CertifiedHours

Prevailing wage rates · Illinois · Wage determination

Prevailing wage rates: Bureau, Carroll, Henry and 7 more counties, Illinois

Heavy, Highway construction · IL20260012 modification 2, published July 30, 2026

The short answer

This sheet sets 81 classifications for heavy, highway work in Bureau, Carroll, Henry and 7 more counties, Illinois. Each line is a basic hourly rate plus a fringe rate, and the sum is the minimum you must pay for that work, from $45.13 an hour (truck driver: 2-3 axles) to $114.00 (operator: power equipment, group 1). Your contract may lock an earlier modification.

Scope

Heavy Construction

Highway Construction

Rates by classification

Total is the basic rate plus the fringe. Source is the agreement or survey the rate came from; a marker means the group changed in this modification. A dagger (†) means the fringe carries a footnote or percentage the total does not include; read the group’s notes.

ClassificationBasic rateFringeTotalSource
CARP0004-010 · Carpenters agreement, May 1, 2025
CARPENTER (HENRY AND ROCK ISLAND COUNTIES)$38.00$35.16$73.16Agreement
CARP0174-002 · Carpenters agreement, May 1, 2025
CARPENTER (BUREAU COUNTY)$40.28$38.95$79.23Agreement
CARP0790-004 · Carpenters agreement, May 1, 2025
CARPENTER (CARROLL…
Full text

CARPENTER (CARROLL, JO DAVIESS, LEE, OGLE (OREGON AND SOUTH THEREOF), STEPHENSON, AND WHITESIDE COUNTIES)

$48.60$38.53$87.13Agreement
CARP0792-002 · Carpenters agreement, May 1, 2025
CARPENTER (OGLE (NORTHERN ONE-HALF), AND WINNEBAGO COUNTIES)$51.00$36.13$87.13Agreement
ELEC0051-005 · Electrical Workers (IBEW) agreement, January 1, 2024
LINE CONSTRUCTION: GROUNDMAN/EQUIPMENT OPERATOR…
Full text

LINE CONSTRUCTION: GROUNDMAN/EQUIPMENT OPERATOR (ALL CRAWLER TYPE EQUIPMENT LARGER THAN D-4, 15 TON CRANE OR LARGER) (BUREAU & HENRY (ANNAWAN, BURNS, CAMBRIDGE, GALVA, KEWANEE, WELLER, AND WESTERFIELD TWPS))

$52.63$24.35$76.98Agreement
LINE CONSTRUCTION: GROUNDMAN/TRUCK DRIVER…
Full text

LINE CONSTRUCTION: GROUNDMAN/TRUCK DRIVER (BUREAU & HENRY (ANNAWAN, BURNS, CAMBRIDGE, GALVA, KEWANEE, WELLER, AND WESTERFIELD TWPS))

$39.92$20.22$60.14Agreement
LINE CONSTRUCTION: LINEMAN AND SUBSTATION TECHNICIAN…
Full text

LINE CONSTRUCTION: LINEMAN AND SUBSTATION TECHNICIAN (BUREAU & HENRY (ANNAWAN, BURNS, CAMBRIDGE, GALVA, KEWANEE, WELLER, AND WESTERFIELD TWPS))

$58.58$26.29$84.87Agreement
ELEC0145-003 · Electrical Workers (IBEW) agreement, December 4, 2023
LINE CONSTRUCTION, CABLE SPLICER…
Full text

LINE CONSTRUCTION, CABLE SPLICER (CARROLL (TOWNSHIPS OF FAIR HAVEN, FREEDOM, MOUNT CARROLL, SALEM, SAVANNA, WASHINGTON, WOODLAND & YORK), JO DAVIESS (TOWNSHIPS OF COUNCIL HILL, DERINDA, DUNLEITH, EAST GALENA, ELIZABETH, GUILFORD, HANOVER, MENOMINEE, RAWLINS, RICE, SCALES MOUND, VINEGAR HILL & WEST GALENA), HENRY (EXCEPT ANNAWAN, BURNS, CAMBRIDGE, GALVA, KEWANEE, WELLER, AND WESTERFIELD TWPS) ROCK ISLAND & WHITESIDE (TOWNSHIPS OF ALBANY, CLYDE, ERIE, FENTON, FULTON, GARDEN PLAIN, LYN

$53.12$24.53$77.65Agreement
LINE CONSTRUCTION, DYNAMITER…
Full text

LINE CONSTRUCTION, DYNAMITER (CARROLL (TOWNSHIPS OF FAIR HAVEN, FREEDOM, MOUNT CARROLL, SALEM, SAVANNA, WASHINGTON, WOODLAND & YORK), JO DAVIESS (TOWNSHIPS OF COUNCIL HILL, DERINDA, DUNLEITH, EAST GALENA, ELIZABETH, GUILFORD, HANOVER, MENOMINEE, RAWLINS, RICE, SCALES MOUND, VINEGAR HILL & WEST GALENA), HENRY (EXCEPT ANNAWAN, BURNS, CAMBRIDGE, GALVA, KEWANEE, WELLER, AND WESTERFIELD TWPS) ROCK ISLAND & WHITESIDE (TOWNSHIPS OF ALBANY, CLYDE, ERIE, FENTON, FULTON, GARDEN PLAIN, LYNDON,

$43.92$21.49$65.41Agreement
LINE CONSTRUCTION, GROUNDMAN…
Full text

LINE CONSTRUCTION, GROUNDMAN (CARROLL (TOWNSHIPS OF FAIR HAVEN, FREEDOM, MOUNT CARROLL, SALEM, SAVANNA, WASHINGTON, WOODLAND & YORK), JO DAVIESS (TOWNSHIPS OF COUNCIL HILL, DERINDA, DUNLEITH, EAST GALENA, ELIZABETH, GUILFORD, HANOVER, MENOMINEE, RAWLINS, RICE, SCALES MOUND, VINEGAR HILL & WEST GALENA), HENRY (EXCEPT ANNAWAN, BURNS, CAMBRIDGE, GALVA, KEWANEE, WELLER, AND WESTERFIELD TWPS) ROCK ISLAND & WHITESIDE (TOWNSHIPS OF ALBANY, CLYDE, ERIE, FENTON, FULTON, GARDEN PLAIN, LYNDON,

$34.64$18.43$53.07Agreement
LINE CONSTRUCTION, GROUNDMAN EQUIPMENT OPERATOR…
Full text

LINE CONSTRUCTION, GROUNDMAN EQUIPMENT OPERATOR (CARROLL (TOWNSHIPS OF FAIR HAVEN, FREEDOM, MOUNT CARROLL, SALEM, SAVANNA, WASHINGTON, WOODLAND & YORK), JO DAVIESS (TOWNSHIPS OF COUNCIL HILL, DERINDA, DUNLEITH, EAST GALENA, ELIZABETH, GUILFORD, HANOVER, MENOMINEE, RAWLINS, RICE, SCALES MOUND, VINEGAR HILL & WEST GALENA), HENRY (EXCEPT ANNAWAN, BURNS, CAMBRIDGE, GALVA, KEWANEE, WELLER, AND WESTERFIELD TWPS) ROCK ISLAND & WHITESIDE (TOWNSHIPS OF ALBANY, CLYDE, ERIE, FENTON, FULTON, GA

$41.61$20.73$62.34Agreement
LINE CONSTRUCTION, GROUNDMAN TRUCK DRIVER…
Full text

LINE CONSTRUCTION, GROUNDMAN TRUCK DRIVER (CARROLL (TOWNSHIPS OF FAIR HAVEN, FREEDOM, MOUNT CARROLL, SALEM, SAVANNA, WASHINGTON, WOODLAND & YORK), JO DAVIESS (TOWNSHIPS OF COUNCIL HILL, DERINDA, DUNLEITH, EAST GALENA, ELIZABETH, GUILFORD, HANOVER, MENOMINEE, RAWLINS, RICE, SCALES MOUND, VINEGAR HILL & WEST GALENA), HENRY (EXCEPT ANNAWAN, BURNS, CAMBRIDGE, GALVA, KEWANEE, WELLER, AND WESTERFIELD TWPS) ROCK ISLAND & WHITESIDE (TOWNSHIPS OF ALBANY, CLYDE, ERIE, FENTON, FULTON, GARDEN P

$36.15$18.93$55.08Agreement
LINE CONSTRUCTION, LINEMAN…
Full text

LINE CONSTRUCTION, LINEMAN, TECHNICIAN, HEAVY EQUIPMENT OPERATOR (CARROLL (TOWNSHIPS OF FAIR HAVEN, FREEDOM, MOUNT CARROLL, SALEM, SAVANNA, WASHINGTON, WOODLAND & YORK), JO DAVIESS (TOWNSHIPS OF COUNCIL HILL, DERINDA, DUNLEITH, EAST GALENA, ELIZABETH, GUILFORD, HANOVER, MENOMINEE, RAWLINS, RICE, SCALES MOUND, VINEGAR HILL & WEST GALENA), HENRY (EXCEPT ANNAWAN, BURNS, CAMBRIDGE, GALVA, KEWANEE, WELLER, AND WESTERFIELD TWPS) ROCK ISLAND & WHITESIDE (TOWNSHIPS OF ALBANY, CLYDE, ERIE, F

$52.67$24.38$77.05Agreement
ELEC0145-005 · Electrical Workers (IBEW) agreement, June 2, 2025
CABLE SPLICER (CARROLL…
Full text

CABLE SPLICER (CARROLL (CHADWICK, MT. CARROLL, SAVANNA AND THOMPSON TWPS), HENRY (EXCLUDING ANNAWAN, BURNS, CAMBRIDGE, GALVA, KEWANEE, WELLER, AND WESTERFIELD TWPS), JO DAVIESS (SAVANNA ORDNANCE DEPOT), WHITESIDE (REMAINDER OF COUNTY), AND ROCK ISLAND COUNTIES)

$47.00$28.64$75.64Agreement
ELECTRICIAN (CARROLL…
Full text

ELECTRICIAN (CARROLL (CHADWICK, MT. CARROLL, SAVANNA AND THOMPSON TWPS), HENRY (EXCLUDING ANNAWAN, BURNS, CAMBRIDGE, GALVA, KEWANEE, WELLER, AND WESTERFIELD TWPS), JO DAVIESS (SAVANNA ORDNANCE DEPOT), WHITESIDE (REMAINDER OF COUNTY), AND ROCK ISLAND COUNTIES)

$46.00$28.56$74.56Agreement
ELEC0176-005 · Electrical Workers (IBEW) agreement, June 1, 2023
ELECTRICIAN (BUREAU AND HENRY…
Full text

ELECTRICIAN (BUREAU AND HENRY (ANNAWAN, BURNS, CAMBRIDGE, GALVA, KEWANEE, WELLER, AND WETHERSFIELD TWPS) COUNTIES)

$50.45$44.96$95.41Agreement
ELEC0196-002 · Electrical Workers (IBEW) agreement, March 6, 2023
LINE CONSTRUCTION, LINEMAN…
Full text

LINE CONSTRUCTION, LINEMAN, SUBSTATION TECHNICIAN, CABLE SPLICING TECHNICIAN, DIGGER OPERATOR, CRANE OPERATOR 20 TONS AND ABOVE, AND SIGNAL TECHNICIAN (CARROLL (TOWNSHIPS OF CHERRY GROVE, ELKHORN GROVE, LIMA, ROCK CREEK, SHANNON & WYSOX), JO DAVIESS (TOWNSHIPS OF APPLE RIVER, BERREMAN, PLEASANT VALLEY, NORA, RUSH, STOCKTON, THOMPSON, WARDS GROVE, WARREN & WOODBINE), LEE, OGLE, STEPHENSON, WHITESIDE (TOWNSHIPS OF GENESEE, HAHNAMAN, HOPKINS, HUME, JORDAN, MONTMORENCY, STERLING & TAPI

$59.17$27.12$86.29Agreement
LINE CONSTRUCTION: EQUIPMENT OPERATOR…
Full text

LINE CONSTRUCTION: EQUIPMENT OPERATOR (CARROLL (TOWNSHIPS OF CHERRY GROVE, ELKHORN GROVE, LIMA, ROCK CREEK, SHANNON & WYSOX), JO DAVIESS (TOWNSHIPS OF APPLE RIVER, BERREMAN, PLEASANT VALLEY, NORA, RUSH, STOCKTON, THOMPSON, WARDS GROVE, WARREN & WOODBINE), LEE, OGLE, STEPHENSON, WHITESIDE (TOWNSHIPS OF GENESEE, HAHNAMAN, HOPKINS, HUME, JORDAN, MONTMORENCY, STERLING & TAPICO) & WINNEBAGO COUNTIES)

FOOTNOTE: A. PAID HOLIDAYS: MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, AND THANKSGIVING DAY

$49.22$23.73$72.95Agreement
LINE CONSTRUCTION: GROUNDMAN…
Full text

LINE CONSTRUCTION: GROUNDMAN (CARROLL (TOWNSHIPS OF CHERRY GROVE, ELKHORN GROVE, LIMA, ROCK CREEK, SHANNON & WYSOX), JO DAVIESS (TOWNSHIPS OF APPLE RIVER, BERREMAN, PLEASANT VALLEY, NORA, RUSH, STOCKTON, THOMPSON, WARDS GROVE, WARREN & WOODBINE), LEE, OGLE, STEPHENSON, WHITESIDE (TOWNSHIPS OF GENESEE, HAHNAMAN, HOPKINS, HUME, JORDAN, MONTMORENCY, STERLING & TAPICO) & WINNEBAGO COUNTIES)

FOOTNOTE: A. PAID HOLIDAYS: MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, AND THANKSGIVING DAY

$37.81$19.86$57.67Agreement
LINE CONSTRUCTION: GROUNDMAN TRUCK DRIVER…
Full text

LINE CONSTRUCTION: GROUNDMAN TRUCK DRIVER (CARROLL (TOWNSHIPS OF CHERRY GROVE, ELKHORN GROVE, LIMA, ROCK CREEK, SHANNON & WYSOX), JO DAVIESS (TOWNSHIPS OF APPLE RIVER, BERREMAN, PLEASANT VALLEY, NORA, RUSH, STOCKTON, THOMPSON, WARDS GROVE, WARREN & WOODBINE), LEE, OGLE, STEPHENSON, WHITESIDE (TOWNSHIPS OF GENESEE, HAHNAMAN, HOPKINS, HUME, JORDAN, MONTMORENCY, STERLING & TAPICO) & WINNEBAGO COUNTIES)

FOOTNOTE: A. PAID HOLIDAYS: MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, AND THANKSGIVING DAY

$39.19$20.32$59.51Agreement
ELEC0364-002 · Electrical Workers (IBEW) agreement, June 2, 2025
ELECTRICIAN (CARROLL…
Full text

ELECTRICIAN (CARROLL (CHERRY GROVE, SHANNON, ROCK CREEK, LIMA, WYSOX, ELKHORN GROVE TWPS), JO DAVIESS (WARREN, RUSH, NORA, STOCKTON, WARDS GROVE, PLEASANT VALLEY, AND BERRENMAN TWPS), LEE, OGLE, STEPHENSON, WHITESIDE (GENESEE, JORDAN, HOPKINS, STERLING, HUME, MONTGOMERY, TAMPICO, AND HAHNAMAN TWPS) AND WINNEBAGO COUNTIES)

$62.61$43.96$106.57Agreement
ENGI0150-004 · Operating Engineers agreement, June 1, 2025
OPERATOR: POWER EQUIPMENT, GROUP 1…
Full text

OPERATOR: POWER EQUIPMENT, GROUP 1 ASPHALT PLANT; ASPHALT HEATER AND PLANER COMBINATION; ASPHALT SPREADER; ASPHALT SILO TENDER; AUTOGRADER, GOMACO OR SIMILAR; BELT LOADER; CAISSON RIGS; CAR DUMPER, CENTRAL REDI-MIX PLANT; COMBINATION BACKHOE FRONT END LOADER MACHINE (1 CU YD OR OVER BACKHOE BUCKET WITH ATTACHMENTS); BACKHOE WITH SHEAR ATTACHMENT; CONCRETE BREAKER (TRUCK MOUNTED); CONCRETE CONVEYOR; CONCRETE PAVER OVER 27E CU FT; CONCRETE PLACER; CONCRETE TUBE FLOAT; CRANES, ALL ATTACHMENTS; CRANES, HAMMERHEAD, LINDEN, PECO AND MACHINES OF A LIKE NATURE; CRETER CRANE; CRUSHER, STONE; DERRICKS; DERRICK BOATS; DERRICKS, TRAVELING; DREDGES; FIELD MECHANIC WELDER; FORMLESS CURB AND GUTTER MACHINE; GRADALL AND MACHINES OF A LIKE NATURE; GRADER, ELEVATING; GRADER, MOTOR GRADER, MOTOR PATROL, AUTO PATROL, FORM GRADER, PULL GRADER, SUBGRADER; GUARD RAIL POST DRIVER MOUNTED; HOISTS, ONE, TWO, AND THREE DRUM; HYDRAULIC BACKHOES; LOCOMOTIVE, ALL MUCKING MACHINE; PILE DRIVERS AND SKID RIG; PRE-STRESS MACHINE; PUMP CRETES DUAL RAM; ROCK DRILL-CRAWLER OR SKID RIG; ROCK DRILL TRUCK MOUNTED; ROTO MILL GRINDER, 36"" AND OVER; ROTO MILL GRINDER, LESS THAN 36""; SLIP- FORM PAVER; SOIL TEST DRILL RIG, TRUCK MOUNTED; STRADDLE BUGGIES; GCI CRANE AND SIMILAR; HYDRAULIC TELESCOPING FORM (TUNNEL); TIE BACK MACHINE; TRACTOR DRAWN BELT LOADER: TRACTOR DRAWN BELT LOADER WITH ATTACHED PUSHER; TRACTOR WITH BOOM; TRACTAIRE WITH ATTACHMENT; TRAFFIC BARRIER CONVEYOR MACHINE; RAISED OR BLIND HOE DRILL (TUNNEL & SHAFT); TRENCHING MACHINE; TRUCK MOUNTED CONCRETE PUMP WITH BOOM; TRUCK MOUNTED CONCRETE CONVEYOR; UNDERGROUND BORING AND/OR MINING MACHINES UNDER 5 FT; WHEEL EXCAVATOR & WIDENER (APSCO) (CARROLL, JO DAVIESS, LEE, OGLE, STEPHENSON, WHITESIDE (EASTERN HALF) AND WINNEBAGO COUNTIES) PREMIMUM PAY: LONG BOOM : CRANES & DERRICKS 90' TO 150' INCLUDING JIB RECEIVE AN EXTRA $.50 PER HOUR. CRANES & DERRICKS OVER 150' INCLUDING JIB RECEIVE AN EXTRA $.50 PER HOUR PLUS AN ADDITIONAL $.10 FOR EACH ADDITIONAL 10' OF BOOM OR JIB. CAPACITY PAY: CRANES & DERRICKS WITH MAXIMUM CAPACITY EXCEEDING 50 TON WITH LESS THAN 90' OF BOOM OR JIB SHALL BE COMPENSATED $.01 PER HOUR FOR EACH TON OF THE RATED CAPACITY IN EXCESS OF 50 TON. LONG BOOM PAY AND CAPACITY PAY CANNOT BE COMBINED. CRANE MOUNTED EARTH AUGER, RAISED AND BLIND HOLE DRILLS, AND TRUCK MOUNTED DRILL RIGS RECEIVE AN EXTRA $.50 PER HOUR. CRETER CRANES: WHEN THE CRETER CRANE IS EQUIPPED WITH A CONVEYOR SYSTEM CAPABLE OF EXTENDING 70' OR MORE, THE ENGINEER SHALL RECEIVE AN EXTRA $.50 PER HOUR. TRUCK MOUNTED CONCRETE PUMPS: WHEN THE TRUCK MOUNTED CONCRETE PUMP IS EQUIPPED WITH A BOOM, WHICH IS CAPABLE OF EXTENDING 90' OR MORE, THE ENGINEER SHALL RECEIVE $.50 PER HOUR EXTRA. TRUCK MOUNTED CONCRETE CONVEYOR: TRUCK MOUNTED CONCRETE CONVEYORS EQUIPPED WITH CONVEYORS THAT ARE CAPABLE OF EXTENDING 90' OR MORE, THE ENGINEER SHALL RECEIVE AN EXTRA $.50 PER HOUR. UNDERGROUND WORK: EMPLOYEES WORKING IN TUNNELS, SHAFTS, ETC. SHALL BE PAID AN ADDITIONAL $.40 PER HOUR. EMPLOYEES WORKING UNDER AIR PRESSURE 1/2 POUND TO 7 POUNDS SHALL RECEIVE AN ADDITIONAL $.50 PER HOUR. EMPLOYEES WORKING UNDER AIR PRESSURE OF 7 POUNDS OR OVER SHALL RECEIVE $.65 PER HOUR MORE. MINING MACHINES- BORING MACHINES: THE CREW OPERATING AND MAINTAINING THE MINING MACHINES SHALL BE COMPENSATED AN ADDITIONAL $.50 PER HOUR

$56.60$51.05$107.65Agreement
OPERATOR: POWER EQUIPMENT, GROUP 2…
Full text

OPERATOR: POWER EQUIPMENT, GROUP 2 BATCH PLANT; BITUMINOUS MIXER; BOBCATS OVER .75 CU YD; BOILER AND THROTTLE VALVE; BULLDOZER; CAR LOADER TRAILING CONVEYORS; COMBINATION BACKKHOE FRONT END LOADER MACHINE, LESS THAN 1 CU YD BACKHOE BUCKET WITH ATTACHMENTS; COMPRESSOR AND THROTTLE VALVE; COMPRESSOR, COMMON RECEIVER (3); CONCRETE BREAKER OR HYDRO HAMMER; CONCRETE GRINDING MACHINE; CONCRETE MIXER OR PAVER 7S SERIES TO AND INCLUDING 27 CU FT; CONCRETE SPREADER; CONCRETE CURING MACHINE, BURLAP MACHINE; BELTING MACHINE AND SEALING MACHINE; CONVEYOR MUCK CARS (HAGLUND OR SIMILAR TYPE); FINISHING MACHINE-CONCRETE; GREASER ENGINEER; HIGHLIFT SHOVELS OR FRONT END LOADER; HOIST-SEWER DRAGGING MACHINE; HYDRAULIC BOOM TRUCKS, ALL ATTACHMENTS; LOCOMOTIVES, DINKY; PUMP CRETES, SQUEEZE CRETES-SCREW TYPE PUMPS, GYPSUM BULKER AND PUMP; ROLLER ASPHALT; ROTARY SNOW PLOWS; ROTOTILLER, SEAMAN, ETC SELF-PROPELLED; SCOOPS-TRACTOR DRAWN; SELF-PROPELLED COMPACTOR; SPREADER-CHIP- STONE ETC; SCRAPER; SCRAPER-PRIME MOVER IN TANDEM REGARDLESS OF SIZE (ADD $1.00 TO TO GROUP 2 HOURLY RATE FOR EACH HOUR AND FOR EACH MACHINE ATTACHED THERETO); TANK CAR HEATER; TRACTORS, PUSH, PULLING SHEEPS FOOT, DISC, OR COMPACTOR, ETC; TUG BOATS PREMIMUM PAY: LONG BOOM : CRANES & DERRICKS 90' TO 150' INCLUDING JIB RECEIVE AN EXTRA $.50 PER HOUR. CRANES & DERRICKS OVER 150' INCLUDING JIB RECEIVE AN EXTRA $.50 PER HOUR PLUS AN ADDITIONAL $.10 FOR EACH ADDITIONAL 10' OF BOOM OR JIB. CAPACITY PAY: CRANES & DERRICKS WITH MAXIMUM CAPACITY EXCEEDING 50 TON WITH LESS THAN 90' OF BOOM OR JIB SHALL BE COMPENSATED $.01 PER HOUR FOR EACH TON OF THE RATED CAPACITY IN EXCESS OF 50 TON. LONG BOOM PAY AND CAPACITY PAY CANNOT BE COMBINED. CRANE MOUNTED EARTH AUGER, RAISED AND BLIND HOLE DRILLS, AND TRUCK MOUNTED DRILL RIGS RECEIVE AN EXTRA $.50 PER HOUR. CRETER CRANES: WHEN THE CRETER CRANE IS EQUIPPED WITH A CONVEYOR SYSTEM CAPABLE OF EXTENDING 70' OR MORE, THE ENGINEER SHALL RECEIVE AN EXTRA $.50 PER HOUR. TRUCK MOUNTED CONCRETE PUMPS: WHEN THE TRUCK MOUNTED CONCRETE PUMP IS EQUIPPED WITH A BOOM, WHICH IS CAPABLE OF EXTENDING 90' OR MORE, THE ENGINEER SHALL RECEIVE $.50 PER HOUR EXTRA. TRUCK MOUNTED CONCRETE CONVEYOR: TRUCK MOUNTED CONCRETE CONVEYORS EQUIPPED WITH CONVEYORS THAT ARE CAPABLE OF EXTENDING 90' OR MORE, THE ENGINEER SHALL RECEIVE AN EXTRA $.50 PER HOUR. UNDERGROUND WORK: EMPLOYEES WORKING IN TUNNELS, SHAFTS, ETC. SHALL BE PAID AN ADDITIONAL $.40 PER HOUR. EMPLOYEES WORKING UNDER AIR PRESSURE 1/2 POUND TO 7 POUNDS SHALL RECEIVE AN ADDITIONAL $.50 PER HOUR. EMPLOYEES WORKING UNDER AIR PRESSURE OF 7 POUNDS OR OVER SHALL RECEIVE $.65 PER HOUR MORE. MINING MACHINES- BORING MACHINES: THE CREW OPERATING AND MAINTAINING THE MINING MACHINES SHALL BE COMPENSATED AN ADDITIONAL $.50 PER HOUR. (CARROLL, JO DAVIESS, LEE, OGLE, STEPHENSON, WHITESIDE (EASTERN HALF) AND WINNEBAGO COUNTIES)

$56.05$51.05$107.10Agreement
OPERATOR: POWER EQUIPMENT, GROUP 3…
Full text

OPERATOR: POWER EQUIPMENT, GROUP 3 BOILERS; BROOMS, ALL POWER PROPELLED; CEMENT SUPPLY TENDER; COMPRESSOR, COMMON RECEIVER (2); CONCRETE MIXER, TWO BAG AND OVER; CONVEYOR, PORTABLE; FARM TYPE TRACTORS USED FOR MOWING, SEEDING, ETC; FIREMAN ON BOILERS; FORKLIFT TRUCKS; GROUTING MACHINES; HOISTS, AUTOMATIC; HOISTS, ALL ELEVATORS; HOISTS, TUGGER SINGLE DRUM; JEEP DIGGERS; PIPE JACKING MACHINES; POST- HOLE DIGGER; POWER SAW, CONCRETE, POWER DRIVEN; PUG MILLS; ROLLERS, OTHER THAN ASPHALT; SEED AND STRAW BLOWER; STEAM GENERATORS; STUMP MACHINE; WINCH TRUCKS WITH A-FRAME; WORK BOATS; TAMPER-FORM MOTOR DRIVEN (CARROLL, JO DAVIESS, LEE, OGLE, STEPHENSON, WHITESIDE (EASTERN HALF) AND WINNEBAGO COUNTIES) PREMIMUM PAY: LONG BOOM : CRANES & DERRICKS 90' TO 150' INCLUDING JIB RECEIVE AN EXTRA $.50 PER HOUR. CRANES & DERRICKS OVER 150' INCLUDING JIB RECEIVE AN EXTRA $.50 PER HOUR PLUS AN ADDITIONAL $.10 FOR EACH ADDITIONAL 10' OF BOOM OR JIB. CAPACITY PAY: CRANES & DERRICKS WITH MAXIMUM CAPACITY EXCEEDING 50 TON WITH LESS THAN 90' OF BOOM OR JIB SHALL BE COMPENSATED $.01 PER HOUR FOR EACH TON OF THE RATED CAPACITY IN EXCESS OF 50 TON. LONG BOOM PAY AND CAPACITY PAY CANNOT BE COMBINED. CRANE MOUNTED EARTH AUGER, RAISED AND BLIND HOLE DRILLS, AND TRUCK MOUNTED DRILL RIGS RECEIVE AN EXTRA $.50 PER HOUR. CRETER CRANES: WHEN THE CRETER CRANE IS EQUIPPED WITH A CONVEYOR SYSTEM CAPABLE OF EXTENDING 70' OR MORE, THE ENGINEER SHALL RECEIVE AN EXTRA $.50 PER HOUR. TRUCK MOUNTED CONCRETE PUMPS: WHEN THE TRUCK MOUNTED CONCRETE PUMP IS EQUIPPED WITH A BOOM, WHICH IS CAPABLE OF EXTENDING 90' OR MORE, THE ENGINEER SHALL RECEIVE $.50 PER HOUR EXTRA. TRUCK MOUNTED CONCRETE CONVEYOR: TRUCK MOUNTED CONCRETE CONVEYORS EQUIPPED WITH CONVEYORS THAT ARE CAPABLE OF EXTENDING 90' OR MORE, THE ENGINEER SHALL RECEIVE AN EXTRA $.50 PER HOUR. UNDERGROUND WORK: EMPLOYEES WORKING IN TUNNELS, SHAFTS, ETC. SHALL BE PAID AN ADDITIONAL $.40 PER HOUR. EMPLOYEES WORKING UNDER AIR PRESSURE 1/2 POUND TO 7 POUNDS SHALL RECEIVE AN ADDITIONAL $.50 PER HOUR. EMPLOYEES WORKING UNDER AIR PRESSURE OF 7 POUNDS OR OVER SHALL RECEIVE $.65 PER HOUR MORE. MINING MACHINES- BORING MACHINES: THE CREW OPERATING AND MAINTAINING THE MINING MACHINES SHALL BE COMPENSATED AN ADDITIONAL $.50 PER HOUR

$54.75$51.05$105.80Agreement
OPERATOR: POWER EQUIPMENT, GROUP 4…
Full text

OPERATOR: POWER EQUIPMENT, GROUP 4 AIR COMPRESSOR - SMALL 185 AND UNDER (1 TO 5 NOT TO EXCEED A TOTAL OF 300 FT); AIR COMPRESSOR - LARGE OVER 185; ASPHALT SPREADER BACKEND MAN; COMBINATION - SMALL EQUIPMENT OPERATOR; GENERATORS - SMALL 50 KW AND UNDER; GENERATORS - LARGE , OVER 50 KW; HEATERS, MECHANICAL; HYDRAULIC POWER UNIT (PILE DRIVING, EXTRACTING OR DRILLING); LIGHT PLANTS ALL (1 TO 5); PUMPS, OVER 3"" (1 TO 3, NOT TO EXCEED A TOTAL OF 300 FT); PUMPS, WELL POINTS; TRACTAIRE; WELDING MACHINES (2 THROUGH 5); WINCHES, 4 SMALL ELECTRIC DRILL WINCHES; BOBCATS UP TO AND INCLUDING .75 CU YD (CARROLL, JO DAVIESS, LEE, OGLE, STEPHENSON, WHITESIDE (EASTERN HALF) AND WINNEBAGO COUNTIES) PREMIMUM PAY: LONG BOOM : CRANES & DERRICKS 90' TO 150' INCLUDING JIB RECEIVE AN EXTRA $.50 PER HOUR. CRANES & DERRICKS OVER 150' INCLUDING JIB RECEIVE AN EXTRA $.50 PER HOUR PLUS AN ADDITIONAL $.10 FOR EACH ADDITIONAL 10' OF BOOM OR JIB. CAPACITY PAY: CRANES & DERRICKS WITH MAXIMUM CAPACITY EXCEEDING 50 TON WITH LESS THAN 90' OF BOOM OR JIB SHALL BE COMPENSATED $.01 PER HOUR FOR EACH TON OF THE RATED CAPACITY IN EXCESS OF 50 TON. LONG BOOM PAY AND CAPACITY PAY CANNOT BE COMBINED. CRANE MOUNTED EARTH AUGER, RAISED AND BLIND HOLE DRILLS, AND TRUCK MOUNTED DRILL RIGS RECEIVE AN EXTRA $.50 PER HOUR. CRETER CRANES: WHEN THE CRETER CRANE IS EQUIPPED WITH A CONVEYOR SYSTEM CAPABLE OF EXTENDING 70' OR MORE, THE ENGINEER SHALL RECEIVE AN EXTRA $.50 PER HOUR. TRUCK MOUNTED CONCRETE PUMPS: WHEN THE TRUCK MOUNTED CONCRETE PUMP IS EQUIPPED WITH A BOOM, WHICH IS CAPABLE OF EXTENDING 90' OR MORE, THE ENGINEER SHALL RECEIVE $.50 PER HOUR EXTRA. TRUCK MOUNTED CONCRETE CONVEYOR: TRUCK MOUNTED CONCRETE CONVEYORS EQUIPPED WITH CONVEYORS THAT ARE CAPABLE OF EXTENDING 90' OR MORE, THE ENGINEER SHALL RECEIVE AN EXTRA $.50 PER HOUR. UNDERGROUND WORK: EMPLOYEES WORKING IN TUNNELS, SHAFTS, ETC. SHALL BE PAID AN ADDITIONAL $.40 PER HOUR. EMPLOYEES WORKING UNDER AIR PRESSURE 1/2 POUND TO 7 POUNDS SHALL RECEIVE AN ADDITIONAL $.50 PER HOUR. EMPLOYEES WORKING UNDER AIR PRESSURE OF 7 POUNDS OR OVER SHALL RECEIVE $.65 PER HOUR MORE. MINING MACHINES- BORING MACHINES: THE CREW OPERATING AND MAINTAINING THE MINING MACHINES SHALL BE COMPENSATED AN ADDITIONAL $.50 PER HOUR

$53.30$51.05$104.35Agreement
OPERATOR: POWER EQUIPMENT, GROUP 5…
Full text

OPERATOR: POWER EQUIPMENT, GROUP 5 OILERS (CARROLL, JO DAVIESS, LEE, OGLE, STEPHENSON, WHITESIDE (EASTERN HALF) AND WINNEBAGO COUNTIES)

$50.85$51.05$101.90Agreement
ENGI0150-016 · Operating Engineers agreement, June 1, 2025
OPERATOR: POWER EQUIPMENT, GROUP 1…
Full text

OPERATOR: POWER EQUIPMENT, GROUP 1 ASPHALT PLANT*; ASPHALT HEATER AND PLANER COMBINATION; ASPHALT HEATER SCARFIRE*; ASPHALT SPREADER; AUTOGRADER; ABG PAVER*; BACKHOES WITH CAISSON ATTACHMENT*;BELT LOADER*;CAISSON RIGS*; CAR DUMPER, CENTRAL REDI-MIX PLANT*; COMBINATION BACKHOE FRONT END LOADER MACHINE (1 CU YD OR OVER BACKHOE BUCKET WITH ATTACHMENTS); CONCRETE BREAKER (TRUCK MOUNTED)*; CONCRETE CONVEYOR; CONCRETE PAVER OVER 27E CU FT*; CONCRETE PLACER*; CONCRETE TUBE FLOAT; CRANES, ALL ATTACHMENTS*; CRANES, HAMMERHEAD, LINDEN, PECO AND MACHINES OF A LIKE NATURE*; CRETER CRANE; CRUSHER, STONE ETC.; ALL DERRICKS; DERRICK BOATS; DERRICKS, TRAVELING*; DREDGES*; FIELD MECHANIC WELDER; FORMLESS CURB AND GUTTER MACHINE; GRADALL AND MACHINES OF A LIKE NATURE; GRADER, ELEVATING; GRADER, MOTOR GRADER, MOTOR PATROL, AUTO PATROL, FORM GRADER, PULL GRADER, SUBGRADER; GUARD RAIL POST DRIVER MOUNTED*; HOISTS, ONE, TWO, AND THREE DRUM; HYDRAULIC BACKHOES; LOCOMOTIVE, ALL MUCKING MACHINE; PILE DRIVERS AND SKID RIG*; PRE- STRESS MACHINE; PUMP CRETES DUAL RAM (REQUIRES FREQUENT LUBRICATION AND WATER)*; ROCK/TRACK TAMPER; ROCK DRILL TRUCK MOUNTED; ROTO MILL GRINDER, 36"" AND OVER*; ROTO MILL GRINDER, LESS THAN 36""; SLIP- FORM PAVER*; SOIL TEST DRILL RIG, TRUCK MOUNTED*; STRADDLE BUGGIES; HYDRAULIC TELESCOPING FORM (TUNNEL); TRACTOR DRAWN BELT LOADER*; TRACTOR DRAWN BELT LOADER WITH ATTACHED PUSHER (TWO ENGINEERS); TRACTOR WITH BOOM; TRACTAIRE WITH ATTACHMENTS; RAISED OR BLIND HOE DRILL (TUNNEL & SHAFT)*; TRENCHING MACHINE; TRUCK MOUNTED CONCRETE PUMP WITH BOOM; UNDERGROUND BORING AND/OR MINING MACHINES 5 FT IN DIAMETER AND OVER TUNNEL, ETC.*; UNDERGROUND BORING AND/OR MINING MACHINES UNDER 5 FT; WHEEL EXCAVATOR* & WIDENER (APSCO) (BUREAU COUNTY (THE PORTION LYING EAST AND NORTH OF HIGHWAY 26 FROM THE TOWN OR VILLAGE OF BUREAU TO THE NORTHERN BUREAU COUNTY LINE.)) *EQUIPMENT REQUIRES AN OILER

$63.00$51.00$114.00Agreement
OPERATOR: POWER EQUIPMENT, GROUP 2…
Full text

OPERATOR: POWER EQUIPMENT, GROUP 2 BATCH PLANT; BITUMINOUS MIXER; BOILER AND THROTTLE VALVE; BULLDOZER; CAR LOADER TRAILING CONVEYORS; COMBINATION BACKKHOE FRONT END LOADER MACHINE, LESS THAN 1 CU YD BACKHOE BUCKET WITH ATTACHMENTS; COMPRESSOR AND THROTTLE VALVE; COMPRESSOR, COMMON RECEIVER (3); CONCRETE BREAKER OR HYDRO HAMMER; CONCRETE GRINDING MACHINE; CONCRETE MIXER OR PAVER 7S SERIES TO AND INCLUDING 27 CU FT; CONCRETE SPREADER; CONCRETE CURING MACHINE, BURLAP MACHINE; BELTING MACHINE AND SEALING MACHINE; CONCRETE WHEEL SAW; CONVEYOR MUCK CARS (HAGLUND OR SIMILAR TYPE); ALL DRILLS; FINISHING MACHINE-CONCRETE; GREASER ENGINEER; HIGHLIFT SHOVELS OR FRONT END LOADER; HOIST-SEWER DRAGGING MACHINE; HYDRAULIC BOOM TRUCKS, ALL ATTACHMENTS; HYDRO- BLASTER REQUIRES TWO OPERATORS (ONE GROUP 4); HYDRAULIC BOOM TRUCKS (ALL ATTACHMENTS);LOCOMOTIVES, DINKY; OFF-ROAD HAULING UNITS (INCLUDING ARTICULATING); LASER SCREED; PUMP CRETES, SQUEEZE CRETES-SCREW TYPE PUMPS, GYPSUM BULKER AND PUMP; ROCK DRILL-CRAWLER OR SKID*; ROCK DRILL-TRUCK MOUNTED*; ROLLER ASPHALT; ROTARY SNOW PLOWS; ROTOTILLER, SEAMAN, ETC. SELF- PROPELLED; SCOOPS-TRACTOR DRAWN; SELF-PROPELLED COMPACTOR; SPREADER-CHIP-STONE ETC; SCRAPER; SCRAPER-PRIME MOVER IN TANDEM REGARDLESS OF SIZE (ADD $1.00 TO TO GROUP 2 HOURLY RATE FOR EACH HOUR AND FOR EACH MACHINE ATTACHED THERETO); TANK CAR HEATER; TRACTORS, PUSH, PULLING SHEEPS FOOT, DISC, COMPACTOR, ETC; TUG BOATS (BUREAU COUNTY (THE PORTION LYING EAST AND NORTH OF HIGHWAY 26 FROM THE TOWN OR VILLAGE OF BUREAU TO THE NORTHERN BUREAU COUNTY LINE.)) *EQUIPMENT REQUIRES AN OILER

$62.45$51.00$113.45Agreement
OPERATOR: POWER EQUIPMENT, GROUP 3…
Full text

OPERATOR: POWER EQUIPMENT, GROUP 3 BOILERS; BROOMS, ALL POWER PROPELLED; CEMENT SUPPLY TENDER; COMPRESSOR, COMMON RECEIVER (2); CONCRETE MIXER, TWO BAG AND OVER; CONVEYOR, PORTABLE; FARM TYPE TRACTORS USED FOR MOWING, SEEDING, ETC; FIREMAN ON BOILERS; FORKLIFT TRUCKS; GROUTING MACHINES; HOISTS, AUTOMATIC; HOISTS, ALL ELEVATORS; HOISTS, TUGGER SINGLE DRUM; JEEP DIGGERS; LOW BOYS; PIPE JACKING MACHINES; POST-HOLE DIGGER; POWER SAW, CONCRETE, POWER DRIVEN; PUG MILLS; ROLLERS, OTHER THAN ASPHALT; SEED AND STRAW BLOWER; STEAM GENERATORS; STUMP MACHINE; WINCH TRUCKS WITH A-FRAME; WORK BOATS;TAMPER-FORM MOTOR DRIVEN (BUREAU COUNTY (THE PORTION LYING EAST AND NORTH OF HIGHWAY 26 FROM THE TOWN OR VILLAGE OF BUREAU TO THE NORTHERN BUREAU COUNTY LINE.))

$60.40$51.00$111.40Agreement
OPERATOR: POWER EQUIPMENT, GROUP 4…
Full text

OPERATOR: POWER EQUIPMENT, GROUP 4 AIR COMPRESSOR - SMALL 250 AND UNDER (1 TO 5 NOT TO EXCEED A TOTAL OF 300 FT); AIR COMPRESSOR - LARGE OVER 250; COMBINATION - SMALL EQUIPMENT OPERATOR; GENERATORS - SMALL 50 KW AND UNDER; GENERATORS - LARGE, OVER 50 KW; HEATERS, MECHANICAL; HYDRAULIC POWER UNIT (PILE DRIVING, EXTRACTING OR DRILLING); HYDRO-BLASTER REQUIRES TWO OPERATORS (ONE GROUP 2); LIGHT PLANTS ALL (1 TO 5); PUMPS, OVER 3"" (1 TO 3, NOT TO EXCEED A TOTAL OF 300 FT); TRACTAIRE; WELDING MACHINES (2 THROUGH 5); WINCHES, 4 SMALL ELECTRIC DRILL WINCHES (BUREAU COUNTY (THE PORTION LYING EAST AND NORTH OF HIGHWAY 26 FROM THE TOWN OR VILLAGE OF BUREAU TO THE NORTHERN BUREAU COUNTY LINE.))

$59.00$51.00$110.00Agreement
OPERATOR: POWER EQUIPMENT, GROUP 5…
Full text

OPERATOR: POWER EQUIPMENT, GROUP 5 BOBCATS (ALL); BRICK FORKLIFTS; DIRECTIONAL BORING MACHINE LOCATOR; OILERS (BUREAU COUNTY (THE PORTION LYING EAST AND NORTH OF HIGHWAY 26 FROM THE TOWN OR VILLAGE OF BUREAU TO THE NORTHERN BUREAU COUNTY LINE.))

$57.80$51.00$108.80Agreement
ENGI0150-020 · Operating Engineers agreement, June 1, 2025
OPERATOR: POWER EQUIPMENT, GROUP 1…
Full text

OPERATOR: POWER EQUIPMENT, GROUP 1 CRANE (FRICTION OR HYDRAULIC, REGARDLESS OF SIZE OR ATTACHMENTS); TOW OR PUSH BOAT (HENRY (WESTERN HALF), ROCK ISLAND, AND WHITESIDE (WESTERN HALF) COUNTIES)

$43.50$41.25$84.75Agreement
OPERATOR: POWER EQUIPMENT, GROUP 2…
Full text

OPERATOR: POWER EQUIPMENT, GROUP 2 ASPHALT HEATER-PLANER UNIT; ASPHALT PAVER; ASPHALT PAVER SCREED; ASPHALT PLANT; AUTOMATIC CURBING MACHINE; BACKFILLER (THROW BUCKET); BLASTHOLER SELF-PROPELLED ROTARY DRILL OR SIMILAR MACHINES; BOOM TRACTOR OR SIDE BOOM; BORING MACHINE (DIRECTIONAL, VERTICAL OR HORIZONTAL); BUILDING HOIST (1,2 OR 3 DRUMS); CAISSON AUGURING MACHINES; CENTRAL REDI-MIX PLANT; CHIP SPREADER; CLEANING & PRIMING MACHINE; COMBINATION BACKHOE FRONT END LOADER; COMBINATION CONCRETE FINISHING MACHINE AND FLOAT; CONCRETE BREAKER OR HYDRO-HAMMER; CONCRETE CONVEYOR OR PUMP; CONCRETE PAVER; CONCRETE SPREADER; CONCRETE WHEEL SAW (LARGE SELF-PROPELLED); CRUSHER (STONE, CONCRETE, ASPHALT, ETC.); CURING-TINNING MACHINE; DIPPER DREDGE CRANE MAN; DIPPER DREDGE OPERATOR; DUAL PURPOSE TRUCK (BOOM, WINCH, ETC.); EXCAVATOR; FARM-TYPE TRACTOR OPERATING SCOOP OR SCRAPER OR WITH POWER ATTACHMENT; FORKLIFT (6000 LB. CAPACITY); GRADER, MOTOR GRADER, MOTOR PATROL, AUTO GRADER, FORM GRADER, PULL GRADER, SUB GRADER, ELEVATING GRADER; GROUP EQUIPMENT GREASER; GUARD RAIL POST DRIVER; HOISTS; HYDRAULIC DREDGE LEVERMAN OR ENGINEER; HYDRO-VAC TRUCK MOUNTED OR PULL TYPE, AND SIMILAR EQUIPMENT; LASER SCREED; LOADER (TRACK, RUBBER TIRE OR ARTICULATED); LOCOMOTIVE ENGINEER; MECHANIC-WELDER; MECHANICAL LOADED LOG CHIPPERS OR SIMILAR MACHINES; MILLING MACHINE; MUCKING MACHINE; PILE DRIVER; PIPE BENDING; PUG MILL; ROAD WIDENER-SHOULDER SPREADER; SCRAPER (SELF-PROPELLED); SELF-PROPELLED ROLLER OR TIRE ROLLER (ON ASPHALT OR BLACKTOP), SHEEP FOOT OR PAD FOOT COMPACTOR; SHOVEL; SLIP FORM PAVER; STEEL TRACK-TYPE TRACTOR (DOZER, PUSH CAT, ETC.); TRANSFER OR SHUTTLE BUGGY; TRENCHING MACHINE (40 H.P. & OVER); WORK BOAT. (HENRY (WESTERN HALF), ROCK ISLAND, AND WHITESIDE (WESTERN HALF) COUNTIES).$ 41.50 41.25 OPERATOR: POWER EQUIPMENT, GROUP 3 ARTICULATED OFF-ROAD HAUL UNIT; ASPHALT BOOSTER; BOILER (ENGINEER OR FIREMAN); CONVEYOR OVER 20 H.P.; DISTRIBUTOR; DRIVER ON TRUCK CRANE OR SIMILAR MACHINES; ELEVATOR; FARM-TYPE TRACTOR (WITHOUT POWER ATTACHMENT); FIREMAN & PUMP OPERATOR AT ASPHALT PLANT; FORKLIFT (LESS THAN 6000 LB. CAPACITY); GROUT PUMP; LIGHT PLANT; MECHANICAL BROOM; MUD JACK; SELF-PROPELLED ROLLER (OTHER THAN LISTED IN GROUP 2); STRADDLE CARRIER; TRENCH MACHINE (UNDER 40 H.P.). (HENRY (WESTERN HALF), ROCK ISLAND, AND WHITESIDE (WESTERN HALF) COUNTIES).$ 38.85 41.25 OPERATOR: POWER EQUIPMENT, GROUP 4 AIR COMPRESSOR (400 C.F.M. OR OVER); COMPACT LOADER (RUBBER TIRE, TRACK & UTILITY); ENGINE DRIVEN WELDING MACHINE; MECHANICAL HEATER (OTHER THAN STEAM BOILER); SMALL OUTBOARD MOTOR BOAT (SAFETY BOAT & LIFE BOAT); WATER PUMP (MORE THAN ONE WELL POINT PUMP). (HENRY (WESTERN HALF), ROCK ISLAND, AND WHITESIDE (WESTERN HALF) COUNTIES)

$37.80$41.25$79.05Agreement
ENGI0649-005 · Operating Engineers agreement, April 1, 2025
OPERATOR: POWER EQUIPMENT, GROUP 1…
Full text

OPERATOR: POWER EQUIPMENT, GROUP 1 CRANES: OVERHEAD CRANES; HYDRO CRANE; SHOVELS; CRANE TYPE BACKFILLER; TOWER CRANES-MOBILE, CRAWLER, STATIONARY; DERRICKS, HOIST (3 DRUM); DRAGLINES; DROTT YUMBO & SIMILAR TYPES CONSIDERED AS CRANES; 360 DEGREES SWING EXCAVATOR, BACKHOE; DERRICK BOATS; PILE DRIVER AND SKID RIGS; CLAM SHELL; LOCOMOTIVE CRANES; ROAD PAVERS (SINGLE DRUM, DUAL DRUM, TRI BATCHER); MOTOR PATROL & POWER BLADES (DUNMORE, ELEVATING & SIMILAR TYPES); MECHANICS; CENTRAL CONCRETE MIXING PLANT OPERATOR; ASPHALT BATCH PLANT OPERATOR AND PLANT ENGINEER; GRADALL; CAISSON RIGS; SKIMMER SCOOP, KOEHRING SCOOPER; DREDGES (ALL TYPES); HOPTOE; ALL CHERRY PICKERS; WORK BOAT; ROSS CARRIER; HELICOPTER; DOZER; TOURNADOZER; TOURNAPULLS (ALL & SIMILAR TYPES); CONCRETE AND ALL RECYCLE MACHINES, MULTIPLE UNIT EARTH MOVERS; 75 CENTS PER HOUR FOR EACH SCOOP OVER ONE; SCOOPS (ALL SIZES); PUSHCATS; ENDLOADERS (ALL TYPES); ASPHALT SURFACING MACHINE; SLIP FORM PAVER; ROCK CRUSHER; MATERIAL CRUSHER (OUTSIDE PITS AND QUARRIES); SCREENING PLANTS (OUTSIDE PITS AND QUARRIES); TUNNEL BORING MACHINE; HEAVY EQUIPMENT GREASER (TOP GREASER ON SPREAD); CMI, AUTO GRADE, CMI BELT PLACER (3 TRACK & SIMILAR TYPES); SIDE BOOMS; STARTING ENGINEER ON PIPELINE OR CONSTRUCTION (ELEVEN 11 PIECES OR MORE); ASPHALT HEATER & PLANER COMBINATION; WHEEL TRACTORS WITH DOZER, HOE OR END LOADER ATTACHEMENTS; CAT EARTHWORK COMPACTORS AND SIMILAR TYPES; BLAW KNOX SPREADER & SIMILAR TYPES; TRENCH MACHINES; PUMP CRETE, BELT CRETE, SQUEEZE CRETE, SCREW TYPE PUMPS & GYPSUM; CRETER CRANE; CONCRETE PUMP TRUCK; FORMLESS FINISHING MACHINES; FLAHERTY SPREADER OR SIMILAR TYPES; SCREEDMAN ON LAYDOWN MACHINE; VERMEER CONCRETE SAW; LASER SCREED; SPAN SAW; DREDGE LEVERMAN; DREDGE ENGINEER; LULL OR SIMILAR TYPE; HYDRO-BOOM TRUCK; GUARD RAIL MACHINE. (HENRY (EASTERN HALF) AND BUREAU (WESTERN HALF) COUNTIES) - ESCALATED RATE ON CRANE, DERRICK BOOMS, AND TOWER CRANES: ADDITIONAL $1.00 PER HOUR OVER SCALE WHEN CRANE OR DERRICK IS POSITIONED 50 FT. OR MORE ABOVE ADJACENT GROUND LEVEL OR WATER LEVEL. $.05 PER HOUR, PER FOOT, OVER 90 FEET INCLUDING JIB. $0.02 PER HOUR, PER TON - OVER 50-TON CAPACITY. - OPERATING ENGINEERS WHO OPERATE LATTICE BOOM CRAWLER CRANES, LATTICE BOOM TRUCK CRANES, TELESCOPIC BOOM CRANES LESS THAN 17.5 TONS, TOWER CRANES, OVERHEAD CRANES AND HAVE BEEN CERTIFIED BY HTE NATIONAL COMMISSION FOR THE CERTIFICATION OF CRANE OPERATORS ON THE EQUIPMENT THEY OPERATE SHALL RECEIVE $1.60 PER HOUR OVER SCALE. A. ON DESIGNATED HAZARDOUS WASTE JOBS, OPERATORS SHALL RECEIVE: LEVEL A ADD $4.00 TO THE APPROPRIATE GROUP RATE; LEVELS B AND C ADD $3.00 TO THE APPROPRIATE GROUP RATE; AND LEVEL D ADD $2.00 TO THE APPROPRIATE GROUP RATE

$47.79$43.42$91.21Agreement
OPERATOR: POWER EQUIPMENT, GROUP 2…
Full text

OPERATOR: POWER EQUIPMENT, GROUP 2 BULKER & PUMP; POWER LAUNCHES; BORING MACHINE & PIPE JACKING MACHINE; DINKEYS; CARTS, POWERED HAUL UNIT FOR A BORING MACHINE; P-H ONE PASS SOIL CEMENT MACHINES AND SIMILAR TYPES: WHEEL TRACTOR; BACK FILLERS; EUCLID LOADER; FORK LIFTS; JEEP WITH DITCHING MACHINES OR OTHER ATTACHMENTS; TUNELUGER; AUTOMATIC CEMENT & GRAVEL BATCHING PLANTS; MOBILE DRILLS SOIL TESTING AND SIMILAR TYPES); PUGMILL WITH PUMP; ALL 1 AND 2 DRUM HOISTS; DE-WATERING SYSTEMS; STRAW BLOWER; HYDRO SEEDER; BUMP GRINDERS, SELF PROPELLED; ASSISTANT HEAVY EQUIPMENT GREASER; APSCO SPREADER TRACTORS (TRACK-TYPE W/O POWER UNITS PULLING ROLLERS); ROLLERS ON ASPHALT, BRICK, OR MACADAM; CONCRETE BREAKERS; CONCRETE SPREADERS; CEMENT STRIPPERS; CEMENT FINISHING MACHINES & CMI TEXTURE & REEL CURING MACHINES; VIBRO-TAMPERS & SIMILAR TYPES SELF-PROPELLED; MECHANICAL BULL-FLOATS; SELF-PROPELLED CONCRETE SAW; TRUCK MOUNTED POWER SAWS; CURB CUTTERS; MIXERS OVER 3 BAGS TO 27E; WINCH & BOOM TRUCKS; TRACTOR PULLING POWER BLADE OR ELEVATING GRADER; PORTER REX RAIL; CLARY SCREED; MULE PULLING ROLLERS; PUGMILL W/O PUMP; BARBER GREENE OR SIMILAR LOADERS; TRACK TYPE TRACTOR WITH POWER UNIT ATTACHED; FIREMAN; SPRAY MACHINE ON PAVING; CURB MACHINE; PAVED DITCH MACHINE; POWER BROOM; SELF-PROPELLED SWEEPERS; SELF- PROPELLED CONVEYORS; POWER SUBGRADER; OIL DISTRIBUTOR; STRAIGHT TRACTOR; TRUCK CRANE OILER; TRUCK TYPE OILERS; DIRECTIONAL BORING MACHINE; HORIZONTAL DIRECTIONAL DRILL; ARTICULATING END DUMP VEHICLES; STARTING ENGINEER (6 TO 10 PIECES). (HENRY (EASTERN HALF) AND BUREAU (WESTERN HALF) COUNTIES) - ESCALATED RATE ON CRANE, DERRICK BOOMS, AND TOWER CRANES: ADDITIONAL $1.00 PER HOUR OVER SCALE WHEN CRANE OR DERRICK IS POSITIONED 50 FT. OR MORE ABOVE ADJACENT GROUND LEVEL OR WATER LEVEL. $.05 PER HOUR, PER FOOT, OVER 90 FEET INCLUDING JIB. $0.02 PER HOUR, PER TON - OVER 50-TON CAPACITY. - OPERATING ENGINEERS WHO OPERATE LATTICE BOOM CRAWLER CRANES, LATTICE BOOM TRUCK CRANES, TELESCOPIC BOOM CRANES LESS THAN 17.5 TONS, TOWER CRANES, OVERHEAD CRANES AND HAVE BEEN CERTIFIED BY HTE NATIONAL COMMISSION FOR THE CERTIFICATION OF CRANE OPERATORS ON THE EQUIPMENT THEY OPERATE SHALL RECEIVE $1.60 PER HOUR OVER SCALE. A. ON DESIGNATED HAZARDOUS WASTE JOBS, OPERATORS SHALL RECEIVE: LEVEL A ADD $4.00 TO THE APPROPRIATE GROUP RATE; LEVELS B AND C ADD $3.00 TO THE APPROPRIATE GROUP RATE; AND LEVEL D ADD $2.00 TO THE APPROPRIATE GROUP RATE

$44.09$43.42$87.51Agreement
OPERATOR: POWER EQUIPMENT, GROUP 3…
Full text

OPERATOR: POWER EQUIPMENT, GROUP 3 STRAIGHT FRAMED TRUCK AND TRUCK MOUNTED VAC UNIT, STARTING ENGINEER (3 TO 5 PIECES); TRAC AIR MACHINE W/O ATTACHMENTS; ROLLERS, 5 TONS & UNDER ON EARTH & GRAVEL; FORM GRADER; BULK CEMENT PLANT; OILERS. (HENRY (EASTERN HALF) AND BUREAU (WESTERN HALF) COUNTIES) - ESCALATED RATE ON CRANE, DERRICK BOOMS, AND TOWER CRANES: ADDITIONAL $1.00 PER HOUR OVER SCALE WHEN CRANE OR DERRICK IS POSITIONED 50 FT. OR MORE ABOVE ADJACENT GROUND LEVEL OR WATER LEVEL. $.05 PER HOUR, PER FOOT, OVER 90 FEET INCLUDING JIB. $0.02 PER HOUR, PER TON - OVER 50-TON CAPACITY. - OPERATING ENGINEERS WHO OPERATE LATTICE BOOM CRAWLER CRANES, LATTICE BOOM TRUCK CRANES, TELESCOPIC BOOM CRANES LESS THAN 17.5 TONS, TOWER CRANES, OVERHEAD CRANES AND HAVE BEEN CERTIFIED BY HTE NATIONAL COMMISSION FOR THE CERTIFICATION OF CRANE OPERATORS ON THE EQUIPMENT THEY OPERATE SHALL RECEIVE $1.60 PER HOUR OVER SCALE. A. ON DESIGNATED HAZARDOUS WASTE JOBS, OPERATORS SHALL RECEIVE: LEVEL A ADD $4.00 TO THE APPROPRIATE GROUP RATE; LEVELS B AND C ADD $3.00 TO THE APPROPRIATE GROUP RATE; AND LEVEL D ADD $2.00 TO THE APPROPRIATE GROUP RATE

$38.03$43.42$81.45Agreement
IRON0111-003 · Ironworkers agreement, July 1, 2025
IRONWORKER (CARROLL…
Full text

IRONWORKER (CARROLL (THOMPSON, SAVANNA & VICINITY), HENRY, JO DAVIESS (EAST DUBUQUE, GALENA, HANOVER, & VICINITY), KNOX (GALESBURG AND AREA NORTH OF THE CITY), MERCER (EXCEPT SOUTHWEST PART), ROCK ISLAND, WARREN (INCLUDES NORTHWEST PART), AND WHITESIDE (WESTERN HALF) COUNTIES)

$38.25$32.28$70.53Agreement
IRON0444-004 · Ironworkers agreement, June 1, 2022
IRONWORKER (BUREAU COUNTY)$45.50$38.90$84.40Agreement
IRON0498-002 · Ironworkers agreement, June 1, 2021
IRONWORKER (CARROLL…
Full text

IRONWORKER (CARROLL (REMAINDER), JO DAVIESS (REMAINDER), LEE, OGLE, STEPHENS, WHITESIDE (EASTERN HALF), AND WINNEBAGO COUNTIES)

$41.37$44.41$85.78Agreement
LABO0032-002 · Laborers agreement, May 1, 2025
LABORER: GENERAL LABORER…
Full text

LABORER: GENERAL LABORER: CARPENTER TENDER, TOOL CRIBMAN, FIREMAN OR SALAMANDER TENDER, FLAGMAN, GRAVEL BOX MAN, BUMPMAN & SPOTTER, FORM HANDLER, MATERIAL HANDLER, FENCING LABORER, CLEANING LUMBER, PIT MAN, MATERIAL CHECKER, LANDSCAPER, UNLOADING EXPLOSIVES, LAYING OF SOD, PLANTING OF TREES, ASPHALT WORKERS WITH MACHINE & LAYERS, ASPHALT PLANT LABORER, WRECKING, FIRE-PROOFING, DRIVING STAKES, STRINGLINES FOR ALL MACHINERY, WINDOW CLEANING, DEMOLITION WORKER, EXPLOSIVE HANDLING, TRIMMING & REMOVAL OF TREES, MULTI-PLATE PIPE, PILOT CARS FOR TRAFFIC CONTROL, POWER RIGGING (WINNEBAGO COUNTY)

$47.04$36.31$83.35Agreement
LABORER: SKILLED LABORER…
Full text

LABORER: SKILLED LABORER: ASBESTOS ABATEMENT WORKER, HAZARDOUS WASTE WORKER, HANDLING ANY MATERIALS WITH ANY FOREIGN MATTER HARMFUL TO SKIN OR CLOTHING, TRACK LABOR, CEMENT HANDLER, CHLORIDE HANDLER, UNLOADING & LABORERS WITH STEEL WORKERS & RE-BARS, WET CONCRETE WORKERS, TUNNEL TENDERS IN FREE AIR, BATCH DUMPER, MASON TENDER, KETTLE & TAR MAN, TANK CLEANER, PLATSIC INSTALLER, SCAFFOLD WORKER, MOTORIZED BUGGIES OR MOTORIZED UNIT USED FOR WET CONCRETE OR HANDLING OF BUILDING MATERIALS, LABORERS WITH DE-WATERING SYSTEMS, SEWER WORKERS PLUS DEPTH, VIBRATOR OPERATOR, CEMENT SILICA, CLAY, FLY ASH, LIME & PLASTERS HANDLERS (BULK OR BAG); COFFERDAM WORKER PLUS DEPTH, CONCRETE PAVING, PLACING CUTTING & TYING OF REINFORCING, DECK HAND, DREDGE HAND AND SHORE LABORER, BANKMAN ON FLOATING PLANT, GRADE CHECKER, POWER TOOLS, FRONT END MAN ON CHIP SPREADER, CAISSON WORKER PLUS DEPTH, GUNNITE NOZZLEMAN, LEADMAN ON SEWER WORK, WELDER, CUTTER, BURNER & TORCHMAN, CHAIN SAW OPERATOR, JACKHAMMER & DRILL OPERATOR, LAYOUT MAN AND/OR TILE LAYER, STEEL FORM SETTER - STREET & HIGHWAY, AIR TAMPING HAMMERMAN, SIGNAL MAN ON CRANE, CONCRETE SAW OPERATOR, SCREENMAN ON ASPHALT PAVER, TENDING MASONS WITH HOT MATERIAL OR WHERE FOREIGN MATERIALS ARE USED, MORTAR MIXER OPERATOR, MULTIPLE CONCRETE DUCT - LEADMAN, LUTEMAN, ASPHALT RAKER, CURB ASPHALT MACHINE OPERATOR, READY MIX SCALEMAN PERMANENT PORTABLE OR TEMPORARY PLANT, LABORER HANDLING MASTERPLATE OR SIMILAR MATERIALS, LASER BEAM OPERATOR, CONCRETE BURNING MACHINE OPERATOR, CORING MACHINE OPERATOR, PLASTER TENDER, UNDERPINNING & SHORING OF BUILDINGS, PUMP MAN, MANHOLE & CATCH BASIN, DIRT & STONE TAMPER, HOSEMAN ON CONCRETE PUMP. (WINNEBAGO COUNTY)

$50.39$36.31$86.70Agreement
LABO0309-001 · Laborers agreement, January 1, 2024
LABORER GROUP 1…
Full text

LABORER GROUP 1 FLAGMAN, DUMPMAN, SPOTTER, BROOM MAN, REMOVAL OF TREES, FENCING LABORERS, CLEANING OF FORMS OR LUMBER (IN BONE YARD), MOVING AND/OR MAINTENANCE OF FLARES AND BARRICADES, OPERATION OF ALL HAND, ELECTRIC, AIR, HYDRAULIC, OR MECHANICALLY POWERED TOOLS UNDER THE THE LABORERS' INCLUDING JACKHAMMERS, TAMPERS, AIR SPADES, AUGERS, CONCRETE SAWS, CHAIN SAWS, UTILITY SAWS, ROCK DRILLS, VIBRATORS, MORTAR MIXER, POWER AND HAND SAW (WHEN CLEARING TIMBER), GENERAL LABORER (NOT ELSEWHERE COVERED), CRAFT- TENDER, MATERIAL CHECKER, MATERIAL HANDLER, FORM HANDLER, CONCRETE DUMPER, PUDDLER, EXPLOSIVES HANDLER, CENTER STRIP, REINFORCING IN CONCRETE, WIRE MESH HANDLER AND INSTALLER, PRIME MOVER OR ANY MECHANICAL DEVICE TAKING THE PLACE OF CONCRETE BUGGY OR WHEEL-BARROW, SANDPOINT SETTER, ASPHALT KETTLEMAN, SHEETING HAMMER DRIVERS, LAYING AND JOINING OF TELEPHONE CONDUIT, GAS DISTRIBUTION MEN, PIPE SETTER ON LATERALS, DRAIN TILES, CULVERT PIPE, AND STORM SEWER CATCH BASIN LEADS, CATCH BASINS, MANHOLES, BATCH DUMPERS, TANK CLEANERS, COFFERDAM WORKER, BANKMAN ON FLOATING PLANT, JOINTMAN WITH PIPELAYERS BACK-UP MAN (CORKER, JOINT MAKER) WITH PIPE SETTER ON SEWER AND WATER MAINS, BATTERBOARD MAN OR LASER OPERATOR ON SEWER AND WATER MAIN, LABORER IN DITCH, OR TUNNEL, ON SEWER OR WATER MAINS AND TELEPHONE CONDUIT, CUTTERS, BURNERS, TORCHMAN, GRAVEL BOX MAN, ASPHALT PLANT LABORER, CONCRETE PLANT LABORER, DECK HAND, UNLOADING OF STEEL AND REBAR, LASER BEAM OPERATOR, WRECKING LABORERS. (ROCK ISLAND COUNTY)

$33.77$23.60$57.37Agreement
LABORER GROUP 2…
Full text

LABORER GROUP 2 ASPHALT RAKER OR LUTEMAN, HEAD FORM SETTER, HEAD DYNAMITE MAN (POWDERMAN) HEAD STRING OR WIRELINE MAN (ON PAVING), PIPE SETTER ON SEWER OR WATER MAIN, GUNNITE NOZZLE MAN, ASPHALT OR CONCRETE CURB MACHINE OPERATOR, HEAD GRADE MAN, HEAD TUNNEL MINER, CONCRETE BURNING MACHINE OPERATOR, CORING MACHINE OPERATOR, WELDER, HAZARDOUS WASTE WORKER, ASBESTOS ABATEMENT WORKER. (ROCK ISLAND COUNTY)

$34.27$23.60$57.87Agreement
LABORER GROUP 3 CONCRETE SPECIALIST (ROCK ISLAND COUNTY)$34.90$23.60$58.50Agreement
LABO0393-002 · Laborers agreement, May 1, 2025
LABORER GROUP 1 UNSKILLED - ALL CLASSIFICATIONS NOT LISTED (BUREAU COUNTY)$40.54$32.42$72.96Agreement
LABORER GROUP 2…
Full text

LABORER GROUP 2 SEMI-SKILLED - HANDLING OF MATERIALS TREATED WITH OIL, CREOSOTE, ASPHALT AND/OR FORIEGN MATERIAL HARMFUL TO SKIN OR CLOTHING; TRACK LABORERS; CEMENT HANDLERS; CHLORIDE HANDLERS; UNLOADING AND LABORERS WITH STEEL WORKERS AND RE-BARS; CONCRETE WORKERS )WET); BATCH DUMPERS; MASON TENDERS; KETTLE AND TAR MEN; TANK CLEANERS; PLASTIC INSTALLERS; SCAFFOLD WORKERS; MOTORIZED BUGGIES OR MOTORIZED UBIT USED FOR WET CONCRETE OR HANDLING OF BUILDING MATERIALS; LABORERS WITH DE-WATERING SYSTEMS; SEWER WORKERS PLUS DEPTH; VIBRATOR OPERATORS; MOTOR MIXER OPERATORS; CEMENT SILICA, CLAY, FLY ASH, LIME AND PLASTERS, HANDLERS (BULK OR BAG); COFFERDAM WORKERS PLUS DEPTH; CONCRETE PAVING, PLACING, CUTTING AND TYING OF REINFORCING; DECK HAND, DREDGE HAND AND SHORE LABORERS; BACKMEN ON FLOATING PLANT; ASPHALT WORKERS WITH MACHINE AND LAYERS; GRADE CHECKER; POWER TOOLS; DRIVING ALL STAKES, STRINGLINES FOR ALL MACHINERY; SETTING AND BUILDING OF MANHOLES AND CATCH BASINS; STRIPPING OF ALL CONCRETE FORMS EXCEPT PAVING FORMS; ALL CONCRETE PAVING AND SLOPE WALLS, PLACING, CUTTING AND TYING OF REINFORCING (RE-BARS AND WIRE MESH) (BUREAU COUNTY)

$40.54$32.42$72.96Agreement
LABORER GROUP 3…
Full text

LABORER GROUP 3 SKILLED - MASON TENDERS; CAISSON WORKERS PLUS DEPTH; GUNNITE NOZZLE MEN; LEAD MAN ON SEWER WORK; WELDERS, CUTTERS, BURNERS & TORCHMEN; CHAIN SAW OPERATORS; PAVING BREAKER, JACKHAMMER & DRILL OPERATORS; LAYOUT MAN AND/OR TILE LAYER; STEEL FORM SETTERS (STREET & HWY); AIR TAMPING HAMMERMAN; SIGNAL MAN ON CRANE; CONCRETE SAW OPERATOR; SCREENMAN ON ASPHALT PAVERS; FRONT END MAN ON CHIP SPREADER; LABORERS TENDING MASONS WITH HOT MATERIALS OR WHERE FOREIGN MATERIALS ARE USED; MULTIPLE CONCRETE DUCT-LEADMAN; LUTEMAN; ASPHALT RAKER; CURB ASPHALT MACHINE OPERATOR; READY MIX SCALEMEN, PERMANENT, PORTABLE OR TEMPORARY PLANT; LABORERS HANDLING MASTERPLATE OR SIMILAR MATERIALS; LASER BEAM OPERATOR; CORING MACHINE OPERATOR; PLASTERER TENDERS; UNDERPINNING AND SHORING OF BUILDING; MATERIAL SELECTOR WHEN WORKING WITH FIREBRICK OR CASTABLE MATERIALS; FIRE WATCH; SIGNALLING OF ALL POWER EQUIPMENT; TREE TOPPER OR TRIMMER (BUREAU COUNTY)

$40.54$32.42$72.96Agreement
LABORER GROUP 4 DYNAMITE MAN (BUREAU COUNTY)$41.54$32.42$73.96Agreement
LABORER GROUP 5 ASBESTOS ABATEMENT WORKER AND HAZARDOUS WASTE WORKER (BUREAU COUNTY)$42.54$32.42$74.96Agreement
LABO0538-005 · Laborers agreement, May 1, 2024
LABORER: GENERAL LABORER: ALL CLASSIFICATIONS NOT LISTED BELOW. (HENRY COUNTY)$35.23$28.10$63.33Agreement
LABORER: SKILLED LABORER…
Full text

LABORER: SKILLED LABORER: FLAGGERS; TRAFFIC CONTROL AND ALL ASSOCIATED WORK; HANDLING OF MATERIALS TREATED WITH OIL, CREOSOTE, ASPHALT AND/OR FORIEGN MATERIAL HARMFUL TO SKIN OR CLOTHING; TRACK LABORERS; CHLORIDE HANDLERS; UNLOADING AND LABORERS WITH STEEL WORKERS AND RE-BARS; CONCRETE WORKERS (WET); BATCH DUMPERS; MASON TENDERS; KETTLE AND TAR MEN; PLASTIC INSTALLERS; SCAFFOLD WORKERS; MOTORIZED BUGGIES OR MOTORIZED UNIT USED FOR WET CONCRETE OR HANDLING OF BUILDING MATERIALS; LABORERS WITH DE-WATERING SYSTEMS; SEWER WORKERS PLUS DEPTH; VIBRATOR OPERATORS; MOTOR MIXER OPERATORS; CEMENT SILICA, CLAY, FLY ASH, LIME AND PLASTERS, HANDLERS (BULK OR BAG); COFFERDAM WORKERS PLUS DEPTH; CONCRETE PAVING, PLACING, CUTTING AND TYING OF REINFORCING; DECKHAND, DREDGE HAND AND SHORE LABORERS; BACKMEN ON FLOATING PLANT; ASPHALT WORKERS WITH MACHINE AND LAYERS; GRADE CHECKER; POWER TOOLS; STRIPPING OF ALL CONCRETE FORMS EXCEPT PAVING FORMS, DUMPMEN AND SPOTTERS, WHEN NECESSARY; CAISSON WORKERS PLUS DEPTH; GUNNITE NOZZLE MEN; TUNNEL HELPERS IN FREE AIR; ROD AND CHAINMEN; WELDERS, CUTTERS, BURNERS, AND TORCHMEN; CHAINSAW OPERATOR; PAVING BREAKER, JACKHAMMER AND DRILL OPERATOR, LAYOUT MAN AND /OR TILE LAYER; STEEL FORM SETTERS - STREET AND HIGHWAY, AIR TAMPING HAMMERMAN; SIGNALMAN ON CRANE CONCRETE SAW OPERATOR; SCREEDMAN ON ASPHALT PAVERS; FRONT END MAN ON CHIP SPREADER; MULTIPLE CONCRETE DUCT; LUTEMAN, ASPHALT RAKER; CURB ASPHALT MACHINE OPERATOR. (HENRY COUNTY)

$36.23$28.10$64.33Agreement
LABO0727-002 · Laborers agreement, May 1, 2025
LABORER: GENERAL LABORER…
Full text

LABORER: GENERAL LABORER: CARPENTER TENDER, TOOL CRIBMAN, FIREMAN OR SALAMANDER TENDER, FLAGMAN, GRAVEL BOX MAN, DUMPMAN & SPOTTER, FORM HANDLER, MATERIAL HANDLER, FENCING LABORER, CLEANING LUMBER, PIT MAN, UNLOADING EXPLOSIVES, REMOVAL OF TREES, ASPHALT WORKERS WITH MACHINE & LAYERS, ASPHALT PLANT LABORER, WRECKING, FIREPROOFING, DRIVING STAKES, STRINGLINES FOR ALL MACHINERY, WINDOW CLEANING. (CARROLL, JO DAVIESS, LEE, OGLE, STEPHENSON, AND WHITESIDE COUNTIES)

$49.17$34.25$83.42Agreement
LABORER: SKILLED LABORER…
Full text

LABORER: SKILLED LABORER: HANDLING ANY MATERIALS WITH ANY FOREIGN MATTER HARMFUL TO SKIN OR CLOTHING, TRACK LABOR, CEMENT HANDLER, CHLORIDE HANDLER, UNLOADING & LABORERS WITH STEEL WORKERS & RE-BARS, WET CONCRETE WORKERS, TUNNEL TENDERS IN FREE AIR, BATCH DUMPER, MASON TENDER, KETTLE & TAR MAN, TANK CLEANER, PLASTIC INSTALLER, SCAFFOLD WORKER, MOTORIZED BUGGIES OR MOTORIZED UNIT USED FOR WET CONCRETE OR SO HANDLING OF BUILDING MATERIALS, LABORERS WITH DE- WATERING SYSTEMS, SEWER WORKERS PLUS DEPTH, VIBRATOR OPERATOR; CEMENT SILICA, CLAY, FLY ASH, LIME & PLASTERS HANDLERS (BULK OR BAG); COFFERDAM WORKER PLUS DEPTH, CONCRETE PAVING, PLACING CUTTING & TYING OF REINFORCING, DECK HAND, DREDGE HAND AND SHORE LABORER, BANKMAN ON FLOATING PLANT, GRADE CHECKER, POWER TOOLS, FRONT END MAN ON CHIP SPREADER, CAISSON WORKER PLUS DEPTH, GUNNITER NOZZLEMAN, LEADMAN ON SEWER WORK, WELDER, CUTTER, BURNER & TORCHMAN, CHAIN SAW OPERATOR, JACKHAMMER & DRILL OPERATOR, LAYOUT MAN AND/OR TILE LAYER, STEEL FORM SETTER - STREET & HIGHWAY, AIR TAMPING HAMMERMAN, SIGNAL MAN ON CRANE, CONCRETE SAW OPERATOR, SCREENMAN ON ASPHALT PAVER, TENDING MASONS WITH HOT MATERIAL OR WHERE FOREIGN MATERIALS ARE USED, MORTAR MIXER OPERATOR, MULTIPLE CONCRETE DUCT - LEADMAN, LUTEMAN, ASPHALT RAKER CURB ASPHALT MACHINE OPERATOR, READY MIX SCALEMAN PERMANENT PORTABLE OR TEMPORARY PLANT, LABORER HANDLING MASTERPLATE OR SIMILAR MATERIALS, LASER BEAM OPERATOR, CONCRETE BURNING MACHINE OPERATOR, CORING MACHINE OPERATOR, PLASTER TENDER, UNDERPINNING & SHORING OF BUILDINGS, PUMP MAN, MANHOLE & CATCH BASIN, DIRT & STONE TAMPER, HOSEMAN ON CONCRETE PUMP. (CARROLL, JO DAVIESS, LEE, OGLE, STEPHENSON, AND WHITESIDE COUNTIES)

$52.52$34.25$86.77Agreement
PAIN0030-004 · Painters and Allied Trades agreement, June 1, 2024
PAINTER: BRUSH, ROLLER…
Full text

PAINTER: BRUSH, ROLLER, SPRAY, SANDBLASTING, PAPERHANGER, DRYWALL FINISHING, TAPER, AND SPRAY STRUCTURAL STEEL (BOONE, JO DAVIESS, LEE, OGLE, STEPHENSON AND WINNEBAGO COUNTIES)

$45.15$29.41$74.56Agreement
PAIN0030-010 · Painters and Allied Trades agreement, June 1, 2023
PAINTER: BRUSH, ROLLER…
Full text

PAINTER: BRUSH, ROLLER, PRESSURE ROLLER, SPRAY, AIRLESS SPRAY, SANDBLASTING, TAPER, DRYWALL TAPER/FINISHER, STRUCTURAL STEEL, AND BRIDGES (BUREAU, FORD, HANCOCK, LA SALLE, LIVINGSTON, MCDONOUGH, MCLEAN, PUTNAM AND STARK COUNTIES)

$40.00$26.90$66.90Agreement
PAIN1178-001 · Painters and Allied Trades agreement, June 1, 2022
PAINTER: BRIDGES (CARROLL, HENRY, ROCK ISLAND, AND WHITESIDE COUNTIES)$32.00$17.37$49.37Agreement
PAINTER: BRUSH AND ROLLER (CARROLL, HENRY, ROCK ISLAND, AND WHITESIDE COUNTIES)$30.00$17.37$47.37Agreement
PAINTER: SPRAY, STRUCTURAL STEEL…
Full text

PAINTER: SPRAY, STRUCTURAL STEEL, & SANDBLASTING (CARROLL, HENRY, ROCK ISLAND, AND WHITESIDE COUNTIES)

$30.50$17.37$47.87Agreement
PLAS0011-004 · Plasterers and Cement Masons agreement, June 1, 2023
CEMENT MASON/CONCRETE FINISHER…
Full text

CEMENT MASON/CONCRETE FINISHER (CARROLL, JO DAVIESS, LEE, OGLE, STEPHENSON, AND WHITESIDE (EXCEPT ERIE AND AREA SOUTHWEST THEREOF) COUNTIES)

$38.48$38.77$77.25Agreement
PLASTERER (CARROLL…
Full text

PLASTERER (CARROLL, JO DAVIESS, LEE, OGLE, STEPHENSON, AND WHITESIDE (EXCEPT ERIE AND AREA SOUTHWEST THEREOF) COUNTIES)

$38.98$36.58$75.56Agreement
PLAS0011-005 · Plasterers and Cement Masons agreement, June 1, 2023
CEMENT MASON/CONCRETE FINISHER (BUREAU COUNTY)$40.50$33.54$74.04Agreement
PLAS0011-017 · Plasterers and Cement Masons agreement, June 1, 2023
CEMENT MASON/CONCRETE FINISHER (WINNEBAGO COUNTY)$41.03$36.39$77.42Agreement
PLAS0018-007 · Plasterers and Cement Masons agreement, June 1, 2015
CEMENT MASON/CONCRETE FINISHER (HENRY COUNTY)$36.70$22.08$58.78Agreement
PLAS0018-036 · Plasterers and Cement Masons agreement, January 1, 2020
Group definitions, zones and premiums for PLAS0018-036
CEMENT MASON/CONCRETE FINISHER (ROCK ISLAND COUNTY).$ 28.52 24.04
TEAM0325-002 · Teamsters agreement, June 1, 2025
TRUCK DRIVER: 2 OR 3 AXLES…
Full text

TRUCK DRIVER: 2 OR 3 AXLES (CARROLL (NORTH OF ROUTE. #72 & EAST OF ROUTE #78), JODAVIESS (EAST OF ROUTE #78, EXCLUDING STOCKTON), STEPHENSON, AND WINNEBAGO COUNTIES)

FOOTNOTE: .20 CENTS ADDITIONAL PER AXLE OVER 6 AXLES

$48.47$26.70$75.17Agreement
TRUCK DRIVER: 4 AXLES…
Full text

TRUCK DRIVER: 4 AXLES (CARROLL (NORTH OF ROUTE. #72 & EAST OF ROUTE #78), JODAVIESS (EAST OF ROUTE #78, EXCLUDING STOCKTON), STEPHENSON, AND WINNEBAGO COUNTIES)

FOOTNOTE: .20 CENTS ADDITIONAL PER AXLE OVER 6 AXLES

$48.62$26.70$75.32Agreement
TRUCK DRIVER: 5 AXLES…
Full text

TRUCK DRIVER: 5 AXLES (CARROLL (NORTH OF ROUTE. #72 & EAST OF ROUTE #78), JODAVIESS (EAST OF ROUTE #78, EXCLUDING STOCKTON), STEPHENSON, AND WINNEBAGO COUNTIES)

FOOTNOTE: .20 CENTS ADDITIONAL PER AXLE OVER 6 AXLES

$48.82$26.70$75.52Agreement
TRUCK DRIVER: 6 AXLES…
Full text

TRUCK DRIVER: 6 AXLES (CARROLL (NORTH OF ROUTE. #72 & EAST OF ROUTE #78), JODAVIESS (EAST OF ROUTE #78, EXCLUDING STOCKTON), STEPHENSON, AND WINNEBAGO COUNTIES)

FOOTNOTE: .20 CENTS ADDITIONAL PER AXLE OVER 6 AXLES

$48.93$26.70$75.63Agreement
TEAM0330-003 · Teamsters agreement, June 1, 2025
TRUCK DRIVER: 2-3 AXLES…
Full text

TRUCK DRIVER: 2-3 AXLES (LEE (EAST OF ROUTE 251, COMPTON, LEE, PAW PAW, SCARBORO, & STEWARD), AND OGLE (NORTH OF ROUTE 72/EAST OF ROUTE 251, ADELINE, BYRON, CRESTON, DEMENT, FORRESTON NORTH OF ROUTE 72, LEAF RIVER NORTH OF ROUTE 72, LYNNVILLE, MONROE, ROCHELLE, & SCOTT) COUNTIES)

FOOTNOTE: A. HEALTH AND WELFARE $468.00 PER WEEK; PENSION $644.34 PER WEEK LOW BOY CLASSIFICATION IS AN ADDITIONAL $1.50 PER HOUR AN ADDITIONAL $.20 PER AXLE SHALL BE PAID FOR ALL VEHICLES WITH MORE THAN SIX (6) AXLES. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY. 900 STRAIGHT TIME HOURS OR MORE IN 1 CALENDAR YEAR FOR THE SAME EMPLOYER SHALL RECEIVE 1 WEEK PAID VACATION; 3 YEARS - 2 WEEKS PAID VACATION; 10 YEARS - 3 WEEKS PAID VACATION; 20 YEARS - 4 WEEKS PAID VACATION

$44.83$0.30$45.13Agreement
TRUCK DRIVER: 4 AXLES…
Full text

TRUCK DRIVER: 4 AXLES (LEE (EAST OF ROUTE 251, COMPTON, LEE, PAW PAW, SCARBORO, & STEWARD), AND OGLE (NORTH OF ROUTE 72/EAST OF ROUTE 251, ADELINE, BYRON, CRESTON, DEMENT, FORRESTON NORTH OF ROUTE 72, LEAF RIVER NORTH OF ROUTE 72, LYNNVILLE, MONROE, ROCHELLE, & SCOTT) COUNTIES)

FOOTNOTE: A. HEALTH AND WELFARE $468.00 PER WEEK; PENSION $644.34 PER WEEK LOW BOY CLASSIFICATION IS AN ADDITIONAL $1.50 PER HOUR AN ADDITIONAL $.20 PER AXLE SHALL BE PAID FOR ALL VEHICLES WITH MORE THAN SIX (6) AXLES. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY. 900 STRAIGHT TIME HOURS OR MORE IN 1 CALENDAR YEAR FOR THE SAME EMPLOYER SHALL RECEIVE 1 WEEK PAID VACATION; 3 YEARS - 2 WEEKS PAID VACATION; 10 YEARS - 3 WEEKS PAID VACATION; 20 YEARS - 4 WEEKS PAID VACATION

$44.98$0.30$45.28Agreement
TRUCK DRIVER: 5 AXLES…
Full text

TRUCK DRIVER: 5 AXLES (LEE (EAST OF ROUTE 251, COMPTON, LEE, PAW PAW, SCARBORO, & STEWARD), AND OGLE (NORTH OF ROUTE 72/EAST OF ROUTE 251, ADELINE, BYRON, CRESTON, DEMENT, FORRESTON NORTH OF ROUTE 72, LEAF RIVER NORTH OF ROUTE 72, LYNNVILLE, MONROE, ROCHELLE, & SCOTT) COUNTIES)

FOOTNOTE: A. HEALTH AND WELFARE $468.00 PER WEEK; PENSION $644.34 PER WEEK LOW BOY CLASSIFICATION IS AN ADDITIONAL $1.50 PER HOUR AN ADDITIONAL $.20 PER AXLE SHALL BE PAID FOR ALL VEHICLES WITH MORE THAN SIX (6) AXLES. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY. 900 STRAIGHT TIME HOURS OR MORE IN 1 CALENDAR YEAR FOR THE SAME EMPLOYER SHALL RECEIVE 1 WEEK PAID VACATION; 3 YEARS - 2 WEEKS PAID VACATION; 10 YEARS - 3 WEEKS PAID VACATION; 20 YEARS - 4 WEEKS PAID VACATION

$45.18$0.30$45.48Agreement
TRUCK DRIVER: 6 AXLES…
Full text

TRUCK DRIVER: 6 AXLES (LEE (EAST OF ROUTE 251, COMPTON, LEE, PAW PAW, SCARBORO, & STEWARD), AND OGLE (NORTH OF ROUTE 72/EAST OF ROUTE 251, ADELINE, BYRON, CRESTON, DEMENT, FORRESTON NORTH OF ROUTE 72, LEAF RIVER NORTH OF ROUTE 72, LYNNVILLE, MONROE, ROCHELLE, & SCOTT) COUNTIES)

FOOTNOTE: A. HEALTH AND WELFARE $468.00 PER WEEK; PENSION $644.34 PER WEEK LOW BOY CLASSIFICATION IS AN ADDITIONAL $1.50 PER HOUR AN ADDITIONAL $.20 PER AXLE SHALL BE PAID FOR ALL VEHICLES WITH MORE THAN SIX (6) AXLES. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY. 900 STRAIGHT TIME HOURS OR MORE IN 1 CALENDAR YEAR FOR THE SAME EMPLOYER SHALL RECEIVE 1 WEEK PAID VACATION; 3 YEARS - 2 WEEKS PAID VACATION; 10 YEARS - 3 WEEKS PAID VACATION; 20 YEARS - 4 WEEKS PAID VACATION

$45.38$0.30$45.68Agreement
TEAM0371-004 · Teamsters agreement, May 1, 2025
TRUCK DRIVER, GROUP 1…
Full text

TRUCK DRIVER, GROUP 1 DRIVERS ON 2 AXLES HAULING LESS THAN 9 TONS; AIR COMPRESSOR & WELDING MACHINES AND BROOMS, INCLUDING THOSE PULLED BY SEPARATE UNITS; TRUCK DRIVER HELPER, WAREHOUSE EMPLOYEES; MECHANIC HELPERS; GREASERS AND TIREMEN; PICK-UP TRUCKS WHEN HAULING MATERIAL, TOOLS, OR WORKERS TO AND FROM AND ON THE JOB SITE; AND FORKLIFTS UP TO 6,000 LB CAPACITY. (HENRY AND ROCK ISLAND COUNTIES)

$45.35$25.72$71.07Agreement
TRUCK DRIVER, GROUP 2 (HENRY AND ROCK ISLAND COUNTIES)$45.93$25.72$71.65Agreement
TRUCK DRIVER, GROUP 3 (HENRY AND ROCK ISLAND COUNTIES)$46.25$25.72$71.97Agreement
TRUCK DRIVER, GROUP 4 LOW BOY AND OIL DISTRIBUTORS. (HENRY AND ROCK ISLAND COUNTIES)$46.60$25.72$72.32Agreement
TRUCK DRIVER, GROUP 5…
Full text

TRUCK DRIVER, GROUP 5 DRIVERS WHO REQUIRE SPECIAL PROTECTIVE CLOTHING WHILE EMPLOYED ON HAZARDOUS WASTE WORK. (HENRY AND ROCK ISLAND COUNTIES)

$47.71$25.72$73.43Agreement
TEAM0722-001 · Teamsters agreement, May 1, 2025
TRUCK DRIVER, GROUP 1…
Full text

TRUCK DRIVER, GROUP 1 DRIVERS ON 2 AXLES HAULING LESS THAN 9 TONS; AIR COMPRESSOR & WELDING MACHINES AND BROOMS, INCLUDING THOSE PULLED BY SEPARATE UNITS; TRUCK DRIVER HELPER, WAREHOUSE EMPLOYEES; MECHANIC HELPERS; GREASERS AND TIREMEN; PICK-UP TRUCKS WHEN HAULING MATERIAL, TOOLS, OR WORKERS TO AND FROM AND ON THE JOB SITE; AND FORKLIFTS UP TO 6,000 LB CAPACITY. (BUREAU, CARROLL (WEST OF ROUTE78/SOUTH OF ROUTE 72), JODAVIESS (WEST OF ROUTE 78), LEE (WEST OF ROUTE 251), OGLE (SOUTH OF ROUTE 72/WEST OF ROUTE 251), AND WHITESIDE COUNTIES)

$45.29$25.42$70.71Agreement
TRUCK DRIVER, GROUP 2…
Full text

TRUCK DRIVER, GROUP 2 (BUREAU, CARROLL (WEST OF ROUTE78/SOUTH OF ROUTE 72), JODAVIESS (WEST OF ROUTE 78), LEE (WEST OF ROUTE 251), OGLE (SOUTH OF ROUTE 72/WEST OF ROUTE 251), AND WHITESIDE COUNTIES)

$45.88$25.42$71.30Agreement
TRUCK DRIVER, GROUP 3…
Full text

TRUCK DRIVER, GROUP 3 (BUREAU, CARROLL (WEST OF ROUTE78/SOUTH OF ROUTE 72), JODAVIESS (WEST OF ROUTE 78), LEE (WEST OF ROUTE 251), OGLE (SOUTH OF ROUTE 72/WEST OF ROUTE 251), AND WHITESIDE COUNTIES)

$46.15$25.42$71.57Agreement
TRUCK DRIVER, GROUP 4…
Full text

TRUCK DRIVER, GROUP 4 LOW BOY AND OIL DISTRIBUTORS. (BUREAU, CARROLL (WEST OF ROUTE78/SOUTH OF ROUTE 72), JODAVIESS (WEST OF ROUTE 78), LEE (WEST OF ROUTE 251), OGLE (SOUTH OF ROUTE 72/WEST OF ROUTE 251), AND WHITESIDE COUNTIES)

$46.54$25.42$71.96Agreement
TRUCK DRIVER, GROUP 5…
Full text

TRUCK DRIVER, GROUP 5 DRIVERS WHO REQUIRE SPECIAL PROTECTIVE CLOTHING WHILE EMPLOYED ON HAZARDOUS WASTE WORK. (BUREAU, CARROLL (WEST OF ROUTE78/SOUTH OF ROUTE 72), JODAVIESS (WEST OF ROUTE 78), LEE (WEST OF ROUTE 251), OGLE (SOUTH OF ROUTE 72/WEST OF ROUTE 251), AND WHITESIDE COUNTIES)

$47.64$25.42$73.06Agreement

Modification history

Modification 0January 2, 2026
Modification 1May 18, 2026
Modification 2July 30, 2026 (current)

Published by the Wage and Hour Division; read from sam.gov. The sheet is checked for a newer modification each day. Contracts awarded since January 1, 2017 also carry Executive Order 13706 paid sick leave (one hour per 30 worked, up to 56 a year).

Questions people ask

Which rate do I pay on IL20260012?
The line for the classification of work actually performed: the basic rate plus the fringe. You may pay the fringe into benefit plans, as cash on every hour, or a mix. Overtime after 40 hours is 1.5 times the basic rate; fringe is paid on every hour and never multiplied.
My trade is not on this sheet. What do I do?
Do not borrow the nearest name. Ask the contracting agency for a conformance on Standard Form 1444 before the first week of that work, and note it as pending on the payroll.
Does modification 2 apply to my contract?
Only if it was in force when your contract was awarded (generally at bid opening). An earlier modification locked into the contract keeps applying, except on option years, added scope and indefinite-quantity contracts. The number and modification are on the first page of the exhibit in your contract.

How to read a wage determination · Paying the fringe in cash or through plans · Overtime on these rates · Fringe credit calculator