Prevailing wage rates · District of Columbia · Wage determination
Prevailing wage rates: District of, Washington and D.C Counties, District of Columbia
Building construction · DC20260002 modification 3, published May 18, 2026
The short answer
This sheet sets 32 classifications for building work in District of, Washington and D.C Counties, District of Columbia. Each line is a basic hourly rate plus a fringe rate, and the sum is the minimum you must pay for that work, from $15.84 an hour (laborer: common or general) to $95.60 (elevator mechanic a). Your contract may lock an earlier modification.
What changed this year
First published January 2, 2026, this sheet is now on modification 3, and its rates have changed in 3 modifications. Of the 30 rates we can follow line by line from the first publication to today, 2 are higher.
If you bid the job or set pay from an earlier copy, find your trades below. The rates that bind you are the ones in the modification written into your contract.
Latest change
May 18, 2026 · modification 3
Classification names reworded; 5 fringe formulas changed among the 30 lines we could match
- Asbestos worker: 1 fringe formula changed
- Asbestos worker/heat & frost insulator: 1 fringe formula changed
- Elevator mechanic a.: 1 fringe formula changed
- Pipefitter: 1 fringe formula changed
- Sheet metal worker: 1 fringe formula changed
SAM.gov reworded this sheet’s classification names in this modification, so not every line can be matched to the one before. Only lines matched with certainty are compared here; nothing is guessed. If your trade is not listed, compare it against your contract’s copy.
Every line that changed (5)
| Classification | Was | Now | Change |
|---|---|---|---|
| ASBESTOS WORKER/HEAT & FROST INSULATOR (INCLUDES THE APPLICATION OF ALL INSULATING MATER… | $40.77 + 20.17+a | $40.77 + $20.17 | changed |
| ASBESTOS WORKER: HAZARDOUS MATERIAL HANDLER INCLUDES PREPARATION, WETTING, STRIPPING, RE… | $24.46 + 10.19+a | $24.46 + $10.19 | changed |
| ELEVATOR MECHANIC A. | $57.16 + 38.435+a+b | $57.16 + $38.44 | changed |
| PIPEFITTER: INCLUDES HVAC PIPE INSTALLATION A. | $55.00 + 24.46+a | $55.00 + $24.46 | changed |
| SHEET METAL WORKER: INCLUDING HVAC DUCT INSTALLATION A. | $53.42 + 23.20+a | $53.42 + $23.20 | changed |
Earlier modifications
January 16, 2026 · modification 21 rate raised
- Electrician: 1 rate raised by $5.09 an hour
Every line that changed (1)
Classification Was Now Change ELECTRICIAN, Includes Installation of HVAC/Temperature Controls $55.50 + $21.97 $59.50 + $23.06 +$5.09 (+6.6%) January 9, 2026 · modification 12 rates raised
- Electrician: 1 rate raised by $3.12 an hour
- Sprinkler fitter: 1 rate raised by $1.30 an hour
Every line that changed (2)
Classification Was Now Change ELECTRICIAN, Includes Installation of HVAC/Temperature Controls $53.00 + $21.35 $55.50 + $21.97 +$3.12 (+4.2%) SPRINKLER FITTER (Fire Sprinklers) $45.22 + $26.39 $45.22 + $27.69 +$1.30 (+1.8%)
Compared line by line from each modification as published on SAM.gov. A line we could not pair with certainty is left out rather than guessed.
Rates by classification
These are the rates in modification 3 as published on SAM.gov. The determination and modification written into your contract are the ones that bind you; check that number before relying on this table. Total is the basic rate plus the fringe. Source is the agreement or survey the rate came from and its year; a survey year long past means the rate has not been surveyed since. A marker means the group changed in this modification. In the Since column, a dash means SAM.gov reworded the line during the year and it cannot be matched to the first publication with certainty. A dagger (†) means the fringe carries a footnote or percentage the total does not include; read the group’s notes.
| Classification | Basic rate | Fringe | Total | Since Jan 2 | Source |
|---|---|---|---|---|---|
| ASBE0024-007 · Asbestos Workers and Heat & Frost Insulators agreement, October 1, 2024 | |||||
ASBESTOS WORKER/HEAT & FROST INSULATOR…Full textASBESTOS WORKER/HEAT & FROST INSULATOR (INCLUDES THE APPLICATION OF ALL INSULATING MATERIALS, PROTECTIVE COVERINGS, COATINGS AND FINISHES TO ALL TYPES OF MECHANICAL SYSTEMS) A. PAID HOLIDAYS: NEW YEAR'S DAY, MARTIN LUTHER KING DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS' DAY, THANKSGIVING DAY,THE DAY AFTER THANKSGIVING AND CHRISTMAS DAY PROVIDED THE EMPLOYEE WORKS THE REGULAR WORK DAY BEFORE AND AFTER THE PAID HOLIDAY | $40.77 | $20.17 | $60.94 | changed | Agreement, 2024 |
| ASBE0024-008 · Asbestos Workers and Heat & Frost Insulators agreement, October 1, 2024 | |||||
ASBESTOS WORKER: HAZARDOUS MATERIAL HANDLER INCLUDES PREPARATION…Full textASBESTOS WORKER: HAZARDOUS MATERIAL HANDLER INCLUDES PREPARATION, WETTING, STRIPPING, REMOVAL, SCRAPPING, VACUUMING, BAGGING AND DISPOSING OF ALL INSULATION MATERIALS, WHETHER THEY CONTAIN ASBESTOS OR NOT, FROM MECHANICAL SYSTEMS A. PAID HOLIDAYS: NEW YEAR'S DAY, MARTIN LUTHER KING DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS' DAY, THANKSGIVING DAY,THE DAY AFTER THANKSGIVING AND CHRISTMAS DAY PROVIDED THE EMPLOYEE WORKS THE REGULAR WORK DAY BEFORE AND AFTER THE PAID HOLIDAY | $24.46 | $10.19 | $34.65 | changed | Agreement, 2024 |
| ASBE0024-014 · Asbestos Workers and Heat & Frost Insulators agreement, October 1, 2024 | |||||
FIRESTOPPER INCLUDES THE APPLICATION OF MATERIALS OR DEVICES WITHIN OR AROUND…Full textFIRESTOPPER INCLUDES THE APPLICATION OF MATERIALS OR DEVICES WITHIN OR AROUND PENETRATIONS AND OPENINGS IN ALL RATED WALL OR FLOOR ASSEMBLIES, IN ORDER TO PREVENT THE PASAGE OF FIRE, SMOKE OF OTHER GASES. THE APPLICATION INCLUDES ALL COMPONENTS INVOLVED IN CREATING THE RATED BARRIER AT PERIMETER SLAB EDGES AND EXTERIOR CAVITIES, THE HEAD OF GYPSUM BOARD OR CONCRETE WALLS, JOINTS BETWEEN RATED WALL OR FLOOR COMPONENTS, SEALING OF PENETRATING ITEMS AND BLANK OPENINGS. A. PAID HOLIDAYS: NEW YEAR'S DAY, MARTIN LUTHER KING DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS' DAY, THANKSGIVING DAY,THE DAY AFTER THANKSGIVING AND CHRISTMAS DAY PROVIDED THE EMPLOYEE WORKS THE REGULAR WORK DAY BEFORE AND AFTER THE PAID HOLIDAY | $30.21 | $10.43 | $40.64 | — | Agreement, 2024 |
| BRDC0001-002 · Bricklayers agreement, April 27, 2025 | |||||
| BRICKLAYER | $38.80 | $15.17 | $53.97 | no change | Agreement, 2025 |
| CARP0197-011 · Carpenters agreement, May 1, 2024 | |||||
| CARPENTER: INCLUDES DRYWALL HANGING, FORM WORK, AND SOFT FLOOR LAYING-CARPET | $34.41 | $14.33 | $48.74 | no change | Agreement, 2024 |
| CARP0219-001 · Carpenters agreement, May 1, 2025 | |||||
| MILLWRIGHT | $39.50 | $17.32 | $56.82 | no change | Agreement, 2025 |
| CARP0474-006 · Carpenters agreement, May 1, 2024 | |||||
| PILEDRIVERMAN | $36.60 | $14.47 | $51.07 | no change | Agreement, 2024 |
| ELEC0026-016 · Electrical Workers (IBEW) agreement, June 2, 2025 | |||||
| ELECTRICIAN: INCLUDES INSTALLATION OF HVAC/TEMPERATURE CONTROLS | $59.50 | $23.06 | $82.56 | +$8.21 (+11.0%) | Agreement, 2025 |
| ELEC0026-017 · Electrical Workers (IBEW) agreement, September 1, 2025 | |||||
| ELECTRICAL INSTALLER (SOUND & COMMUNICATION SYSTEMS) SCOPE OF WORK: INCLUDES LOW VOLTAGE CONSTRUCTION, INSTALLATION, MAINTENANCE AND REMOVAL OF TELEDATA FACILITIES (VOICE, DATA AND VIDEO) INCLUDING OUTSIDE PLANT, TELEPHONE AND DATA INSIDE WIRE, INTERCONNECT, TERMINAL EQUIPMENT, CENTRAL OFFICES, PABX, FIBER OPTIC CABLE AND EQUIPMENT, RAILROAD COMMUNICATIONS, MICRO WAVES, VSAT, BYPASS, CATV, WAN (WIDE AREA NETWORKS), LAN (LOCAL AREA NETWORKS) AND ISDN (INTEGRATED SYSTEMS DIGITAL NETWORK). WORK EXCLUDED: THE INSTALLATION OF COMPUTER SYSTEMS IN INDUSTRIAL APPLICATIONS SUCH AS ASSEMBLY LINES, ROBOTICS AND COMPUTER CONTROLLER MANUFACTURING SYSTEMS. THE INSTALLATION OF CONDUIT AND/OR RACEWAYS SHALL BE INSTALLED BY INSIDE WIREMEN. ON SITES WHERE THERE IS NO INSIDE WIREMAN EMPLOYED, THE TELEDATA TECHNICIAN MAY INSTALL RACEWAY OR CONDUIT NOT GREATER THAN 10 FEET. FIRE ALARM WORK IS EXCLUDED ON ALL NEW CONSTRUCTION SITES OR WHEREVER THE FIRE ALARM SYSTEM IS INSTALLED IN CONDUIT. ALL HVAC CONTROL WORK | $34.16 | $13.54 | $47.70 | no change | Agreement, 2025 |
| ELEV0010-001 · Elevator Constructors agreement, January 1, 2025 | |||||
| ELEVATOR MECHANIC A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS' DAY, THANKSGIVING DAY, CHRISTMAS DAY AND THE FRIDAY AFTER THANKSGIVING. B. VACATIONS: EMPLOYER CONTRIBUTES 8% OF BASIC HOURLY RATE FOR 5 YEARS OR MORE OF SERVICE; 6% OF BASIC HOURLY RATE FOR 6 MONTHS TO 5 YEARS OF SERVICE AS VACATION PAY CREDIT | $57.16 | $38.44 | $95.60 | changed | Agreement, 2025 |
| IRON0005-005 · Ironworkers agreement, June 1, 2024 | |||||
| IRONWORKER: STRUCTURAL AND ORNAMENTAL | $37.86 | $25.86 | $63.72 | no change | Agreement, 2024 |
| IRON0005-012 · Ironworkers agreement, May 1, 2024 | |||||
| IRONWORKER, REINFORCING | $31.88 | $23.78 | $55.66 | no change | Agreement, 2024 |
| LABO0011-009 · Laborers agreement, June 1, 2025 | |||||
| LABORER: SKILLED | $30.47 | $8.70 | $39.17 | no change | Agreement, 2025 |
| MARB0002-004 · MARB, April 27, 2025 | |||||
MARBLE/STONE MASON INCLUDING POINTING…Full textMARBLE/STONE MASON INCLUDING POINTING, CAULKING AND CLEANING OF ALL TYPES OF MASONRY, BRICK, STONE AND CEMENT EXCEPT POINTING, CAULKING, CLEANING OF EXISTING MASONRY, BRICK, STONE AND CEMENT (RESTORATION WORK) | $45.65 | $21.21 | $66.86 | no change | MARB |
| MARB0003-006 · MARB, April 27, 2025 | |||||
| TERRAZZO WORKER/SETTER | $34.34 | $14.20 | $48.54 | no change | MARB |
| MARB0003-007 · MARB, April 27, 2025 | |||||
| TERRAZZO FINISHER | $28.85 | $12.55 | $41.40 | no change | MARB |
| MARB0003-008 · MARB, April 27, 2025 | |||||
| TILE SETTER | $34.34 | $14.20 | $48.54 | no change | MARB |
| MARB0003-009 · MARB, April 27, 2025 | |||||
| TILE FINISHER | $28.85 | $12.55 | $41.40 | no change | MARB |
| PAIN0051-014 · Painters and Allied Trades agreement, June 1, 2025 | |||||
| GLAZIER: GLAZING CONTRACTS $2 MILLION AND UNDER | $32.41 | $14.46 | $46.87 | no change | Agreement, 2025 |
| GLAZIER (GLAZING CONTRACTS OVER $2 MILLION) | $36.65 | $14.46 | $51.11 | no change | Agreement, 2025 |
| PAIN0051-015 · Painters and Allied Trades agreement, June 1, 2025 | |||||
| PAINTER: BRUSH, ROLLER, SPRAY AND DRYWALL FINISHER | $29.16 | $11.86 | $41.02 | no change | Agreement, 2025 |
| PLAS0891-005 · Plasterers and Cement Masons agreement, July 1, 2025 | |||||
| PLASTERER (INCLUDING FIREPROOFING) | $32.86 | $10.46 | $43.32 | no change | Agreement, 2025 |
| PLAS0891-006 · Plasterers and Cement Masons agreement, March 1, 2025 | |||||
| CEMENT MASON/CONCRETE FINISHER | $30.50 | $14.23 | $44.73 | no change | Agreement, 2025 |
| PLUM0005-010 · Plumbers and Pipefitters agreement, August 1, 2025 | |||||
| PLUMBER A. PAID HOLIDAYS: LABOR DAY, VETERANS' DAY, THANKSGIVING DAY AND THE DAY AFTER THANKSGIVING, CHRISTMAS DAY, NEW YEAR'S DAY, MARTIN LUTHER KING'S BIRTHDAY, MEMORIAL DAY AND THE FOURTH OF JULY | $53.30 | $23.71 | $77.01 | — | Agreement, 2025 |
| PLUM0602-008 · Plumbers and Pipefitters agreement, August 1, 2025 | |||||
| PIPEFITTER: INCLUDES HVAC PIPE INSTALLATION A. PAID HOLIDAYS: NEW YEAR'S DAY, MARTIN LUTHER KING'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS' DAY, THANKSGIVING DAY AND THE DAY AFTER THANKSGIVING AND CHRISTMAS DAY | $55.00 | $24.46 | $79.46 | changed | Agreement, 2025 |
| ROOF0030-016 · Roofers agreement, July 1, 2025 | |||||
| ROOFER | $36.26 | $14.91 | $51.17 | no change | Agreement, 2025 |
| SFDC0669-002 · SFDC, January 1, 2026 | |||||
| SPRINKLER FITTER (FIRE SPRINKLERS) | $45.22 | $27.69 | $72.91 | +$1.30 (+1.8%) | SFDC |
| SHEE0100-015 · Sheet Metal Workers agreement, November 1, 2025 | |||||
| SHEET METAL WORKER: INCLUDING HVAC DUCT INSTALLATION A. PAID HOLIDAYS: NEW YEAR'S DAY, MARTIN LUTHER KING'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $53.42 | $23.20 | $76.62 | changed | Agreement, 2025 |
| SUDC2009-003 · Survey of contractors in DC, May 19, 2009 | |||||
POINTER, CAULKER, CLEANER…Full textPOINTER, CAULKER, CLEANER, INCLUDES POINTING, CAULKING, CLEANING OF EXISTING MASONRY, BRICK, STONE AND CEMENT STRUCTURES (RESTORATION WORK); EXCLUDES POINTING, CAULKING, CLEANING OF NEW OR REPLACEMENT MASONRY, BRICK, STONE OR CEMENT | $18.88 | $0.00 | $18.88 | no change | Survey, 2009 |
LABORER: MASON TENDER FOR POINTING…Full textLABORER: MASON TENDER FOR POINTING, CAULKING, CLEANING OF EXISTING MASONRY, BRICK, STONE AND CEMENT STRUCTURES (RESTORATION WORK); EXCLUDES POINTING, CAULKING AND CLEANING OF NEW OR REPLACEMENT MASONRY, BRICK, STONE AND CEMENT | $11.67 | $0.00 | $11.67 | no change | Survey, 2009 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | $15.40 | $2.85 | $18.25 | no change | Survey, 2009 |
| LABORER: COMMON OR GENERAL | $13.04 | $2.80 | $15.84 | no change | Survey, 2009 |
Modification history
| Modification 2 | January 16, 2026 |
| Modification 3 | May 18, 2026 (current) |
Published by the Wage and Hour Division; read from sam.gov. The sheet is checked for a newer modification each day. Contracts awarded since January 1, 2017 also carry Executive Order 13706 paid sick leave (one hour per 30 worked, up to 56 a year).
Questions people ask
- Which rate do I pay on DC20260002?
- The line for the classification of work actually performed: the basic rate plus the fringe. You may pay the fringe into benefit plans, as cash on every hour, or a mix. Overtime after 40 hours is 1.5 times the basic rate; fringe is paid on every hour and never multiplied.
- My trade is not on this sheet. What do I do?
- Do not borrow the nearest name. Ask the contracting agency for a conformance on Standard Form 1444 before the first week of that work, and note it as pending on the payroll.
- Does modification 3 apply to my contract?
- Only if it was in force when your contract was awarded (generally at bid opening). An earlier modification locked into the contract keeps applying, except on option years, added scope and indefinite-quantity contracts. The number and modification are on the first page of the exhibit in your contract.
How to read a wage determination · Paying the fringe in cash or through plans · Overtime on these rates · Fringe credit calculator
Put these rates on a certified payroll.
Start here and DC20260002 is already filled in when you set up the job. CertifiedHours loads this sheet, checks every line against it as you type hours, and prints the WH-347. Free for one payroll a month.
Start a payroll on this sheetOn this sheet
- 32 classifications in 28 rate groups
- 21 from agreements, 1 from surveys
- Counties: District of, Washington, D.C