Prevailing wage rates · Idaho · Wage determination
Prevailing wage rates: Jerome County, Idaho
Highway construction · ID20260081 modification 2, published May 18, 2026
The short answer
This sheet sets 37 classifications for highway work in Jerome County, Idaho. Each line is a basic hourly rate plus a fringe rate, and the sum is the minimum you must pay for that work, from $30.81 an hour (operator: roller (subgrade)) to $58.74 (electrician). Your contract may lock an earlier modification.
What changed this year
First published January 2, 2026, this sheet is now on modification 2, and its rates have changed in 1 modification. Of the 37 rates we can follow line by line from the first publication to today, 1 is higher.
If you bid the job or set pay from an earlier copy, find your trades below. The rates that bind you are the ones in the modification written into your contract.
Latest change
May 18, 2026 · modification 2
Classification names reworded; no change among the 37 lines we could match
SAM.gov reworded this sheet’s classification names in this modification, so not every line can be matched to the one before. Only lines matched with certainty are compared here; nothing is guessed. If your trade is not listed, compare it against your contract’s copy.
Earlier modifications
January 30, 2026 · modification 11 rate raised
- Electrician: 1 rate raised by $4.49 an hour
Every line that changed (1)
Classification Was Now Change ELECTRICIAN $36.97 + $17.28 $40.00 + $18.74 +$4.49 (+8.3%)
Compared line by line from each modification as published on SAM.gov. A line we could not pair with certainty is left out rather than guessed.
Rates by classification
These are the rates in modification 2 as published on SAM.gov. The determination and modification written into your contract are the ones that bind you; check that number before relying on this table. Total is the basic rate plus the fringe. Source is the agreement or survey the rate came from and its year; a survey year long past means the rate has not been surveyed since. A marker means the group changed in this modification. In the Since column, a dash means SAM.gov reworded the line during the year and it cannot be matched to the first publication with certainty. A dagger (†) means the fringe carries a footnote or percentage the total does not include; read the group’s notes.
| Classification | Basic rate | Fringe | Total | Since Jan 2 | Source |
|---|---|---|---|---|---|
| ELEC0449-001 · Electrical Workers (IBEW) agreement, December 1, 2025 | |||||
| ELECTRICIAN | $40.00 | $18.74 | $58.74 | +$4.49 (+8.3%) | Agreement, 2025 |
| ENGI0302-015 · Operating Engineers agreement, January 1, 2025 | |||||
POWER EQUIPMENT OPERATOR: GROUP 7…Full textPOWER EQUIPMENT OPERATOR: GROUP 7 MECHANIC ZONE PAY: ZONE 1 0 - 30 MILES: FREE ZONE 2 30 - 60 MILES: $30.00/PER DAY ZONE 3 MORE THAN 60 MILES: $35.00/PER DAY. IF A PROJECT IS LOCATED IN MORE THAN ONE ZONE THE LOWER ZONE RATE SHALL APPLY ZONES SHALL BE MEASURED FROM THE THE FOLLOWING U.S. POST OFFICES: BOISE: 304 N. 8TH STREET TWIN FALLS: 253 2ND AVE. WEST POCATELLO: CLARK STREET IDAHO FALLS: 875 NORTH CAPITAL AVE | $37.35 | $16.10 | $53.45 | no change | Agreement, 2025 |
| PLAS0072-001 · Plasterers and Cement Masons agreement, June 1, 2025 | |||||
CEMENT MASON/CONCRETE FINISHER…Full textCEMENT MASON/CONCRETE FINISHER (ZONE 1) ZONE DIFFERENTIAL (ADD TO ZONE 1 RATE): ZONE 2 - $3.00 BASE POINTS: SPOKANE, PASCO, LEWISTON, WENATCHEE ZONE 1: 0-45 RADIUS MILES FROM THE MAIN POST OFFICE ZONE 2: OVER 45 RADIUS MILES FROM THE MAIN POST OFFICE | $40.89 | $18.64 | $59.53 | no change | Agreement, 2025 |
| SUID2013-009 · Survey of contractors in ID, June 17, 2013 | |||||
| TRUCK DRIVER: WATER TRUCK | $21.35 | $13.05 | $34.40 | no change | Survey, 2013 |
| TRUCK DRIVER: OIL DISTRIBUTOR TRUCK | $22.54 | $12.35 | $34.89 | no change | Survey, 2013 |
| TRUCK DRIVER: LOWBOY TRUCK | $21.53 | $12.98 | $34.51 | no change | Survey, 2013 |
| TRUCK DRIVER: DISTRIBUTOR TRUCK | $21.35 | $13.05 | $34.40 | no change | Survey, 2013 |
| TRAFFIC CONTROL: LABORER-CONES/ BARRICADES/BARRELS - SETTER/MOVER/SWEEPER | $22.66 | $10.90 | $33.56 | no change | Survey, 2013 |
| TRAFFIC CONTROL: FLAGGER | $22.68 | $10.90 | $33.58 | no change | Survey, 2013 |
| OPERATOR: SCREED | $25.63 | $10.34 | $35.97 | no change | Survey, 2013 |
| OPERATOR: ROTOMILL | $26.54 | $10.00 | $36.54 | no change | Survey, 2013 |
| OPERATOR: ROLLER (SUBGRADE) | $22.24 | $8.57 | $30.81 | no change | Survey, 2013 |
| OPERATOR: ROLLER | $25.52 | $10.11 | $35.63 | no change | Survey, 2013 |
| OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | $25.93 | $10.05 | $35.98 | no change | Survey, 2013 |
| OPERATOR: OILER | $25.66 | $9.23 | $34.89 | no change | Survey, 2013 |
| OPERATOR: LOADER | $25.59 | $10.03 | $35.62 | no change | Survey, 2013 |
| OPERATOR: HYDROSEEDER | $24.76 | $11.51 | $36.27 | no change | Survey, 2013 |
| OPERATOR: GRADER/BLADE | $26.14 | $10.69 | $36.83 | no change | Survey, 2013 |
| OPERATOR: CRUSHER | $25.06 | $9.23 | $34.29 | no change | Survey, 2013 |
| OPERATOR: CRANE | $26.04 | $10.00 | $36.04 | no change | Survey, 2013 |
| OPERATOR: BULLDOZER | $26.19 | $9.60 | $35.79 | no change | Survey, 2013 |
| OPERATOR: BROOM/SWEEPER | $25.01 | $10.16 | $35.17 | no change | Survey, 2013 |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $25.35 | $11.55 | $36.90 | no change | Survey, 2013 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $25.80 | $10.00 | $35.80 | no change | Survey, 2013 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | $23.69 | $10.97 | $34.66 | no change | Survey, 2013 |
| LABORER: GRADE CHECKER | $23.45 | $10.97 | $34.42 | no change | Survey, 2013 |
| LABORER: CONCRETE SAW (HAND HELD/WALK BEHIND) | $23.98 | $11.05 | $35.03 | no change | Survey, 2013 |
| LABORER: COMMON OR GENERAL | $22.68 | $10.90 | $33.58 | no change | Survey, 2013 |
| LABORER: ASPHALT, INCLUDES RAKER, SHOVELER, SPREADER AND DISTRIBUTOR | $23.13 | $11.01 | $34.14 | no change | Survey, 2013 |
| HIGHWAY/PARKING LOT STRIPING: PAINTER | $26.38 | $7.89 | $34.27 | no change | Survey, 2013 |
| CARPENTER (FORM WORK ONLY) | $26.57 | $8.10 | $34.67 | no change | Survey, 2013 |
| TEAM0483-004 · Teamsters agreement, January 1, 2025 | |||||
| TRUCK DRIVER, GROUP 5F DUMP (OVER 100 YDS) | $37.19 | $17.00 | $54.19 | no change | Agreement, 2025 |
| TRUCK DRIVER, GROUP 5E DUMP (75-100 YDS) | $36.75 | $17.00 | $53.75 | no change | Agreement, 2025 |
| TRUCK DRIVER, GROUP 5D DUMP (50-75 YDS) | $36.12 | $17.00 | $53.12 | no change | Agreement, 2025 |
| TRUCK DRIVER, GROUP 5C DUMP (30-50 YDS) | $36.01 | $17.00 | $53.01 | no change | Agreement, 2025 |
| TRUCK DRIVER, GROUP 5B DUMP (16-30 YDS) | $35.78 | $17.00 | $52.78 | no change | Agreement, 2025 |
| TRUCK DRIVER, GROUP 5A DUMP (0-16 YDS) | $35.60 | $17.00 | $52.60 | no change | Agreement, 2025 |
Modification history
| Modification 1 | January 30, 2026 |
| Modification 2 | May 18, 2026 (current) |
Published by the Wage and Hour Division; read from sam.gov. The sheet is checked for a newer modification each day. Contracts awarded since January 1, 2017 also carry Executive Order 13706 paid sick leave (one hour per 30 worked, up to 56 a year).
Questions people ask
- Which rate do I pay on ID20260081?
- The line for the classification of work actually performed: the basic rate plus the fringe. You may pay the fringe into benefit plans, as cash on every hour, or a mix. Overtime after 40 hours is 1.5 times the basic rate; fringe is paid on every hour and never multiplied.
- My trade is not on this sheet. What do I do?
- Do not borrow the nearest name. Ask the contracting agency for a conformance on Standard Form 1444 before the first week of that work, and note it as pending on the payroll.
- Does modification 2 apply to my contract?
- Only if it was in force when your contract was awarded (generally at bid opening). An earlier modification locked into the contract keeps applying, except on option years, added scope and indefinite-quantity contracts. The number and modification are on the first page of the exhibit in your contract.
How to read a wage determination · Paying the fringe in cash or through plans · Overtime on these rates · Fringe credit calculator
Put these rates on a certified payroll.
Start here and ID20260081 is already filled in when you set up the job. CertifiedHours loads this sheet, checks every line against it as you type hours, and prints the WH-347. Free for one payroll a month.
Start a payroll on this sheetOn this sheet
- 37 classifications in 5 rate groups
- 4 from agreements, 1 from surveys
- Counties: Jerome