CertifiedHours

Prevailing wage rates · Colorado · Wage determination

Prevailing wage rates: El Paso, Pueblo and Teller Counties, Colorado

Highway construction · CO20260008 modification 1, published May 18, 2026

The short answer

This sheet sets 77 classifications for highway work in El Paso, Pueblo and Teller Counties, Colorado. Each line is a basic hourly rate plus a fringe rate, and the sum is the minimum you must pay for that work, from $12.60 an hour (laborer: traffic control (flagger)) to $59.17 (electrician (el paso and teller counties)). Your contract may lock an earlier modification.

Rates by classification

Total is the basic rate plus the fringe. Source is the agreement or survey the rate came from; a marker means the group changed in this modification. A dagger (†) means the fringe carries a footnote or percentage the total does not include; read the group’s notes.

ClassificationBasic rateFringeTotalSource
ELEC0012-009 · Electrical Workers (IBEW) agreement, September 1, 2025
ELECTRICIAN (PUEBLO COUNTY)$35.40$16.06$51.46Agreement
ELEC0113-009 · Electrical Workers (IBEW) agreement, June 1, 2025
ELECTRICIAN (EL PASO AND TELLER COUNTIES)$40.70$18.47$59.17Agreement
ENGI0009-009 · Operating Engineers agreement, May 1, 2024
POWER EQUIPMENT OPERATOR: (6)-CRANE (91-140 TONS)$37.34$15.20$52.54Agreement
POWER EQUIPMENT OPERATOR…
Full text

POWER EQUIPMENT OPERATOR: (5)-DRILL RIG CAISSON (WATSON 2500 SIMILAR OR LARGER), CRANE (51-90 TONS).$ 35.41 15.20 POWER EQUIPMENT OPERATOR: (4)-CRANE (50 TONS AND UNDER)

$35.78$15.20$50.98Agreement
POWER EQUIPMENT OPERATOR: (3)-DRILL RIG CAISSON (SMALLER THAN WATSON 2500 AND SIMILAR)$35.20$15.20$50.40Agreement
SUCO2011-003 · Survey of contractors in CO, September 15, 2011
TRUCK DRIVER: WATER TRUCK (TELLER)$17.31$4.07$21.38Survey
TRUCK DRIVER: WATER TRUCK (PUEBLO)$20.93$4.98$25.91Survey
TRUCK DRIVER: WATER TRUCK (EL PASO)$17.24$4.15$21.39Survey
TRUCK DRIVER: TRUCK MOUNTED ATTENUATOR$12.43$3.22$15.65Survey
TRUCK DRIVER: SEMI/TRAILER TRUCK$16.00$2.60$18.60Survey
TRUCK DRIVER: PICKUP AND PILOT CAR$13.93$3.68$17.61Survey
TRUCK DRIVER: MULTI-PURPOSE SPECIALTY & HOISTING TRUCK$17.27$3.71$20.98Survey
TRUCK DRIVER: MECHANIC$26.69$3.50$30.19Survey
TRUCK DRIVER: LOWBOY TRUCK$17.25$5.27$22.52Survey
TRUCK DRIVER: DUMP TRUCK (PUEBLO)$16.87$4.79$21.66Survey
TRUCK DRIVER: DUMP TRUCK (EL PASO, TELLER)$16.85$4.83$21.68Survey
TRUCK DRIVER: DISTRIBUTOR (PUEBLO)$18.35$3.85$22.20Survey
TRUCK DRIVER: DISTRIBUTOR (EL PASO, TELLER)$17.98$3.97$21.95Survey
POWER EQUIPMENT OPERATOR: TRACTOR$13.13$2.95$16.08Survey
POWER EQUIPMENT OPERATOR: SCREED (PUEBLO)$23.67$9.22$32.89Survey
POWER EQUIPMENT OPERATOR: SCREED (EL PASO, TELLER)$25.22$5.74$30.96Survey
POWER EQUIPMENT OPERATOR: SCRAPER$24.28$4.83$29.11Survey
POWER EQUIPMENT OPERATOR: ROTOMILL$16.22$4.41$20.63Survey
POWER EQUIPMENT OPERATOR: ROLLER/COMPACTOR (DIRT AND GRADE COMPACTION) (PUEBLO,TELLER)$18.43$4.62$23.05Survey
POWER EQUIPMENT OPERATOR: ROLLER/COMPACTOR (DIRT AND GRADE COMPACTION) (EL PASO)$16.70$3.30$20.00Survey
POWER EQUIPMENT OPERATOR: OILER (TELLER)$22.68$7.11$29.79Survey
POWER EQUIPMENT OPERATOR: OILER (PUEBLO)$23.13$7.01$30.14Survey
POWER EQUIPMENT OPERATOR: OILER (EL PASO)$23.29$7.48$30.77Survey
POWER EQUIPMENT OPERATOR: MECHANIC (TELLER)$22.16$6.17$28.33Survey
POWER EQUIPMENT OPERATOR: MECHANIC (PUEBLO)$24.02$8.43$32.45Survey
POWER EQUIPMENT OPERATOR: MECHANIC (EL PASO)$22.35$6.36$28.71Survey
POWER EQUIPMENT OPERATOR: LOADER (FRONT END) (TELLER)$23.50$7.64$31.14Survey
POWER EQUIPMENT OPERATOR: LOADER (FRONT END) (PUEBLO)$21.67$8.22$29.89Survey
POWER EQUIPMENT OPERATOR: LOADER (FRONT END) (EL PASO)$23.61$7.79$31.40Survey
POWER EQUIPMENT OPERATOR: GUARDRAIL/POST DRIVER$16.07$4.41$20.48Survey
POWER EQUIPMENT OPERATOR: GRADER/BLADE (TELLER)$23.22$8.72$31.94Survey
POWER EQUIPMENT OPERATOR: GRADER/BLADE (PUEBLO)$23.25$6.98$30.23Survey
POWER EQUIPMENT OPERATOR: GRADER/BLADE (EL PASO)$22.83$8.72$31.55Survey
POWER EQUIPMENT OPERATOR: FORKLIFT$15.91$4.68$20.59Survey
POWER EQUIPMENT OPERATOR: DRILL$17.59$3.45$21.04Survey
POWER EQUIPMENT OPERATOR: BULLDOZER (PUEBLO, TELLER)$26.11$6.92$33.03Survey
POWER EQUIPMENT OPERATOR: BULLDOZER (EL PASO)$26.56$7.40$33.96Survey
POWER EQUIPMENT OPERATOR: BROOM/SWEEPER (PUEBLO)$23.47$9.22$32.69Survey
POWER EQUIPMENT OPERATOR: BROOM/SWEEPER (EL PASO, TELLER)$23.43$8.04$31.47Survey
POWER EQUIPMENT OPERATOR: BOOM$22.67$8.72$31.39Survey
POWER EQUIPMENT OPERATOR: BOBCAT/SKID LOADER$15.37$4.28$19.65Survey
POWER EQUIPMENT OPERATOR…
Full text

POWER EQUIPMENT OPERATOR: BACKHOE/TRACKHOE (TELLER).$ 23.32 5.50 POWER EQUIPMENT OPERATOR: BACKHOE/TRACKHOE (PUEBLO).$ 21.82 8.22 POWER EQUIPMENT OPERATOR: BACKHOE/TRACKHOE (EL PASO)

$23.31$5.61$28.92Survey
POWER EQUIPMENT OPERATOR: ASPHALT SPREADER$22.67$8.72$31.39Survey
POWER EQUIPMENT OPERATOR: ASPHALT ROLLER (TELLER)$24.42$6.96$31.38Survey
POWER EQUIPMENT OPERATOR: ASPHALT ROLLER (PUEBLO)$23.67$9.22$32.89Survey
POWER EQUIPMENT OPERATOR: ASPHALT ROLLER (EL PASO)$24.42$6.96$31.38Survey
POWER EQUIPMENT OPERATOR: ASPHALT PAVER$21.50$3.50$25.00Survey
POWER EQUIPMENT OPERATOR: ASPHALT LAYDOWN$22.67$8.72$31.39Survey
PAINTER (SPRAY ONLY)$16.99$2.87$19.86Survey
LABORER: TRAFFIC CONTROL…
Full text

LABORER: TRAFFIC CONTROL (SETS UP/MOVES BARRELS, CONES, INSTALL SIGNS, ARROW BOARDS AND PLACE STATIONARY FLAGS)(EXCLUDES FLAGGERS)

$12.43$3.22$15.65Survey
LABORER: TRAFFIC CONTROL (FLAGGER)$9.55$3.05$12.60Survey
LABORER: PIPELAYER$18.72$3.24$21.96Survey
LABORER: MASON TENDER-CEMENT/CONCRETE$16.29$4.25$20.54Survey
LABORER: LANDSCAPE AND IRRIGATION$12.26$3.16$15.42Survey
LABORER: CONCRETE SAW (HAND HELD)$16.29$6.14$22.43Survey
LABORER: COMMON OR GENERAL (TELLER)$16.88$3.61$20.49Survey
LABORER: COMMON OR GENERAL (PUEBLO)$16.29$4.25$20.54Survey
LABORER: COMMON OR GENERAL (EL PASO)$17.05$3.69$20.74Survey
LABORER: ASPHALT SPREADER$18.58$4.65$23.23Survey
LABORER: ASPHALT SHOVELER$21.21$4.25$25.46Survey
LABORER: ASPHALT RAKER$17.54$3.16$20.70Survey
IRONWORKER: STRUCTURAL (EXCLUDES GUARDRAIL INSTALLATION)$18.22$6.01$24.23Survey
IRONWORKER: REINFORCING (EXCLUDES GUARDRAIL INSTALLATION) (PUEBLO)$16.69$5.45$22.14Survey
IRONWORKER: REINFORCING (EXCLUDES GUARDRAIL INSTALLATION) (EL PASO, TELLER)$20.49$1.65$22.14Survey
HIGHWAY/PARKING LOT STRIPING: PAINTER$12.62$3.21$15.83Survey
GUARDRAIL INSTALLER$12.89$3.20$16.09Survey
FENCE ERECTOR$13.02$3.20$16.22Survey
CEMENT MASON/CONCRETE FINISHER (PUEBLO)$17.74$3.00$20.74Survey
CEMENT MASON/CONCRETE FINISHER (EL PASO, TELLER)$17.36$3.00$20.36Survey
CARPENTER, FORM WORK ONLY (PUEBLO)$19.00$5.88$24.88Survey
CARPENTER, FORM WORK ONLY (EL PASO, TELLER)$19.06$5.84$24.90Survey
CARPENTER (EXCLUDES FORM WORK)$24.15$6.25$30.40Survey

Modification history

Modification 0January 2, 2026
Modification 1May 18, 2026 (current)

Published by the Wage and Hour Division; read from sam.gov. The sheet is checked for a newer modification each day. Contracts awarded since January 1, 2017 also carry Executive Order 13706 paid sick leave (one hour per 30 worked, up to 56 a year).

Questions people ask

Which rate do I pay on CO20260008?
The line for the classification of work actually performed: the basic rate plus the fringe. You may pay the fringe into benefit plans, as cash on every hour, or a mix. Overtime after 40 hours is 1.5 times the basic rate; fringe is paid on every hour and never multiplied.
My trade is not on this sheet. What do I do?
Do not borrow the nearest name. Ask the contracting agency for a conformance on Standard Form 1444 before the first week of that work, and note it as pending on the payroll.
Does modification 1 apply to my contract?
Only if it was in force when your contract was awarded (generally at bid opening). An earlier modification locked into the contract keeps applying, except on option years, added scope and indefinite-quantity contracts. The number and modification are on the first page of the exhibit in your contract.

How to read a wage determination · Paying the fringe in cash or through plans · Overtime on these rates · Fringe credit calculator