CertifiedHours

Prevailing wage rates · Connecticut · Wage determination

Prevailing wage rates: New Haven County, Connecticut

Building construction · CT20260023 modification 2, published May 18, 2026

The short answer

This sheet sets 35 classifications for building work in New Haven County, Connecticut. Each line is a basic hourly rate plus a fringe rate, and the sum is the minimum you must pay for that work, from $45.89 an hour (laborer: common or general) to $105.16 (elevator mechanic). Your contract may lock an earlier modification.

What changed this year

First published January 2, 2026, this sheet is now on modification 2, and its rates have changed in 2 modifications. Of the 35 rates we can follow line by line from the first publication to today, 5 are higher.

If you bid the job or set pay from an earlier copy, find your trades below. The rates that bind you are the ones in the modification written into your contract.

Latest change

May 18, 2026 · modification 2

6 fringe formulas changed

  • Electrician: 5 fringe formulas changed
  • Elevator mechanic: 1 fringe formula changed
Every line that changed (6)
ClassificationWasNowChange
ELECTRICIAN$46.48 + 3%+36.66$46.48 + $38.05changed
ELECTRICIAN (ALARM INSTALLATION ONLY)$46.48 + 3%+36.66$46.48 + $38.05changed
ELECTRICIAN: COMMUNICATION TECHNICIAN$46.48 + 3%+36.66$46.48 + $38.05changed
ELECTRICIAN (LOW VOLTAGE WIRING ONLY)$46.48 + 3%+36.66$46.48 + $38.05changed
ELECTRICIAN (HVAC/TEMPERATURE CONTROLS INSTALLATION)$47.40 + 3%+35.32$47.40 + $36.74changed
ELEVATOR MECHANIC$66.72 + 38.435+a+b$66.72 + $38.44changed

Earlier modifications

  • January 23, 2026 · modification 15 rates raised
    • Bricklayer: 1 rate raised by $5.00 an hour
    • Cement mason/concrete finisher: 1 rate raised by $5.00 an hour
    • Millwright: 1 rate raised by $3.00 an hour
    • Roofer composition: 1 rate raised by $0.22 an hour
    • Roofer slate and tile: 1 rate raised by $0.22 an hour
    Every line that changed (5)
    ClassificationWasNowChange
    BRICKLAYER$42.61 + $34.89$45.56 + $36.94+$5.00 (+6.5%)
    CEMENT MASON/CONCRETE FINISHER$42.61 + $34.89$45.56 + $36.94+$5.00 (+6.5%)
    MILLWRIGHT$43.25 + $29.13$45.14 + $30.24+$3.00 (+4.1%)
    ROOFER Composition$45.15 + $23.31$45.15 + $23.53+$0.22 (+0.3%)
    ROOFER Slate and Tile$45.65 + $23.31$45.65 + $23.53+$0.22 (+0.3%)

Compared line by line from each modification as published on SAM.gov. A line we could not pair with certainty is left out rather than guessed.

Rates by classification

These are the rates in modification 2 as published on SAM.gov. The determination and modification written into your contract are the ones that bind you; check that number before relying on this table. Total is the basic rate plus the fringe. Source is the agreement or survey the rate came from and its year; a survey year long past means the rate has not been surveyed since. A marker means the group changed in this modification. In the Since column, a dash means SAM.gov reworded the line during the year and it cannot be matched to the first publication with certainty. A dagger (†) means the fringe carries a footnote or percentage the total does not include; read the group’s notes.

ClassificationBasic rateFringeTotalSince Jan 2Source
ASBE0033-002 · Asbestos Workers and Heat & Frost Insulators agreement, June 1, 2025
HEAT & FROST INSULATOR (INCLUDES DUCT, PIPE AND MECHANICAL SYSTEMS)$48.81$33.65$82.46no changeAgreement, 2025
BRCT0001-001 · Bricklayers agreement, January 5, 2026
BRICKLAYER$45.56$36.94$82.50+$5.00 (+6.5%)Agreement, 2026
BRCT0001-005 · Bricklayers agreement, January 5, 2026
CEMENT MASON/CONCRETE FINISHER$45.56$36.94$82.50+$5.00 (+6.5%)Agreement, 2026
CARP0326-023 · Carpenters agreement, May 5, 2025
CARPENTER (INCLUDES ACOUSTICAL CEILING INSTALLATION…
Full text

CARPENTER (INCLUDES ACOUSTICAL CEILING INSTALLATION, DRYWALL HANGING, FORM WORK, METAL STUD INSTALLATION, SOFT FLOOR LAYER - VINYL AND RESILIENT)

$42.03$29.19$71.22no changeAgreement, 2025
CARP0326-024 · Carpenters agreement, May 5, 2025
FLOOR LAYER: CARPET ONLY$42.03$29.19$71.22no changeAgreement, 2025
CARP0326-025 · Carpenters agreement, May 5, 2025
FLOOR LAYER: HARDWOOD FLOORS ONLY$42.03$29.19$71.22no changeAgreement, 2025
CARP0326-026 · Carpenters agreement, May 5, 2025
METAL BUILDING ERECTOR (METAL SIDING / WALL PANELS)$42.03$29.19$71.22no changeAgreement, 2025
CARP0326-027 · Carpenters agreement, May 5, 2025
CARPENTER (SCAFFOLD BUILDER)$42.03$29.19$71.22no changeAgreement, 2025
CARP0326-036 · Carpenters agreement, May 5, 2025
SOFT FLOOR LAYER$42.03$29.19$71.22no changeAgreement, 2025
CARP1121-006 · Carpenters agreement, January 5, 2026
MILLWRIGHT$45.14$30.24$75.38+$3.00 (+4.1%)Agreement, 2026
ELEC0090-012 · Electrical Workers (IBEW) agreement, June 1, 2024
ELECTRICIAN$46.48$38.05$84.53changedAgreement, 2024
ELEC0090-013 · Electrical Workers (IBEW) agreement, June 1, 2025
ELECTRICIAN (ALARM INSTALLATION ONLY)$46.48$38.05$84.53changedAgreement, 2025
ELEC0090-014 · Electrical Workers (IBEW) agreement, June 1, 2025
ELECTRICIAN: COMMUNICATION TECHNICIAN$46.48$38.05$84.53changedAgreement, 2025
ELEC0090-015 · Electrical Workers (IBEW) agreement, June 1, 2025
ELECTRICIAN (LOW VOLTAGE WIRING ONLY)$46.48$38.05$84.53changedAgreement, 2025
ELEC0488-003 · Electrical Workers (IBEW) agreement, June 1, 2025
ELECTRICIAN (HVAC/TEMPERATURE CONTROLS INSTALLATION)$47.40$36.74$84.14changedAgreement, 2025
ELEV0091-002 · Elevator Constructors agreement, January 1, 2025
ELEVATOR MECHANIC

FOOTNOTE: A.VACATION: 6%/UNDER 5 YEARS BASED ON REGULAR HOURLY RATE FOR ALL HOURS WORKED. 8%/OVER 5 YEARS BASED ON REGULAR HOURLY RATE FOR ALL HOURS WORKED. B. PAID HOLIDAYS: NEW YEAR'S DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERANS' DAY; THANKSGIVING DAY; THE FRIDAY AFTER THANKSGIVING DAY; AND CHRISTMAS DAY

$66.72$38.44$105.16changedAgreement, 2025
ENGI0478-004 · Operating Engineers agreement, April 6, 2025
POWER EQUIPMENT OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE

PAID HOLIDAYS: NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS 3 DAYS DURING THE WEEK IN WHICH THE HOLIDAY FALLS, IF SCHEDULED, AND IF SCHEDULED, THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY

$51.92$29.80$81.72no changeAgreement, 2025
ENGI0478-005 · Operating Engineers agreement, April 6, 2025
POWER EQUIPMENT OPERATOR, BULLDOZER: ROUGH GRADE DOZER

PAID HOLIDAYS: NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS 3 DAYS DURING THE WEEK IN WHICH THE HOLIDAY FALLS, IF SCHEDULED, AND IF SCHEDULED, THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY

$50.22$29.80$80.02no changeAgreement, 2025
POWER EQUIPMENT OPERATOR, BULLDOZER: FINEGRADE (SLOPES, SHAPING, LASER OR GPS, ETC.)

PAID HOLIDAYS: NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS 3 DAYS DURING THE WEEK IN WHICH THE HOLIDAY FALLS, IF SCHEDULED, AND IF SCHEDULED, THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY

$51.92$29.80$81.72no changeAgreement, 2025
ENGI0478-012 · Operating Engineers agreement, April 6, 2025
POWER EQUIPMENT OPERATOR: CRANE UNDER 100 TON RATED CAPACITY)

PAID HOLIDAYS: NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS 3 DAYS DURING THE WEEK IN WHICH THE HOLIDAY FALLS, IF SCHEDULED, AND IF SCHEDULED, THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY

$56.79$29.80$86.59no changeAgreement, 2025
ENGI0478-016 · Operating Engineers agreement, April 6, 2025
POWER EQUIPMENT OPERATOR: LOADER - 7 CUBIC YARDS OR OVER

PAID HOLIDAYS: NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS 3 DAYS DURING THE WEEK IN WHICH THE HOLIDAY FALLS, IF SCHEDULED, AND IF SCHEDULED, THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY

$53.33$29.80$83.13no changeAgreement, 2025
IRON0424-001 · Ironworkers agreement, June 2, 2025
IRONWORKER: REINFORCING, STRUCTURAL, ORNAMENTAL$45.25$43.62$88.87no changeAgreement, 2025
LABO0455-001 · Laborers agreement, April 6, 2025
LABORER: MASON TENDER- CEMENT/CONCRETE$35.70$28.85$64.55no changeAgreement, 2025
PAIN0011-014 · Painters and Allied Trades agreement, June 1, 2025
GLAZIER$43.13$26.75$69.88no changeAgreement, 2025
PAIN0011-021 · Painters and Allied Trades agreement, June 1, 2025
PAINTER: BRUSH AND ROLLER$39.57$26.75$66.32no changeAgreement, 2025
PAIN0011-023 · Painters and Allied Trades agreement, June 1, 2025
DRYWALL FINISHER/TAPER$40.32$26.75$67.07no changeAgreement, 2025
PLUM0777-001 · Plumbers and Pipefitters agreement, June 1, 2025
PLUMBER$50.58$35.85$86.43no changeAgreement, 2025
PLUM0777-008 · Plumbers and Pipefitters agreement, June 1, 2025
PIPEFITTER (INCLUDES HVAC PIPE INSTALLATION)$50.58$35.85$86.43no changeAgreement, 2025
ROOF0009-001 · Roofers agreement, January 1, 2026
ROOFER: SLATE AND TILE$45.65$23.53$69.18+$0.22 (+0.3%)Agreement, 2026
ROOFER: COMPOSITION$45.15$23.53$68.68+$0.22 (+0.3%)Agreement, 2026
SHEE0040-001 · Sheet Metal Workers agreement, July 1, 2025
SHEET METAL WORKER (INCLUDING HVAC UNIT INSTALLATION)$44.70$44.50$89.20no changeAgreement, 2025
SHEE0040-002 · Sheet Metal Workers agreement, July 1, 2025
SHEET METAL WORKER (METAL FLASHING AND HVAC DUCT INSTALLATION ONLY)$44.70$44.50$89.20no changeAgreement, 2025
SHEE0040-008 · Sheet Metal Workers agreement, July 1, 2025
SHEET METAL WORKER (METAL ROOFS INSTALLATION)$44.70$44.50$89.20no changeAgreement, 2025
SUCT2016-005 · Survey of contractors in CT, September 19, 2018
LABORER: COMMON OR GENERAL$27.85$18.04$45.89no changeSurvey, 2018
TEAM0191-001 · Teamsters agreement, April 6, 2025
TRUCK DRIVER: DUMP TRUCK$36.39$32.68$69.07no changeAgreement, 2025

Modification history

Modification 1January 23, 2026
Modification 2May 18, 2026 (current)

Published by the Wage and Hour Division; read from sam.gov. The sheet is checked for a newer modification each day. Contracts awarded since January 1, 2017 also carry Executive Order 13706 paid sick leave (one hour per 30 worked, up to 56 a year).

Questions people ask

Which rate do I pay on CT20260023?
The line for the classification of work actually performed: the basic rate plus the fringe. You may pay the fringe into benefit plans, as cash on every hour, or a mix. Overtime after 40 hours is 1.5 times the basic rate; fringe is paid on every hour and never multiplied.
My trade is not on this sheet. What do I do?
Do not borrow the nearest name. Ask the contracting agency for a conformance on Standard Form 1444 before the first week of that work, and note it as pending on the payroll.
Does modification 2 apply to my contract?
Only if it was in force when your contract was awarded (generally at bid opening). An earlier modification locked into the contract keeps applying, except on option years, added scope and indefinite-quantity contracts. The number and modification are on the first page of the exhibit in your contract.

How to read a wage determination · Paying the fringe in cash or through plans · Overtime on these rates · Fringe credit calculator

Put these rates on a certified payroll.

Start here and CT20260023 is already filled in when you set up the job. CertifiedHours loads this sheet, checks every line against it as you type hours, and prints the WH-347. Free for one payroll a month.

Start a payroll on this sheet

On this sheet

  • 35 classifications in 33 rate groups
  • 32 from agreements, 1 from surveys
  • Counties: New Haven