Prevailing wage rates: Bannock County, Idaho

Highway construction · ID20260091 modification 1, published May 18, 2026

The short answer

This sheet sets 29 classifications for highway work in Bannock County, Idaho. Each line is a basic hourly rate plus a fringe rate, and the sum is the minimum you must pay for that work, from $22.35 an hour (traffic control: laborer-cones/ barricades/barrels - setter/mover/sweeper) to $53.68 (power equipment operator: group 8). Your contract may lock an earlier modification.

Rates by classification

Total is the basic rate plus the fringe. Source is the agreement or survey the rate came from; a marker means the group changed in this modification. A dagger (†) means the fringe carries a footnote or percentage the total does not include; read the group’s notes.

ClassificationBasic rateFringeTotalSource
ENGI0370-043 · Operating Engineers agreement, January 1, 2025
POWER EQUIPMENT OPERATOR:(GROUP 6…
Full text

POWER EQUIPMENT OPERATOR:(GROUP 6): BLADE OPERATOR, BACKHOE/TRACKHOE/EXCAVATOR (3/4 YDS- 3 1/2 YDS, FRONT END LOADER (OVER 4 YDS TO AND INCLUDING 7YDS) ZONE PAY: ZONE 1 0 - 30 MILES: FREE ZONE 2 30 - 60 MILES: $30.00/PER DAY ZONE 3 MORE THAN 60 MILES: $35.00/PER DAY IF A PROJECT IS LOCATED IN MORE THAN ONE ZONE THE LOWER ZONE RATE SHALL APPLY ZONES SHALL BE MEASURED FROM THE THE FOLLOWING U.S. POST OFFICES: BOISE: 304 N. 8TH STREET TWIN FALLS: 253 2ND AVE. WEST POCATELLO: CLARK STREET IDAHO FALLS: 875 NORTH CAPITAL AVE. BOOM PAY: ALL CRANES AND CONCRETE PUMP BOOM TRUCKS 100 FT TO 150 FT $.15 OVER SCALE 150 FT TO 200 FT $.30 OVER SCALE OVER 200 FT $.45 OVER SCALE

$36.98$16.10$53.08Agreement
POWER EQUIPMENT OPERATOR: GROUP 8…
Full text

POWER EQUIPMENT OPERATOR: GROUP 8 BULLDOZER ZONE PAY: ZONE 1 0 - 30 MILES: FREE ZONE 2 30 - 60 MILES: $30.00/PER DAY ZONE 3 MORE THAN 60 MILES: $35.00/PER DAY IF A PROJECT IS LOCATED IN MORE THAN ONE ZONE THE LOWER ZONE RATE SHALL APPLY ZONES SHALL BE MEASURED FROM THE THE FOLLOWING U.S. POST OFFICES: BOISE: 304 N. 8TH STREET TWIN FALLS: 253 2ND AVE. WEST POCATELLO: CLARK STREET IDAHO FALLS: 875 NORTH CAPITAL AVE.

$37.58$16.10$53.68Agreement
POWER EQUIPMENT OPERATOR: GROUP 7…
Full text

POWER EQUIPMENT OPERATOR: GROUP 7 GRADER (FINE), FRONT END LOADER (OVER 7 YDS), HEAVY DUTY MECHANIC ZONE PAY: ZONE 1 0 - 30 MILES: FREE ZONE 2 30 - 60 MILES: $30.00/PER DAY ZONE 3 MORE THAN 60 MILES: $35.00/PER DAY IF A PROJECT IS LOCATED IN MORE THAN ONE ZONE THE LOWER ZONE RATE SHALL APPLY ZONES SHALL BE MEASURED FROM THE THE FOLLOWING U.S. POST OFFICES: BOISE: 304 N. 8TH STREET TWIN FALLS: 253 2ND AVE. WEST POCATELLO: CLARK STREET IDAHO FALLS: 875 NORTH CAPITAL AVE. BOOM PAY: ALL CRANES AND CONCRETE PUMP BOOM TRUCKS 100 FT TO 150 FT $.15 OVER SCALE 150 FT TO 200 FT $.30 OVER SCALE OVER 200 FT $.45 OVER SCALE

$37.35$16.10$53.45Agreement
POWER EQUIPMENT OPERATOR: GROUP 5…
Full text

POWER EQUIPMENT OPERATOR: GROUP 5 ELEVATING GRADER OPERATOR, BACKHOE/TRACKHOE/EXCAVATOR (UNDER 3/4 YDS) ZONE PAY: ZONE 1 0 - 30 MILES: FREE ZONE 2 30 - 60 MILES: $30.00/PER DAY ZONE 3 MORE THAN 60 MILES: $35.00/PER DAY IF A PROJECT IS LOCATED IN MORE THAN ONE ZONE THE LOWER ZONE RATE SHALL APPLY ZONES SHALL BE MEASURED FROM THE THE FOLLOWING U.S. POST OFFICES: BOISE: 304 N. 8TH STREET TWIN FALLS: 253 2ND AVE. WEST POCATELLO: CLARK STREET IDAHO FALLS: 875 NORTH CAPITAL AVE. BOOM PAY: ALL CRANES AND CONCRETE PUMP BOOM TRUCKS 100 FT TO 150 FT $.15 OVER SCALE 150 FT TO 200 FT $.30 OVER SCALE OVER 200 FT $.45 OVER SCALE

$36.81$16.10$52.91Agreement
POWER EQUIPMENT OPERATOR: GROUP 4…
Full text

POWER EQUIPMENT OPERATOR: GROUP 4 FRONT END LOADER (UP TO 4YD) ZONE PAY: ZONE 1 0 - 30 MILES: FREE ZONE 2 30 - 60 MILES: $30.00/PER DAY ZONE 3 MORE THAN 60 MILES: $35.00/PER DAY IF A PROJECT IS LOCATED IN MORE THAN ONE ZONE THE LOWER ZONE RATE SHALL APPLY ZONES SHALL BE MEASURED FROM THE THE FOLLOWING U.S. POST OFFICES: BOISE: 304 N. 8TH STREET TWIN FALLS: 253 2ND AVE. WEST POCATELLO: CLARK STREET IDAHO FALLS: 875 NORTH CAPITAL AVE.

$36.64$16.10$52.74Agreement
POWER EQUIPMENT OPERATOR: GROUP 3…
Full text

POWER EQUIPMENT OPERATOR: GROUP 3 ROLLER ZONE PAY: ZONE 1 0 - 30 MILES: FREE ZONE 2 30 - 60 MILES: $30.00/PER DAY ZONE 3 MORE THAN 60 MILES: $35.00/PER DAY IF A PROJECT IS LOCATED IN MORE THAN ONE ZONE THE LOWER ZONE RATE SHALL APPLY ZONES SHALL BE MEASURED FROM THE THE FOLLOWING U.S. POST OFFICES: BOISE: 304 N. 8TH STREET TWIN FALLS: 253 2ND AVE. WEST POCATELLO: CLARK STREET IDAHO FALLS: 875 NORTH CAPITAL AVE

$36.33$16.10$52.43Agreement
LABO0238-035 · Laborers agreement, June 1, 2019
LABORER: PIPELAYER ZONE DIFFERENTIAL…
Full text

LABORER: PIPELAYER ZONE DIFFERENTIAL (ADD TO ZONE 1 RATES): ZONE 2 - $2.00 BASE POINTS: PASCO ZONE 1: 0-45 RADIUS MILES FROM THE MAIN POST OFFICE. ZONE 2: 45 RADIUS MILES AND OVER FROM THE MAIN POST OFFICE

$28.48$13.00$41.48Agreement
SUID2013-019 · Survey of contractors in ID, June 17, 2013
TRUCK DRIVER: WATER TRUCK$21.54$12.19$33.73Survey
TRUCK DRIVER: OIL DISTRIBUTOR TRUCK$23.93$11.27$35.20Survey
TRUCK DRIVER: LOWBOY TRUCK$26.61$13.21$39.82Survey
TRUCK DRIVER: DUMP TRUCK$21.59$10.93$32.52Survey
TRAFFIC CONTROL: LABORER-CONES/ BARRICADES/BARRELS - SETTER/MOVER/SWEEPER$17.69$4.66$22.35Survey
OPERATOR: SCREED$22.30$7.22$29.52Survey
OPERATOR: ROLLER (SUBGRADE)$19.99$7.99$27.98Survey
OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE)$24.37$7.11$31.48Survey
OPERATOR: OILER$22.25$6.52$28.77Survey
OPERATOR: FORKLIFT$23.13$9.17$32.30Survey
OPERATOR: CRANE$23.34$9.45$32.79Survey
OPERATOR: BROOM/SWEEPER$24.34$8.04$32.38Survey
OPERATOR: BOBCAT/SKID STEER/SKID LOADER$21.15$8.20$29.35Survey
LABORER: MASON TENDER - CEMENT/CONCRETE$22.34$10.90$33.24Survey
LABORER: GRADE CHECKER$20.64$7.37$28.01Survey
LABORER: COMMON OR GENERAL$19.18$7.65$26.83Survey
LABORER: ASPHALT, INCLUDES RAKER, SHOVELER, SPREADER AND DISTRIBUTOR$19.38$7.63$27.01Survey
HIGHWAY/PARKING LOT STRIPING: PAINTER$25.47$9.52$34.99Survey
ELECTRICIAN$26.33$11.45$37.78Survey
CEMENT MASON/CONCRETE FINISHER$22.90$11.99$34.89Survey
CARPENTER, EXCLUDES FORM WORK$23.92$9.84$33.76Survey
CARPENTER (FORM WORK ONLY)$26.24$9.48$35.72Survey

Modification history

Modification 0January 2, 2026
Modification 1May 18, 2026 (current)

Published by the Wage and Hour Division; read from sam.gov. The sheet is checked for a newer modification each day. Contracts awarded since January 1, 2017 also carry Executive Order 13706 paid sick leave (one hour per 30 worked, up to 56 a year).

Questions people ask

Which rate do I pay on ID20260091?
The line for the classification of work actually performed: the basic rate plus the fringe. You may pay the fringe into benefit plans, as cash on every hour, or a mix. Overtime after 40 hours is 1.5 times the basic rate; fringe is paid on every hour and never multiplied.
My trade is not on this sheet. What do I do?
Do not borrow the nearest name. Ask the contracting agency for a conformance on Standard Form 1444 before the first week of that work, and note it as pending on the payroll.
Does modification 1 apply to my contract?
Only if it was in force when your contract was awarded (generally at bid opening). An earlier modification locked into the contract keeps applying, except on option years, added scope and indefinite-quantity contracts. The number and modification are on the first page of the exhibit in your contract.

How to read a wage determination · Paying the fringe in cash or through plans · Overtime on these rates · Fringe credit calculator