Prevailing wage rates · Colorado · Wage determination
Prevailing wage rates: Adams, Arapahoe, Clear Creek and 5 more counties, Colorado
Highway construction · CO20260006 modification 1, published May 18, 2026
The short answer
This sheet sets 140 classifications for highway work in Adams, Arapahoe, Clear Creek and 5 more counties, Colorado. Each line is a basic hourly rate plus a fringe rate, and the sum is the minimum you must pay for that work, from $12.60 an hour (laborer: traffic control) to $52.54 (power equipment operator). Your contract may lock an earlier modification.
What changed this year
First published January 2, 2026, this sheet is now on modification 1, and its rates have changed in 1 modification.
Latest change
May 18, 2026 · modification 1
Classification names reworded; 1 fringe formula changed among the 136 lines we could match
- Electrician: 1 fringe formula changed
SAM.gov reworded this sheet’s classification names in this modification, so not every line can be matched to the one before. Only lines matched with certainty are compared here; nothing is guessed. If your trade is not listed, compare it against your contract’s copy.
Every line that changed (1)
| Classification | Was | Now | Change |
|---|---|---|---|
| ELECTRICIAN, TRAFFIC SIGNALIZATION ONLY (CLEAR CREEK) | $38.97 + 13.75%+7.80 | $38.97 + $13.16 | changed |
Compared line by line from each modification as published on SAM.gov. A line we could not pair with certainty is left out rather than guessed.
Rates by classification
These are the rates in modification 1 as published on SAM.gov. The determination and modification written into your contract are the ones that bind you; check that number before relying on this table. Total is the basic rate plus the fringe. Source is the agreement or survey the rate came from and its year; a survey year long past means the rate has not been surveyed since. A marker means the group changed in this modification. In the Since column, a dash means SAM.gov reworded the line during the year and it cannot be matched to the first publication with certainty. A dagger (†) means the fringe carries a footnote or percentage the total does not include; read the group’s notes.
| Classification | Basic rate | Fringe | Total | Since Jan 2 | Source |
|---|---|---|---|---|---|
| ELEC0111-003 · Electrical Workers (IBEW) agreement, March 1, 2025 | |||||
| ELECTRICIAN, TRAFFIC SIGNALIZATION ONLY (CLEAR CREEK) | $38.97 | $13.16 | $52.13 | changed | Agreement, 2025 |
| ENGI0009-010 · Operating Engineers agreement, May 1, 2024 | |||||
POWER EQUIPMENT OPERATOR…Full textPOWER EQUIPMENT OPERATOR: (6)-CRANE (91-140 TONS) (ARAPAHOE, BROOMFIELD, CLEAR CREEK, ELBERT, GILPIN COUNTIES) | $37.34 | $15.20 | $52.54 | no change | Agreement, 2024 |
POWER EQUIPMENT OPERATOR…Full textPOWER EQUIPMENT OPERATOR: (5)-DRILL RIG CAISSON (WATSON 2500 SIMILAR OR LARGER), SCRAPER (40 CU.YD AND OVER) | $35.41 | $15.20 | $50.61 | no change | Agreement, 2024 |
POWER EQUIPMENT OPERATOR…Full textPOWER EQUIPMENT OPERATOR: (5)-CRANE (51-90 TONS) (ARAPAHOE, BROOMFIELD, CLEAR CREEK, ELBERT, GILPIN COUNTIES) | $36.09 | $15.20 | $51.29 | no change | Agreement, 2024 |
| POWER EQUIPMENT OPERATOR: (4)-SCRAPER (SINGLE BOWL, UNDER 40 CU. YD) | $35.20 | $15.20 | $50.40 | no change | Agreement, 2024 |
POWER EQUIPMENT OPERATOR…Full textPOWER EQUIPMENT OPERATOR: (4)-CRANE (50 TONS AND UNDER) (ARAPAHOE, BROOMFIELD, CLEAR CREEK, ELBERT, GILPIN COUNTIES) | $35.78 | $15.20 | $50.98 | no change | Agreement, 2024 |
| POWER EQUIPMENT OPERATOR: (3)- DRILL RIG CAISSON (SMALLER THAN WATSON 2500 AND SIMILAR) | $35.03 | $15.20 | $50.23 | no change | Agreement, 2024 |
| SUCO2011-001 · Survey of contractors in CO, September 15, 2011 | |||||
| TRUCK DRIVER: WATER TRUCK (JEFFERSON) | $17.57 | $5.27 | $22.84 | no change | Survey, 2011 |
| TRUCK DRIVER: WATER TRUCK (ARAPAHOE, BROOMFIELD, CLEAR CREEK, ELBERT, GILPIN, PARK) | $19.36 | $4.07 | $23.43 | no change | Survey, 2011 |
| TRUCK DRIVER: WATER TRUCK (ADAMS) | $17.50 | $5.19 | $22.69 | no change | Survey, 2011 |
| TRUCK DRIVER: TRUCK MOUNTED ATTENUATOR | $12.43 | $3.22 | $15.65 | no change | Survey, 2011 |
TRUCK DRIVER: SINGLE AXLE…Full textTRUCK DRIVER: SINGLE AXLE (INCLUDES PICKUP AND PILOT CAR) (BROOMFIELD, CLEAR CREEK, ELBERT, GILPIN, PARK) | $14.74 | $3.68 | $18.42 | no change | Survey, 2011 |
| TRUCK DRIVER: SINGLE AXLE (INCLUDES PICKUP AND PILOT CAR) (ARAPAHOE) | $15.10 | $3.77 | $18.87 | no change | Survey, 2011 |
| TRUCK DRIVER: SINGLE AXLE (INCLUDES PICKUP AND PILOT CAR) (ADAMS, JEFFERSON) | $13.93 | $3.68 | $17.61 | no change | Survey, 2011 |
| TRUCK DRIVER: SEMI/TRAILER TRUCK (ARAPAHOE) | $16.00 | $2.60 | $18.60 | no change | Survey, 2011 |
TRUCK DRIVER: SEMI/TRAILER TRUCK…Full textTRUCK DRIVER: SEMI/TRAILER TRUCK (ADAMS, BROOMFIELD, CLEAR CREEK, ELBERT, GILPIN, JEFFERSON, PARK) | $18.39 | $4.13 | $22.52 | no change | Survey, 2011 |
| TRUCK DRIVER: MULTI-PURPOSE SPECIALITY AND HOISTING TRUCK (JEFFERSON) | $15.13 | $3.89 | $19.02 | no change | Survey, 2011 |
| TRUCK DRIVER: MULTI-PURPOSE SPECIALITY AND HOISTING TRUCK (ARAPAHOE) | $15.79 | $2.48 | $18.27 | no change | Survey, 2011 |
TRUCK DRIVER: MULTI-PURPOSE SPECIALITY AND HOISTING TRUCK…Full textTRUCK DRIVER: MULTI-PURPOSE SPECIALITY AND HOISTING TRUCK (ADAMS, BROOMFIELD, CLEAR CREEK, ELBERT, GILPIN, PARK) | $17.49 | $3.17 | $20.66 | no change | Survey, 2011 |
| TRUCK DRIVER: MECHANIC | $26.48 | $3.50 | $29.98 | no change | Survey, 2011 |
| TRUCK DRIVER: LOWBOY TRUCK (JEFFERSON) | $19.80 | $6.42 | $26.22 | no change | Survey, 2011 |
TRUCK DRIVER: LOWBOY TRUCK…Full textTRUCK DRIVER: LOWBOY TRUCK (ADAMS, ARAPAHOE, BROOMFIELD, CLEAR CREEK, ELBERT, GILPIN, PARK) | $17.25 | $5.27 | $22.52 | no change | Survey, 2011 |
| TRUCK DRIVER: DUMP TRUCK (PARK) | $15.40 | $3.21 | $18.61 | no change | Survey, 2011 |
| TRUCK DRIVER: DUMP TRUCK (JEFFERSON) | $16.97 | $4.78 | $21.75 | no change | Survey, 2011 |
| TRUCK DRIVER: DUMP TRUCK (BROOMFIELD, CLEAR CREEK, ELBERT, GILPIN) | $16.47 | $5.27 | $21.74 | no change | Survey, 2011 |
| TRUCK DRIVER: DUMP TRUCK (ARAPAHOE) | $18.94 | $5.27 | $24.21 | no change | Survey, 2011 |
| TRUCK DRIVER: DUMP TRUCK (ADAMS) | $16.68 | $5.27 | $21.95 | no change | Survey, 2011 |
| TRUCK DRIVER: DISTRIBUTOR (JEFFERSON) | $19.46 | $6.04 | $25.50 | no change | Survey, 2011 |
| TRUCK DRIVER: DISTRIBUTOR (BROOMFIELD, CLEAR CREEK, ELBERT, GILPIN, PARK) | $18.19 | $5.27 | $23.46 | no change | Survey, 2011 |
| TRUCK DRIVER: DISTRIBUTOR (ARAPAHOE) | $19.62 | $5.27 | $24.89 | no change | Survey, 2011 |
| TRUCK DRIVER: DISTRIBUTOR (ADAMS) | $15.80 | $5.27 | $21.07 | no change | Survey, 2011 |
| POWER EQUIPMENT OPERATOR: TRACTOR | $13.13 | $2.95 | $16.08 | no change | Survey, 2011 |
| POWER EQUIPMENT OPERATOR: SCREED (PARK) | $20.36 | $3.04 | $23.40 | no change | Survey, 2011 |
| POWER EQUIPMENT OPERATOR: SCREED (JEFFERSON) | $22.64 | $8.43 | $31.07 | no change | Survey, 2011 |
| POWER EQUIPMENT OPERATOR: SCREED (BROOMFIELD, CLEAR CREEK, ELBERT, GILPIN) | $24.67 | $6.02 | $30.69 | no change | Survey, 2011 |
| POWER EQUIPMENT OPERATOR: SCREED (ARAPAHOE) | $22.67 | $8.72 | $31.39 | — | Survey, 2011 |
| POWER EQUIPMENT OPERATOR: SCREED (ADAMS) | $27.89 | $3.50 | $31.39 | no change | Survey, 2011 |
| POWER EQUIPMENT OPERATOR: ROTOMILL | $16.22 | $4.41 | $20.63 | no change | Survey, 2011 |
| POWER EQUIPMENT OPERATOR: ROLLER/COMPACTOR (DIRT AND GRADE COMPACTION) (PARK) | $16.52 | $3.13 | $19.65 | no change | Survey, 2011 |
POWER EQUIPMENT OPERATOR…Full textPOWER EQUIPMENT OPERATOR: ROLLER/COMPACTOR (DIRT AND GRADE COMPACTION) (ARAPAHOE, BROOMFIELD, CLEAR CREEK, ELBERT, GILPIN, JEFFERSON) | $20.30 | $5.51 | $25.81 | no change | Survey, 2011 |
| POWER EQUIPMENT OPERATOR: ROLLER/COMPACTOR (DIRT AND GRADE COMPACTION) (ADAMS) | $16.70 | $3.30 | $20.00 | no change | Survey, 2011 |
| POWER EQUIPMENT OPERATOR: OILER (ARAPAHOE, BROOMFIELD, CLEAR CREEK, ELBERT, GILPIN, PARK) | $23.73 | $8.41 | $32.14 | no change | Survey, 2011 |
| POWER EQUIPMENT OPERATOR: OILER (ADAMS, JEFFERSON) | $21.97 | $8.72 | $30.69 | no change | Survey, 2011 |
| POWER EQUIPMENT OPERATOR: MECHANIC (JEFFERSON) | $23.56 | $8.72 | $32.28 | no change | Survey, 2011 |
POWER EQUIPMENT OPERATOR…Full textPOWER EQUIPMENT OPERATOR: MECHANIC (ARAPAHOE, BROOMFIELD, CLEAR CREEK, ELBERT, GILPIN, PARK) | $24.04 | $7.35 | $31.39 | no change | Survey, 2011 |
| POWER EQUIPMENT OPERATOR: MECHANIC (ADAMS) | $22.82 | $8.72 | $31.54 | no change | Survey, 2011 |
| POWER EQUIPMENT OPERATOR: LOADER (FRONT END) (PARK) | $22.67 | $8.72 | $31.39 | — | Survey, 2011 |
| POWER EQUIPMENT OPERATOR: LOADER (FRONT END) (JEFFERSON) | $23.06 | $7.76 | $30.82 | no change | Survey, 2011 |
| POWER EQUIPMENT OPERATOR: LOADER (FRONT END) (BROOMFIELD, CLEAR CREEK, ELBERT, GILPIN) | $23.20 | $8.33 | $31.53 | no change | Survey, 2011 |
| POWER EQUIPMENT OPERATOR: LOADER (FRONT END) (ARAPAHOE) | $26.80 | $4.84 | $31.64 | no change | Survey, 2011 |
| POWER EQUIPMENT OPERATOR: LOADER (FRONT END) (ADAMS) | $23.09 | $8.72 | $31.81 | no change | Survey, 2011 |
| POWER EQUIPMENT OPERATOR: GUARDRAIL/POST DRIVER | $16.07 | $4.41 | $20.48 | no change | Survey, 2011 |
| POWER EQUIPMENT OPERATOR: GRADER/BLADE (JEFFERSON) | $23.28 | $7.73 | $31.01 | no change | Survey, 2011 |
| POWER EQUIPMENT OPERATOR: GRADER/BLADE (BROOMFIELD, CLEAR CREEK, ELBERT, GILPIN, PARK) | $23.90 | $7.93 | $31.83 | no change | Survey, 2011 |
| POWER EQUIPMENT OPERATOR: GRADER/BLADE (ARAPAHOE) | $22.67 | $8.72 | $31.39 | — | Survey, 2011 |
| POWER EQUIPMENT OPERATOR: GRADER/BLADE (ADAMS) | $23.94 | $8.23 | $32.17 | no change | Survey, 2011 |
| POWER EQUIPMENT OPERATOR: FORKLIFT | $15.91 | $4.68 | $20.59 | no change | Survey, 2011 |
| POWER EQUIPMENT OPERATOR: DRILL (JEFFERSON) | $20.65 | $5.74 | $26.39 | no change | Survey, 2011 |
POWER EQUIPMENT OPERATOR…Full textPOWER EQUIPMENT OPERATOR: DRILL (ADAMS, ARAPAHOE, BROOMFIELD, CLEAR CREEK, ELBERT, GILPIN, PARK) | $20.48 | $4.71 | $25.19 | no change | Survey, 2011 |
| POWER EQUIPMENT OPERATOR: CRANE (JEFFERSON) | $23.55 | $6.68 | $30.23 | no change | Survey, 2011 |
| POWER EQUIPMENT OPERATOR: CRANE (ADAMS, PARK) | $22.82 | $8.72 | $31.54 | no change | Survey, 2011 |
| POWER EQUIPMENT OPERATOR: CONCRETE PUMP | $21.60 | $5.21 | $26.81 | no change | Survey, 2011 |
POWER EQUIPMENT OPERATOR…Full textPOWER EQUIPMENT OPERATOR: BULLDOZER (ARAPAHOE, BROOMFIELD, CLEAR CREEK, ELBERT, GILPIN, JEFFERSON, PARK) | $26.90 | $5.59 | $32.49 | no change | Survey, 2011 |
| POWER EQUIPMENT OPERATOR: BULLDOZER (ADAMS) | $25.20 | $6.72 | $31.92 | no change | Survey, 2011 |
| POWER EQUIPMENT OPERATOR: BROOM/SWEEPER (JEFFERSON) | $22.18 | $8.36 | $30.54 | no change | Survey, 2011 |
| POWER EQUIPMENT OPERATOR: BROOM/SWEEPER (ARAPAHOE) | $22.67 | $8.73 | $31.40 | no change | Survey, 2011 |
POWER EQUIPMENT OPERATOR…Full textPOWER EQUIPMENT OPERATOR: BROOM/SWEEPER (ADAMS, BROOMFIELD, CLEAR CREEK, ELBERT, GILPIN, PARK) | $22.70 | $8.07 | $30.77 | no change | Survey, 2011 |
| POWER EQUIPMENT OPERATOR: BOOM | $22.67 | $8.72 | $31.39 | no change | Survey, 2011 |
| POWER EQUIPMENT OPERATOR: BOBCAT/SKID LOADER (PARK) | $22.46 | $0.00 | $22.46 | no change | Survey, 2011 |
| POWER EQUIPMENT OPERATOR: BOBCAT/SKID LOADER (JEFFERSON) | $16.85 | $4.28 | $21.13 | no change | Survey, 2011 |
| POWER EQUIPMENT OPERATOR: BOBCAT/SKID LOADER (ARAPAHOE) | $18.23 | $4.28 | $22.51 | no change | Survey, 2011 |
POWER EQUIPMENT OPERATOR…Full textPOWER EQUIPMENT OPERATOR: BOBCAT/SKID LOADER (ADAMS, BROOMFIELD, CLEAR CREEK, ELBERT, GILPIN) | $15.37 | $4.28 | $19.65 | no change | Survey, 2011 |
| POWER EQUIPMENT OPERATOR: BACKHOE/TRACKHOE (PARK) | $20.81 | $6.58 | $27.39 | no change | Survey, 2011 |
| POWER EQUIPMENT OPERATOR: BACKHOE/TRACKHOE (JEFFERSON) | $21.99 | $5.60 | $27.59 | no change | Survey, 2011 |
| POWER EQUIPMENT OPERATOR: BACKHOE/TRACKHOE (BROOMFIELD, CLEAR CREEK, ELBERT, GILPIN) | $22.19 | $6.48 | $28.67 | no change | Survey, 2011 |
| POWER EQUIPMENT OPERATOR: BACKHOE/TRACKHOE (ARAPAHOE) | $24.59 | $6.24 | $30.83 | no change | Survey, 2011 |
| POWER EQUIPMENT OPERATOR: BACKHOE/TRACKHOE (ADAMS) | $20.31 | $4.24 | $24.55 | no change | Survey, 2011 |
| POWER EQUIPMENT OPERATOR: ASPHALT SPREADER (JEFFERSON) | $23.34 | $8.06 | $31.40 | no change | Survey, 2011 |
POWER EQUIPMENT OPERATOR…Full textPOWER EQUIPMENT OPERATOR: ASPHALT SPREADER (ADAMS, ARAPAHOE, BROOMFIELD, CLEAR CREEK, ELBERT, GILPIN, PARK) | $22.67 | $8.67 | $31.34 | no change | Survey, 2011 |
| POWER EQUIPMENT OPERATOR: ASPHALT ROLLER (PARK) | $22.84 | $8.72 | $31.56 | no change | Survey, 2011 |
| POWER EQUIPMENT OPERATOR: ASPHALT ROLLER (JEFFERSON) | $22.84 | $7.69 | $30.53 | no change | Survey, 2011 |
| POWER EQUIPMENT OPERATOR: ASPHALT ROLLER (BROOMFIELD, CLEAR CREEK, ELBERT, GILPIN) | $23.41 | $7.67 | $31.08 | no change | Survey, 2011 |
| POWER EQUIPMENT OPERATOR: ASPHALT ROLLER (ARAPAHOE) | $22.68 | $8.72 | $31.40 | no change | Survey, 2011 |
| POWER EQUIPMENT OPERATOR: ASPHALT ROLLER (ADAMS) | $24.20 | $7.70 | $31.90 | no change | Survey, 2011 |
| POWER EQUIPMENT OPERATOR: ASPHALT PAVER | $24.97 | $6.13 | $31.10 | no change | Survey, 2011 |
| POWER EQUIPMENT OPERATOR: ASPHALT LAYDOWN (PARK) | $22.67 | $8.72 | $31.39 | — | Survey, 2011 |
POWER EQUIPMENT OPERATOR…Full textPOWER EQUIPMENT OPERATOR: ASPHALT LAYDOWN (ADAMS, ARAPAHOE, BROOMFIELD, CLEAR CREEK, ELBERT, GILPIN, JEFFERSON) | $22.67 | $8.75 | $31.42 | no change | Survey, 2011 |
| PAINTER (SPRAY ONLY) | $16.99 | $2.87 | $19.86 | no change | Survey, 2011 |
LABORER: TRAFFIC CONTROL…Full textLABORER: TRAFFIC CONTROL (SETS UP/MOVES BARRELS, CONES, INSTALL SIGNS, ARROW BOARDS AND PLACE STATIONARY FLAGS) (EXCLUDES FLAGGERS) (PARK) | $12.76 | $3.20 | $15.96 | no change | Survey, 2011 |
LABORER: TRAFFIC CONTROL…Full textLABORER: TRAFFIC CONTROL (SETS UP/MOVES BARRELS, CONES, INSTALL SIGNS, ARROW BOARDS AND PLACE STATIONARY FLAGS) (EXCLUDES FLAGGERS) (CLEAR CREEK) | $13.14 | $3.20 | $16.34 | no change | Survey, 2011 |
LABORER: TRAFFIC CONTROL…Full textLABORER: TRAFFIC CONTROL (SETS UP/MOVES BARRELS, CONES, INSTALL SIGNS, ARROW BOARDS AND PLACE STATIONARY FLAGS) (EXCLUDES FLAGGERS) (ADAMS, ARAPAHOE, BROOMFIELD, ELBERT, GILPIN, JEFFERSON) | $12.43 | $3.22 | $15.65 | no change | Survey, 2011 |
| LABORER: TRAFFIC CONTROL (FLAGGER) (PARK) | $9.42 | $3.21 | $12.63 | no change | Survey, 2011 |
| LABORER: TRAFFIC CONTROL (FLAGGER) (JEFFERSON) | $9.73 | $3.05 | $12.78 | no change | Survey, 2011 |
LABORER: TRAFFIC CONTROL…Full textLABORER: TRAFFIC CONTROL (FLAGGER) (ADAMS, ARAPAHOE, BROOMFIELD, CLEAR CREEK, ELBERT, GILPIN) | $9.55 | $3.05 | $12.60 | no change | Survey, 2011 |
| LABORER: PIPELAYER | $13.55 | $2.41 | $15.96 | no change | Survey, 2011 |
| LABORER: MASON TENDER-CEMENT/CONCRETE (PARK) | $15.08 | $3.10 | $18.18 | no change | Survey, 2011 |
| LABORER: MASON TENDER-CEMENT/CONCRETE (JEFFERSON) | $16.29 | $4.25 | $20.54 | no change | Survey, 2011 |
| LABORER: MASON TENDER-CEMENT/CONCRETE (ARAPAHOE, BROOMFIELD, CLEAR CREEK, ELBERT, GILPIN) | $16.96 | $4.04 | $21.00 | no change | Survey, 2011 |
| LABORER: MASON TENDER-CEMENT/CONCRETE (ADAMS) | $17.71 | $2.83 | $20.54 | no change | Survey, 2011 |
| LABORER: LANDSCAPE AND IRRIGATION (CLEAR CREEK) | $14.98 | $3.16 | $18.14 | no change | Survey, 2011 |
LABORER: LANDSCAPE AND IRRIGATION…Full textLABORER: LANDSCAPE AND IRRIGATION (ADAMS, ARAPAHOE, BROOMFIELD, ELBERT, GILPIN, JEFFERSON, PARK) | $12.26 | $3.16 | $15.42 | no change | Survey, 2011 |
LABORER: CONCRETE SAW…Full textLABORER: CONCRETE SAW (HAND HELD) (ARAPAHOE, BROOMFIELD, CLEAR CREEK, ELBERT, GILPIN, JEFFERSON, PARK) | $16.29 | $6.14 | $22.43 | no change | Survey, 2011 |
| LABORER: CONCRETE SAW (HAND HELD) (ADAMS) | $16.29 | $5.20 | $21.49 | no change | Survey, 2011 |
| LABORER: COMMON OR GENERAL (PARK) | $15.64 | $2.46 | $18.10 | no change | Survey, 2011 |
| LABORER: COMMON OR GENERAL (JEFFERSON) | $16.51 | $4.27 | $20.78 | no change | Survey, 2011 |
| LABORER: COMMON OR GENERAL (ARAPAHOE, BROOMFIELD, CLEAR CREEK, ELBERT, GILPIN) | $16.67 | $4.27 | $20.94 | no change | Survey, 2011 |
| LABORER: COMMON OR GENERAL (ADAMS) | $16.29 | $4.25 | $20.54 | no change | Survey, 2011 |
| LABORER: ASPHALT SPREADER | $18.58 | $4.65 | $23.23 | no change | Survey, 2011 |
| LABORER: ASPHALT SHOVELER | $21.21 | $4.25 | $25.46 | no change | Survey, 2011 |
| LABORER: ASPHALT RAKER (PARK) | $17.41 | $1.86 | $19.27 | no change | Survey, 2011 |
LABORER: ASPHALT RAKER…Full textLABORER: ASPHALT RAKER (ADAMS, ARAPAHOE, BROOMFIELD, CLEAR CREEK, ELBERT, GILPIN, JEFFERSON) | $16.29 | $4.25 | $20.54 | no change | Survey, 2011 |
| IRONWORKER: REINFORCING (PARK) | $19.98 | $2.89 | $22.87 | no change | Survey, 2011 |
| IRONWORKER: REINFORCING (ARAPAHOE, BROOMFIELD, CLEAR CREEK, ELBERT, GILPIN, JEFFERSON) | $16.69 | $5.45 | $22.14 | no change | Survey, 2011 |
| IRONWORKER: REINFORCING (ADAMS) | $22.14 | $0.77 | $22.91 | no change | Survey, 2011 |
| IRONWORKER, STRUCTURAL | $18.22 | $6.01 | $24.23 | no change | Survey, 2011 |
| HIGHWAY/PARKING LOT STRIPING:PAINTER (JEFFERSON) | $14.21 | $3.21 | $17.42 | no change | Survey, 2011 |
HIGHWAY/PARKING LOT STRIPING…Full textHIGHWAY/PARKING LOT STRIPING: PAINTER (ADAMS, ARAPAHOE, BROOMFIELD, CLEAR CREEK, ELBERT, GILPIN, PARK) | $12.62 | $3.21 | $15.83 | no change | Survey, 2011 |
| GUARDRAIL INSTALLER (ARAPAHOE, BROOMFIELD, CLEAR CREEK, ELBERT, GILPIN, JEFFERSON, PARK) | $12.89 | $3.20 | $16.09 | no change | Survey, 2011 |
| GUARDRAIL INSTALLER (ADAMS) | $12.89 | $3.45 | $16.34 | no change | Survey, 2011 |
| FORM WORKER (ARAPAHOE) | $15.30 | $3.90 | $19.20 | no change | Survey, 2011 |
| FENCE ERECTOR | $13.02 | $3.20 | $16.22 | no change | Survey, 2011 |
| ELECTRICIAN: TRAFFIC SIGNALIZATION GROUNDSMAN (JEFFERSON) | $15.19 | $4.72 | $19.91 | no change | Survey, 2011 |
| ELECTRICIAN: TRAFFIC SIGNALIZATION GROUNDSMAN (CLEAR CREEK) | $15.70 | $2.14 | $17.84 | no change | Survey, 2011 |
| ELECTRICIAN: TRAFFIC SIGNALIZATION GROUNDSMAN (ARAPHAOE, BROOMFIELD, ELBERT, GILPIN, PARK) | $15.24 | $3.81 | $19.05 | no change | Survey, 2011 |
| ELECTRICIAN: TRAFFIC SIGNALIZATION GROUNDSMAN (ADAMS) | $13.96 | $2.80 | $16.76 | no change | Survey, 2011 |
| ELECTRICIAN: TRAFFIC SIGNALIZATION ELECTRICIAN (JEFFERSON) | $26.78 | $5.44 | $32.22 | no change | Survey, 2011 |
ELECTRICIAN: TRAFFIC SIGNALIZATION ELECTRICIAN…Full textELECTRICIAN: TRAFFIC SIGNALIZATION ELECTRICIAN (ADAMS, ARAPAHOE, BROOMFIELD, ELBERT, GILPIN, PARK) | $27.25 | $7.10 | $34.35 | no change | Survey, 2011 |
ELECTRICIAN: EXCLUDES TRAFFIC SIGNAL INSTALLATION…Full textELECTRICIAN: EXCLUDES TRAFFIC SIGNAL INSTALLATION (ARAPAHOE, BROOMFIELD, CLEAR CREEK, ELBERT, GILPIN, JEFFERSON, PARK) | $35.13 | $6.83 | $41.96 | no change | Survey, 2011 |
| ELECTRICIAN: EXCLUDES TRAFFIC SIGNAL INSTALLATION (ADAMS) | $31.00 | $14.01 | $45.01 | no change | Survey, 2011 |
| CEMENT MASON/CONCRETE FINISHER (PARK) | $17.09 | $2.85 | $19.94 | no change | Survey, 2011 |
| CEMENT MASON/CONCRETE FINISHER (JEFFERSON) | $18.02 | $3.42 | $21.44 | no change | Survey, 2011 |
| CEMENT MASON/CONCRETE FINISHER (BROOMFIELD, CLEAR CREEK, ELBERT, GILPIN) | $18.37 | $3.00 | $21.37 | no change | Survey, 2011 |
| CEMENT MASON/CONCRETE FINISHER (ARAPAHOE) | $18.70 | $3.85 | $22.55 | no change | Survey, 2011 |
| CEMENT MASON/CONCRETE FINISHER (ADAMS) | $16.05 | $3.00 | $19.05 | no change | Survey, 2011 |
| CARPENTER, FORM WORK ONLY (PARK) | $17.28 | $5.38 | $22.66 | no change | Survey, 2011 |
| CARPENTER, FORM WORK ONLY (JEFFERSON) | $16.88 | $3.81 | $20.69 | no change | Survey, 2011 |
| CARPENTER, FORM WORK ONLY (BROOMFIELD, CLEAR CREEK, ELBERT, GILPIN) | $19.11 | $5.46 | $24.57 | no change | Survey, 2011 |
| CARPENTER, FORM WORK ONLY (ADAMS) | $16.78 | $3.57 | $20.35 | no change | Survey, 2011 |
CARPENTER, EXCLUDES FORM WORK…Full textCARPENTER, EXCLUDES FORM WORK (ARAPAHOE, BROOMFIELD, CLEAR CREEK, ELBERT, GILPIN, JEFFERSON, PARK) | $19.27 | $5.08 | $24.35 | no change | Survey, 2011 |
| CARPENTER, EXCLUDES FORM WORK (ADAMS) | $16.61 | $3.88 | $20.49 | no change | Survey, 2011 |
Modification history
| Modification 0 | January 2, 2026 |
| Modification 1 | May 18, 2026 (current) |
Published by the Wage and Hour Division; read from sam.gov. The sheet is checked for a newer modification each day. Contracts awarded since January 1, 2017 also carry Executive Order 13706 paid sick leave (one hour per 30 worked, up to 56 a year).
Questions people ask
- Which rate do I pay on CO20260006?
- The line for the classification of work actually performed: the basic rate plus the fringe. You may pay the fringe into benefit plans, as cash on every hour, or a mix. Overtime after 40 hours is 1.5 times the basic rate; fringe is paid on every hour and never multiplied.
- My trade is not on this sheet. What do I do?
- Do not borrow the nearest name. Ask the contracting agency for a conformance on Standard Form 1444 before the first week of that work, and note it as pending on the payroll.
- Does modification 1 apply to my contract?
- Only if it was in force when your contract was awarded (generally at bid opening). An earlier modification locked into the contract keeps applying, except on option years, added scope and indefinite-quantity contracts. The number and modification are on the first page of the exhibit in your contract.
How to read a wage determination · Paying the fringe in cash or through plans · Overtime on these rates · Fringe credit calculator
Put these rates on a certified payroll.
Start here and CO20260006 is already filled in when you set up the job. CertifiedHours loads this sheet, checks every line against it as you type hours, and prints the WH-347. Free for one payroll a month.
Start a payroll on this sheetOn this sheet
- 140 classifications in 3 rate groups
- 2 from agreements, 1 from surveys
- Counties: Adams, Arapahoe, Clear Creek, Elbert, Gilpin, Jefferson, Park, Broomfield