Prevailing wage rates · Colorado · Wage determination
Prevailing wage rates: Cheyenne, Kit Carson, Lincoln and 6 more counties, Colorado
Highway construction · CO20260011 modification 1, published May 18, 2026
The short answer
This sheet sets 72 classifications for highway work in Cheyenne, Kit Carson, Lincoln and 6 more counties, Colorado. Each line is a basic hourly rate plus a fringe rate, and the sum is the minimum you must pay for that work, from $12.63 an hour (laborer: traffic control (flagger)) to $52.54 (power equipment operator: (6)-crane (91-140 tons)). Your contract may lock an earlier modification.
What changed this year
First published January 2, 2026, this sheet is now on modification 1, but none of its modifications has changed a rate.
Latest change
May 18, 2026 · modification 1
Classification names reworded; no change among the 72 lines we could match
SAM.gov reworded this sheet’s classification names in this modification, so not every line can be matched to the one before. Only lines matched with certainty are compared here; nothing is guessed. If your trade is not listed, compare it against your contract’s copy.
Compared line by line from each modification as published on SAM.gov. A line we could not pair with certainty is left out rather than guessed.
Rates by classification
These are the rates in modification 1 as published on SAM.gov. The determination and modification written into your contract are the ones that bind you; check that number before relying on this table. Total is the basic rate plus the fringe. Source is the agreement or survey the rate came from and its year; a survey year long past means the rate has not been surveyed since. A marker means the group changed in this modification. In the Since column, a dash means SAM.gov reworded the line during the year and it cannot be matched to the first publication with certainty. A dagger (†) means the fringe carries a footnote or percentage the total does not include; read the group’s notes.
| Classification | Basic rate | Fringe | Total | Source |
|---|---|---|---|---|
| ENGI0009-015 · Operating Engineers agreement, May 1, 2024 | ||||
| POWER EQUIPMENT OPERATOR: (6)-CRANE (91-140 TONS) | $37.34 | $15.20 | $52.54 | Agreement, 2024 |
POWER EQUIPMENT OPERATOR…Full textPOWER EQUIPMENT OPERATOR: (5)-DRILL RIG CAISSON (WATSON 2500 SIMILAR OR LARGER), CRANE (51-90 TONS) | $35.41 | $15.20 | $50.61 | Agreement, 2024 |
| POWER EQUIPMENT OPERATOR: (4)-CRANE (50 TONS AND UNDER) | $35.78 | $15.20 | $50.98 | Agreement, 2024 |
| POWER EQUIPMENT OPERATOR: (3)-ASPHALT SCREED (KIT CARSON COUNTY) | $35.03 | $15.20 | $50.23 | Agreement, 2024 |
POWER EQUIPMENT OPERATOR…Full textPOWER EQUIPMENT OPERATOR: (3)- DRILL RIG CAISSON (SMALLER THAN WATSON 2500 AND SIMILAR), POWER BROOM/SWEEPER (70 HP AND OVER) | $35.03 | $15.20 | $50.23 | Agreement, 2024 |
| POWER EQUIPMENT OPERATOR: (1)-POWER BROOM/SWEEPER(UNDER 70 HP) | $34.14 | $15.20 | $49.34 | Agreement, 2024 |
| LABO0720-004 · Laborers agreement, May 1, 2021 | ||||
| LABORER, COMMON OR GENERAL (KIT CARSON COUNTY) | $20.84 | $7.04 | $27.88 | Agreement, 2021 |
| SUCO2011-006 · Survey of contractors in CO, September 15, 2011 | ||||
| TRUCK DRIVER: WATER TRUCK | $14.88 | $2.07 | $16.95 | Survey, 2011 |
| TRUCK DRIVER: SEMI TRUCK (LOGAN, PHILLIPS, SEDGWICK, WASHINGTON, YUMA) | $15.80 | $4.67 | $20.47 | Survey, 2011 |
| TRUCK DRIVER: SEMI TRUCK (CHEYENNE, KIT CARSON, LINCOLN, MORGAN) | $17.58 | $4.67 | $22.25 | Survey, 2011 |
| TRUCK DRIVER: PICKUP AND PILOT CAR | $14.04 | $3.49 | $17.53 | Survey, 2011 |
| TRUCK DRIVER: MULTI-PURPOSE SPECIALTY & HOISTING TRUCK | $18.79 | $3.49 | $22.28 | Survey, 2011 |
| TRUCK DRIVER: MECHANIC | $17.79 | $3.51 | $21.30 | Survey, 2011 |
| TRUCK DRIVER: LOWBOY TRUCK | $18.29 | $4.87 | $23.16 | Survey, 2011 |
| TRUCK DRIVER: DUMP TRUCK (SEDGWICK) | $18.92 | $6.19 | $25.11 | Survey, 2011 |
| TRUCK DRIVER: DUMP TRUCK (LINCOLN) | $14.15 | $3.83 | $17.98 | Survey, 2011 |
| TRUCK DRIVER: DUMP TRUCK (CHEYENNE, LOGAN, MORGAN, PHILLIPS, WASHINGTON, YUMA) | $18.52 | $5.96 | $24.48 | Survey, 2011 |
| TRUCK DRIVER: DISTRIBUTOR | $17.98 | $5.27 | $23.25 | Survey, 2011 |
| POWER EQUIPMENT OPERATOR: TRACTOR | $16.83 | $2.95 | $19.78 | Survey, 2011 |
POWER EQUIPMENT OPERATOR…Full textPOWER EQUIPMENT OPERATOR: SCREED (CHEYENNE, LINCOLN, LOGAN, MORGAN, PHILLIPS, SEDGWICK, WASHINGTON, YUMA) | $21.30 | $6.40 | $27.70 | Survey, 2011 |
| POWER EQUIPMENT OPERATOR: SCRAPER | $19.93 | $5.38 | $25.31 | Survey, 2011 |
| POWER EQUIPMENT OPERATOR: ROLLER/COMPACTOR (DIRT AND GRADE COMPACTION) | $16.52 | $4.87 | $21.39 | Survey, 2011 |
| POWER EQUIPMENT OPERATOR: OILER | $22.54 | $9.22 | $31.76 | Survey, 2011 |
| POWER EQUIPMENT OPERATOR: MECHANIC (SEDGWICK) | $21.09 | $4.87 | $25.96 | Survey, 2011 |
| POWER EQUIPMENT OPERATOR: MECHANIC (KIT CARSON) | $16.74 | $4.20 | $20.94 | Survey, 2011 |
POWER EQUIPMENT OPERATOR…Full textPOWER EQUIPMENT OPERATOR: MECHANIC (CHEYENNE, LINCOLN, LOGAN, MORGAN, PHILLIPS, WASHINGTON, YUMA) | $20.52 | $5.49 | $26.01 | Survey, 2011 |
| POWER EQUIPMENT OPERATOR: LOADER (FRONT END) (SEDGWICK) | $27.48 | $4.87 | $32.35 | Survey, 2011 |
POWER EQUIPMENT OPERATOR…Full textPOWER EQUIPMENT OPERATOR: LOADER (FRONT END) (CHEYENNE, KIT CARSON, LINCOLN, LOGAN, MORGAN, PHILLIPS, WASHINGTON, YUMA) | $27.22 | $5.85 | $33.07 | Survey, 2011 |
| POWER EQUIPMENT OPERATOR: GUARDRAIL/POST DRIVER | $16.07 | $4.41 | $20.48 | Survey, 2011 |
| POWER EQUIPMENT OPERATOR: GRADER/BLADE | $19.02 | $4.20 | $23.22 | Survey, 2011 |
| POWER EQUIPMENT OPERATOR: FORKLIFT | $18.30 | $2.01 | $20.31 | Survey, 2011 |
| POWER EQUIPMENT OPERATOR: DRILL | $20.49 | $2.66 | $23.15 | Survey, 2011 |
| POWER EQUIPMENT OPERATOR: CHIPPER | $22.04 | $8.26 | $30.30 | Survey, 2011 |
| POWER EQUIPMENT OPERATOR: BULLDOZER | $29.99 | $2.90 | $32.89 | Survey, 2011 |
| POWER EQUIPMENT OPERATOR: BOBCAT/SKID LOADER | $20.79 | $5.36 | $26.15 | Survey, 2011 |
| POWER EQUIPMENT OPERATOR: BACKHOE/TRACKHOE (KIT CARSON) | $28.64 | $1.40 | $30.04 | Survey, 2011 |
POWER EQUIPMENT OPERATOR…Full textPOWER EQUIPMENT OPERATOR: BACKHOE/TRACKHOE (CHEYENNE, LINCOLN, LOGAN, MORGAN, PHILLIPS, SEDGWICK, WASHINGTON, YUMA) | $25.88 | $4.18 | $30.06 | Survey, 2011 |
| POWER EQUIPMENT OPERATOR: ASPHALT SPREADER | $23.19 | $7.66 | $30.85 | Survey, 2011 |
| POWER EQUIPMENT OPERATOR: ASPHALT ROLLER (SEDQWICK) | $23.92 | $9.22 | $33.14 | Survey, 2011 |
POWER EQUIPMENT OPERATOR…Full textPOWER EQUIPMENT OPERATOR: ASPHALT ROLLER (CHEYENNE, KIT CARSON, LINCOLN, LOGAN, MORGAN, PHILLIPS, WASHINGTON, YUMA) | $23.79 | $7.59 | $31.38 | Survey, 2011 |
| POWER EQUIPMENT OPERATOR: ASPHALT PLANT | $21.13 | $2.16 | $23.29 | Survey, 2011 |
| POWER EQUIPMENT OPERATOR: ASPHALT PAVER | $22.67 | $8.72 | $31.39 | Survey, 2011 |
| POWER EQUIPMENT OPERATOR: ASPHALT LAYDOWN | $24.56 | $6.68 | $31.24 | Survey, 2011 |
| PAINTER (SPRAY ONLY) | $17.54 | $3.52 | $21.06 | Survey, 2011 |
LABORER: TRAFFIC CONTROL…Full textLABORER: TRAFFIC CONTROL (SETS UP/MOVES BARRELS, CONES, INSTALL SIGNS, ARROW BOARDS AND PLACE STATIONARY FLAGS)(EXCLUDES FLAGGERS) | $12.39 | $3.20 | $15.59 | Survey, 2011 |
| LABORER: TRAFFIC CONTROL (FLAGGER) | $9.42 | $3.21 | $12.63 | Survey, 2011 |
| LABORER: MASON TENDER-CEMENT/CONCRETE | $14.71 | $3.29 | $18.00 | Survey, 2011 |
| LABORER: LANDSCAPE AND IRRIGATION | $12.81 | $3.16 | $15.97 | Survey, 2011 |
| LABORER: CONCRETE SAW (HAND HELD) | $16.00 | $6.14 | $22.14 | Survey, 2011 |
LABORER: COMMON OR GENERAL…Full textLABORER: COMMON OR GENERAL (CHEYENNE, LINCOLN, LOGAN, MORGAN, PHILLIPS, SEDGQICK, WASHINGTON, YUMA) | $12.44 | $3.53 | $15.97 | Survey, 2011 |
| LABORER: ASPHALT SPREADER | $22.67 | $8.72 | $31.39 | Survey, 2011 |
| LABORER: ASPHALT RAKER (SEDGWICK) | $15.79 | $4.87 | $20.66 | Survey, 2011 |
LABORER: ASPHALT RAKER…Full textLABORER: ASPHALT RAKER (CHEYENNE, KIT CARSON, LINCOLN, LOGAN, MORGAN, PHILLIPS, WASHINGTON, YUMA) | $17.02 | $5.79 | $22.81 | Survey, 2011 |
| IRONWORKER, STRUCTURAL | $16.76 | $6.01 | $22.77 | Survey, 2011 |
| IRONWORKER, REINFORCING | $21.12 | $3.89 | $25.01 | Survey, 2011 |
| HIGHWAY/PARKING LOT STRIPING: PAINTER | $12.90 | $3.07 | $15.97 | Survey, 2011 |
| HIGHWAY/PARKING LOT STRIPING: TRUCK DRIVER (LINE STRIPING TRUCK) | $14.60 | $3.49 | $18.09 | Survey, 2011 |
| ELECTRICIAN | $28.06 | $8.76 | $36.82 | Survey, 2011 |
| CEMENT MASON/CONCRETE FINISHER (LINCOLN) | $21.00 | $1.40 | $22.40 | Survey, 2011 |
| CEMENT MASON/CONCRETE FINISHER (KIT CARSON) | $17.98 | $2.53 | $20.51 | Survey, 2011 |
CEMENT MASON/CONCRETE FINISHER…Full textCEMENT MASON/CONCRETE FINISHER (CHEYENNE, LOGAN, MORGAN, PHILLIPS, SEDGWICK, WASHINGTON, YUMA) | $19.22 | $2.74 | $21.96 | Survey, 2011 |
| CARPENTER, FORM WORK ONLY (LINCOLN) | $20.98 | $3.89 | $24.87 | Survey, 2011 |
CARPENTER, FORM WORK ONLY…Full textCARPENTER, FORM WORK ONLY (CHEYENNE, KIT CARSON, LOGAN, MORGAN, PHILLIPS, SEDGWICK, WASHINGTON, YUMA) | $20.28 | $4.50 | $24.78 | Survey, 2011 |
| CARPENTER (EXCLUDES FORM WORK) | $18.96 | $3.18 | $22.14 | Survey, 2011 |
| TEAM0455-001 · Teamsters agreement, May 1, 2025 | ||||
| TRUCK DRIVER: DUMP (UP TO AND INCLUDING 6 CU. YDS.) (KIT CARSON COUNTY) | $27.10 | $4.87 | $31.97 | Agreement, 2025 |
| TRUCK DRIVER: DUMP (UP TO 39 CU. YDS UP TO AND INCLUDING 54 CU. YDS) (KIT CARSON COUNTY) | $28.21 | $4.87 | $33.08 | Agreement, 2025 |
| TRUCK DRIVER: DUMP (OVER 80 CU. YDS UP TO AND INCLUDING 104 CU. YDS) (KIT CARSON COUNTY) | $28.77 | $4.87 | $33.64 | Agreement, 2025 |
| TRUCK DRIVER: DUMP (OVER 6 CU. YDS UP TO AND INCLUDING 14 CU. YDS) (KIT CARSON COUNTY) | $27.25 | $4.87 | $32.12 | Agreement, 2025 |
| TRUCK DRIVER: DUMP (OVER 54 CU. YDS UP TO AND INCLUDING 79 CU. YDS) (KIT CARSON COUNTY) | $28.50 | $4.87 | $33.37 | Agreement, 2025 |
| TRUCK DRIVER: DUMP (OVER 30 CU.YDS UP TO AND INCLUDING 38 CU. YDS) (KIT CARSON COUNTY) | $27.93 | $4.87 | $32.80 | Agreement, 2025 |
| TRUCK DRIVER: DUMP (OVER 14 CU. YDS UP TO AND INCLUDING 29 CU. YDS) (KIT CARSON COUNTY) | $27.59 | $4.87 | $32.46 | Agreement, 2025 |
| TRUCK DRIVER: DUMP (OVER 104 CU. YDS) (KIT CARSON COUNTY) | $29.06 | $4.87 | $33.93 | Agreement, 2025 |
Modification history
| Modification 0 | January 2, 2026 |
| Modification 1 | May 18, 2026 (current) |
Published by the Wage and Hour Division; read from sam.gov. The sheet is checked for a newer modification each day. Contracts awarded since January 1, 2017 also carry Executive Order 13706 paid sick leave (one hour per 30 worked, up to 56 a year).
Questions people ask
- Which rate do I pay on CO20260011?
- The line for the classification of work actually performed: the basic rate plus the fringe. You may pay the fringe into benefit plans, as cash on every hour, or a mix. Overtime after 40 hours is 1.5 times the basic rate; fringe is paid on every hour and never multiplied.
- My trade is not on this sheet. What do I do?
- Do not borrow the nearest name. Ask the contracting agency for a conformance on Standard Form 1444 before the first week of that work, and note it as pending on the payroll.
- Does modification 1 apply to my contract?
- Only if it was in force when your contract was awarded (generally at bid opening). An earlier modification locked into the contract keeps applying, except on option years, added scope and indefinite-quantity contracts. The number and modification are on the first page of the exhibit in your contract.
How to read a wage determination · Paying the fringe in cash or through plans · Overtime on these rates · Fringe credit calculator
Put these rates on a certified payroll.
Start here and CO20260011 is already filled in when you set up the job. CertifiedHours loads this sheet, checks every line against it as you type hours, and prints the WH-347. Free for one payroll a month.
Start a payroll on this sheetOn this sheet
- 72 classifications in 4 rate groups
- 3 from agreements, 1 from surveys
- Counties: Cheyenne, Kit Carson, Lincoln, Logan, Morgan, Phillips, Sedgwick, Washington, Yuma