Prevailing wage rates · Iowa · Wage determination
Prevailing wage rates: Cerro Gordo County, Iowa
Building construction · IA20260037 modification 1, published May 18, 2026
The short answer
This sheet sets 26 classifications for building work in Cerro Gordo County, Iowa. Each line is a basic hourly rate plus a fringe rate, and the sum is the minimum you must pay for that work, from $18.72 an hour (cement mason/concrete finisher) to $94.74 (elevator mechanic). Your contract may lock an earlier modification.
Rates by classification
Total is the basic rate plus the fringe. Source is the agreement or survey the rate came from; a marker means the group changed in this modification. A dagger (†) means the fringe carries a footnote or percentage the total does not include; read the group’s notes.
| Classification | Basic rate | Fringe | Total | Source |
|---|---|---|---|---|
| BOIL0083-009 · Boilermakers agreement, January 1, 2025 | ||||
| BOILERMAKER | $48.48 | $33.91 | $82.39 | Agreement |
| BRIA0003-007 · Bricklayers agreement, May 1, 2025 | ||||
| BRICKLAYER | $29.80 | $17.16 | $46.96 | Agreement |
| ELEV0033-002 · Elevator Constructors agreement, January 1, 2025 | ||||
| ELEVATOR MECHANIC FOOTNOTES: A. EMPLOYER CONTRIBUTES 8% OF REGULAR BASIC HOURLY RATE AS VACATION PAY CREDIT FOR EMPLOYEES WITH MORE THAN 5 YEARS OF SERVICE, AND 6% FOR EMPLOYEES WITH LESS THAN 5 YEARS OF SERVICE. B. PAID HOLIDAYS: NEW YEAR'S DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERAN'S DAY; THANKSGIVING DAY; DAY AFTER THANKSGIVING; & CHRISTMAS DAY | $56.30 | $38.44 | $94.74 | Agreement |
| ENGI0234-018 · Operating Engineers agreement, May 1, 2025 | ||||
| POWER EQUIPMENT OPERATOR: (CLASS 3)- FORKLIFT (OTHER THAN ABOVE) | $35.29 | $18.35 | $53.64 | Agreement |
POWER EQUIPMENT OPERATOR…Full textPOWER EQUIPMENT OPERATOR: (CLASS 2)- FORKLIFT (USED FOR STEEL ERECTION OR MACHINERY MOVING) | $37.62 | $18.35 | $55.97 | Agreement |
| IRON0089-001 · Ironworkers agreement, May 1, 2025 | ||||
| IRONWORKER: STRUCTURAL | $35.53 | $24.45 | $59.98 | Agreement |
| IRON0577-001 · Ironworkers agreement, June 1, 2025 | ||||
| IRONWORKER: ORNAMENTAL | $36.30 | $25.80 | $62.10 | Agreement |
| LABO0177-002 · Laborers agreement, May 1, 2025 | ||||
| LABORER: MASON TENDER - BRICK | $29.36 | $17.99 | $47.35 | Agreement |
| PAIN0246-001 · Painters and Allied Trades agreement, May 1, 2025 | ||||
| PAINTER: BRUSH AND ROLLER | $32.41 | $16.30 | $48.71 | Agreement |
| PLUM0033-002 · Plumbers and Pipefitters agreement, June 1, 2025 | ||||
| PIPEFITTER (HVAC PIPE INSTALLATION ONLY) | $45.20 | $23.25 | $68.45 | Agreement |
| SUIA2016-010 · Survey of contractors in IA, July 19, 2016 | ||||
| SHEET METAL WORKER, INCLUDES HVAC DUCT, AND HVAC UNIT INSTALLATION | $22.59 | $6.02 | $28.61 | Survey |
| ROOFER | $15.53 | $4.57 | $20.10 | Survey |
| PLUMBER | $23.95 | $10.13 | $34.08 | Survey |
| OPERATOR: LOADER | $25.36 | $15.62 | $40.98 | Survey |
| OPERATOR: CRANE | $21.51 | $6.41 | $27.92 | Survey |
| OPERATOR: BULLDOZER | $22.31 | $8.36 | $30.67 | Survey |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $25.14 | $18.26 | $43.40 | Survey |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $26.64 | $14.47 | $41.11 | Survey |
| LABORER: PIPELAYER | $18.00 | $2.70 | $20.70 | Survey |
| LABORER: COMMON OR GENERAL | $17.64 | $3.57 | $21.21 | Survey |
| IRONWORKER, REINFORCING | $24.43 | $16.24 | $40.67 | Survey |
| INSULATOR: MECHANICAL (DUCT, PIPE AND MECHANICAL SYSTEM INSULATION) | $17.68 | $4.36 | $22.04 | Survey |
| ELECTRICIAN | $25.02 | $9.76 | $34.78 | Survey |
| CEMENT MASON/CONCRETE FINISHER | $16.99 | $1.73 | $18.72 | Survey |
| CAULKER | $17.21 | $8.18 | $25.39 | Survey |
| CARPENTER, INCLUDES DRYWALL HANGING, AND FORM WORK | $18.54 | $2.34 | $20.88 | Survey |
Modification history
| Modification 0 | January 2, 2026 |
| Modification 1 | May 18, 2026 (current) |
Published by the Wage and Hour Division; read from sam.gov. The sheet is checked for a newer modification each day. Contracts awarded since January 1, 2017 also carry Executive Order 13706 paid sick leave (one hour per 30 worked, up to 56 a year).
Questions people ask
- Which rate do I pay on IA20260037?
- The line for the classification of work actually performed: the basic rate plus the fringe. You may pay the fringe into benefit plans, as cash on every hour, or a mix. Overtime after 40 hours is 1.5 times the basic rate; fringe is paid on every hour and never multiplied.
- My trade is not on this sheet. What do I do?
- Do not borrow the nearest name. Ask the contracting agency for a conformance on Standard Form 1444 before the first week of that work, and note it as pending on the payroll.
- Does modification 1 apply to my contract?
- Only if it was in force when your contract was awarded (generally at bid opening). An earlier modification locked into the contract keeps applying, except on option years, added scope and indefinite-quantity contracts. The number and modification are on the first page of the exhibit in your contract.
How to read a wage determination · Paying the fringe in cash or through plans · Overtime on these rates · Fringe credit calculator