CertifiedHours

Prevailing wage rates · California · Wage determination

Prevailing wage rates: Inyo, Kern and Mono Counties, California

Building, Heavy, Highway construction · CA20260020 modification 5, published July 30, 2026

The short answer

This sheet sets 149 classifications for building, heavy, highway work in Inyo, Kern and Mono Counties, California. Each line is a basic hourly rate plus a fringe rate, and the sum is the minimum you must pay for that work, from $32.72 an hour (drywall (stocker/scrapper)) to $928.10 (diver: (1) wet amounts in ""rates'' column are per day). Your contract may lock an earlier modification.

Scope

Building Construction Projects Dredging Projects-Includes Dredging Projects (does not include hopper dredge work) Heavy Construction Projects (excludes water well drilling) Highway Construction Projects

Rates by classification

Total is the basic rate plus the fringe. Source is the agreement or survey the rate came from; a marker means the group changed in this modification. A dagger (†) means the fringe carries a footnote or percentage the total does not include; read the group’s notes.

ClassificationBasic rateFringeTotalSource
ASBE0005-001 · Asbestos Workers and Heat & Frost Insulators agreement, July 1, 2024
INSULATOR/ASBESTOS WORKER…
Full text

INSULATOR/ASBESTOS WORKER: INCLUDES THE APPLICATION OF ALL INSULATING MATERIALS, PROTECTIVE COVERINGS, COATINGS & FINISHES TO ALL TYPES OF MECHANICAL SYSTEMS INYO AND KERN

$56.32$26.52$82.84Agreement
ASBE0005-001 · Asbestos Workers and Heat & Frost Insulators agreement, September 1, 2024
FIRE STOP TECHNICIAN…
Full text

FIRE STOP TECHNICIAN: APPLICATION OF FIRESTOPPING MATERIALS FOR WALL OPENINGS AND PENETRATIONS IN WALLS, FLOORS, CEILINGS AND CURTAIN WALLS (INYO AND KERN)

$39.94$20.65$60.59Agreement
ASBE0005-005 · Asbestos Workers and Heat & Frost Insulators agreement, July 4, 2022
ASBESTOS REMOVAL WORKER/HAZARDOUS MATERIAL HANDLER…
Full text

ASBESTOS REMOVAL WORKER/HAZARDOUS MATERIAL HANDLER: INCLUDES PREPARATION, WETTING, STRIPPING, REMOVAL, SCRAPPING, VACUUMING, BAGGING AND DISPOSING OF ALL INSULATION MATERIALS FROM MECHANICAL SYSTEMS, WHETHER THEY CONTAIN ASBESTOS OR NOT (INYO AND KERN)

$23.52$13.37$36.89Agreement
ASBE0016-003 · Asbestos Workers and Heat & Frost Insulators agreement, January 1, 2024
ASBESTOS WORKERS/INSULATOR…
Full text

ASBESTOS WORKERS/INSULATOR: INCLUDES THE APPLICATION OF ALL INSULATING MATERIALS, PROTECTIVE COVERINGS, COATINGS, AND FINISHES TO ALL TYPES OF MECHANICAL SYSTEMS (MONO)

$64.56$25.07$89.63Agreement
BOIL0092-005 · Boilermakers agreement, January 1, 2024
BOILERMAKER (INYO AND KERN)$51.98$42.11$94.09Agreement
BOIL0549-003 · Boilermakers agreement, January 1, 2021
BOILERMAKER (MONO COUNTY)$45.60$38.99$84.59Agreement
BRCA0004-005 · Bricklayers agreement, May 1, 2024
BRICKLAYER; MARBLE SETTER *THE WAGE SCALE FOR PREVAILING WAGE PROJECTS PERFORMED IN BLYTHE…
Full text

BRICKLAYER; MARBLE SETTER *THE WAGE SCALE FOR PREVAILING WAGE PROJECTS PERFORMED IN BLYTHE, CHINA LAKE, DEATH VALLEY, FORT IRWIN, TWENTY-NINE PALMS, NEEDLES AND 1-15 CORRIDOR (BARSTOW TO THE NEVADA STATE LINE) WILL BE THREE DOLLARS ($3.00) ABOVE THE STANDARD SAN BERNARDINO/RIVERSIDE COUNTY HOURLY WAGE RATE

$45.53$20.29$65.82Agreement
BRCA0018-010 · Bricklayers agreement, September 1, 2024
TERRAZZO FINISHER$42.11$14.67$56.78Agreement
TERRAZZO WORKER/SETTER$49.62$15.26$64.88Agreement
BRCA0018-011 · Bricklayers agreement, June 1, 2023
TILE LAYER$48.29$19.18$67.47Agreement
BRCA0018-012 · Bricklayers agreement, June 1, 2024
MARBLE FINISHER (KERN)$43.38$15.36$58.74Agreement
TILE FINISHER (KERN)$37.96$13.77$51.73Agreement
CARP0213-002 · Carpenters agreement, July 1, 2025
DIVER: (1) WET AMOUNTS IN ""RATES'' COLUMN ARE PER DAY$901.92$26.18$928.10Agreement
DIVER: (2) STANDBY AMOUNTS IN ""RATES'' COLUMN ARE PER DAY$450.96$26.18$477.14Agreement
DIVER: (3) TENDER AMOUNTS IN ""RATES'' COLUMN ARE PER DAY$442.96$26.18$469.14Agreement
DIVER: (4) ASSISTANT TENDER AMOUNTS IN ""RATES'' COLUMN ARE PER DAY$418.96$26.18$445.14Agreement
CARP0213-004 · Carpenters agreement, July 1, 2025
DRYWALL (DRYWALL INSTALLER/LATHER)$52.24$26.18$78.42Agreement
DRYWALL (STOCKER/SCRAPPER)$21.45$11.27$32.72Agreement
CARP0661-001 · Carpenters agreement, July 1, 2021
CARPENTER: (01) CARPENTER…
Full text

CARPENTER: (01) CARPENTER, CABINET INSTALLER, INSULATION INSTALLER, FLOOR WORKER AND ACOUSTICAL INSTALLER

FOOTNOTE: WORK OF FORMING IN THE CONSTRUCTION OF OPEN CUT SEWERS OR STORM DRAINS, ON OPERATIONS IN WHICH HORIZONTAL LAGGING IS USED IN CONJUNCTION WITH STEEL H-BEAMS DRIVEN OR PLACED IN PRE-DRILLED HOLES, FOR THAT PORTION OF A LAGGED TRENCH AGAINST WHICH CONCRETE IS POURED, NAMELY, AS A SUBSTITUTE FOR BACK FORMS (WHICH WORK IS PERFORMED BY PILEDRIVERS): $0.13 PER HOUR ADDITIONAL

$51.03$16.28$67.31Agreement
CARPENTER: (02) MILLWRIGHT

FOOTNOTE: WORK OF FORMING IN THE CONSTRUCTION OF OPEN CUT SEWERS OR STORM DRAINS, ON OPERATIONS IN WHICH HORIZONTAL LAGGING IS USED IN CONJUNCTION WITH STEEL H-BEAMS DRIVEN OR PLACED IN PRE-DRILLED HOLES, FOR THAT PORTION OF A LAGGED TRENCH AGAINST WHICH CONCRETE IS POURED, NAMELY, AS A SUBSTITUTE FOR BACK FORMS (WHICH WORK IS PERFORMED BY PILEDRIVERS): $0.13 PER HOUR ADDITIONAL

$52.10$16.48$68.58Agreement
CARPENTER: (03) PILEDRIVERMEN…
Full text

CARPENTER: (03) PILEDRIVERMEN; DERRICK BARGE; BRIDGE OR DOCK CARPENTER; HEAVY FRAMER; ROCKSLINGER; ROCK BARGEMAN; SCOWMAN

FOOTNOTE: WORK OF FORMING IN THE CONSTRUCTION OF OPEN CUT SEWERS OR STORM DRAINS, ON OPERATIONS IN WHICH HORIZONTAL LAGGING IS USED IN CONJUNCTION WITH STEEL H-BEAMS DRIVEN OR PLACED IN PRE-DRILLED HOLES, FOR THAT PORTION OF A LAGGED TRENCH AGAINST WHICH CONCRETE IS POURED, NAMELY, AS A SUBSTITUTE FOR BACK FORMS (WHICH WORK IS PERFORMED BY PILEDRIVERS): $0.13 PER HOUR ADDITIONAL

$51.73$16.28$68.01Agreement
CARPENTER: (04) SHINGLER (COMMERCIAL)

FOOTNOTE: WORK OF FORMING IN THE CONSTRUCTION OF OPEN CUT SEWERS OR STORM DRAINS, ON OPERATIONS IN WHICH HORIZONTAL LAGGING IS USED IN CONJUNCTION WITH STEEL H-BEAMS DRIVEN OR PLACED IN PRE-DRILLED HOLES, FOR THAT PORTION OF A LAGGED TRENCH AGAINST WHICH CONCRETE IS POURED, NAMELY, AS A SUBSTITUTE FOR BACK FORMS (WHICH WORK IS PERFORMED BY PILEDRIVERS): $0.13 PER HOUR ADDITIONAL

$51.17$16.28$67.45Agreement
CARPENTER: (05) TABLE POWER SAW OPERATOR$52.13$16.28$68.41Agreement
CARPENTER: (06) PNEUMATIC NAILER OR POWER STAPLER

FOOTNOTE: WORK OF FORMING IN THE CONSTRUCTION OF OPEN CUT SEWERS OR STORM DRAINS, ON OPERATIONS IN WHICH HORIZONTAL LAGGING IS USED IN CONJUNCTION WITH STEEL H-BEAMS DRIVEN OR PLACED IN PRE-DRILLED HOLES, FOR THAT PORTION OF A LAGGED TRENCH AGAINST WHICH CONCRETE IS POURED, NAMELY, AS A SUBSTITUTE FOR BACK FORMS (WHICH WORK IS PERFORMED BY PILEDRIVERS): $0.13 PER HOUR ADDITIONAL

$51.29$16.28$67.57Agreement
CARPENTER: (07) ROOF LOADER OF SHINGLES (COMMERCIAL

FOOTNOTE: WORK OF FORMING IN THE CONSTRUCTION OF OPEN CUT SEWERS OR STORM DRAINS, ON OPERATIONS IN WHICH HORIZONTAL LAGGING IS USED IN CONJUNCTION WITH STEEL H-BEAMS DRIVEN OR PLACED IN PRE-DRILLED HOLES, FOR THAT PORTION OF A LAGGED TRENCH AGAINST WHICH CONCRETE IS POURED, NAMELY, AS A SUBSTITUTE FOR BACK FORMS (WHICH WORK IS PERFORMED BY PILEDRIVERS): $0.13 PER HOUR ADDITIONAL

$38.92$16.28$55.20Agreement
CARPENTER: (08) SAW FILER

FOOTNOTE: WORK OF FORMING IN THE CONSTRUCTION OF OPEN CUT SEWERS OR STORM DRAINS, ON OPERATIONS IN WHICH HORIZONTAL LAGGING IS USED IN CONJUNCTION WITH STEEL H-BEAMS DRIVEN OR PLACED IN PRE-DRILLED HOLES, FOR THAT PORTION OF A LAGGED TRENCH AGAINST WHICH CONCRETE IS POURED, NAMELY, AS A SUBSTITUTE FOR BACK FORMS (WHICH WORK IS PERFORMED BY PILEDRIVERS): $0.13 PER HOUR ADDITIONAL

$51.03$16.28$67.31Agreement
CARPENTER: (09) SCAFFOLD BUILDER

FOOTNOTE: WORK OF FORMING IN THE CONSTRUCTION OF OPEN CUT SEWERS OR STORM DRAINS, ON OPERATIONS IN WHICH HORIZONTAL LAGGING IS USED IN CONJUNCTION WITH STEEL H-BEAMS DRIVEN OR PLACED IN PRE-DRILLED HOLES, FOR THAT PORTION OF A LAGGED TRENCH AGAINST WHICH CONCRETE IS POURED, NAMELY, AS A SUBSTITUTE FOR BACK FORMS (WHICH WORK IS PERFORMED BY PILEDRIVERS): $0.13 PER HOUR ADDITIONAL.

$42.80$16.28$59.08Agreement
CARP0721-001 · Carpenters agreement, July 1, 2025
MODULAR FURNITURE INSTALLER$25.00$13.06$38.06Agreement
ELEC0428-001 · Electrical Workers (IBEW) agreement, December 30, 2024
CABLE SPLICER (REMAINDER OF KERN COUNTY)$62.32$22.06$84.38Agreement
CABLE SPLICER (CHINA LAKE NAVAL WEAPONS CENTER, EDWARDS AFB)$71.07$22.32$93.39Agreement
ELECTRICIAN (CHINA LAKE NAVAL WEAPONS CENTER, EDWARDS AFB)$65.40$22.15$87.55Agreement
ELECTRICIAN (REMAINTER OF KERN COUNTY)$53.65$21.80$75.45Agreement
ELEC0428-003 · Electrical Workers (IBEW) agreement, June 30, 2025
COMMUNICATIONS SYSTEM…
Full text

COMMUNICATIONS SYSTEM: INSTALLER (CHINA LAKE NAVAL WEAPONS CENTER) COMMUNICATIONS AND SYSTEMS WORK

SCOPE OF WORK: INSTALLATION, TESTING, SERVICE AND MAINTENANCE OF SYSTEMS UTILIZING THE TRANSMISSION AND/OR TRANSFERENCE OF VOICE, SOUND, VISION AND DIGITAL FOR COMMERCIAL, EDUCATIONAL, SECURITY AND ENTERTAINMENT PURPOSES FOR THE FOLLOWING: TV MONITORING AND SURVEILLANCE, BACKGROUND-FOREGROUND MUSIC, INTERCOM AND TELEPHONE INTERCONNECT, INVENTORY CONTROL SYSTEMS, MICROWAVE TRANSMISSION, MULTI-MEDIA, MULTIPLEX, NURSE CALL SYSTEMS, RADIO PAGE, SCHOOL INTERCOM AND SOUND, BURGLAR ALARMS, FIRE ALARM (SEE LAST PARAGRAPH BELOW) AND LOW VOLTAGE MASTER CLOCK SYSTEMS IN COMMERCIAL BUILDINGS. COMMUNICATION SYSTEMS THAT TRANSMIT OR RECEIVE INFORMATION AND/OR CONTROL SYSTEMS THAT ARE INTRINSIC TO THE ABOVE LISTED SYSTEMS; INCLUSION OR EXCLUSION OF TERMINATIONS AND TESTINGS OF CONDUCTORS DETERMINED BY THEIR FUNCTION; EXCLUDING ALL OTHER DATA SYSTEMS OR MULTIPLE SYSTEMS WHICH INCLUDE CONTROL FUNCTION OR POWER SUPPLY; EXCLUDING INSTALLATION OF RACEWAY SYSTEMS, CONDUIT SYSTEMS, LINE VOLTAGE WORK, AND ENERGY MANAGEMENT SYSTEMS. FIRE ALARM WORK SHALL BE PERFORMED AT THE CURRENT INSIDE WIREMAN TOTAL COST PACKAGE

$55.90$21.32$77.22Agreement
COMMUNICATIONS SYSTEM: INSTALLER (EDWARDS AFB) COMMUNICATIONS AND SYSTEMS WORK

SCOPE OF WORK: INSTALLATION, TESTING, SERVICE AND MAINTENANCE OF SYSTEMS UTILIZING THE TRANSMISSION AND/OR TRANSFERENCE OF VOICE, SOUND, VISION AND DIGITAL FOR COMMERCIAL, EDUCATIONAL, SECURITY AND ENTERTAINMENT PURPOSES FOR THE FOLLOWING: TV MONITORING AND SURVEILLANCE, BACKGROUND-FOREGROUND MUSIC, INTERCOM AND TELEPHONE INTERCONNECT, INVENTORY CONTROL SYSTEMS, MICROWAVE TRANSMISSION, MULTI-MEDIA, MULTIPLEX, NURSE CALL SYSTEMS, RADIO PAGE, SCHOOL INTERCOM AND SOUND, BURGLAR ALARMS, FIRE ALARM (SEE LAST PARAGRAPH BELOW) AND LOW VOLTAGE MASTER CLOCK SYSTEMS IN COMMERCIAL BUILDINGS. COMMUNICATION SYSTEMS THAT TRANSMIT OR RECEIVE INFORMATION AND/OR CONTROL SYSTEMS THAT ARE INTRINSIC TO THE ABOVE LISTED SYSTEMS; INCLUSION OR EXCLUSION OF TERMINATIONS AND TESTINGS OF CONDUCTORS DETERMINED BY THEIR FUNCTION; EXCLUDING ALL OTHER DATA SYSTEMS OR MULTIPLE SYSTEMS WHICH INCLUDE CONTROL FUNCTION OR POWER SUPPLY; EXCLUDING INSTALLATION OF RACEWAY SYSTEMS, CONDUIT SYSTEMS, LINE VOLTAGE WORK, AND ENERGY MANAGEMENT SYSTEMS. FIRE ALARM WORK SHALL BE PERFORMED AT THE CURRENT INSIDE WIREMAN TOTAL COST PACKAGE

$52.39$21.21$73.60Agreement
COMMUNICATIONS SYSTEM: INSTALLER (KERN COUNTY) COMMUNICATIONS AND SYSTEMS WORK

SCOPE OF WORK: INSTALLATION, TESTING, SERVICE AND MAINTENANCE OF SYSTEMS UTILIZING THE TRANSMISSION AND/OR TRANSFERENCE OF VOICE, SOUND, VISION AND DIGITAL FOR COMMERCIAL, EDUCATIONAL, SECURITY AND ENTERTAINMENT PURPOSES FOR THE FOLLOWING: TV MONITORING AND SURVEILLANCE, BACKGROUND-FOREGROUND MUSIC, INTERCOM AND TELEPHONE INTERCONNECT, INVENTORY CONTROL SYSTEMS, MICROWAVE TRANSMISSION, MULTI-MEDIA, MULTIPLEX, NURSE CALL SYSTEMS, RADIO PAGE, SCHOOL INTERCOM AND SOUND, BURGLAR ALARMS, FIRE ALARM (SEE LAST PARAGRAPH BELOW) AND LOW VOLTAGE MASTER CLOCK SYSTEMS IN COMMERCIAL BUILDINGS. COMMUNICATION SYSTEMS THAT TRANSMIT OR RECEIVE INFORMATION AND/OR CONTROL SYSTEMS THAT ARE INTRINSIC TO THE ABOVE LISTED SYSTEMS; INCLUSION OR EXCLUSION OF TERMINATIONS AND TESTINGS OF CONDUCTORS DETERMINED BY THEIR FUNCTION; EXCLUDING ALL OTHER DATA SYSTEMS OR MULTIPLE SYSTEMS WHICH INCLUDE CONTROL FUNCTION OR POWER SUPPLY; EXCLUDING INSTALLATION OF RACEWAY SYSTEMS, CONDUIT SYSTEMS, LINE VOLTAGE WORK, AND ENERGY MANAGEMENT SYSTEMS. FIRE ALARM WORK SHALL BE PERFORMED AT THE CURRENT INSIDE WIREMAN TOTAL COST PACKAGE

$46.26$21.03$67.29Agreement
ELEC0477-001 · Electrical Workers (IBEW) agreement, June 1, 2024
ELECTRICIAN (INYO AND MONO) CABLE SPLICER…
Full text

ELECTRICIAN (INYO AND MONO) CABLE SPLICER: $1.50 ABOVE ELECTRICIAN. TUNNEL WORK: 10% ABOVE ELECTRICIAN. ZONE PAY: ZONE A - 80 ROAD MILES FROM POST OFFICE, 455 ORANGE SHOW LANE, SAN BERNARDINO, WILL BE A FREE ZONE FOR ALL CONTRACTORS ZONE B - ANY WORK PERFORMED OUTSIDE ZONE A'S 80 ROAD MILES, SHALL ADD $12.00 PER HOUR TO THE CURRENT WAGE SCALE

$53.15$29.07$82.22Agreement
ELEC1245-001 · Electrical Workers (IBEW) agreement, January 1, 2025
LINE CONSTRUCTION…
Full text

LINE CONSTRUCTION: (1) LINEMAN; CABLE SPLICER HOLIDAYS: NEW YEAR'S DAY, M.L. KING DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS DAY, THANKSGIVING DAY AND DAY AFTER THANKSGIVING, CHRISTMAS DAY

$70.16$24.71$94.87Agreement
LINE CONSTRUCTION…
Full text

LINE CONSTRUCTION: (2) EQUIPMENT SPECIALIST (OPERATES CRAWLER TRACTORS, COMMERCIAL MOTOR VEHICLES, BACKHOES, TRENCHERS, CRANES (50 TONS AND BELOW), OVERHEAD & UNDERGROUND DISTRIBUTION LINE EQUIPMENT) HOLIDAYS: NEW YEAR'S DAY, M.L. KING DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS DAY, THANKSGIVING DAY AND DAY AFTER THANKSGIVING, CHRISTMAS DAY

$53.30$22.26$75.56Agreement
LINE CONSTRUCTION…
Full text

LINE CONSTRUCTION: (3) GROUNDMAN HOLIDAYS: NEW YEAR'S DAY, M.L. KING DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS DAY, THANKSGIVING DAY AND DAY AFTER THANKSGIVING, CHRISTMAS DAY

$40.76$21.76$62.52Agreement
ELEV0018-001 · Elevator Constructors agreement, January 1, 2025
ELEVATOR MECHANIC

FOOTNOTE: A. PAID VACATION: EMPLOYER CONTRIBUTES 8% OF REGULAR HOURLY RATE AS VACATION PAY CREDIT FOR EMPLOYEES WITH MORE THAN 5 YEARS OF SERVICE, AND 6% FOR 6 MONTHS TO 5 YEARS OF SERVICE. B. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS' DAY, THANKSGIVING DAY, FRIDAY AFTER THANKSGIVING, AND CHRISTMAS DAY

$69.43$38.44$107.87Agreement
ENGI0012-004 · Operating Engineers agreement, August 1, 2025
OPERATOR, POWER EQUIPMENT: (1) LEVERMAN (DREDGING)$67.90$40.95$108.85Agreement
OPERATOR, POWER EQUIPMENT: (2) DREDGE DOZER (DREDGING)$61.93$40.95$102.88Agreement
OPERATOR, POWER EQUIPMENT: (3) DECKMATE (DREDGING)$61.82$40.95$102.77Agreement
OPERATOR, POWER EQUIPMENT: (4) WINCH OPERATOR (STERN WINCH ON DREDGE) (DREDGING)$61.27$40.95$102.22Agreement
OPERATOR, POWER EQUIPMENT: (5) FIREMAN-OILER, DECKHAND, BARGEMAN, LEVEEHAND (DREDGING)$60.73$40.95$101.68Agreement
OPERATOR, POWER EQUIPMENT: (6) BARGE MATE (DREDGING)$61.34$40.95$102.29Agreement
ENGI0012-024 · Operating Engineers agreement, July 1, 2025
OPERATOR: POWER EQUIPMENT, ALL OTHER WORK: GROUP 1…
Full text

OPERATOR: POWER EQUIPMENT, ALL OTHER WORK: GROUP 1- BARGEMAN; BRAKEMAN; COMPRESSOR OPERATOR; DITCH WITCH, WITH SEAT OR SIMILAR TYPE EQUIPMENT; ELEVATOR OPERATOR-INSIDE; ENGINEER OILER; FORKLIFT OPERATOR (INCLUDES LOED, LULL OR SIMILAR TYPES UNDER 5 TONS; GENERATOR OPERATOR; GENERATOR, PUMP OR COMPRESSOR PLANT OPERATOR; PUMP OPERATOR; SIGNALMAN; SWITCHMAN

PREMIUM PAY: $10.00 PER HOUR SHALL BE PAID ON ALL POWER EQUIPMENT OPERATOR WORK ON THE FOLLOWNG MILITARY BASES: CHINA LAKE NAVAL RESERVE, VANDENBERG AFB, POINT ARGUELLO, SEELY NAVAL BASE, FORT IRWIN, NEBO ANNEX MARINE BASE, MARINE CORP LOGISTICS BASE YERMO, EDWARDS AFB, 29 PALMS MARINE BASE AND CAMP PENDLETON WORKERS REQUIRED TO SUIT UP AND WORK IN A HAZARDOUS MATERIAL ENVIRONMENT: $2.00 PER HOUR ADDITIONAL. COMBINATION MIXER AND COMPRESSOR OPERATOR ON GUNITE WORK SHALL BE CLASSIFIED AS A CONCRETE MOBILE MIXER OPERATOR

$63.40$33.20$96.60Agreement
OPERATOR: POWER EQUIPMENT, ALL OTHER WORK: GROUP 2…
Full text

OPERATOR: POWER EQUIPMENT, ALL OTHER WORK: GROUP 2- ASPHALT-RUBBER PLANT OPERATOR (NURSE TANK OPERATOR);COIL TUBING RIG OPERATOR, CONCRETE MIXER OPERATOR-SKIP TYPE; CONVEYOR OPERATOR; FIREMAN; FORKLIFT OPERATOR (INCLUDES LOED, LULL OR SIMILAR TYPES OVER 5 TONS; HYDROSTATIC PUMP OPERATOR; OILER CRUSHER (ASPHALT OR CONCRETE PLANT); PETROMAT LAYDOWN MACHINE; PJU SIDE DUM JACK; SCREENING AND CONVEYOR MACHINE OPERATOR (OR SIMILAR TYPES); SKIPLOADER (WHEEL TYPE UP TO 3/4 YD. WITHOUT ATTACHMENT); TAR POT FIREMAN; TEMPORARY HEATING PLANT OPERATOR; TRENCHING MACHINE OILER

PREMIUM PAY: $10.00 PER HOUR SHALL BE PAID ON ALL POWER EQUIPMENT OPERATOR WORK ON THE FOLLOWNG MILITARY BASES: CHINA LAKE NAVAL RESERVE, VANDENBERG AFB, POINT ARGUELLO, SEELY NAVAL BASE, FORT IRWIN, NEBO ANNEX MARINE BASE, MARINE CORP LOGISTICS BASE YERMO, EDWARDS AFB, 29 PALMS MARINE BASE AND CAMP PENDLETON WORKERS REQUIRED TO SUIT UP AND WORK IN A HAZARDOUS MATERIAL ENVIRONMENT: $2.00 PER HOUR ADDITIONAL. COMBINATION MIXER AND COMPRESSOR OPERATOR ON GUNITE WORK SHALL BE CLASSIFIED AS A CONCRETE MOBILE MIXER OPERATOR

$64.18$33.20$97.38Agreement
OPERATOR: POWER EQUIPMENT, ALL OTHER WORK: GROUP 3…
Full text

OPERATOR: POWER EQUIPMENT, ALL OTHER WORK: GROUP 3- ASPHALT-RUBBER BLEND OPERATOR; BOBCAT OR SIMILAR TYPE (SKID STEER); EQUIPMENT GREASER (RACK); FORD FERGUSON (WITH DRAGTYPE ATTACHMENTS); HELICOPTER RADIOMAN (GROUND); STATIONARY PIPE WRAPPING AND CLEANING MACHINE OPERATOR

PREMIUM PAY: $10.00 PER HOUR SHALL BE PAID ON ALL POWER EQUIPMENT OPERATOR WORK ON THE FOLLOWNG MILITARY BASES: CHINA LAKE NAVAL RESERVE, VANDENBERG AFB, POINT ARGUELLO, SEELY NAVAL BASE, FORT IRWIN, NEBO ANNEX MARINE BASE, MARINE CORP LOGISTICS BASE YERMO, EDWARDS AFB, 29 PALMS MARINE BASE AND CAMP PENDLETON WORKERS REQUIRED TO SUIT UP AND WORK IN A HAZARDOUS MATERIAL ENVIRONMENT: $2.00 PER HOUR ADDITIONAL. COMBINATION MIXER AND COMPRESSOR OPERATOR ON GUNITE WORK SHALL BE CLASSIFIED AS A CONCRETE MOBILE MIXER OPERATOR

$64.67$33.20$97.87Agreement
OPERATOR: POWER EQUIPMENT, ALL OTHER WORK: GROUP 4…
Full text

OPERATOR: POWER EQUIPMENT, ALL OTHER WORK: GROUP 4- ASPHALT PLANT FIREMAN; BACKHOE OPERATOR (MINI-MAX OR SIMILAR TYPE); BORING MACHINE OPERATOR; BOXMAN OR MIXERMAN (ASPHALT OR CONCRETE); CHIP SPREADING MACHINE OPERATOR; CONCRETE CLEANING DECONTAMINATION MACHINE OPERATOR; CONCRETE PUMP OPERATOR (SMALL PORTABLE);DIRECT PUSH OPERATOR (GEOPROBE OR SIMILAR TYPES) DRILLING MACHINE OPERATOR, SMALL AUGER TYPES (TEXOMA SUPER ECONOMATIC OR SIMILAR TYPES - HUGHES 100 OR 200 OR SIMILAR TYPES - DRILLING DEPTH OF 30' MAXIMUM); EQUIPMENT GREASER (GREASE TRUCK); GUARD RAIL POST DRIVER OPERATOR; HIGHLINE CABLEWAY SIGNALMAN; HYDRA-HAMMER-AERO STOMPER; MICRO TUNNELING (ABOVE GROUND TUNNEL); POWER CONCRETE CURING MACHINE OPERATOR; POWER CONCRETE SAW OPERATOR; POWER-DRIVEN JUMBO FORM SETTER OPERATOR; POWER SWEEPER OPERATOR; ROCK WHEEL SAW/TRENCHER; ROLLER OPERATOR (COMPACTING); SCREED OPERATOR (ASPHALT OR CONCRETE); TRENCHING MACHINE OPERATOR (UP TO 6 FT.); VACUUM OR MUCH TRUCK

PREMIUM PAY: $10.00 PER HOUR SHALL BE PAID ON ALL POWER EQUIPMENT OPERATOR WORK ON THE FOLLOWNG MILITARY BASES: CHINA LAKE NAVAL RESERVE, VANDENBERG AFB, POINT ARGUELLO, SEELY NAVAL BASE, FORT IRWIN, NEBO ANNEX MARINE BASE, MARINE CORP LOGISTICS BASE YERMO, EDWARDS AFB, 29 PALMS MARINE BASE AND CAMP PENDLETON WORKERS REQUIRED TO SUIT UP AND WORK IN A HAZARDOUS MATERIAL ENVIRONMENT: $2.00 PER HOUR ADDITIONAL. COMBINATION MIXER AND COMPRESSOR OPERATOR ON GUNITE WORK SHALL BE CLASSIFIED AS A CONCRETE MOBILE MIXER OPERATOR

$65.96$33.20$99.16Agreement
OPERATOR: POWER EQUIPMENT, ALL OTHER WORK: GROUP 6…
Full text

OPERATOR: POWER EQUIPMENT, ALL OTHER WORK: GROUP 6- ARTICULATING MATERIAL HAULER; ASPHALT PLANT ENGINEER; BATCH PLANT OPERATOR; BIT SHARPENER; CONCRETE JOINT MACHINE OPERATOR (CANAL AND SIMILAR TYPE); CONCRETE PLANER OPERATOR; DANDY DIGGER; DECK ENGINE OPERATOR; DERRICKMAN (OILFIELD TYPE); DRILLING MACHINE OPERATOR, BUCKET OR AUGER TYPES (CALWELD 100 BUCKET OR SIMILAR TYPES - WATSON 1000 AUGER OR SIMILAR TYPES - TEXOMA 330, 500 OR 600 AUGER OR SIMILAR TYPES - DRILLING DEPTH OF 45' MAXIMUM); DRILLING MACHINE OPERATOR; HYDROGRAPHIC SEEDER MACHINE OPERATOR (STRAW, PULP OR SEED), JACKSON TRACK MAINTAINER, OR SIMILAR TYPE; KALAMAZOO SWITCH TAMPER, OR SIMILAR TYPE; MACHINE TOOL OPERATOR; MAGINNIS INTERNAL FULL SLAB VIBRATOR, MECHANICAL BERM, CURB OR GUTTER(CONCRETE OR ASPHALT); MECHANICAL FINISHER OPERATOR (CONCRETE, CLARY-JOHNSON-BIDWELL OR SIMILAR); MICRO TUNNEL SYSTEM (BELOW GROUND); PAVEMENT BREAKER OPERATOR (TRUCK MOUNTED); ROAD OIL MIXING MACHINE OPERATOR; ROLLER OPERATOR (ASPHALT OR FINISH), RUBBER-TIRED EARTH MOVING EQUIPMENT (SINGLE ENGINE, UP TO AND INCLUDING 25 YDS. STRUCK); SELF-PROPELLED TAR PIPELINING MACHINE OPERATOR; SKIPLOADER OPERATOR (CRAWLER AND WHEEL TYPE, OVER 3/4 YD. AND UP TO AND INCLUDING 1-1/2 YDS.); SLIP FORM PUMP OPERATOR (POWER DRIVEN HYDRAULIC LIFTING DEVICE FOR CONCRETE FORMS); TRACTOR OPERATOR-BULLDOZER, TAMPER-SCRAPER (SINGLE ENGINE, UP TO 100 H.P. FLYWHEEL AND SIMILAR TYPES, UP TO AND INCLUDING D-5 AND SIMILAR TYPES); TUGGER HOIST OPERATOR (1 DRUM); ULTRA HIGH PRESSURE WATERJET CUTTING TOOL SYSTEM OPERATOR; VACUUM BLASTING MACHINE OPERATOR

PREMIUM PAY: $10.00 PER HOUR SHALL BE PAID ON ALL POWER EQUIPMENT OPERATOR WORK ON THE FOLLOWNG MILITARY BASES: CHINA LAKE NAVAL RESERVE, VANDENBERG AFB, POINT ARGUELLO, SEELY NAVAL BASE, FORT IRWIN, NEBO ANNEX MARINE BASE, MARINE CORP LOGISTICS BASE YERMO, EDWARDS AFB, 29 PALMS MARINE BASE AND CAMP PENDLETON WORKERS REQUIRED TO SUIT UP AND WORK IN A HAZARDOUS MATERIAL ENVIRONMENT: $2.00 PER HOUR ADDITIONAL. COMBINATION MIXER AND COMPRESSOR OPERATOR ON GUNITE WORK SHALL BE CLASSIFIED AS A CONCRETE MOBILE MIXER OPERATOR

$66.18$33.20$99.38Agreement
OPERATOR: POWER EQUIPMENT, ALL OTHER WORK: GROUP 8…
Full text

OPERATOR: POWER EQUIPMENT, ALL OTHER WORK: GROUP 8- ASPHALT OR CONCRETE SPREADING OPERATOR (TAMPING OR FINISHING); ASPHALT PAVING MACHINE OPERATOR (BARBER GREENE OR SIMILAR TYPE); ASPHALT-RUBBER DISTRIBUTION OPERATOR; BACKHOE OPERATOR (UP TO AND INCLUDING 3/4 YD.), SMALL FORD, CASE OR SIMILAR TYPES; CABLE BUNDLING MACHINE OPERATOR (EXCLUDING HANDHELD); CABLE TRENCHING MACHINE OPERATOR (SPIDER PLOW OR SIMILAR TYPES) CAST-IN-PLACE PIPE LAYING MACHINE OPERATOR; COMBINATION MIXER AND COMPRESSOR OPERATOR (GUNITE WORK); COMPACTOR OPERATOR (SELF-PROPELLED); CONCRETE MIXER OPERATOR (PAVING); CRUSHING PLANT OPERATOR; DRILL DOCTOR; DRILLING MACHINE OPERATOR, BUCKET OR AUGER TYPES (CALWELD 150 BUCKET OR SIMILAR TYPES - WATSON 1500, 2000 2500 AUGER OR SIMILAR TYPES - TEXOMA 700, 800 AUGER OR SIMILAR TYPES - DRILLING DEPTH OF 60' MAXIMUM); ELEVATING GRADER OPERATOR; GRADE CHECKER; GRADALL OPERATOR; GROUTING MACHINE OPERATOR; HEAVY-DUTY REPAIRMAN; HEAVY EQUIPMENT ROBOTICS OPERATOR; KALAMAZOO BALLISTE REGULATOR OR SIMILAR TYPE; KOLMAN BELT LOADER AND SIMILAR TYPE; LE TOURNEAU BLOB COMPACTOR OR SIMILAR TYPE; LOADER OPERATOR (ATHEY, EUCLID, SIERRA AND SIMILAR TYPES); MOBARK CHIPPER OR SIMILAR; OZZIE PADDER OR SIMILAR TYPES; P.C. SLOT SAW; PNEUMATIC CONCRETE PLACING MACHINE OPERATOR (HACKLEY-PRESSWELL OR SIMILAR TYPE); PUMPCRETE GUN OPERATOR; RCM CEMENTING UNIT OPERATOR, RAIL/SWITCH GRINDER OPERATOR (HARSCO OR SIMILAR TYPES) ROCK DRILL OR SIMILAR TYPES; ROTARY DRILL OPERATOR (EXCLUDING CAISSON TYPE); RUBBER-TIRED EARTH-MOVING EQUIPMENT OPERATOR (SINGLE ENGINE, CATERPILLAR, EUCLID, ATHEY WAGON AND SIMILAR TYPES WITH ANY AND ALL ATTACHMENTS OVER 25 YDS. UP TO AND INCLUDING 50 CU. YDS. STRUCK); RUBBER-TIRED EARTH-MOVING EQUIPMENT OPERATOR (MULTIPLE ENGINE UP TO AND INCLUDING 25 YDS. STRUCK); RUBBER-TIRED SCRAPER OPERATOR (SELF-LOADING PADDLE WHEEL TYPE-JOHN DEERE, 1040 AND SIMILAR SINGLE UNIT); SELF- PROPELLED CURB AND GUTTER MACHINE OPERATOR; SHUTTLE BUGGY; SKIPLOADER OPERATOR (CRAWLER AND WHEEL TYPE OVER 1-1/2 YDS. UP TO AND INCLUDING 6-1/2 YDS.); SOIL REMEDIATION PLANT OPERATOR; SURFACE HEATERS AND PLANER OPERATOR; TRACTOR COMPRESSOR DRILL COMBINATION OPERATOR; TRACTOR OPERATOR (ANY TYPE LARGER THAN D-5 - 100 FLYWHEEL H.P. AND OVER, OR SIMILAR-BULLDOZER, TAMPER, SCRAPER AND PUSH TRACTOR SINGLE ENGINE); TRACTOR OPERATOR (BOOM ATTACHMENTS), TRAVELING PIPE WRAPPING, CLEANING AND BENDNG MACHINE OPERATOR; TRENCHING MACHINE OPERATOR (OVER 6 FT. DEPTH CAPACITY, MANUFACTURER'S RATING); TRENCHING MACHINE WITH ROAD MINER ATTACHMENT (OVER 6 FT DEPTH CAPACITY): ULTRA HIGH PRESSURE WATERJET CUTTING TOOL SYSTEM MECHANIC; WATER PULL (COMPACTION) OPERATOR

PREMIUM PAY: $10.00 PER HOUR SHALL BE PAID ON ALL POWER EQUIPMENT OPERATOR WORK ON THE FOLLOWNG MILITARY BASES: CHINA LAKE NAVAL RESERVE, VANDENBERG AFB, POINT ARGUELLO, SEELY NAVAL BASE, FORT IRWIN, NEBO ANNEX MARINE BASE, MARINE CORP LOGISTICS BASE YERMO, EDWARDS AFB, 29 PALMS MARINE BASE AND CAMP PENDLETON WORKERS REQUIRED TO SUIT UP AND WORK IN A HAZARDOUS MATERIAL ENVIRONMENT: $2.00 PER HOUR ADDITIONAL. COMBINATION MIXER AND COMPRESSOR OPERATOR ON GUNITE WORK SHALL BE CLASSIFIED AS A CONCRETE MOBILE MIXER OPERATOR

$66.29$33.20$99.49Agreement
OPERATOR: POWER EQUIPMENT, ALL OTHER WORK: GROUP 10…
Full text

OPERATOR: POWER EQUIPMENT, ALL OTHER WORK: GROUP 10- DRILLING MACHINE OPERATOR, BUCKET OR AUGER TYPES (CALWELD 200 B BUCKET OR SIMILAR TYPES-WATSON 3000 OR 5000 AUGER OR SIMILAR TYPES-TEXOMA 900 AUGER OR SIMILAR TYPES-DRILLING DEPTH OF 105' MAXIMUM); DUAL DRUM MIXER, DYNAMIC COMPACTOR LDC350 (OR SIMILAR TYPES); MONORAIL LOCOMOTIVE OPERATOR (DIESEL, GAS OR ELECTRIC); MOTOR PATROL-BLADE OPERATOR (SINGLE ENGINE); MULTIPLE ENGINE TRACTOR OPERATOR (EUCLID AND SIMILAR TYPE-EXCEPT QUAD 9 CAT.); RUBBER-TIRED EARTH-MOVING EQUIPMENT OPERATOR (SINGLE ENGINE, OVER 50 YDS. STRUCK); PNEUMATIC PIPE RAMMING TOOL AND SIMILAR TYPES; PRESTRESSED WRAPPING MACHINE OPERATOR; RUBBER-TIRED EARTH-MOVING EQUIPMENT OPERATOR (SINGLE ENGINE, OVER 50 YDS. STRUCK); RUBBER TIRED EARTH MOVING EQUIPMENT OPERATOR (MULTIPLE ENGINE, EUCLID, CATERPILLAR AND SIMILAR OVER 25 YDS. AND UP TO 50 YDS. STRUCK), TOWER CRANE REPAIRMAN; TRACTOR LOADER OPERATOR (CRAWLER AND WHEEL TYPE OVER 6-1/2 YDS.); WOODS MIXER OPERATOR (AND SIMILAR PUGMILL EQUIPMENT)

PREMIUM PAY: $10.00 PER HOUR SHALL BE PAID ON ALL POWER EQUIPMENT OPERATOR WORK ON THE FOLLOWNG MILITARY BASES: CHINA LAKE NAVAL RESERVE, VANDENBERG AFB, POINT ARGUELLO, SEELY NAVAL BASE, FORT IRWIN, NEBO ANNEX MARINE BASE, MARINE CORP LOGISTICS BASE YERMO, EDWARDS AFB, 29 PALMS MARINE BASE AND CAMP PENDLETON WORKERS REQUIRED TO SUIT UP AND WORK IN A HAZARDOUS MATERIAL ENVIRONMENT: $2.00 PER HOUR ADDITIONAL. COMBINATION MIXER AND COMPRESSOR OPERATOR ON GUNITE WORK SHALL BE CLASSIFIED AS A CONCRETE MOBILE MIXER OPERATOR

$66.41$33.20$99.61Agreement
OPERATOR: POWER EQUIPMENT, ALL OTHER WORK: GROUP 12…
Full text

OPERATOR: POWER EQUIPMENT, ALL OTHER WORK: GROUP 12- AUTO GRADER OPERATOR; AUTOMATIC SLIP FORM OPERATOR; DRILLING MACHINE OPERATOR, BUCKET OR AUGER TYPES (CALWELD, AUGER 200 CA OR SIMILAR TYPES - WATSON, AUGER 6000 OR SIMILAR TYPES - HUGHES SUPER DUTY, AUGER 200 OR SIMILAR TYPES - DRILLING DEPTH OF 175' MAXIMUM); HOE RAM OR SIMILAR WITH COMPRESSOR; MASS EXCAVATOR OPERATOR LESS THA 750 CU. YARDS; MECHANICAL FINISHING MACHINE OPERATOR; MOBILE FORM TRAVELER OPERATOR; MOTOR PATROL OPERATOR (MULTI-ENGINE); PIPE MOBILE MACHINE OPERATOR; RUBBER-TIRED EARTH- MOVING EQUIPMENT OPERATOR (MULTIPLE ENGINE, EUCLID, CATERPILLAR AND SIMILAR TYPE, OVER 50 CU. YDS. STRUCK); RUBBER-TIRED SELF- LOADING SCRAPER OPERATOR (PADDLE-WHEEL-AUGER TYPE SELF-LOADING - TWO (2) OR MORE UNITS)

PREMIUM PAY: $10.00 PER HOUR SHALL BE PAID ON ALL POWER EQUIPMENT OPERATOR WORK ON THE FOLLOWNG MILITARY BASES: CHINA LAKE NAVAL RESERVE, VANDENBERG AFB, POINT ARGUELLO, SEELY NAVAL BASE, FORT IRWIN, NEBO ANNEX MARINE BASE, MARINE CORP LOGISTICS BASE YERMO, EDWARDS AFB, 29 PALMS MARINE BASE AND CAMP PENDLETON WORKERS REQUIRED TO SUIT UP AND WORK IN A HAZARDOUS MATERIAL ENVIRONMENT: $2.00 PER HOUR ADDITIONAL. COMBINATION MIXER AND COMPRESSOR OPERATOR ON GUNITE WORK SHALL BE CLASSIFIED AS A CONCRETE MOBILE MIXER OPERATOR

$66.58$33.20$99.78Agreement
OPERATOR: POWER EQUIPMENT, ALL OTHER WORK: GROUP 13…
Full text

OPERATOR: POWER EQUIPMENT, ALL OTHER WORK: GROUP 13- RUBBER-TIRED EARTH-MOVING EQUIPMENT OPERATOR OPERATING EQUIPMENT WITH PUSH-PULL SYSTEM (SINGLE ENGINE, UP TO AND INCLUDING 25 YDS. STRUCK)

PREMIUM PAY: $10.00 PER HOUR SHALL BE PAID ON ALL POWER EQUIPMENT OPERATOR WORK ON THE FOLLOWNG MILITARY BASES: CHINA LAKE NAVAL RESERVE, VANDENBERG AFB, POINT ARGUELLO, SEELY NAVAL BASE, FORT IRWIN, NEBO ANNEX MARINE BASE, MARINE CORP LOGISTICS BASE YERMO, EDWARDS AFB, 29 PALMS MARINE BASE AND CAMP PENDLETON WORKERS REQUIRED TO SUIT UP AND WORK IN A HAZARDOUS MATERIAL ENVIRONMENT: $2.00 PER HOUR ADDITIONAL. COMBINATION MIXER AND COMPRESSOR OPERATOR ON GUNITE WORK SHALL BE CLASSIFIED AS A CONCRETE MOBILE MIXER OPERATOR

$66.68$33.20$99.88Agreement
OPERATOR: POWER EQUIPMENT, ALL OTHER WORK: GROUP 14…
Full text

OPERATOR: POWER EQUIPMENT, ALL OTHER WORK: GROUP 14- CANAL LINER OPERATOR; CANAL TRIMMER OPERATOR; REMOTE- CONTROL EARTH-MOVING EQUIPMENT OPERATOR (OPERATING A SECOND PIECE OF EQUIPMENT: $1.00 PER HOUR ADDITIONAL); WHEEL EXCAVATOR OPERATOR (OVER 750 CU. YDS.)

PREMIUM PAY: $10.00 PER HOUR SHALL BE PAID ON ALL POWER EQUIPMENT OPERATOR WORK ON THE FOLLOWNG MILITARY BASES: CHINA LAKE NAVAL RESERVE, VANDENBERG AFB, POINT ARGUELLO, SEELY NAVAL BASE, FORT IRWIN, NEBO ANNEX MARINE BASE, MARINE CORP LOGISTICS BASE YERMO, EDWARDS AFB, 29 PALMS MARINE BASE AND CAMP PENDLETON WORKERS REQUIRED TO SUIT UP AND WORK IN A HAZARDOUS MATERIAL ENVIRONMENT: $2.00 PER HOUR ADDITIONAL. COMBINATION MIXER AND COMPRESSOR OPERATOR ON GUNITE WORK SHALL BE CLASSIFIED AS A CONCRETE MOBILE MIXER OPERATOR

$66.71$33.20$99.91Agreement
OPERATOR: POWER EQUIPMENT, ALL OTHER WORK: GROUP 15…
Full text

OPERATOR: POWER EQUIPMENT, ALL OTHER WORK: GROUP 15- RUBBER-TIRED EARTH-MOVING EQUIPMENT OPERATOR, OPERATING EQUIPMENT WITH PUSH-PULL SYSTEM (SINGLE ENGINE, CATERPILLAR, EUCLID, ATHEY WAGON AND SIMILAR TYPES WITH ANY AND ALL ATTACHMENTS OVER 25 YDS. AND UP TO AND INCLUDING 50 YDS. STRUCK); RUBBER-TIRED EARTH-MOVING EQUIPMENT OPERATOR, OPERATING EQUIPMENT WITH PUSH-PULL SYSTEM (MULTIPLE ENGINE-UP TO AND INCLUDING 25 YDS. STRUCK)

PREMIUM PAY: $10.00 PER HOUR SHALL BE PAID ON ALL POWER EQUIPMENT OPERATOR WORK ON THE FOLLOWNG MILITARY BASES: CHINA LAKE NAVAL RESERVE, VANDENBERG AFB, POINT ARGUELLO, SEELY NAVAL BASE, FORT IRWIN, NEBO ANNEX MARINE BASE, MARINE CORP LOGISTICS BASE YERMO, EDWARDS AFB, 29 PALMS MARINE BASE AND CAMP PENDLETON WORKERS REQUIRED TO SUIT UP AND WORK IN A HAZARDOUS MATERIAL ENVIRONMENT: $2.00 PER HOUR ADDITIONAL. COMBINATION MIXER AND COMPRESSOR OPERATOR ON GUNITE WORK SHALL BE CLASSIFIED AS A CONCRETE MOBILE MIXER OPERATOR

$66.79$33.20$99.99Agreement
OPERATOR: POWER EQUIPMENT, ALL OTHER WORK: GROUP 16…
Full text

OPERATOR: POWER EQUIPMENT, ALL OTHER WORK: GROUP 16- RUBBER-TIRED EARTH-MOVING EQUIPMENT OPERATOR, OPERATING EQUIPMENT WITH PUSH-PULL SYSTEM (SINGLE ENGINE, OVER 50 YDS. STRUCK); RUBBER-TIRED EARTH-MOVING EQUIPMENT OPERATOR, OPERATING EQUIPMENT WITH PUSH-PULL SYSTEM (MULTIPLE ENGINE, EUCLID, CATERPILLAR AND SIMILAR, OVER 25 YDS. AND UP TO 50 YDS. STRUCK)

PREMIUM PAY: $10.00 PER HOUR SHALL BE PAID ON ALL POWER EQUIPMENT OPERATOR WORK ON THE FOLLOWNG MILITARY BASES: CHINA LAKE NAVAL RESERVE, VANDENBERG AFB, POINT ARGUELLO, SEELY NAVAL BASE, FORT IRWIN, NEBO ANNEX MARINE BASE, MARINE CORP LOGISTICS BASE YERMO, EDWARDS AFB, 29 PALMS MARINE BASE AND CAMP PENDLETON WORKERS REQUIRED TO SUIT UP AND WORK IN A HAZARDOUS MATERIAL ENVIRONMENT: $2.00 PER HOUR ADDITIONAL. COMBINATION MIXER AND COMPRESSOR OPERATOR ON GUNITE WORK SHALL BE CLASSIFIED AS A CONCRETE MOBILE MIXER OPERATOR

$66.91$33.20$100.11Agreement
OPERATOR: POWER EQUIPMENT, ALL OTHER WORK: GROUP 17…
Full text

OPERATOR: POWER EQUIPMENT, ALL OTHER WORK: GROUP 17- RUBBER-TIRED EARTH-MOVING EQUIPMENT OPERATOR, OPERATING EQUIPMENT WITH PUSH-PULL SYSTEM (MULTIPLE ENGINE, EUCLID, CATERPILLAR AND SIMILAR, OVER 50 CU. YDS. STRUCK); TANDEM TRACTOR OPERATOR (OPERATING CRAWLER TYPE TRACTORS IN TANDEM - QUAD 9 AND SIMILAR TYPE)

PREMIUM PAY: $10.00 PER HOUR SHALL BE PAID ON ALL POWER EQUIPMENT OPERATOR WORK ON THE FOLLOWNG MILITARY BASES: CHINA LAKE NAVAL RESERVE, VANDENBERG AFB, POINT ARGUELLO, SEELY NAVAL BASE, FORT IRWIN, NEBO ANNEX MARINE BASE, MARINE CORP LOGISTICS BASE YERMO, EDWARDS AFB, 29 PALMS MARINE BASE AND CAMP PENDLETON WORKERS REQUIRED TO SUIT UP AND WORK IN A HAZARDOUS MATERIAL ENVIRONMENT: $2.00 PER HOUR ADDITIONAL. COMBINATION MIXER AND COMPRESSOR OPERATOR ON GUNITE WORK SHALL BE CLASSIFIED AS A CONCRETE MOBILE MIXER OPERATOR

$67.08$33.20$100.28Agreement
OPERATOR: POWER EQUIPMENT, ALL OTHER WORK: GROUP 18…
Full text

OPERATOR: POWER EQUIPMENT, ALL OTHER WORK: GROUP 18- RUBBER-TIRED EARTH-MOVING EQUIPMENT OPERATOR, OPERATING IN TANDEM (SCRAPERS, BELLY DUMPS AND SIMILAR TYPES IN ANY COMBINATION, EXCLUDING COMPACTION UNITS - SINGLE ENGINE, UP TO AND INCLUDING 25 YDS. STRUCK)

PREMIUM PAY: $10.00 PER HOUR SHALL BE PAID ON ALL POWER EQUIPMENT OPERATOR WORK ON THE FOLLOWNG MILITARY BASES: CHINA LAKE NAVAL RESERVE, VANDENBERG AFB, POINT ARGUELLO, SEELY NAVAL BASE, FORT IRWIN, NEBO ANNEX MARINE BASE, MARINE CORP LOGISTICS BASE YERMO, EDWARDS AFB, 29 PALMS MARINE BASE AND CAMP PENDLETON WORKERS REQUIRED TO SUIT UP AND WORK IN A HAZARDOUS MATERIAL ENVIRONMENT: $2.00 PER HOUR ADDITIONAL. COMBINATION MIXER AND COMPRESSOR OPERATOR ON GUNITE WORK SHALL BE CLASSIFIED AS A CONCRETE MOBILE MIXER OPERATOR

$67.18$33.20$100.38Agreement
OPERATOR: POWER EQUIPMENT, ALL OTHER WORK: GROUP 19…
Full text

OPERATOR: POWER EQUIPMENT, ALL OTHER WORK: GROUP 19- ROTEX CONCRETE BELT OPERATOR (OR SIMILAR TYPES); RUBBER-TIRED EARTH-MOVING EQUIPMENT OPERATOR, OPERATING IN TANDEM (SCRAPERS, BELLY DUMPS AND SIMILAR TYPES IN ANY COMBINATION, EXCLUDING COMPACTION UNITS - SINGLE ENGINE, CATERPILLAR, EUCLID, ATHEY WAGON AND SIMILAR TYPES WITH ANY AND ALL ATTACHMENTS OVER 25 YDS.AND UP TO AND INCLUDING 50 CU. YDS. STRUCK); RUBBER-TIRED EARTH-MOVING EQUIPMENT OPERATOR, OPERATING IN TANDEM (SCRAPERS, BELLY DUMPS AND SIMILAR TYPES IN ANY COMBINATION, EXCLUDING COMPACTION UNITS - MULTIPLE ENGINE, UP TO AND INCLUDING 25 YDS. STRUCK)

PREMIUM PAY: $10.00 PER HOUR SHALL BE PAID ON ALL POWER EQUIPMENT OPERATOR WORK ON THE FOLLOWNG MILITARY BASES: CHINA LAKE NAVAL RESERVE, VANDENBERG AFB, POINT ARGUELLO, SEELY NAVAL BASE, FORT IRWIN, NEBO ANNEX MARINE BASE, MARINE CORP LOGISTICS BASE YERMO, EDWARDS AFB, 29 PALMS MARINE BASE AND CAMP PENDLETON WORKERS REQUIRED TO SUIT UP AND WORK IN A HAZARDOUS MATERIAL ENVIRONMENT: $2.00 PER HOUR ADDITIONAL. COMBINATION MIXER AND COMPRESSOR OPERATOR ON GUNITE WORK SHALL BE CLASSIFIED AS A CONCRETE MOBILE MIXER OPERATOR

$67.29$33.20$100.49Agreement
OPERATOR: POWER EQUIPMENT, ALL OTHER WORK: GROUP 2…
Full text

OPERATOR: POWER EQUIPMENT, ALL OTHER WORK: GROUP 2-0 RUBBER-TIRED EARTH-MOVING EQUIPMENT OPERATOR, OPERATING IN TANDEM (SCRAPERS, BELLY DUMPS AND SIMILAR TYPES IN ANY COMBINATION, EXCLUDING COMPACTION UNITS - SINGLE ENGINE, OVER 50 YDS. STRUCK); RUBBER-TIRED EARTH-MOVING EQUIPMENT OPERATOR, OPERATING IN TANDEM (SCRAPERS, BELLY DUMPS, AND SIMILAR TYPES IN ANY COMBINATION, EXCLUDING COMPACTION UNITS - MULTIPLE ENGINE, EUCLID, CATERPILLAR AND SIMILAR, OVER 25 YDS. AND UP TO 50 YDS. STRUCK)

PREMIUM PAY: $10.00 PER HOUR SHALL BE PAID ON ALL POWER EQUIPMENT OPERATOR WORK ON THE FOLLOWNG MILITARY BASES: CHINA LAKE NAVAL RESERVE, VANDENBERG AFB, POINT ARGUELLO, SEELY NAVAL BASE, FORT IRWIN, NEBO ANNEX MARINE BASE, MARINE CORP LOGISTICS BASE YERMO, EDWARDS AFB, 29 PALMS MARINE BASE AND CAMP PENDLETON WORKERS REQUIRED TO SUIT UP AND WORK IN A HAZARDOUS MATERIAL ENVIRONMENT: $2.00 PER HOUR ADDITIONAL. COMBINATION MIXER AND COMPRESSOR OPERATOR ON GUNITE WORK SHALL BE CLASSIFIED AS A CONCRETE MOBILE MIXER OPERATOR

$67.41$33.20$100.61Agreement
OPERATOR: POWER EQUIPMENT, ALL OTHER WORK: GROUP 21…
Full text

OPERATOR: POWER EQUIPMENT, ALL OTHER WORK: GROUP 21- RUBBER-TIRED EARTH-MOVING EQUIPMENT OPERATOR, OPERATING IN TANDEM (SCRAPERS, BELLY DUMPS AND SIMILAR TYPES IN ANY COMBINATION, EXCLUDING COMPACTION UNITS - MULTIPLE ENGINE, EUCLID, CATERPILLAR AND SIMILAR TYPE, OVER 50 CU. YDS. STRUCK)

PREMIUM PAY: $10.00 PER HOUR SHALL BE PAID ON ALL POWER EQUIPMENT OPERATOR WORK ON THE FOLLOWNG MILITARY BASES: CHINA LAKE NAVAL RESERVE, VANDENBERG AFB, POINT ARGUELLO, SEELY NAVAL BASE, FORT IRWIN, NEBO ANNEX MARINE BASE, MARINE CORP LOGISTICS BASE YERMO, EDWARDS AFB, 29 PALMS MARINE BASE AND CAMP PENDLETON WORKERS REQUIRED TO SUIT UP AND WORK IN A HAZARDOUS MATERIAL ENVIRONMENT: $2.00 PER HOUR ADDITIONAL. COMBINATION MIXER AND COMPRESSOR OPERATOR ON GUNITE WORK SHALL BE CLASSIFIED AS A CONCRETE MOBILE MIXER OPERATOR

$67.58$33.20$100.78Agreement
OPERATOR: POWER EQUIPMENT, ALL OTHER WORK: GROUP 22…
Full text

OPERATOR: POWER EQUIPMENT, ALL OTHER WORK: GROUP 22- RUBBER-TIRED EARTH-MOVING EQUIPMENT OPERATOR, OPERATING EQUIPMENT WITH THE TANDEM PUSH-PULL SYSTEM (SINGLE ENGINE, UP TO AND INCLUDING 25 YDS. STRUCK)

PREMIUM PAY: $10.00 PER HOUR SHALL BE PAID ON ALL POWER EQUIPMENT OPERATOR WORK ON THE FOLLOWNG MILITARY BASES: CHINA LAKE NAVAL RESERVE, VANDENBERG AFB, POINT ARGUELLO, SEELY NAVAL BASE, FORT IRWIN, NEBO ANNEX MARINE BASE, MARINE CORP LOGISTICS BASE YERMO, EDWARDS AFB, 29 PALMS MARINE BASE AND CAMP PENDLETON WORKERS REQUIRED TO SUIT UP AND WORK IN A HAZARDOUS MATERIAL ENVIRONMENT: $2.00 PER HOUR ADDITIONAL. COMBINATION MIXER AND COMPRESSOR OPERATOR ON GUNITE WORK SHALL BE CLASSIFIED AS A CONCRETE MOBILE MIXER OPERATOR

$67.68$33.20$100.88Agreement
OPERATOR: POWER EQUIPMENT, ALL OTHER WORK: GROUP 23…
Full text

OPERATOR: POWER EQUIPMENT, ALL OTHER WORK: GROUP 23- RUBBER-TIRED EARTH-MOVING EQUIPMENT OPERATOR, OPERATING EQUIPMENT WITH THE TANDEM PUSH-PULL SYSTEM (SINGLE ENGINE, CATERPILLAR, EUCLID, ATHEY WAGON AND SIMILAR TYPES WITH ANY AND ALL ATTACHMENTS OVER 25 YDS. AND UP TO AND INCLUDING 50 YDS. STRUCK); RUBBER-TIRED EARTH-MOVING EQUIPMENT OPERATOR, OPERATING WITH THE TANDEM PUSH-PULL SYSTEM (MULTIPLE ENGINE, UP TO AND INCLUDING 25 YDS. STRUCK)

PREMIUM PAY: $10.00 PER HOUR SHALL BE PAID ON ALL POWER EQUIPMENT OPERATOR WORK ON THE FOLLOWNG MILITARY BASES: CHINA LAKE NAVAL RESERVE, VANDENBERG AFB, POINT ARGUELLO, SEELY NAVAL BASE, FORT IRWIN, NEBO ANNEX MARINE BASE, MARINE CORP LOGISTICS BASE YERMO, EDWARDS AFB, 29 PALMS MARINE BASE AND CAMP PENDLETON WORKERS REQUIRED TO SUIT UP AND WORK IN A HAZARDOUS MATERIAL ENVIRONMENT: $2.00 PER HOUR ADDITIONAL. COMBINATION MIXER AND COMPRESSOR OPERATOR ON GUNITE WORK SHALL BE CLASSIFIED AS A CONCRETE MOBILE MIXER OPERATOR

$67.79$33.20$100.99Agreement
OPERATOR: POWER EQUIPMENT, ALL OTHER WORK: GROUP 24…
Full text

OPERATOR: POWER EQUIPMENT, ALL OTHER WORK: GROUP 24- RUBBER-TIRED EARTH-MOVING EQUIPMENT OPERATOR, OPERATING EQUIPMENT WITH THE TANDEM PUSH-PULL SYSTEM (SINGLE ENGINE, OVER 50 YDS. STRUCK); RUBBER-TIRED EARTH-MOVING EQUIPMENT OPERATOR, OPERATING EQUIPMENT WITH THE TANDEM PUSH-PULL SYSTEM (MULTIPLE ENGINE, EUCLID, CATERPILLAR AND SIMILAR, OVER 25 YDS. AND UP TO 50 YDS. STRUCK)

PREMIUM PAY: $10.00 PER HOUR SHALL BE PAID ON ALL POWER EQUIPMENT OPERATOR WORK ON THE FOLLOWNG MILITARY BASES: CHINA LAKE NAVAL RESERVE, VANDENBERG AFB, POINT ARGUELLO, SEELY NAVAL BASE, FORT IRWIN, NEBO ANNEX MARINE BASE, MARINE CORP LOGISTICS BASE YERMO, EDWARDS AFB, 29 PALMS MARINE BASE AND CAMP PENDLETON WORKERS REQUIRED TO SUIT UP AND WORK IN A HAZARDOUS MATERIAL ENVIRONMENT: $2.00 PER HOUR ADDITIONAL. COMBINATION MIXER AND COMPRESSOR OPERATOR ON GUNITE WORK SHALL BE CLASSIFIED AS A CONCRETE MOBILE MIXER OPERATOR

$67.91$33.20$101.11Agreement
OPERATOR: POWER EQUIPMENT, ALL OTHER WORK: GROUP 25…
Full text

OPERATOR: POWER EQUIPMENT, ALL OTHER WORK: GROUP 25- CONCRETE PUMP OPERATOR-TRUCK MOUNTED; RUBBER-TIRED EARTH-MOVING EQUIPMENT OPERATOR, OPERATING EQUIPMENT WITH THE TANDEM PUSH-PULL SYSTEM (MULTIPLE ENGINE, EUCLID, CATERPILLAR AND SIMILAR TYPE, OVER 50 CU. YDS. STRUCK); SPYDER EXCAVATOR OPERATOR, WITH ALL ATTACHMENTS

PREMIUM PAY: $10.00 PER HOUR SHALL BE PAID ON ALL POWER EQUIPMENT OPERATOR WORK ON THE FOLLOWNG MILITARY BASES: CHINA LAKE NAVAL RESERVE, VANDENBERG AFB, POINT ARGUELLO, SEELY NAVAL BASE, FORT IRWIN, NEBO ANNEX MARINE BASE, MARINE CORP LOGISTICS BASE YERMO, EDWARDS AFB, 29 PALMS MARINE BASE AND CAMP PENDLETON WORKERS REQUIRED TO SUIT UP AND WORK IN A HAZARDOUS MATERIAL ENVIRONMENT: $2.00 PER HOUR ADDITIONAL. COMBINATION MIXER AND COMPRESSOR OPERATOR ON GUNITE WORK SHALL BE CLASSIFIED AS A CONCRETE MOBILE MIXER OPERATOR. $ 68.08 33.20 OPERATOR: POWER EQUIPMENT, CRANES, PILEDRIVING & HOISTING: GROUP 1- Engineer oiler; Fork lift operator (includes loed, lull or similar types) PREMIUM PAY: $10.00 PER HOUR SHALL BE PAID ON ALL POWER EQUIPMENT OPERATOR WORK ON THE FOLLOWNG MILITARY BASES: CHINA LAKE NAVAL RESERVE, VANDENBERG AFB, POINT ARGUELLO, SEELY NAVAL BASE, FORT IRWIN, NEBO ANNEX MARINE BASE, MARINE CORP LOGISTICS BASE YERMO, EDWARDS AFB, 29 PALMS MARINE BASE AND CAMP PENDLETON WORKERS REQUIRED TO SUIT UP AND WORK IN A HAZARDOUS MATERIAL ENVIRONMENT: $2.00 PER HOUR ADDITIONAL. COMBINATION MIXER AND COMPRESSOR OPERATOR ON GUNITE WORK SHALL BE CLASSIFIED AS A CONCRETE MOBILE MIXER OPERATOR.

$64.75$33.20$97.95Agreement
OPERATOR: POWER EQUIPMENT, CRANES, PILEDRIVING & HOISTING: GROUP 2- Truck crane oiler

PREMIUM PAY: $10.00 PER HOUR SHALL BE PAID ON ALL POWER EQUIPMENT OPERATOR WORK ON THE FOLLOWNG MILITARY BASES: CHINA LAKE NAVAL RESERVE, VANDENBERG AFB, POINT ARGUELLO, SEELY NAVAL BASE, FORT IRWIN, NEBO ANNEX MARINE BASE, MARINE CORP LOGISTICS BASE YERMO, EDWARDS AFB, 29 PALMS MARINE BASE AND CAMP PENDLETON WORKERS REQUIRED TO SUIT UP AND WORK IN A HAZARDOUS MATERIAL ENVIRONMENT: $2.00 PER HOUR ADDITIONAL. COMBINATION MIXER AND COMPRESSOR OPERATOR ON GUNITE WORK SHALL BE CLASSIFIED AS A CONCRETE MOBILE MIXER OPERATOR

$65.53$33.20$98.73Agreement
OPERATOR: POWER EQUIPMENT, CRANES, PILEDRIVING & HOISTING: GROUP 3…
Full text

OPERATOR: POWER EQUIPMENT, CRANES, PILEDRIVING & HOISTING: GROUP 3- A-frame or winch truck operator; Ross carrier operator (jobsite)

PREMIUM PAY: $10.00 PER HOUR SHALL BE PAID ON ALL POWER EQUIPMENT OPERATOR WORK ON THE FOLLOWNG MILITARY BASES: CHINA LAKE NAVAL RESERVE, VANDENBERG AFB, POINT ARGUELLO, SEELY NAVAL BASE, FORT IRWIN, NEBO ANNEX MARINE BASE, MARINE CORP LOGISTICS BASE YERMO, EDWARDS AFB, 29 PALMS MARINE BASE AND CAMP PENDLETON WORKERS REQUIRED TO SUIT UP AND WORK IN A HAZARDOUS MATERIAL ENVIRONMENT: $2.00 PER HOUR ADDITIONAL. COMBINATION MIXER AND COMPRESSOR OPERATOR ON GUNITE WORK SHALL BE CLASSIFIED AS A CONCRETE MOBILE MIXER OPERATOR

$65.82$33.20$99.02Agreement
OPERATOR: POWER EQUIPMENT, CRANES, PILEDRIVING & HOISTING: GROUP 4…
Full text

OPERATOR: POWER EQUIPMENT, CRANES, PILEDRIVING & HOISTING: GROUP 4- Bridge-type unloader and turntable operator; Helicopter hoist operator

PREMIUM PAY: $10.00 PER HOUR SHALL BE PAID ON ALL POWER EQUIPMENT OPERATOR WORK ON THE FOLLOWNG MILITARY BASES: CHINA LAKE NAVAL RESERVE, VANDENBERG AFB, POINT ARGUELLO, SEELY NAVAL BASE, FORT IRWIN, NEBO ANNEX MARINE BASE, MARINE CORP LOGISTICS BASE YERMO, EDWARDS AFB, 29 PALMS MARINE BASE AND CAMP PENDLETON WORKERS REQUIRED TO SUIT UP AND WORK IN A HAZARDOUS MATERIAL ENVIRONMENT: $2.00 PER HOUR ADDITIONAL. COMBINATION MIXER AND COMPRESSOR OPERATOR ON GUNITE WORK SHALL BE CLASSIFIED AS A CONCRETE MOBILE MIXER OPERATOR

$65.96$33.20$99.16Agreement
OPERATOR: POWER EQUIPMENT, CRANES, PILEDRIVING & HOISTING: GROUP 5…
Full text

OPERATOR: POWER EQUIPMENT, CRANES, PILEDRIVING & HOISTING: GROUP 5 HYDRAULIC BOOM TRUCK; STINGER CRANE (AUSTIN-WESTERN OR SIMILAR TYPE); TUGGER HOIST OPERATOR (1 DRUM)

PREMIUM PAY: $10.00 PER HOUR SHALL BE PAID ON ALL POWER EQUIPMENT OPERATOR WORK ON THE FOLLOWNG MILITARY BASES: CHINA LAKE NAVAL RESERVE, VANDENBERG AFB, POINT ARGUELLO, SEELY NAVAL BASE, FORT IRWIN, NEBO ANNEX MARINE BASE, MARINE CORP LOGISTICS BASE YERMO, EDWARDS AFB, 29 PALMS MARINE BASE AND CAMP PENDLETON WORKERS REQUIRED TO SUIT UP AND WORK IN A HAZARDOUS MATERIAL ENVIRONMENT: $2.00 PER HOUR ADDITIONAL. COMBINATION MIXER AND COMPRESSOR OPERATOR ON GUNITE WORK SHALL BE CLASSIFIED AS A CONCRETE MOBILE MIXER OPERATOR

$66.18$33.20$99.38Agreement
OPERATOR: POWER EQUIPMENT, CRANES, PILEDRIVING & HOISTING: GROUP 6…
Full text

OPERATOR: POWER EQUIPMENT, CRANES, PILEDRIVING & HOISTING: GROUP 6 Bridge crane operator; Cretor crane operator; Hoist operator (Chicago boom and similar type); Lift mobile operator; Lift slab machine operator (Vagtborg and similar types); Material hoist and/or manlift operator; Polar gantry crane operator; Self Climbing scaffold (or similar type); Shovel, backhoe, dragline, clamshell operator (over 3/4 yd. and up to 5 cu. yds. mrc); Tugger hoist operator

PREMIUM PAY: $10.00 PER HOUR SHALL BE PAID ON ALL POWER EQUIPMENT OPERATOR WORK ON THE FOLLOWNG MILITARY BASES: CHINA LAKE NAVAL RESERVE, VANDENBERG AFB, POINT ARGUELLO, SEELY NAVAL BASE, FORT IRWIN, NEBO ANNEX MARINE BASE, MARINE CORP LOGISTICS BASE YERMO, EDWARDS AFB, 29 PALMS MARINE BASE AND CAMP PENDLETON WORKERS REQUIRED TO SUIT UP AND WORK IN A HAZARDOUS MATERIAL ENVIRONMENT: $2.00 PER HOUR ADDITIONAL. COMBINATION MIXER AND COMPRESSOR OPERATOR ON GUNITE WORK SHALL BE CLASSIFIED AS A CONCRETE MOBILE MIXER OPERATOR

$66.29$33.20$99.49Agreement
OPERATOR: POWER EQUIPMENT, CRANES, PILEDRIVING & HOISTING: GROUP 7…
Full text

OPERATOR: POWER EQUIPMENT, CRANES, PILEDRIVING & HOISTING: GROUP 7 PEDESTAL CRANE OPERATOR; SHOVEL, BACKHOE, DRAGLINE, CLAMSHELL OPERATOR (OVER 5 CU. YDS. MRC); TOWER CRANE REPAIR; TUGGER HOIST OPERATOR (3 DRUM)

PREMIUM PAY: $10.00 PER HOUR SHALL BE PAID ON ALL POWER EQUIPMENT OPERATOR WORK ON THE FOLLOWNG MILITARY BASES: CHINA LAKE NAVAL RESERVE, VANDENBERG AFB, POINT ARGUELLO, SEELY NAVAL BASE, FORT IRWIN, NEBO ANNEX MARINE BASE, MARINE CORP LOGISTICS BASE YERMO, EDWARDS AFB, 29 PALMS MARINE BASE AND CAMP PENDLETON WORKERS REQUIRED TO SUIT UP AND WORK IN A HAZARDOUS MATERIAL ENVIRONMENT: $2.00 PER HOUR ADDITIONAL. COMBINATION MIXER AND COMPRESSOR OPERATOR ON GUNITE WORK SHALL BE CLASSIFIED AS A CONCRETE MOBILE MIXER OPERATOR

$66.41$33.20$99.61Agreement
OPERATOR: POWER EQUIPMENT, CRANES, PILEDRIVING & HOISTING: GROUP 8…
Full text

OPERATOR: POWER EQUIPMENT, CRANES, PILEDRIVING & HOISTING: GROUP 8 Crane operator (up to and including 25 ton capacity); Crawler transporter operator; Derrick barge operator (up to and including 25 ton capacity); Hoist operator, stiff legs, Guy derrick or similar type (up to and including 25 ton capacity); Shovel, backhoe, dragline, clamshell operator (over 7 cu. yds., M.R.C.)

PREMIUM PAY: $10.00 PER HOUR SHALL BE PAID ON ALL POWER EQUIPMENT OPERATOR WORK ON THE FOLLOWNG MILITARY BASES: CHINA LAKE NAVAL RESERVE, VANDENBERG AFB, POINT ARGUELLO, SEELY NAVAL BASE, FORT IRWIN, NEBO ANNEX MARINE BASE, MARINE CORP LOGISTICS BASE YERMO, EDWARDS AFB, 29 PALMS MARINE BASE AND CAMP PENDLETON WORKERS REQUIRED TO SUIT UP AND WORK IN A HAZARDOUS MATERIAL ENVIRONMENT: $2.00 PER HOUR ADDITIONAL. COMBINATION MIXER AND COMPRESSOR OPERATOR ON GUNITE WORK SHALL BE CLASSIFIED AS A CONCRETE MOBILE MIXER OPERATOR

$66.58$33.20$99.78Agreement
OPERATOR: POWER EQUIPMENT, CRANES, PILEDRIVING & HOISTING: GROUP 9…
Full text

OPERATOR: POWER EQUIPMENT, CRANES, PILEDRIVING & HOISTING: GROUP 9 Crane operator (over 25 tons and up to and including 50 tons mrc); Derrick barge operator (over 25 tons up to and including 50 tons mrc); Highline cableway operator; Hoist operator, stiff legs, Guy derrick or similar type (over 25 tons up to and including 50 tons mrc); K-crane operator; Polar crane operator; Self erecting tower crane operator maximum lifting capacity ten tons

PREMIUM PAY: $10.00 PER HOUR SHALL BE PAID ON ALL POWER EQUIPMENT OPERATOR WORK ON THE FOLLOWNG MILITARY BASES: CHINA LAKE NAVAL RESERVE, VANDENBERG AFB, POINT ARGUELLO, SEELY NAVAL BASE, FORT IRWIN, NEBO ANNEX MARINE BASE, MARINE CORP LOGISTICS BASE YERMO, EDWARDS AFB, 29 PALMS MARINE BASE AND CAMP PENDLETON WORKERS REQUIRED TO SUIT UP AND WORK IN A HAZARDOUS MATERIAL ENVIRONMENT: $2.00 PER HOUR ADDITIONAL. COMBINATION MIXER AND COMPRESSOR OPERATOR ON GUNITE WORK SHALL BE CLASSIFIED AS A CONCRETE MOBILE MIXER OPERATOR

$66.75$33.20$99.95Agreement
OPERATOR: POWER EQUIPMENT, CRANES, PILEDRIVING & HOISTING: GROUP 10…
Full text

OPERATOR: POWER EQUIPMENT, CRANES, PILEDRIVING & HOISTING: GROUP 10- Crane operator (over 50 tons and up to and including 100 tons mrc); Derrick barge operator (over 50 tons up to and including 100 tons mrc); Hoist operator, stiff legs, Guy derrick or similar type (over 50 tons up to and including 100 tons mrc), Mobile tower crane operator (over 50 tons, up to and including 100 tons M.R.C.)

PREMIUM PAY: $10.00 PER HOUR SHALL BE PAID ON ALL POWER EQUIPMENT OPERATOR WORK ON THE FOLLOWNG MILITARY BASES: CHINA LAKE NAVAL RESERVE, VANDENBERG AFB, POINT ARGUELLO, SEELY NAVAL BASE, FORT IRWIN, NEBO ANNEX MARINE BASE, MARINE CORP LOGISTICS BASE YERMO, EDWARDS AFB, 29 PALMS MARINE BASE AND CAMP PENDLETON WORKERS REQUIRED TO SUIT UP AND WORK IN A HAZARDOUS MATERIAL ENVIRONMENT: $2.00 PER HOUR ADDITIONAL. COMBINATION MIXER AND COMPRESSOR OPERATOR ON GUNITE WORK SHALL BE CLASSIFIED AS A CONCRETE MOBILE MIXER OPERATOR

$67.75$33.20$100.95Agreement
OPERATOR: POWER EQUIPMENT, CRANES, PILEDRIVING & HOISTING: GROUP 11…
Full text

OPERATOR: POWER EQUIPMENT, CRANES, PILEDRIVING & HOISTING: GROUP 11- Crane operator (over 100 tons and up to and including 200 tons mrc); Derrick barge operator (over 100 tons up to and including 200 tons mrc); Hoist operator, stiff legs, Guy derrick or similar type (over 100 tons up to and including 200 tons mrc); Mobile tower crane operator (over 100 tons up to and including 200 tons mrc) ; Tower crane operator and tower gantry

PREMIUM PAY: $10.00 PER HOUR SHALL BE PAID ON ALL POWER EQUIPMENT OPERATOR WORK ON THE FOLLOWNG MILITARY BASES: CHINA LAKE NAVAL RESERVE, VANDENBERG AFB, POINT ARGUELLO, SEELY NAVAL BASE, FORT IRWIN, NEBO ANNEX MARINE BASE, MARINE CORP LOGISTICS BASE YERMO, EDWARDS AFB, 29 PALMS MARINE BASE AND CAMP PENDLETON WORKERS REQUIRED TO SUIT UP AND WORK IN A HAZARDOUS MATERIAL ENVIRONMENT: $2.00 PER HOUR ADDITIONAL. COMBINATION MIXER AND COMPRESSOR OPERATOR ON GUNITE WORK SHALL BE CLASSIFIED AS A CONCRETE MOBILE MIXER OPERATOR

$68.75$33.20$101.95Agreement
OPERATOR: POWER EQUIPMENT, CRANES, PILEDRIVING & HOISTING: GROUP 12…
Full text

OPERATOR: POWER EQUIPMENT, CRANES, PILEDRIVING & HOISTING: GROUP 12- Crane operator (over 200 tons up to and including 300 tons mrc); Derrick barge operator (over 200 tons up to and including 300 tons mrc); Hoist operator, stiff legs, Guy derrick or similar type (over 200 tons, up to and including 300 tons mrc); Mobile tower crane operator (over 200 tons, up to and including 300 tons mrc)

PREMIUM PAY: $10.00 PER HOUR SHALL BE PAID ON ALL POWER EQUIPMENT OPERATOR WORK ON THE FOLLOWNG MILITARY BASES: CHINA LAKE NAVAL RESERVE, VANDENBERG AFB, POINT ARGUELLO, SEELY NAVAL BASE, FORT IRWIN, NEBO ANNEX MARINE BASE, MARINE CORP LOGISTICS BASE YERMO, EDWARDS AFB, 29 PALMS MARINE BASE AND CAMP PENDLETON WORKERS REQUIRED TO SUIT UP AND WORK IN A HAZARDOUS MATERIAL ENVIRONMENT: $2.00 PER HOUR ADDITIONAL. COMBINATION MIXER AND COMPRESSOR OPERATOR ON GUNITE WORK SHALL BE CLASSIFIED AS A CONCRETE MOBILE MIXER OPERATOR

$69.75$33.20$102.95Agreement
OPERATOR: POWER EQUIPMENT, CRANES, PILEDRIVING & HOISTING: GROUP 13…
Full text

OPERATOR: POWER EQUIPMENT, CRANES, PILEDRIVING & HOISTING: GROUP 13 Crane operator (over 300 tons); Derrick barge operator (over 300 tons); Helicopter pilot; Hoist operator, stiff legs, Guy derrick or similar type (over 300 tons); Mobile tower crane operator (over 300 tons)

$70.75$33.20$103.95Agreement
OPERATOR: POWER EQUIPMENT, TUNNEL WORK: GROUP 1…
Full text

OPERATOR: POWER EQUIPMENT, TUNNEL WORK: GROUP 1- Skiploader (wheel type up to 3/4 yd. without attachment)

PREMIUM PAY: $10.00 per hour shall be paid on all Power Equipment Operator work on the followng Military Bases: China Lake Naval Reserve, Vandenberg AFB, Point Arguello, Seely Naval Base, Fort Irwin, Nebo Annex Marine Base, Marine Corp Logistics Base Yermo, Edwards AFB, 29 Palms Marine Base and Camp Pendleton Workers required to suit up and work in a hazardous material environment: $2.00 per hour additional. Combination mixer and compressor operator on gunite work shall be classified as a concrete mobile mixer operator

$65.25$33.20$98.45Agreement
OPERATOR: POWER EQUIPMENT, TUNNEL WORK: GROUP 2- Power-driven jumbo form setter operator

PREMIUM PAY: $10.00 per hour shall be paid on all Power Equipment Operator work on the followng Military Bases: China Lake Naval Reserve, Vandenberg AFB, Point Arguello, Seely Naval Base, Fort Irwin, Nebo Annex Marine Base, Marine Corp Logistics Base Yermo, Edwards AFB, 29 Palms Marine Base and Camp Pendleton Workers required to suit up and work in a hazardous material environment: $2.00 per hour additional. Combination mixer and compressor operator on gunite work shall be classified as a concrete mobile mixer operator

$66.03$33.20$99.23Agreement
OPERATOR: POWER EQUIPMENT, TUNNEL WORK: GROUP 3…
Full text

OPERATOR: POWER EQUIPMENT, TUNNEL WORK: GROUP 3- Dinkey locomotive or motorperson (up to and including 10 tons)

PREMIUM PAY: $10.00 per hour shall be paid on all Power Equipment Operator work on the followng Military Bases: China Lake Naval Reserve, Vandenberg AFB, Point Arguello, Seely Naval Base, Fort Irwin, Nebo Annex Marine Base, Marine Corp Logistics Base Yermo, Edwards AFB, 29 Palms Marine Base and Camp Pendleton Workers required to suit up and work in a hazardous material environment: $2.00 per hour additional. Combination mixer and compressor operator on gunite work shall be classified as a concrete mobile mixer operator

$66.32$33.20$99.52Agreement
OPERATOR: POWER EQUIPMENT, TUNNEL WORK: GROUP 4…
Full text

OPERATOR: POWER EQUIPMENT, TUNNEL WORK: GROUP 4- Bit sharpener; Equipment greaser (grease truck); Slip form pump operator (power-driven hydraulic lifting device for concrete forms); Tugger hoist operator (1 drum); Tunnel locomotive operator (over 10 and up to and including 30 tons)

PREMIUM PAY: $10.00 per hour shall be paid on all Power Equipment Operator work on the followng Military Bases: China Lake Naval Reserve, Vandenberg AFB, Point Arguello, Seely Naval Base, Fort Irwin, Nebo Annex Marine Base, Marine Corp Logistics Base Yermo, Edwards AFB, 29 Palms Marine Base and Camp Pendleton Workers required to suit up and work in a hazardous material environment: $2.00 per hour additional. Combination mixer and compressor operator on gunite work shall be classified as a concrete mobile mixer operator

$66.46$33.20$99.66Agreement
OPERATOR: POWER EQUIPMENT, TUNNEL WORK: GROUP 5…
Full text

OPERATOR: POWER EQUIPMENT, TUNNEL WORK: GROUP 5- Backhoe operator (up to and including 3/4 yd.); Small Ford, Case or similar; Drill doctor; Grouting machine operator; Heading shield operator; Heavy-duty repairperson; Loader operator (Athey, Euclid, Sierra and similar types); Mucking machine operator (1/4 yd., rubber-tired, rail or track type); Pneumatic concrete placing machine operator (Hackley-Presswell or similar type); Pneumatic heading shield (tunnel); Pumpcrete gun operator; Tractor compressor drill combination operator; Tugger hoist operator (2 drum); Tunnel locomotive operator (over 30 tons)

PREMIUM PAY: $10.00 per hour shall be paid on all Power Equipment Operator work on the followng Military Bases: China Lake Naval Reserve, Vandenberg AFB, Point Arguello, Seely Naval Base, Fort Irwin, Nebo Annex Marine Base, Marine Corp Logistics Base Yermo, Edwards AFB, 29 Palms Marine Base and Camp Pendleton Workers required to suit up and work in a hazardous material environment: $2.00 per hour additional. Combination mixer and compressor operator on gunite work shall be classified as a concrete mobile mixer operator

$66.68$33.20$99.88Agreement
OPERATOR: POWER EQUIPMENT, TUNNEL WORK: GROUP 6- Heavy Duty Repairman

PREMIUM PAY: $10.00 per hour shall be paid on all Power Equipment Operator work on the followng Military Bases: China Lake Naval Reserve, Vandenberg AFB, Point Arguello, Seely Naval Base, Fort Irwin, Nebo Annex Marine Base, Marine Corp Logistics Base Yermo, Edwards AFB, 29 Palms Marine Base and Camp Pendleton Workers required to suit up and work in a hazardous material environment: $2.00 per hour additional. Combination mixer and compressor operator on gunite work shall be classified as a concrete mobile mixer operator

$66.79$33.20$99.99Agreement
OPERATOR: POWER EQUIPMENT, TUNNEL WORK: GROUP 7- Tunnel mole boring machine operator

PREMIUM PAY: $10.00 per hour shall be paid on all Power Equipment Operator work on the followng Military Bases: China Lake Naval Reserve, Vandenberg AFB, Point Arguello, Seely Naval Base, Fort Irwin, Nebo Annex Marine Base, Marine Corp Logistics Base Yermo, Edwards AFB, 29 Palms Marine Base and Camp Pendleton Workers required to suit up and work in a hazardous material environment: $2.00 per hour additional. Combination mixer and compressor operator on gunite work shall be classified as a concrete mobile mixer operator

$66.91$33.20$100.11Agreement
IRON0155-002 · Ironworkers agreement, January 1, 2025
IRONWORKER (INYO AND MONO COUNTIES)$43.75$34.45$78.20Agreement
IRON0155-003 · Ironworkers agreement, January 1, 2025
IRONWORKER (KERN COUNTY)$50.70$35.15$85.85Agreement
LABO0220-002 · Laborers agreement, July 1, 2025
LABORER GROUP 1…
Full text

LABORER GROUP 1 CLEANING AND HANDLING OF PANEL FORMS; CONCRETE SCREEDING FOR ROUGH STRIKE-OFF; CONCRETE, WATER CURING; DEMOLITION LABORER, THE CLEANING OF BRICK IF PERFORMED BY A WORKER PERFORMING ANY OTHER PHASE OF DEMOLITION WORK, AND THE CLEANING OF LUMBER; FIRE WATCHER, LIMBER, BRUSH LOADER, PILER AND DEBRIS HANDLER; FLAG PERSON; GAS, OIL AND/OR WATER PIPELINE LABORER; LABORER, ASPHALT-RUBBER MATERIAL LOADER; LABORER, GENERAL OR CONSTRUCTION; LABORER, GENERAL CLEAN-UP; LABORER, LANDSCAPING; LABORER, JETTING; LABORER, TEMPORARY WATER AND AIR LINES; MATERIAL HOSE OPERATOR (WALLS, SLABS, FLOORS AND DECKS); PLUGGING, FILLING OF SHEE BOLT HOLES; DRY PACKING OF CONCRETE; RAILROAD MAINTENANCE, REPAIR TRACK PERSON AND ROAD BEDS; STREETCAR AND RAILROAD CONSTRUCTION TRACK LABORERS; RIGGING AND SIGNALING; SCALER; SLIP FORM RAISER; TAR AND MORTAR; TOOL CRIB OR TOOL HOUSE LABORER; TRAFFIC CONTROL BY ANY METHOD; WINDOW CLEANER; WIRE MESH PULLING - ALL CONCRETE POURING OPERATIONS (KERN COUNTY)

$46.48$25.95$72.43Agreement
LABORER GROUP 2…
Full text

LABORER GROUP 2 ASPHALT SHOVELER; CEMENT DUMPER (ON 1 YD. OR LARGER MIXER AND HANDLING BULK CEMENT); CESSPOOL DIGGER AND INSTALLER; CHUCKTENDER; CHUTE HANDLER, POURING CONCRETE, THE HANDLING OF THE CHUTE FROM READYMIX TRUCKS, SUCH AS WALLS, SLABS, DECKS, FLOORS, FOUNDATION, FOOTINGS, CURBS, GUTTERS AND SIDEWALKS; CONCRETE CURER, IMPERVIOUS MEMBRANE AND FORM OILER; CUTTING TORCH OPERATOR (DEMOLITION); FINE GRADER, HIGHWAYS AND STREET PAVING, AIRPORT, RUNWAYS AND SIMILAR TYPE HEAVY CONSTRUCTION; GAS, OIL AND/OR WATER PIPELINE WRAPPER - POT TENDER AND FORM PERSON; GUINEA CHASER; HEADERBOARD PERSON - ASPHALT; LABORER, PACKING ROD STEEL AND PANS; MEMBRANE VAPOR BARRIER INSTALLER; POWER BROOM SWEEPER (SMALL); RIPRAP STONEPAVER, PLACING STONE OR WET SACKED CONCRETE; ROTO SCRAPER AND TILLER; SANDBLASTER (POT TENDER); SEPTIC TANK DIGGER AND INSTALLER(LEAD); TANK SCALER AND CLEANER; TREE CLIMBER, FALLER, CHAIN SAW OPERATOR, PITTSBURGH CHIPPER AND SIMILAR TYPE BRUSH SHREDDER; UNDERGROUND LABORER, INCLUDING CAISSON BELLOWER (KERN COUNTY)

$47.03$25.95$72.98Agreement
LABORER GROUP 3…
Full text

LABORER GROUP 3 BUGGYMOBILE PERSON; CONCRETE CUTTING TORCH; CONCRETE PILE CUTTER; DRILLER, JACKHAMMER, 2-1/2 FT. DRILL STEEL OR LONGER; DRI-PAK-IT MACHINE; GAS, OIL AND/OR WATER PIPELINE WRAPPER, 6-IN. PIPE AND OVER, BY ANY METHOD, INSIDE AND OUT; HIGH SCALER (INCLUDING DRILLING OF SAME); HYDRO SEEDER AND SIMILAR TYPE; IMPACT WRENCH MULTI-PLATE; KETTLE PERSON, POT PERSON AND WORKERS APPLYING ASPHALT, LAY-KOLD, CREOSOTE, LIME CAUSTIC AND SIMILAR TYPE MATERIALS (""APPLYING"" MEANS APPLYING, DIPPING, BRUSHING OR HANDLING OF SUCH MATERIALS FOR PIPE WRAPPING AND WATERPROOFING); OPERATOR OF PNEUMATIC, GAS, ELECTRIC TOOLS, VIBRATING MACHINE, PAVEMENT BREAKER, AIR BLASTING, COME-ALONGS, AND SIMILAR MECHANICAL TOOLS NOT SEPARATELY CLASSIFIED HEREIN; PIPELAYER'S BACKUP PERSON, COATING, GROUTING, MAKING OF JOINTS, SEALING, CAULKING, DIAPERING AND INCLUDING RUBBER GASKET JOINTS, POINTING AND ANY AND ALL OTHER SERVICES; ROCK SLINGER; ROTARY SCARIFIER OR MULTIPLE HEAD CONCRETE CHIPPING SCARIFIER; STEEL HEADERBOARD AND GUIDELINE SETTER; TAMPER, BARKO, WACKER AND SIMILAR TYPE; TRENCHING MACHINE, HAND-PROPELLED (KERN COUNTY)

$47.58$25.95$73.53Agreement
LABORER GROUP 4…
Full text

LABORER GROUP 4 ASPHALT RAKER, LUTE PERSON, IRONER, ASPHALT DUMP PERSON, AND ASPHALT SPREADER BOXES (ALL TYPES); CONCRETE CORE CUTTER (WALLS, FLOORS OR CEILINGS), GRINDER OR SANDER; CONCRETE SAW PERSON, CUTTING WALLS OR FLAT WORK, SCORING OLD OR NEW CONCRETE; CRIBBER, SHORER, LAGGING, SHEETING AND TRENCH BRACING, HAND-GUIDED LAGGING HAMMER; HEAD ROCK SLINGER; LABORER, ASPHALT- RUBBER DISTRIBUTOR BOOT PERSON; LASER BEAM IN CONNECTION WITH LABORERS' WORK; OVERSIZE CONCRETE VIBRATOR OPERATOR, 70 LBS. AND OVER; PIPELAYER PERFORMING ALL SERVICES IN THE LAYING AND INSTALLATION OF PIPE FROM THE POINT OF RECEIVING PIPE IN THE DITCH UNTIL COMPLETION OF OPERATION, INCLUDING ANY AND ALL FORMS OF TUBULAR MATERIAL, WHETHER PIPE, METALLIC OR NON-METALLIC, CONDUIT AND ANY OTHER STATIONARY TYPE OF TUBULAR DEVICE USED FOR THE CONVEYING OF ANY SUBSTANCE OR ELEMENT, WHETHER WATER, SEWAGE, SOLID GAS, AIR, OR OTHER PRODUCT WHATSOEVER AND WITHOUT REGARD TO THE NATURE OF MATERIAL FROM WHICH THE TUBULAR MATERIAL IS FABRICATED; NO-JOINT PIPE AND STRIPPING OF SAME; PREFABRICATED MANHOLE INSTALLER; SANDBLASTER (NOZZLE PERSON), WATER BLASTING, PORTA SHOT-BLAST (KERN COUNTY)

$49.13$25.95$75.08Agreement
LABORER GROUP 5…
Full text

LABORER GROUP 5 BLASTER POWDER, ALL WORK OF LOADING HOLES, PLACING AND BLASTING OF ALL POWDER AND EXPLOSIVES OF WHATEVER TYPE, REGARDLESS OF METHOD USED FOR SUCH LOADING AND PLACING; DRILLER: ALL POWER DRILLS, EXCLUDING JACKHAMMER, WHETHER CORE, DIAMOND, WAGON, TRACK, MULTIPLE UNIT, AND ANY AND ALL OTHER TYPES OF MECHANICAL DRILLS WITHOUT REGARD TO THE FORM OF MOTIVE POWER; TOXIC WASTE REMOVAL (KERN COUNTY)

$49.48$25.95$75.43Agreement
LABORER, TUNNEL: GROUP 1…
Full text

LABORER, TUNNEL: GROUP 1: BATCH PLANT LABORER; CHANGEHOUSE PERSON; DUMP PERSON; DUMP PERSON (OUTSIDE); SWAMPER (BRAKE PERSON AND SWITCH PERSON ON TUNNEL WORK); TUNNEL MATERIALS HANDLING PERSON; NIPPER; POT TENDER, USING MASTIC OR OTHER MATERIALS (FOR EXAMPLE, BUT NOT BY WAY OF LIMITATION, SHOTCRETE, ETC.) (KERN COUNTY)

$53.60$25.74$79.34Agreement
LABORER, TUNNEL: GROUP 2…
Full text

LABORER, TUNNEL: GROUP 2: CHUCKTENDER, CABLETENDER; LOADING AND UNLOADING AGITATOR CARS; VIBRATOR PERSON, JACK HAMMER, PNEUMATIC TOOLS (EXCEPT DRILLER); BULL GANG MUCKER, TRACK PERSON; CONCRETE CREW, INCLUDING RODDER AND SPREADER (KERN COUNTY)

$53.92$25.74$79.66Agreement
LABORER, TUNNEL: GROUP 3…
Full text

LABORER, TUNNEL: GROUP 3: BLASTER, DRILLER, POWDER PERSON; CHEMICAL GROUT JET PERSON; CHERRY PICKER PERSON; GROUT GUN PERSON; GROUT MIXER PERSON; GROUT PUMP PERSON; JACKLEG MINER; JUMBO PERSON; KEMPER AND OTHER PNEUMATIC CONCRETE PLACER OPERATOR; MINER, TUNNEL (HAND OR MACHINE); NOZZLE PERSON; OPERATING OF TROWELING AND/OR GROUTING MACHINES; POWDER PERSON (PRIMER HOUSE); PRIMER PERSON; SANDBLASTER; SHOTCRETE PERSON; STEEL FORM RAISER AND SETTER; TIMBER PERSON, RETIMBER PERSON, WOOD OR STEEL; TUNNEL CONCRETE FINISHER (KERN COUNTY)

$54.38$25.74$80.12Agreement
LABORER, TUNNEL: GROUP 4…
Full text

LABORER, TUNNEL: GROUP 4 GROUP 4: DIAMOND DRILLER; SANDBLASTER; SHAFT AND RAISE WORK (KERN COUNTY)

$55.07$25.74$80.81Agreement
LABO0220-005 · Laborers agreement, November 1, 2025
BRICK TENDER (KERN COUNTY)$42.60$22.13$64.73Agreement
LABO0300-005 · Laborers agreement, July 1, 2025
ASBESTOS REMOVAL LABORER

SCOPE OF WORK: INCLUDES SITE MOBILIZATION, INITIAL SITE CLEANUP, SITE PREPARATION, REMOVAL OF ASBESTOS-CONTAINING MATERIAL AND TOXIC WASTE, ENCAPSULATION, ENCLOSURE AND DISPOSAL OF ASBESTOS- CONTAINING MATERIALS AND TOXIC WASTE BY HAND OR WITH EQUIPMENT OR MACHINERY; SCAFFOLDING, FABRICATION OF TEMPORARY WOODEN BARRIERS AND ASSEMBLY OF DECONTAMINATION STATIONS

$46.48$25.93$72.41Agreement
LABO0345-001 · Laborers agreement, July 1, 2025
LABORER, GUNITE: GROUP 1 RODMEN, NOZZLEMEN

FOOTNOTE: GUNITE PREMIUM PAY: WORKERS WORKING FROM A BOSN'N'S CHAIR OR SUSPENDED FROM A ROPE OR CABLE SHALL RECEIVE 40 CENTS PER HOUR ABOVE THE FOREGOING APPLICABLE CLASSIFICATION RATES. WORKERS DOING GUNITE AND/OR SHOTCRETE WORK IN A TUNNEL SHALL RECEIVE 35 CENTS PER HOUR ABOVE THE FOREGOING APPLICABLE CLASSIFICATION RATES, PAID ON A PORTAL-TO-PORTAL BASIS. ANY WORK PERFORMED ON, IN OR ABOVE ANY SMOKE STACK, SILO, STORAGE ELEVATOR OR SIMILAR TYPE OF STRUCTURE, WHEN SUCH STRUCTURE IS IN EXCESS OF 75'-0"" ABOVE BASE LEVEL AND WHICH WORK MUST BE PERFORMED IN WHOLE OR IN PART MORE THAN 75'-0"" ABOVE BASE LEVEL, THAT WORK PERFORMED ABOVE THE 75'-0"" LEVEL SHALL BE COMPENSATED FOR AT 35 CENTS PER HOUR ABOVE THE APPLICABLE CLASSIFICATION WAGE RATE

$55.88$23.77$79.65Agreement
LABORER, GUNITE: GROUP 2 GUNMEN

FOOTNOTE: GUNITE PREMIUM PAY: WORKERS WORKING FROM A BOSN'N'S CHAIR OR SUSPENDED FROM A ROPE OR CABLE SHALL RECEIVE 40 CENTS PER HOUR ABOVE THE FOREGOING APPLICABLE CLASSIFICATION RATES. WORKERS DOING GUNITE AND/OR SHOTCRETE WORK IN A TUNNEL SHALL RECEIVE 35 CENTS PER HOUR ABOVE THE FOREGOING APPLICABLE CLASSIFICATION RATES, PAID ON A PORTAL-TO-PORTAL BASIS. ANY WORK PERFORMED ON, IN OR ABOVE ANY SMOKE STACK, SILO, STORAGE ELEVATOR OR SIMILAR TYPE OF STRUCTURE, WHEN SUCH STRUCTURE IS IN EXCESS OF 75'-0"" ABOVE BASE LEVEL AND WHICH WORK MUST BE PERFORMED IN WHOLE OR IN PART MORE THAN 75'-0"" ABOVE BASE LEVEL, THAT WORK PERFORMED ABOVE THE 75'-0"" LEVEL SHALL BE COMPENSATED FOR AT 35 CENTS PER HOUR ABOVE THE APPLICABLE CLASSIFICATION WAGE RATE

$54.93$23.77$78.70Agreement
LABORER, GUNITE: GROUP 3 REBOUNDMEN

FOOTNOTE: GUNITE PREMIUM PAY: WORKERS WORKING FROM A BOSN'N'S CHAIR OR SUSPENDED FROM A ROPE OR CABLE SHALL RECEIVE 40 CENTS PER HOUR ABOVE THE FOREGOING APPLICABLE CLASSIFICATION RATES. WORKERS DOING GUNITE AND/OR SHOTCRETE WORK IN A TUNNEL SHALL RECEIVE 35 CENTS PER HOUR ABOVE THE FOREGOING APPLICABLE CLASSIFICATION RATES, PAID ON A PORTAL-TO-PORTAL BASIS. ANY WORK PERFORMED ON, IN OR ABOVE ANY SMOKE STACK, SILO, STORAGE ELEVATOR OR SIMILAR TYPE OF STRUCTURE, WHEN SUCH STRUCTURE IS IN EXCESS OF 75'-0"" ABOVE BASE LEVEL AND WHICH WORK MUST BE PERFORMED IN WHOLE OR IN PART MORE THAN 75'-0"" ABOVE BASE LEVEL, THAT WORK PERFORMED ABOVE THE 75'-0"" LEVEL SHALL BE COMPENSATED FOR AT 35 CENTS PER HOUR ABOVE THE APPLICABLE CLASSIFICATION WAGE RATE

$51.39$23.77$75.16Agreement
LABO0783-001 · Laborers agreement, July 1, 2025
LABORER GROUP 1…
Full text

LABORER GROUP 1 CLEANING AND HANDLING OF PANEL FORMS; CONCRETE SCREEDING FOR ROUGH STRIKE-OFF; CONCRETE, WATER CURING; DEMOLITION LABORER, THE CLEANING OF BRICK IF PERFORMED BY A WORKER PERFORMING ANY OTHER PHASE OF DEMOLITION WORK, AND THE CLEANING OF LUMBER; FIRE WATCHER, LIMBER, BRUSH LOADER, PILER AND DEBRIS HANDLER; FLAG PERSON; GAS, OIL AND/OR WATER PIPELINE LABORER; LABORER, ASPHALT-RUBBER MATERIAL LOADER; LABORER, GENERAL OR CONSTRUCTION; LABORER, GENERAL CLEAN-UP; LABORER, LANDSCAPING; LABORER, JETTING; LABORER, TEMPORARY WATER AND AIR LINES; MATERIAL HOSE OPERATOR (WALLS, SLABS, FLOORS AND DECKS); PLUGGING, FILLING OF SHEE BOLT HOLES; DRY PACKING OF CONCRETE; RAILROAD MAINTENANCE, REPAIR TRACK PERSON AND ROAD BEDS; STREETCAR AND RAILROAD CONSTRUCTION TRACK LABORERS; RIGGING AND SIGNALING; SCALER; SLIP FORM RAISER; TAR AND MORTAR; TOOL CRIB OR TOOL HOUSE LABORER; TRAFFIC CONTROL BY ANY METHOD; WINDOW CLEANER; WIRE MESH PULLING - ALL CONCRETE POURING OPERATIONS (INYO AND MONO COUNTIES)

$46.48$25.95$72.43Agreement
LABORER GROUP 2…
Full text

LABORER GROUP 2 ASPHALT SHOVELER; CEMENT DUMPER (ON 1 YD. OR LARGER MIXER AND HANDLING BULK CEMENT); CESSPOOL DIGGER AND INSTALLER; CHUCKTENDER; CHUTE HANDLER, POURING CONCRETE, THE HANDLING OF THE CHUTE FROM READYMIX TRUCKS, SUCH AS WALLS, SLABS, DECKS, FLOORS, FOUNDATION, FOOTINGS, CURBS, GUTTERS AND SIDEWALKS; CONCRETE CURER, IMPERVIOUS MEMBRANE AND FORM OILER; CUTTING TORCH OPERATOR (DEMOLITION); FINE GRADER, HIGHWAYS AND STREET PAVING, AIRPORT, RUNWAYS AND SIMILAR TYPE HEAVY CONSTRUCTION; GAS, OIL AND/OR WATER PIPELINE WRAPPER - POT TENDER AND FORM PERSON; GUINEA CHASER; HEADERBOARD PERSON - ASPHALT; LABORER, PACKING ROD STEEL AND PANS; MEMBRANE VAPOR BARRIER INSTALLER; POWER BROOM SWEEPER (SMALL); RIPRAP STONEPAVER, PLACING STONE OR WET SACKED CONCRETE; ROTO SCRAPER AND TILLER; SANDBLASTER (POT TENDER); SEPTIC TANK DIGGER AND INSTALLER(LEAD); TANK SCALER AND CLEANER; TREE CLIMBER, FALLER, CHAIN SAW OPERATOR, PITTSBURGH CHIPPER AND SIMILAR TYPE BRUSH SHREDDER; UNDERGROUND LABORER, INCLUDING CAISSON BELLOWER (INYO AND MONO COUNTIES)

$47.03$25.95$72.98Agreement
LABORER GROUP 3…
Full text

LABORER GROUP 3 BUGGYMOBILE PERSON; CONCRETE CUTTING TORCH; CONCRETE PILE CUTTER; DRILLER, JACKHAMMER, 2-1/2 FT. DRILL STEEL OR LONGER; DRI-PAK-IT MACHINE; GAS, OIL AND/OR WATER PIPELINE WRAPPER, 6-IN. PIPE AND OVER, BY ANY METHOD, INSIDE AND OUT; HIGH SCALER (INCLUDING DRILLING OF SAME); HYDRO SEEDER AND SIMILAR TYPE; IMPACT WRENCH MULTI-PLATE; KETTLE PERSON, POT PERSON AND WORKERS APPLYING ASPHALT, LAY-KOLD, CREOSOTE, LIME CAUSTIC AND SIMILAR TYPE MATERIALS (""APPLYING"" MEANS APPLYING, DIPPING, BRUSHING OR HANDLING OF SUCH MATERIALS FOR PIPE WRAPPING AND WATERPROOFING); OPERATOR OF PNEUMATIC, GAS, ELECTRIC TOOLS, VIBRATING MACHINE, PAVEMENT BREAKER, AIR BLASTING, COME-ALONGS, AND SIMILAR MECHANICAL TOOLS NOT SEPARATELY CLASSIFIED HEREIN; PIPELAYER'S BACKUP PERSON, COATING, GROUTING, MAKING OF JOINTS, SEALING, CAULKING, DIAPERING AND INCLUDING RUBBER GASKET JOINTS, POINTING AND ANY AND ALL OTHER SERVICES; ROCK SLINGER; ROTARY SCARIFIER OR MULTIPLE HEAD CONCRETE CHIPPING SCARIFIER; STEEL HEADERBOARD AND GUIDELINE SETTER; TAMPER, BARKO, WACKER AND SIMILAR TYPE; TRENCHING MACHINE, HAND-PROPELLED (INYO AND MONO COUNTIES)

$47.58$25.95$73.53Agreement
LABORER GROUP 4…
Full text

LABORER GROUP 4 ASPHALT RAKER, LUTE PERSON, IRONER, ASPHALT DUMP PERSON, AND ASPHALT SPREADER BOXES (ALL TYPES); CONCRETE CORE CUTTER (WALLS, FLOORS OR CEILINGS), GRINDER OR SANDER; CONCRETE SAW PERSON, CUTTING WALLS OR FLAT WORK, SCORING OLD OR NEW CONCRETE; CRIBBER, SHORER, LAGGING, SHEETING AND TRENCH BRACING, HAND-GUIDED LAGGING HAMMER; HEAD ROCK SLINGER; LABORER, ASPHALT- RUBBER DISTRIBUTOR BOOT PERSON; LASER BEAM IN CONNECTION WITH LABORERS' WORK; OVERSIZE CONCRETE VIBRATOR OPERATOR, 70 LBS. AND OVER; PIPELAYER PERFORMING ALL SERVICES IN THE LAYING AND INSTALLATION OF PIPE FROM THE POINT OF RECEIVING PIPE IN THE DITCH UNTIL COMPLETION OF OPERATION, INCLUDING ANY AND ALL FORMS OF TUBULAR MATERIAL, WHETHER PIPE, METALLIC OR NON-METALLIC, CONDUIT AND ANY OTHER STATIONARY TYPE OF TUBULAR DEVICE USED FOR THE CONVEYING OF ANY SUBSTANCE OR ELEMENT, WHETHER WATER, SEWAGE, SOLID GAS, AIR, OR OTHER PRODUCT WHATSOEVER AND WITHOUT REGARD TO THE NATURE OF MATERIAL FROM WHICH THE TUBULAR MATERIAL IS FABRICATED; NO-JOINT PIPE AND STRIPPING OF SAME; PREFABRICATED MANHOLE INSTALLER; SANDBLASTER (NOZZLE PERSON), WATER BLASTING, PORTA SHOT-BLAST (INYO AND MONO COUNTIES)

$49.13$25.95$75.08Agreement
LABORER GROUP 5…
Full text

LABORER GROUP 5 BLASTER POWDER, ALL WORK OF LOADING HOLES, PLACING AND BLASTING OF ALL POWDER AND EXPLOSIVES OF WHATEVER TYPE, REGARDLESS OF METHOD USED FOR SUCH LOADING AND PLACING; DRILLER: ALL POWER DRILLS, EXCLUDING JACKHAMMER, WHETHER CORE, DIAMOND, WAGON, TRACK, MULTIPLE UNIT, AND ANY AND ALL OTHER TYPES OF MECHANICAL DRILLS WITHOUT REGARD TO THE FORM OF MOTIVE POWER; TOXIC WASTE REMOVAL (INYO AND MONO COUNTIES)

$49.48$25.95$75.43Agreement
LABORER, TUNNEL: GROUP 1…
Full text

LABORER, TUNNEL: GROUP 1: BATCH PLANT LABORER; CHANGEHOUSE PERSON; DUMP PERSON; DUMP PERSON (OUTSIDE); SWAMPER (BRAKE PERSON AND SWITCH PERSON ON TUNNEL WORK); TUNNEL MATERIALS HANDLING PERSON; NIPPER; POT TENDER, USING MASTIC OR OTHER MATERIALS (FOR EXAMPLE, BUT NOT BY WAY OF LIMITATION, SHOTCRETE, ETC.) (INYO AND MONO COUNTIES)

$53.60$25.74$79.34Agreement
LABORER, TUNNEL: GROUP 2…
Full text

LABORER, TUNNEL: GROUP 2: CHUCKTENDER, CABLETENDER; LOADING AND UNLOADING AGITATOR CARS; VIBRATOR PERSON, JACK HAMMER, PNEUMATIC TOOLS (EXCEPT DRILLER); BULL GANG MUCKER, TRACK PERSON; CONCRETE CREW, INCLUDING RODDER AND SPREADER (INYO AND MONO COUNTIES)

$53.92$25.74$79.66Agreement
LABORER, TUNNEL: GROUP 3…
Full text

LABORER, TUNNEL: GROUP 3 GROUP 3: BLASTER, DRILLER, POWDER PERSON; CHEMICAL GROUT JET PERSON; CHERRY PICKER PERSON; GROUT GUN PERSON; GROUT MIXER PERSON; GROUT PUMP PERSON; JACKLEG MINER; JUMBO PERSON; KEMPER AND OTHER PNEUMATIC CONCRETE PLACER OPERATOR; MINER, TUNNEL (HAND OR MACHINE); NOZZLE PERSON; OPERATING OF TROWELING AND/OR GROUTING MACHINES; POWDER PERSON (PRIMER HOUSE); PRIMER PERSON; SANDBLASTER; SHOTCRETE PERSON; STEEL FORM RAISER AND SETTER; TIMBER PERSON, RETIMBER PERSON, WOOD OR STEEL; TUNNEL CONCRETE FINISHER (INYO AND MONO COUNTIES)

$54.38$25.74$80.12Agreement
LABORER, TUNNEL: GROUP 4…
Full text

LABORER, TUNNEL: GROUP 4: DIAMOND DRILLER; SANDBLASTER; SHAFT AND RAISE WORK (INYO AND MONO COUNTIES)

$55.07$25.74$80.81Agreement
LABO0783-004 · Laborers agreement, November 1, 2025
BRICK TENDER (INYO AND MONO COUNTIES)$42.60$22.13$64.73Agreement
LABO1184-001 · Laborers agreement, July 1, 2025
LABORERS: HORIZONTAL DIRECTIONAL DRILLING: (1) DRILLING CREW LABORER$47.94$20.86$68.80Agreement
LABORERS: HORIZONTAL DIRECTIONAL DRILLING: (2) VEHICLE OPERATOR/HAULER$48.11$20.86$68.97Agreement
LABORERS: HORIZONTAL DIRECTIONAL DRILLING: (3) HORIZONTAL DIRECTIONAL DRILL OPERATOR$49.96$20.86$70.82Agreement
LABORERS: HORIZONTAL DIRECTIONAL DRILLING: (4) ELECTRONIC TRACKING LOCATOR$51.96$20.86$72.82Agreement
LABORERS:, STRIPING/SLURRY SEAL: GROUP 1…
Full text

LABORERS:, STRIPING/SLURRY SEAL: GROUP 1 PROTECTIVE COATING, PAVEMENT SEALING, INCLUDING REPAIR AND FILLING OF CRACKS BY ANY METHOD ON ANY SURFACE IN PARKING LOTS, GAME COURTS AND PLAYGROUNDS; CARSTOPS; OPERATION OF ALL RELATED MACHINERY AND EQUIPMENT; EQUIPMENT REPAIR TECHNICIAN

$49.30$23.97$73.27Agreement
LABORERS:, STRIPING/SLURRY SEAL: GROUP 2…
Full text

LABORERS:, STRIPING/SLURRY SEAL: GROUP 2 TRAFFIC SURFACE ABRASIVE BLASTER; POT TENDER - REMOVAL OF ALL TRAFFIC LINES AND MARKINGS BY ANY METHOD (SANDBLASTING, WATERBLASTING, GRINDING, ETC.) AND PREPARATION OF SURFACE FOR COATINGS. TRAFFIC CONTROL PERSON: CONTROLLING AND DIRECTING TRAFFIC THROUGH BOTH CONVENTIONAL AND MOVING LANE CLOSURES; OPERATION OF ALL RELATED MACHINERY AND EQUIPMENT

$50.60$23.97$74.57Agreement
LABORERS:, STRIPING/SLURRY SEAL: GROUP 3…
Full text

LABORERS:, STRIPING/SLURRY SEAL: GROUP 3 TRAFFIC DELINEATING DEVICE APPLICATOR: LAYOUT AND APPLICATION OF PAVEMENT MARKERS, DELINEATING SIGNS, RUMBLE AND TRAFFIC BARS, ADHESIVES, GUIDE MARKERS, OTHER TRAFFIC DELINEATING DEVICES INCLUDING TRAFFIC CONTROL. THIS CATEGORY INCLUDES ALL TRAFFIC RELATED SURFACE PREPARATION (SANDBLASTING, WATERBLASTING, GRINDING) AS PART OF THE APPLICATION PROCESS. TRAFFIC PROTECTIVE DELINEATING SYSTEM INSTALLER: REMOVES, RELOCATES, INSTALLS, PERMANENTLY AFFIXED ROADSIDE AND PARKING DELINEATION BARRICADES, FENCING, CABLE ANCHOR, GUARD RAIL, REFERENCE SIGNS, MONUMENT MARKERS; OPERATION OF ALL RELATED MACHINERY AND EQUIPMENT; POWER BROOM SWEEPER

$52.61$23.97$76.58Agreement
LABORERS:, STRIPING/SLURRY SEAL: GROUP 4…
Full text

LABORERS:, STRIPING/SLURRY SEAL: GROUP 4 STRIPER: LAYOUT AND APPLICATION OF TRAFFIC STRIPES AND MARKINGS; HOT THERMO PLASTIC; TAPE TRAFFIC STRIPES AND MARKINGS, INCLUDING TRAFFIC CONTROL; OPERATION OF ALL RELATED MACHINERY AND EQUIPMENT

$54.35$23.97$78.32Agreement
PAIN0036-009 · Painters and Allied Trades agreement, September 1, 2024
DRYWALL FINISHER/TAPER$45.20$26.82$72.02Agreement
PAIN0036-021 · Painters and Allied Trades agreement, July 1, 2023
PAINTERS: INCLUDING LEAD ABATEMENT: (1) JOURNEYMAN PAINTER$34.08$18.50$52.58Agreement
PAINTERS: INCLUDING LEAD ABATEMENT: (4) ALL OTHER WORK$34.08$18.50$52.58Agreement
PAINTERS: INCLUDING LEAD ABATEMENT: (5) INDUSTRIAL$41.42$19.04$60.46Agreement
PAIN0169-002 · Painters and Allied Trades agreement, January 1, 2023
GLAZIER$44.33$28.88$73.21Agreement
PAIN1247-001 · Painters and Allied Trades agreement, January 1, 2025
SOFT FLOOR LAYER$45.15$19.43$64.58Agreement
PLAS0200-007 · Plasterers and Cement Masons agreement, August 3, 2022
PLASTERER U.S. MARINE CORPS-PICKLE MEADOW & MOUNTAIN WARFARE TRAINING CENTER…
Full text

PLASTERER U.S. MARINE CORPS-PICKLE MEADOW & MOUNTAIN WARFARE TRAINING CENTER: $3.00 ADDITIONAL PER HOUR

$47.37$19.64$67.01Agreement
PLAS0500-002 · Plasterers and Cement Masons agreement, July 1, 2025
CEMENT MASON/CONCRETE FINISHER$47.70$27.07$74.77Agreement
PLUM0345-001 · Plumbers and Pipefitters agreement, September 1, 2025
PLUMBER (LANDSCAPE/IRRIGATION FITTER)$44.75$26.20$70.95Agreement
PLUMBER (SEWER & STORM DRAIN WORK)$48.84$23.58$72.42Agreement
PLUM0460-002 · Plumbers and Pipefitters agreement, September 1, 2025
PLUMBER: PLUMBER, PIPEFITTER, STEAMFITTER, REFRIGERATION: ALL OTHER WORK

FOOTNOTE: WORK FROM A SWINGING SCAFFOLD, SWINGING BASKET, SPIDER OR FROM A BOSUN CHAIR: 10% ABOVE THE REGULAR RATE OF PAY FOR THAT DAY

$61.73$26.81$88.54Agreement
PLUMBER: PLUMBER, PIPEFITTER…
Full text

PLUMBER: PLUMBER, PIPEFITTER, STEAMFITTER, REFRIGERATION: CHINA LAKE, MARINE WARFARE TRAINING CENTER

FOOTNOTE: WORK FROM A SWINGING SCAFFOLD, SWINGING BASKET, SPIDER OR FROM A BOSUN CHAIR: 10% ABOVE THE REGULAR RATE OF PAY FOR THAT DAY

$72.23$26.81$99.04Agreement
PLUMBER: PLUMBER, PIPEFITTER, STEAMFITTER, REFRIGERATION: EDWARDS AIR FORCE BASE

FOOTNOTE: WORK FROM A SWINGING SCAFFOLD, SWINGING BASKET, SPIDER OR FROM A BOSUN CHAIR: 10% ABOVE THE REGULAR RATE OF PAY FOR THAT DAY

$68.73$26.81$95.54Agreement
ROOF0027-001 · Roofers agreement, September 1, 2024
ROOFER

FOOTNOTE: WORK WITH PITCH, PITCH BASE OF PITCH IMPREGNATED PRODUCTS OR ANY MATERIAL CONTAINING COAL TAR PITCH, ON ANY BUILDING OLD OR NEW, WHERE BOTH ASPHALT AND PITCHERS ARE USED IN THE APPLICATION OF A BUILT-UP ROOF OR TEAR OFF: $2.00 PER HOUR ADDITIONAL

$45.76$16.86$62.62Agreement
SFCA0669-007 · SFCA, January 1, 2026
SPRINKLER FITTER$50.79$29.80$80.59SFCA
SHEE0105-003 · Sheet Metal Workers agreement, January 1, 2025
SHEET METAL WORKER…
Full text

SHEET METAL WORKER: (1) COMMERCIAL - NEW CONSTRUCTION AND REMODEL WORK (LOS ANGELES (SOUTH OF A STRAIGHT LINE DRAWN BETWEEN GORMAN AND BIG PINES)AND CATALINA ISLAND, INYO, KERN (NORTHEAST PART, EAST OF HWY 395), MONO ORANGE, RIVERSIDE, AND SAN BERNARDINO COUNTIES)

$59.31$30.43$89.74Agreement
SHEE0105-004 · Sheet Metal Workers agreement, July 1, 2023
SHEET METAL WORKER…
Full text

SHEET METAL WORKER (KERN (EXCLUDING PORTION EAST OF HWY 395) & LOS ANGELES (NORTH OF A STRAIGHT LINE DRAWN BETWEEN GORMAN AND BIG PINES INCLUDING CITIES OF LANCASTER AND PALMDALE) COUNTIES)

$45.98$29.24$75.22Agreement
TEAM0011-002 · Teamsters agreement, July 1, 2025
TRUCK DRIVER GROUP 1 TRUCK DRIVER WORK ON ALL MILITARY BASES

PREMIUM PAY: $3.00 PER HOUR ADDITIONAL. [29 PALMS MARINE BASE, CAMP ROBERTS, CHINA LAKE, EDWARDS AFB, EL CENTRO NAVAL FACILITY, FORT IRWIN, MARINE CORPS LOGISTICS BASE AT NEBO & YERMO, MOUNTAIN WARFARE TRAINING CENTER, BRIDGEPORT, POINT ARGUELLO, POINT CONCEPTION, VANDENBERG AFB]

$41.59$35.69$77.28Agreement
TRUCK DRIVER GROUP 2…
Full text

TRUCK DRIVER GROUP 2 DRIVER OF VEHICLE OR COMBINATION OF VEHICLES - 2 AXLES; TRAFFIC CONTROL PILOT CAR EXCLUDING MOVING HEAVY EQUIPMENT PERMIT LOAD; TRUCK MOUNTED BROOM WORK ON ALL MILITARY BASES

PREMIUM PAY: $3.00 PER HOUR ADDITIONAL. [29 PALMS MARINE BASE, CAMP ROBERTS, CHINA LAKE, EDWARDS AFB, EL CENTRO NAVAL FACILITY, FORT IRWIN, MARINE CORPS LOGISTICS BASE AT NEBO & YERMO, MOUNTAIN WARFARE TRAINING CENTER, BRIDGEPORT, POINT ARGUELLO, POINT CONCEPTION, VANDENBERG AFB]

$41.74$35.69$77.43Agreement
TRUCK DRIVER GROUP 3…
Full text

TRUCK DRIVER GROUP 3 DRIVER OF VEHICLE OR COMBINATION OF VEHICLES - 3 AXLES; BOOT PERSON; CEMENT MASON DISTRIBUTION TRUCK; FUEL TRUCK DRIVER; WATER TRUCK - 2 AXLE; DUMP TRUCK, LESS THAN 16 YDS. WATER LEVEL; EROSION CONTROL DRIVER WORK ON ALL MILITARY BASES

PREMIUM PAY: $3.00 PER HOUR ADDITIONAL. [29 PALMS MARINE BASE, CAMP ROBERTS, CHINA LAKE, EDWARDS AFB, EL CENTRO NAVAL FACILITY, FORT IRWIN, MARINE CORPS LOGISTICS BASE AT NEBO & YERMO, MOUNTAIN WARFARE TRAINING CENTER, BRIDGEPORT, POINT ARGUELLO, POINT CONCEPTION, VANDENBERG AFB]

$41.87$35.69$77.56Agreement
TRUCK DRIVER GROUP 4…
Full text

TRUCK DRIVER GROUP 4 DRIVER OF TRANSIT MIX TRUCK, UNDER 3 YDS.; DUMPCRETE TRUCK, LESS THAN 6-1/2 YDS. WATER LEVEL WORK ON ALL MILITARY BASES

PREMIUM PAY: $3.00 PER HOUR ADDITIONAL. [29 PALMS MARINE BASE, CAMP ROBERTS, CHINA LAKE, EDWARDS AFB, EL CENTRO NAVAL FACILITY, FORT IRWIN, MARINE CORPS LOGISTICS BASE AT NEBO & YERMO, MOUNTAIN WARFARE TRAINING CENTER, BRIDGEPORT, POINT ARGUELLO, POINT CONCEPTION, VANDENBERG AFB]

$42.06$35.69$77.75Agreement
TRUCK DRIVER GROUP 5…
Full text

TRUCK DRIVER GROUP 5 WATER TRUCK, 3 OR MORE AXLES; TRUCK GREASER AND TIRE PERSON ($0.50 ADDITIONAL FOR TIRE PERSON); PIPELINE AND UTILITY WORKING TRUCK DRIVER, INCLUDING WINCH TRUCK AND PLASTIC FUSION, LIMITED TO PIPELINE AND UTILITY WORK; SLURRY TRUCK DRIVER WORK ON ALL MILITARY BASES

PREMIUM PAY: $3.00 PER HOUR ADDITIONAL. [29 PALMS MARINE BASE, CAMP ROBERTS, CHINA LAKE, EDWARDS AFB, EL CENTRO NAVAL FACILITY, FORT IRWIN, MARINE CORPS LOGISTICS BASE AT NEBO & YERMO, MOUNTAIN WARFARE TRAINING CENTER, BRIDGEPORT, POINT ARGUELLO, POINT CONCEPTION, VANDENBERG AFB]

$42.09$35.69$77.78Agreement
TRUCK DRIVER GROUP 6…
Full text

TRUCK DRIVER GROUP 6 TRANSIT MIX TRUCK, 3 YDS. OR MORE; DUMPCRETE TRUCK, 6-1/2 YDS. WATER LEVEL AND OVER; VEHICLE OR COMBINATION OF VEHICLES - 4 OR MORE AXLES; OIL SPREADER TRUCK; DUMP TRUCK, 16 YDS. TO 25 YDS. WATER LEVEL WORK ON ALL MILITARY BASES

PREMIUM PAY: $3.00 PER HOUR ADDITIONAL. [29 PALMS MARINE BASE, CAMP ROBERTS, CHINA LAKE, EDWARDS AFB, EL CENTRO NAVAL FACILITY, FORT IRWIN, MARINE CORPS LOGISTICS BASE AT NEBO & YERMO, MOUNTAIN WARFARE TRAINING CENTER, BRIDGEPORT, POINT ARGUELLO, POINT CONCEPTION, VANDENBERG AFB]

$42.12$35.69$77.81Agreement
TRUCK DRIVER GROUP 7$42.37$35.69$78.06Agreement
TRUCK DRIVER GROUP 8…
Full text

TRUCK DRIVER GROUP 8 DUMP TRUCK, 25 YDS. TO 49 YDS. WATER LEVEL; TRUCK REPAIR PERSON; WATER PULL - SINGLE ENGINE; WELDER WORK ON ALL MILITARY BASES

PREMIUM PAY: $3.00 PER HOUR ADDITIONAL. [29 PALMS MARINE BASE, CAMP ROBERTS, CHINA LAKE, EDWARDS AFB, EL CENTRO NAVAL FACILITY, FORT IRWIN, MARINE CORPS LOGISTICS BASE AT NEBO & YERMO, MOUNTAIN WARFARE TRAINING CENTER, BRIDGEPORT, POINT ARGUELLO, POINT CONCEPTION, VANDENBERG AFB]

$42.62$35.69$78.31Agreement
TRUCK DRIVER GROUP 9…
Full text

TRUCK DRIVER GROUP 9 TRUCK REPAIR PERSON/WELDER; LOW BED DRIVER, 9 AXLES OR OVER WORK ON ALL MILITARY BASES

PREMIUM PAY: $3.00 PER HOUR ADDITIONAL. [29 PALMS MARINE BASE, CAMP ROBERTS, CHINA LAKE, EDWARDS AFB, EL CENTRO NAVAL FACILITY, FORT IRWIN, MARINE CORPS LOGISTICS BASE AT NEBO & YERMO, MOUNTAIN WARFARE TRAINING CENTER, BRIDGEPORT, POINT ARGUELLO, POINT CONCEPTION, VANDENBERG AFB]

$42.82$35.69$78.51Agreement
TRUCK DRIVER GROUP 10…
Full text

TRUCK DRIVER GROUP 10 DUMP TRUCK - 50 YDS. OR MORE WATER LEVEL; WATER PULL - SINGLE ENGINE WITH ATTACHMENT WORK ON ALL MILITARY BASES

PREMIUM PAY: $3.00 PER HOUR ADDITIONAL. [29 PALMS MARINE BASE, CAMP ROBERTS, CHINA LAKE, EDWARDS AFB, EL CENTRO NAVAL FACILITY, FORT IRWIN, MARINE CORPS LOGISTICS BASE AT NEBO & YERMO, MOUNTAIN WARFARE TRAINING CENTER, BRIDGEPORT, POINT ARGUELLO, POINT CONCEPTION, VANDENBERG AFB]

$43.12$35.69$78.81Agreement
TRUCK DRIVER GROUP 11…
Full text

TRUCK DRIVER GROUP 11 WATER PULL - TWIN ENGINE; WATER PULL - TWIN ENGINE WITH ATTACHMENTS; WINCH TRUCK DRIVER - $1.25 ADDITIONAL WHEN OPERATING WINCH OR SIMILAR SPECIAL ATTACHMENTS WORK ON ALL MILITARY BASES

PREMIUM PAY: $3.00 PER HOUR ADDITIONAL. [29 PALMS MARINE BASE, CAMP ROBERTS, CHINA LAKE, EDWARDS AFB, EL CENTRO NAVAL FACILITY, FORT IRWIN, MARINE CORPS LOGISTICS BASE AT NEBO & YERMO, MOUNTAIN WARFARE TRAINING CENTER, BRIDGEPORT, POINT ARGUELLO, POINT CONCEPTION, VANDENBERG AFB]

$43.62$35.69$79.31Agreement
TRUCK DRIVER GROUP 12 BOOM TRUCK 17K AND ABOVE WORK ON ALL MILITARY BASES

PREMIUM PAY: $3.00 PER HOUR ADDITIONAL. [29 PALMS MARINE BASE, CAMP ROBERTS, CHINA LAKE, EDWARDS AFB, EL CENTRO NAVAL FACILITY, FORT IRWIN, MARINE CORPS LOGISTICS BASE AT NEBO & YERMO, MOUNTAIN WARFARE TRAINING CENTER, BRIDGEPORT, POINT ARGUELLO, POINT CONCEPTION, VANDENBERG AFB]

$44.05$35.69$79.74Agreement

Modification history

Modification 2January 30, 2026
Modification 3May 18, 2026
Modification 4July 14, 2026
Modification 5July 30, 2026 (current)

Published by the Wage and Hour Division; read from sam.gov. The sheet is checked for a newer modification each day. Contracts awarded since January 1, 2017 also carry Executive Order 13706 paid sick leave (one hour per 30 worked, up to 56 a year).

Questions people ask

Which rate do I pay on CA20260020?
The line for the classification of work actually performed: the basic rate plus the fringe. You may pay the fringe into benefit plans, as cash on every hour, or a mix. Overtime after 40 hours is 1.5 times the basic rate; fringe is paid on every hour and never multiplied.
My trade is not on this sheet. What do I do?
Do not borrow the nearest name. Ask the contracting agency for a conformance on Standard Form 1444 before the first week of that work, and note it as pending on the payroll.
Does modification 5 apply to my contract?
Only if it was in force when your contract was awarded (generally at bid opening). An earlier modification locked into the contract keeps applying, except on option years, added scope and indefinite-quantity contracts. The number and modification are on the first page of the exhibit in your contract.

How to read a wage determination · Paying the fringe in cash or through plans · Overtime on these rates · Fringe credit calculator