Prevailing wage rates: Baca, Bent, Costilla and 6 more counties, Colorado

Highway construction · CO20260010 modification 1, published May 18, 2026

The short answer

This sheet sets 50 classifications for highway work in Baca, Bent, Costilla and 6 more counties, Colorado. Each line is a basic hourly rate plus a fringe rate, and the sum is the minimum you must pay for that work, from $12.63 an hour (laborer: traffic control (flagger)) to $50.78 (power equipment operator: (6)-crane (91-140 tons)). Your contract may lock an earlier modification.

Rates by classification

Total is the basic rate plus the fringe. Source is the agreement or survey the rate came from; a marker means the group changed in this modification. A dagger (†) means the fringe carries a footnote or percentage the total does not include; read the group’s notes.

ClassificationBasic rateFringeTotalSource
CARP9901-008 · Carpenters agreement, May 1, 2024
CARPENTER (FORM WORK ONLY)$33.11$12.17$45.28Agreement
ENGI0009-014 · Operating Engineers agreement, May 1, 2024
POWER EQUIPMENT OPERATOR: (6)-CRANE (91-140 TONS)$35.58$15.20$50.78Agreement
POWER EQUIPMENT OPERATOR…
Full text

POWER EQUIPMENT OPERATOR: (5)-DRILL RIG CAISSON (WATSON 2500 SIMILAR OR LARGER), CRANE (51-90 TONS).$ 35.41 15.20 POWER EQUIPMENT OPERATOR: (4)-CRANE (50 TONS AND UNDER)

$35.20$15.20$50.40Agreement
POWER EQUIPMENT OPERATOR…
Full text

POWER EQUIPMENT OPERATOR: (3)- DRILL RIG CAISSON (SMALLER THAN WATSON 2500 AND SIMILAR), POWER BROOM/SWEEPER (70 HP AND OVER)

$35.03$15.20$50.23Agreement
POWER EQUIPMENT OPERATOR: (1)-POWER BROOM/SWEEPER(UNDER 70 HP)$34.14$15.20$49.34Agreement
SUCO2011-005 · Survey of contractors in CO, September 15, 2011
TRUCK DRIVER: WATER TRUCK$14.88$2.07$16.95Survey
TRUCK DRIVER: PICKUP AND PILOT CAR$14.04$3.49$17.53Survey
TRUCK DRIVER: MULTI-PURPOSE SPECIALTY & HOISTING TRUCK$18.89$3.49$22.38Survey
TRUCK DRIVER: MECHANIC$17.79$3.51$21.30Survey
TRUCK DRIVER: LOWBOY TRUCK (LAS ANIMAS)$19.77$3.25$23.02Survey
TRUCK DRIVER: LOWBOY TRUCK…
Full text

TRUCK DRIVER: LOWBOY TRUCK (BACA, BENT, COSTILLA, CROWLEY, HUERFANO, KIOWA, OTERO, PROWERS)

$19.95$3.36$23.31Survey
TRUCK DRIVER: DUMP TRUCK$17.61$2.69$20.30Survey
TRUCK DRIVER: DISTRIBUTOR$17.98$5.27$23.25Survey
TRUCK DRIVER (SEMI TRUCK)$17.58$4.67$22.25Survey
POWER EQUIPMENT OPERATOR: TRACTOR$16.83$2.95$19.78Survey
POWER EQUIPMENT OPERATOR: SCREED$16.21$3.76$19.97Survey
POWER EQUIPMENT OPERATOR: SCRAPER$19.93$5.38$25.31Survey
POWER EQUIPMENT OPERATOR: ROLLER COMPACTOR (DIRT AND GRADE COMPACTION)$17.78$2.83$20.61Survey
POWER EQUIPMENT OPERATOR: MECHANIC$18.91$4.20$23.11Survey
POWER EQUIPMENT OPERATOR: LOADER (FRONT END) (LAS ANIMAS)$23.56$5.93$29.49Survey
POWER EQUIPMENT OPERATOR…
Full text

POWER EQUIPMENT OPERATOR: LOADER (FRONT END) (BACA, BENT, COSTILLA, CROWLEY, HUERFANO, KIOWA, OTERO, PROWERS)

$23.58$6.66$30.24Survey
POWER EQUIPMENT OPERATOR: GUARDRAIL/POST DRIVER$16.07$4.41$20.48Survey
POWER EQUIPMENT OPERATOR…
Full text

POWER EQUIPMENT OPERATOR: GRADER/BLADE (LAS ANIMAS).$ 18.88 3.14 POWER EQUIPMENT OPERATOR: GRADER/BLADE (BACA, BENT, COSTILLA, CROWLEY, HUERFANO, KIOWA, OTERO, PROWERS).$ 18.40 4.20 POWER EQUIPMENT OPERATOR: FORKLIFT

$18.30$5.01$23.31Survey
POWER EQUIPMENT OPERATOR: DRILL$20.49$2.66$23.15Survey
POWER EQUIPMENT OPERATOR: CHIPPER$22.04$8.26$30.30Survey
POWER EQUIPMENT OPERATOR: BULLDOZER$26.65$4.46$31.11Survey
POWER EQUIPMENT OPERATOR: BOBCAT/SKID LOADER$18.43$3.12$21.55Survey
POWER EQUIPMENT OPERATOR: BACKHOE/TRACKHOE (LAS ANIMAS)$24.70$3.40$28.10Survey
POWER EQUIPMENT OPERATOR…
Full text

POWER EQUIPMENT OPERATOR: BACKHOE/TRACKHOE (BACA, BENT, COSTILLA, CROWLEY, HUERFANO, KIOWA, OTERO, PROWERS)

$23.19$4.18$27.37Survey
POWER EQUIPMENT OPERATOR: ASPHALT SPREADER$23.19$7.66$30.85Survey
POWER EQUIPMENT OPERATOR: ASPHALT ROLLER$23.14$7.51$30.65Survey
POWER EQUIPMENT OPERATOR: ASPHALT PLANT$21.13$2.16$23.29Survey
POWER EQUIPMENT OPERATOR: ASPHALT PAVER$22.67$8.72$31.39Survey
POWER EQUIPMENT OPERATOR: ASPHALT LAYDOWN$24.17$6.73$30.90Survey
POWER EQUIPMENT OPERATOR: (OILER)$22.54$9.22$31.76Survey
PAINTER (SPRAY ONLY)$17.54$3.52$21.06Survey
LABORER: TRAFFIC CONTROL…
Full text

LABORER: TRAFFIC CONTROL (SETS UP/MOVES BARRELS, CONES, INSTALL SIGNS, ARROW BOARDS AND PLACE STATIONARY FLAGS) (EXCLUDES FLAGGERS)

$12.39$3.20$15.59Survey
LABORER: TRAFFIC CONTROL (FLAGGER)$9.42$3.21$12.63Survey
LABORER: MASON TENDER-CEMENT/CONCRETE$12.44$3.10$15.54Survey
LABORER: LANDSCAPE AND IRRIGATION$15.37$3.16$18.53Survey
LABORER: CONCRETE SAW (HAND HELD)$16.00$6.14$22.14Survey
LABORER: COMMON OR GENERAL (LAS ANIMAS)$14.52$3.53$18.05Survey
LABORER: COMMON OR GENERAL…
Full text

LABORER: COMMON OR GENERAL (BACA, BENT, COSTILLA, CROWLEY, HUERFANO, KIOWA, OTERO, PROWERS)

$14.48$3.53$18.01Survey
IRONWORKER, STRUCTURAL$16.76$6.01$22.77Survey
IRONWORKER, REINFORCING$16.94$6.77$23.71Survey
HIGHWAY/PARKING LOT STRIPING: PAINTER$13.92$3.07$16.99Survey
HIGHWAY/PARKING LOT STRIPING: TRUCK DRIVER (LINE STRIPING TRUCK)$14.60$3.49$18.09Survey
ELECTRICIAN$28.06$8.76$36.82Survey
CEMENT MASON/CONCRETE FINISHER (LAS ANIMAS)$17.24$2.85$20.09Survey
CEMENT MASON/CONCRETE FINISHER…
Full text

CEMENT MASON/CONCRETE FINISHER (BACA, BENT, COSTILLA, CROWLEY, HUERFANO, KIOWA, OTERO, PROWERS).$ 17.70 2.53 CARPENTER (EXCLUDES FORM WORK)

$18.96$3.18$22.14Survey

Modification history

Modification 0January 2, 2026
Modification 1May 18, 2026 (current)

Published by the Wage and Hour Division; read from sam.gov. The sheet is checked for a newer modification each day. Contracts awarded since January 1, 2017 also carry Executive Order 13706 paid sick leave (one hour per 30 worked, up to 56 a year).

Questions people ask

Which rate do I pay on CO20260010?
The line for the classification of work actually performed: the basic rate plus the fringe. You may pay the fringe into benefit plans, as cash on every hour, or a mix. Overtime after 40 hours is 1.5 times the basic rate; fringe is paid on every hour and never multiplied.
My trade is not on this sheet. What do I do?
Do not borrow the nearest name. Ask the contracting agency for a conformance on Standard Form 1444 before the first week of that work, and note it as pending on the payroll.
Does modification 1 apply to my contract?
Only if it was in force when your contract was awarded (generally at bid opening). An earlier modification locked into the contract keeps applying, except on option years, added scope and indefinite-quantity contracts. The number and modification are on the first page of the exhibit in your contract.

How to read a wage determination · Paying the fringe in cash or through plans · Overtime on these rates · Fringe credit calculator