Prevailing wage rates · Florida · Wage determination
Prevailing wage rates: Duval County, Florida
Residential construction · FL20260060 modification 1, published May 18, 2026
The short answer
This sheet sets 42 classifications for residential work in Duval County, Florida. Each line is a basic hourly rate plus a fringe rate, and the sum is the minimum you must pay for that work, from $7.95 an hour (laborer: landscape and irrigation) to $55.09 (plumber, including hvac pipe installation). Your contract may lock an earlier modification.
Scope
RESIDENTIAL CONSTRUCTION PROJECTS (consisting of single family homes and apartments up to and including 4 stories)
Rates by classification
Total is the basic rate plus the fringe. Source is the agreement or survey the rate came from; a marker means the group changed in this modification. A dagger (†) means the fringe carries a footnote or percentage the total does not include; read the group’s notes.
| Classification | Basic rate | Fringe | Total | Source |
|---|---|---|---|---|
| ENGI0673-009 · Operating Engineers agreement, May 1, 2024 | ||||
| POWER EQUIPMENT OPERATOR: OILER | $23.05 | $13.60 | $36.65 | Agreement |
| POWER EQUIPMENT OPERATOR: (GANTRY CRANE, BRIDGE CRANE) | $35.41 | $13.60 | $49.01 | Agreement |
POWER EQUIPMENT OPERATOR…Full textPOWER EQUIPMENT OPERATOR: (CRAWLER CRANE, HYDRO CRANE, LOCOMOTIVE CRANE, TOWER CRANE, TRUCK CRANE) | $35.41 | $13.60 | $49.01 | Agreement |
| PLUM0234-003 · Plumbers and Pipefitters agreement, September 1, 2025 | ||||
| PLUMBER, INCLUDING HVAC PIPE INSTALLATION | $37.50 | $17.59 | $55.09 | Agreement |
| SHEE0435-001 · Sheet Metal Workers agreement, April 1, 2025 | ||||
| SHEET METAL WORKER (EXCLUDES HVAC DUCT AND METAL ROOF INSTALLATION) | $31.64 | $15.98 | $47.62 | Agreement |
| SUFL2009-099 · Survey of contractors in FL, June 8, 2009 | ||||
| TRUCK DRIVER: LOWBOY TRUCK | $12.12 | $0.00 | $12.12 | Survey |
| TRUCK DRIVER, INCLUDES DUMP TRUCK | $10.62 | $0.00 | $10.62 | Survey |
| TILE SETTER | $10.00 | $0.00 | $10.00 | Survey |
| ROOFER: METAL ROOF | $16.99 | $0.00 | $16.99 | Survey |
ROOFER, INCLUDES BUILT UP…Full textROOFER, INCLUDES BUILT UP, MODIFIED BITUMEN, AND SHAKE & SHINGLE ROOFS (EXCLUDES METAL ROOFS) | $9.00 | $0.00 | $9.00 | Survey |
| PLASTERER | $15.10 | $0.00 | $15.10 | Survey |
| PAINTER: INCLUDES BRUSH, ROLLER AND SPRAY (EXCLUDES DRYWALL FINISHING/TAPING) | $10.68 | $0.00 | $10.68 | Survey |
| OPERATOR: TRACTOR | $10.20 | $0.00 | $10.20 | Survey |
| OPERATOR: TRACKHOE | $15.68 | $0.00 | $15.68 | Survey |
| OPERATOR: SCREED | $10.93 | $0.00 | $10.93 | Survey |
| OPERATOR: ROLLER | $10.54 | $0.00 | $10.54 | Survey |
| OPERATOR: LOADER | $12.94 | $0.00 | $12.94 | Survey |
| OPERATOR: GRADER/BLADE | $15.50 | $0.00 | $15.50 | Survey |
| OPERATOR: FORKLIFT | $17.50 | $0.00 | $17.50 | Survey |
| OPERATOR: DISTRIBUTOR | $11.41 | $0.00 | $11.41 | Survey |
| OPERATOR: BULLDOZER | $12.40 | $0.00 | $12.40 | Survey |
| OPERATOR: BACKHOE/EXCAVATOR | $12.72 | $0.00 | $12.72 | Survey |
| OPERATOR: BACKHOE LOADER COMBO | $17.04 | $0.00 | $17.04 | Survey |
| OPERATOR: ASPHALT PAVER | $11.63 | $0.00 | $11.63 | Survey |
| LATHER | $14.20 | $0.00 | $14.20 | Survey |
| LABORER: LANDSCAPE AND IRRIGATION | $7.95 | $0.00 | $7.95 | Survey |
| LABORER: ROOF TEAROFF | $9.00 | $0.00 | $9.00 | Survey |
| LABORER: PIPELAYER | $11.93 | $0.00 | $11.93 | Survey |
| LABORER: MASON TENDER - CEMENT/CONCRETE | $10.46 | $0.00 | $10.46 | Survey |
| LABORER: MASON TENDER - BRICK | $11.51 | $0.00 | $11.51 | Survey |
| LABORER: COMMON OR GENERAL | $9.00 | $0.00 | $9.00 | Survey |
| LABORER: ASPHALT RAKER | $10.06 | $0.00 | $10.06 | Survey |
| IRONWORKER: STRUCTURAL, REINFORCING AND ORNAMENTAL | $9.00 | $0.00 | $9.00 | Survey |
| HVAC MECHANIC (INSTALLATION OF HVAC DUCT) | $13.78 | $0.00 | $13.78 | Survey |
| FORM WORKER | $12.00 | $0.46 | $12.46 | Survey |
| FLOOR LAYER: CARPET | $10.00 | $0.00 | $10.00 | Survey |
| ELECTRICIAN | $12.49 | $0.00 | $12.49 | Survey |
| DRYWALL HANGER | $13.15 | $0.00 | $13.15 | Survey |
| DRYWALL FINISHER/TAPER | $16.13 | $0.00 | $16.13 | Survey |
| CEMENT MASON/CONCRETE FINISHER | $12.30 | $0.00 | $12.30 | Survey |
| CARPENTER, EXCLUDES DRYWALL HANGING, AND FORM WORK | $14.63 | $0.00 | $14.63 | Survey |
| BRICKLAYER | $20.00 | $0.00 | $20.00 | Survey |
Modification history
| Modification 0 | January 2, 2026 |
| Modification 1 | May 18, 2026 (current) |
Published by the Wage and Hour Division; read from sam.gov. The sheet is checked for a newer modification each day. Contracts awarded since January 1, 2017 also carry Executive Order 13706 paid sick leave (one hour per 30 worked, up to 56 a year).
Questions people ask
- Which rate do I pay on FL20260060?
- The line for the classification of work actually performed: the basic rate plus the fringe. You may pay the fringe into benefit plans, as cash on every hour, or a mix. Overtime after 40 hours is 1.5 times the basic rate; fringe is paid on every hour and never multiplied.
- My trade is not on this sheet. What do I do?
- Do not borrow the nearest name. Ask the contracting agency for a conformance on Standard Form 1444 before the first week of that work, and note it as pending on the payroll.
- Does modification 1 apply to my contract?
- Only if it was in force when your contract was awarded (generally at bid opening). An earlier modification locked into the contract keeps applying, except on option years, added scope and indefinite-quantity contracts. The number and modification are on the first page of the exhibit in your contract.