CertifiedHours

Prevailing wage rates · Iowa · Wage determination

Prevailing wage rates: Scott County, Iowa

Heavy, Highway construction · IA20260001 modification 2, published July 30, 2026

The short answer

This sheet sets 23 classifications for heavy, highway work in Scott County, Iowa. Each line is a basic hourly rate plus a fringe rate, and the sum is the minimum you must pay for that work, from $47.10 an hour (painters: elevated tanks) to $84.75 (power equipment operators:, group 1). Your contract may lock an earlier modification.

Scope

Heavy Construction

Highway Construction

Rates by classification

Total is the basic rate plus the fringe. Source is the agreement or survey the rate came from; a marker means the group changed in this modification. A dagger (†) means the fringe carries a footnote or percentage the total does not include; read the group’s notes.

ClassificationBasic rateFringeTotalSource
CARP0004-006 · Carpenters agreement, January 1, 2025
CARPENTER$34.67$31.94$66.61Agreement
PILEDRIVERMAN$34.67$31.94$66.61Agreement
CARP2158-003 · Carpenters agreement, June 1, 2025
MILLWRIGHT$39.31$29.89$69.20Agreement
ELEC0145-004 · Electrical Workers (IBEW) agreement, June 2, 2025
CABLE SPLICER$47.00$28.56$75.56Agreement
ELECTRICIAN$46.00$28.56$74.56Agreement
ENGI0150-011 · Operating Engineers agreement, June 1, 2025
POWER EQUIPMENT OPERATORS:, GROUP 1…
Full text

POWER EQUIPMENT OPERATORS:, GROUP 1: CRANE (FRICTION OR HYDRAULIC, REGARDLESS OF SIZE OR ATTACHMENTS); TOW OR PUSH BOAT

$43.50$41.25$84.75Agreement
POWER EQUIPMENT OPERATORS:, GROUP 2…
Full text

POWER EQUIPMENT OPERATORS:, GROUP 2: ASPHALT HEATER-PLANER UNIT; ASPHALT PAVER; ASPHALT PAVER SCREED; ASPHALT PLANT; AUTOMATIC CURBING MACHINE; BACKFILLER (THROW BUCKET); BLASTHOLER SELF-PROPELLED ROTARY DRILL OR SIMILAR MACHINES; BOOM TRACTOR OR SIDE BOOM; BORING MACHINE (DIRECTIONAL, VERTICAL OR HORIZONTAL); BUILDING HOIST (1,2 OR 3 DRUMS); CAISSON AUGURING MACHINES; CENTRAL REDI-MIX PLANT; CHIP SPREADER; CLEANING & PRIMING MACHINE; COMBINATION BACKHOE FRONT END LOADER; COMBINATION CONCRETE FINISHING MACHINE AND FLOAT; CONCRETE BREAKER OR HYDRO-HAMMER; CONCRETE CONVEYOR OR PUMP; CONCRETE PAVER; CONCRETE SPREADER; CONCRETE WHEEL SAW (LARGE SELF-PROPELLED); CRUSHER (STONE, CONCRETE, ASPHALT, ETC.); CURING-TINNING MACHINE; DIPPER DREDGE CRANE MAN; DIPPER DREDGE OPERATOR; DUAL PURPOSE TRUCK (BOOM, WINCH, ETC.); EXCAVATOR; FARM-TYPE TRACTOR OPERATING SCOOP OR SCRAPER OR WITH POWER ATTACHMENT; FORKLIFT (6000 LB. CAPACITY); GRADER, MOTOR GRADER, MOTOR PATROL, AUTO GRADER, FORM GRADER, PULL GRADER, SUB GRADER, ELEVATING GRADER; GROUP EQUIPMENT GREASER; GUARD RAIL POST DRIVER; HOISTS; HYDRAULIC DREDGE LEVERMAN OR ENGINEER; HYDRO-VAC TRUCK MOUNTED OR PULL TYPE, AND SIMILAR EQUIPMENT; LASER SCREED; LOADER (TRACK, RUBBER TIRE OR ARTICULATED); LOCOMOTIVE ENGINEER; MECHANIC-WELDER; MECHANICAL LOADED LOG CHIPPERS OR SIMILAR MACHINES; MILLING MACHINE; MUCKING MACHINE; PILE DRIVER; PIPE BENDING; PUG MILL; ROAD WIDENER-SHOULDER SPREADER; SCRAPER (SELF-PROPELLED); SELF-PROPELLED ROLLER OR TIRE ROLLER (ON ASPHALT OR BLACKTOP), SHEEP FOOT OR PAD FOOT COMPACTOR; SHOVEL; SLIP FORM PAVER; STEEL TRACK-TYPE TRACTOR (DOZER, PUSH CAT, ETC.); TRANSFER OR SHUTTLE BUGGY; TRENCHING MACHINE (40 H.P. & OVER); WORK BOAT

$41.50$41.25$82.75Agreement
POWER EQUIPMENT OPERATORS:, GROUP 3…
Full text

POWER EQUIPMENT OPERATORS:, GROUP 3: ARTICULATED OFF-ROAD HAUL UNIT; ASPHALT BOOSTER; BOILER (ENGINEER OR FIREMAN); CONVEYOR OVER 20 H.P.; DISTRIBUTOR; DRIVER ON TRUCK CRANE OR SIMILAR MACHINES; ELEVATOR; FARM-TYPE TRACTOR (WITHOUT POWER ATTACHMENT); FIREMAN & PUMP OPERATOR AT ASPHALT PLANT; FORKLIFT (LESS THAN 6000 LB. CAPACITY); GROUT PUMP; LIGHT PLANT; MECHANICAL BROOM; MUD JACK; SELF-PROPELLED ROLLER (OTHER THAN LISTED IN GROUP 2); STRADDLE CARRIER; TRENCH MACHINE (UNDER 40 H.P.)

$38.85$41.25$80.10Agreement
POWER EQUIPMENT OPERATORS:, GROUP 4…
Full text

POWER EQUIPMENT OPERATORS:, GROUP 4: AIR COMPRESSOR (400 C.F.M. OR OVER); COMPACT LOADER (RUBBER TIRE, TRACK & UTILITY); ENGINE DRIVEN WELDING MACHINE; MECHANICAL HEATER (OTHER THAN STEAM BOILER); SMALL OUTBOARD MOTOR BOAT (SAFETY BOAT & LIFE BOAT); WATER PUMP (MORE THAN ONE WELL POINT PUMP)

$37.80$41.25$79.05Agreement
IRON0111-001 · Ironworkers agreement, July 1, 2024
IRONWORKER$37.50$30.99$68.49Agreement
LABO0309-005 · Laborers agreement, January 1, 2024
LABORERS: GROUP 1…
Full text

LABORERS: GROUP 1 (SCOTT COUNTY) FLAGMAN; DUMPMAN; SPOTTER; BROOM MAN; LANDSCAPER; PLANTING & REMOVAL OF TREES; FENCING LABORERS; CLEANING OF FORMS OR LUMBER (IN BONE YARD); LAYING OF SOD; MOVING AND/OR MAINTENANCE OF FLARES & BARRICADES; OPERATION OF ALL HAND, ELECTRIC, AIR, HYDRAULIC OR MECHANICALLY POWERED TOOLS UNDER THE THE LABORERS' INCLUDING JACKHAMMER, TAMPER, AIR SPADE, AUGER, CONCRETE SAW, CHAIN SAW, UTILITY SAW, ROCK DRILL, VIBRATOR; MORTAR MIXER; POWER & HAND SAW (WHEN CLEARING TIMBER); GENERAL LABORER; MATERIAL HANDLER; FORM HANDLER; CONCRETE DUMPER; PUDDLER; EXPLOSIVES HANDLER; CENTER STRIP HANDLER & INSTALLER; PRIME MOVER OR ANY MECHANICAL DEVICE TAKING THE PLACE OF CONCRETE BUGGY OR WHEELBARROW; SANDPOINT SETTER; ASPHALT KETTLEMAN; SHEETING HAMMER DRIVER; LAYING & JOINTING OF TELEPHONE CONDUIT; GAS DISTRIBUTION MAN; PIPE SETTER ON LATERAL, DRAIN TILE, CULVERT PIPE & STORM SEWER; CATCH BASIN LEAD; CATCH BASIN; MANHOLES; BATCH DUMPER; TANK CLEANER; COFFERDAM WORKER; BANKMAN ON FLOATING PLANT; JOINTMAN WITH PIPELAYER; BACK-UP MAN (CORKER, JOINT MAKER) WITH PIPE SETTER ON SEWER & WATER MAIN; BATTERBOARD MAN OR LASER OPERATOR ON SEWER & WATER MAIN; LABORER IN DITCH OR TUNNEL, ON SEWER OR WATER MAIN & TELEPHONE CONDUIT, CUTTERS; BURNERS; TORCHMAN; GRAVEL BOX MAN; ASPHALT PLANT; CONCRETE PLANT; DECK HAND; UNLOADING OF STEEL & REBAR; & WRECKING LABORERS

$33.77$23.60$57.37Agreement
LABORERS: GROUP 2…
Full text

LABORERS: GROUP 2 (SCOTT COUNTY) ASPHALT RAKER OR LUTEMAN; PIPE SETTER ON SEWER OR WATER MAIN; GUNNITE NOZZLE MAN; ASPHALT OR CONCRETE CURB MACHINE OPERATOR; CONCRETE BURNING MACHINE OPERATOR; & CORING MACHINE OPERATOR; HAZARDOUS WASTE WORKER; ASBESTOS ABATEMENT WORKER

$34.27$23.60$57.87Agreement
LABORERS: GROUP 3…
Full text

LABORERS: GROUP 3 (SCOTT COUNTY) CONCRETE SPECIALIST (ALL WORK RELATING TO BUT NOT LIMITED TO POURING, STRIKING OF & FINISHING ALL CONCRETE SURFACES)

$34.90$23.60$58.50Agreement
PAIN0081-001 · Painters and Allied Trades agreement, May 1, 2024
PAINTERS: BRUSH & ROLLER$31.32$19.05$50.37Agreement
PAINTERS: DRYWALL TAPER$31.82$19.05$50.87Agreement
PAINTERS: ELEVATED TANKS…
Full text

PAINTERS: ELEVATED TANKS, BRIDGES, STACKS FLAG POLES, MFG, VESSELS (INTERIOR AND EXTERIOR SURFACES.$ 33.32 19.05 PAINTERS: SIGN PAINTERS

$28.05$19.05$47.10Agreement
PAINTERS: SPRAY, STRUCTURAL STEEL AND SANDBLASTING, INDUSTRIAL$31.82$19.05$50.87Agreement
PLAS0018-020 · Plasterers and Cement Masons agreement, January 1, 2025
CEMENT MASON/CONCRETE FINISHER (SCOTT COUNTY)$33.12$28.39$61.51Agreement
TEAM0371-001 · Teamsters agreement, July 1, 2025
TRUCK DRIVERS: GROUP 1…
Full text

TRUCK DRIVERS: GROUP 1 (SCOTT COUNTY) DRIVERS ON 2 AXLE TRUCKS HAULING LESS THAN 9 TONS , AIR COMPRESSOR AND WELDING MACHINES AND BROOMS, INCLUDING THOSE PULLED BY SEPARATE UNITS, WAREHOUSEMEN, GREASERS AND TIREMEN, PICK- UP-TRUCKS WHEN HAULING MATERIAL, TOOLS OR MEN TO AND FROM AND ON THE JOB SITE, AND FORKLIFTS UP TO 6,000 LB CAPACITY

FOOTNOTE: A. PENSION: $52.80 PER DAY

$45.35$16.11$61.46Agreement
TRUCK DRIVERS: GROUP 2…
Full text

TRUCK DRIVERS: GROUP 2- 2 OR 3 AXLE TRUCKS HAULING MORE THAN 9 TONS BUT HAULING LESS THAN 16 TONS. A-FRAME WINCH TRUCKS, OR SIMILAR EQUIPMENT WHEN USED FOR TRANSPORTATION PURPOSES. FORKLIFTS OVER 6,000 LB CAPACITY, WINCH TRUCKS, FOUR AXLE COMBINATION UNITS, HYDROLIFT TRUCKS, VACTOR TRUCKS OR SIMIOLAR EQUIPMENT WHEN USED FOR TRANSPORTATION PURPOSES.

FOOTNOTE: PENSION: $52.80 PER DAY IN ADDITIONAL FRINGE BENEFITS

$45.93$16.11$62.04Agreement
TRUCK DRIVERS: GROUP 3…
Full text

TRUCK DRIVERS: GROUP 3- 2, 3, AND 4 AXLES HAULING 16 TONS OR MORE, WATER PULLS, 5 AXLES OR MORE COMBINATION UNITS, WATER PULLS, ARTICULATED DUMP TRUCKS

FOOTNOTE: PENSION: $52.80 PER DAY IN ADDITIONAL FRINGE BENEFITS

$46.25$16.11$62.36Agreement
TRUCK DRIVERS: GROUP 4 (SCOTT COUNTY) OIL DISTRIBUTORS, LOWBOYS

FOOTNOTE: A. PENSION: $52.80 PER DAY

$46.60$16.11$62.71Agreement
TRUCK DRIVERS: GROUP 5…
Full text

TRUCK DRIVERS: GROUP 5 (SCOTT COUNTY) DRIVERS WHO REQUIRE SPECIAL PROTECTIVE CLOTHING WHILE EMPLOYED ON HAZARDOUS WASTE WORK

FOOTNOTE: A. PENSION: $52.80 PER DAY

$47.71$16.11$63.82Agreement

Modification history

Modification 0January 2, 2026
Modification 1May 18, 2026
Modification 2July 30, 2026 (current)

Published by the Wage and Hour Division; read from sam.gov. The sheet is checked for a newer modification each day. Contracts awarded since January 1, 2017 also carry Executive Order 13706 paid sick leave (one hour per 30 worked, up to 56 a year).

Questions people ask

Which rate do I pay on IA20260001?
The line for the classification of work actually performed: the basic rate plus the fringe. You may pay the fringe into benefit plans, as cash on every hour, or a mix. Overtime after 40 hours is 1.5 times the basic rate; fringe is paid on every hour and never multiplied.
My trade is not on this sheet. What do I do?
Do not borrow the nearest name. Ask the contracting agency for a conformance on Standard Form 1444 before the first week of that work, and note it as pending on the payroll.
Does modification 2 apply to my contract?
Only if it was in force when your contract was awarded (generally at bid opening). An earlier modification locked into the contract keeps applying, except on option years, added scope and indefinite-quantity contracts. The number and modification are on the first page of the exhibit in your contract.

How to read a wage determination · Paying the fringe in cash or through plans · Overtime on these rates · Fringe credit calculator

Prevailing wage rates: Scott County, Iowa (Heavy, Highway) · IA20260001 Mod 2 · CertifiedHours