This sheet sets 32 classifications for heavy work in Idaho County, Idaho. Each line is a basic hourly rate plus a fringe rate, and the sum is the minimum you must pay for that work, from $20.97 an hour (operator: bobcat/skid steer/skid loader) to $73.67 (ironworker: reinforcing and structural). Your contract may lock an earlier modification.

Rates by classification

Total is the basic rate plus the fringe. Source is the agreement or survey the rate came from; a marker means the group changed in this modification. A dagger (†) means the fringe carries a footnote or percentage the total does not include; read the group’s notes.

ClassificationBasic rateFringeTotalSource
CARP0001-045 · Carpenters agreement, June 1, 2021
CARPENTER (FORM WORK ONLY)$38.87$17.84$56.71Agreement
ELEC0073-011 · Electrical Workers (IBEW) agreement, August 1, 2025
ELECTRICIAN$49.55$19.09$68.64Agreement
ENGI0370-041 · Operating Engineers agreement, January 1, 2025
POWER EQUIPMENT OPERATOR: GROUP 8…
Full text

POWER EQUIPMENT OPERATOR: GROUP 8 CRANES (85 TONS & OVER), FRONT END LOADER (10 YDS & OVER) AREA NORTH OF 46TH PARALLEL IN IDAHO COUNTY ZONE PAY: ZONE CENTERS: SPOKANE, PASCO, LEWISTON ZONE 1: 0-45 MILES: FREE ZONE 2: 45 MILES & OVER: $2.00 BOOM PAY (ALL CRANES): (A): 180'-250': $.50 OVER SCALE (B): OVER 250': $.80 OVER SCALE

$37.58$15.95$53.53Agreement
POWER EQUIPMENT OPERATOR: GROUP 7…
Full text

POWER EQUIPMENT OPERATOR: GROUP 7 BACKHOE (OVER 110,000 GW), CRANES (45-85 TONS), HEAVY DUTY MECHANIC, FRONT END LOADER (8-10 YDS) ZONE PAY: ZONE CENTERS: SPOKANE, PASCO, LEWISTON ZONE 1: 0-45 MILES: FREE ZONE 2: 45 MILES & OVER: $2.00 BOOM PAY (ALL CRANES): (A): 180'-250': $.50 OVER SCALE (B): OVER 250': $.80 OVER SCALE

$37.35$15.95$53.30Agreement
POWER EQUIPMENT OPERATOR: GROUP 6…
Full text

POWER EQUIPMENT OPERATOR: GROUP 6 BACKHOE (45,000-110,000 GW), CRANE (25-45 TONS), BULLDOZER (D-6 AND OVER), GRADER/BLADE, FRONT-END LOADER(4-8 YDS), PAVER, SCRAPERS (ALL) AREA NORTH OF 46TH PARALLEL IN IDAHO COUNTY ZONE PAY: ZONE CENTERS: SPOKANE, PASCO, LEWISTON ZONE 1: 0-45 MILES: FREE ZONE 2: 45 MILES & OVER: $2.00 BOOM PAY (ALL CRANES): (A): 180'-250': $.50 OVER SCALE (B): OVER 250': $.80 OVER SCALE

$36.98$15.95$52.93Agreement
POWER EQUIPMENT OPERATOR: GROUP 5…
Full text

POWER EQUIPMENT OPERATOR: GROUP 5 BACKHOE (45,000 GW & UNDER), CRANES (25 TONS & UNDER), DRILL (8 IN BIT AND OVER AREA NORTH OF 46TH PARALLEL IN IDAHO COUNTY ZONE PAY: ZONE CENTERS: SPOKANE, PASCO, LEWISTON ZONE 1: 0-45 MILES: FREE ZONE 2: 45 MILES & OVER: $2.00 BOOM PAY (ALL CRANES): (A): 180'-250': $.50 OVER SCALE (B): OVER 250': $.80 OVER SCALE

$36.81$15.95$52.76Agreement
POWER EQUIPMENT OPERATOR: GROUP 4…
Full text

POWER EQUIPMENT OPERATOR: GROUP 4 FRONT END LOADER (UNDER 4 YDS) AREA NORTH OF 46TH PARALLEL IN IDAHO COUNTY ZONE PAY: ZONE CENTERS: SPOKANE, PASCO, LEWISTON ZONE 1: 0-45 MILES: FREE ZONE 2: 45 MILES & OVER: $2.00

$36.64$15.95$52.59Agreement
POWER EQUIPMENT OPERATOR: GROUP 3…
Full text

POWER EQUIPMENT OPERATOR: GROUP 3 BULLDOZER (UP TO D-6) AREA NORTH OF 46TH PARALLEL IN IDAHO COUNTY ZONE PAY: ZONE CENTERS: SPOKANE, PASCO, LEWISTON ZONE 1: 0-45 MILES: FREE ZONE 2: 45 MILES & OVER: $2.00

$36.33$15.95$52.28Agreement
POWER EQUIPMENT OPERATOR: GROUP 1…
Full text

POWER EQUIPMENT OPERATOR: GROUP 1 ROLLERS (ALL) AREA NORTH OF 46TH PARALLEL IN IDAHO COUNTY ZONE PAY: ZONE CENTERS: SPOKANE, PASCO, LEWISTON ZONE 1: 0-45 MILES: FREE ZONE 2: 45 MILES & OVER: $2.00

$35.80$15.95$51.75Agreement
ENGI0370-042 · Operating Engineers agreement, January 1, 2025
POWER EQUIPMENT OPERATOR: GROUP 8…
Full text

POWER EQUIPMENT OPERATOR: GROUP 8 BULLDOZER, SCRAPER (OVER 80 YDS TO 100 YDS) AREA SOUTH OF 46TH PARALLEL IN IDAHO COUNTY ZONE PAY: ZONE 1 0 - 30 MILES: FREE ZONE 2 30 - 60 MILES: $30.00/PER DAY ZONE 3 MORE THAN 60 MILES: $35.00/PER DAY IF A PROJECT IS LOCATED IN MORE THAN ONE ZONE THE LOWER ZONE RATE SHALL APPLY ZONES SHALL BE MEASURED FROM THE THE FOLLOWING U.S. POST OFFICES: BOISE: 304 N. 8TH STREET TWIN FALLS: 253 2ND AVE. WEST POCATELLO: CLARK STREET IDAHO FALLS: 875 NORTH CAPITAL AVE. BOOM PAY: ALL CRANES AND CONCRETE PUMP BOOM TRUCKS 100 FT TO 150 FT $.15 OVER SCALE 150 FT TO 200 FT $.30 OVER SCALE OVER 200 FT $.45 OVER SCALE

$37.58$16.10$53.68Agreement
POWER EQUIPMENT OPERATOR: GROUP 7…
Full text

POWER EQUIPMENT OPERATOR: GROUP 7 CRANES (OVER 50 TONS), DRILL (BIT 8 IN AND OVER), GRADER (FINE), FRONT END LOADER (OVER 7 YDS), HEAVY DUTY MECHANIC, SCRAPERS (OVER 40 YDS TO 60 YDS), TOWER CRANE AREA SOUTH OF 46TH PARALLEL IN IDAHO COUNTY ZONE PAY: ZONE 1 0 - 30 MILES: FREE ZONE 2 30 - 60 MILES: $30.00/PER DAY ZONE 3 MORE THAN 60 MILES: $35.00/PER DAY IF A PROJECT IS LOCATED IN MORE THAN ONE ZONE THE LOWER ZONE RATE SHALL APPLY ZONES SHALL BE MEASURED FROM THE THE FOLLOWING U.S. POST OFFICES: BOISE: 304 N. 8TH STREET TWIN FALLS: 253 2ND AVE. WEST POCATELLO: CLARK STREET IDAHO FALLS: 875 NORTH CAPITAL AVE. BOOM PAY: ALL CRANES AND CONCRETE PUMP BOOM TRUCKS 100 FT TO 150 FT $.15 OVER SCALE 150 FT TO 200 FT $.30 OVER SCALE OVER 200 FT $.45 OVER SCALE

$37.35$16.10$53.45Agreement
POWER EQUIPMENT OPERATOR: GROUP 6…
Full text

POWER EQUIPMENT OPERATOR: GROUP 6: BLADE OPERATOR, BACKHOE (3/4 YDS- 31/2 YDS), CRANES (UP TO AND INCLUDING 50 TONS), DRILLING (BIT UNDER 8IN), FRONT END LOADER (OVER 4 YDS TO AND INCLUDING 7YDS), PAVER, SCRAPER (UP TO AND INCLUDING 40 YDS) AREA SOUTH OF 46TH PARALLEL IN IDAHO COUNTY ZONE PAY: ZONE 1 0 - 30 MILES: FREE ZONE 2 30 - 60 MILES: $30.00/PER DAY ZONE 3 MORE THAN 60 MILES: $35.00/PER DAY IF A PROJECT IS LOCATED IN MORE THAN ONE ZONE THE LOWER ZONE RATE SHALL APPLY ZONES SHALL BE MEASURED FROM THE THE FOLLOWING U.S. POST OFFICES: BOISE: 304 N. 8TH STREET TWIN FALLS: 253 2ND AVE. WEST POCATELLO: CLARK STREET IDAHO FALLS: 875 NORTH CAPITAL AVE. BOOM PAY: ALL CRANES AND CONCRETE PUMP BOOM TRUCKS 100 FT TO 150 FT $.15 OVER SCALE 150 FT TO 200 FT $.30 OVER SCALE OVER 200 FT $.45 OVER SCALE

$36.98$16.10$53.08Agreement
POWER EQUIPMENT OPERATOR: GROUP 5…
Full text

POWER EQUIPMENT OPERATOR: GROUP 5 ELEVATING GRADER OPERATOR, BACKHOE (UNDER 3/4 YDS) AREA SOUTH OF 46TH PARALLEL IN IDAHO COUNTY ZONE PAY: ZONE 1 0 - 30 MILES: FREE ZONE 2 30 - 60 MILES: $30.00/PER DAY ZONE 3 MORE THAN 60 MILES: $35.00/PER DAY IF A PROJECT IS LOCATED IN MORE THAN ONE ZONE THE LOWER ZONE RATE SHALL APPLY ZONES SHALL BE MEASURED FROM THE THE FOLLOWING U.S. POST OFFICES: BOISE: 304 N. 8TH STREET TWIN FALLS: 253 2ND AVE. WEST POCATELLO: CLARK STREET IDAHO FALLS: 875 NORTH CAPITAL AVE. BOOM PAY: ALL CRANES AND CONCRETE PUMP BOOM TRUCKS 100 FT TO 150 FT $.15 OVER SCALE 150 FT TO 200 FT $.30 OVER SCALE OVER 200 FT $.45 OVER SCALE

$36.81$16.10$52.91Agreement
POWER EQUIPMENT OPERATOR: GROUP 4…
Full text

POWER EQUIPMENT OPERATOR: GROUP 4 FRONT END LOADER (UP TO 4YD) AREA SOUTH OF 46TH PARALLEL IN IDAHO COUNTY ZONE PAY: ZONE 1 0 - 30 MILES: FREE ZONE 2 30 - 60 MILES: $30.00/PER DAY ZONE 3 MORE THAN 60 MILES: $35.00/PER DAY IF A PROJECT IS LOCATED IN MORE THAN ONE ZONE THE LOWER ZONE RATE SHALL APPLY ZONES SHALL BE MEASURED FROM THE THE FOLLOWING U.S. POST OFFICES: BOISE: 304 N. 8TH STREET TWIN FALLS: 253 2ND AVE. WEST POCATELLO: CLARK STREET IDAHO FALLS: 875 NORTH CAPITAL AVE

$36.64$16.10$52.74Agreement
POWER EQUIPMENT OPERATOR: GROUP 3…
Full text

POWER EQUIPMENT OPERATOR: GROUP 3 ROLLER AREA SOUTH OF 46TH PARALLEL IN IDAHO COUNTY ZONE PAY: ZONE 1 0 - 30 MILES: FREE ZONE 2 30 - 60 MILES: $30.00/PER DAY ZONE 3 MORE THAN 60 MILES: $35.00/PER DAY IF A PROJECT IS LOCATED IN MORE THAN ONE ZONE THE LOWER ZONE RATE SHALL APPLY ZONES SHALL BE MEASURED FROM THE THE FOLLOWING U.S. POST OFFICES: BOISE: 304 N. 8TH STREET TWIN FALLS: 253 2ND AVE. WEST POCATELLO: CLARK STREET IDAHO FALLS: 875 NORTH CAPITAL AVE

$36.33$16.10$52.43Agreement
POWER EQUIPMENT OPERATOR: GROUP 10…
Full text

POWER EQUIPMENT OPERATOR: GROUP 10 SCRAPER (OVER 100 YDS) AREA SOUTH OF 46TH PARALLEL IN IDAHO COUNTY ZONE PAY: ZONE 1 0 - 30 MILES: FREE ZONE 2 30 - 60 MILES: $30.00/PER DAY ZONE 3 MORE THAN 60 MILES: $35.00/PER DAY IF A PROJECT IS LOCATED IN MORE THAN ONE ZONE THE LOWER ZONE RATE SHALL APPLY ZONES SHALL BE MEASURED FROM THE THE FOLLOWING U.S. POST OFFICES: BOISE: 304 N. 8TH STREET TWIN FALLS: 253 2ND AVE. WEST POCATELLO: CLARK STREET IDAHO FALLS: 875 NORTH CAPITAL AVE

$38.06$16.10$54.16Agreement
IRON0014-006 · Ironworkers agreement, July 3, 2025
IRONWORKER: REINFORCING AND STRUCTURAL$43.40$30.27$73.67Agreement
LABO0155-007 · Laborers agreement, January 1, 2025
LABORER: (PIPELINE ONLY): COMMON (PART OF IDAHO COUNTY SOUTH OF 46TH PARALLEL)$33.63$16.50$50.13Agreement
LABO0155-009 · Laborers agreement, January 1, 2025
LABORER: FLAGGER, COMMON OR GENERAL LABORER (IDAHO COUNTY SOUTH OF 46TH PARALLEL)$33.63$15.50$49.13Agreement
LABORER: ASPHALT LABORER INCLUDES ASPHALT RAKER…
Full text

LABORER: ASPHALT LABORER INCLUDES ASPHALT RAKER, SHOVELER, SPREADER, AND DISTRIBUTOR (IDAHO COUNTY SOUTH OF 46TH PARALLEL)

$33.63$15.50$49.13Agreement
LABO0238-029 · Laborers agreement, June 1, 2017
LABORER (PIPELINE ONLY): COMMON (IDAHO COUNTY NORTH OF 46TH PARALLEL)$26.28$12.15$38.43Agreement
LABO0238-032 · Laborers agreement, June 1, 2024
LABORER: GROUP 2…
Full text

LABORER: GROUP 2 COMMON OR GENERAL IDAHO COUNTY NORTH OF 46TH PARALLEL ZONE DIFFERENTIAL (ADD TO ZONE 1 RATES): ZONE 2 - $2.00 BASE POINTS: SPOKANE ZONE 1: 0-45 RADIUS MILES FROM THE MAIN POST OFFICE. ZONE 2: 45 RADIUS MILES AND OVER FROM THE MAIN POST OFFICE

$32.15$16.30$48.45Agreement
PLAS0072-003 · Plasterers and Cement Masons agreement, June 1, 2025
CEMENT MASON/CONCRETE FINISHER…
Full text

CEMENT MASON/CONCRETE FINISHER (ZONE 1) ZONE DIFFERENTIAL (ADD TO ZONE 1 RATE): ZONE 2 - $3.00 BASE POINTS: SPOKANE, PASCO, LEWISTON, WENATCHEE ZONE 1: 0-45 RADIUS MILES FROM THE MAIN POST OFFICE ZONE 2: OVER 45 RADIUS MILES FROM THE MAIN POST OFFICE

$40.89$18.64$59.53Agreement
SUID2010-044 · Survey of contractors in ID, August 8, 2012
TRUCK DRIVER: WATER TRUCK$24.48$11.67$36.15Survey
TRUCK DRIVER: LOWBOY TRUCK$21.00$12.10$33.10Survey
TRUCK DRIVER: DUMP TRUCK$24.70$12.10$36.80Survey
OPERATOR: CONCRETE BATCH PLANT$24.94$11.96$36.90Survey
OPERATOR: FORKLIFT$21.20$0.00$21.20Survey
OPERATOR: BOBCAT/SKID STEER/SKID LOADER$20.97$0.00$20.97Survey
LABORER: PIPELAYER$17.67$7.26$24.93Survey
LABORER: LANDSCAPE$22.13$11.13$33.26Survey
CARPENTER, EXCLUDES FORM WORK$29.92$5.20$35.12Survey

Modification history

Modification 0January 2, 2026
Modification 1May 18, 2026 (current)

Published by the Wage and Hour Division; read from sam.gov. The sheet is checked for a newer modification each day. Contracts awarded since January 1, 2017 also carry Executive Order 13706 paid sick leave (one hour per 30 worked, up to 56 a year).

Questions people ask

Which rate do I pay on ID20260051?
The line for the classification of work actually performed: the basic rate plus the fringe. You may pay the fringe into benefit plans, as cash on every hour, or a mix. Overtime after 40 hours is 1.5 times the basic rate; fringe is paid on every hour and never multiplied.
My trade is not on this sheet. What do I do?
Do not borrow the nearest name. Ask the contracting agency for a conformance on Standard Form 1444 before the first week of that work, and note it as pending on the payroll.
Does modification 1 apply to my contract?
Only if it was in force when your contract was awarded (generally at bid opening). An earlier modification locked into the contract keeps applying, except on option years, added scope and indefinite-quantity contracts. The number and modification are on the first page of the exhibit in your contract.