CertifiedHours

Prevailing wage rates · Colorado · Wage determination

Prevailing wage rates: Boulder County, Colorado

Highway construction · CO20260007 modification 1, published May 18, 2026

The short answer

This sheet sets 53 classifications for highway work in Boulder County, Colorado. Each line is a basic hourly rate plus a fringe rate, and the sum is the minimum you must pay for that work, from $12.60 an hour (laborer: traffic control (flagger)) to $52.54 (power equipment operator: (6)-crane (91-140 tons)). Your contract may lock an earlier modification.

Rates by classification

Total is the basic rate plus the fringe. Source is the agreement or survey the rate came from; a marker means the group changed in this modification. A dagger (†) means the fringe carries a footnote or percentage the total does not include; read the group’s notes.

ClassificationBasic rateFringeTotalSource
ENGI0009-011 · Operating Engineers agreement, May 1, 2024
POWER EQUIPMENT OPERATOR: (6)-CRANE (91-140 TONS)$37.34$15.20$52.54Agreement
POWER EQUIPMENT OPERATOR…
Full text

POWER EQUIPMENT OPERATOR: (5)-DRILL RIG CAISSON (WATSON 2500 SIMILAR OR LARGER), CRANE (51-90 TONS), SCRAPER (40 CU.YD AND OVER),)

$35.41$15.20$50.61Agreement
POWER EQUIPMENT OPERATOR…
Full text

POWER EQUIPMENT OPERATOR: (4)-SCRAPER (SINGLE BOWL, UNDER 40 CU. YD), CRANE (50 TONS AND UNDER)

$35.20$15.20$50.40Agreement
POWER EQUIPMENT OPERATOR: (3)- DRILL RIG CAISSON (SMALLER THAN WATSON 2500 AND SIMILAR)$35.03$15.20$50.23Agreement
SUCO2011-002 · Survey of contractors in CO, September 15, 2011
TRUCK DRIVER: WATER TRUCK$20.64$5.27$25.91Survey
TRUCK DRIVER: TRUCK MOUNTED ATTENUATOR$12.43$3.22$15.65Survey
TRUCK DRIVER: SEMI/TRAILER TRUCK$18.39$4.13$22.52Survey
TRUCK DRIVER: PICKUP AND PILOT CAR$13.93$3.68$17.61Survey
TRUCK DRIVER: MULTI-PURPOSE SPECIALTY & HOISTING TRUCK$16.41$4.97$21.38Survey
TRUCK DRIVER: LOWBOY TRUCK$17.25$5.27$22.52Survey
TRUCK DRIVER: DUMP TRUCK$16.41$5.27$21.68Survey
TRUCK DRIVER: DISTRIBUTOR$21.69$5.27$26.96Survey
TRAFFIC SIGNALIZATION: GROUNDSMAN$18.52$3.59$22.11Survey
POWER EQUIPMENT OPERATOR: TRACTOR$13.13$2.95$16.08Survey
POWER EQUIPMENT OPERATOR: SCREED$22.67$8.72$31.39Survey
POWER EQUIPMENT OPERATOR: ROTOMILL$16.22$4.41$20.63Survey
POWER EQUIPMENT OPERATOR: ROLLER/COMPACTOR (DIRT AND GRADE COMPACTION)$22.32$8.72$31.04Survey
POWER EQUIPMENT OPERATOR: OILER$22.77$9.22$31.99Survey
POWER EQUIPMENT OPERATOR: MECHANIC$22.97$8.72$31.69Survey
POWER EQUIPMENT OPERATOR: LOADER (FRONT END)$22.67$8.72$31.39Survey
POWER EQUIPMENT OPERATOR: GUARDRAIL/POST DRIVER$16.54$4.10$20.64Survey
POWER EQUIPMENT OPERATOR: GRADER/BLADE$22.67$8.72$31.39Survey
POWER EQUIPMENT OPERATOR: FORKLIFT$15.91$4.27$20.18Survey
POWER EQUIPMENT OPERATOR: DRILL$21.42$2.88$24.30Survey
POWER EQUIPMENT OPERATOR: BULLDOZER$26.90$5.59$32.49Survey
POWER EQUIPMENT OPERATOR: BROOM/SWEEPER$22.83$8.72$31.55Survey
POWER EQUIPMENT OPERATOR: BOOM$22.67$8.72$31.39Survey
POWER EQUIPMENT OPERATOR: BOBCAT/SKID LOADER$15.37$4.28$19.65Survey
POWER EQUIPMENT OPERATOR: BACKHOE/TRACKHOE$21.70$5.51$27.21Survey
POWER EQUIPMENT OPERATOR: ASPHALT SPREADER$22.67$8.72$31.39Survey
POWER EQUIPMENT OPERATOR: ASPHALT ROLLER$23.01$9.22$32.23Survey
POWER EQUIPMENT OPERATOR: ASPHALT PAVER$24.19$6.58$30.77Survey
POWER EQUIPMENT OPERATOR: ASPHALT LAYDOWN$22.67$8.25$30.92Survey
PAINTER (SPRAY ONLY)$16.99$2.87$19.86Survey
LABORER: TRAFFIC CONTROL…
Full text

LABORER: TRAFFIC CONTROL (SETS UP/MOVES BARRELS, CONES, INSTALLS SIGNS, ARROW BOARDS AND PLACE STATIONARY FLAGS) (EXCLUDES FLAGGERS)

$12.43$3.22$15.65Survey
LABORER: TRAFFIC CONTROL (FLAGGER)$9.55$3.05$12.60Survey
LABORER: PIPELAYER$16.74$1.89$18.63Survey
LABORER: MASON TENDER- CEMENT/CONCRETE$16.29$4.25$20.54Survey
LABORER: LANDSCAPE AND IRRIGATION$12.26$3.16$15.42Survey
LABORER: CONCRETE SAW (HAND HELD)$16.29$6.14$22.43Survey
LABORER: COMMON OR GENERAL$16.29$4.25$20.54Survey
LABORER: ASPHALT SPREADER$18.58$4.65$23.23Survey
LABORER: ASPHALT SHOVELER$21.21$4.25$25.46Survey
LABORER: ASPHALT RAKER$16.29$4.25$20.54Survey
IRONWORKER: STRUCTURAL (EXCLUDES GUARDRAIL INSTALLATION)$18.22$6.01$24.23Survey
IRONWORKER: REINFORCING (EXCLUDES GUARDRAIL INSTALLATION)$16.69$5.45$22.14Survey
HIGHWAY/PARKING LOT STRIPING: PAINTER$12.62$3.21$15.83Survey
GUARDRAIL INSTALLER$16.21$3.63$19.84Survey
FENCE ERECTOR$15.96$3.46$19.42Survey
ELECTRICIAN$33.39$7.64$41.03Survey
CEMENT MASON/CONCRETE FINISHER$17.39$3.00$20.39Survey
CARPENTER (FORM WORK ONLY)$17.06$3.90$20.96Survey
CARPENTER (EXCLUDES FORM WORK)$16.61$3.88$20.49Survey

Modification history

Modification 0January 2, 2026
Modification 1May 18, 2026 (current)

Published by the Wage and Hour Division; read from sam.gov. The sheet is checked for a newer modification each day. Contracts awarded since January 1, 2017 also carry Executive Order 13706 paid sick leave (one hour per 30 worked, up to 56 a year).

Questions people ask

Which rate do I pay on CO20260007?
The line for the classification of work actually performed: the basic rate plus the fringe. You may pay the fringe into benefit plans, as cash on every hour, or a mix. Overtime after 40 hours is 1.5 times the basic rate; fringe is paid on every hour and never multiplied.
My trade is not on this sheet. What do I do?
Do not borrow the nearest name. Ask the contracting agency for a conformance on Standard Form 1444 before the first week of that work, and note it as pending on the payroll.
Does modification 1 apply to my contract?
Only if it was in force when your contract was awarded (generally at bid opening). An earlier modification locked into the contract keeps applying, except on option years, added scope and indefinite-quantity contracts. The number and modification are on the first page of the exhibit in your contract.

How to read a wage determination · Paying the fringe in cash or through plans · Overtime on these rates · Fringe credit calculator