNIT MACHINE - 1.00 PER HOUR; UNDERGROUND WORK - 1.00 PER HOUR; UNDER AIR PRESSURE - 1.00 PER HOUR; HAZARDOUS WASTE OR ASBESTOS REMOVAL PROJECTS - 1.00 PER HOUR FOR LEVEL C WORK; 1.50 PER HOUR FOR LEVEL B WORK; 2.00 PER HOUR FOR LEVEL A WORK; LONG BOOM ON A STATIONARY CRANE 1.00 PER HOUR ABOVE LONG BOOM SCALE LEVEL A: (HIGHEST LEVEL OF REPIRATORY, SKIN, AND EYE PROTECTION) LEVEL B: (SAME AS LEVEL A, BUT A LOWER LEVEL OF SKIN PROTECTION) LEVEL C: (SAME AS LEVEL B, BUT A LOWER LEVEL OF RESPIRATORY PROTECTION) | $41.88 | $30.20 | $72.08 | Agreement |
POWER EQUIPMENT OPERATOR GROUP 3…Full textPOWER EQUIPMENT OPERATOR GROUP 3 AIR COMPRESSOR, TRACK OR SELF-PROPELLED; BULK CEMENT BATCHING- PLANTS; CONVEYORS; CONCRETE MIXERS (EXCEPT PLANT, PAVER, TOWER) FIREMENT, GENERATORS; GREASERS; LIGHT PLANTS; MECHANICAL THEATER; OILERS; POWER FROM GRADERS; POWER SUB-GRADER; PUG MILL, WHEN USED OTHER THAN ASPHALT OPERATION; ROOLERS (EXCEPT BITUMINOUS); TRACTORS W/O POWER ATTACHMENTS REGARDLESS OF SIZE OR TYPE; TRUCK CRANE OILER; & DRIVER (ONE MAN); VIBRATORY HAMMER; WATER PUMP; WELDING MACHINE (ONE 300 AMP OR OVER) COMBINATIONS OF FIVE OF ANY AIR COMPRESSORS; CONVEYORS, WELDING MACHINES, WATER PUMPS; LIGHT PLANTS OR GENERATORS SHALL BE IN BATTERIES OR WITH IN 300 FT. (ADAMS, BROWN, CASS, CHRISTIAN, DE WITT, LOGAN, MACON, MENARD, MORGAN, PIATT, PIKE, SANGAMON, SCHUYLER, SCOTT, AND SHELBY COUNTIES) PREMIUM PAY: - CRANES WITH BOOMS 120-200 FT. 1.00 PER HOUR; .02 PER FOOT FOR EACH FOOT ABOVE 200 MULTIPLE UNIT MACHINE - 1.00 PER HOUR; UNDERGROUND WORK - 1.00 PER HOUR; UNDER AIR PRESSURE - 1.00 PER HOUR; HAZARDOUS WASTE OR ASBESTOS REMOVAL PROJECTS - 1.00 PER HOUR FOR LEVEL C WORK; 1.50 PER HOUR FOR LEVEL B WORK; 2.00 PER HOUR FOR LEVEL A WORK; LONG BOOM ON A STATIONARY CRANE 1.00 PER HOUR ABOVE LONG BOOM SCALE LEVEL A: (HIGHEST LEVEL OF REPIRATORY, SKIN, AND EYE PROTECTION) LEVEL B: (SAME AS LEVEL A, BUT A LOWER LEVEL OF SKIN PROTECTION) LEVEL C: (SAME AS LEVEL B, BUT A LOWER LEVEL OF RESPIRATORY PROTECTION) | $33.67 | $30.20 | $63.87 | Agreement |
POWER EQUIPMENT OPERATOR GROUP 4…Full textPOWER EQUIPMENT OPERATOR GROUP 4 LATTICE BOOM CRAWLER CRANE, LATTICE BOOM TRUCK CRANE, TELESCOPIC TRUCK MOUNTED CRANE, TOWER CRANE. (ADAMS, BROWN, CASS, CHRISTIAN, DE WITT, LOGAN, MACON, MENARD, MORGAN, PIATT, PIKE, SANGAMON, SCHUYLER, SCOTT, AND SHELBY COUNTIES) PREMIUM PAY: - CRANES WITH BOOMS 120-200 FT. 1.00 PER HOUR; .02 PER FOOT FOR EACH FOOT ABOVE 200 MULTIPLE UNIT MACHINE - 1.00 PER HOUR; UNDERGROUND WORK - 1.00 PER HOUR; UNDER AIR PRESSURE - 1.00 PER HOUR; HAZARDOUS WASTE OR ASBESTOS REMOVAL PROJECTS - 1.00 PER HOUR FOR LEVEL C WORK; 1.50 PER HOUR FOR LEVEL B WORK; 2.00 PER HOUR FOR LEVEL A WORK; LONG BOOM ON A STATIONARY CRANE 1.00 PER HOUR ABOVE LONG BOOM SCALE LEVEL A: (HIGHEST LEVEL OF REPIRATORY, SKIN, AND EYE PROTECTION) LEVEL B: (SAME AS LEVEL A, BUT A LOWER LEVEL OF SKIN PROTECTION) LEVEL C: (SAME AS LEVEL B, BUT A LOWER LEVEL OF RESPIRATORY PROTECTION) | $48.81 | $30.20 | $79.01 | Agreement |
| IRON0022-006 · Ironworkers agreement, June 1, 2025 | ||||
| IRONWORKER (CLARK, COLES, CUMBERLAND, EDGAR, SHELBY, AND VERMILION COUNTIES) | $38.00 | $26.39 | $64.39 | Agreement |
| IRON0046-002 · Ironworkers agreement, May 1, 2024 | ||||
IRONWORKER (BROWN, CASS…Full textIRONWORKER (BROWN, CASS, CHRISTIAN, DEWITT (WESTERN HALF), LOGAN, MACON (EXCEPT PORTION EAST OF DECATUR), MASON, MENARD, MORGAN, PIKE, SANGAMON, SCHUYLER (EASTERN HALF), SCOTT, AND SHELBY (WESTERN HALF) COUNTIES) | $37.60 | $32.94 | $70.54 | Agreement |
| IRON0380-003 · Ironworkers agreement, May 1, 2024 | ||||
| IRONWORKER (MACON COUNTY (EAST OF DECATUR)) | $37.71 | $29.65 | $67.36 | Agreement |
| IRON0577-004 · Ironworkers agreement, June 1, 2025 | ||||
| IRONWORKER (ADAMS AND SCHUYLER (WESTERN HALF) COUNTIES) | $36.30 | $25.80 | $62.10 | Agreement |
| LABO0159-003 · Laborers agreement, May 1, 2024 | ||||
| LABORER (CLARK, COLES, CUMBERLAND, DOUGLAS, EDGAR, MACON, MOULTRIE, AND SHELBY COUNTIES) | $33.63 | $31.76 | $65.39 | Agreement |
| LABO0231-009 · Laborers agreement, May 1, 2024 | ||||
| LABORER (ADAMS COUNTY) | $33.50 | $29.33 | $62.83 | Agreement |
| LABO0231-011 · Laborers agreement, May 1, 2024 | ||||
Group definitions, zones and premiums for LABO0231-011LABORER (BROWN, MASON, PIKE, AND SCHUYLER COUNTIES).$ 33.50 29.33 | ||||
| LABO0477-002 · Laborers agreement, May 1, 2024 | ||||
| LABORER (CASS, CHRISTIAN, LOGAN, MENARD, MORGAN, SANGAMON, AND SCOTT COUNTIES) | $34.04 | $29.26 | $63.30 | Agreement |
| LABO0703-002 · Laborers agreement, May 1, 2024 | ||||
| LABORER (CHAMPAIGN, DE WITT, PIATT, AND VERMILION COUNTIES) | $37.47 | $28.77 | $66.24 | Agreement |
| PAIN0058-008 · Painters and Allied Trades agreement, May 1, 2017 | ||||
| PAINTER: BRIDGE EPOXY OR TOXIC-LEAD-BASED PAINT WORK-$1.00 PREMIMUM | $32.45 | $17.12 | $49.57 | Agreement |
| PAIN0090-002 · Painters and Allied Trades agreement, September 1, 2021 | ||||
PAINTER (ADAMS, BROWN…Full textPAINTER (ADAMS, BROWN, CASS, LOGAN, MENARD, MORGAN, AND SCOTT COUNTIES) EPOXY OR TOXIC-LEAD-BASED PAINT WORK-$1.00 PREMIMUM ALL WORK OVER 40 FT. ABOVE FLOOR OR GROUND LEVEL - $1.00 PREMIUM | $32.23 | $20.58 | $52.81 | Agreement |
| PAIN0090-006 · Painters and Allied Trades agreement, September 1, 2021 | ||||
PAINTER (SANGAMON COUNTY) EPOXY OR TOXIC-LEAD-BASED PAINT WORK-$1.00 PREMIMUM ALL WORK…Full textPAINTER (SANGAMON COUNTY) EPOXY OR TOXIC-LEAD-BASED PAINT WORK-$1.00 PREMIMUM ALL WORK OVER 40 FT. ABOVE FLOOR OR GROUND LEVEL - $1.00 PREMIUM | $32.23 | $20.58 | $52.81 | Agreement |
| PAIN0157-001 · Painters and Allied Trades agreement, June 1, 2023 | ||||
PAINTER: BRUSH, SPRAY…Full textPAINTER: BRUSH, SPRAY, PRESSURE ROLLER, SANDBLASTING, BRIDGES, & NEW STRUCTURAL STEEL WORK (FULTON, MARSHALL, MASON, PEORIA, SCHUYLER, TAZEWELL AND WOODFORD COUNTIES) | $40.00 | $26.90 | $66.90 | Agreement |
| PAIN0288-002 · Painters and Allied Trades agreement, September 1, 2021 | ||||
PAINTER: BRUSH AND ROLLER…Full textPAINTER: BRUSH AND ROLLER (DE WITT, MACON, MOULTRIE, PIATT, AND SHELBY COUNTIES) EPOXY OR TOXIC-LEAD-BASED PAINT WORK-$1.00 PREMIMUM WORK OVER 50 FT. ABOVE GROUND OR FLOOR LEVEL - $1.00 PREMIUM | $30.50 | $22.30 | $52.80 | Agreement |
PAINTER: PAPERHANGING AND DRYWALL TAPING…Full textPAINTER: PAPERHANGING AND DRYWALL TAPING (DE WITT, MACON, MOULTRIE, PIATT, AND SHELBY COUNTIES) EPOXY OR TOXIC-LEAD-BASED PAINT WORK-$1.00 PREMIMUM WORK OVER 50 FT. ABOVE GROUND OR FLOOR LEVEL - $1.00 PREMIUM | $30.50 | $22.30 | $52.80 | Agreement |
PAINTER: SPRAY AND SANDBLASTING…Full textPAINTER: SPRAY AND SANDBLASTING (DE WITT, MACON, MOULTRIE, PIATT, AND SHELBY COUNTIES) EPOXY OR TOXIC-LEAD-BASED PAINT WORK-$1.00 PREMIMUM WORK OVER 50 FT. ABOVE GROUND OR FLOOR LEVEL - $1.00 PREMIUM | $31.25 | $22.30 | $53.55 | Agreement |
| PAIN0363-001 · Painters and Allied Trades agreement, May 1, 2017 | ||||
PAINTER (CHAMPAIGN…Full textPAINTER (CHAMPAIGN, COLES, CUMBERLAND, DOUGLAS, AND VERMILION COUNTIES) EPOXY OR TOXIC-LEAD-BASED PAINT WORK-$1.00 PREMIMUM | $35.29 | $14.50 | $49.79 | Agreement |
| PAIN1705-002 · Painters and Allied Trades agreement, September 1, 2018 | ||||
PAINTER: BLASTING, SPRAYING & PRESSURE WASHING…Full textPAINTER: BLASTING, SPRAYING & PRESSURE WASHING (CLARK AND EDGAR COUNTIES) EPOXY OR TOXIC-LEAD-BASED PAINT WORK-$1.00 PREMIMUM BRUSH & ROLLER WORK OVER 30FT ABOVE GROUND OR FLOOR LEVEL - $0.80 PREMIUM BRUSH & ROLLER WORK OVER 100FT ABOVE GROUND OR FLOOR LEVEL - $1.80 PREMIUM BLASTING, SPRAYING & PRESSURE WORK OVER 30FT ABOVE GROUND LEVEL - $2.30 PREMIUM | $28.37 | $21.05 | $49.42 | Agreement |
PAINTER: BRUSH & ROLLER AND WALL COVERING DRYWALL PREPARING…Full textPAINTER: BRUSH & ROLLER AND WALL COVERING DRYWALL PREPARING (CLARK AND EDGAR COUNTIES) EPOXY OR TOXIC-LEAD-BASED PAINT WORK-$1.00 PREMIMUM BRUSH & ROLLER WORK OVER 30FT ABOVE GROUND OR FLOOR LEVEL - $0.80 PREMIUM BRUSH & ROLLER WORK OVER 100FT ABOVE GROUND OR FLOOR LEVEL - $1.80 PREMIUM BLASTING, SPRAYING & PRESSURE WORK OVER 30FT ABOVE GROUND LEVEL - $2.30 PREMIUM BLASTING, SPRAYING & PRESSURE WORK OVER 100FT ABOVE GROUND LEVEL - $3.30 PREMIUM | $27.37 | $21.05 | $48.42 | Agreement |
| PLAS0018-003 · Plasterers and Cement Masons agreement, May 1, 2025 | ||||
| CEMENT MASON/CONCRETE FINISHER (DEWITT (NORTH OF ROUTE 10)) | $38.75 | $31.92 | $70.67 | Agreement |
| PLAS0018-021 · Plasterers and Cement Masons agreement, May 1, 2025 | ||||
| CEMENT MASON/CONCRETE FINISHER (DE WITT (SOUTH OF ROUTE 10) & MACON COUNTIES) | $35.63 | $31.88 | $67.51 | Agreement |
| PLAS0018-032 · Plasterers and Cement Masons agreement, May 1, 2017 | ||||
CEMENT MASON/CONCRETE FINISHER…Full textCEMENT MASON/CONCRETE FINISHER (ADAMS, BROWN, CASS, CHRISTIAN, MENARD, PIKE, AND SANGAMON COUNTIES) | $28.64 | $24.57 | $53.21 | Agreement |
| PLAS0143-003 · Plasterers and Cement Masons agreement, May 1, 2017 | ||||
CEMENT MASON/CONCRETE FINISHER…Full textCEMENT MASON/CONCRETE FINISHER (CHAMPAIGN, CLARK, COLES, CUMBERLAND, DOUGLAS, EDGAR, MOULTRIE, PIATT, SHELBY, AND VERMILION COUNTIES) | $33.71 | $18.91 | $52.62 | Agreement |
| TEAM0026-004 · Teamsters agreement, May 1, 2025 | ||||
TRUCK DRIVER, GROUP 1…Full textTRUCK DRIVER, GROUP 1 (CHAMPAIGN, COLES, DEWITT, DOUGLAS, MOULTRIE (EAST OF A LINE FROM THE NORTHEAST CORNER OF THE COUNTY EXTENDING SOUTHEAST IN THE DIRECTION OF FINDLAY (SHELBY COUNTY) TO A POINT THAT INTERSECTS THE SHELBY COUNTY LINE), PIATT (EAST OF A LINE FROM WHERE THE DEWITT COUNTY LINE INTERSECTS ROUTE 10 IN A SOUTHEAST DIRECTION TOWARDS THE SOUTHEAST CORNER OF THE COUNTY), SHELBY (EAST OF AN IMAGINARY LINE BEGINNING AT THE NORTHEAST BORDER WITH MOULTRIE COUNTY EXTENDING SOUTHWEST IN TH | $45.29 | $25.42 | $70.71 | Agreement |
TRUCK DRIVER, GROUP 2…Full textTRUCK DRIVER, GROUP 2 (CHAMPAIGN, COLES, DEWITT, DOUGLAS, MOULTRIE (EAST OF A LINE FROM THE NORTHEAST CORNER OF THE COUNTY EXTENDING SOUTHEAST IN THE DIRECTION OF FINDLAY (SHELBY COUNTY) TO A POINT THAT INTERSECTS THE SHELBY COUNTY LINE), PIATT (EAST OF A LINE FROM WHERE THE DEWITT COUNTY LINE INTERSECTS ROUTE 10 IN A SOUTHEAST DIRECTION TOWARDS THE SOUTHEAST CORNER OF THE COUNTY), SHELBY (EAST OF AN IMAGINARY LINE BEGINNING AT THE NORTHEAST BORDER WITH MOULTRIE COUNTY EXTENDING SOUTHWEST IN TH | $45.88 | $25.42 | $71.30 | Agreement |
TRUCK DRIVER, GROUP 3…Full textTRUCK DRIVER, GROUP 3 (CHAMPAIGN, COLES, DEWITT, DOUGLAS, MOULTRIE (EAST OF A LINE FROM THE NORTHEAST CORNER OF THE COUNTY EXTENDING SOUTHEAST IN THE DIRECTION OF FINDLAY (SHELBY COUNTY) TO A POINT THAT INTERSECTS THE SHELBY COUNTY LINE), PIATT (EAST OF A LINE FROM WHERE THE DEWITT COUNTY LINE INTERSECTS ROUTE 10 IN A SOUTHEAST DIRECTION TOWARDS THE SOUTHEAST CORNER OF THE COUNTY), SHELBY (EAST OF AN IMAGINARY LINE BEGINNING AT THE NORTHEAST BORDER WITH MOULTRIE COUNTY EXTENDING SOUTHWEST IN TH | $46.15 | $25.42 | $71.57 | Agreement |
TRUCK DRIVER, GROUP 4…Full textTRUCK DRIVER, GROUP 4 (CHAMPAIGN, COLES, DEWITT, DOUGLAS, MOULTRIE (EAST OF A LINE FROM THE NORTHEAST CORNER OF THE COUNTY EXTENDING SOUTHEAST IN THE DIRECTION OF FINDLAY (SHELBY COUNTY) TO A POINT THAT INTERSECTS THE SHELBY COUNTY LINE), PIATT (EAST OF A LINE FROM WHERE THE DEWITT COUNTY LINE INTERSECTS ROUTE 10 IN A SOUTHEAST DIRECTION TOWARDS THE SOUTHEAST CORNER OF THE COUNTY), SHELBY (EAST OF AN IMAGINARY LINE BEGINNING AT THE NORTHEAST BORDER WITH MOULTRIE COUNTY EXTENDING SOUTHWEST IN TH | $46.54 | $25.42 | $71.96 | Agreement |
TRUCK DRIVER, GROUP 5…Full textTRUCK DRIVER, GROUP 5 (CHAMPAIGN, COLES, DEWITT, DOUGLAS, MOULTRIE (EAST OF A LINE FROM THE NORTHEAST CORNER OF THE COUNTY EXTENDING SOUTHEAST IN THE DIRECTION OF FINDLAY (SHELBY COUNTY) TO A POINT THAT INTERSECTS THE SHELBY COUNTY LINE), PIATT (EAST OF A LINE FROM WHERE THE DEWITT COUNTY LINE INTERSECTS ROUTE 10 IN A SOUTHEAST DIRECTION TOWARDS THE SOUTHEAST CORNER OF THE COUNTY), SHELBY (EAST OF AN IMAGINARY LINE BEGINNING AT THE NORTHEAST BORDER WITH MOULTRIE COUNTY EXTENDING SOUTHWEST IN TH | $47.64 | $25.42 | $73.06 | Agreement |
| TEAM0135-008 · Teamsters agreement, May 1, 2025 | ||||
TRUCK DRIVER, GROUP 1…Full textTRUCK DRIVER, GROUP 1 DRIVERS ON 2 AXLE TRUCKSHAULING LESS THAN 9 TON; AIR COMPRESSOR AND WELDING MACHINES AND BROOMS, INCLUDING THOSE PULLED BY SEPARATE UNITS; TRUCK DRIVER HELPERS; WAREHOUSE EMPLOYEES; MECHANIC HELPERS; GREASERS AND TIREMEN; FORK LIFTS UP TO 6,000 POUNDS CAPACITY (CLARK AND EDGAR COUNTIES) FOOTNOTE: A. $46.20 PER DAY | $38.55 | $16.11 | $54.66 | Agreement |
TRUCK DRIVER, GROUP 2…Full textTRUCK DRIVER, GROUP 2: 2 OR 3 AXLE TRUCKS HAULING MORE THAN 9 TON BUT HAULING LESS THAN 16 TON; A-FRAME WINCH TRUCKS; HYDROLIFT TRUCKS; VACTOR TRUCKS OR SIMILAR EQUIPMENT WHEN USED FOR TRANSPORTATION PURPOSES; FORK LIFTS OVER 6,000 POUND CAPACITY; WINCH TRUCKS; 4 AXLE COMBINATION UNITS; IN THE EVENT THE EMPLOYER DESIRES TO USE TICKET WRITERS THAT CLASSIFICATION SHALL COME UNDER GROUP II FOOTNOTE: $46.20 PER DAY IN ADDITIONAL FRINGE BENEFITS (CLARK AND EDGAR COUNTIES) | $38.97 | $16.11 | $55.08 | Agreement |
| TRUCK DRIVER, GROUP 3 (CLARK AND EDGAR COUNTIES) | $39.18 | $16.11 | $55.29 | Agreement |
| TRUCK DRIVER, GROUP 4 LOW BOY; OIL DISTRIBUTORS (CLARK AND EDGAR COUNTIES) FOOTNOTE: A. $46.20 PER DAY | $39.44 | $16.11 | $55.55 | Agreement |
TRUCK DRIVER, GROUP 5…Full textTRUCK DRIVER, GROUP 5 DRIVERS WHO REQUIRE SPECIAL PROTECTIVE CLOTHING WHILE EMPLOYED ON HAZARDOUS WASTE WORK. (CLARK AND EDGAR COUNTIES) FOOTNOTE: A. $46.20 PER DAY | $39.44 | $16.11 | $55.55 | Agreement |
| TEAM0279-003 · Teamsters agreement, May 1, 2025 | ||||
TRUCK DRIVER, GROUP 1…Full textTRUCK DRIVER, GROUP 1 (CHRISTIAN,MACON, MOULTRIE (WEST OF A LINE FROM THE NORTHEAST CORNER EXTENDING STRAIGHT SOUTHEAST INTHE DIRECTION OF FINDLAY - SHELBY COUNTY - TO A POINT THAT INTERSECTS THE SHELBY COUNTY LINE), PIATT (WEST OF A LINE FROME WHERE THE DEWITT COUNTY LINE INTERSECTS ROUTE 10 IN A SOUTHEAST DIRECTION TOWARDS THE SOUTHEAST CORNER OF THE COUNTY), SHELBY (WEST OF AN IMAGINARY LINE BEGINNING AT THE NORTHEAST BORDER WITH MOULTRIE COUNTY EXTENDING SOUTHWEST IN THE DIRECTION OF FINDL | $43.28 | $27.56 | $70.84 | Agreement |
TRUCK DRIVER, GROUP 2…Full textTRUCK DRIVER, GROUP 2 (CHRISTIAN,MACON, MOULTRIE (WEST OF A LINE FROM THE NORTHEAST CORNER EXTENDING STRAIGHT SOUTHEAST INTHE DIRECTION OF FINDLAY - SHELBY COUNTY - TO A POINT THAT INTERSECTS THE SHELBY COUNTY LINE), PIATT (WEST OF A LINE FROME WHERE THE DEWITT COUNTY LINE INTERSECTS ROUTE 10 IN A SOUTHEAST DIRECTION TOWARDS THE SOUTHEAST CORNER OF THE COUNTY), SHELBY (WEST OF AN IMAGINARY LINE BEGINNING AT THE NORTHEAST BORDER WITH MOULTRIE COUNTY EXTENDING SOUTHWEST IN THE DIRECTION OF FINDL | $43.86 | $27.56 | $71.42 | Agreement |
TRUCK DRIVER, GROUP 3…Full textTRUCK DRIVER, GROUP 3 (CHRISTIAN,MACON, MOULTRIE (WEST OF A LINE FROM THE NORTHEAST CORNER EXTENDING STRAIGHT SOUTHEAST INTHE DIRECTION OF FINDLAY - SHELBY COUNTY - TO A POINT THAT INTERSECTS THE SHELBY COUNTY LINE), PIATT (WEST OF A LINE FROME WHERE THE DEWITT COUNTY LINE INTERSECTS ROUTE 10 IN A SOUTHEAST DIRECTION TOWARDS THE SOUTHEAST CORNER OF THE COUNTY), SHELBY (WEST OF AN IMAGINARY LINE BEGINNING AT THE NORTHEAST BORDER WITH MOULTRIE COUNTY EXTENDING SOUTHWEST IN THE DIRECTION OF FINDL | $44.15 | $27.56 | $71.71 | Agreement |
TRUCK DRIVER, GROUP 4…Full textTRUCK DRIVER, GROUP 4 (CHRISTIAN,MACON, MOULTRIE (WEST OF A LINE FROM THE NORTHEAST CORNER EXTENDING STRAIGHT SOUTHEAST INTHE DIRECTION OF FINDLAY - SHELBY COUNTY - TO A POINT THAT INTERSECTS THE SHELBY COUNTY LINE), PIATT (WEST OF A LINE FROME WHERE THE DEWITT COUNTY LINE INTERSECTS ROUTE 10 IN A SOUTHEAST DIRECTION TOWARDS THE SOUTHEAST CORNER OF THE COUNTY), SHELBY (WEST OF AN IMAGINARY LINE BEGINNING AT THE NORTHEAST BORDER WITH MOULTRIE COUNTY EXTENDING SOUTHWEST IN THE DIRECTION OF FINDL | $44.53 | $27.56 | $72.09 | Agreement |
TRUCK DRIVER, GROUP 5…Full textTRUCK DRIVER, GROUP 5 (CHRISTIAN,MACON, MOULTRIE (WEST OF A LINE FROM THE NORTHEAST CORNER EXTENDING STRAIGHT SOUTHEAST INTHE DIRECTION OF FINDLAY - SHELBY COUNTY - TO A POINT THAT INTERSECTS THE SHELBY COUNTY LINE), PIATT (WEST OF A LINE FROME WHERE THE DEWITT COUNTY LINE INTERSECTS ROUTE 10 IN A SOUTHEAST DIRECTION TOWARDS THE SOUTHEAST CORNER OF THE COUNTY), SHELBY (WEST OF AN IMAGINARY LINE BEGINNING AT THE NORTHEAST BORDER WITH MOULTRIE COUNTY EXTENDING SOUTHWEST IN THE DIRECTION OF FINDL | $45.61 | $27.56 | $73.17 | Agreement |
| TEAM0627-003 · Teamsters agreement, May 1, 2024 | ||||
TRUCK DRIVER, GROUP 1…Full textTRUCK DRIVER, GROUP 1 DRIVERS ON 2 AXLES HAULING LESS THAN 9 TONS; AIR COMPRESSOR & WELDING MACHINES AND BROOMS, INCLUDING THOSE PULLED BY SEPARATE UNITS; TRUCK DRIVER HELPER, WAREHOUSE EMPLOYEES; MECHANIC HELPERS; GREASERS AND TIREMEN; PICK-UP TRUCKS WHEN HAULING MATERIAL, TOOLS, OR WORKERS TO AND FROM AND ON THE JOB SITE; AND FORKLIFTS UP TO 6,000 LB CAPACITY. (MASON COUNTY) | $43.24 | $24.27 | $67.51 | Agreement |
| TRUCK DRIVER, GROUP 2 (MASON COUNTY) | $43.83 | $24.27 | $68.10 | Agreement |
| TRUCK DRIVER, GROUP 3 (MASON COUNTY) | $44.10 | $24.27 | $68.37 | Agreement |
| TRUCK DRIVER, GROUP 4 LOW BOY AND OIL DISTRIBUTORS. (MASON COUNTY) | $44.49 | $24.27 | $68.76 | Agreement |
TRUCK DRIVER, GROUP 5…Full textTRUCK DRIVER, GROUP 5 DRIVERS WHO REQUIRE SPECIAL PROTECTIVE CLOTHING WHILE EMPLOYED ON HAZARDOUS WASTE WORK. (MASON COUNTY) | $45.59 | $24.27 | $69.86 | Agreement |
| TEAM0916-003 · Teamsters agreement, May 1, 2025 | ||||
TRUCK DRIVER, GROUP 1…Full textTRUCK DRIVER, GROUP 1 DRIVERS ON 2 AXLES HAULING LESS THAN 9 TONS; AIR COMPRESSOR & WELDING MACHINES AND BROOMS, INCLUDING THOSE PULLED BY SEPARATE UNITS; TRUCK DRIVER HELPER, WAREHOUSE EMPLOYEES; MECHANIC HELPERS; GREASERS AND TIREMEN; PICK-UP TRUCKS WHEN HAULING MATERIAL, TOOLS, OR WORKERS TO AND FROM AND ON THE JOB SITE; AND FORKLIFTS UP TO 6,000 LB CAPACITY. (LOGAN, MENARD, MORGAN, PIKE, SANGAMON, SCHUYLER, SCOTT COUNTIES) | $45.35 | $25.72 | $71.07 | Agreement |
TRUCK DRIVER, GROUP 2…Full textTRUCK DRIVER, GROUP 2 2 OR 3 AXLES HAULING MORE THAN 9 TONS BUT HAULING LESS THAN 16 TONS; A-FRAME WINCH TRUCKS; HYDROLIFT TRUCKS; VACTOR TRUCKS OR SIMILAR EQUIPMENT WHEN USED FOR TRANSPORTATION PURPOSES; FORKLIFT OVER 6,000 LB.CAPACITY; WINCH TRUCKS; AND FOUR AXLE COMBIATION UNITS. (LOGAN, MENARD, MORGAN, PIKE, SANGAMON, SCHUYLER, SCOTT COUNTIES) | $45.93 | $25.72 | $71.65 | Agreement |
| TRUCK DRIVER, GROUP 3 (LOGAN, MENARD, MORGAN, PIKE, SANGAMON, SCHUYLER, SCOTT COUNTIES) | $46.25 | $25.72 | $71.97 | Agreement |
TRUCK DRIVER, GROUP 4…Full textTRUCK DRIVER, GROUP 4 LOW BOY AND OIL DISTRIBUTORS. (LOGAN, MENARD, MORGAN, PIKE, SANGAMON, SCHUYLER, SCOTT COUNTIES) | $46.60 | $25.72 | $72.32 | Agreement |
TRUCK DRIVER, GROUP 5…Full textTRUCK DRIVER, GROUP 5 DRIVERS WHO REQUIRE SPECIAL PROTECTIVE CLOTHING WHILE EMPLOYED ON HAZARDOUS WASTE WORK. (LOGAN, MENARD, MORGAN, PIKE, SANGAMON, SCHUYLER, SCOTT COUNTIES) | $47.71 | $25.72 | $73.43 | Agreement |
Modification history
| Modification 0 | January 2, 2026 |
| Modification 1 | May 18, 2026 |
| Modification 2 | July 30, 2026 (current) |
Published by the Wage and Hour Division; read from sam.gov. The sheet is checked for a newer modification each day. Contracts awarded since January 1, 2017 also carry Executive Order 13706 paid sick leave (one hour per 30 worked, up to 56 a year).
Questions people ask
- Which rate do I pay on IL20260015?
- The line for the classification of work actually performed: the basic rate plus the fringe. You may pay the fringe into benefit plans, as cash on every hour, or a mix. Overtime after 40 hours is 1.5 times the basic rate; fringe is paid on every hour and never multiplied.
- My trade is not on this sheet. What do I do?
- Do not borrow the nearest name. Ask the contracting agency for a conformance on Standard Form 1444 before the first week of that work, and note it as pending on the payroll.
- Does modification 2 apply to my contract?
- Only if it was in force when your contract was awarded (generally at bid opening). An earlier modification locked into the contract keeps applying, except on option years, added scope and indefinite-quantity contracts. The number and modification are on the first page of the exhibit in your contract.
How to read a wage determination · Paying the fringe in cash or through plans · Overtime on these rates · Fringe credit calculator