CertifiedHours

Prevailing wage rates · California · Wage determination

Prevailing wage rates: Amador County, California

Building construction · CA20260023 modification 1, published May 18, 2026

The short answer

This sheet sets 130 classifications for building work in Amador County, California. Each line is a basic hourly rate plus a fringe rate, and the sum is the minimum you must pay for that work, from $12.33 an hour (tile finisher) to $36.25 (power equipment operators: group 11). Your contract may lock an earlier modification.

What changed this year

First published January 2, 2026, this sheet is now on modification 1, and its rates have changed in 1 modification.

Latest change

May 18, 2026 · modification 1

Classification names reworded; 14 fringe formulas changed among the 126 lines we could match

  • Parking lot striping: 6 fringe formulas changed
  • Carpenters: 3 fringe formulas changed
  • Drywall installers/lathers: 2 fringe formulas changed
  • Electricians: 1 fringe formula changed
  • Elevator constructor: 1 fringe formula changed
  • Sheet metal worker: 1 fringe formula changed

SAM.gov reworded this sheet’s classification names in this modification, so not every line can be matched to the one before. Only lines matched with certainty are compared here; nothing is guessed. If your trade is not listed, compare it against your contract’s copy.

Every line that changed (14)
ClassificationWasNowChange
SHEET METAL WORKER$18.37 + 12% + 5.06$18.37 + $7.26changed
PARKING LOT STRIPING; HIGHWAY MARKERS: (SLURRY SEAL OPERATION: APPLICATOR OPERATION; SHU…$13.37 + 2.00 + b$13.37 + $2.00changed
PARKING LOT STRIPING: HIGHWAY MARKERS: (TRAFFIC SURFACE PROTECTIVE COATING APPLICATOR) b…$14.48 + 2.00 + b$14.48 + $2.00changed
PARKING LOT STRIPING: HIGHWAY MARKERS: (TRAFFIC DELINEATING DEVICE APPLICATOR) b. Employ…$14.83 + 2.00 + b$14.83 + $2.00changed
PARKING LOT STRIPING: HIGHWAY MARKERS: (SANDBLASTER; STRIPER; WHEEL STOP INSTALLER) b. E…$14.30 + 2.00 + b$14.30 + $2.00changed
PARKING LOT STRIPING: HIGHWAY MARKERS: (MIXER OPERATOR) b. Employer contributes $ .80 pe…$13.95 + 2.00 + b$13.95 + $2.00changed
PARKING LOT STRIPING: HIGHWAY MARKERS: (COMPACTOR, TOP, TRAFFIC CONTROL, SERVICE AND SPR…$12.39 + 2.00 + b$12.39 + $2.00changed
ELEVATOR CONSTRUCTOR$29.39 + 3.29 + a$29.39 + $3.29changed
ELECTRICIANS: CABLE SPLICER$17.93 + 3% + 3.38$17.93 + $3.92changed
DRYWALL INSTALLERS/LATHERS: DRYWALL STOCKER, SCRAPPER & CLEAN-UP$10.07 + 3.335$10.07 + $3.34changed
DRYWALL INSTALLERS/LATHERS: DRYWALL INSTALLER/LATHER$18.14 + 6.485$18.14 + $6.48changed
CARPENTERS: PILEDRIVER, BRIDGE, WHARF AND DOCK BUILDER$19.38 + 9.715$19.38 + $9.71changed
CARPENTERS: MILLWRIGHT$20.48 + 7.855$20.48 + $7.86changed
CARPENTERS: HARDWOOD FLOORLAYER; POWER SAW OPERATOR; SAW FILER; SHINGLER; STEEL SCAFFOLD…$18.73 + 6.455$18.73 + $6.46changed

Compared line by line from each modification as published on SAM.gov. A line we could not pair with certainty is left out rather than guessed.

Rates by classification

These are the rates in modification 1 as published on SAM.gov. The determination and modification written into your contract are the ones that bind you; check that number before relying on this table. Total is the basic rate plus the fringe. Source is the agreement or survey the rate came from and its year; a survey year long past means the rate has not been surveyed since. A marker means the group changed in this modification. In the Since column, a dash means SAM.gov reworded the line during the year and it cannot be matched to the first publication with certainty. A dagger (†) means the fringe carries a footnote or percentage the total does not include; read the group’s notes.

ClassificationBasic rateFringeTotalSince Jan 2Source
SUCA1985-003 · Survey of contractors in CA, July 1, 1985
TRUCK DRIVERS: GROUP 37 Over 80 to 95 yds$22.34$7.04$29.38no changeSurvey, 1985
TRUCK DRIVERS: GROUP 36 Over 65 to 80 yds$19.99$7.04$27.03no changeSurvey, 1985
TRUCK DRIVERS: GROUP 35…
Full text

TRUCK DRIVERS: GROUP 35 Bulk cement spreader (with or without auger, over 50 yds. and under 65 yds. water level); Dump (over 50 yds. and under 65 yds. water level); Dumpcrete (over 50 yds. and under 65 yds. water level); Dumpster (over 50 yds. and under 65 yds. water level); Helicopter pilot (when transporting workers ormaterials); Skid (debris box, over 50 yds. and under 65 yds. water level); Truck (dry pre-batch concrete mix, over 50 yds. and under 65 yds. water level)

$19.04$7.04$26.08no changeSurvey, 1985
TRUCK DRIVERS: GROUP 34…
Full text

TRUCK DRIVERS: GROUP 34 DW 10's, 20's, 21's and other similar Cat type, Terra Cobra, LeTournapulls, Tournarocker, Euclid and similar type equipment when pulling Aqua/Pak or water tank trailers

$19.89$7.04$26.93no changeSurvey, 1985
TRUCK DRIVERS: GROUP 33…
Full text

TRUCK DRIVERS: GROUP 33 Bulk cement spreader (with or without auger, over 35 yds. and including 50 yds. water level); Dump (over 35 yds. and including 50 yds. water level); Dumpcrete (over 35 yds. and including 50 yds. water level); Dumpster (over 35 yds. and including 50 yds. water level); Skid (debris box, over 35 yds. and including 50 yds. water level); Truck (dry pre-batch concrete mix, over 35 yds. and including 50 yds. water level)

$19.69$7.04$26.73no changeSurvey, 1985
TRUCK DRIVERS: GROUP 32…
Full text

TRUCK DRIVERS: GROUP 32 Bulk cement spreader (with or without auger, over 24 yds. and including 35 yds. water level); Dump (over 24 yds. and including 35 yds. water level); Dumpcrete (over 24 yds. and including 35 yds. water level); Dumpster (over 24 yds. and including 35 yds. water level); DW 10's, 20's, 21's and other similar Cat type, Terra Cobra, LeTournapulls, Tournarocker, Euclid and similar type equipment when pulling fuel and/or grease tank trailers or other miscellaneous trailers; Skid (debris box, over 24 yds. and including 35 yds. water level); Truck (dry pre- batch concrete mix, over 24 yds. and including 35 yds. water level)

$19.47$7.04$26.51no changeSurvey, 1985
TRUCK DRIVERS: GROUP 31…
Full text

TRUCK DRIVERS: GROUP 31 Bulk cement spreader (with or without auger, over 18 yds. and including 24 yds. water level); Combination dump and dump trailer; Dump (over 18 yds. and including 24 yds. water level); Dumpcrete (over 18 yds. and including 24 yds. water level); Dumpster (over 18 yds. and including 24 yds. water level); Skid (debris box, over 18 yds. and including 24 yds. water level); Transit mix agitator (over 12 yds. through 16 yds.); Truck (dry pre-batch concrete mix, over 18 yds. and including 24 yds. water level)

$19.54$7.04$26.58no changeSurvey, 1985
TRUCK DRIVERS: GROUP 30…
Full text

TRUCK DRIVERS: GROUP 30 Truck repair; Hydro-lift or Swedish crane type (including when Swedish crane is used for jetting); Hydro-lift extension or retracting crane (boom-type)

$19.48$7.04$26.52no changeSurvey, 1985
TRUCK DRIVERS: GROUP 29 Transit mix agitator (over 14 yds. through 16 yds.)$19.45$7.04$26.49no changeSurvey, 1985
TRUCK DRIVERS: GROUP 28 P.B. or similar type self-loading truck$19.44$7.04$26.48no changeSurvey, 1985
TRUCK DRIVERS: GROUP 27 Double gooseneck (7 or more axles); Heavy-duty transport tiller$19.40$7.04$26.44no changeSurvey, 1985
TRUCK DRIVERS: GROUP 26…
Full text

TRUCK DRIVERS: GROUP 26 Ammonia nitrate distributor driver and mixer; Bulk cement spreader (with or without auger, over 12 yds. and including 18 yds. water level); Dump (over 12 yds. and including 18 yds. water level); Dumpcrete (over 12 yds. and including 18 yds. water level); Dumpster (over 12 yds. and including 18 yds. water level); Skid (debris box, over 12 yds. and including 18 yds. water level); Truck (dry pre-batch concrete mix, over 12 yds. and including 18 yds. water level)

$19.38$7.04$26.42no changeSurvey, 1985
TRUCK DRIVERS: GROUP 25…
Full text

TRUCK DRIVERS: GROUP 25 Heavy-duty transport (gooseneck lowbed); Transit mix or agitator (over 12 yds. through 14 yds.)

$19.35$7.04$26.39no changeSurvey, 1985
TRUCK DRIVERS: GROUP 24…
Full text

TRUCK DRIVERS: GROUP 24 Bulk cement spreader (with or without auger, 8 ys. and including 12 yds. water level); Dump (8 yds. and including 12 yds. water level); Dumpcrete (8 yds. and including 12 yds. water level); Dumpster (8 yds. and including 12 yds. water level); Self-propelled street sweeper with self-contained refuse bin; Skid (debris box, 8 yds. and including 12 yds. water level); Snow Go and/or snow plow; Truck (dry pre-batch concrete mix, 8 yds. and including 12 yds. water level)

$19.34$7.04$26.38no changeSurvey, 1985
TRUCK DRIVERS: GROUP 23 Transit mix or agitator (over 10 yds. through 12 yds.)$19.25$7.04$26.29no changeSurvey, 1985
TRUCK DRIVERS: GROUP 22 Combination boot person and road oiler$19.24$7.04$26.28no changeSurvey, 1985
TRUCK DRIVERS: GROUP 21…
Full text

TRUCK DRIVERS: GROUP 21 Jetting truck and water truck (5,000 gallons and under 7,000 gallons)

$19.21$7.04$26.25no changeSurvey, 1985
TRUCK DRIVERS: GROUP 20 Vacuum truck (5,500 gallons and under 7,500 gallons)$19.16$7.04$26.20no changeSurvey, 1985
TRUCK DRIVERS: GROUP 19 Transit mix or agitator (8 yds. through 10 yds.)$19.15$7.04$26.19no changeSurvey, 1985
TRUCK DRIVERS: GROUP 18 Ross Hyster and similar straddle carrier$19.14$7.04$26.18no changeSurvey, 1985
TRUCK DRIVERS: GROUP 17 Heavy-duty transport (high bed)$19.12$7.04$26.16no changeSurvey, 1985
TRUCK DRIVERS: GROUP 16…
Full text

TRUCK DRIVERS: GROUP 16 A-frame, winch truck; Buggymobile; Jetting and water truck (4,000 gallons and under 5,000 gallons); Rubber-tired truck jumbo

$19.11$7.04$26.15no changeSurvey, 1985
TRUCK DRIVERS: GROUP 15…
Full text

TRUCK DRIVERS: GROUP 15 Bulk cement spreader (with or without auger, 6 yds. and under 8 yds. water level); Dump (6 yds. and under 8 yds. water level); Dumpcrete (6 yds. and under 8 yds. water level); Dumpster (6 yds. and under 8 yds. water level); Skid (debris box, 6 yds. and under 8 yds. water level); Truck (dry pre-batch concrete mix, 6 yds. and under 8 yds. water level)

$19.40$7.04$26.44no changeSurvey, 1985
TRUCK DRIVERS: GROUP 14 Rubber-tired muck car (not self-loaded)$19.07$7.04$26.11no changeSurvey, 1985
TRUCK DRIVERS: GROUP 13 Vacuum truck, 3,500 gallons and under 5,500 gallons$19.26$7.04$26.30no changeSurvey, 1985
TRUCK DRIVERS: GROUP 12…
Full text

TRUCK DRIVERS: GROUP 12 Combination winch truck with hoist; Transit mix or agitator (6 yds. and under 8 yds.)

$19.25$7.04$26.29no changeSurvey, 1985
TRUCK DRIVERS: GROUP 11…
Full text

TRUCK DRIVERS: GROUP 11 Jetting truck and water truck, 2,500 gallons and under 4,000 gallons

$19.01$7.04$26.05no changeSurvey, 1985
TRUCK DRIVERS: GROUP 10…
Full text

TRUCK DRIVERS: GROUP 10 Scissor truck; Single unit flat rack (3-axle unit); Industrial lift truck (mechanical tailgate); Small rubber-tired tractor (when used within teamsters' jurisdiction)

$19.00$7.04$26.04no changeSurvey, 1985
TRUCK DRIVERS: GROUP 9 Vacuum truck, under 3,500 gallons$17.98$7.04$25.02no changeSurvey, 1985
TRUCK DRIVERS: GROUP 8 Fuel and/or grease truck driver or fuel worker$17.97$7.04$25.01no changeSurvey, 1985
TRUCK DRIVERS: GROUP 7 Transit mix, agitator (under 6 yds.)$17.95$7.04$24.99no changeSurvey, 1985
TRUCK DRIVERS: GROUP 6 Lift jitney, fork lift$17.93$7.04$24.97no changeSurvey, 1985
TRUCK DRIVERS: GROUP 5 Road oil truck or boot$17.92$7.04$24.96no changeSurvey, 1985
TRUCK DRIVERS: GROUP 4 Jetting truck and water truck (under 2,500 gallons)$17.91$7.04$24.95no changeSurvey, 1985
TRUCK DRIVERS: GROUP 3…
Full text

TRUCK DRIVERS: GROUP 3 Bulk cement spreader (with or without auger, 4 yd. and under 6 yds. water level); Dump (4 yds. and under 6 yds. water level); Dumpcrete (4 yds. and under 6 yds. water level); Dumpster (4 yds. and under 6 yds. water level); Skid (debris box, 4 yds. and under 6 yds. water level); Single unit flat rack (2-axle unit); Industrial lift truck (mechanical tailgate); Truck (dry pre-batch concrete mix, 4 yds. and under 6 yds. water level)

$17.90$7.04$24.94no changeSurvey, 1985
TRUCK DRIVERS: GROUP 2 Teamster oiler and/or greaser and/or service$17.88$7.04$24.92no changeSurvey, 1985
TRUCK DRIVERS: GROUP 1…
Full text

TRUCK DRIVERS: GROUP 1 Bulk cement spreader (with or without auger, under 4 yds. water level); Bus driver; Concrete pump machine; Concrete pump truck (when flat rack truck is used appropriate flat rack rate shall apply); Dump (under 4 yds. water level); Dumpcrete truck (under 4 yds. water level); Dumpster (under 4 yds. water level); Escort or pilot car driver; Nipper truck (when flat rack truck is used appropriate flat rack rate shall apply); Pick-up; Skid (debris box, under 4 yds. water level); Team driver; Truck (dry pre-batch concrete mix, under 4 yds. water level)

$17.20$7.04$24.24no changeSurvey, 1985
TILE SETTER$18.92$3.29$22.21no changeSurvey, 1985
TILE FINISHER$10.68$1.65$12.33no changeSurvey, 1985
TERRAZZO FINISHER (BASE MACHINE OPERATOR)$16.72$3.95$20.67no changeSurvey, 1985
TERRAZZO FINISHER$16.02$3.95$19.97no changeSurvey, 1985
SPRINKLER FITTER$21.87$3.23$25.10no changeSurvey, 1985
SHEET METAL WORKER$18.37$7.26$25.63changedSurvey, 1985
ROOFERS: SLATE, TILE AND COMPOSITION$15.00$7.64$22.64no changeSurvey, 1985
ROOFERS: ENAMELER AND PITCH$17.65$7.64$25.29no changeSurvey, 1985
POWER EQUIPMENT OPERATORS:: GROUP 11…
Full text

POWER EQUIPMENT OPERATORS:: GROUP 11-C Operator of helicopter (when used in erection work); Remote-controlled earthmoving equipment AREA 1: AREA LYING WESTERLY OF THE EAST LINE OF RANGE 14E

$24.65$9.60$34.25no changeSurvey, 1985
POWER EQUIPMENT OPERATORS:: GROUP 9…
Full text

POWER EQUIPMENT OPERATORS:: GROUP 9 Canal finger drain digger; Chicago boom; Combination mixer and compressor (gunite); Combination slurry mixer and/or cleaner; Highline cable (5 tons and under); Lull Hi- lift or similar (20 ft. or over); Mucking machine (rubber-tired, rail or track type); Tractor (with boom) (D-6 or larger and similar) AREA 1: AREA LYING WESTERLY OF THE EAST LINE OF RANGE 14E

$21.10$9.60$30.70no changeSurvey, 1985
POWER EQUIPMENT OPERATORS:: GROUP 8…
Full text

POWER EQUIPMENT OPERATORS:: GROUP 8 Armor-Coater (or similar); Asphalt plant engineer; Cast-in-place pipe laying machine; Combination slusher and motor operator; Concrete batch plant (multiple units); Dozer; Heading shield operator; Heavy-duty repair and/or welder; Ken Seal machine (or similar); Kolman loader; Loader (up to 2 yds.); Mechanical trench shield; Portable crushing and screening plant; Push cat; Rubber-tired earth-moving equipment (up to and including 45 cu. yds. """"struck"""" m.r.c.) (Euclids, T-Pulls, DW-10, 20, 21 and similar); Rubber-tired dozer; Self-propelled compactor with dozer; Sheepfoot; Timber skidder (rubber-tired or similar equipment); Tractor-drawn scraper; Tractor; Trenching machine; Tri-batch paver; Tunnel mole boring machine; Woods-Mixer (and other similar Pugmill equipment) AREA 1: AREA LYING WESTERLY OF THE EAST LINE OF RANGE 14E

$19.76$9.60$29.36no changeSurvey, 1985
POWER EQUIPMENT OPERATORS:: GROUP 5…
Full text

POWER EQUIPMENT OPERATORS:: GROUP 5 Compressor operator (over 2); Concrete mixer (over 1 yd.); Concrete pump or pumpcrete gun; Generator; Grouting machine; Pressweld (air operated); Pumps (over 1); Welding machines (powered other than by electricity) AREA 1: AREA LYING WESTERLY OF THE EAST LINE OF RANGE 14E

$17.60$9.60$27.20no changeSurvey, 1985
POWER EQUIPMENT OPERATORS: GROUP 11…
Full text

POWER EQUIPMENT OPERATORS: GROUP 11-C Operator of helicopter (when used in erection work); Remote-controlled earthmoving equipment AREA 2 (REMAINDER OF COUNTY)

$26.65$9.60$36.25no changeSurvey, 1985
POWER EQUIPMENT OPERATORS: GROUP 11-B Loader (over 18 yds.) AREA 2 (REMAINDER OF COUNTY)$26.14$9.60$35.74no changeSurvey, 1985
POWER EQUIPMENT OPERATORS: GROUP 11…
Full text

POWER EQUIPMENT OPERATORS: GROUP 11-B Loader (over 18 yds.) AREA 1: AREA LYING WESTERLY OF THE EAST LINE OF RANGE 14E

$24.14$9.60$33.74no changeSurvey, 1985
POWER EQUIPMENT OPERATORS: GROUP 11…
Full text

POWER EQUIPMENT OPERATORS: GROUP 11-A Band wagon (in conjunction with wheel excavator); Crane (over 125 tons); Loader (over 12 cu. yds. up to and including 18 cu. yds.); Power shovel, clamshell, backhoe, gradall and dragline (over 7 cu. yds. m.r.c.); Rubber-tired multi-purpose earthmoving machine (2 units over 75 cu. yds.""struck"" m.r.c.); Wheel excavator (over 750 cu. yds. per hour) AREA 2 (REMAINDER OF COUNTY)

$25.71$9.60$35.31no changeSurvey, 1985
POWER EQUIPMENT OPERATORS: GROUP 11…
Full text

POWER EQUIPMENT OPERATORS: GROUP 11-A Band wagon (in conjunction with wheel excavator); Crane (over 125 tons); Loader (over 12 cu. yds. up to and including 18 cu. yds.); Power shovel, clamshell, backhoe, gradall and dragline (over 7 cu. yds. m.r.c.); Rubber-tired multi-purpose earthmoving machine (2 units over 75 cu. yds. ""struck"" m.r.c.); Wheel excavator (over 750 cu. yds. per hour) AREA 1: AREA LYING WESTERLY OF THE EAST LINE OF RANGE 14E

$21.71$9.60$31.31no changeSurvey, 1985
POWER EQUIPMENT OPERATORS: GROUP 11…
Full text

POWER EQUIPMENT OPERATORS: GROUP 11 Automatic concrete slip-form paver (Gradesetter, Screed); Automatic railroad car dumper; Canal trimmer with ditching attachment; Cary-lift, Campbell or similar; Continuous flight tie back auger (crane attached, single controls); Crane (over 25 tons up to and including 125 tons); Drott travelift 650- A-1 or similar (45 tons or over); Euclid loader when controlled from the Pullcat; Highline cableway (over 5 tons); Loader (over 4 cu. yds. up to and including 12 cu. yds.); Miller formless M-900 slope paver or similar (grade setter required); Multiple engine scraper (when used as Push Pull); Power blade operator (multi- engine); Power shovel, clamshell, dragline, backhoe, gradall (over 1 cu. yd. up to and including 7 cu. yds. m.r.c., long boom pay); Rubber-tired earthmoving machine (multiple propulsion power units and two or more scrapers) (up to and including 75 cu. yds. struck m.r.c.); Self-propelled compactor boom-type lifting device (center mount) (over 25 tons m.r.c.); Single engine rubber-tired earthmoving machine (with tandem scrapers); Slip form paver (concrete or asphalt) (screed required); Tandem cat; Tower crane mobile (including rail mounted); Trencher (pulling attached shield); Tower cranes, Universal Liebher and similar types (in the erection, dismantling and moving of equipment); Wheel excavator (up to and including 750 cu. yds. per hour); Whirley crane (over 25 tons); Multi-earthmoving equipment (up to and including 75 cu. yds. """"struck"""" m.r.c.); Truck-mounted hydraulic crane when remote control equipped (over 10 tons up to and including 25 tons) AREA 2 (REMAINDER OF COUNTY)

$24.91$9.60$34.51no changeSurvey, 1985
POWER EQUIPMENT OPERATORS: GROUP 11…
Full text

POWER EQUIPMENT OPERATORS: GROUP 11 Automatic concrete slip-form paver (Gradesetter, Screed); Automatic railroad car dumper; Canal trimmer with ditching attachment; Cary-lift, Campbell or similar; Continuous flight tie back auger (crane attached, single controls); Crane (over 25 tons up to and including 125 tons); Drott travelift 650- A-1 or similar (45 tons or over); Euclid loader when controlled from the Pullcat; Highline cableway (over 5 tons); Loader (over 4 cu. yds. up to and including 12 cu. yds.); Miller formless M-900 slope paver or similar (grade setter required); Multiple engine scraper (when used as Push Pull); Power blade operator (multi- engine); Power shovel, clamshell, dragline, backhoe, gradall (over 1 cu. yd. up to and including 7 cu. yds. m.r.c., long boom pay); Rubber-tired earthmoving machine (multiple propulsion power units and two or more scrapers) (up to and including 75 cu. yds. struck m.r.c.); Self-propelled compactor boom-type lifting device (center mount) (over 25 tons m.r.c.); Single engine rubber-tired earthmoving machine (with tandem scrapers); Slip form paver (concrete or asphalt) (screed required); Tandem cat; Tower crane mobile (including rail mounted); Trencher (pulling attached shield); Tower cranes, Universal Liebher and similar types (in the erection, dismantling and moving of equipment); Wheel excavator (up to and including 750 cu. yds. per hour); Whirley crane (over 25 tons); Multi-earthmoving equipment (up to and including 75 cu. yds. """"struck"""" m.r.c.); Truck-mounted hydraulic crane when remote control equipped (over 10 tons up to and including 25 tons) AREA 1: AREA LYING WESTERLY OF THE EAST LINE OF RANGE 14E

$21.91$9.60$31.51no changeSurvey, 1985
POWER EQUIPMENT OPERATORS: GROUP 10…
Full text

POWER EQUIPMENT OPERATORS: GROUP 10-A Backhoe (hydraulic) (up to and including 1 cu. yd. m.r.c.); Backhoe (cable) (up to and including 1 cu. yd. m.r.c.); Combination backhoe and loader (over 3/4 cu. yd. m.r.c.); Continuous flight tie back auger (crane attached/separate controls); Crane not over 25 tons, Hammerhead and Gantry; Gradall (up to and including 1 cu. yd.); Power blade operator (single engine); Power shovel, clamshell, dragline (up to and including 1 cu. yd. m.r.c.) (long boom pay); Rubber- tired scraper, self-loading (Paddle Wheel, twin engine); Self- propelled boom-type lifting device (center mount); over 10 tons up to and including 25 tons); CMI dual land auto grader SP-30 or similar AREA 1: AREA LYING WESTERLY OF THE EAST LINE OF RANGE 14E

$21.64$9.60$31.24no changeSurvey, 1985
POWER EQUIPMENT OPERATORS: GROUP 10…
Full text

POWER EQUIPMENT OPERATORS: GROUP 10-A Backhoe (hydraulic) (up to and including 1 cu. yd. m.r.c.); Backhoe (cable) (up to and including 1 cu. yd. m.r.c.); Combination backhoe and loader (over 3/4 cu. yd. m.r.c.); Continuous flight tie back auger (crane attached/separate controls); Crane not over 25 tons, Hammerhead and Gantry; Gradall (up to and including 1 cu. yd.); Power blade operator (single engine); Power shovel, clamshell, dragline (up to and including 1 cu. yd. m.r.c.) (long boom pay); Rubber- tired scraper, self-loading (Paddle Wheel, twin engine); Self- propelled boom-type lifting device (center mount); over 10 tons up to and including 25 tons); CMI dual land auto grader SP-30 or similar AREA 2 (REMAINDER OF COUNTY)

$23.64$9.60$33.24no changeSurvey, 1985
POWER EQUIPMENT OPERATORS: GROUP 10…
Full text

POWER EQUIPMENT OPERATORS: GROUP 10 Boom-type backfilling machine; Bridge crane; Cary- lift (or similar); Chemical grouting machine, truck-mounted; Combination backhoe and loader (up to and including 1/2 cu. yd. m.r.c.); Derrick (2 operators required when swing engine remote from hoist); Derrick barge (except excavation work); Do-mor loader; Adams elegrader; Elevating grader; Heavy rotary drill rig (including caisson foundation work and Euclid loader and similar type); Robbins type drill; Koehring Skooper (or similar); Lift slab machine (Vagtborg and similar types); Loader (2 yds. up to and including 4 yds.); Locomotive, 100 tons (single or multiple units); Multiple engine earthmoving machine (Euclids, dozers, etc.) (no tandem scraper); Pre-stress wire wrapping machine; Reservoir-debris tug (self-propelled floating); Rubber-tired scraper, self-loading (paddle wheels, etc.); Shuttle car (reclaim station); Single-engine scraper over 45 yds.; Soil stabilizer (P & H or equal); Sub-grader (Gurrier or other automatic type); Tractor, compressor drill combination; Track-laying-type earthmoving machine (single engine with tandem scrapers); Train loading station; Trenching machine, multi-engine with sloping attachment, Jeffco or similar; Vacuum cooling plant; Whirley crane (up to and including 25 tons) AREA 1: AREA LYING WESTERLY OF THE EAST LINE OF RANGE 14E

$21.45$9.60$31.05no changeSurvey, 1985
POWER EQUIPMENT OPERATORS: GROUP 10…
Full text

POWER EQUIPMENT OPERATORS: GROUP 10 Boom-type backfilling machine; Bridge crane; Cary- lift (or similar); Chemical grouting machine, truck-mounted; Combination backhoe and loader (up to and including 1/2 cu. yd. m.r.c.); Derrick (2 operators required when swing engine remote from hoist); Derrick barge (except excavation work); Do-mor loader; Adams elegrader; Elevating grader; Heavy rotary drill rig (including caisson foundation work and Euclid loader and similar type); Robbins type drill; Koehring Skooper (or similar); Lift slab machine (Vagtborg and similar types); Loader (2 yds. up to and including 4 yds.); Locomotive, 100 tons (single or multiple units); Multiple engine earthmoving machine (Euclids, dozers, etc.) (no tandem scraper); Pre-stress wire wrapping machine; Reservoir-debris tug (self-propelled floating); Rubber-tired scraper, self-loading (paddle wheels, etc.); Shuttle car (reclaim station); Single-engine scraper over 45 yds.; Soil stabilizer (P & H or equal); Sub-grader (Gurrier or other automatic type); Tractor, compressor drill combination; Track-laying-type earthmoving machine (single engine with tandem scrapers); Train loading station; Trenching machine, multi-engine with sloping attachment, Jeffco or similar; Vacuum cooling plant; Whirley crane (up to and including 25 tons) AREA 2 (REMAINDER OF COUNTY)

$23.45$9.60$33.05no changeSurvey, 1985
POWER EQUIPMENT OPERATORS: GROUP 9…
Full text

POWER EQUIPMENT OPERATORS: GROUP 9 Canal finger drain digger; Chicago boom; Combination mixer and compressor (gunite); Combination slurry mixer and/or cleaner; Highline cable (5 tons and under); Lull Hi- lift or similar (20 ft. or over); Mucking machine (rubber-tired, rail or track type); Tractor (with boom) (D-6 or larger and similar) AREA 2 (REMAINDER OF COUNTY)

$23.10$9.60$32.70no changeSurvey, 1985
POWER EQUIPMENT OPERATORS: GROUP 8…
Full text

POWER EQUIPMENT OPERATORS: GROUP 8 Armor-Coater (or similar); Asphalt plant engineer; Cast-in-place pipe laying machine; Combination slusher and motor operator; Concrete batch plant (multiple units); Dozer; Heading shield operator; Heavy-duty repair and/or welder; Ken Seal machine (or similar); Kolman loader; Loader (up to 2 yds.); Mechanical trench shield; Portable crushing and screening plant; Push cat; Rubber-tired earth-moving equipment (up to and including 45 cu. yds. ""struck"" m.r.c.) (Euclids, T-Pulls, DW-10, 20, 21 and similar); Rubber-tired dozer; Self-propelled compactor with dozer; Sheepfoot; Timber skidder (rubber-tired or similar equipment); Tractor-drawn scraper; Tractor; Trenching machine; Tri-batch paver; Tunnel mole boring machine; Woods-Mixer (and other similar Pugmill equipment) AREA 2 (REMAINDER OF COUNTY)

$22.76$9.60$32.36no changeSurvey, 1985
POWER EQUIPMENT OPERATORS: GROUP 7…
Full text

POWER EQUIPMENT OPERATORS: GROUP 7 Concrete conveyor or concrete pump, truck or equipment mounted (boom length to apply); Concrete conveyor, building site; Deck engineer; Dual drum mixer; Fuller Kenyon pump and similar types; Gantry rider (or similar); Hydra-hammer (or similar); Material hoist (2 or more drums); Mechanical finisher or spreader machine (asphalt, Barber-Greene and similar); Mine or shaft hoist; Mixermobile; Pavement breaker with or without compressor combination; Pipe bending machine (pipelines only); Pipe cleaning machine (tractor propelled and supported); Pipe wrapping machine (tractor propelled and supported); Refrigeration plant; Roller operator (finish asphalt); Self-propelled boom-type lifting device (center mount) (10 tons or less m.r.c.); Self-propelled elevating grader plane; Slusher operator; Small tractor (with boom); Soil tester; Truck- type loader; Welding machine (gasoline or diesel) AREA 2 (REMAINDER OF COUNTY)

$21.08$9.60$30.68no changeSurvey, 1985
POWER EQUIPMENT OPERATORS: GROUP 7…
Full text

POWER EQUIPMENT OPERATORS: GROUP 7 Concrete conveyor or concrete pump, truck or equipment mounted (boom length to apply); Concrete conveyor, building site; Deck engineer; Dual drum mixer; Fuller Kenyon pump and similar types; Gantry rider (or similar); Hydra-hammer (or similar); Material hoist (2 or more drums); Mechanical finisher or spreader machine (asphalt, Barber-Greene and similar); Mine or shaft hoist; Mixermobile; Pavement breaker with or without compressor combination; Pipe bending machine (pipelines only); Pipe cleaning machine (tractor propelled and supported); Pipe wrapping machine (tractor propelled and supported); Refrigeration plant; Roller operator (finish asphalt); Self-propelled boom-type lifting device (center mount) (10 tons or less m.r.c.); Self-propelled elevating grader plane; Slusher operator; Small tractor (with boom); Soil tester; Truck- type loader; Welding machine (gasoline or diesel) AREA 1: AREA LYING WESTERLY OF THE EAST LINE OF RANGE 14E

$19.08$9.60$28.68no changeSurvey, 1985
POWER EQUIPMENT OPERATORS: GROUP 6…
Full text

POWER EQUIPMENT OPERATORS: GROUP 6 BLH Lima road pactor or similar; Boom truck or dual-purpose A-frame truck; Concrete batch plant (wet or dry); Concrete saw (self-propelled unit) on streets, highways, airports and canals; Drilling and boring machinery, vertical and horizontal (not to apply to waterliners, wagon drills or jackhammers); Gradesetter, grade checker (mechanical or otherwise); Highline cableway signal; Locomotive (steam of over 30 tons); Maginnis internal full slab vibrator (on airports, highways, canals and warehouses); Mechanical finisher (concrete) (Clary, Johnson, Bidwell Bridge deck or similar types); Mechanical burm, curb and/or curb and gutter machine, concrete or asphalt; Portable crusher; Post driver (M-1500 and similar); Power jumbo operator (setting slip forms, etc., in tunnels); Roller (except asphalt); Screed (Barber-Greene and similar) (asphaltic concrete paving); Self-propelled compactor (single engine); Self-propelled pipeline wrapping machine, Perault, CRC, or similar types; Slip form pump (lifting device for concrete forms); Small rubber-tired tractor; Surface heater; Self- propelled power sweeper; Self-propelled tape machine; Auger-type drilling equipment, up to and including 30 ft. depth digging capacity m.r.c. AREA 2 (REMAINDER OF COUNTY)

$20.83$9.60$30.43no changeSurvey, 1985
POWER EQUIPMENT OPERATORS: GROUP 6…
Full text

POWER EQUIPMENT OPERATORS: GROUP 6 BLH Lima road pactor or similar; Boom truck or dual-purpose A-frame truck; Concrete batch plant (wet or dry); Concrete saw (self-propelled unit) on streets, highways, airports and canals; Drilling and boring machinery, vertical and horizontal (not to apply to waterliners, wagon drills or jackhammers); Gradesetter, grade checker (mechanical or otherwise); Highline cableway signal; Locomotive (steam of over 30 tons); Maginnis internal full slab vibrator (on airports, highways, canals and warehouses); Mechanical finisher (concrete) (Clary, Johnson, Bidwell Bridge deck or similar types); Mechanical burm, curb and/or curb and gutter machine, concrete or asphalt; Portable crusher; Post driver (M-1500 and similar); Power jumbo operator (setting slip forms, etc., in tunnels); Roller (except asphalt); Screed (Barber-Greene and similar) (asphaltic concrete paving); Self-propelled compactor (single engine); Self-propelled pipeline wrapping machine, Perault, CRC, or similar types; Slip form pump (lifting device for concrete forms); Small rubber-tired tractor; Surface heater; Self- propelled power sweeper; Self-propelled tape machine; Auger-type drilling equipment, up to and including 30 ft. depth digging capacity m.r.c. AREA 1: AREA LYING WESTERLY OF THE EAST LINE OF RANGE 14E

$18.83$9.60$28.43no changeSurvey, 1985
POWER EQUIPMENT OPERATORS: GROUP 5…
Full text

POWER EQUIPMENT OPERATORS: GROUP 5 Compressor operator (over 2); Concrete mixer (over 1 yd.); Concrete pump or pumpcrete gun; Generator; Grouting machine; Pressweld (air operated); Pumps (over 1); Welding machines (powered other than by electricity) AREA 2 (REMAINDER OF COUNTY)

$20.60$9.60$30.20no changeSurvey, 1985
POWER EQUIPMENT OPERATORS: GROUP 4…
Full text

POWER EQUIPMENT OPERATORS: GROUP 4 Ballast jack tamper; Ballast regulation; Ballast tamper multipurpose; Box (asphalt plant); Elevator operator (inside); Fork lift or lumber stacker (construction job site); Line master; Material hoist (1 drum); Shuttlecar; Tie spacer; Towermobile AREA 2 (REMAINDER OF COUNTY

$20.27$9.60$29.87no changeSurvey, 1985
POWER EQUIPMENT OPERATORS: GROUP 4…
Full text

POWER EQUIPMENT OPERATORS: GROUP 4 Ballast jack tamper; Ballast regulation; Ballast tamper multipurpose; Box (asphalt plant); Elevator operator (inside); Fork lift or lumber stacker (construction job site); Line master; Material hoist (1 drum); Shuttlecar; Tie spacer; Towermobile AREA 1: AREA LYING WESTERLY OF THE EAST LINE OF RANGE 14E

$18.27$9.60$27.87no changeSurvey, 1985
POWER EQUIPMENT OPERATORS: GROUP 3…
Full text

POWER EQUIPMENT OPERATORS: GROUP 3 Box operator (bunker); Helicopter radio operator (signal); Motor operator; Locomotive (30 tons or under); Oiler; Ross Carrier (construction job site); Rotomist operator; Screed (except asphaltic concrete paving); Self-propelled, automatically applied concrete curing machine (on streets, highways, airports and canals); Trenching machine (maximum digging capacity 5 ft. depth); Tugger hoist, single drum; Truck crane oiler; Boiler tender AREA 2 (REMAINDER OF COUNTY)

$19.42$9.60$29.02no changeSurvey, 1985
POWER EQUIPMENT OPERATORS: GROUP 3…
Full text

POWER EQUIPMENT OPERATORS: GROUP 3 Box operator (bunker); Helicopter radio operator (signal); Motor operator; Locomotive (30 tons or under); Oiler; Ross Carrier (construction job site); Rotomist operator; Screed (except asphaltic concrete paving); Self-propelled, automatically applied concrete curing machine (on streets, highways, airports and canals); Trenching machine (maximum digging capacity 5 ft. depth); Tugger hoist, single drum; Truck crane oiler; Boiler tender AREA 1: AREA LYING WESTERLY OF THE EAST LINE OF RANGE 14E

$16.42$9.60$26.02no changeSurvey, 1985
POWER EQUIPMENT OPERATORS: GROUP 2…
Full text

POWER EQUIPMENT OPERATORS: GROUP 2 Compressor operator; Concrete mixer (up to and including 1 yd.); Conveyor belt operator (tunnel); Fire tender, hot plant; Hydraulic monitor; Mechanical conveyor (handling building materials); Mixer box operator (concrete plant); Pump operator; Spreader box (with screeds); Tar pot fire tender (power agitated) AREA 2 (REMAINDER OF COUNTY)

$19.09$9.60$28.69no changeSurvey, 1985
POWER EQUIPMENT OPERATORS: GROUP 2…
Full text

POWER EQUIPMENT OPERATORS: GROUP 2 Compressor operator; Concrete mixer (up to and including 1 yd.); Conveyor belt operator (tunnel); Fire tender, hot plant; Hydraulic monitor; Mechanical conveyor (handling building materials); Mixer box operator (concrete plant); Pump operator; Spreader box (with screeds); Tar pot fire tender (power agitated) AREA 1: AREA LYING WESTERLY OF THE EAST LINE OF RANGE 14E

$18.09$9.60$27.69no changeSurvey, 1985
POWER EQUIPMENT OPERATORS: GROUP 1…
Full text

POWER EQUIPMENT OPERATORS: GROUP 1-A Landscape irrigation trencher, Davis trencher (300 or similar and all small trenchers including all trenching equipment with seats) capacity up to 3 ft. in depth AREA 2 (REMAINDER OF COUNTY)

$15.76$9.60$25.36no changeSurvey, 1985
POWER EQUIPMENT OPERATORS: GROUP 1…
Full text

POWER EQUIPMENT OPERATORS: GROUP 1-A Landscape irrigation trencher, Davis trencher (300 or similar and all small trenchers including all trenching equipment with seats) capacity up to 3 ft. in depth AREA 1: AREA LYING WESTERLY OF THE EAST LINE OF RANGE 14E

$14.76$9.60$24.36no changeSurvey, 1985
POWER EQUIPMENT OPERATORS: GROUP 1…
Full text

POWER EQUIPMENT OPERATORS: GROUP 1 Assistant to engineer (Brake; Fire tender; Heavy duty repair tender; Oiler; Deckhand; Signal; Switch; Tar pot fire tender) AREA 2 (REMAINDER OF COUNTY)

$18.54$9.60$28.14no changeSurvey, 1985
POWER EQUIPMENT OPERATORS: GROUP 1…
Full text

POWER EQUIPMENT OPERATORS: GROUP 1 Assistant to engineer (Brake; Fire tender; Heavy duty repair tender; Oiler; Deckhand; Signal; Switch; Tar pot fire tender) AREA 1: AREA LYING WESTERLY OF THE EAST LINE OF RANGE 14E

$17.54$9.60$27.14no changeSurvey, 1985
PLUMBER AND STEAMFITTER (AMADOR COUNTY (SOUTHERN HALF))$22.03$6.35$28.38no changeSurvey, 1985
PLUMBER AND STEAMFITTER (AMADOR COUNTY (NORTHERN HALF))$19.72$6.71$26.43no changeSurvey, 1985
PLASTERER$17.36$6.35$23.71no changeSurvey, 1985
PARKING LOT STRIPING…
Full text

PARKING LOT STRIPING; HIGHWAY MARKERS: (SLURRY SEAL OPERATION: APPLICATOR OPERATION; SHUTTLE; SQUEEGEE)

$13.37$2.00$15.37changedSurvey, 1985
PARKING LOT STRIPING…
Full text

PARKING LOT STRIPING: HIGHWAY MARKERS: (TRAFFIC SURFACE PROTECTIVE COATING APPLICATOR) b. Employer contributes $ .80 per hour to vacation fund for the first year of employment; 1 year but less than 5 years, 1.13 per hour to vacation fund; 5 years but less than 10 years, 1.48 per hour to vacation fund; over 10 years 1.83 per hour to vacation fund

$14.48$2.00$16.48changedSurvey, 1985
PARKING LOT STRIPING…
Full text

PARKING LOT STRIPING: HIGHWAY MARKERS: (TRAFFIC DELINEATING DEVICE APPLICATOR) b. Employer contributes $ .80 per hour to vacation fund for the first year of employment; 1 year but less than 5 years, 1.13 per hour to vacation fund; 5 years but less than 10 years, 1.48 per hour to vacation fund; over 10 years 1.83 per hour to vacation fund

$14.83$2.00$16.83changedSurvey, 1985
PARKING LOT STRIPING…
Full text

PARKING LOT STRIPING: HIGHWAY MARKERS: (SANDBLASTER; STRIPER; WHEEL STOP INSTALLER) b. Employer contributes $ .80 per hour to vacation fund for the first year of employment; 1 year but less than 5 years, 1.13 per hour to vacation fund; 5 years but less than 10 years, 1.48 per hour to vacation fund; over 10 years 1.83 per hour to vacation fund

$14.30$2.00$16.30changedSurvey, 1985
PARKING LOT STRIPING…
Full text

PARKING LOT STRIPING: HIGHWAY MARKERS: (MIXER OPERATOR) b. Employer contributes $ .80 per hour to vacation fund for the first year of employment; 1 year but less than 5 years, 1.13 per hour to vacation fund; 5 years but less than 10 years, 1.48 per hour to vacation fund; over 10 years 1.83 per hour to vacation fund

$13.95$2.00$15.95changedSurvey, 1985
PARKING LOT STRIPING…
Full text

PARKING LOT STRIPING: HIGHWAY MARKERS: (COMPACTOR, TOP, TRAFFIC CONTROL, SERVICE AND SPREADER) b. Employer contributes $ .80 per hour to vacation fund for the first year of employment; 1 year but less than 5 years, 1.13 per hour to vacation fund; 5 years but less than 10 years, 1.48 per hour to vacation fund; over 10 years 1.83 per hour to vacation fund

$12.39$2.00$14.39changedSurvey, 1985
PAINTERS: SPRAY$14.64$4.60$19.24no changeSurvey, 1985
PAINTERS: SANDBLASTER; SCAFFOLD; SHEETROCK; STRUCTURAL STEEL; SWING STAGE; TAPER$15.79$4.60$20.39no changeSurvey, 1985
PAINTERS: BRUSH$14.39$4.60$18.99no changeSurvey, 1985
MARBLE SETTER, TERRAZZO WORKER$17.57$4.60$22.17no changeSurvey, 1985
MARBLE FINISHER$15.92$4.67$20.59no changeSurvey, 1985
LABORERS: WRECKING WORK GROUP 3…
Full text

LABORERS: WRECKING WORK GROUP 3 General laborer (includes all clean-up work, loading lumber, loading and burning of debris)

$12.88$5.36$18.24no changeSurvey, 1985
LABORERS: WRECKING WORK GROUP 2…
Full text

LABORERS: WRECKING WORK GROUP 2 Semi-skilled wrecker (salvaging of other building materials)

$12.98$5.36$18.34no changeSurvey, 1985
LABORERS: WRECKING WORK GROUP 1…
Full text

LABORERS: WRECKING WORK GROUP 1 Skilled wrecker (removing and salvaging of sash, windows, doors, plumbing and electric fixtures)

$13.11$5.36$18.47no changeSurvey, 1985
LABORERS: GROUP 4 Brick cleaner; Lumber cleaner$9.66$5.36$15.02no changeSurvey, 1985
LABORERS: GROUP 3…
Full text

LABORERS: GROUP 3 All clean-up work of debris, grounds and buildings including but not limited to street cleaner; Cleaning and washing windows; Construction laborers including bridge and general laborer; Dump; Load spotter; Fire watcher; Street cleaner; Gardener, horticultural and landscape laborer; Jetting; Limber; Brush loader; Piler, maintenance landscape laborer on new construction; Maintenance, repair track and road beds; Streetcar and railroad construction track laborer; Temporary air and water lines, Victaulic or similar; Fence erector; Guardrail erector; Pavement marker (button setter)

$11.88$5.36$17.24no changeSurvey, 1985
LABORERS: GROUP 2…
Full text

LABORERS: GROUP 2 Asphalt shoveler; Cement dumper and handling dry cement or gypsum; Choke-setter and digger (clearing work); Concrete bucket dumper and chute; Concrete chipping and grinding; Concrete laborer (wet or dry); Chuck tender; High pressure nozzle operator, adductor; Grout-crew; Hydraulic monitor (over 100 lbs. pressure); Loading and unloading, carrying and hauling of all rods and materials for use in reinforcing concrete construction; Pittsburgh chipper and similar type brush shredders; Sloper; Singlefoot, hand held, pneumatic tamper; All pneumatic, air, gas and electric tools not listed in Groups 1 through 1-f; Jacking of pipe under 12 inches

$13.98$5.36$19.34no changeSurvey, 1985
LABORERS: GROUP 1-F Wire winding machine in connection with guniting or shotcrete-aligner$13.62$5.36$18.98no changeSurvey, 1985
LABORERS: GROUP 1…
Full text

LABORERS: GROUP 1-E Laborer on general construction work on or in bell hole footings and shaft

$13.59$5.36$18.95no changeSurvey, 1985
LABORERS: GROUP 1…
Full text

LABORERS: GROUP 1-D Repair track and road beds (cut and cover work of subway after the temporary cover has been placed)

$13.36$5.36$18.72no changeSurvey, 1985
LABORERS: GROUP 1-C Burning and welding in connection with laborers' work$13.76$5.36$19.12no changeSurvey, 1985
LABORERS: GROUP 1…
Full text

LABORERS: GROUP 1-B Sewer cleaner receives an additional $4.00 per day; $5.00 per day on recently active large diameter sewers or sewer manholes

$13.32$5.36$18.68—Survey, 1985
LABORERS: GROUP 1…
Full text

LABORERS: GROUP 1-A Joy drill model TWM-2A; Gardener-Denver model DH143 and similar type drills; Track driller; Jack leg driller; Diamond driller; Wagon driller; Mechanical drillers, all types regardless of type or method of power; Multiple unit drill; Blaster and powder; All work or loading, placing and blasting of all power and explosives of whatever type regardless of method used for such loading and placing; High scaler (including drilling of same); Tree topper; Bit grinder

$13.32$5.36$18.68—Survey, 1985
LABORERS: GROUP 1…
Full text

LABORERS: GROUP 1 Asphalt ironer and raker; Asphalt spreader boxes (all types); Barko, Wacker and similar type tampers; Buggymobile; Chainsaw, faller, logloader and bucker; Compactors of all types; Concrete and magnesite mixer, 1/2 yd. and under; Concrete pan work; Concrete saw; Concrete sander; Cribber and/or shoring; Cut granite curb setter; Form raiser; Slip form; Green Cutter, headerboard, hubsetter, aligner; Jackhammer operator; Jacking of pipe over 12 inches; Jackson and similar type compactors; Kettle tender, pot and worker applying asphalt, lay-kold, creosote, lime, caustic and similar type materials; Lagging, sheeting, whaling, bracing, trenchjacking, handguided lagging hammer; Magnesite, epoxyresin, fiberglass, mastic worker (wet or dry); Perma curb; Precast-manhole setter; Cast-in-place manhole form setter; Pressure pipe tester; Pavement breaker and spader, including tool grinder; Pipelayer, caulker, bander, pipewrapper, conduit layer, plastic pipelayer, post hole digger, air, gas and electric; Power broom sweeper; Power tampers of all types (except as shown in Group 2); Ram set gun and stud gun; Riprap stonepaver and rock-slinger, including placing of sacked concrete and/or sand (wet or dry); Rotary Scarifier, multiple head concrete chipper; Davis trencher, 300 or similar type (and all small trenchers); Roto and Ditch Witch; Roto-tiller; Sandblaster, pot, gun, nozzle operator; Signalling and rigging; Tank cleaner; Tree climber; Vibrascreed, bull float in connection with laborers' work; Vibrator; Dri-pak-it machine; High pressure blow pipe (1-1/2-inch. or over, 100 lbs. pressure and over); Hydro seeder and similar type; Laser beam in connection with laborers' work

$13.31$5.36$18.67no changeSurvey, 1985
LABORER: GUNITE GROUP 3 General laborer$12.88$5.36$18.24no changeSurvey, 1985
LABORER: GUNITE GROUP 2 Rebound$13.00$5.36$18.36no changeSurvey, 1985
LABORER: GUNITE GROUP 1 Nozzle operator (including gun, pot); Ground$13.52$5.36$18.88no changeSurvey, 1985
IRONWORKERS: ORNAMENTAL, REINFORCING AND STRUCTURAL$18.90$8.95$27.85no changeSurvey, 1985
IRONWORKERS: FENCE ERECTOR$18.01$8.93$26.94no changeSurvey, 1985
INSULATOR/ASBESTOS WORKER…
Full text

INSULATOR/ASBESTOS WORKER (INCLUDES THE APPLICATION OF ALL INSULATING MATERIALS, PROTECTIVE COVERINGS, COATINGS, AND FINISHES TO ALL TYPES OF MECHANICAL SYSTEMS)

$24.85$5.61$30.46no changeSurvey, 1985
GLAZIER$17.75$6.44$24.19no changeSurvey, 1985
FLOOR LAYER: CARPET$16.06$3.00$19.06no changeSurvey, 1985
ELEVATOR CONSTRUCTOR$29.39$3.29$32.68changedSurvey, 1985
ELECTRICIANS: SOUND AND SIGNAL TECHNICIAN$15.65$1.50$17.15no changeSurvey, 1985
ELECTRICIANS: RESIDENTIAL ELECTRICIAN$14.50$3.30$17.80no changeSurvey, 1985
ELECTRICIANS: CABLE SPLICER$17.93$3.92$21.85changedSurvey, 1985
ELECTRICIAN$16.30$3.87$20.17—Survey, 1985
DRYWALL INSTALLERS/LATHERS: DRYWALL STOCKER, SCRAPPER & CLEAN-UP$10.07$3.34$13.41changedSurvey, 1985
DRYWALL INSTALLERS/LATHERS: DRYWALL INSTALLER/LATHER$18.14$6.48$24.62changedSurvey, 1985
CEMENT MASONS: SWING OR SLIP FORM SCAFFOLDS…
Full text

CEMENT MASONS: SWING OR SLIP FORM SCAFFOLDS; MASTIC, MAGNESITE, GYPSUM, EPOXY, POLYESTER, RESIN AND ALL COMPOSITION

$17.16$6.18$23.34no changeSurvey, 1985
CEMENT MASONS: CEMENT MASON$16.91$6.18$23.09no changeSurvey, 1985
CARPENTERS: PILEDRIVER, BRIDGE, WHARF AND DOCK BUILDER$19.38$9.71$29.09changedSurvey, 1985
CARPENTERS: MILLWRIGHT$20.48$7.86$28.34changedSurvey, 1985
CARPENTERS: HARDWOOD FLOORLAYER…
Full text

CARPENTERS: HARDWOOD FLOORLAYER; POWER SAW OPERATOR; SAW FILER; SHINGLER; STEEL SCAFFOLD ERECTOR AND STEEL SHORING

$18.73$6.46$25.19changedSurvey, 1985
CARPENTER$18.58$6.46$25.04—Survey, 1985
BRICKLAYER, STONEMASON$17.57$4.04$21.61no changeSurvey, 1985
BRICK TENDER$15.80$3.46$19.26no changeSurvey, 1985
BOILERMAKER - BLACKSMITH (STORAGE TANK REPAIR)$17.05$4.00$21.05no changeSurvey, 1985
BOILERMAKER - BLACKSMITH (STORAGE TANK ERECTION))$19.25$4.00$23.25no changeSurvey, 1985
BOILERMAKER$22.60$4.25$26.85no changeSurvey, 1985

Modification history

Modification 0January 2, 2026
Modification 1May 18, 2026 (current)

Published by the Wage and Hour Division; read from sam.gov. The sheet is checked for a newer modification each day. Contracts awarded since January 1, 2017 also carry Executive Order 13706 paid sick leave (one hour per 30 worked, up to 56 a year).

Questions people ask

Which rate do I pay on CA20260023?
The line for the classification of work actually performed: the basic rate plus the fringe. You may pay the fringe into benefit plans, as cash on every hour, or a mix. Overtime after 40 hours is 1.5 times the basic rate; fringe is paid on every hour and never multiplied.
My trade is not on this sheet. What do I do?
Do not borrow the nearest name. Ask the contracting agency for a conformance on Standard Form 1444 before the first week of that work, and note it as pending on the payroll.
Does modification 1 apply to my contract?
Only if it was in force when your contract was awarded (generally at bid opening). An earlier modification locked into the contract keeps applying, except on option years, added scope and indefinite-quantity contracts. The number and modification are on the first page of the exhibit in your contract.

How to read a wage determination · Paying the fringe in cash or through plans · Overtime on these rates · Fringe credit calculator

Put these rates on a certified payroll.

Start here and CA20260023 is already filled in when you set up the job. CertifiedHours loads this sheet, checks every line against it as you type hours, and prints the WH-347. Free for one payroll a month.

Start a payroll on this sheet

On this sheet

  • 130 classifications in 1 rate groups
  • 0 from agreements, 1 from surveys
  • Counties: Amador