CertifiedHours

Prevailing wage rates · Hawaii · Wage determination

Prevailing wage rates: Hawaii, Honolulu, Kalawao and 2 more counties, Hawaii

Building, Heavy, Highway, Residential construction · HI20260001 modification 4, published October 15, 2026

The short answer

This sheet sets 132 classifications for building, heavy, highway, residential work in Hawaii, Honolulu, Kalawao and 2 more counties, Hawaii. Each line is a basic hourly rate plus a fringe rate, and the sum is the minimum you must pay for that work, from $10.98 an hour (fence erector (chain link fence)) to $117.40 (diver: (aqua lung) (scuba) (over 30 feet)). Your contract may lock an earlier modification.

Scope

BUILDING CONSTRUCTION PROJECTS

RESIDENTIAL CONSTRUCTION PROJECTS (consisting of single family homes and apartments up to and including 4 stories)

HIGHWAY CONSTRUCTION PROJECTS

HEAVY CONSTRUCTION PROJECTS

What changed this year

First published January 2, 2026, this sheet is now on modification 4, and its rates have changed in 3 modifications. Of the 126 rates we can follow line by line from the first publication to today, 2 are higher.

If you bid the job or set pay from an earlier copy, find your trades below. The rates that bind you are the ones in the modification written into your contract.

Latest change

October 15, 2026 · modification 4

1 rate raised

  • Roofers: 1 rate raised by $4.55 an hour
Every line that changed (1)
ClassificationWasNowChange
ROOFERS (INCLUDING BUILT UP, COMPOSITION AND SINGLE PLY)$43.15 + $21.21$45.55 + $23.36+$4.55 (+7.1%)

Earlier modifications

  • May 27, 2026 · modification 3No rate changed (wording or notes only)
  • May 18, 2026 · modification 2Classification names reworded; 1 fringe formula changed among the 126 lines we could match
    • Elevator mechanic a. vacation: 1 fringe formula changed

    SAM.gov reworded this sheet’s classification names in this modification, so not every line can be matched to the one before. Only lines matched with certainty are compared here; nothing is guessed. If your trade is not listed, compare it against your contract’s copy.

    Every line that changed (1)
    ClassificationWasNowChange
    ELEVATOR MECHANIC A. VACATION: EMPLOYER CONTRIBUTES 8% OF BASIC HOURLY RATE FOR 5 YEARS…$73.85 + 38.435+a+b$73.85 + $38.44changed
  • January 16, 2026 · modification 11 rate raised
    • Ironworkers: 1 rate raised by $4.10 an hour
    Every line that changed (1)
    ClassificationWasNowChange
    Ironworkers:$48.00 + $41.86$50.50 + $43.46+$4.10 (+4.6%)

Compared line by line from each modification as published on SAM.gov. A line we could not pair with certainty is left out rather than guessed.

Rates by classification

These are the rates in modification 4 as published on SAM.gov. The determination and modification written into your contract are the ones that bind you; check that number before relying on this table. Total is the basic rate plus the fringe. Source is the agreement or survey the rate came from and its year; a survey year long past means the rate has not been surveyed since. A marker means the group changed in this modification. In the Since column, a dash means SAM.gov reworded the line during the year and it cannot be matched to the first publication with certainty. A dagger (†) means the fringe carries a footnote or percentage the total does not include; read the group’s notes.

ClassificationBasic rateFringeTotalSince Jan 2Source
ASBE0132-001 · Asbestos Workers and Heat & Frost Insulators agreement, September 7, 2025
ASBESTOS WORKERS/INSULATOR…
Full text

ASBESTOS WORKERS/INSULATOR (INCLUDES APPLICATION OF ALL INSULATING MATERIALS, PROTECTIVE COVERINGS, COATINGS AND FINISHES TO ALL TYPES OF MECHANICAL SYSTEMS. ALSO THE APPLICATION OF FIRESTOPPING MATERIAL FOR WALL OPENINGS AND PENETRATIONS IN WALLS, FLOORS, CEILINGS AND CURTAIN WALLS.)

$46.90$29.75$76.65no changeAgreement, 2025
BOIL0627-005 · Boilermakers agreement, January 1, 2025
BOILERMAKER$49.37$31.25$80.62no changeAgreement, 2025
BRHI0001-001 · Bricklayers agreement, September 5, 2023
BRICKLAYERS AND STONEMASONS$48.03$32.23$80.26no changeAgreement, 2023
BRICKLAYER: POINTERS, CAULKERS AND WEATHERPROOFERS$48.28$32.23$80.51no changeAgreement, 2023
BRHI0001-002 · Bricklayers agreement, September 5, 2023
TILE, MARBLE & TERRAZZO WORKER (TILE, MARBLE AND TERRAZZO WORKERS)$46.50$33.00$79.50no changeAgreement, 2023
TILE, MARBLE & TERRAZZO WORKER (TERRAZZO FLOOR GRINDERS AND TENDERS)$43.14$33.00$76.14no changeAgreement, 2023
TILE, MARBLE & TERRAZZO WORKER (TERRAZZO BASE GRINDERS)$44.69$33.00$77.69no changeAgreement, 2023
CARP0745-001 · Carpenters agreement, September 1, 2025
CARPENTERS: POWER SAW OPERATORS (2 H.P. AND OVER)$55.65$29.81$85.46no changeAgreement, 2025
CARPENTERS: MILLWRIGHTS AND MACHINE ERECTORS$55.75$29.81$85.56no changeAgreement, 2025
CARPENTERS: (CARPENTERS…
Full text

CARPENTERS: (CARPENTERS; HARDWOOD FLOOR LAYERS; PATENT SCAFFOLD ERECTORS (14 FT. AND OVER); PILEDRIVERS; PNEUMATIC NAILERS; WOOD SHINGLERS AND TRANSIT AND/OR LAYOUT MAN)

$55.50$29.81$85.31no changeAgreement, 2025
CARP0745-002 · Carpenters agreement, September 1, 2025
DRYWALL AND ACOUSTICAL WORKERS AND LATHERS$55.75$29.81$85.56no changeAgreement, 2025
ELEC1186-001 · Electrical Workers (IBEW) agreement, August 24, 2025
ELECTRICIANS: TELECOMMUNICATION WORKER$41.00$16.28$57.28no changeAgreement, 2025
ELECTRICIANS: CABLE SPLICERS$63.90$33.38$97.28no changeAgreement, 2025
ELECTRICIANS$56.55$33.16$89.71no changeAgreement, 2025
ELEC1186-002 · Electrical Workers (IBEW) agreement, August 24, 2025
LINE CONSTRUCTION: TELECOMMUNICATION WORKER$41.00$16.28$57.28no changeAgreement, 2025
LINE CONSTRUCTION: LINEMEN$56.55$33.16$89.71no changeAgreement, 2025
LINE CONSTRUCTION: HEAVY EQUIPMENT OPERATORS$50.90$30.75$81.65no changeAgreement, 2025
LINE CONSTRUCTION: GROUNDMEN/TRUCK DRIVERS$42.41$27.14$69.55no changeAgreement, 2025
LINE CONSTRUCTION: CABLE SPLICERS$63.90$33.38$97.28no changeAgreement, 2025
ELEV0126-001 · Elevator Constructors agreement, January 1, 2025
ELEVATOR MECHANIC A. VACATION…
Full text

ELEVATOR MECHANIC A. VACATION: EMPLOYER CONTRIBUTES 8% OF BASIC HOURLY RATE FOR 5 YEARS SERVICE AND 6% OF BASIC HOURLY RATE FOR 6 MONTHS TO 5 YEARS SERVICE AS VACATION PAY CREDIT. B.

PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS' DAY, THANKSGIVING DAY, THE FRIDAY AFTER THANKSGIVING DAY AND CHRISTMAS DAY

$73.85$38.44$112.29changedAgreement, 2025
ENGI0003-002 · Operating Engineers agreement, September 1, 2025
STAND-BY DIVER: OTHER THAN AQUA LUNG$62.97$35.68$98.65—Agreement, 2025
STAND-BY DIVER: (AQUA LUNG) (SCUBA)$62.97$35.68$98.65—Agreement, 2025
POWER EQUIPMENT OPERATORS:, GROUP 13E…
Full text

POWER EQUIPMENT OPERATORS:, GROUP 13E: END DUMPS, UNLICENSED (EUCLID, MACK, CATERPILLAR OR SIMILAR); TRACTOR TRAILER (HAULING EQUIPMENT); TANDEM TRUCKS HOOKED UP TO TRAILER (HAULING EQUIPMENT)

$59.60$35.68$95.28no changeAgreement, 2025
POWER EQUIPMENT OPERATORS:, GROUP 13D: TRUCK DRIVER (SLIP-IN OR PUP)$59.49$35.68$95.17no changeAgreement, 2025
POWER EQUIPMENT OPERATORS:, GROUP 13C…
Full text

POWER EQUIPMENT OPERATORS:, GROUP 13C: TRUCK DRIVER (SEMI-TRAILER. ROCK CANS, SEMI-DUMP OR ROLL-OFFS)

$59.17$35.68$94.85no changeAgreement, 2025
POWER EQUIPMENT OPERATORS:, GROUP 13B…
Full text

POWER EQUIPMENT OPERATORS:, GROUP 13B: WATER TRUCK (OVER 2,000 GALLONS); TANDEM DUMP TRUCK, OVER 8 CU. YDS. (WATER LEVEL)

$58.52$35.68$94.20no changeAgreement, 2025
POWER EQUIPMENT OPERATORS:, GROUP 13A…
Full text

POWER EQUIPMENT OPERATORS:, GROUP 13A: DUMP TRUCK, 8 CU.YDS. AND UNDER (WATER LEVEL); WATER TRUCK (UP TO AND INCLUDING 2,000 GALLONS)

$58.21$35.68$93.89no changeAgreement, 2025
POWER EQUIPMENT OPERATORS:, GROUP 13: TRUCK DRIVER (UTILITY, FLATBED, ETC.)$57.94$35.68$93.62no changeAgreement, 2025
POWER EQUIPMENT OPERATORS:, GROUP 12A…
Full text

POWER EQUIPMENT OPERATORS:, GROUP 12A: DOZER (D-11 OR SIMILAR OR LARGER); HYDRAULIC EXCAVATORS (OVER 4 CU. YDS.); LIFTING CRANES (50 TONS AND OVER); PIONEERING DOZER/BACKHOE (INITIAL CLEARING AND EXCAVATION FOR THE PURPOSE OF PROVIDING ACCESS FOR OTHER EQUIPMENT WHERE THE TERRAIN WORKED INVOLVES 1-TO-1 SLOPES THAT ARE 50 FEET IN HEIGHT OR DEPTH, THE SCOPE OF THIS WORK DOES NOT INCLUDE NORMAL CLEARING AND GRUBBING ON USUAL HILLY TERRAIN NOR THE EXCAVATION WORK ONCE THE ACCESS IS PROVIDED); POWER BLADE OPERATOR (CAT 12 OR EQUIVALENT OR OVER); STRADDLE LIFTS (OVER 50 TONS); TOWER CRANE, MOBILE; TRAVELING TRUSS CRANES; UNIVERSAL, LIEBHER, LINDEN, AND SIMILAR TYPES OF TOWER CRANES (IN THE ERECTION, DISMANTLING, AND MOVING OF EQUIPMENT THERE SHALL BE AN ADDITIONAL OPERATING ENGINEER OR HEAVY DUTY REPAIRMAN); YO-YO CAT OR DOZER. BOOMS AND/OR LEADS (HOURLY PREMIUMS): THE OPERATOR OF A CRANE (UNDER 50 TONS) WITH A BOOM OF 80 FEET OR MORE (INCLUDING JIB), OR OF A CRANE (UNDER 50 TONS) WITH LEADS OF 100 FEET OR MORE, SHALL RECEIVE A PER HOUR PREMIUM FOR EACH HOUR WORKED ON SAID CRANE (UNDER 50 TONS) IN ACCORDANCE WITH THE FOLLOWING SCHEDULE: BOOMS OF 80 FEET UP TO BUT NOT INCLUDING 130 FEET OR LEADS OF 100 FEET UP TO BUT NOT INCLUDING 130 FEET 0.50 BOOMS AND/OR LEADS OF 130 FEET UP TO BUT NOT INCLUDING 180 FEET 0.75 BOOMS AND/OR LEADS OF 180 FEET UP TO AND INCLUDING 250 FEET 1.15 BOOMS AND/OR LEADS OVER 250 FEET 1.50 THE OPERATOR OF A CRANE (50 TONS AND OVER) WITH A BOOM OF 180 FEET OR MORE (INCLUDING JIB) SHALL RECEIVE A PER HOUR PREMIUM FOR EACH HOUR WORKED ON SAID CRANE (50 TONS AND OVER) IN ACCORDANCE WITH THE FOLLOWING SCHEDULE: BOOMS OF 180 FEET UP TO AND INCLUDING 250 FEET 1.25 BOOMS OVER 250 FEET 1.75

$61.02$35.68$96.70no changeAgreement, 2025
POWER EQUIPMENT OPERATORS:, GROUP 12…
Full text

POWER EQUIPMENT OPERATORS:, GROUP 12 CLAMSHELL OR DIPPER OPERATOR; DERRICKS; DRILL RIGS; MULTI-PROPULSION EARTHMOVING MACHINES (2 OR MORE SCRAPERS) (OVER 35 CU. YDS ""STRUCK""M.R.C.); OPERATORS (DERRICKS, PILEDRIVERS AND CRANES); POWER SHOVELS AND DRAGLINES (7 CU. YDS. M.R.C. AND OVER); SELF-PROPELLED RUBBER-TIRED EARTHMOVING EQUIPMENT (OVER 31 CU. YDS.) (657B AND SIMILAR); WHEEL EXCAVATOR (UP TO AND INCLUDING 750 CU. YDS. PER HOUR); WHEEL EXCAVATOR (OVER 750 CU. YDS. PER HOUR). BOOMS AND/OR LEADS (HOURLY PREMIUMS): THE OPERATOR OF A CRANE (UNDER 50 TONS) WITH A BOOM OF 80 FEET OR MORE (INCLUDING JIB), OR OF A CRANE (UNDER 50 TONS) WITH LEADS OF 100 FEET OR MORE, SHALL RECEIVE A PER HOUR PREMIUM FOR EACH HOUR WORKED ON SAID CRANE (UNDER 50 TONS) IN ACCORDANCE WITH THE FOLLOWING SCHEDULE: BOOMS OF 80 FEET UP TO BUT NOT INCLUDING 130 FEET OR LEADS OF 100 FEET UP TO BUT NOT INCLUDING 130 FEET 0.50 BOOMS AND/OR LEADS OF 130 FEET UP TO BUT NOT INCLUDING 180 FEET 0.75 BOOMS AND/OR LEADS OF 180 FEET UP TO AND INCLUDING 250 FEET 1.15 BOOMS AND/OR LEADS OVER 250 FEET 1.50 THE OPERATOR OF A CRANE (50 TONS AND OVER) WITH A BOOM OF 180 FEET OR MORE (INCLUDING JIB) SHALL RECEIVE A PER HOUR PREMIUM FOR EACH HOUR WORKED ON SAID CRANE (50 TONS AND OVER) IN ACCORDANCE WITH THE FOLLOWING SCHEDULE: BOOMS OF 180 FEET UP TO AND INCLUDING 250 FEET 1.25 BOOMS OVER 250 FEET 1.75

$60.66$35.68$96.34no changeAgreement, 2025
POWER EQUIPMENT OPERATORS:, GROUP 11…
Full text

POWER EQUIPMENT OPERATORS:, GROUP 11: AUTOMATIC SLIP FORM PAVER (CONCRETE OR ASPHALT); BAND WAGON (IN CONJUNCTION WITH WHEEL EXCAVATOR); CABLE-OPERATED CRAWLER CRANES (OVER 25 TONS BUT LESS THAN 50 TONS); CABLE-OPERATED POWER SHOVEL, CLAMSHELL, DRAGLINE AND BACKHOE (OVER 1 CU. YD. UP TO 7 CU. YDS.); GRADALL (OVER 1 CU. YDS. UP TO 7 CU. YDS.); DW-10, 20, ETC. (TANDEM); EARTHMOVING MACHINES (MULTIPLE PROPULSION POWER UNITS AND 2 OR MORE SCRAPERS) (UP TO AND INCLUDING 35 CU. YDS.,"" STRUCK"" M.R.C.); HIGHLINE CABLEWAY; HYDRAULIC BACKHOE (OVER 2 CU. YDS. UP TO AND INCLUDING 4 CU. YDS.); LEVERMAN; LIFT SLAB MACHINE; LOADER (OVER 12 CU. YDS); MASTER BOAT OPERATOR; MOBILE TRUCK CRANE OPERATOR (OVER 25 TONS BUT LESS THAN 50 TONS); (MOBILE TRUCK CRANE DRIVER REQUIRED); PRE-STRESS WIRE WRAPPING MACHINE; SELF-PROPELLED BOOM-TYPE LIFTING DEVICE (CENTER MOUNT) (OVER 25 TONS M.R.C); SELF-PROPELLED COMPACTOR (WITH MULTIPLE-PROPULSION POWER UNITS); SINGLE ENGINE RUBBER TIRED EARTHMOVING MACHINE (WITH TANDEM SCRAPER); TANDEM CATS; TRENCHER (PULLING ATTACHED SHIELD). BOOMS AND/OR LEADS (HOURLY PREMIUMS): THE OPERATOR OF A CRANE (UNDER 50 TONS) WITH A BOOM OF 80 FEET OR MORE (INCLUDING JIB), OR OF A CRANE (UNDER 50 TONS) WITH LEADS OF 100 FEET OR MORE, SHALL RECEIVE A PER HOUR PREMIUM FOR EACH HOUR WORKED ON SAID CRANE (UNDER 50 TONS) IN ACCORDANCE WITH THE FOLLOWING SCHEDULE: BOOMS OF 80 FEET UP TO BUT NOT INCLUDING 130 FEET OR LEADS OF 100 FEET UP TO BUT NOT INCLUDING 130 FEET 0.50 BOOMS AND/OR LEADS OF 130 FEET UP TO BUT NOT INCLUDING 180 FEET 0.75 BOOMS AND/OR LEADS OF 180 FEET UP TO AND INCLUDING 250 FEET 1.15 BOOMS AND/OR LEADS OVER 250 FEET 1.50 THE OPERATOR OF A CRANE (50 TONS AND OVER) WITH A BOOM OF 180 FEET OR MORE (INCLUDING JIB) SHALL RECEIVE A PER HOUR PREMIUM FOR EACH HOUR WORKED ON SAID CRANE (50 TONS AND OVER) IN ACCORDANCE WITH THE FOLLOWING SCHEDULE: BOOMS OF 180 FEET UP TO AND INCLUDING 250 FEET 1.25 BOOMS OVER 250 FEET 1.75

$60.30$35.68$95.98no changeAgreement, 2025
POWER EQUIPMENT OPERATORS:, GROUP 10A…
Full text

POWER EQUIPMENT OPERATORS:, GROUP 10A: BOAT OPERATOR; CABLE-OPERATED CRAWLER CRANE (UP TO AND INCLUDING 25 TONS); CABLE-OPERATED POWER SHOVEL, CLAMSHELL, DRAGLINE AND BACKHOE (UP TO AND INCLUDING 1 CU. YD.); DOZER D9-L; DOZER (D-10, HD41 AND SIMILAR) (ALL ATTACHMENTS); GRADALL (UP TO AND INCLUDING 1 CU. YD.); HYDRAULIC BACKHOE (OVER 3/4 CU. YDS. UP TO AND INCLUDING 2 CU. YDS.); MOBILE TRUCK CRANE OPERATOR (UP TO AND INCLUDING 25 TONS) (MOBILE TRUCK CRANE DRIVER REQUIRED); SELF-PROPELLED BOOM TYPE LIFTING DEVICE (CENTER MOUNT) (UP TO AND INCLUDING 25 TONS) (GROVE, DROTT, P&H, PETTIBONE AND SIMILAR; TRENCHER (OVER 6 FEET AND 750 H.P. OR MORE); WATCH ENGINEER (STEAM OR ELECTRIC). BOOMS AND/OR LEADS (HOURLY PREMIUMS): THE OPERATOR OF A CRANE (UNDER 50 TONS) WITH A BOOM OF 80 FEET OR MORE (INCLUDING JIB), OR OF A CRANE (UNDER 50 TONS) WITH LEADS OF 100 FEET OR MORE, SHALL RECEIVE A PER HOUR PREMIUM FOR EACH HOUR WORKED ON SAID CRANE (UNDER 50 TONS) IN ACCORDANCE WITH THE FOLLOWING SCHEDULE: BOOMS OF 80 FEET UP TO BUT NOT INCLUDING 130 FEET OR LEADS OF 100 FEET UP TO BUT NOT INCLUDING 130 FEET 0.50 BOOMS AND/OR LEADS OF 130 FEET UP TO BUT NOT INCLUDING 180 FEET 0.75 BOOMS AND/OR LEADS OF 180 FEET UP TO AND INCLUDING 250 FEET 1.15 BOOMS AND/OR LEADS OVER 250 FEET 1.50 THE OPERATOR OF A CRANE (50 TONS AND OVER) WITH A BOOM OF 180 FEET OR MORE (INCLUDING JIB) SHALL RECEIVE A PER HOUR PREMIUM FOR EACH HOUR WORKED ON SAID CRANE (50 TONS AND OVER) IN ACCORDANCE WITH THE FOLLOWING SCHEDULE: BOOMS OF 180 FEET UP TO AND INCLUDING 250 FEET 1.25 BOOMS OVER 250 FEET 1.75

$60.15$35.68$95.83no changeAgreement, 2025
POWER EQUIPMENT OPERATORS:, GROUP 10…
Full text

POWER EQUIPMENT OPERATORS:, GROUP 10: CHICAGO BOOM; COLD PLANERS; HEAVY DUTY REPAIRMAN OR WELDER; HOIST AND/OR WINCH (3 DRUMS); HYDRAULIC SKOOPER (KOEHRING AND SIMILAR); LOADER (OVER 6 CU. YDS. UP TO AND INCLUDING 12 CU. YDS.); SAURMAN TYPE DRAGLINE (OVER 5 CU. YDS.); SELF-PROPELLED, RUBBER-TIRED EARTHMOVING EQUIPMENT (OVER 20 CU. YDS. UP TO AND INCLUDING 31 CU. YDS.) (637D AND SIMILAR); SOIL STABILIZER (P & H OR EQUAL); SUB-GRADER (GURRIES OR OTHER AUTOMATIC TYPE); TRACTORS (D-9 OR EQUIVALENT, ALL ATTACHMENTS); TRACTOR (TANDEM SCRAPER); WATCH ENGINEER. BOOMS AND/OR LEADS (HOURLY PREMIUMS): THE OPERATOR OF A CRANE (UNDER 50 TONS) WITH A BOOM OF 80 FEET OR MORE (INCLUDING JIB), OR OF A CRANE (UNDER 50 TONS) WITH LEADS OF 100 FEET OR MORE, SHALL RECEIVE A PER HOUR PREMIUM FOR EACH HOUR WORKED ON SAID CRANE (UNDER 50 TONS) IN ACCORDANCE WITH THE FOLLOWING SCHEDULE: BOOMS OF 80 FEET UP TO BUT NOT INCLUDING 130 FEET OR LEADS OF 100 FEET UP TO BUT NOT INCLUDING 130 FEET 0.50 BOOMS AND/OR LEADS OF 130 FEET UP TO BUT NOT INCLUDING 180 FEET 0.75 BOOMS AND/OR LEADS OF 180 FEET UP TO AND INCLUDING 250 FEET 1.15 BOOMS AND/OR LEADS OVER 250 FEET 1.50 THE OPERATOR OF A CRANE (50 TONS AND OVER) WITH A BOOM OF 180 FEET OR MORE (INCLUDING JIB) SHALL RECEIVE A PER HOUR PREMIUM FOR EACH HOUR WORKED ON SAID CRANE (50 TONS AND OVER) IN ACCORDANCE WITH THE FOLLOWING SCHEDULE: BOOMS OF 180 FEET UP TO AND INCLUDING 250 FEET 1.25 BOOMS OVER 250 FEET 1.75

$60.00$35.68$95.68no changeAgreement, 2025
POWER EQUIPMENT OPERATORS:, GROUP 9A…
Full text

POWER EQUIPMENT OPERATORS:, GROUP 9A: DOZER (D-8 AND SIMILAR); GRADESETTER (WHEN REQUIRED BY THE CONTRACTOR TO WORK FROM DRAWINGS, PLANS OR SPECIFICATIONS WITHOUT THE DIRECT SUPERVISION OF A FOREMAN OR SUPERINTENDENT); PUSH CAT; SCRAPERS (UP TO AND INCLUDING 20 CU. YDS); SELF-PROPELLED COMPACTOR WITH DOZER; SELF-PROPELLED, RUBBER-TIRED EARTHMOVING EQUIPMENT (UP TO AND INCLUDING 20 CU. YDS) (621 BAND AND SIMILAR); SHEEP'S FOOT; TRACTOR (D-8 AND SIMILAR); TRACTORS WITH BOOM (LARGER THAN D-6, AND SIMILAR). BOOMS AND/OR LEADS (HOURLY PREMIUMS): THE OPERATOR OF A CRANE (UNDER 50 TONS) WITH A BOOM OF 80 FEET OR MORE (INCLUDING JIB), OR OF A CRANE (UNDER 50 TONS) WITH LEADS OF 100 FEET OR MORE, SHALL RECEIVE A PER HOUR PREMIUM FOR EACH HOUR WORKED ON SAID CRANE (UNDER 50 TONS) IN ACCORDANCE WITH THE FOLLOWING SCHEDULE: BOOMS OF 80 FEET UP TO BUT NOT INCLUDING 130 FEET OR LEADS OF 100 FEET UP TO BUT NOT INCLUDING 130 FEET 0.50 BOOMS AND/OR LEADS OF 130 FEET UP TO BUT NOT INCLUDING 180 FEET 0.75 BOOMS AND/OR LEADS OF 180 FEET UP TO AND INCLUDING 250 FEET 1.15 BOOMS AND/OR LEADS OVER 250 FEET 1.50 THE OPERATOR OF A CRANE (50 TONS AND OVER) WITH A BOOM OF 180 FEET OR MORE (INCLUDING JIB) SHALL RECEIVE A PER HOUR PREMIUM FOR EACH HOUR WORKED ON SAID CRANE (50 TONS AND OVER) IN ACCORDANCE WITH THE FOLLOWING SCHEDULE: BOOMS OF 180 FEET UP TO AND INCLUDING 250 FEET 1.25 BOOMS OVER 250 FEET 1.75

$59.94$35.68$95.62no changeAgreement, 2025
POWER EQUIPMENT OPERATORS:, GROUP 9…
Full text

POWER EQUIPMENT OPERATORS:, GROUP 9: COMBINATION MIXER AND COMPRESSOR (GUNITE); DO-MOR LOADERAND ADAMS ELEGRADER; DOZER (D-7 OR EQUAL); WHEEL AND/OR LADDER TRENCHER (OVER 6 FEET AND 200 TO 749 H.P.). BOOMS AND/OR LEADS (HOURLY PREMIUMS): THE OPERATOR OF A CRANE (UNDER 50 TONS) WITH A BOOM OF 80 FEET OR MORE (INCLUDING JIB), OR OF A CRANE (UNDER 50 TONS) WITH LEADS OF 100 FEET OR MORE, SHALL RECEIVE A PER HOUR PREMIUM FOR EACH HOUR WORKED ON SAID CRANE (UNDER 50 TONS) IN ACCORDANCE WITH THE FOLLOWING SCHEDULE: BOOMS OF 80 FEET UP TO BUT NOT INCLUDING 130 FEET OR LEADS OF 100 FEET UP TO BUT NOT INCLUDING 130 FEET 0.50 BOOMS AND/OR LEADS OF 130 FEET UP TO BUT NOT INCLUDING 180 FEET 0.75 BOOMS AND/OR LEADS OF 180 FEET UP TO AND INCLUDING 250 FEET 1.15 BOOMS AND/OR LEADS OVER 250 FEET 1.50 THE OPERATOR OF A CRANE (50 TONS AND OVER) WITH A BOOM OF 180 FEET OR MORE (INCLUDING JIB) SHALL RECEIVE A PER HOUR PREMIUM FOR EACH HOUR WORKED ON SAID CRANE (50 TONS AND OVER) IN ACCORDANCE WITH THE FOLLOWING SCHEDULE: BOOMS OF 180 FEET UP TO AND INCLUDING 250 FEET 1.25 BOOMS OVER 250 FEET 1.75

$59.71$35.68$95.39no changeAgreement, 2025
POWER EQUIPMENT OPERATORS:, GROUP 8…
Full text

POWER EQUIPMENT OPERATORS:, GROUP 8: ASPHALT PLANT OPERATOR; BARGE MATE (SEAGOING); CAST-IN-PLACE PIPE LAYING MACHINE; CONCRETE BATCH PLANT (MULTIPLE UNITS); CONVEYOR OPERATOR (TUNNEL); DECKMATE; DOZER (D-6 AND SIMILAR); FINISHING MACHINE OPERATOR (AIRPORTS AND HIGHWAYS); GRADESETTER; KOLMAN LOADER (AND SIMILAR); MUCKING MACHINE (CRAWLER-TYPE); MUCKING MACHINE (CONVEYOR-TYPE); NO-JOINT PIPE LAYING MACHINE; PORTABLE CRUSHING AND SCREENING PLANT; POWER BLADE OPERATOR (UNDER 12); SAURMAN TYPE DRAGLINE (UP TO AND INCLUDING 5 YDS.); STATIONARY PIPE WRAPPING, CLEANING AND BENDING MACHINE; SURFACE HEATER AND PLANER OPERATOR, TRACTOR (D-6 AND SIMILAR); TRI-BATCH PAVER; TUNNEL BADGER; TUNNEL MOLE AND/OR BORING MACHINE OPERATOR UNDERBRIDGE PERSONNEL AERIAL PLATFORM (OVER 50 FEET OF PLATFORM). BOOMS AND/OR LEADS (HOURLY PREMIUMS): THE OPERATOR OF A CRANE (UNDER 50 TONS) WITH A BOOM OF 80 FEET OR MORE (INCLUDING JIB), OR OF A CRANE (UNDER 50 TONS) WITH LEADS OF 100 FEET OR MORE, SHALL RECEIVE A PER HOUR PREMIUM FOR EACH HOUR WORKED ON SAID CRANE (UNDER 50 TONS) IN ACCORDANCE WITH THE FOLLOWING SCHEDULE: BOOMS OF 80 FEET UP TO BUT NOT INCLUDING 130 FEET OR LEADS OF 100 FEET UP TO BUT NOT INCLUDING 130 FEET 0.50 BOOMS AND/OR LEADS OF 130 FEET UP TO BUT NOT INCLUDING 180 FEET 0.75 BOOMS AND/OR LEADS OF 180 FEET UP TO AND INCLUDING 250 FEET 1.15 BOOMS AND/OR LEADS OVER 250 FEET 1.50 THE OPERATOR OF A CRANE (50 TONS AND OVER) WITH A BOOM OF 180 FEET OR MORE (INCLUDING JIB) SHALL RECEIVE A PER HOUR PREMIUM FOR EACH HOUR WORKED ON SAID CRANE (50 TONS AND OVER) IN ACCORDANCE WITH THE FOLLOWING SCHEDULE: BOOMS OF 180 FEET UP TO AND INCLUDING 250 FEET 1.25 BOOMS OVER 250 FEET 1.75

$59.60$35.68$95.28no changeAgreement, 2025
POWER EQUIPMENT OPERATORS:, GROUP 7…
Full text

POWER EQUIPMENT OPERATORS:, GROUP 7: CRUSHER PLANT ENGINEER, DOZER (D-4, CASE 450, JOHN DEERE 450, AND SIMILAR); DUAL DRUM MIXER, EXTEND LIFT; HOIST AND/OR WINCH (2 DRUMS); LOADER (OVER 3 AND 1/2 CU. YDS. UP TO AND INCLUDING 6 YARDS.); MECHANICAL FINISHER OR SPREADER MACHINE (ASPHALT), (BARBER GREENE AND SIMILAR) (SCREEDMAN REQUIRED); MINE OR SHAFT HOIST; MOBILE CONCRETE MIXER (OVER 5 TONS); PIPE BENDING MACHINE (PIPELINES ONLY); PIPE CLEANING MACHINE (TRACTOR PROPELLED AND SUPPORTED); PIPE WRAPPING MACHINE (TRACTOR PROPELLED AND SUPPORTED); ROLLER OPERATOR (ASPHALT); SELF-PROPELLED ELEVATING GRADE PLANE; SLUSHER OPERATOR; TRACTOR (WITH BOOM) (D-6, OR SIMILAR); TRENCHER (OVER 6 FEET AND LESS THAN 200 H.P.); WATER TANKER (PULLED BY EUCLIDS, T-PULLS, DW-10, 20 OR 21, OR SIMILAR); WINCHMAN (STERN WINCH ON DREDGE). BOOMS AND/OR LEADS (HOURLY PREMIUMS): THE OPERATOR OF A CRANE (UNDER 50 TONS) WITH A BOOM OF 80 FEET OR MORE (INCLUDING JIB), OR OF A CRANE (UNDER 50 TONS) WITH LEADS OF 100 FEET OR MORE, SHALL RECEIVE A PER HOUR PREMIUM FOR EACH HOUR WORKED ON SAID CRANE (UNDER 50 TONS) IN ACCORDANCE WITH THE FOLLOWING SCHEDULE: BOOMS OF 80 FEET UP TO BUT NOT INCLUDING 130 FEET OR LEADS OF 100 FEET UP TO BUT NOT INCLUDING 130 FEET 0.50 BOOMS AND/OR LEADS OF 130 FEET UP TO BUT NOT INCLUDING 180 FEET 0.75 BOOMS AND/OR LEADS OF 180 FEET UP TO AND INCLUDING 250 FEET 1.15 BOOMS AND/OR LEADS OVER 250 FEET 1.50 THE OPERATOR OF A CRANE (50 TONS AND OVER) WITH A BOOM OF 180 FEET OR MORE (INCLUDING JIB) SHALL RECEIVE A PER HOUR PREMIUM FOR EACH HOUR WORKED ON SAID CRANE (50 TONS AND OVER) IN ACCORDANCE WITH THE FOLLOWING SCHEDULE: BOOMS OF 180 FEET UP TO AND INCLUDING 250 FEET 1.25 BOOMS OVER 250 FEET 1.75

$59.49$35.68$95.17no changeAgreement, 2025
POWER EQUIPMENT OPERATORS:, GROUP 6…
Full text

POWER EQUIPMENT OPERATORS:, GROUP 6: BOOM TRUCK OR DUAL PURPOSE ""A""FRAME TRUCK (OVER 5 TONS); COMBINATION LOADER/BACKHOE (UP TO AND INCLUDING 3/4 CU. YD.); CONCRETE BATCH PLANTS (WET OR DRY); CONCRETE CUTTER, GROOVER AND/OR GRINDER (SELF-PROPELLED UNIT ON STREETS, HIGHWAYS, AIRPORTS, AND CANALS); CONVEYOR OR CONCRETE PUMP (TRUCK OR EQUIPMENT MOUNTED); DRILLING MACHINERY (NOT TO APPLY TO WATERLINERS, WAGON DRILLS OR JACK HAMMERS); FORK LIFT (OVER 10 TONS); LOADER (UP TO AND INCLUDING 3 AND 1/2 CU. YDS); LULL HIGH LIFT (UNDER 40 FEET); LUBRICATION AND SERVICE ENGINEER (MOBILE); MAGINNIS INTERNAL FULL SLAB VIBRATOR (ON AIRPORTS, HIGHWAYS, CANALS AND WAREHOUSES); MAN OR MATERIAL HOIST; MECHANICAL CONCRETE FINISHER (LARGE CLARY, JOHNSON BIDWELL, BRIDGE DECK AND SIMILAR); MOBILE TRUCK CRANE DRIVER; PORTABLE SHOTBLAST CONCRETE CLEANING MACHINE; PORTABLE BORING MACHINE (UNDER STREETS, HIGHWAYS, ETC.); PORTABLE CRUSHER; POWER JUMBO OPERATOR (SETTING SLIP FORMS, ETC., IN TUNNELS); ROLLERS (OVER 5 TONS); SELF-PROPELLED COMPACTOR (SINGLE ENGINE); SELF-PROPELLED PAVEMENT BREAKER; SKIDSTEER LOADER WITH ATTACHMENTS; SLIP FORM PUMPS (POWER DRIVEN BY HYDRAULIC, ELECTRIC, AIR, GAS, ETC., LIFTING DEVICE FOR CONCRETE FORMS); SMALL RUBBER TIRED TRACTORS; TRENCHER (UP TO AND INCLUDING 6 FEET); UNDERBRIDGE PERSONNEL AERIAL PLATFORM (50 FEET OF PLATFORM OR LESS). BOOMS AND/OR LEADS (HOURLY PREMIUMS): THE OPERATOR OF A CRANE (UNDER 50 TONS) WITH A BOOM OF 80 FEET OR MORE (INCLUDING JIB), OR OF A CRANE (UNDER 50 TONS) WITH LEADS OF 100 FEET OR MORE, SHALL RECEIVE A PER HOUR PREMIUM FOR EACH HOUR WORKED ON SAID CRANE (UNDER 50 TONS) IN ACCORDANCE WITH THE FOLLOWING SCHEDULE: BOOMS OF 80 FEET UP TO BUT NOT INCLUDING 130 FEET OR LEADS OF 100 FEET UP TO BUT NOT INCLUDING 130 FEET 0.50 BOOMS AND/OR LEADS OF 130 FEET UP TO BUT NOT INCLUDING 180 FEET 0.75 BOOMS AND/OR LEADS OF 180 FEET UP TO AND INCLUDING 250 FEET 1.15 BOOMS AND/OR LEADS OVER 250 FEET 1.50 THE OPERATOR OF A CRANE (50 TONS AND OVER) WITH A BOOM OF 180 FEET OR MORE (INCLUDING JIB) SHALL RECEIVE A PER HOUR PREMIUM FOR EACH HOUR WORKED ON SAID CRANE (50 TONS AND OVER) IN ACCORDANCE WITH THE FOLLOWING SCHEDULE: BOOMS OF 180 FEET UP TO AND INCLUDING 250 FEET 1.25 BOOMS OVER 250 FEET 1.75

$59.17$35.68$94.85no changeAgreement, 2025
POWER EQUIPMENT OPERATORS:, GROUP 5…
Full text

POWER EQUIPMENT OPERATORS:, GROUP 5: ASPHALT PLANT FIREMAN; COMPRESSORS, PUMPS, GENERATORS AND WELDING MACHINES (""BANK"" OF 9 OR MORE, INDIVIDUALLY OR COLLECTIVELY); CONCRETE PUMPS OR PUMPCRETE GUNS; LUBRICATION AND SERVICE ENGINEER (GREASE RACK); SCREEDMAN BOOMS AND/OR LEADS (HOURLY PREMIUMS): THE OPERATOR OF A CRANE (UNDER 50 TONS) WITH A BOOM OF 80 FEET OR MORE (INCLUDING JIB), OR OF A CRANE (UNDER 50 TONS) WITH LEADS OF 100 FEET OR MORE, SHALL RECEIVE A PER HOUR PREMIUM FOR EACH HOUR WORKED ON SAID CRANE (UNDER 50 TONS) IN ACCORDANCE WITH THE FOLLOWING SCHEDULE: BOOMS OF 80 FEET UP TO BUT NOT INCLUDING 130 FEET OR LEADS OF 100 FEET UP TO BUT NOT INCLUDING 130 FEET 0.50 BOOMS AND/OR LEADS OF 130 FEET UP TO BUT NOT INCLUDING 180 FEET 0.75 BOOMS AND/OR LEADS OF 180 FEET UP TO AND INCLUDING 250 FEET 1.15 BOOMS AND/OR LEADS OVER 250 FEET 1.50 THE OPERATOR OF A CRANE (50 TONS AND OVER) WITH A BOOM OF 180 FEET OR MORE (INCLUDING JIB) SHALL RECEIVE A PER HOUR PREMIUM FOR EACH HOUR WORKED ON SAID CRANE (50 TONS AND OVER) IN ACCORDANCE WITH THE FOLLOWING SCHEDULE: BOOMS OF 180 FEET UP TO AND INCLUDING 250 FEET 1.25 BOOMS OVER 250 FEET 1.75

$58.52$35.68$94.20no changeAgreement, 2025
POWER EQUIPMENT OPERATORS:, GROUP 4…
Full text

POWER EQUIPMENT OPERATORS:, GROUP 4: BOOM TRUCK OR DUAL PURPOSE ""A"" FRAME TRUCK (5 TONS OR LESS); CONCRETE PLACING BOOM (BUILDING CONSTRUCTION); DINKY OPERATOR; ELEVATOR OPERATOR; HOIST AND/OR WINCH (ONE DRUM); STRADDLE TRUCK (ROSS CARRIER, HYSTER AND SIMILAR). BOOMS AND/OR LEADS (HOURLY PREMIUMS): THE OPERATOR OF A CRANE (UNDER 50 TONS) WITH A BOOM OF 80 FEET OR MORE (INCLUDING JIB), OR OF A CRANE (UNDER 50 TONS) WITH LEADS OF 100 FEET OR MORE, SHALL RECEIVE A PER HOUR PREMIUM FOR EACH HOUR WORKED ON SAID CRANE (UNDER 50 TONS) IN ACCORDANCE WITH THE FOLLOWING SCHEDULE: BOOMS OF 80 FEET UP TO BUT NOT INCLUDING 130 FEET OR LEADS OF 100 FEET UP TO BUT NOT INCLUDING 130 FEET 0.50 BOOMS AND/OR LEADS OF 130 FEET UP TO BUT NOT INCLUDING 180 FEET 0.75 BOOMS AND/OR LEADS OF 180 FEET UP TO AND INCLUDING 250 FEET 1.15 BOOMS AND/OR LEADS OVER 250 FEET 1.50 THE OPERATOR OF A CRANE (50 TONS AND OVER) WITH A BOOM OF 180 FEET OR MORE (INCLUDING JIB) SHALL RECEIVE A PER HOUR PREMIUM FOR EACH HOUR WORKED ON SAID CRANE (50 TONS AND OVER) IN ACCORDANCE WITH THE FOLLOWING SCHEDULE: BOOMS OF 180 FEET UP TO AND INCLUDING 250 FEET 1.25 BOOMS OVER 250 FEET 1.75

$58.21$35.68$93.89no changeAgreement, 2025
POWER EQUIPMENT OPERATORS:, GROUP 3…
Full text

POWER EQUIPMENT OPERATORS:, GROUP 3: BRAKEMAN; DECKHAND; FIREMAN; OILER; OILER/GRADECHECKER; SIGNALMAN; SWITCHMAN; HIGHLINE CABLEWAY SIGNALMAN; BARGEMAN; BUNKERMAN; CONCRETE CURING MACHINE (SELF-PROPELLED, AUTOMATICALLY APPLIED UNIT ON STREETS, HIGHWAYS, AIRPORTS AND CANALS); LEVEEMAN; ROLLER (5 TONS AND UNDER); TUGGER HOIST. BOOMS AND/OR LEADS (HOURLY PREMIUMS): THE OPERATOR OF A CRANE (UNDER 50 TONS) WITH A BOOM OF 80 FEET OR MORE (INCLUDING JIB), OR OF A CRANE (UNDER 50 TONS) WITH LEADS OF 100 FEET OR MORE, SHALL RECEIVE A PER HOUR PREMIUM FOR EACH HOUR WORKED ON SAID CRANE (UNDER 50 TONS) IN ACCORDANCE WITH THE FOLLOWING SCHEDULE: BOOMS OF 80 FEET UP TO BUT NOT INCLUDING 130 FEET OR LEADS OF 100 FEET UP TO BUT NOT INCLUDING 130 FEET 0.50 BOOMS AND/OR LEADS OF 130 FEET UP TO BUT NOT INCLUDING 180 FEET 0.75 BOOMS AND/OR LEADS OF 180 FEET UP TO AND INCLUDING 250 FEET 1.15 BOOMS AND/OR LEADS OVER 250 FEET 1.50 THE OPERATOR OF A CRANE (50 TONS AND OVER) WITH A BOOM OF 180 FEET OR MORE (INCLUDING JIB) SHALL RECEIVE A PER HOUR PREMIUM FOR EACH HOUR WORKED ON SAID CRANE (50 TONS AND OVER) IN ACCORDANCE WITH THE FOLLOWING SCHEDULE: BOOMS OF 180 FEET UP TO AND INCLUDING 250 FEET 1.25 BOOMS OVER 250 FEET 1.75

$57.94$35.68$93.62no changeAgreement, 2025
POWER EQUIPMENT OPERATORS:, GROUP 2…
Full text

POWER EQUIPMENT OPERATORS:, GROUP 2: CONVEYOR OPERATOR (HANDLING BUILDING MATERIAL); HYDRAULIC MONITOR; MIXER BOX OPERATOR (CONCRETE PLANT). BOOMS AND/OR LEADS (HOURLY PREMIUMS): THE OPERATOR OF A CRANE (UNDER 50 TONS) WITH A BOOM OF 80 FEET OR MORE (INCLUDING JIB), OR OF A CRANE (UNDER 50 TONS) WITH LEADS OF 100 FEET OR MORE, SHALL RECEIVE A PER HOUR PREMIUM FOR EACH HOUR WORKED ON SAID CRANE (UNDER 50 TONS) IN ACCORDANCE WITH THE FOLLOWING SCHEDULE: BOOMS OF 80 FEET UP TO BUT NOT INCLUDING 130 FEET OR LEADS OF 100 FEET UP TO BUT NOT INCLUDING 130 FEET 0.50 BOOMS AND/OR LEADS OF 130 FEET UP TO BUT NOT INCLUDING 180 FEET 0.75 BOOMS AND/OR LEADS OF 180 FEET UP TO AND INCLUDING 250 FEET 1.15 BOOMS AND/OR LEADS OVER 250 FEET 1.50 THE OPERATOR OF A CRANE (50 TONS AND OVER) WITH A BOOM OF 180 FEET OR MORE (INCLUDING JIB) SHALL RECEIVE A PER HOUR PREMIUM FOR EACH HOUR WORKED ON SAID CRANE (50 TONS AND OVER) IN ACCORDANCE WITH THE FOLLOWING SCHEDULE: BOOMS OF 180 FEET UP TO AND INCLUDING 250 FEET 1.25 BOOMS OVER 250 FEET 1.75

$57.77$35.68$93.45no changeAgreement, 2025
POWER EQUIPMENT OPERATORS:, GROUP 1…
Full text

POWER EQUIPMENT OPERATORS:, GROUP 1: FORK LIFT (UP TO AND INCLUDING 10 TONS); PARTSMAN (HEAVY DUTY REPAIR SHOP PARTS ROOM WHEN NEEDED). BOOMS AND/OR LEADS (HOURLY PREMIUMS): THE OPERATOR OF A CRANE (UNDER 50 TONS) WITH A BOOM OF 80 FEET OR MORE (INCLUDING JIB), OR OF A CRANE (UNDER 50 TONS) WITH LEADS OF 100 FEET OR MORE, SHALL RECEIVE A PER HOUR PREMIUM FOR EACH HOUR WORKED ON SAID CRANE (UNDER 50 TONS) IN ACCORDANCE WITH THE FOLLOWING SCHEDULE: BOOMS OF 80 FEET UP TO BUT NOT INCLUDING 130 FEET OR LEADS OF 100 FEET UP TO BUT NOT INCLUDING 130 FEET 0.50 BOOMS AND/OR LEADS OF 130 FEET UP TO BUT NOT INCLUDING 180 FEET 0.75 BOOMS AND/OR LEADS OF 180 FEET UP TO AND INCLUDING 250 FEET 1.15 BOOMS AND/OR LEADS OVER 250 FEET 1.50 THE OPERATOR OF A CRANE (50 TONS AND OVER) WITH A BOOM OF 180 FEET OR MORE (INCLUDING JIB) SHALL RECEIVE A PER HOUR PREMIUM FOR EACH HOUR WORKED ON SAID CRANE (50 TONS AND OVER) IN ACCORDANCE WITH THE FOLLOWING SCHEDULE: BOOMS OF 180 FEET UP TO AND INCLUDING 250 FEET 1.25 BOOMS OVER 250 FEET 1.75

$57.66$35.68$93.34no changeAgreement, 2025
POWER EQUIPMENT OPERATOR - TUNNEL WORK, GROUP 12A…
Full text

POWER EQUIPMENT OPERATOR - TUNNEL WORK, GROUP 12A: DOZER (D-11 OR SIMILAR OR LARGER); HYDRAULIC EXCAVATORS (OVER 4 CU. YDS.); LIFTING CRANES (50 TONS AND OVER); PIONEERING DOZER/BACKHOE (INITIAL CLEARING AND EXCAVATION FOR THE PURPOSE OF PROVIDING ACCESS FOR OTHER EQUIPMENT WHERE THE TERRAIN WORKED INVOLVES 1-TO-1 SLOPES THAT ARE 50 FEET IN HEIGHT OR DEPTH, THE SCOPE OF THIS WORK DOES NOT INCLUDE NORMAL CLEARING AND GRUBBING ON USUAL HILLY TERRAIN NOR THE EXCAVATION WORK ONCE THE ACCESS IS PROVIDED); POWER BLADE OPERATOR (CAT 12 OR EQUIVALENT OR OVER); STRADDLE LIFTS (OVER 50 TONS); TOWER CRANE, MOBILE; TRAVELING TRUSS CRANES; UNIVERSAL, LIEBHER, LINDEN, AND SIMILAR TYPES OF TOWER CRANES (IN THE ERECTION, DISMANTLING, AND MOVING OF EQUIPMENT THERE SHALL BE AN ADDITIONAL OPERATING ENGINEER OR HEAVY DUTY REPAIRMAN); YO-YO CAT OR DOZER. BOOMS AND/OR LEADS (HOURLY PREMIUMS): THE OPERATOR OF A CRANE (UNDER 50 TONS) WITH A BOOM OF 80 FEET OR MORE (INCLUDING JIB), OR OF A CRANE (UNDER 50 TONS) WITH LEADS OF 100 FEET OR MORE, SHALL RECEIVE A PER HOUR PREMIUM FOR EACH HOUR WORKED ON SAID CRANE (UNDER 50 TONS) IN ACCORDANCE WITH THE FOLLOWING SCHEDULE: BOOMS OF 80 FEET UP TO BUT NOT INCLUDING 130 FEET OR LEADS OF 100 FEET UP TO BUT NOT INCLUDING 130 FEET 0.50 BOOMS AND/OR LEADS OF 130 FEET UP TO BUT NOT INCLUDING 180 FEET 0.75 BOOMS AND/OR LEADS OF 180 FEET UP TO AND INCLUDING 250 FEET 1.15 BOOMS AND/OR LEADS OVER 250 FEET 1.50 THE OPERATOR OF A CRANE (50 TONS AND OVER) WITH A BOOM OF 180 FEET OR MORE (INCLUDING JIB) SHALL RECEIVE A PER HOUR PREMIUM FOR EACH HOUR WORKED ON SAID CRANE (50 TONS AND OVER) IN ACCORDANCE WITH THE FOLLOWING SCHEDULE: BOOMS OF 180 FEET UP TO AND INCLUDING 250 FEET 1.25 BOOMS OVER 250 FEET 1.75

$61.32$35.68$97.00no changeAgreement, 2025
POWER EQUIPMENT OPERATOR - TUNNEL WORK, GROUP 12…
Full text

POWER EQUIPMENT OPERATOR - TUNNEL WORK, GROUP 12: CLAMSHELL OR DIPPER OPERATOR; DERRICKS; DRILL RIGS; MULTI-PROPULSION EARTHMOVING MACHINES (2 OR MORE SCRAPERS) (OVER 35 CU. YDS ""STRUCK""M.R.C.); OPERATORS (DERRICKS, PILEDRIVERS AND CRANES); POWER SHOVELS AND DRAGLINES (7 CU. YDS. M.R.C. AND OVER); SELF-PROPELLED RUBBER-TIRED EARTHMOVING EQUIPMENT (OVER 31 CU. YDS.) (657B AND SIMILAR); WHEEL EXCAVATOR (UP TO AND INCLUDING 750 CU. YDS. PER HOUR); WHEEL EXCAVATOR (OVER 750 CU. YDS. PER HOUR).

$60.96$35.68$96.64no changeAgreement, 2025
POWER EQUIPMENT OPERATOR - TUNNEL WORK, GROUP 11…
Full text

POWER EQUIPMENT OPERATOR - TUNNEL WORK, GROUP 11: AUTOMATIC SLIP FORM PAVER (CONCRETE OR ASPHALT); BAND WAGON (IN CONJUNCTION WITH WHEEL EXCAVATOR); CABLE-OPERATED CRAWLER CRANES (OVER 25 TONS BUT LESS THAN 50 TONS); CABLE-OPERATED POWER SHOVEL, CLAMSHELL, DRAGLINE AND BACKHOE (OVER 1 CU. YD. UP TO 7 CU. YDS.); GRADALL (OVER 1 CU. YDS. UP TO 7 CU. YDS.); DW-10, 20, ETC. (TANDEM); EARTHMOVING MACHINES (MULTIPLE PROPULSION POWER UNITS AND 2 OR MORE SCRAPERS) (UP TO AND INCLUDING 35 CU. YDS.,"" STRUCK"" M.R.C.); HIGHLINE CABLEWAY; HYDRAULIC BACKHOE (OVER 2 CU. YDS. UP TO AND INCLUDING 4 CU. YDS.); LEVERMAN; LIFT SLAB MACHINE; LOADER (OVER 12 CU. YDS); MASTER BOAT OPERATOR; MOBILE TRUCK CRANE OPERATOR (OVER 25 TONS BUT LESS THAN 50 TONS); (MOBILE TRUCK CRANE DRIVER REQUIRED); PRE-STRESS WIRE WRAPPING MACHINE; SELF-PROPELLED BOOM-TYPE LIFTING DEVICE (CENTER MOUNT) (OVER 25 TONS M.R.C); SELF-PROPELLED COMPACTOR (WITH MULTIPLE-PROPULSION POWER UNITS); SINGLE ENGINE RUBBER TIRED EARTHMOVING MACHINE (WITH TANDEM SCRAPER); TANDEM CATS; TRENCHER (PULLING ATTACHED SHIELD). BOOMS AND/OR LEADS (HOURLY PREMIUMS): THE OPERATOR OF A CRANE (UNDER 50 TONS) WITH A BOOM OF 80 FEET OR MORE (INCLUDING JIB), OR OF A CRANE (UNDER 50 TONS) WITH LEADS OF 100 FEET OR MORE, SHALL RECEIVE A PER HOUR PREMIUM FOR EACH HOUR WORKED ON SAID CRANE (UNDER 50 TONS) IN ACCORDANCE WITH THE FOLLOWING SCHEDULE: BOOMS OF 80 FEET UP TO BUT NOT INCLUDING 130 FEET OR LEADS OF 100 FEET UP TO BUT NOT INCLUDING 130 FEET 0.50 BOOMS AND/OR LEADS OF 130 FEET UP TO BUT NOT INCLUDING 180 FEET 0.75 BOOMS AND/OR LEADS OF 180 FEET UP TO AND INCLUDING 250 FEET 1.15 BOOMS AND/OR LEADS OVER 250 FEET 1.50 THE OPERATOR OF A CRANE (50 TONS AND OVER) WITH A BOOM OF 180 FEET OR MORE (INCLUDING JIB) SHALL RECEIVE A PER HOUR PREMIUM FOR EACH HOUR WORKED ON SAID CRANE (50 TONS AND OVER) IN ACCORDANCE WITH THE FOLLOWING SCHEDULE: BOOMS OF 180 FEET UP TO AND INCLUDING 250 FEET 1.25 BOOMS OVER 250 FEET 1.75

$60.60$35.68$96.28no changeAgreement, 2025
POWER EQUIPMENT OPERATOR - TUNNEL WORK, GROUP 10A…
Full text

POWER EQUIPMENT OPERATOR - TUNNEL WORK, GROUP 10A: BOAT OPERATOR; CABLE-OPERATED CRAWLER CRANE (UP TO AND INCLUDING 25 TONS); CABLE-OPERATED POWER SHOVEL, CLAMSHELL, DRAGLINE AND BACKHOE (UP TO AND INCLUDING 1 CU. YD.); DOZER D9-L; DOZER (D-10, HD41 AND SIMILAR) (ALL ATTACHMENTS); GRADALL (UP TO AND INCLUDING 1 CU. YD.); HYDRAULIC BACKHOE (OVER 3/4 CU. YDS. UP TO AND INCLUDING 2 CU. YDS.); MOBILE TRUCK CRANE OPERATOR (UP TO AND INCLUDING 25 TONS) (MOBILE TRUCK CRANE DRIVER REQUIRED); SELF-PROPELLED BOOM TYPE LIFTING DEVICE (CENTER MOUNT) (UP TO AND INCLUDING 25 TONS) (GROVE, DROTT, P&H, PETTIBONE AND SIMILAR; TRENCHER (OVER 6 FEET AND 750 H.P. OR MORE); WATCH ENGINEER (STEAM OR ELECTRIC). BOOMS AND/OR LEADS (HOURLY PREMIUMS): THE OPERATOR OF A CRANE (UNDER 50 TONS) WITH A BOOM OF 80 FEET OR MORE (INCLUDING JIB), OR OF A CRANE (UNDER 50 TONS) WITH LEADS OF 100 FEET OR MORE, SHALL RECEIVE A PER HOUR PREMIUM FOR EACH HOUR WORKED ON SAID CRANE (UNDER 50 TONS) IN ACCORDANCE WITH THE FOLLOWING SCHEDULE: BOOMS OF 80 FEET UP TO BUT NOT INCLUDING 130 FEET OR LEADS OF 100 FEET UP TO BUT NOT INCLUDING 130 FEET 0.50 BOOMS AND/OR LEADS OF 130 FEET UP TO BUT NOT INCLUDING 180 FEET 0.75 BOOMS AND/OR LEADS OF 180 FEET UP TO AND INCLUDING 250 FEET 1.15 BOOMS AND/OR LEADS OVER 250 FEET 1.50 THE OPERATOR OF A CRANE (50 TONS AND OVER) WITH A BOOM OF 180 FEET OR MORE (INCLUDING JIB) SHALL RECEIVE A PER HOUR PREMIUM FOR EACH HOUR WORKED ON SAID CRANE (50 TONS AND OVER) IN ACCORDANCE WITH THE FOLLOWING SCHEDULE: BOOMS OF 180 FEET UP TO AND INCLUDING 250 FEET 1.25 BOOMS OVER 250 FEET 1.75

$60.45$35.68$96.13no changeAgreement, 2025
POWER EQUIPMENT OPERATOR - TUNNEL WORK, GROUP 10…
Full text

POWER EQUIPMENT OPERATOR - TUNNEL WORK, GROUP 10: CHICAGO BOOM; COLD PLANERS; HEAVY DUTY REPAIRMAN OR WELDER; HOIST AND/OR WINCH (3 DRUMS); HYDRAULIC SKOOPER (KOEHRING AND SIMILAR); LOADER (OVER 6 CU. YDS. UP TO AND INCLUDING 12 CU. YDS.); SAURMAN TYPE DRAGLINE (OVER 5 CU. YDS.); SELF-PROPELLED, RUBBER-TIRED EARTHMOVING EQUIPMENT (OVER 20 CU. YDS. UP TO AND INCLUDING 31 CU. YDS.) (637D AND SIMILAR); SOIL STABILIZER (P & H OR EQUAL); SUB-GRADER (GURRIES OR OTHER AUTOMATIC TYPE); TRACTORS (D-9 OR EQUIVALENT, ALL ATTACHMENTS); TRACTOR (TANDEM SCRAPER); WATCH ENGINEER. BOOMS AND/OR LEADS (HOURLY PREMIUMS): THE OPERATOR OF A CRANE (UNDER 50 TONS) WITH A BOOM OF 80 FEET OR MORE (INCLUDING JIB), OR OF A CRANE (UNDER 50 TONS) WITH LEADS OF 100 FEET OR MORE, SHALL RECEIVE A PER HOUR PREMIUM FOR EACH HOUR WORKED ON SAID CRANE (UNDER 50 TONS) IN ACCORDANCE WITH THE FOLLOWING SCHEDULE: BOOMS OF 80 FEET UP TO BUT NOT INCLUDING 130 FEET OR LEADS OF 100 FEET UP TO BUT NOT INCLUDING 130 FEET 0.50 BOOMS AND/OR LEADS OF 130 FEET UP TO BUT NOT INCLUDING 180 FEET 0.75 BOOMS AND/OR LEADS OF 180 FEET UP TO AND INCLUDING 250 FEET 1.15 BOOMS AND/OR LEADS OVER 250 FEET 1.50 THE OPERATOR OF A CRANE (50 TONS AND OVER) WITH A BOOM OF 180 FEET OR MORE (INCLUDING JIB) SHALL RECEIVE A PER HOUR PREMIUM FOR EACH HOUR WORKED ON SAID CRANE (50 TONS AND OVER) IN ACCORDANCE WITH THE FOLLOWING SCHEDULE: BOOMS OF 180 FEET UP TO AND INCLUDING 250 FEET 1.25 BOOMS OVER 250 FEET 1.75

$60.30$35.68$95.98no changeAgreement, 2025
POWER EQUIPMENT OPERATOR - TUNNEL WORK, GROUP 9A…
Full text

POWER EQUIPMENT OPERATOR - TUNNEL WORK, GROUP 9A: DOZER (D-8 AND SIMILAR); GRADESETTER (WHEN REQUIRED BY THE CONTRACTOR TO WORK FROM DRAWINGS, PLANS OR SPECIFICATIONS WITHOUT THE DIRECT SUPERVISION OF A FOREMAN OR SUPERINTENDENT); PUSH CAT; SCRAPERS (UP TO AND INCLUDING 20 CU. YDS); SELF-PROPELLED COMPACTOR WITH DOZER; SELF-PROPELLED, RUBBER-TIRED EARTHMOVING EQUIPMENT (UP TO AND INCLUDING 20 CU. YDS) (621 BAND AND SIMILAR); SHEEP'S FOOT; TRACTOR (D-8 AND SIMILAR); TRACTORS WITH BOOM (LARGER THAN D-6, AND SIMILAR). BOOMS AND/OR LEADS (HOURLY PREMIUMS): THE OPERATOR OF A CRANE (UNDER 50 TONS) WITH A BOOM OF 80 FEET OR MORE (INCLUDING JIB), OR OF A CRANE (UNDER 50 TONS) WITH LEADS OF 100 FEET OR MORE, SHALL RECEIVE A PER HOUR PREMIUM FOR EACH HOUR WORKED ON SAID CRANE (UNDER 50 TONS) IN ACCORDANCE WITH THE FOLLOWING SCHEDULE: BOOMS OF 80 FEET UP TO BUT NOT INCLUDING 130 FEET OR LEADS OF 100 FEET UP TO BUT NOT INCLUDING 130 FEET 0.50 BOOMS AND/OR LEADS OF 130 FEET UP TO BUT NOT INCLUDING 180 FEET 0.75 BOOMS AND/OR LEADS OF 180 FEET UP TO AND INCLUDING 250 FEET 1.15 BOOMS AND/OR LEADS OVER 250 FEET 1.50 THE OPERATOR OF A CRANE (50 TONS AND OVER) WITH A BOOM OF 180 FEET OR MORE (INCLUDING JIB) SHALL RECEIVE A PER HOUR PREMIUM FOR EACH HOUR WORKED ON SAID CRANE (50 TONS AND OVER) IN ACCORDANCE WITH THE FOLLOWING SCHEDULE: BOOMS OF 180 FEET UP TO AND INCLUDING 250 FEET 1.25 BOOMS OVER 250 FEET 1.75

$60.24$35.68$95.92no changeAgreement, 2025
POWER EQUIPMENT OPERATOR - TUNNEL WORK, GROUP 9…
Full text

POWER EQUIPMENT OPERATOR - TUNNEL WORK, GROUP 9: COMBINATION MIXER AND COMPRESSOR (GUNITE); DO-MOR LOADERAND ADAMS ELEGRADER; DOZER (D-7 OR EQUAL); WHEEL AND/OR LADDER TRENCHER (OVER 6 FEET AND 200 TO 749 H.P.). BOOMS AND/OR LEADS (HOURLY PREMIUMS): THE OPERATOR OF A CRANE (UNDER 50 TONS) WITH A BOOM OF 80 FEET OR MORE (INCLUDING JIB), OR OF A CRANE (UNDER 50 TONS) WITH LEADS OF 100 FEET OR MORE, SHALL RECEIVE A PER HOUR PREMIUM FOR EACH HOUR WORKED ON SAID CRANE (UNDER 50 TONS) IN ACCORDANCE WITH THE FOLLOWING SCHEDULE: BOOMS OF 80 FEET UP TO BUT NOT INCLUDING 130 FEET OR LEADS OF 100 FEET UP TO BUT NOT INCLUDING 130 FEET 0.50 BOOMS AND/OR LEADS OF 130 FEET UP TO BUT NOT INCLUDING 180 FEET 0.75 BOOMS AND/OR LEADS OF 180 FEET UP TO AND INCLUDING 250 FEET 1.15 BOOMS AND/OR LEADS OVER 250 FEET 1.50 THE OPERATOR OF A CRANE (50 TONS AND OVER) WITH A BOOM OF 180 FEET OR MORE (INCLUDING JIB) SHALL RECEIVE A PER HOUR PREMIUM FOR EACH HOUR WORKED ON SAID CRANE (50 TONS AND OVER) IN ACCORDANCE WITH THE FOLLOWING SCHEDULE: BOOMS OF 180 FEET UP TO AND INCLUDING 250 FEET 1.25 BOOMS OVER 250 FEET 1.75

$60.01$35.68$95.69no changeAgreement, 2025
POWER EQUIPMENT OPERATOR - TUNNEL WORK, GROUP 8…
Full text

POWER EQUIPMENT OPERATOR - TUNNEL WORK, GROUP 8: ASPHALT PLANT OPERATOR; BARGE MATE (SEAGOING); CAST-IN-PLACE PIPE LAYING MACHINE; CONCRETE BATCH PLANT (MULTIPLE UNITS); CONVEYOR OPERATOR (TUNNEL); DECKMATE; DOZER (D-6 AND SIMILAR); FINISHING MACHINE OPERATOR (AIRPORTS AND HIGHWAYS); GRADESETTER; KOLMAN LOADER (AND SIMILAR); MUCKING MACHINE (CRAWLER-TYPE); MUCKING MACHINE (CONVEYOR-TYPE); NO-JOINT PIPE LAYING MACHINE; PORTABLE CRUSHING AND SCREENING PLANT; POWER BLADE OPERATOR (UNDER 12); SAURMAN TYPE DRAGLINE (UP TO AND INCLUDING 5 YDS.); STATIONARY PIPE WRAPPING, CLEANING AND BENDING MACHINE; SURFACE HEATER AND PLANER OPERATOR, TRACTOR (D-6 AND SIMILAR); TRI-BATCH PAVER; TUNNEL BADGER; TUNNEL MOLE AND/OR BORING MACHINE OPERATOR UNDERBRIDGE PERSONNEL AERIAL PLATFORM (OVER 50 FEET OF PLATFORM). BOOMS AND/OR LEADS (HOURLY PREMIUMS): THE OPERATOR OF A CRANE (UNDER 50 TONS) WITH A BOOM OF 80 FEET OR MORE (INCLUDING JIB), OR OF A CRANE (UNDER 50 TONS) WITH LEADS OF 100 FEET OR MORE, SHALL RECEIVE A PER HOUR PREMIUM FOR EACH HOUR WORKED ON SAID CRANE (UNDER 50 TONS) IN ACCORDANCE WITH THE FOLLOWING SCHEDULE: BOOMS OF 80 FEET UP TO BUT NOT INCLUDING 130 FEET OR LEADS OF 100 FEET UP TO BUT NOT INCLUDING 130 FEET 0.50 BOOMS AND/OR LEADS OF 130 FEET UP TO BUT NOT INCLUDING 180 FEET 0.75 BOOMS AND/OR LEADS OF 180 FEET UP TO AND INCLUDING 250 FEET 1.15 BOOMS AND/OR LEADS OVER 250 FEET 1.50 THE OPERATOR OF A CRANE (50 TONS AND OVER) WITH A BOOM OF 180 FEET OR MORE (INCLUDING JIB) SHALL RECEIVE A PER HOUR PREMIUM FOR EACH HOUR WORKED ON SAID CRANE (50 TONS AND OVER) IN ACCORDANCE WITH THE FOLLOWING SCHEDULE: BOOMS OF 180 FEET UP TO AND INCLUDING 250 FEET 1.25 BOOMS OVER 250 FEET 1.75

$59.90$35.68$95.58no changeAgreement, 2025
POWER EQUIPMENT OPERATOR - TUNNEL WORK, GROUP 7…
Full text

POWER EQUIPMENT OPERATOR - TUNNEL WORK, GROUP 7: CRUSHER PLANT ENGINEER, DOZER (D-4, CASE 450, JOHN DEERE 450, AND SIMILAR); DUAL DRUM MIXER, EXTEND LIFT; HOIST AND/OR WINCH (2 DRUMS); LOADER (OVER 3 AND 1/2 CU. YDS. UP TO AND INCLUDING 6 YARDS.); MECHANICAL FINISHER OR SPREADER MACHINE (ASPHALT), (BARBER GREENE AND SIMILAR) (SCREEDMAN REQUIRED); MINE OR SHAFT HOIST; MOBILE CONCRETE MIXER (OVER 5 TONS); PIPE BENDING MACHINE (PIPELINES ONLY); PIPE CLEANING MACHINE (TRACTOR PROPELLED AND SUPPORTED); PIPE WRAPPING MACHINE (TRACTOR PROPELLED AND SUPPORTED); ROLLER OPERATOR (ASPHALT); SELF-PROPELLED ELEVATING GRADE PLANE; SLUSHER OPERATOR; TRACTOR (WITH BOOM) (D-6, OR SIMILAR); TRENCHER (OVER 6 FEET AND LESS THAN 200 H.P.); WATER TANKER (PULLED BY EUCLIDS, T-PULLS, DW-10, 20 OR 21, OR SIMILAR); WINCHMAN (STERN WINCH ON DREDGE). BOOMS AND/OR LEADS (HOURLY PREMIUMS): THE OPERATOR OF A CRANE (UNDER 50 TONS) WITH A BOOM OF 80 FEET OR MORE (INCLUDING JIB), OR OF A CRANE (UNDER 50 TONS) WITH LEADS OF 100 FEET OR MORE, SHALL RECEIVE A PER HOUR PREMIUM FOR EACH HOUR WORKED ON SAID CRANE (UNDER 50 TONS) IN ACCORDANCE WITH THE FOLLOWING SCHEDULE: BOOMS OF 80 FEET UP TO BUT NOT INCLUDING 130 FEET OR LEADS OF 100 FEET UP TO BUT NOT INCLUDING 130 FEET 0.50 BOOMS AND/OR LEADS OF 130 FEET UP TO BUT NOT INCLUDING 180 FEET 0.75 BOOMS AND/OR LEADS OF 180 FEET UP TO AND INCLUDING 250 FEET 1.15 BOOMS AND/OR LEADS OVER 250 FEET 1.50 THE OPERATOR OF A CRANE (50 TONS AND OVER) WITH A BOOM OF 180 FEET OR MORE (INCLUDING JIB) SHALL RECEIVE A PER HOUR PREMIUM FOR EACH HOUR WORKED ON SAID CRANE (50 TONS AND OVER) IN ACCORDANCE WITH THE FOLLOWING SCHEDULE: BOOMS OF 180 FEET UP TO AND INCLUDING 250 FEET 1.25 BOOMS OVER 250 FEET 1.75

$59.79$35.68$95.47no changeAgreement, 2025
POWER EQUIPMENT OPERATOR - TUNNEL WORK, GROUP 6…
Full text

POWER EQUIPMENT OPERATOR - TUNNEL WORK, GROUP 6: BOOM TRUCK OR DUAL PURPOSE ""A""FRAME TRUCK (OVER 5 TONS); COMBINATION LOADER/BACKHOE (UP TO AND INCLUDING 3/4 CU. YD.); CONCRETE BATCH PLANTS (WET OR DRY); CONCRETE CUTTER, GROOVER AND/OR GRINDER (SELF-PROPELLED UNIT ON STREETS, HIGHWAYS, AIRPORTS, AND CANALS); CONVEYOR OR CONCRETE PUMP (TRUCK OR EQUIPMENT MOUNTED); DRILLING MACHINERY (NOT TO APPLY TO WATERLINERS, WAGON DRILLS OR JACK HAMMERS); FORK LIFT (OVER 10 TONS); LOADER (UP TO AND INCLUDING 3 AND 1/2 CU. YDS); LULL HIGH LIFT (UNDER 40 FEET); LUBRICATION AND SERVICE ENGINEER (MOBILE); MAGINNIS INTERNAL FULL SLAB VIBRATOR (ON AIRPORTS, HIGHWAYS, CANALS AND WAREHOUSES); MAN OR MATERIAL HOIST; MECHANICAL CONCRETE FINISHER (LARGE CLARY, JOHNSON BIDWELL, BRIDGE DECK AND SIMILAR); MOBILE TRUCK CRANE DRIVER; PORTABLE SHOTBLAST CONCRETE CLEANING MACHINE; PORTABLE BORING MACHINE (UNDER STREETS, HIGHWAYS, ETC.); PORTABLE CRUSHER; POWER JUMBO OPERATOR (SETTING SLIP FORMS, ETC., IN TUNNELS); ROLLERS (OVER 5 TONS); SELF-PROPELLED COMPACTOR (SINGLE ENGINE); SELF-PROPELLED PAVEMENT BREAKER; SKIDSTEER LOADER WITH ATTACHMENTS; SLIP FORM PUMPS (POWER DRIVEN BY HYDRAULIC, ELECTRIC, AIR, GAS, ETC., LIFTING DEVICE FOR CONCRETE FORMS); SMALL RUBBER TIRED TRACTORS; TRENCHER (UP TO AND INCLUDING 6 FEET); UNDERBRIDGE PERSONNEL AERIAL PLATFORM (50 FEET OF PLATFORM OR LESS). BOOMS AND/OR LEADS (HOURLY PREMIUMS): THE OPERATOR OF A CRANE (UNDER 50 TONS) WITH A BOOM OF 80 FEET OR MORE (INCLUDING JIB), OR OF A CRANE (UNDER 50 TONS) WITH LEADS OF 100 FEET OR MORE, SHALL RECEIVE A PER HOUR PREMIUM FOR EACH HOUR WORKED ON SAID CRANE (UNDER 50 TONS) IN ACCORDANCE WITH THE FOLLOWING SCHEDULE: BOOMS OF 80 FEET UP TO BUT NOT INCLUDING 130 FEET OR LEADS OF 100 FEET UP TO BUT NOT INCLUDING 130 FEET 0.50 BOOMS AND/OR LEADS OF 130 FEET UP TO BUT NOT INCLUDING 180 FEET 0.75 BOOMS AND/OR LEADS OF 180 FEET UP TO AND INCLUDING 250 FEET 1.15 BOOMS AND/OR LEADS OVER 250 FEET 1.50 THE OPERATOR OF A CRANE (50 TONS AND OVER) WITH A BOOM OF 180 FEET OR MORE (INCLUDING JIB) SHALL RECEIVE A PER HOUR PREMIUM FOR EACH HOUR WORKED ON SAID CRANE (50 TONS AND OVER) IN ACCORDANCE WITH THE FOLLOWING SCHEDULE: BOOMS OF 180 FEET UP TO AND INCLUDING 250 FEET 1.25 BOOMS OVER 250 FEET 1.75

$59.47$35.68$95.15no changeAgreement, 2025
POWER EQUIPMENT OPERATOR - TUNNEL WORK, GROUP 5…
Full text

POWER EQUIPMENT OPERATOR - TUNNEL WORK, GROUP 5: ASPHALT PLANT FIREMAN; COMPRESSORS, PUMPS, GENERATORS AND WELDING MACHINES (""BANK"" OF 9 OR MORE, INDIVIDUALLY OR COLLECTIVELY); CONCRETE PUMPS OR PUMPCRETE GUNS; LUBRICATION AND SERVICE ENGINEER (GREASE RACK); SCREEDMAN. BOOMS AND/OR LEADS (HOURLY PREMIUMS): THE OPERATOR OF A CRANE (UNDER 50 TONS) WITH A BOOM OF 80 FEET OR MORE (INCLUDING JIB), OR OF A CRANE (UNDER 50 TONS) WITH LEADS OF 100 FEET OR MORE, SHALL RECEIVE A PER HOUR PREMIUM FOR EACH HOUR WORKED ON SAID CRANE (UNDER 50 TONS) IN ACCORDANCE WITH THE FOLLOWING SCHEDULE: BOOMS OF 80 FEET UP TO BUT NOT INCLUDING 130 FEET OR LEADS OF 100 FEET UP TO BUT NOT INCLUDING 130 FEET 0.50 BOOMS AND/OR LEADS OF 130 FEET UP TO BUT NOT INCLUDING 180 FEET 0.75 BOOMS AND/OR LEADS OF 180 FEET UP TO AND INCLUDING 250 FEET 1.15 BOOMS AND/OR LEADS OVER 250 FEET 1.50 THE OPERATOR OF A CRANE (50 TONS AND OVER) WITH A BOOM OF 180 FEET OR MORE (INCLUDING JIB) SHALL RECEIVE A PER HOUR PREMIUM FOR EACH HOUR WORKED ON SAID CRANE (50 TONS AND OVER) IN ACCORDANCE WITH THE FOLLOWING SCHEDULE: BOOMS OF 180 FEET UP TO AND INCLUDING 250 FEET 1.25 BOOMS OVER 250 FEET 1.75

$58.82$35.68$94.50no changeAgreement, 2025
POWER EQUIPMENT OPERATOR - TUNNEL WORK, GROUP 4…
Full text

POWER EQUIPMENT OPERATOR - TUNNEL WORK, GROUP 4: BOOM TRUCK OR DUAL PURPOSE ""A"" FRAME TRUCK (5 TONS OR LESS); CONCRETE PLACING BOOM (BUILDING CONSTRUCTION); DINKY OPERATOR; ELEVATOR OPERATOR; HOIST AND/OR WINCH (ONE DRUM); STRADDLE TRUCK (ROSS CARRIER, HYSTER AND SIMILAR BOOMS AND/OR LEADS (HOURLY PREMIUMS): THE OPERATOR OF A CRANE (UNDER 50 TONS) WITH A BOOM OF 80 FEET OR MORE (INCLUDING JIB), OR OF A CRANE (UNDER 50 TONS) WITH LEADS OF 100 FEET OR MORE, SHALL RECEIVE A PER HOUR PREMIUM FOR EACH HOUR WORKED ON SAID CRANE (UNDER 50 TONS) IN ACCORDANCE WITH THE FOLLOWING SCHEDULE: BOOMS OF 80 FEET UP TO BUT NOT INCLUDING 130 FEET OR LEADS OF 100 FEET UP TO BUT NOT INCLUDING 130 FEET 0.50 BOOMS AND/OR LEADS OF 130 FEET UP TO BUT NOT INCLUDING 180 FEET 0.75 BOOMS AND/OR LEADS OF 180 FEET UP TO AND INCLUDING 250 FEET 1.15 BOOMS AND/OR LEADS OVER 250 FEET 1.50 THE OPERATOR OF A CRANE (50 TONS AND OVER) WITH A BOOM OF 180 FEET OR MORE (INCLUDING JIB) SHALL RECEIVE A PER HOUR PREMIUM FOR EACH HOUR WORKED ON SAID CRANE (50 TONS AND OVER) IN ACCORDANCE WITH THE FOLLOWING SCHEDULE: BOOMS OF 180 FEET UP TO AND INCLUDING 250 FEET 1.25 BOOMS OVER 250 FEET 1.75

$58.51$35.68$94.19no changeAgreement, 2025
POWER EQUIPMENT OPERATOR - TUNNEL WORK, GROUP 3…
Full text

POWER EQUIPMENT OPERATOR - TUNNEL WORK, GROUP 3: BRAKEMAN; DECKHAND; FIREMAN; OILER; OILER/GRADECHECKER; SIGNALMAN; SWITCHMAN; HIGHLINE CABLEWAY SIGNALMAN; BARGEMAN; BUNKERMAN; CONCRETE CURING MACHINE (SELF-PROPELLED, AUTOMATICALLY APPLIED UNIT ON STREETS, HIGHWAYS, AIRPORTS AND CANALS); LEVEEMAN; ROLLER (5 TONS AND UNDER); TUGGER HOIST. BOOMS AND/OR LEADS (HOURLY PREMIUMS): THE OPERATOR OF A CRANE (UNDER 50 TONS) WITH A BOOM OF 80 FEET OR MORE (INCLUDING JIB), OR OF A CRANE (UNDER 50 TONS) WITH LEADS OF 100 FEET OR MORE, SHALL RECEIVE A PER HOUR PREMIUM FOR EACH HOUR WORKED ON SAID CRANE (UNDER 50 TONS) IN ACCORDANCE WITH THE FOLLOWING SCHEDULE: BOOMS OF 80 FEET UP TO BUT NOT INCLUDING 130 FEET OR LEADS OF 100 FEET UP TO BUT NOT INCLUDING 130 FEET 0.50 BOOMS AND/OR LEADS OF 130 FEET UP TO BUT NOT INCLUDING 180 FEET 0.75 BOOMS AND/OR LEADS OF 180 FEET UP TO AND INCLUDING 250 FEET 1.15 BOOMS AND/OR LEADS OVER 250 FEET 1.50 THE OPERATOR OF A CRANE (50 TONS AND OVER) WITH A BOOM OF 180 FEET OR MORE (INCLUDING JIB) SHALL RECEIVE A PER HOUR PREMIUM FOR EACH HOUR WORKED ON SAID CRANE (50 TONS AND OVER) IN ACCORDANCE WITH THE FOLLOWING SCHEDULE: BOOMS OF 180 FEET UP TO AND INCLUDING 250 FEET 1.25 BOOMS OVER 250 FEET 1.75

$58.24$35.68$93.92no changeAgreement, 2025
POWER EQUIPMENT OPERATOR - TUNNEL WORK, GROUP 2…
Full text

POWER EQUIPMENT OPERATOR - TUNNEL WORK, GROUP 2: CONVEYOR OPERATOR (HANDLING BUILDING MATERIAL); HYDRAULIC MONITOR; MIXER BOX OPERATOR (CONCRETE PLANT). BOOMS AND/OR LEADS (HOURLY PREMIUMS): THE OPERATOR OF A CRANE (UNDER 50 TONS) WITH A BOOM OF 80 FEET OR MORE (INCLUDING JIB), OR OF A CRANE (UNDER 50 TONS) WITH LEADS OF 100 FEET OR MORE, SHALL RECEIVE A PER HOUR PREMIUM FOR EACH HOUR WORKED ON SAID CRANE (UNDER 50 TONS) IN ACCORDANCE WITH THE FOLLOWING SCHEDULE: BOOMS OF 80 FEET UP TO BUT NOT INCLUDING 130 FEET OR LEADS OF 100 FEET UP TO BUT NOT INCLUDING 130 FEET 0.50 BOOMS AND/OR LEADS OF 130 FEET UP TO BUT NOT INCLUDING 180 FEET 0.75 BOOMS AND/OR LEADS OF 180 FEET UP TO AND INCLUDING 250 FEET 1.15 BOOMS AND/OR LEADS OVER 250 FEET 1.50 THE OPERATOR OF A CRANE (50 TONS AND OVER) WITH A BOOM OF 180 FEET OR MORE (INCLUDING JIB) SHALL RECEIVE A PER HOUR PREMIUM FOR EACH HOUR WORKED ON SAID CRANE (50 TONS AND OVER) IN ACCORDANCE WITH THE FOLLOWING SCHEDULE: BOOMS OF 180 FEET UP TO AND INCLUDING 250 FEET 1.25 BOOMS OVER 250 FEET 1.75

$58.07$35.68$93.75no changeAgreement, 2025
POWER EQUIPMENT OPERATOR - TUNNEL WORK, GROUP 1…
Full text

POWER EQUIPMENT OPERATOR - TUNNEL WORK, GROUP 1: FORK LIFT (UP TO AND INCLUDING 10 TONS); PARTSMAN (HEAVY DUTY REPAIR SHOP PARTS ROOM WHEN NEEDED). BOOMS AND/OR LEADS (HOURLY PREMIUMS): THE OPERATOR OF A CRANE (UNDER 50 TONS) WITH A BOOM OF 80 FEET OR MORE (INCLUDING JIB), OR OF A CRANE (UNDER 50 TONS) WITH LEADS OF 100 FEET OR MORE, SHALL RECEIVE A PER HOUR PREMIUM FOR EACH HOUR WORKED ON SAID CRANE (UNDER 50 TONS) IN ACCORDANCE WITH THE FOLLOWING SCHEDULE: BOOMS OF 80 FEET UP TO BUT NOT INCLUDING 130 FEET OR LEADS OF 100 FEET UP TO BUT NOT INCLUDING 130 FEET 0.50 BOOMS AND/OR LEADS OF 130 FEET UP TO BUT NOT INCLUDING 180 FEET 0.75 BOOMS AND/OR LEADS OF 180 FEET UP TO AND INCLUDING 250 FEET 1.15 BOOMS AND/OR LEADS OVER 250 FEET 1.50 THE OPERATOR OF A CRANE (50 TONS AND OVER) WITH A BOOM OF 180 FEET OR MORE (INCLUDING JIB) SHALL RECEIVE A PER HOUR PREMIUM FOR EACH HOUR WORKED ON SAID CRANE (50 TONS AND OVER) IN ACCORDANCE WITH THE FOLLOWING SCHEDULE: BOOMS OF 180 FEET UP TO AND INCLUDING 250 FEET 1.25 BOOMS OVER 250 FEET 1.75

$57.96$35.68$93.64no changeAgreement, 2025
HELICOPTER WORK: PILOT OF HELICOPTER$62.83$35.68$98.51no changeAgreement, 2025
HELICOPTER WORK: CO-PILOT OF HELICOPTER$61.66$35.68$97.34no changeAgreement, 2025
HELICOPTER WORK, AIRBORNE HOIST OPERATOR FOR HELICOPTER$61.52$35.68$97.20no changeAgreement, 2025
DIVER: OTHER THAN AQUA LUNG$81.72$35.68$117.40—Agreement, 2025
DIVER: (AQUA LUNG) (SCUBA) (up to 30 feet)$72.35$35.68$108.03no changeAgreement, 2025
DIVER: (AQUA LUNG) (SCUBA) (over 30 feet)$81.72$35.68$117.40—Agreement, 2025
DIVER TENDER: OTHER THAN AQUA LUNG$59.94$35.68$95.62no changeAgreement, 2025
ENGI0003-004 · Operating Engineers agreement, September 1, 2025
DREDGING:, HYDRAULIC SUCTION DREDGES: GROUP 7…
Full text

DREDGING:, HYDRAULIC SUCTION DREDGES: GROUP 7: DECKHAND (CAN OPERATE ANCHOR SCOW UNDER DIRECTION OF DECKMATE); FIREMAN; LEVEEMAN; OILER

$57.94$35.68$93.62no changeAgreement, 2025
DREDGING:, HYDRAULIC SUCTION DREDGES: GROUP 6: WINCHMAN (STERN WINCH ON DREDGE)$59.49$35.68$95.17no changeAgreement, 2025
DREDGING:, HYDRAULIC SUCTION DREDGES: GROUP 5: DECKMATE.$59.60$35.68$95.28no changeAgreement, 2025
DREDGING:, HYDRAULIC SUCTION DREDGES: GROUP 4: DOZER OPERATOR.$59.94$35.68$95.62no changeAgreement, 2025
DREDGING:, HYDRAULIC SUCTION DREDGES: GROUP 3: MECHANIC OR WELDER.$60.00$35.68$95.68no changeAgreement, 2025
DREDGING:, HYDRAULIC SUCTION DREDGES: GROUP 2: WATCH ENGINEER (STEAM OR ELECTRIC).$60.15$35.68$95.83no changeAgreement, 2025
DREDGING:, HYDRAULIC SUCTION DREDGES: GROUP 1: LEVERMAN.$60.30$35.68$95.98no changeAgreement, 2025
DREDGING:, DERRICKS: GROUP 4: DECKHAND, FIREMAN, OILER$57.94$35.68$93.62no changeAgreement, 2025
DREDGING:, DERRICKS: GROUP 3…
Full text

DREDGING:, DERRICKS: GROUP 3: DECKMATE; SAURMAN TYPE DRAGLINE (UP TO AND INCLUDING 5 YARDS).

$59.60$35.68$95.28no changeAgreement, 2025
DREDGING:, DERRICKS: GROUP 2: SAURMAN TYPE DRAGLINE (OVER 5 CUBIC YARDS).$60.00$35.68$95.68no changeAgreement, 2025
DREDGING:, DERRICKS: GROUP 1: OPERATORS (DERRICKS, PILEDRIVERS AND CRANES).$60.66$35.68$96.34no changeAgreement, 2025
DREDGING:, CLAMSHELL OR DIPPER DREDGING: GROUP 4…
Full text

DREDGING:, CLAMSHELL OR DIPPER DREDGING: GROUP 4: BARGEMAN; DECKHAND; FIREMAN; OILER. HYDRAULIC SUCTION DREDGING CLASSIFICATIONS

$57.94$35.68$93.62no changeAgreement, 2025
DREDGING:, CLAMSHELL OR DIPPER DREDGING: GROUP 3: BARGE MATE; DECKMATE$59.60$35.68$95.28no changeAgreement, 2025
DREDGING:, CLAMSHELL OR DIPPER DREDGING: GROUP 2: MECHANIC OR WELDER; WATCH ENGINEER$60.00$35.68$95.68no changeAgreement, 2025
DREDGING:, CLAMSHELL OR DIPPER DREDGING: GROUP 1: CLAMSHELL OR DIPPER OPERATOR$60.66$35.68$96.34no changeAgreement, 2025
DREDGING (BOAT OPERATORS): MASTER BOAT OPERATOR$60.30$35.68$95.98no changeAgreement, 2025
DREDGING (BOAT OPERATORS): BOAT OPERATOR$60.15$35.68$95.83no changeAgreement, 2025
DREDGING (BOAT OPERATORS): BOAT DECKHAND$57.94$35.68$93.62no changeAgreement, 2025
ENGI0003-044 · Operating Engineers agreement, September 1, 2025
POWER EQUIPMENT OPERATORS (PAVING): SOIL STABILIZER$59.47$34.86$94.33no changeAgreement, 2025
POWER EQUIPMENT OPERATORS (PAVING): SCREED PERSON$58.64$34.86$93.50no changeAgreement, 2025
POWER EQUIPMENT OPERATORS (PAVING): ROLLER OPERATOR (OVER FIVE TONS)$58.84$34.86$93.70no changeAgreement, 2025
POWER EQUIPMENT OPERATORS (PAVING): ROLLER OPERATOR (FIVE TONS AND UNDER)$57.41$34.86$92.27no changeAgreement, 2025
POWER EQUIPMENT OPERATORS…
Full text

POWER EQUIPMENT OPERATORS (PAVING): LOADER (OVER 2 1/2 CU. YDS. TO AND INCLUDING 5 CU. YDS.)

$58.96$34.86$93.82no changeAgreement, 2025
POWER EQUIPMENT OPERATORS (PAVING): LOADER (2 1/2 CU. YDS. AND UNDER)$58.64$34.86$93.50no changeAgreement, 2025
POWER EQUIPMENT OPERATORS (PAVING): LABORER, HAND ROLLER$57.18$34.86$92.04no changeAgreement, 2025
POWER EQUIPMENT OPERATORS (PAVING): GRADER$59.47$34.86$94.33no changeAgreement, 2025
POWER EQUIPMENT OPERATORS…
Full text

POWER EQUIPMENT OPERATORS (PAVING): CONCRETE SAWS AND/OR GRINDER (SELF-PROPELLED UNIT ON STREETS, HIGHWAYS, AIRPORTS AND CANALS)

$58.64$34.86$93.50no changeAgreement, 2025
POWER EQUIPMENT OPERATORS (PAVING): COMBINATION LOADER/BACKHOE (UP TO 3/4 CU.YD.)$56.70$34.86$91.56no changeAgreement, 2025
POWER EQUIPMENT OPERATORS (PAVING): COMBINATION LOADER/BACKHOE (OVER 3/4 CU.YD.)$57.68$34.86$92.54no changeAgreement, 2025
POWER EQUIPMENT OPERATORS (PAVING): COLD PLANER$59.47$34.86$94.33no changeAgreement, 2025
POWER EQUIPMENT OPERATORS (PAVING): ASPHALT SPREADER OPERATOR$59.16$34.86$94.02no changeAgreement, 2025
POWER EQUIPMENT OPERATORS (PAVING): ASPHALT RAKER$57.68$34.86$92.54no changeAgreement, 2025
POWER EQUIPMENT OPERATORS (PAVING): ASPHALT PLANT OPERATOR$59.07$34.86$93.93no changeAgreement, 2025
POWER EQUIPMENT OPERATORS (PAVING): ASPHALT CONCRETE MATERIAL TRANSFER$58.67$34.86$93.53no changeAgreement, 2025
IRON0625-001 · Ironworkers agreement, September 1, 2025
IRONWORKERS A. EMPLOYEES WILL BE PAID $.50 PER HOUR MORE WHILE WORKING IN TUNNELS AND COFFER DAMS…
Full text

IRONWORKERS A. EMPLOYEES WILL BE PAID $.50 PER HOUR MORE WHILE WORKING IN TUNNELS AND COFFER DAMS; $1.00 PER HOUR MORE WHEN REQUIRED TO WORK UNDER OR ARE COVERED WITH WATER (SUBMERGED) AND WHEN THEY ARE REQUIRED TO WORK ON THE SUMMIT OF MAUNA KEA, MAUNA LOA OR HALEAKALA

$50.50$43.46$93.96+$4.10 (+4.6%)Agreement, 2025
LABO0368-001 · Laborers agreement, September 2, 2024
LABORERS: WINDOW WASHER (BOSUN CHAIR)$41.25$25.96$67.21no changeAgreement, 2024
LABORERS: POWDERMAN$42.75$25.96$68.71no changeAgreement, 2024
LABORERS: MASON TENDER/HOD CARRIER$42.25$25.96$68.21no changeAgreement, 2024
LABORERS: GUNITE/SHOTCRETE OPERATOR AND HIGH SCALER$42.25$25.96$68.21no changeAgreement, 2024
LABORERS: FINAL CLEAN UP$31.40$21.37$52.77no changeAgreement, 2024
LABORERS: DRILLER$44.75$25.96$70.71no changeAgreement, 2024
LABO0368-002 · Laborers agreement, September 3, 2024
LANDSCAPE & IRRIGATION LABORERS: GROUP 2…
Full text

LANDSCAPE & IRRIGATION LABORERS: GROUP 2 LAYOUT OF IRRIGATION AND OTHER NON-POTABLE IRRIGATION WATER SYSTEMS AND THE LAYOUT OF DRINKING FOUNTAINS AND OTHER POTABLE IRRIGATION WATER SYSTEMS IN CONNECTION WITH SUCH LANDSCAPING AND IRRIGATION WORK. THIS INCLUDES THE LAYOUT OF ALL HEADS, RISERS, VALVES, VALVE BOXES, VACUUM BREAKERS, LOW VOLTAGE ELECTRICAL LINES, HYDRAULIC AND ELECTRICAL CONTROLLERS, AND METALLIC (COPPERS, BRASS, GALVANIZED, OR SIMILAR) PIPE, AS WELL AS PVC OR OTHER PLASTIC PIPE. THIS WORK ALSO INCLUDES THE READING AND INTERPRETATION OF PLANS AND SPECIFICATIONS IN CONNECTION WITH THE LAYOUT OF LANDSCAPING, ROCKSCAPE, WATERSCAPE, AND IRRIGATION WORK; OPERATION OF HYDRO-MULCHING MACHINES (SPRAYMAN AND DRIVER), DRILLERS, TRENCHERS (RIDING TYPE, DAVIS T-66, AND SIMILAR) AND FORK LIFTS USED IN CONNECTION WITH THE PERFORMANCE OF SUCH LANDSCAPING AND IRRIGATION WORK; TREE CLIMBERS AND CHAIN SAW TREE TRIMMERS, SPORADIC OPERATION (WHEN USED IN CONNECTION WITH LANDSCAPING, ROCKSCAPE, WATERSCAPE, AND IRRIGATION WORK) OF SKID-STEER LOADERS (BOBCAT AND SIMILAR), CRANES (BANTAM, GROVE, AND SIMILAR), HOPTOS, BACKHOES, LOADERS, ROLLERS, AND DOZERS (CASE, JOHN DEERE, AND SIMILAR), WATER TRUCKS, TRUCKS REQUIRING A STATE OF HAWAII PUBLIC UTILITIES COMMISSION TYPE 5 AND/OR TYPE 7 LICENSE, SIT-DOWN TYPE AND ""GANG"" MOWERS, AND OTHER SELF-PROPELLED, SIT-DOWN OPERATED MACHINES NOT LISTED UNDER LANDSCAPE & IRRIGATION MAINTENANCE LABORER; CHEMICAL SPRAYING USING SELF-PROPELLED POWER SPRAYING EQUIPMENT (200 GALLON CAPACITY OR MORE)

$29.40$17.15$46.55—Agreement, 2024
LANDSCAPE & IRRIGATION LABORERS,GROUP 2…
Full text

LANDSCAPE & IRRIGATION LABORERS,GROUP 2: LAYOUT OF IRRIGATION AND OTHER NON-POTABLE IRRIGATION WATER SYSTEMS AND THE LAYOUT OF DRINKING FOUNTAINS AND OTHER POTABLE IRRIGATION WATER SYSTEMS IN CONNECTION WITH SUCH LANDSCAPING AND IRRIGATION WORK. THIS INCLUDES THE LAYOUT OF ALL HEADS, RISERS, VALVES, VALVE BOXES, VACUUM BREAKERS, LOW VOLTAGE ELECTRICAL LINES, HYDRAULIC AND ELECTRICAL CONTROLLERS, AND METALLIC (COPPERS, BRASS, GALVANIZED, OR SIMILAR) PIPE, AS WELL AS PVC OR OTHER PLASTIC PIPE. THIS WORK ALSO INCLUDES THE READING AND INTERPRETATION OF PLANS AND SPECIFICATIONS IN CONNECTION WITH THE LAYOUT OF LANDSCAPING, ROCKSCAPE, WATERSCAPE, AND IRRIGATION WORK; OPERATION OF HYDRO-MULCHING MACHINES (SPRAYMAN AND DRIVER), DRILLERS, TRENCHERS (RIDING TYPE, DAVIS T-66, AND SIMILAR) AND FORK LIFTS USED IN CONNECTION WITH THE PERFORMANCE OF SUCH LANDSCAPING AND IRRIGATION WORK; TREE CLIMBERS AND CHAIN SAW TREE TRIMMERS, SPORADIC OPERATION (WHEN USED IN CONNECTION WITH LANDSCAPING, ROCKSCAPE, WATERSCAPE, AND IRRIGATION WORK) OF SKID-STEER LOADERS (BOBCAT AND SIMILAR), CRANES (BANTAM, GROVE, AND SIMILAR), HOPTOS, BACKHOES, LOADERS, ROLLERS, AND DOZERS (CASE, JOHN DEERE, AND SIMILAR), WATER TRUCKS, TRUCKS REQUIRING A STATE OF HAWAII PUBLIC UTILITIES COMMISSION TYPE 5 AND/OR TYPE 7 LICENSE, SIT-DOWN TYPE AND ""GANG"" MOWERS, AND OTHER SELF-PROPELLED, SIT-DOWN OPERATED MACHINES NOT LISTED UNDER LANDSCAPE & IRRIGATION MAINTENANCE LABORER; CHEMICAL SPRAYING USING SELF-PROPELLED POWER SPRAYING EQUIPMENT (200 GALLON CAPACITY OR MORE)

$29.40$17.15$46.55—Agreement, 2024
LANDSCAPE & IRRIGATION LABORERS, GROUP 3…
Full text

LANDSCAPE & IRRIGATION LABORERS, GROUP 3: MAINTENANCE OF TREES, SHRUBS, GROUND COVERS, LAWNS AND OTHER PLANTED AREAS, INCLUDING THE REPLANTING OF TREES, SHRUBS, GROUND COVERS, AND OTHER PLANTINGS THAT DID NOT ""TAKE"" OR WHICH ARE DAMAGED; PROVIDED, HOWEVER, THAT RE-PLANTING THAT REQUIRES THE USE OF EQUIPMENT, MACHINERY, OR POWER TOOLS SHALL BE PAID FOR AT THE RATE OF PAY SPECIFIED UNDER LANDSCAPE AND IRRIGATION LABORER, GROUP 1; RAKING, MOWING, TRIMMING, AND RUNING, INCLUDING THE USE OF ""WEED EATERS"", HEDGE TRIMMERS, VACUUMS, BLOWERS, AND OTHER HAND-HELD GAS, AIR, ELECTRIC, OR SELF-POWERED TOOLS, AND THE OPERATION OF LAWN MOWERS (NOTE: THE OPERATION OF SIT-DOWN TYPE AND ""GANG"" MOWERS SHALL BE PAID FOR AT THE RATE OF PAY SPECIFIED UNDER LANDSCAPE & IRRIGATION LABORER, GROUP 2); GUYWIRING, STAKING, PROPPING, AND SUPPORTING TREES; FERTILIZING, CHEMICAL SPRAYING USING SPRAY EQUIPMENT WITH LESS THAN 200 GALLON CAPACITY, MAINTAINING IRRIGATION AND SPRINKLER SYSTEMS, INCLUDING THE STAKING, CLAMPING, AND ADJUSTMENT OF RISERS, AND THE ADJUSTMENT AND/OR REPLACEMENT OF SPRINKLER HEADS, (NOTE: THE CLEANING AND GLUING OF PIPE AND FITTINGS SHALL BE PAID FOR AT THE RATE OF PAY SPECIFIED UNDER LANDSCAPE & IRRIGATION LABORER(GROUP 1); WATERING BY HAND OR SPRINKLER SYSTEM AND THE PEFORMANCE OF OTHER TYPES OF GARDENING, YARDMAN, AND HORTICULTURAL-RELATED WORK

$23.00$17.15$40.15no changeAgreement, 2024
LANDSCAPE & IRRIGATION LABORERS, GROUP 1…
Full text

LANDSCAPE & IRRIGATION LABORERS, GROUP 1: INSTALLATION OF NON-POTABLE PERMANENT OR TEMPORARY IRRIGATION WATER SYSTEMS PERFORMED FOR THE PURPOSES OF LANDSCAPING AND IRRIGATION ARCHITECTURAL HORTICULTURAL WORK; THE INSTALLATION OF DRINKING FOUNTAINS AND PERMANENT OR TEMPORARY IRRIGATION SYSTEMS USING POTABLE WATER FOR LANDSCAPING AND IRRIGATION ARCHITECTURAL HORTICULTURAL PURPOSES ONLY. THIS WORK INCLUDES (A) THE INSTALLATION OF ALL HEADS, RISERS, VALVES, VALVE BOXES, VACUUM BREAKERS (PRESSURE AND NON-PRESSURE), LOW VOLTAGE ELECTRICAL LINES AND, PROVIDED SUCH WORK INVOLVES ELECTRICAL WIRING THAT WILL CARRY 24 VOLTS OR LESS, THE INSTALLATION OF SENSORS, MASTER CONTROL PANELS, DISPLAY BOARDS, JUNCTION BOXES, CONDUCTORS, INCLUDING ALL OTHER COMPONENTS FOR CONTROLLERS, (B) AND METALLIC (COPPER, BRASS, GALVANIZED, OR SIMILAR) PIPE, AS WELL AS PVC OR OTHER PLASTIC PIPE INCLUDING ALL WORK INCIDENTAL THERETO, I.E., UNLOADING, HANDLING AND DISTRIBUTION OF ALL PIPES FITTINGS, TOOLS, MATERIALS AND EQUIPMENT, (C) ALL SOLDERING WORK IN CONNECTION WITH THE ABOVE WHETHER DONE BY TORCH, SOLDERING IRON, OR OTHER MEANS; (D) TIE-IN TO MAIN LINES, THRUST BLOCKS (BOTH PRECAST AND POURED IN PLACE), PIPE HANGERS AND SUPPORTS INCIDENTAL TO INSTALLATION OF THE ENTIRE IRRIGATION SYSTEM, (E) MAKING OF PRESSURE TESTS, START-UP TESTING, FLUSHING, PURGING, WATER BALANCING, PLACING INTO OPERATION ALL IRRIGATION EQUIPMENT, FIXTURES AND APPURTENANCES INSTALLED UNDER THIS AGREEMENT, AND (F) THE FABRICATION, REPLACEMENT, REPAIR AND SERVICING OFLANDSCAPING AND IRRIGATION SYSTEMS. OPERATION OF HAND-HELD GAS, AIR, ELECTRIC, OR SELF-POWERED TOOLS AND EQUIPMENT USED IN THE PERFORMANCE OF LANDSCAPE AND IRRIGATION WORK IN CONNECTION WITH ARCHITECTURAL HORTICULTURE; CHOKE-SETTING, SIGNALING, AND RIGGING FOR EQUIPMENT OPERATORS ON JOB-SITE IN THE PERFORMANCE OF SUCH LANDSCAPING AND IRRIGATION WORK; CONCRETE WORK (WET OR DRY) PERFORMED IN CONNECTION WITH SUCH LANDSCAPING AND IRRIGATION WORK. THIS WORK SHALL ALSO INCLUDE THE SETTING OF ROCK, STONE, OR RIPRAP IN CONNECTION WITH SUCH LANDSCAPE, WATERSCAPE, ROCKSCAPE, AND IRRIGATION WORK; GRUBBING, PICK AND SHOVEL EXCAVATION, AND HAND ROLLING OR TAMPING IN CONNECTION WITH THE PERFORMANCE OF SUCH LANDSCAPING AND IRRIGATION WORK; SPRIGGING, HANDSEEDING, AND PLANTING OF TREES, SHRUBS, GROUND COVERS, AND OTHER PLANTINGS AND THE PERFORMANCE OF ALL TYPES OF GARDENING AND HORTICULTURAL WORK RELATING TO SAID PLANTING; OPERATION OF FLAT BED TRUCKS (UP TO AND INCLUDING 2 1/2 TONS).:

$28.40$17.15$45.55no changeAgreement, 2024
LABO0368-003 · Laborers agreement, September 2, 2024
UNDERGROUND LABORER, GROUP 7: SHIFTER (SHAFT WORK & RAISER)$46.40$25.91$72.31no changeAgreement, 2024
UNDERGROUND LABORER, GROUP 6: SHIFTER$45.95$25.91$71.86no changeAgreement, 2024
UNDERGROUND LABORER, GROUP 5…
Full text

UNDERGROUND LABORER, GROUP 5: SHAFT WORK & RAISE (BELOW ACTUAL OR EXCAVATED GROUND LEVEL); DIAMOND DRILLER; GUNITE OR SHOTCRETE NOZZLEMAN; RODMAN; GROUNDMAN

$45.70$25.91$71.61no changeAgreement, 2024
UNDERGROUND LABORER, GROUP 4…
Full text

UNDERGROUND LABORER, GROUP 4: MINERS - TUNNEL (INCLUDING TOP AND BOTTOM MAN ON SHAFT AND RAISE WORK); TIMBERMAN, RETIMBERMAN (WOOD OR STEEL OR SUBSTITUTE MATERIALS THEREOF); BLASTERS, DRILLERS, POWDERMAN (IN HEADING); MICROTUNNEL LABORER; HEADMAN; CHERRY PICKERMAN (WHERE CAR IS LIFTED); NIPPER; GROUT GUNMEN; GROUT PUMPMAN & POTMAN; GUNITE, SHOTCRETE GUNMEN & POTMEN; CONCRETE FINISHER (IN TUNNEL); CONCRETE SCREED MAN; BIT GRINDER; STEEL FORM RAISERS & SETTERS; HIGH PRESSURE NOZZLEMAN; NOZZLEMAN (ON SLICK LINE); SANDBLASTER-POTMAN (COMBINATION WORK ASSIGNMENT INTERCHANGEABLE); TUGGER

$45.35$25.91$71.26no changeAgreement, 2024
UNDERGROUND LABORER, GROUP 3…
Full text

UNDERGROUND LABORER, GROUP 3: CHUCKTENDERS AND CABLETENDERS; POWDERMAN (PRIME HOUSE); VIBRATORMAN, PAVEMENT BREAKERS

$44.35$25.91$70.26no changeAgreement, 2024
UNDERGROUND LABORER, GROUP 2…
Full text

UNDERGROUND LABORER, GROUP 2: SWAMPER; BRAKEMAN; BULL GANG-MUCKERS, TRACKMEN; DUMPMEN (ANY METHOD); CONCRETE CREW (INCLUDES RODDING AND SPREADING); GROUT CREW; REBOUNDMEN

$43.85$25.91$69.76no changeAgreement, 2024
UNDERGROUND LABORER, GROUP 1: WATCHMEN; CHANGE HOUSE ATTENDANT$42.35$25.91$68.26no changeAgreement, 2024
PAIN1791-001 · Painters and Allied Trades agreement, July 1, 2025
PAINTERS: SANDBLASTER; SPRAY$44.05$30.05$74.10no changeAgreement, 2025
PAINTERS: BRUSH$44.05$30.05$74.10no changeAgreement, 2025
PAIN1889-001 · Painters and Allied Trades agreement, July 1, 2025
GLAZIERS$48.50$40.20$88.70no changeAgreement, 2025
PAIN1926-001 · Painters and Allied Trades agreement, March 2, 2025
SOFT FLOOR LAYERS$43.27$35.18$78.45no changeAgreement, 2025
PAIN1944-001 · Painters and Allied Trades agreement, January 1, 2025
TAPER$47.36$32.00$79.36no changeAgreement, 2025
PLAS0630-001 · Plasterers and Cement Masons agreement, September 4, 2023
PLASTERER$46.12$34.53$80.65no changeAgreement, 2023
PLAS0630-002 · Plasterers and Cement Masons agreement, September 4, 2023
CEMENT MASONS: TROWEL MACHINE OPERATORS$44.27$33.63$77.90no changeAgreement, 2023
CEMENT MASONS$44.12$33.63$77.75no changeAgreement, 2023
PLUM0675-001 · Plumbers and Pipefitters agreement, July 6, 2025
PLUMBER, PIPEFITTER, STEAMFITTER & SPRINKLER FITTER$53.83$33.19$87.02no changeAgreement, 2025
ROOF0221-001 · Roofers agreement, September 6, 2026
ROOFERS (INCLUDING BUILT UP, COMPOSITION AND SINGLE PLY)$45.55$23.36$68.91+$4.55 (+7.1%)Agreement, 2026
SHEE0293-001 · Sheet Metal Workers agreement, March 2, 2025
SHEET METAL WORKER$50.16$33.32$83.48no changeAgreement, 2025
SUHI1997-002 · Survey of contractors in HI, September 15, 1997
DRAPERY INSTALLER$13.60$1.20$14.80no changeSurvey, 1997

Modification history

Modification 1January 16, 2026
Modification 2May 18, 2026
Modification 3May 27, 2026
Modification 4October 15, 2026 (current)

Published by the Wage and Hour Division; read from sam.gov. The sheet is checked for a newer modification each day. Contracts awarded since January 1, 2017 also carry Executive Order 13706 paid sick leave (one hour per 30 worked, up to 56 a year).

Questions people ask

Which rate do I pay on HI20260001?
The line for the classification of work actually performed: the basic rate plus the fringe. You may pay the fringe into benefit plans, as cash on every hour, or a mix. Overtime after 40 hours is 1.5 times the basic rate; fringe is paid on every hour and never multiplied.
My trade is not on this sheet. What do I do?
Do not borrow the nearest name. Ask the contracting agency for a conformance on Standard Form 1444 before the first week of that work, and note it as pending on the payroll.
Does modification 4 apply to my contract?
Only if it was in force when your contract was awarded (generally at bid opening). An earlier modification locked into the contract keeps applying, except on option years, added scope and indefinite-quantity contracts. The number and modification are on the first page of the exhibit in your contract.

How to read a wage determination · Paying the fringe in cash or through plans · Overtime on these rates · Fringe credit calculator

Put these rates on a certified payroll.

Start here and HI20260001 is already filled in when you set up the job. CertifiedHours loads this sheet, checks every line against it as you type hours, and prints the WH-347. Free for one payroll a month.

Start a payroll on this sheet

On this sheet

  • 132 classifications in 26 rate groups
  • 25 from agreements, 1 from surveys
  • Counties: Hawaii, Honolulu, Kalawao, Kauai, Maui