CertifiedHours

Prevailing wage rates · District of Columbia · Wage determination

Prevailing wage rates: Washington and D.C. Counties, District of Columbia

Heavy, Highway construction · DC20260001 modification 6, published August 27, 2026

The short answer

This sheet sets 77 classifications for heavy, highway work in Washington and D.C. Counties, District of Columbia. Each line is a basic hourly rate plus a fringe rate, and the sum is the minimum you must pay for that work, from $29.66 an hour (line construction: groundmen) to $82.56 (electricians). Your contract may lock an earlier modification.

Scope

Heavy Construction

Highway Construction

Rates by classification

Total is the basic rate plus the fringe. Source is the agreement or survey the rate came from; a marker means the group changed in this modification. A dagger (†) means the fringe carries a footnote or percentage the total does not include; read the group’s notes.

ClassificationBasic rateFringeTotalSource
ASBE0024-001 · Asbestos Workers and Heat & Frost Insulators agreement, October 1, 2024
Group definitions, zones and premiums for ASBE0024-001
ASBESTOS WORKER/HEAT AND FROST INSULATOR (INCLUDES THE APPLICATION OF ALL INSULATING MATERIALS, PROTECTIVE COVERINGS, COATINGS AND FINISHES TO ALL TYPES OF MECHANICAL SYSTEMS.) (PAID HOLIDAYS: NEW YEAR'S DAY, MARTIN LUTHER KIND DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS' DAY, THANKSGIVING DAY, THE DAY AFTER THANKSGIVING AND CHRISTMAS DAY PROVIDED THE EMPLOYEE WORKS THE REGULAR WORK DAY BEFORE AND AFTER THE PAID HOLIDAY).$ 40.77 20.17
ASBE0024-002 · Asbestos Workers and Heat & Frost Insulators agreement, October 1, 2024
HAZARDOUS MATERIAL HANDLER…
Full text

HAZARDOUS MATERIAL HANDLER (INCLUDES PREPARATION, WETTING, STRIPPING, REMOVAL, SCRAPPING, VACUUMING, BAGGING AND DISPOSING OF ALL INSULATION MATERIALS, WHETHER THEY CONTAIN ASBESTOS OR NOT, FROM MECHANICAL SYSTEMS.) (A.

PAID HOLIDAYS: NEW YEAR'S DAY, MARTIN LUTHER KING DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS' DAY, THANKSGIVING DAY,THE DAY AFTER THANKSGIVING AND CHRISTMAS DAY PROVIDED THE EMPLOYEE WORKS THE REGULAR WORK DAY BEFORE AND AFTER THE PAID HOLIDAY.)

$24.46$10.19$34.65Agreement
ASBE0024-005 · Asbestos Workers and Heat & Frost Insulators agreement, October 1, 2024
FIRE STOP TECHNICIAN…
Full text

FIRE STOP TECHNICIAN (INCLUDES THE APPLICATION OF MATERIALS OR DEVICES WITHIN OR AROUND PENETRATIONS AND OPENINGS IN ALL RATED WALL OR FLOOR ASSEMBLIES, IN ORDER TO PREVENT THE PASAGE OF FIRE, SMOKE OF OTHER GASES. THE APPLICATION INCLUDES ALL COMPONENTS INVOLVED IN CREATING THE RATED BARRIER AT PERIMETER SLAB EDGES AND EXTERIOR CAVITIES, THE HEAD OF GYPSUM BOARD OR CONCRETE WALLS, JOINTS BETWEEN RATED WALL OR FLOOR COMPONENTS, SEALING OF PENETRATING ITEMS AND BLANK OPENINGS) (A.

PAID HOLIDAYS: NEW YEAR'S DAY, MARTIN LUTHER KING DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS' DAY, THANKSGIVING DAY,THE DAY AFTER THANKSGIVING AND CHRISTMAS DAY PROVIDED THE EMPLOYEE WORKS THE REGULAR WORK DAY BEFORE AND AFTER THE PAID HOLIDAY.)

$30.21$10.43$40.64Agreement
BOIL0193-001 · Boilermakers agreement, January 1, 2025
BOILERMAKERS$47.37$25.60$72.97Agreement
BRDC0001-001 · Bricklayers agreement, April 27, 2025
BRICKLAYER$38.80$15.17$53.97Agreement
BRMD0001-004 · Bricklayers agreement, April 27, 2025
BRICKLAYER: REFRACTORY (FIREBRICK)$43.94$17.74$61.68Agreement
CARP0197-010 · Carpenters agreement, May 1, 2024
CARPENTER/LATHER$34.41$14.33$48.74Agreement
CARP0219-001 · Carpenters agreement, May 1, 2025
MILLWRIGHT$39.50$17.32$56.82Agreement
CARP0474-006 · Carpenters agreement, May 1, 2024
PILEDRIVERMAN$36.60$14.47$51.07Agreement
CARP0474-007 · Carpenters agreement, May 1, 2024
DIVER$43.92$14.47$58.39Agreement
DIVER TENDER$36.60$14.47$51.07Agreement
ELEC0026-001 · Electrical Workers (IBEW) agreement, June 2, 2025
ELECTRICIANS$59.50$23.06$82.56Agreement
ELEC0070-001 · Electrical Workers (IBEW) agreement, May 5, 2024
LINE CONSTRUCTION: CABLE SPLICERS$44.56$17.50$62.06Agreement
LINE CONSTRUCTION: EQUIPMENT OPERATORS$44.56$17.50$62.06Agreement
LINE CONSTRUCTION: GROUNDMEN$18.00$11.66$29.66Agreement
LINE CONSTRUCTION: LINEMEN$44.56$17.50$62.06Agreement
LINE CONSTRUCTION: TRUCK DRIVER$23.00$12.76$35.76Agreement
ENGI0077-001 · Operating Engineers agreement, May 1, 2025
POWER EQUIPMENT OPERATORS, HEAVY AND HIGHWAY CONSTRUCTION: GROUP 1…
Full text

POWER EQUIPMENT OPERATORS, HEAVY AND HIGHWAY CONSTRUCTION: GROUP 1 - TOWER CRANES AND CRANES 100 TON AND OVER. (PAID HOLIDAYS: NEW YEARS DAY, INAUGURAL DAY, DECORATION DAY, INDEPENDENCE DAY, LABOR DAY, MARTIN LUTHER KING'S BIRTHDAY, VETERANS' DAY, THANKSGIVING DAY, FRIDAY AFTER THANKSGIVING AND CHRISTMAS DAY.)

$45.76$13.27$59.03Agreement
POWER EQUIPMENT OPERATORS, HEAVY AND HIGHWAY CONSTRUCTION: GROUP 2…
Full text

POWER EQUIPMENT OPERATORS, HEAVY AND HIGHWAY CONSTRUCTION: GROUP 2 - 35 TON CRANES & ABOVE, DERRICKS, CONCRETE BOOM PUMP, DRILL RIGS (+50,000 LBS TORQUE), MOLE, MECHANIC. (PAID HOLIDAYS: NEW YEARS DAY, INAUGURAL DAY, DECORATION DAY, INDEPENDENCE DAY, LABOR DAY, MARTIN LUTHER KING'S BIRTHDAY, VETERANS' DAY, THANKSGIVING DAY, FRIDAY AFTER THANKSGIVING AND CHRISTMAS DAY.)

$43.44$13.27$56.71Agreement
POWER EQUIPMENT OPERATORS, HEAVY AND HIGHWAY CONSTRUCTION: GROUP 3…
Full text

POWER EQUIPMENT OPERATORS, HEAVY AND HIGHWAY CONSTRUCTION: GROUP 3 - CRANES, HOISTS, DRILL RIGS (UNDER 50,000 LBS TORQUE), TIE BACK MACHINES, PAVING MIXERS, TUNNEL SHOVELS, BATCH PLANTS, SHIELDS, TUNNEL MINING MACHINES, DRAGLINES, MUCKING MACHINES, GRADERS IN TUNNELS, PILE DRIVING ENGINES, WELDER, HORIZONTAL DIRECTIONAL DRILL OPERATOR, TUG BOATS. (PAID HOLIDAYS: NEW YEARS DAY, INAUGURAL DAY, DECORATION DAY, INDEPENDENCE DAY, LABOR DAY, MARTIN LUTHER KING'S BIRTHDAY, VETERANS' DAY, THANKSGIVING DAY, FRIDAY AFTER THANKSGIVING AND CHRISTMAS DAY.)

$40.73$13.27$54.00Agreement
POWER EQUIPMENT OPERATORS, HEAVY AND HIGHWAY CONSTRUCTION: GROUP 4…
Full text

POWER EQUIPMENT OPERATORS, HEAVY AND HIGHWAY CONSTRUCTION: GROUP 4 - FRONT END LOADERS, BOOM TRUCKS, BACKHOES, EXCAVATORS, GRADALLS, POWER DRIVEN WHEEL SCOOPS & SCRAPERS, BLADE GRADERS, MOTOR GRADERS, BULLDOZERS, TRENCHING MACHINES, BALLAST REGULATOR,HOE RAM, LOCOMOTIVE (STANDARD, NARROW GAUGE, TUGGERS). (PAID HOLIDAYS: NEW YEARS DAY, INAUGURAL DAY, DECORATION DAY, INDEPENDENCE DAY, LABOR DAY, MARTIN LUTHER KING'S BIRTHDAY, VETERANS' DAY, THANKSGIVING DAY, FRIDAY AFTER THANKSGIVING AND CHRISTMAS DAY.)

$36.31$13.27$49.58Agreement
POWER EQUIPMENT OPERATORS, HEAVY AND HIGHWAY CONSTRUCTION: GROUP 5…
Full text

POWER EQUIPMENT OPERATORS, HEAVY AND HIGHWAY CONSTRUCTION: GROUP 5 - BOILERS (SKELTON), ASPHALT SPREADERS, BULLFLOAT FINISHING MACHINES, CONCRETE FINISHING MACHINES, CONCRETE SPREADERS,CONCRETE MIXER, CONCRETE PUMP, WELL POINTS, HYDRAULIC PUMPS, ELEVATORS, FREEZE UNIITS, TUNNEL MOTORMAN OR DINKY OPERATOR, CONVEYORS, GROUT PUMP, FIREMAN, ULTRA HIGH PRESSURE WATER JET CUTTING TOOL SYSTEM OPERATOR/MECHANIC, HORIZONTAL DIRECTIONAL DRILL LOCATOR, SKID STEERS (FINE GRADING), HIGH LIFTS (LULL TYPE LIFTS). (PAID HOLIDAYS: NEW YEARS DAY, INAUGURAL DAY, DECORATION DAY, INDEPENDENCE DAY, LABOR DAY, MARTIN LUTHER KING'S BIRTHDAY, VETERANS' DAY, THANKSGIVING DAY, FRIDAY AFTER THANKSGIVING AND CHRISTMAS DAY.)

$31.09$13.27$44.36Agreement
POWER EQUIPMENT OPERATORS, HEAVY AND HIGHWAY CONSTRUCTION: GROUP 6…
Full text

POWER EQUIPMENT OPERATORS, HEAVY AND HIGHWAY CONSTRUCTION: GROUP 6 - FORK LIFTS, DITCH WITCH, BOBCAT, SKID STEER, SPACE HEATERS, SWEEPERS, ASSISTANT ENGINEERS, OILERS, SERVICE UNIT EQUIPMENT, ROLLER. (PAID HOLIDAYS: NEW YEARS DAY, INAUGURAL DAY, DECORATION DAY, INDEPENDENCE DAY, LABOR DAY, MARTIN LUTHER KING'S BIRTHDAY, VETERANS' DAY, THANKSGIVING DAY, FRIDAY AFTER THANKSGIVING AND CHRISTMAS DAY.)

$28.39$13.27$41.66Agreement
POWER EQUIPMENT OPERATORS, HEAVY AND HIGHWAY CONSTRUCTION: GROUP 7…
Full text

POWER EQUIPMENT OPERATORS, HEAVY AND HIGHWAY CONSTRUCTION: GROUP 7 - MASTER MECHANIC. (PAID HOLIDAYS: NEW YEARS DAY, INAUGURAL DAY, DECORATION DAY, INDEPENDENCE DAY, LABOR DAY, MARTIN LUTHER KING'S BIRTHDAY, VETERANS' DAY, THANKSGIVING DAY, FRIDAY AFTER THANKSGIVING AND CHRISTMAS DAY.)

$47.18$13.27$60.45Agreement
ENGI0077-002 · Operating Engineers agreement, June 1, 2025
POWER EQUIPMENT OPERATORS, PAVING AND INCIDENTAL GRADING: GROUP 1…
Full text

POWER EQUIPMENT OPERATORS, PAVING AND INCIDENTAL GRADING: GROUP 1 - GRADALL OPERATOR, CRANE

$37.07$11.17$48.24Agreement
POWER EQUIPMENT OPERATORS, PAVING AND INCIDENTAL GRADING: GROUP 2…
Full text

POWER EQUIPMENT OPERATORS, PAVING AND INCIDENTAL GRADING: GROUP 2 - BOOM TRUCK, MILLING MACHINE, EXCAVATOR, RUBBER TIRE BACKHOE, ASPHALT PAVER, ASPHALT PLANT ENGINEER, MOTOR GRADER, TRACK LOADER, RUBBER TIRE LOADER, TRACK DOZER, CONCRETE PAVER

$32.89$11.17$44.06Agreement
POWER EQUIPMENT OPERATORS, PAVING AND INCIDENTAL GRADING: GROUP 3…
Full text

POWER EQUIPMENT OPERATORS, PAVING AND INCIDENTAL GRADING: GROUP 3 - BROOM TRUCK, ASPHALT ROLLER

$28.09$11.17$39.26Agreement
POWER EQUIPMENT OPERATORS, PAVING AND INCIDENTAL GRADING: GROUP 4…
Full text

POWER EQUIPMENT OPERATORS, PAVING AND INCIDENTAL GRADING: GROUP 4 - AIR COMPRESSOR, GRADE ROLLERS

$25.14$11.17$36.31Agreement
POWER EQUIPMENT OPERATORS, PAVING AND INCIDENTAL GRADING: GROUP 5 - MECHANIC$37.93$10.97$48.90Agreement
ENGI0077-003 · Operating Engineers agreement, July 1, 2025
POWER EQUIPMENT OPERATORS, SEWER, GAS AND WATER LINE CONSTRUCTION: GROUP 1…
Full text

POWER EQUIPMENT OPERATORS, SEWER, GAS AND WATER LINE CONSTRUCTION: GROUP 1 - CRANES 50 TON AND ABOVE. (PAID HOLIDAYS: NEW YEAR'S DAY, INAUGURAL DAY, WASHINGTON'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, DAY AFTER THANKSGIVING AND CHRISTMAS DAY)

$41.40$11.55$52.95Agreement
POWER EQUIPMENT OPERATORS, SEWER, GAS AND WATER LINE CONSTRUCTION: GROUP 2…
Full text

POWER EQUIPMENT OPERATORS, SEWER, GAS AND WATER LINE CONSTRUCTION: GROUP 2 - CRANES UNDER 50 TON CAPACITY, BOOM TRUCKS. (PAID HOLIDAYS: NEW YEAR'S DAY, INAUGURAL DAY, WASHINGTON'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, DAY AFTER THANKSGIVING AND CHRISTMAS DAY)

$35.00$11.55$46.55Agreement
POWER EQUIPMENT OPERATORS, SEWER, GAS AND WATER LINE CONSTRUCTION: GROUP 3…
Full text

POWER EQUIPMENT OPERATORS, SEWER, GAS AND WATER LINE CONSTRUCTION: GROUP 3 - GRADALL, LEAD MECHANIC. (PAID HOLIDAYS: NEW YEAR'S DAY, INAUGURAL DAY, WASHINGTON'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, DAY AFTER THANKSGIVING AND CHRISTMAS DAY)

$33.80$11.55$45.35Agreement
POWER EQUIPMENT OPERATORS, SEWER, GAS AND WATER LINE CONSTRUCTION: GROUP 4…
Full text

POWER EQUIPMENT OPERATORS, SEWER, GAS AND WATER LINE CONSTRUCTION: GROUP 4 - EXCAVATORS, BACKHOES, FRONT-END LOADERS, FORK LIFT/LULL, BULLDOZERS, MOTOR GRADERS, MECHANIC 1, HYDRAULIC TAMPER AND HOE PACK, PAVING MIXERS, PILE DRIVING ENGINES, BATCH PLANT, CONCRETE PUMPS, LOW-BOY DRIVER, LUBE TRUCK. (PAID HOLIDAYS: NEW YEAR'S DAY, INAUGURAL DAY, WASHINGTON'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, DAY AFTER THANKSGIVING AND CHRISTMAS DAY)

$33.26$11.55$44.81Agreement
POWER EQUIPMENT OPERATORS, SEWER, GAS AND WATER LINE CONSTRUCTION: GROUP 5…
Full text

POWER EQUIPMENT OPERATORS, SEWER, GAS AND WATER LINE CONSTRUCTION: GROUP 5 - KNUCKLE BOOM, TRENCHING MACHINE, WELL DRILLING MACHINES, CONCRETE MIXERS, ASSISTANT MECHANIC, MINI EXCAVATOR UNDER 10,000 LBS. GROSS WEIGHT. (PAID HOLIDAYS: NEW YEAR'S DAY, INAUGURAL DAY, WASHINGTON'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, DAY AFTER THANKSGIVING AND CHRISTMAS DAY)

$31.16$11.55$42.71Agreement
POWER EQUIPMENT OPERATORS, SEWER, GAS AND WATER LINE CONSTRUCTION: GROUP 6…
Full text

POWER EQUIPMENT OPERATORS, SEWER, GAS AND WATER LINE CONSTRUCTION: GROUP 6 - OILER, DUMP TRUCK, SKID STEER/BOBCAT, ROLLERS. (PAID HOLIDAYS: NEW YEAR'S DAY, INAUGURAL DAY, WASHINGTON'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, DAY AFTER THANKSGIVING AND CHRISTMAS DAY)

$25.89$11.55$37.44Agreement
IRON0005-005 · Ironworkers agreement, June 1, 2024
IRONWORKER, STRUCTURAL AND ORNAMENTAL$37.86$25.86$63.72Agreement
IRON0005-012 · Ironworkers agreement, May 1, 2024
IRONWORKER, REINFORCING$31.88$23.78$55.66Agreement
LABO0011-003 · Laborers agreement, June 1, 2025
LABORERS, HEAVY AND HIGHWAY AND SEWER & WATER LINES CONSTRUCTION: GROUP 1…
Full text

LABORERS, HEAVY AND HIGHWAY AND SEWER & WATER LINES CONSTRUCTION: GROUP 1 - CARLAODERS, CHOKER SETTER, CONCRETE CREWMAN, CRUSHED FEEDER, DEMOLITION LABORERS, INCLUDING SALVAGING ALL MATERIAL, LOADING, CLEANING UP, WRECKING, DUMPMENT, FLAGMENT, FENCE ERECTOR AND INSTALLER (OTHER THAN CHAIN LINK), INCLUDING INSTALLATION AND ERECTION OF FENCE, GUARD RAILS, MEDIAL RAILS, REFERENCE POSTS, GUIDE POSTS AND RIGHT-OF-WAY MARKERS, FORM STRIPPERS, GENERAL LABORERS, RAILROAD TRACK LABORERS, RIPRAP MAN, SCALE MAN, STAKE JUMPER, STRUCTURE MOVER, INCLUDES FOUNDATION, SEPARATION, PREPARATION, CRIBBING, SHORING, JACKING AND UNLOADING OF STRUCTURES, WATER NOZZLEMAN, TIMBER BUCKER AND FALLER, TRUCK LOADER, WATER BOYS, TOOL ROOM MEN

$33.25$8.70$41.95Agreement
LABORERS, HEAVY AND HIGHWAY AND SEWER & WATER LINES CONSTRUCTION: GROUP 2…
Full text

LABORERS, HEAVY AND HIGHWAY AND SEWER & WATER LINES CONSTRUCTION: GROUP 2 - COMBINED AIR AND WATER NOZZLEMAN, CEMENT HANDLER, DOPE POT FIREMAN (NONMECHANICAL), FORM CLEANING MACHINE, MECHANICAL RAILROAD EQUIPMENT (INCLUDES SPIKER, PULLER, TILE CLEANER, TAMPER, PIPE WRAPPER, POWER DRIVEN WHEELBARROWS, OPERATORS OF HAND DERRICKS, TOWMASTERS, SCOOTSCRETES, BUGGYMOBILES, AND SIMILAR EQUIPMENT), TAMPER OR RAMMER OPERATOR, TRESTLE SCAFFOLD BUILDERS OVER ONE TIER HIGH, POWER TOOL OPERATOR (GAS, ELECTRIC, OR PNEUMATIC), SANDBLAST OR GUNNITE TAILHOSE MAN, SCAFFOLD ERECTOR (STEEL OR WOOD), VIBRATOR OPERATOR (UP TO 4 FEET), ASPHALT CUTTER, MORTAR MEN, SHORER AND LAGGER, CREOSOTE MATERIAL HANDLER, CORROSIVE ENAMEL OR EQUAL, PAVER BREAKER AND JACKHAMMER OPERATORS

$34.27$8.70$42.97Agreement
LABORERS, HEAVY AND HIGHWAY AND SEWER & WATER LINES CONSTRUCTION: GROUP 3…
Full text

LABORERS, HEAVY AND HIGHWAY AND SEWER & WATER LINES CONSTRUCTION: GROUP 3 - MULTI-SECTION PIPE LAYER, NON-METALLIC CLAY AND CONCRETE PIPE LAYER (INCLUDING CAULKER, COLLARMAN, JOINTER, RIGGER AND JACKER, THERMAL WELDER AND CORRUGATED METAL CULVERT PIPE LAYER

$34.27$8.70$42.97Agreement
LABORERS, HEAVY AND HIGHWAY AND SEWER & WATER LINES CONSTRUCTION: GROUP 4…
Full text

LABORERS, HEAVY AND HIGHWAY AND SEWER & WATER LINES CONSTRUCTION: GROUP 4 - ASPHALT BLOCK PNEUMATIC CUTTER, ASPHALT ROLLER, WALKER, CHAINSAW OPERATOR WITH ATTACHMENT, CONCRETE SAW (WALKING), HIGH SCALERS, JACKHAMMER OPERATOR *USING OVER 6 FEET OF STEEL), VIBRATORY OPERATOR (4 FEET AND OVER), WELL POINT INSTALLER, AIR TRAC OPERATOR

$34.32$8.70$43.02Agreement
LABORERS, HEAVY AND HIGHWAY AND SEWER & WATER LINES CONSTRUCTION: GROUP 5…
Full text

LABORERS, HEAVY AND HIGHWAY AND SEWER & WATER LINES CONSTRUCTION: GROUP 5 - ASPHALT SCREEDER, BIG DRILLS, CUT OF THE HOLE DRILLS (1 1/2"" PISTON OR LARGER), DOWN THE HOLE DRILLS (3 1/2"" PISTON OR LARGER) GUNNITE OR SANDBLASTER NOZZLEMAN, ASPHALT RAKER, ASPHALT TAMPER, FORM SETTER, DEMOLITION TORCH OPERATOR, SHOTCRETE NOZZLEMEN AND POTMAN

$35.00$8.70$43.70Agreement
LABORERS, HEAVY AND HIGHWAY AND SEWER & WATER LINES CONSTRUCTION: GROUP 6…
Full text

LABORERS, HEAVY AND HIGHWAY AND SEWER & WATER LINES CONSTRUCTION: GROUP 6 - POWDERMAN, MASTER FORM SETTERS

$35.93$8.70$44.63Agreement
LABORERS, HEAVY AND HIGHWAY AND SEWER & WATER LINES CONSTRUCTION: GROUP 7…
Full text

LABORERS, HEAVY AND HIGHWAY AND SEWER & WATER LINES CONSTRUCTION: GROUP 7 - BRICK PAVER (ASPHALT BLOCK PAVER, ASPHALT BLOCK SAWMAN, ASPHALT BLOCK GRINDER, HASTINGS BLOCK OR SIMILAR TYPE)

$36.81$8.70$45.51Agreement
LABORERS, HEAVY AND HIGHWAY AND SEWER & WATER LINES CONSTRUCTION: GROUP 8…
Full text

LABORERS, HEAVY AND HIGHWAY AND SEWER & WATER LINES CONSTRUCTION: GROUP 8 - LICENSED POWDERMEN

$37.95$8.70$46.65Agreement
LABO0011-004 · Laborers agreement, June 1, 2025
LABORERS:, SKILLED ASBESTOS ABATEMENT LABORERS…
Full text

LABORERS:, SKILLED ASBESTOS ABATEMENT LABORERS (HAZARDOUS WASTE REMOVAL, EXCEPT ON MECHANICAL SYSTEMS: PREPARATION FOR, REMOVING AND ENCAPSULATION OF HAZARDOUS MATERIALS FROM NON-MECHANICAL SYSTEMS)

$32.25$8.70$40.95Agreement
LABORERS:, SKILLED TOXIC AND HAZARDOUS WASTE REMOVAL LABORERS…
Full text

LABORERS:, SKILLED TOXIC AND HAZARDOUS WASTE REMOVAL LABORERS (HAZARDOUS WASTE REMOVAL, EXCEPT ON MECHANICAL SYSTEMS: PREPARATION FOR, REMOVING AND ENCAPSULATION OF HAZARDOUS MATERIALS FROM NON-MECHANICAL SYSTEMS)

$32.25$8.70$40.95Agreement
LABO0011-005 · Laborers agreement, June 1, 2025
LABORERS: TUNNEL, RAISE…
Full text

LABORERS: TUNNEL, RAISE, & SHAFT (FREE AIR) FOR HEAVY AND SEWER AND WATER LINES CONSTRUCTION, GROUP 1 - BRAKEMAN, BULL GANG, DUMPER, TRACKMEN, CONCRETE MAN

$34.41$8.70$43.11Agreement
LABORERS: TUNNEL, RAISE…
Full text

LABORERS: TUNNEL, RAISE, & SHAFT (FREE AIR) FOR HEAVY AND SEWER AND WATER LINES CONSTRUCTION, GROUP 2 - CHUCK TENDER, POWDERMEN IN PRIME HOUSE, FORM SETTERS AND MOVERS, NIPPERS, CABLEMAN, HOUSEMAN, GROUTMAN, BELL OR SIGNALMAN, TOP OR BOTTOM VIBRATORY OPERATOR

$35.48$8.70$44.18Agreement
LABORERS: TUNNEL, RAISE…
Full text

LABORERS: TUNNEL, RAISE, & SHAFT (FREE AIR) FOR HEAVY AND SEWER AND WATER LINES CONSTRUCTION, GROUP 3 - MINERS, RE-BAR UNDERGROUND, CONCRETE OR GUNNITE NOZZLEMEN, POWDERMEN, TIMBERMEN AND RE-TIMBERMEN, WOOD STEEL INCLUDING LINER PLATE OR OTHER SUPPORT, MATERIAL MOTORMAN, CAULKERS, DIAMOND DRILL OPERATORS, RIGGERS, CEMENT FINISHERS-UNDERGROUND, WELDERS AND BURNERS, SHIELD DRIVER, AIR TRAC OPERATOR, SHOT CRETE NOZZLEMAN AND POTMAN

$38.17$8.70$46.87Agreement
LABORERS: TUNNEL, RAISE…
Full text

LABORERS: TUNNEL, RAISE, & SHAFT (FREE AIR) FOR HEAVY AND SEWER AND WATER LINES CONSTRUCTION, GROUP 4 - MUCKING MACHINE OPERATOR (AIR)

$39.29$8.70$47.99Agreement
LABO0011-006 · Laborers agreement, June 1, 2025
LABORERS: TUNNEL, RAISE AND SHAFT…
Full text

LABORERS: TUNNEL, RAISE AND SHAFT (COMPRESSED AIR) FOR HEAVY CONSTRUCTION ONLY, POUNDS (1-14) AND HOURS (7)

$44.04$8.70$52.74Agreement
LABORERS: TUNNEL, RAISE AND SHAFT…
Full text

LABORERS: TUNNEL, RAISE AND SHAFT (COMPRESSED AIR) FOR HEAVY CONSTRUCTION ONLY, POUNDS (14-18) AND HOURS (6)

$51.82$8.70$60.52Agreement
LABO0011-007 · Laborers agreement, September 1, 2025
LABORERS: ASPHALT RAKER & CONCRETE SAW OPERATOR (PAVING AND INCIDENTAL GRADING)$24.30$8.74$33.04Agreement
LABORERS: ASPHALT TAMPER & CONCRETE SHOVELER (PAVING AND INCIDENTAL GRADING)$23.86$8.74$32.60Agreement
LABORERS: JACK HAMMER (PAVING AND INCIDENTAL GRADING)$23.89$8.74$32.63Agreement
LABORERS: LABORER (PAVING AND INCIDENTAL GRADING)$23.06$8.74$31.80Agreement
LABORERS: SAND SETTER & FORM SETTER (PAVING AND INCIDENTAL GRADING)$25.10$8.74$33.84Agreement
LABORERS: ASPHALT SHOVELER (PAVING AND INCIDENTAL GRADING)$23.27$8.74$32.01Agreement
LABO0011-008 · Laborers agreement, June 1, 2025
LABORERS: BRICK MASONRY WORK (MASON TENDERS)$24.31$8.70$33.01Agreement
LABORERS: BRICK MASONRY WORK (SCAFFOLD BUILDERS, MORTARMEN)$24.96$8.70$33.66Agreement
MARB0002-003 · MARB, April 27, 2025
MARBLE & STONE MASON…
Full text

MARBLE & STONE MASON (INCLUDES POINTING, CAULKING AND CLEANING OF ALL TYPES OF MASONRY, BRICK, STONE AND CEMENT STRUCTURES)

$45.65$21.21$66.86MARB
MARB0003-001 · MARB, April 27, 2025
MOSAIC & TERRAZZO WORKER, TILE LAYER$34.34$14.20$48.54MARB
MARB0003-004 · MARB, April 27, 2025
MARBLE, TILE & TERRAZZO FINISHER$28.85$12.55$41.40MARB
PAIN0051-001 · Painters and Allied Trades agreement, June 1, 2025
PAINTERS: COMMERCIAL AND MOLD REMEDIATION, PAINTERS, WALLCOVERS AND DRYWALL FINISHERS$29.16$11.86$41.02Agreement
PAINTERS: ALL INDUSTRIAL WORK$34.30$12.98$47.28Agreement
PAINTERS: BRIDGES, HEAVY HIGHWAY, LEAD ABATEMENT AND FLAME/THERMAL SPRAY$42.93$13.77$56.70Agreement
METAL POLISHING AND REFINISHING$28.46$11.56$40.02Agreement
PLAS0891-001 · Plasterers and Cement Masons agreement, March 1, 2025
CEMENT MASONS: (HEAVY CONSTRUCTION ONLY)$30.50$14.23$44.73Agreement
PLAS0891-002 · Plasterers and Cement Masons agreement, June 1, 2025
CEMENT MASONS: CEMENT MASONS (PAVING & INCIDENTAL GRADING)$23.50$9.75$33.25Agreement
CEMENT MASONS: CONCRETE SAW OPERATORS (PAVING & INCIDENTAL GRADING)$23.50$9.75$33.25Agreement
CEMENT MASONS: FORM SETTERS (PAVING & INCIDENTAL GRADING)$23.50$9.75$33.25Agreement
PLUM0005-001 · Plumbers and Pipefitters agreement, August 1, 2025
PLUMBERS (PAID HOLIDAYS…
Full text

PLUMBERS (PAID HOLIDAYS: LABOR DAY, VETERANS' DAY, THANKSGIVING DAY AND THE DAY AFTER THANKSGIVING, CHRISTMAS DAY, NEW YEAR'S DAY, MARTIN LUTHER KING'S BIRTHDAY, MEMORIAL DAY AND THE FOURTH OF JULY.)

$53.30$23.71$77.01Agreement
PLUM0602-005 · Plumbers and Pipefitters agreement, August 1, 2025
STEAMFITTER, REFRIGERATION & AIR CONDITIONING MECHANIC…
Full text

STEAMFITTER, REFRIGERATION & AIR CONDITIONING MECHANIC (PAID HOLIDAYS: NEW YEAR'S DAY, MARTIN LUTHER KING'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS DAY, THANKSGIVING DAY AND THE DAY AFTER THANKSGIVING AND CHRISTMAS DAY)

$55.00$24.46$79.46Agreement
SHEE0100-001 · Sheet Metal Workers agreement, November 1, 2025
SHEET METAL WORKER…
Full text

SHEET METAL WORKER (PAID HOLIDAYS: NEW YEAR'S DAY, MARTIN LUTHER KING'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS DAY, THANKSGIVING DAY AND CHRISTMAS DAY)

$53.42$23.20$76.62Agreement
TEAM0639-001 · Teamsters agreement, June 1, 2025
TRUCK DRIVERS: HEAVY & HIGHWAY CONSTRUCTION - TRACTOR TRAILER…
Full text

TRUCK DRIVERS: HEAVY & HIGHWAY CONSTRUCTION - TRACTOR TRAILER, LOW BOY (VACATION: EMPLOYEES WILL RECEIVE ONE (1) WEEK'S PAID VACATION AFTER ONE (1) YEAR OF SERVICE.)

$33.75$7.30$41.05Agreement
TRUCK DRIVERS: HEAVY & HIGHWAY CONSTRUCTION - TRUCK DRIVERS…
Full text

TRUCK DRIVERS: HEAVY & HIGHWAY CONSTRUCTION - TRUCK DRIVERS (VACATION: EMPLOYEES WILL RECEIVE ONE (1) WEEK'S PAID VACATION AFTER ONE (1) YEAR OF SERVICE.)

$31.75$7.30$39.05Agreement
TEAM0639-005 · Teamsters agreement, June 1, 2025
TRUCK DRIVERS: PAVING & INCIDENTAL GRADING…
Full text

TRUCK DRIVERS: PAVING & INCIDENTAL GRADING: ALL PAVING PROJECTS WHERE THE GRADING IS INCIDENTAL TO THE PAVING A. VACATION: EMPLOYEES WILL RECEIVE ONE (1) WEEK'S PAID VACATION AFTER ONE (1) YEAR OF SERVICE

$31.75$7.30$39.05Agreement

Modification history

Modification 3January 23, 2026
Modification 4May 18, 2026
Modification 5July 30, 2026
Modification 6August 27, 2026 (current)

Published by the Wage and Hour Division; read from sam.gov. The sheet is checked for a newer modification each day. Contracts awarded since January 1, 2017 also carry Executive Order 13706 paid sick leave (one hour per 30 worked, up to 56 a year).

Questions people ask

Which rate do I pay on DC20260001?
The line for the classification of work actually performed: the basic rate plus the fringe. You may pay the fringe into benefit plans, as cash on every hour, or a mix. Overtime after 40 hours is 1.5 times the basic rate; fringe is paid on every hour and never multiplied.
My trade is not on this sheet. What do I do?
Do not borrow the nearest name. Ask the contracting agency for a conformance on Standard Form 1444 before the first week of that work, and note it as pending on the payroll.
Does modification 6 apply to my contract?
Only if it was in force when your contract was awarded (generally at bid opening). An earlier modification locked into the contract keeps applying, except on option years, added scope and indefinite-quantity contracts. The number and modification are on the first page of the exhibit in your contract.

How to read a wage determination · Paying the fringe in cash or through plans · Overtime on these rates · Fringe credit calculator