CertifiedHours

Prevailing wage rates · California · Wage determination

Prevailing wage rates: Alameda, Calaveras, Contra Costa and 14 more counties, California

Building, Heavy, Highway construction · CA20260018 modification 7, published September 3, 2026

The short answer

This sheet sets 480 classifications for building, heavy, highway work in Alameda, Calaveras, Contra Costa and 14 more counties, California. Each line is a basic hourly rate plus a fringe rate, and the sum is the minimum you must pay for that work, from $23.74 an hour (plumber: pipe tradesman. (pipe tradesman) to $154.14 (cable splicer (footnotes). Your contract may lock an earlier modification.

Scope

Building Construction Projects Dredging Projects-Includes Dredging Projects (does not include hopper dredge work) Heavy Construction Projects (excludes water well drilling) Highway Construction Projects

Rates by classification

Total is the basic rate plus the fringe. Source is the agreement or survey the rate came from; a marker means the group changed in this modification. A dagger (†) means the fringe carries a footnote or percentage the total does not include; read the group’s notes.

ClassificationBasic rateFringeTotalSource
ASBE0016-004 · Asbestos Workers and Heat & Frost Insulators agreement, May 1, 2025
ASBESTOS REMOVAL WORKER/HAZARDOUS MATERIAL HANDLER…
Full text

ASBESTOS REMOVAL WORKER/HAZARDOUS MATERIAL HANDLER: INCLUDES PREPARATION, WETTING, STRIPPING, REMOVAL, SCRAPPING, VACUUMING, BAGGING AND DISPOSING OF ALL INSULATION MATERIALS FROM MECHANICAL SYSTEMS, WHETHER THEY CONTAIN ASBESTOS OR NOT (AREA 1: CALAVERAS, FRESNO, KINGS, MADERA, MARIPOSA, MERCED, MONTEREY, SAN BENITO, SAN JOAQUIN, SANTA CRUZ, STANISLAUS, & TOULMNE COUNTIES)

$34.56$11.40$45.96Agreement
ASBESTOS REMOVAL WORKER/HAZARDOUS MATERIAL HANDLER…
Full text

ASBESTOS REMOVAL WORKER/HAZARDOUS MATERIAL HANDLER: INCLUDES PREPARATION, WETTING, STRIPPING, REMOVAL, SCRAPPING, VACUUMING, BAGGING AND DISPOSING OF ALL INSULATION MATERIALS FROM MECHANICAL SYSTEMS, WHETHER THEY CONTAIN ASBESTOS OR NOT (AREA 2: ALAMEDA, CONTRA COSTA, SAN FRANCISCO, SAN MATEO, & SANTA CLARA COUNTIES)

$44.73$12.75$57.48Agreement
ASBE0016-008 · Asbestos Workers and Heat & Frost Insulators agreement, January 1, 2024
ASBESTOS WORKERS/INSULATOR…
Full text

ASBESTOS WORKERS/INSULATOR: INCLUDES THE APPLICATION OF ALL INSULATING MATERIALS, PROTECTIVE COVERINGS, COATINGS, AND FINISHES TO ALL TYPES OF MECHANICAL SYSTEMS (AREA 1: ALAMEDA, CONTRA COSTA, MONTEREY, SAN BENITO, SAN FRANCISCO, SAN MATEO, SANTA CLARA, & SANTA CRUZ)

$84.76$25.07$109.83Agreement
ASBESTOS WORKERS/INSULATOR…
Full text

ASBESTOS WORKERS/INSULATOR: INCLUDES THE APPLICATION OF ALL INSULATING MATERIALS, PROTECTIVE COVERINGS, COATINGS, AND FINISHES TO ALL TYPES OF MECHANICAL SYSTEMS (AREA 2: CALAVERAS, FRESNO, KINGS, MADERA, MARIPOSA, MERCED, SAN JOAQUIN, STANISLAUS, & TUOLUMNE)

$64.56$25.07$89.63Agreement
BOIL0549-001 · Boilermakers agreement, January 1, 2021
BOILERMAKER (AREA 1…
Full text

BOILERMAKER (AREA 1: ALAMEDA, CONTRA COSTA, SAN FRANCISCO, SAN MATEO & SANTA CLARA COUNTIES)

$49.62$41.27$90.89Agreement
BOILERMAKER (AREA 2: REMAINING COUNTIES)$45.60$38.99$84.59Agreement
BRCA0003-001 · Bricklayers agreement, August 1, 2024
MARBLE FINISHER$42.06$19.80$61.86Agreement
BRCA0003-003 · Bricklayers agreement, August 1, 2024
MARBLE MASON$61.72$30.31$92.03Agreement
BRCA0003-005 · Bricklayers agreement, May 1, 2024
BRICKLAYER ( 1) FRESNO, KINGS, MADERA, MARIPOSA, MERCED$51.17$25.80$76.97Agreement
BRICKLAYER ( 7) SAN FRANCISCO, SAN MATEO$57.02$28.50$85.52Agreement
BRICKLAYER ( 9) CALAVERAS, SAN JOAQUIN, STANISLAUS, TOULUMNE$52.76$25.01$77.77Agreement
BRICKLAYER (16) MONTEREY, SANTA CRUZ$54.18$27.82$82.00Agreement
BRICKLAYER (8) ALAMEDA, CONTRA COSTA, SAN BENITO, SANTA CLARA)$56.94$26.28$83.22Agreement
BRCA0003-008 · Bricklayers agreement, July 1, 2024
TERRAZZO FINISHER$44.93$20.98$65.91Agreement
TERRAZZO WORKER/SETTER$60.58$29.79$90.37Agreement
BRCA0003-011 · Bricklayers agreement, April 1, 2024
TILE FINISHER (AREA 1…
Full text

TILE FINISHER (AREA 1: ALAMEDA, CONTRA COSTA, MONTEREY, SAN BENITO, SAN FRANCISCO, SAN MATEO, SANTA CLARA, SANTA CRUZ)

$37.75$19.28$57.03Agreement
TILE FINISHER (AREA 2: CALAVERAS, SAN JOAQUIN, STANISLAUS, TUOLUMNE)$34.76$19.22$53.98Agreement
TILE FINISHER (AREA 3: FRESNO, KINGS, MADERA, MARIPOSA, MERCED)$32.68$18.32$51.00Agreement
TILE LAYER (AREA 1…
Full text

TILE LAYER (AREA 1: ALAMEDA, CONTRA COSTA, MONTEREY, SAN BENITO, SAN FRANCISCO, SAN MATEO, SANTA CLARA, SANTA CRUZ)

$59.92$22.62$82.54Agreement
TILE LAYER (AREA 2: CALAVERAS, SAN JOAQUIN, STANISLAUS, TUOLUMNE)$55.17$22.52$77.69Agreement
TILE LAYER (AREA 3: FRESNO, KINGS, MADERA, MARIPOSA, MERCED)$50.28$22.05$72.33Agreement
CARP0022-001 · Carpenters agreement, July 1, 2023
CARPENTERS: BRIDGE BUILDER/HIGHWAY CARPENTER (SAN FRANCISCO COUNTY)$60.39$33.52$93.91Agreement
CARPENTERS: HARDWOOD FLOORLAYER…
Full text

CARPENTERS: HARDWOOD FLOORLAYER, SHINGLER, POWER SAW OPERATOR, STEEL SCAFFOLD & STEEL SHORING ERECTOR, SAW FILER (SAN FRANCISCO COUNTY)

$60.54$33.52$94.06Agreement
CARPENTERS: JOURNEYMAN CARPENTER (SAN FRANCISCO COUNTY)$60.39$33.52$93.91Agreement
CARPENTERS: MILLWRIGHT (SAN FRANCISCO COUNTY)$60.49$35.11$95.60Agreement
CARP0034-001 · Carpenters agreement, July 1, 2021
DIVER: ASSISTANT TENDER…
Full text

DIVER: ASSISTANT TENDER, ROV TENDER/TECHNICIAN. DEPTH PAY (SURFACE DIVING): 50 TO 100 FT, $2.00 PER FOOT; 101 TO 150 FT, $3.00 PER FOOT; 151 TO 220 FT, $4.00 PER FOOT; 221 FT. AND DEEPER, $5.00 PER FOOT. (SATURATION DIVING: THE STANDBY RATE SHALL APPLY UNTIL SATURATION STARTS. THE SATURATION DIVING RATE APPLIES WHEN DIVERS ARE UNDER PRESSURE CONTINUOUSLY UNTIL WORK TASK AND DECOMPRESSION ARE COMPLETE. THE DIVER RATE SHALL BE PAID FOR ALL SATURATION HOURS.) (DIVING IN ENCLOSURES: WHERE IT IS NECESSARY FOR DIVERS TO ENTER PIPES OR TUNNELS, OR OTHER ENCLOSURES WHERE THERE IS NO VERTICAL ASCENT, THE FOLLOWING PREMIUM SHALL BE PAID: DISTANCE TRAVELED FROM ENTRANCE 26 FEET TO 300 FEET: $1.00 PER FOOT. WHEN IT IS NECESSARY FOR A DIVER TO ENTER ANY PIPE, TUNNEL OR OTHER ENCLOSURE LESS THAN 48"" IN HEIGHT, THE PREMIUM WILL BE $1.00 PER FOOT.) (WORK IN COMBINATION OF CLASSIFICATIONS: EMPLOYEES WORKING IN ANY COMBINATION OF CLASSIFICATIONS WITHIN THE DIVING CREW (EXCEPT DIVE SUPERVISOR) IN A SHIFT ARE PAID IN THE CLASSIFICATION WITH THE HIGHEST RATE FOR THAT SHIFT.)

$54.10$34.69$88.79Agreement
DIVER: DIVER STANDBY. DEPTH PAY…
Full text

DIVER: DIVER STANDBY. DEPTH PAY (SURFACE DIVING): 50 TO 100 FT, $2.00 PER FOOT; 101 TO 150 FT, $3.00 PER FOOT; 151 TO 220 FT, $4.00 PER FOOT; 221 FT. AND DEEPER, $5.00 PER FOOT. (SATURATION DIVING: THE STANDBY RATE SHALL APPLY UNTIL SATURATION STARTS. THE SATURATION DIVING RATE APPLIES WHEN DIVERS ARE UNDER PRESSURE CONTINUOUSLY UNTIL WORK TASK AND DECOMPRESSION ARE COMPLETE. THE DIVER RATE SHALL BE PAID FOR ALL SATURATION HOURS.) (DIVING IN ENCLOSURES: WHERE IT IS NECESSARY FOR DIVERS TO ENTER PIPES OR TUNNELS, OR OTHER ENCLOSURES WHERE THERE IS NO VERTICAL ASCENT, THE FOLLOWING PREMIUM SHALL BE PAID: DISTANCE TRAVELED FROM ENTRANCE 26 FEET TO 300 FEET: $1.00 PER FOOT. WHEN IT IS NECESSARY FOR A DIVER TO ENTER ANY PIPE, TUNNEL OR OTHER ENCLOSURE LESS THAN 48"" IN HEIGHT, THE PREMIUM WILL BE $1.00 PER FOOT.) (WORK IN COMBINATION OF CLASSIFICATIONS: EMPLOYEES WORKING IN ANY COMBINATION OF CLASSIFICATIONS WITHIN THE DIVING CREW (EXCEPT DIVE SUPERVISOR) IN A SHIFT ARE PAID IN THE CLASSIFICATION WITH THE HIGHEST RATE FOR THAT SHIFT.)

$60.51$34.69$95.20Agreement
DIVER: DIVER TENDER. DEPTH PAY…
Full text

DIVER: DIVER TENDER. DEPTH PAY (SURFACE DIVING): 50 TO 100 FT, $2.00 PER FOOT; 101 TO 150 FT, $3.00 PER FOOT; 151 TO 220 FT, $4.00 PER FOOT; 221 FT. AND DEEPER, $5.00 PER FOOT. (SATURATION DIVING: THE STANDBY RATE SHALL APPLY UNTIL SATURATION STARTS. THE SATURATION DIVING RATE APPLIES WHEN DIVERS ARE UNDER PRESSURE CONTINUOUSLY UNTIL WORK TASK AND DECOMPRESSION ARE COMPLETE. THE DIVER RATE SHALL BE PAID FOR ALL SATURATION HOURS.) (DIVING IN ENCLOSURES: WHERE IT IS NECESSARY FOR DIVERS TO ENTER PIPES OR TUNNELS, OR OTHER ENCLOSURES WHERE THERE IS NO VERTICAL ASCENT, THE FOLLOWING PREMIUM SHALL BE PAID: DISTANCE TRAVELED FROM ENTRANCE 26 FEET TO 300 FEET: $1.00 PER FOOT. WHEN IT IS NECESSARY FOR A DIVER TO ENTER ANY PIPE, TUNNEL OR OTHER ENCLOSURE LESS THAN 48"" IN HEIGHT, THE PREMIUM WILL BE $1.00 PER FOOT.) (WORK IN COMBINATION OF CLASSIFICATIONS: EMPLOYEES WORKING IN ANY COMBINATION OF CLASSIFICATIONS WITHIN THE DIVING CREW (EXCEPT DIVE SUPERVISOR) IN A SHIFT ARE PAID IN THE CLASSIFICATION WITH THE HIGHEST RATE FOR THAT SHIFT.)

$59.51$34.69$94.20Agreement
DIVER: DIVER WET. DEPTH PAY…
Full text

DIVER: DIVER WET. DEPTH PAY (SURFACE DIVING): 50 TO 100 FT, $2.00 PER FOOT; 101 TO 150 FT, $3.00 PER FOOT; 151 TO 220 FT, $4.00 PER FOOT; 221 FT. AND DEEPER, $5.00 PER FOOT. (SATURATION DIVING: THE STANDBY RATE SHALL APPLY UNTIL SATURATION STARTS. THE SATURATION DIVING RATE APPLIES WHEN DIVERS ARE UNDER PRESSURE CONTINUOUSLY UNTIL WORK TASK AND DECOMPRESSION ARE COMPLETE. THE DIVER RATE SHALL BE PAID FOR ALL SATURATION HOURS.) (DIVING IN ENCLOSURES: WHERE IT IS NECESSARY FOR DIVERS TO ENTER PIPES OR TUNNELS, OR OTHER ENCLOSURES WHERE THERE IS NO VERTICAL ASCENT, THE FOLLOWING PREMIUM SHALL BE PAID: DISTANCE TRAVELED FROM ENTRANCE 26 FEET TO 300 FEET: $1.00 PER FOOT. WHEN IT IS NECESSARY FOR A DIVER TO ENTER ANY PIPE, TUNNEL OR OTHER ENCLOSURE LESS THAN 48"" IN HEIGHT, THE PREMIUM WILL BE $1.00 PER FOOT.) (WORK IN COMBINATION OF CLASSIFICATIONS: EMPLOYEES WORKING IN ANY COMBINATION OF CLASSIFICATIONS WITHIN THE DIVING CREW (EXCEPT DIVE SUPERVISOR) IN A SHIFT ARE PAID IN THE CLASSIFICATION WITH THE HIGHEST RATE FOR THAT SHIFT.)

$103.62$34.69$138.31Agreement
DIVER: MANIFOLD OPERATOR…
Full text

DIVER: MANIFOLD OPERATOR (MIXED GAS). DEPTH PAY (SURFACE DIVING): 50 TO 100 FT, $2.00 PER FOOT; 101 TO 150 FT, $3.00 PER FOOT; 151 TO 220 FT, $4.00 PER FOOT; 221 FT. AND DEEPER, $5.00 PER FOOT. (SATURATION DIVING: THE STANDBY RATE SHALL APPLY UNTIL SATURATION STARTS. THE SATURATION DIVING RATE APPLIES WHEN DIVERS ARE UNDER PRESSURE CONTINUOUSLY UNTIL WORK TASK AND DECOMPRESSION ARE COMPLETE. THE DIVER RATE SHALL BE PAID FOR ALL SATURATION HOURS.) (DIVING IN ENCLOSURES: WHERE IT IS NECESSARY FOR DIVERS TO ENTER PIPES OR TUNNELS, OR OTHER ENCLOSURES WHERE THERE IS NO VERTICAL ASCENT, THE FOLLOWING PREMIUM SHALL BE PAID: DISTANCE TRAVELED FROM ENTRANCE 26 FEET TO 300 FEET: $1.00 PER FOOT. WHEN IT IS NECESSARY FOR A DIVER TO ENTER ANY PIPE, TUNNEL OR OTHER ENCLOSURE LESS THAN 48"" IN HEIGHT, THE PREMIUM WILL BE $1.00 PER FOOT.) (WORK IN COMBINATION OF CLASSIFICATIONS: EMPLOYEES WORKING IN ANY COMBINATION OF CLASSIFICATIONS WITHIN THE DIVING CREW (EXCEPT DIVE SUPERVISOR) IN A SHIFT ARE PAID IN THE CLASSIFICATION WITH THE HIGHEST RATE FOR THAT SHIFT.)

$64.51$34.69$99.20Agreement
DIVER: MANIFOLD OPERATOR…
Full text

DIVER: MANIFOLD OPERATOR (STANDBY). DEPTH PAY (SURFACE DIVING): 50 TO 100 FT, $2.00 PER FOOT; 101 TO 150 FT, $3.00 PER FOOT; 151 TO 220 FT, $4.00 PER FOOT; 221 FT. AND DEEPER, $5.00 PER FOOT. (SATURATION DIVING: THE STANDBY RATE SHALL APPLY UNTIL SATURATION STARTS. THE SATURATION DIVING RATE APPLIES WHEN DIVERS ARE UNDER PRESSURE CONTINUOUSLY UNTIL WORK TASK AND DECOMPRESSION ARE COMPLETE. THE DIVER RATE SHALL BE PAID FOR ALL SATURATION HOURS.) (DIVING IN ENCLOSURES: WHERE IT IS NECESSARY FOR DIVERS TO ENTER PIPES OR TUNNELS, OR OTHER ENCLOSURES WHERE THERE IS NO VERTICAL ASCENT, THE FOLLOWING PREMIUM SHALL BE PAID: DISTANCE TRAVELED FROM ENTRANCE 26 FEET TO 300 FEET: $1.00 PER FOOT. WHEN IT IS NECESSARY FOR A DIVER TO ENTER ANY PIPE, TUNNEL OR OTHER ENCLOSURE LESS THAN 48"" IN HEIGHT, THE PREMIUM WILL BE $1.00 PER FOOT.) (WORK IN COMBINATION OF CLASSIFICATIONS: EMPLOYEES WORKING IN ANY COMBINATION OF CLASSIFICATIONS WITHIN THE DIVING CREW (EXCEPT DIVE SUPERVISOR) IN A SHIFT ARE PAID IN THE CLASSIFICATION WITH THE HIGHEST RATE FOR THAT SHIFT.)

$59.51$34.69$94.20Agreement
CARP0034-003 · Carpenters agreement, July 1, 2021
PILEDRIVER$54.10$34.69$88.79Agreement
CARP0035-007 · Carpenters agreement, July 1, 2020
MODULAR FURNITURE INSTALLER…
Full text

MODULAR FURNITURE INSTALLER: INSTALLER (AREA 1: ALAMEDA, CONTRA COSTA, SAN FRANCISCO, SAN MATEO, SANTA CLARA COUNTIES)

$28.76$22.53$51.29Agreement
MODULAR FURNITURE INSTALLER: INSTALLER (AREA 2: MONTEREY, SAN BENITO, SANTA CRUZ COUNTIES)$26.11$22.53$48.64Agreement
MODULAR FURNITURE INSTALLER…
Full text

MODULAR FURNITURE INSTALLER: INSTALLER (AREA 3: CALAVERAS, FRESNO, KINGS, MADERA, MARIPOSA, MERCED, SAN JOAQUIN, STANISLAUS, TUOLUMNE COUNTIES)

$25.16$22.53$47.69Agreement
MODULAR FURNITURE INSTALLER…
Full text

MODULAR FURNITURE INSTALLER: LEAD INSTALLER (AREA 2: MONTEREY, SAN BENITO, SANTA CRUZ COUNTIES)

$29.08$23.03$52.11Agreement
MODULAR FURNITURE INSTALLER…
Full text

MODULAR FURNITURE INSTALLER: LEAD INSTALLER (AREA 3: CALAVERAS, FRESNO, KINGS, MADERA, MARIPOSA, MERCED, SAN JOAQUIN, STANISLAUS, TUOLUMNE COUNTIES).$ 27.96 23.03 MODULAR FURNITURE INSTALLER: LEAD INSTALLER (AREA 1: ALAMEDA, CONTRA COSTA, SAN FRANCISCO, SAN MATEO, SANTA CLARA COUNTIES)

$32.21$23.03$55.24Agreement
MODULAR FURNITURE INSTALLER…
Full text

MODULAR FURNITURE INSTALLER: MASTER INSTALLER (AREA 1: ALAMEDA, CONTRA COSTA, SAN FRANCISCO, SAN MATEO, SANTA CLARA COUNTIES)

$36.43$23.03$59.46Agreement
MODULAR FURNITURE INSTALLER…
Full text

MODULAR FURNITURE INSTALLER: MASTER INSTALLER (AREA 2: MONTEREY, SAN BENITO, SANTA CRUZ COUNTIES)

$32.71$23.03$55.74Agreement
Group definitions, zones and premiums for CARP0035-007
MODULAR FURNITURE INSTALLER: MASTER INSTALLER (AREA 3: CALAVERAS, FRESNO, KINGS, MADERA, MARIPOSA, MERCED, SAN JOAQUIN, STANISLAUS, TUOLUMNE COUNTIES).$ 31.38 23.03
CARP0035-008 · Carpenters agreement, August 1, 2020
DRYWALL INSTALLERS/LATHERS…
Full text

DRYWALL INSTALLERS/LATHERS (AREA 1: ALAMEDA, CONTRA COSTA, SAN FRANCISCO, SAN MATEO, SANTA CLARA COUNTIES)

$52.65$31.26$83.91Agreement
DRYWALL INSTALLERS/LATHERS (AREA 2: MONTEREY, SAN BENITO, SANTA CRUZ COUNTIES)$46.77$31.26$78.03Agreement
DRYWALL INSTALLERS/LATHERS (AREA 3: SAN JOAQUIN)$47.27$31.26$78.53Agreement
DRYWALL INSTALLERS/LATHERS…
Full text

DRYWALL INSTALLERS/LATHERS (AREA 4: CALAVERAS, FRESNO, KINGS, MADERA, MARIPOSA, MERCED, STANISLAUS, TUOLUMNE COUNTIES)

$45.92$31.26$77.18Agreement
DRYWALL STOCKER/SCRAPPER…
Full text

DRYWALL STOCKER/SCRAPPER (AREA 1: ALAMEDA, CONTRA COSTA, SAN FRANCISCO, SAN MATEO, SANTA CLARA COUNTIES)

$26.33$18.22$44.55Agreement
DRYWALL STOCKER/SCRAPPER (AREA 2: MONTEREY, SAN BENITO, SANTA CRUZ COUNTIES)$23.39$18.22$41.61Agreement
DRYWALL STOCKER/SCRAPPER (AREA 3: SAN JOAQUIN)$23.64$18.22$41.86Agreement
DRYWALL STOCKER/SCRAPPER…
Full text

DRYWALL STOCKER/SCRAPPER (AREA 4: CALAVERAS, FRESNO, KINGS, MADERA, MARIPOSA, MERCED, STANISLAUS, TUOLUMNE COUNTIES)

$22.97$18.22$41.19Agreement
CARP0152-001 · Carpenters agreement, July 1, 2020
CARPENTERS: BRIDGE BUILDER/HIGHWAY CARPENTER (CONTRA COSTA COUNTY)$52.65$30.82$83.47Agreement
CARPENTERS: HARDWOOD FLOORLAYER…
Full text

CARPENTERS: HARDWOOD FLOORLAYER, SHINGLER, POWER SAW OPERATOR, STEEL SCAFFOLD & STEEL SHORING ERECTOR, SAW FILER (CONTRA COSTA COUNTY)

$52.80$30.82$83.62Agreement
CARPENTERS: JOURNEYMAN CARPENTER (CONTRA COSTA COUNTY)$52.65$30.82$83.47Agreement
CARPENTERS: MILLWRIGHT (CONTRA COSTA COUNTY)$52.75$32.41$85.16Agreement
CARP0152-002 · Carpenters agreement, July 1, 2020
CARPENTERS: BRIDGE BUILDER/HIGHWAY CARPENTER (SAN JOAQUIN COUNTY)$52.65$30.82$83.47Agreement
CARPENTERS: HARDWOOD FLOORLAYER…
Full text

CARPENTERS: HARDWOOD FLOORLAYER, SHINGLER, POWER SAW OPERATOR, STEEL SCAFFOLD & STEEL SHORING ERECTOR, SAW FILER (SAN JOAQUIN COUNTY)

$46.92$30.82$77.74Agreement
CARPENTERS: JOURNEYMAN CARPENTER (SAN JOAQUIN COUNTY)$46.77$30.82$77.59Agreement
CARPENTERS: MILLWRIGHT (SAN JOAQUIN COUNTY)$49.27$32.41$81.68Agreement
CARP0152-004 · Carpenters agreement, July 1, 2020
CARPENTERS: BRIDGE BUILDER/HIGHWAY CARPENTER…
Full text

CARPENTERS: BRIDGE BUILDER/HIGHWAY CARPENTER (CALAVERAS, MARIPOSA, MERCED, STANISLAUS AND TUOLUMNE COUNTIES)

$52.65$30.82$83.47Agreement
CARPENTERS: HARDWOOD FLOORLAYER…
Full text

CARPENTERS: HARDWOOD FLOORLAYER, SHINGLER, POWER SAW OPERATOR, STEEL SCAFFOLD & STEEL SHORING ERECTOR, SAW FILER CALAVERAS, MARIPOSA, MERCED, STANISLAUS AND TUOLUMNE COUNTIES

$45.57$30.82$76.39Agreement
CARPENTERS: JOURNEYMAN CARPENTER…
Full text

CARPENTERS: JOURNEYMAN CARPENTER (CALAVERAS, MARIPOSA, MERCED, STANISLAUS AND TUOLUMNE COUNTIES).$ 45.42 30.82 CARPENTERS: MILLWRIGHT (CALAVERAS, MARIPOSA, MERCED, STANISLAUS AND TUOLUMNE COUNTIES)

$47.92$32.41$80.33Agreement
CARP0217-001 · Carpenters agreement, July 1, 2023
CARPENTERS: BRIDGE BUILDER/HIGHWAY CARPENTER (SAN MATEO COUNTY)$60.39$33.52$93.91Agreement
CARPENTERS: HARDWOOD FLOORLAYER…
Full text

CARPENTERS: HARDWOOD FLOORLAYER, SHINGLER, POWER SAW OPERATOR, STEEL SCAFFOLD & STEEL SHORING ERECTOR, SAW FILER (SAN MATEO COUNTY)

$60.54$33.52$94.06Agreement
CARPENTERS: JOURNEYMAN CARPENTER…
Full text

CARPENTERS: JOURNEYMAN CARPENTER (SAN MATEO COUNTY).$ 60.39 33.52 CARPENTERS: MILLWRIGHT (SAN MATEO COUNTY)

$60.49$35.11$95.60Agreement
CARP0405-001 · Carpenters agreement, July 1, 2021
CARPENTERS: BRIDGE BUILDER/HIGHWAY CARPENTER (SANTA CLARA COUNTY)$54.85$31.49$86.34Agreement
CARPENTERS: HARDWOOD FLOORLAYER…
Full text

CARPENTERS: HARDWOOD FLOORLAYER, SHINGLER, POWER SAW OPERATOR, STEEL SCAFFOLD & STEEL SHORING ERECTOR, SAW FILER (SANTA CLARA COUNTY)

$55.00$31.49$86.49Agreement
CARPENTERS: JOURNEYMAN CARPENTER (SANTA CLARA COUNTY)$54.85$31.49$86.34Agreement
CARPENTERS: MILLWRIGHT (SANTA CLARA COUNTY)$54.95$33.08$88.03Agreement
CARP0405-002 · Carpenters agreement, July 1, 2021
CARPENTERS: BRIDGE BUILDER/HIGHWAY CARPENTER (SAN BENITO COUNTY)$54.85$31.49$86.34Agreement
CARPENTERS: HARDWOOD FLOORLAYER…
Full text

CARPENTERS: HARDWOOD FLOORLAYER, SHINGLER, POWER SAW OPERATOR, STEEL SCAFFOLD & STEEL SHORING ERECTOR, SAW FILER (SAN BENITO COUNTY)

$49.12$31.49$80.61Agreement
CARPENTERS: JOURNEYMAN CARPENTER (SAN BENITO COUNTY)$48.97$31.49$80.46Agreement
CARPENTERS: MILLWRIGHT (SAN BENITO COUNTY)$51.47$33.08$84.55Agreement
CARP0505-001 · Carpenters agreement, July 1, 2021
CARPENTERS: BRIDGE BUILDER/HIGHWAY CARPENTER (SANTA CRUZ COUNTY)$54.85$31.49$86.34Agreement
CARPENTERS: HARDWOOD FLOORLAYER…
Full text

CARPENTERS: HARDWOOD FLOORLAYER, SHINGLER, POWER SAW OPERATOR, STEEL SCAFFOLD & STEEL SHORING ERECTOR, SAW FILER (SANTA CRUZ COUNTY)

$49.12$31.49$80.61Agreement
CARPENTERS: JOURNEYMAN CARPENTER (SANTA CRUZ COUNTY)$48.97$31.49$80.46Agreement
CARPENTERS: MILLWRIGHT (SANTA CRUZ COUNTY)$51.47$33.08$84.55Agreement
CARP0605-001 · Carpenters agreement, July 1, 2021
CARPENTERS: BRIDGE BUILDER/HIGHWAY CARPENTER (MONTEREY COUNTY)$54.85$31.49$86.34Agreement
CARPENTERS: HARDWOOD FLOORLAYER…
Full text

CARPENTERS: HARDWOOD FLOORLAYER, SHINGLER, POWER SAW OPERATOR, STEEL SCAFFOLD & STEEL SHORING ERECTOR, SAW FILER (MONTEREY COUNTY)

$49.12$31.49$80.61Agreement
CARPENTERS: JOURNEYMAN CARPENTER (MONTEREY COUNTY)$48.97$31.49$80.46Agreement
CARPENTERS: MILLWRIGHT (MONTEREY COUNTY)$51.47$33.08$84.55Agreement
CARP0701-001 · Carpenters agreement, July 1, 2021
CARPENTERS: BRIDGE BUILDER/HIGHWAY CARPENTER (FRESNO AND MADERA COUNTIES)$54.85$31.49$86.34Agreement
CARPENTERS: HARDWOOD FLOORLAYER…
Full text

CARPENTERS: HARDWOOD FLOORLAYER, SHINGLER, POWER SAW OPERATOR, STEEL SCAFFOLD & STEEL SHORING ERECTOR, SAW FILER (FRESNO AND MADERA COUNTIES)

$47.77$31.49$79.26Agreement
CARPENTERS: JOURNEYMAN CARPENTER (FRESNO AND MADERA COUNTIES)$47.62$31.49$79.11Agreement
Group definitions, zones and premiums for CARP0701-001
CARPENTERS: MILLWRIGHT (FRESNO AND MADERA COUNTIES).$ 50.12 33.08
CARP0713-001 · Carpenters agreement, July 1, 2021
CARPENTERS: BRIDGE BUILDER/HIGHWAY CARPENTER (ALAMEDA COUNTY)$54.85$31.49$86.34Agreement
CARPENTERS: HARDWOOD FLOORLAYER…
Full text

CARPENTERS: HARDWOOD FLOORLAYER, SHINGLER, POWER SAW OPERATOR, STEEL SCAFFOLD & STEEL SHORING ERECTOR, SAW FILER (ALAMEDA COUNTY)

$55.00$31.49$86.49Agreement
CARPENTERS: JOURNEYMAN CARPENTER (ALAMEDA COUNTY)$54.85$31.49$86.34Agreement
CARPENTERS: MILLWRIGHT (ALAMEDA COUNTY)$54.95$33.08$88.03Agreement
CARP1109-001 · Carpenters agreement, July 1, 2021
CARPENTERS: BRIDGE BUILDER/HIGHWAY CARPENTER (KINGS COUNTY)$54.85$31.49$86.34Agreement
CARPENTERS: HARDWOOD FLOORLAYER…
Full text

CARPENTERS: HARDWOOD FLOORLAYER, SHINGLER, POWER SAW OPERATOR, STEEL SCAFFOLD & STEEL SHORING ERECTOR, SAW FILER KINGS COUNTY

$47.77$31.49$79.26Agreement
CARPENTERS: JOURNEYMAN CARPENTER (KINGS COUNTY)$47.62$31.49$79.11Agreement
CARPENTERS: MILLWRIGHT (KINGS COUNTY)$50.12$33.08$83.20Agreement
ELEC0006-004 · Electrical Workers (IBEW) agreement, December 1, 2025
SOUND & COMMUNICATIONS…
Full text

SOUND & COMMUNICATIONS: INSTALLER. (SCOPE OF WORK: INCLUDING ANY DATA SYSTEM WHOSE ONLY FUNCTION IS TO TRANSMIT OR RECEIVE INFORMATION; EXCLUDING ALL OTHER DATA SYSTEMS OR MULTIPLE SYSTEMS WHICH INCLUDE CONTROL FUNCTION OR POWER SUPPLY; INCLUSION OR EXCLUSION OF TERMINATIONS AND TESTINGS OF CONDUCTORS DETERMINED BY THEIR FUNCTION; EXCLUDING FIRE ALARM WORK WHEN INSTALLED IN RACEWAYS (INCLUDING WIRE AND CABLE PULLING) AND WHEN PERFORMED ON NEW OR MAJOR REMODEL BUILDING PROJECTS OR JOBS FOR WHICH THE CONDUCTORS FOR THE FIRE ALARM SYSTEM ARE INSTALLED IN CONDUIT; EXCLUDING INSTALLATION OF RACEWAY SYSTEMS, LINE VOLTAGE WORK, INDUSTRIAL WORK, LIFE-SAFETY SYSTEMS (ALL BUILDINGS HAVING FLOORS LOCATED MORE THAN 75' ABOVE THE LOWEST FLOOR LEVEL HAVING BUILDING ACCESS); EXCLUDING ENERGY MANAGEMENT SYSTEMS.) (FOOTNOTE: FIRE ALARM WORK WHEN INSTALLED IN RACEWAYS (INCLUDING WIRE AND CABLE PULLING), ON PROJECTS WHICH INVOLVE NEW OR MAJOR REMODEL BUILDING CONSTRUCTION, FOR WHICH THE CONDUCTORS FOR THE FIRE ALARM SYSTEM ARE INSTALLED IN THE CONDUIT, SHALL BE PERFORMED BY THE INSIDE ELECTRICIAN.) (SAN FRANCISCO COUNTY)

$58.83$31.51$90.34Agreement
SOUND & COMMUNICATIONS…
Full text

SOUND & COMMUNICATIONS: TECHNICIAN (SCOPE OF WORK: INCLUDING ANY DATA SYSTEM WHOSE ONLY FUNCTION IS TO TRANSMIT OR RECEIVE INFORMATION; EXCLUDING ALL OTHER DATA SYSTEMS OR MULTIPLE SYSTEMS WHICH INCLUDE CONTROL FUNCTION OR POWER SUPPLY; INCLUSION OR EXCLUSION OF TERMINATIONS AND TESTINGS OF CONDUCTORS DETERMINED BY THEIR FUNCTION; EXCLUDING FIRE ALARM WORK WHEN INSTALLED IN RACEWAYS (INCLUDING WIRE AND CABLE PULLING) AND WHEN PERFORMED ON NEW OR MAJOR REMODEL BUILDING PROJECTS OR JOBS FOR WHICH THE CONDUCTORS FOR THE FIRE ALARM SYSTEM ARE INSTALLED IN CONDUIT; EXCLUDING INSTALLATION OF RACEWAY SYSTEMS, LINE VOLTAGE WORK, INDUSTRIAL WORK, LIFE-SAFETY SYSTEMS (ALL BUILDINGS HAVING FLOORS LOCATED MORE THAN 75' ABOVE THE LOWEST FLOOR LEVEL HAVING BUILDING ACCESS); EXCLUDING ENERGY MANAGEMENT SYSTEMS.) (FOOTNOTE: FIRE ALARM WORK WHEN INSTALLED IN RACEWAYS (INCLUDING WIRE AND CABLE PULLING), ON PROJECTS WHICH INVOLVE NEW OR MAJOR REMODEL BUILDING CONSTRUCTION, FOR WHICH THE CONDUCTORS FOR THE FIRE ALARM SYSTEM ARE INSTALLED IN THE CONDUIT, SHALL BE PERFORMED BY THE INSIDE ELECTRICIAN.) (SAN FRANCISCO COUNTY) (SAN FRANCISCO COUNTY)

$67.65$31.78$99.43Agreement
ELEC0006-007 · Electrical Workers (IBEW) agreement, June 1, 2024
ELECTRICIAN (SAN FRANCISCO COUNTY)$91.25$48.05$139.30Agreement
ELEC0100-002 · Electrical Workers (IBEW) agreement, September 1, 2025
ELECTRICIAN (FRESNO, KINGS, AND MADERA COUNTIES)$50.00$30.15$80.15Agreement
ELEC0100-005 · Electrical Workers (IBEW) agreement, December 1, 2024
COMMUNICATIONS SYSTEM…
Full text

COMMUNICATIONS SYSTEM: INSTALLER (SCOPE OF WORK: INCLUDES THE INSTALLATION TESTING, SERVICE AND MAINTENANCE, OF THE FOLLOWING SYSTEMS WHICH UTILIZE THE TRANSMISSION AND/OR TRANSFERENCE OF VOICE, SOUND, VISION AND DIGITAL FOR COMMERCIAL, EDUCATION, SECURITY AND ENTERTAINMENT PURPOSES FOR THE FOLLOWING: TV MONITORING AND SURVEILLANCE, BACKGROUND-FOREGROUND MUSIC, INTERCOM AND TELEPHONE INTERCONNECT, INVENTORY CONTROL SYSTEMS, MICROWAVE TRANSMISSION, MULTI-MEDIA, MULTIPLEX, NURSE CALL SYSTEM, RADIO PAGE, SCHOOL INTERCOM AND SOUND, BURGLAR ALARMS, AND LOW VOLTAGE MASTER CLOCK SYSTEMS. A. SOUND AND VOICE TRANSMISSION/TRANSFERENCE SYSTEMS BACKGROUND FOREGROUND MUSIC, INTERCOM AND TELEPHONE INTERCONNECT SYSTEMS, TELEPHONE SYSTEMS NURSE CALL SYSTEMS, RADIO PAGE SYSTEMS, SCHOOL INTERCOM AND SOUND SYSTEMS, BURGLAR ALARM SYSTEMS, LOW VOLTAGE, MASTER CLOCK SYSTEMS, MULTI-MEDIA/MULTIPLEX SYSTEMS, SOUND AND MUSICAL ENTERTAINMENT SYSTEMS, RF SYSTEMS, ANTENNAS AND WAVE GUIDE. B. FIRE ALARM SYSTEMS INSTALLATION, WIRE PULLING AND TESTING. C. TELEVISION AND VIDEO SYSTEMS TELEVISION MONITORING AND SURVEILLANCE SYSTEMS VIDEO SECURITY SYSTEMS, VIDEO ENTERTAINMENT SYSTEMS, VIDEO EDUCATIONAL SYSTEMS, MICROWAVE TRANSMISSION SYSTEMS, CATV AND CCTV. D. SECURITY SYSTEMS PERIMETER SECURITY SYSTEMS VIBRATION SENSOR SYSTEMS CARD ACCESS SYSTEMS ACCESS CONTROL SYSTEMS, SONAR/INFRARED MONITORING EQUIPMENT. E. COMMUNICATIONS SYSTEMS THAT TRANSMIT OR RECEIVE INFORMATION AND/OR CONTROL SYSTEMS THAT ARE INTRINSIC TO THE ABOVE LISTED SYSTEMS SCADA (SUPERVISORY CONTROL AND DATA ACQUISITION) PCM (PULSE CODE MODULATION) INVENTORY CONTROL SYSTEMS, DIGITAL DATA SYSTEMS BROADBAND AND BASEBAND AND CARRIERS POINT OF SALE SYSTEMS, VSAT DATA SYSTEMS DATA COMMUNICATION SYSTEMS RF AND REMOTE CONTROL SYSTEMS, FIBER OPTIC DATA SYSTEMS. WORK EXCLUDED RACEWAY SYSTEMS ARE NOT COVERED (EXCLUDING LADDER-RACK FOR THE PURPOSE OF THE ABOVE LISTED SYSTEMS). CHASES AND/OR NIPPLES (NOT TO EXCEED 10 FEET) MAY BE INSTALLED ON OPEN WIRING SYSTEMS. ENERGY MANAGEMENT SYSTEMS. SCADA (SUPERVISORY CONTROL AND DATA ACQUISITION) WHEN NOT INTRINSIC TO THE ABOVE LISTED SYSTEMS (IN THE SCOPE). FIRE ALARM SYSTEMS WHEN INSTALLED IN RACEWAYS (INCLUDING WIRE AND CABLE PULLING) SHALL BE PERFORMED AT THE ELECTRICIAN WAGE RATE, WHEN EITHER OF THE FOLLOWING TWO (2) CONDITIONS APPLY: 1. THE PROJECT INVOLVES NEW OR MAJOR REMODEL BUILDING TRADES CONSTRUCTION. 2. THE CONDUCTORS FOR THE FIRE ALARM SYSTEM ARE INSTALLED IN CONDUIT.) (FRESNO, KINGS, MADERA)

$45.28$28.01$73.29Agreement
COMMUNICATIONS SYSTEM…
Full text

COMMUNICATIONS SYSTEM: TECHNICIAN (SCOPE OF WORK: INCLUDES THE INSTALLATION TESTING, SERVICE AND MAINTENANCE, OF THE FOLLOWING SYSTEMS WHICH UTILIZE THE TRANSMISSION AND/OR TRANSFERENCE OF VOICE, SOUND, VISION AND DIGITAL FOR COMMERCIAL, EDUCATION, SECURITY AND ENTERTAINMENT PURPOSES FOR THE FOLLOWING: TV MONITORING AND SURVEILLANCE, BACKGROUND-FOREGROUND MUSIC, INTERCOM AND TELEPHONE INTERCONNECT, INVENTORY CONTROL SYSTEMS, MICROWAVE TRANSMISSION, MULTI-MEDIA, MULTIPLEX, NURSE CALL SYSTEM, RADIO PAGE, SCHOOL INTERCOM AND SOUND, BURGLAR ALARMS, AND LOW VOLTAGE MASTER CLOCK SYSTEMS. A. SOUND AND VOICE TRANSMISSION/TRANSFERENCE SYSTEMS BACKGROUND FOREGROUND MUSIC, INTERCOM AND TELEPHONE INTERCONNECT SYSTEMS, TELEPHONE SYSTEMS NURSE CALL SYSTEMS, RADIO PAGE SYSTEMS, SCHOOL INTERCOM AND SOUND SYSTEMS, BURGLAR ALARM SYSTEMS, LOW VOLTAGE, MASTER CLOCK SYSTEMS, MULTI-MEDIA/MULTIPLEX SYSTEMS, SOUND AND MUSICAL ENTERTAINMENT SYSTEMS, RF SYSTEMS, ANTENNAS AND WAVE GUIDE. B. FIRE ALARM SYSTEMS INSTALLATION, WIRE PULLING AND TESTING. C. TELEVISION AND VIDEO SYSTEMS TELEVISION MONITORING AND SURVEILLANCE SYSTEMS VIDEO SECURITY SYSTEMS, VIDEO ENTERTAINMENT SYSTEMS, VIDEO EDUCATIONAL SYSTEMS, MICROWAVE TRANSMISSION SYSTEMS, CATV AND CCTV. D. SECURITY SYSTEMS PERIMETER SECURITY SYSTEMS VIBRATION SENSOR SYSTEMS CARD ACCESS SYSTEMS ACCESS CONTROL SYSTEMS, SONAR/INFRARED MONITORING EQUIPMENT. E. COMMUNICATIONS SYSTEMS THAT TRANSMIT OR RECEIVE INFORMATION AND/OR CONTROL SYSTEMS THAT ARE INTRINSIC TO THE ABOVE LISTED SYSTEMS SCADA (SUPERVISORY CONTROL AND DATA ACQUISITION) PCM (PULSE CODE MODULATION) INVENTORY CONTROL SYSTEMS, DIGITAL DATA SYSTEMS BROADBAND AND BASEBAND AND CARRIERS POINT OF SALE SYSTEMS, VSAT DATA SYSTEMS DATA COMMUNICATION SYSTEMS RF AND REMOTE CONTROL SYSTEMS, FIBER OPTIC DATA SYSTEMS. WORK EXCLUDED RACEWAY SYSTEMS ARE NOT COVERED (EXCLUDING LADDER-RACK FOR THE PURPOSE OF THE ABOVE LISTED SYSTEMS). CHASES AND/OR NIPPLES (NOT TO EXCEED 10 FEET) MAY BE INSTALLED ON OPEN WIRING SYSTEMS. ENERGY MANAGEMENT SYSTEMS. SCADA (SUPERVISORY CONTROL AND DATA ACQUISITION) WHEN NOT INTRINSIC TO THE ABOVE LISTED SYSTEMS (IN THE SCOPE). FIRE ALARM SYSTEMS WHEN INSTALLED IN RACEWAYS (INCLUDING WIRE AND CABLE PULLING) SHALL BE PERFORMED AT THE ELECTRICIAN WAGE RATE, WHEN EITHER OF THE FOLLOWING TWO (2) CONDITIONS APPLY: 1. THE PROJECT INVOLVES NEW OR MAJOR REMODEL BUILDING TRADES CONSTRUCTION. 2. THE CONDUCTORS FOR THE FIRE ALARM SYSTEM ARE INSTALLED IN CONDUIT.) (FRESNO, KINGS, MADERA)

$52.07$28.21$80.28Agreement
ELEC0234-001 · Electrical Workers (IBEW) agreement, December 30, 2025
ELECTRICIAN ZONE A…
Full text

ELECTRICIAN ZONE A : ALL OF SANTA CRUZ, MONTEREY, AND SAN BENITO COUNTIES WITHIN 25 AIR MILES OF HIGHWAY 1 AND DOLAN ROAD IN MOSS LANDING, AND AN AREA EXTENDING 5 MILES EAST AND WEST OF HIGHWAY 101 SOUTH TO THE SAN LUIS OBISPO COUNTY LINE (MONTEREY, SAN BENITO AND SANTA CRUZ COUNTIES)

$70.41$33.76$104.17Agreement
ELECTRICIAN ZONE B…
Full text

ELECTRICIAN ZONE B: ANY AREA OUTSIDE OF ZONE A (MONTEREY, SAN BENITO AND SANTA CRUZ COUNTIES)

$77.45$33.97$111.42Agreement
ELEC0234-003 · Electrical Workers (IBEW) agreement, December 1, 2021
SOUND & COMMUNICATIONS…
Full text

SOUND & COMMUNICATIONS: INSTALLER (SCOPE OF WORK: INCLUDING ANY DATA SYSTEM WHOSE ONLY FUNCTION IS TO TRANSMIT OR RECEIVE INFORMATION; EXCLUDING ALL OTHER DATA SYSTEMS OR MULTIPLE SYSTEMS WHICH INCLUDE CONTROL FUNCTION OR POWER SUPPLY; INCLUSION OR EXCLUSION OF TERMINATIONS AND TESTINGS OF CONDUCTORS DETERMINED BY THEIR FUNCTION; EXCLUDING FIRE ALARM WORK WHEN INSTALLED IN RACEWAYS (INCLUDING WIRE AND CABLE PULLING) AND WHEN PERFORMED ON NEW OR MAJOR REMODEL BUILDING PROJECTS OR JOBS FOR WHICH THE CONDUCTORS FOR THE FIRE ALARM SYSTEM ARE INSTALLED IN CONDUIT; EXCLUDING INSTALLATION OF RACEWAY SYSTEMS, LINE VOLTAGE WORK, INDUSTRIAL WORK, LIFE-SAFETY SYSTEMS (ALL BUILDINGS HAVING FLOORS LOCATED MORE THAN 75' ABOVE THE LOWEST FLOOR LEVEL HAVING BUILDING ACCESS); EXCLUDING ENERGY MANAGEMENT SYSTEMS.) (FOOTNOTE: FIRE ALARM WORK WHEN INSTALLED IN RACEWAYS (INCLUDING WIRE AND CABLE PULLING), ON PROJECTS WHICH INVOLVE NEW OR MAJOR REMODEL BUILDING CONSTRUCTION, FOR WHICH THE CONDUCTORS FOR THE FIRE ALARM SYSTEM ARE INSTALLED IN THE CONDUIT, SHALL BE PERFORMED BY THE INSIDE ELECTRICIAN.) (MONTEREY, SAN BENITO, AND SANTA CRUZ COUNTIES)

$47.93$24.09$72.02Agreement
SOUND & COMMUNICATIONS…
Full text

SOUND & COMMUNICATIONS: TECHNICIAN (SCOPE OF WORK: INCLUDING ANY DATA SYSTEM WHOSE ONLY FUNCTION IS TO TRANSMIT OR RECEIVE INFORMATION; EXCLUDING ALL OTHER DATA SYSTEMS OR MULTIPLE SYSTEMS WHICH INCLUDE CONTROL FUNCTION OR POWER SUPPLY; INCLUSION OR EXCLUSION OF TERMINATIONS AND TESTINGS OF CONDUCTORS DETERMINED BY THEIR FUNCTION; EXCLUDING FIRE ALARM WORK WHEN INSTALLED IN RACEWAYS (INCLUDING WIRE AND CABLE PULLING) AND WHEN PERFORMED ON NEW OR MAJOR REMODEL BUILDING PROJECTS OR JOBS FOR WHICH THE CONDUCTORS FOR THE FIRE ALARM SYSTEM ARE INSTALLED IN CONDUIT; EXCLUDING INSTALLATION OF RACEWAY SYSTEMS, LINE VOLTAGE WORK, INDUSTRIAL WORK, LIFE-SAFETY SYSTEMS (ALL BUILDINGS HAVING FLOORS LOCATED MORE THAN 75' ABOVE THE LOWEST FLOOR LEVEL HAVING BUILDING ACCESS); EXCLUDING ENERGY MANAGEMENT SYSTEMS.) (FOOTNOTE: FIRE ALARM WORK WHEN INSTALLED IN RACEWAYS (INCLUDING WIRE AND CABLE PULLING), ON PROJECTS WHICH INVOLVE NEW OR MAJOR REMODEL BUILDING CONSTRUCTION, FOR WHICH THE CONDUCTORS FOR THE FIRE ALARM SYSTEM ARE INSTALLED IN THE CONDUIT, SHALL BE PERFORMED BY THE INSIDE ELECTRICIAN.) (MONTEREY, SAN BENITO, AND SANTA CRUZ COUNTIES)

$55.12$24.30$79.42Agreement
ELEC0302-001 · Electrical Workers (IBEW) agreement, March 1, 2025
CABLE SPLICER (CONTRA COSTA COUNTY)$74.54$36.09$110.63Agreement
ELECTRICIAN (CONTRA COSTA COUNTY)$66.26$35.84$102.10Agreement
ELEC0302-003 · Electrical Workers (IBEW) agreement, December 1, 2025
SOUND & COMMUNICATIONS…
Full text

SOUND & COMMUNICATIONS: INSTALLER (SCOPE OF WORK: INCLUDING ANY DATA SYSTEM WHOSE ONLY FUNCTION IS TO TRANSMIT OR RECEIVE INFORMATION; EXCLUDING ALL OTHER DATA SYSTEMS OR MULTIPLE SYSTEMS WHICH INCLUDE CONTROL FUNCTION OR POWER SUPPLY; INCLUSION OR EXCLUSION OF TERMINATIONS AND TESTINGS OF CONDUCTORS DETERMINED BY THEIR FUNCTION; EXCLUDING FIRE ALARM WORK WHEN INSTALLED IN RACEWAYS (INCLUDING WIRE AND CABLE PULLING) AND WHEN PERFORMED ON NEW OR MAJOR REMODEL BUILDING PROJECTS OR JOBS FOR WHICH THE CONDUCTORS FOR THE FIRE ALARM SYSTEM ARE INSTALLED IN CONDUIT; EXCLUDING INSTALLATION OF RACEWAY SYSTEMS, LINE VOLTAGE WORK, INDUSTRIAL WORK, LIFE-SAFETY SYSTEMS (ALL BUILDINGS HAVING FLOORS LOCATED MORE THAN 75' ABOVE THE LOWEST FLOOR LEVEL HAVING BUILDING ACCESS); EXCLUDING ENERGY MANAGEMENT SYSTEMS.) (FOOTNOTE: FIRE ALARM WORK WHEN INSTALLED IN RACEWAYS (INCLUDING WIRE AND CABLE PULLING), ON PROJECTS WHICH INVOLVE NEW OR MAJOR REMODEL BUILDING CONSTRUCTION, FOR WHICH THE CONDUCTORS FOR THE FIRE ALARM SYSTEM ARE INSTALLED IN THE CONDUIT, SHALL BE PERFORMED BY THE INSIDE ELECTRICIAN.) (CONTRA COSTA COUNTY)

$53.08$30.84$83.92Agreement
SOUND & COMMUNICATIONS…
Full text

SOUND & COMMUNICATIONS: TECHNICIAN (SCOPE OF WORK: INCLUDING ANY DATA SYSTEM WHOSE ONLY FUNCTION IS TO TRANSMIT OR RECEIVE INFORMATION; EXCLUDING ALL OTHER DATA SYSTEMS OR MULTIPLE SYSTEMS WHICH INCLUDE CONTROL FUNCTION OR POWER SUPPLY; INCLUSION OR EXCLUSION OF TERMINATIONS AND TESTINGS OF CONDUCTORS DETERMINED BY THEIR FUNCTION; EXCLUDING FIRE ALARM WORK WHEN INSTALLED IN RACEWAYS (INCLUDING WIRE AND CABLE PULLING) AND WHEN PERFORMED ON NEW OR MAJOR REMODEL BUILDING PROJECTS OR JOBS FOR WHICH THE CONDUCTORS FOR THE FIRE ALARM SYSTEM ARE INSTALLED IN CONDUIT; EXCLUDING INSTALLATION OF RACEWAY SYSTEMS, LINE VOLTAGE WORK, INDUSTRIAL WORK, LIFE-SAFETY SYSTEMS (ALL BUILDINGS HAVING FLOORS LOCATED MORE THAN 75' ABOVE THE LOWEST FLOOR LEVEL HAVING BUILDING ACCESS); EXCLUDING ENERGY MANAGEMENT SYSTEMS.) (FOOTNOTE: FIRE ALARM WORK WHEN INSTALLED IN RACEWAYS (INCLUDING WIRE AND CABLE PULLING), ON PROJECTS WHICH INVOLVE NEW OR MAJOR REMODEL BUILDING CONSTRUCTION, FOR WHICH THE CONDUCTORS FOR THE FIRE ALARM SYSTEM ARE INSTALLED IN THE CONDUIT, SHALL BE PERFORMED BY THE INSIDE ELECTRICIAN.) (CONTRA COSTA COUNTY)

$61.04$31.08$92.12Agreement
ELEC0332-001 · Electrical Workers (IBEW) agreement, June 1, 2025
CABLE SPLICER (FOOTNOTES…
Full text

CABLE SPLICER (FOOTNOTES: WORK UNDER COMPRESSED AIR OR WHERE GAS MASKS ARE REQUIRED, ORWORK ON LADDERS, SCAFFOLDS, STACKS, ""BOSUN'S CHAIRS,"" OR OTHER STRUCTURES AND WHERE THE WORKERS ARE NOT PROTECTED BY PERMANENT GUARD RAILS AT A DISTANCE OF 40 TO 60 FT. FROM THE GROUND OR SUPPORTING STRUCTURES: TO BE PAID ONE AND ONE-HALF TIMES THE STRAIGHT-TIME RATE OF PAY. WORK ON STRUCTURES OF 60 FT. OR OVER (AS DESCRIBED ABOVE): TO BE PAID TWICE THE STRAIGHT-TIME RATE OF PAY.) (SANTA CLARA COUNTY)

$104.68$49.46$154.14Agreement
ELECTRICIAN (FOOTNOTES…
Full text

ELECTRICIAN (FOOTNOTES: WORK UNDER COMPRESSED AIR OR WHERE GAS MASKS ARE REQUIRED, ORWORK ON LADDERS, SCAFFOLDS, STACKS, ""BOSUN'S CHAIRS,"" OR OTHER STRUCTURES AND WHERE THE WORKERS ARE NOT PROTECTED BY PERMANENT GUARD RAILS AT A DISTANCE OF 40 TO 60 FT. FROM THE GROUND OR SUPPORTING STRUCTURES: TO BE PAID ONE AND ONE-HALF TIMES THE STRAIGHT-TIME RATE OF PAY. WORK ON STRUCTURES OF 60 FT. OR OVER (AS DESCRIBED ABOVE): TO BE PAID TWICE THE STRAIGHT-TIME RATE OF PAY.) (SANTA CLARA COUNTY)

$91.03$49.05$140.08Agreement
ELEC0332-003 · Electrical Workers (IBEW) agreement, December 1, 2025
SOUND & COMMUNICATIONS…
Full text

SOUND & COMMUNICATIONS: INSTALLER (SCOPE OF WORK: INCLUDING ANY DATA SYSTEM WHOSE ONLY FUNCTION IS TO TRANSMIT OR RECEIVE INFORMATION; EXCLUDING ALL OTHER DATA SYSTEMS OR MULTIPLE SYSTEMS WHICH INCLUDE CONTROL FUNCTION OR POWER SUPPLY; INCLUSION OR EXCLUSION OF TERMINATIONS AND TESTINGS OF CONDUCTORS DETERMINED BY THEIR FUNCTION; EXCLUDING FIRE ALARM WORK WHEN INSTALLED IN RACEWAYS (INCLUDING WIRE AND CABLE PULLING) AND WHEN PERFORMED ON NEW OR MAJOR REMODEL BUILDING PROJECTS OR JOBS FOR WHICH THE CONDUCTORS FOR THE FIRE ALARM SYSTEM ARE INSTALLED IN CONDUIT; EXCLUDING INSTALLATION OF RACEWAY SYSTEMS, LINE VOLTAGE WORK, INDUSTRIAL WORK, LIFE-SAFETY SYSTEMS (ALL BUILDINGS HAVING FLOORS LOCATED MORE THAN 75' ABOVE THE LOWEST FLOOR LEVEL HAVING BUILDING ACCESS); EXCLUDING ENERGY MANAGEMENT SYSTEMS.) (FOOTNOTE: FIRE ALARM WORK WHEN INSTALLED IN RACEWAYS (INCLUDING WIRE AND CABLE PULLING), ON PROJECTS WHICH INVOLVE NEW OR MAJOR REMODEL BUILDING CONSTRUCTION, FOR WHICH THE CONDUCTORS FOR THE FIRE ALARM SYSTEM ARE INSTALLED IN THE CONDUIT, SHALL BE PERFORMED BY THE INSIDE ELECTRICIAN.) (SANTA CLARA COUNTY)

$58.33$31.00$89.33Agreement
SOUND & COMMUNICATIONS…
Full text

SOUND & COMMUNICATIONS: TECHNICIAN (SCOPE OF WORK: INCLUDING ANY DATA SYSTEM WHOSE ONLY FUNCTION IS TO TRANSMIT OR RECEIVE INFORMATION; EXCLUDING ALL OTHER DATA SYSTEMS OR MULTIPLE SYSTEMS WHICH INCLUDE CONTROL FUNCTION OR POWER SUPPLY; INCLUSION OR EXCLUSION OF TERMINATIONS AND TESTINGS OF CONDUCTORS DETERMINED BY THEIR FUNCTION; EXCLUDING FIRE ALARM WORK WHEN INSTALLED IN RACEWAYS (INCLUDING WIRE AND CABLE PULLING) AND WHEN PERFORMED ON NEW OR MAJOR REMODEL BUILDING PROJECTS OR JOBS FOR WHICH THE CONDUCTORS FOR THE FIRE ALARM SYSTEM ARE INSTALLED IN CONDUIT; EXCLUDING INSTALLATION OF RACEWAY SYSTEMS, LINE VOLTAGE WORK, INDUSTRIAL WORK, LIFE-SAFETY SYSTEMS (ALL BUILDINGS HAVING FLOORS LOCATED MORE THAN 75' ABOVE THE LOWEST FLOOR LEVEL HAVING BUILDING ACCESS); EXCLUDING ENERGY MANAGEMENT SYSTEMS.) (FOOTNOTE: FIRE ALARM WORK WHEN INSTALLED IN RACEWAYS (INCLUDING WIRE AND CABLE PULLING), ON PROJECTS WHICH INVOLVE NEW OR MAJOR REMODEL BUILDING CONSTRUCTION, FOR WHICH THE CONDUCTORS FOR THE FIRE ALARM SYSTEM ARE INSTALLED IN THE CONDUIT, SHALL BE PERFORMED BY THE INSIDE ELECTRICIAN.) (SANTA CLARA COUNTY)

$67.08$31.26$98.34Agreement
ELEC0595-001 · Electrical Workers (IBEW) agreement, June 1, 2025
CABLE SPLICER (ALAMEDA COUNTY)$87.40$49.41$136.81Agreement
ELECTRICIAN (ALAMEDA COUNTY)$76.00$49.07$125.07Agreement
ELEC0595-002 · Electrical Workers (IBEW) agreement, June 1, 2024
CABLE SPLICER (CALAVERAS AND SAN JOAQUIN COUNTIES)$59.34$32.26$91.60Agreement
ELECTRICIAN: ALL OTHER WORK (CALAVERAS AND SAN JOAQUIN COUNTIES)$49.45$31.96$81.41Agreement
ELECTRICIAN: TUNNEL WORK (CALAVERAS AND SAN JOAQUIN COUNTIES)$51.92$32.04$83.96Agreement
ELEC0595-006 · Electrical Workers (IBEW) agreement, December 1, 2025
SOUND & COMMUNICATIONS…
Full text

SOUND & COMMUNICATIONS: INSTALLER (SCOPE OF WORK: INCLUDING ANY DATA SYSTEM WHOSE ONLY FUNCTION IS TO TRANSMIT OR RECEIVE INFORMATION; EXCLUDING ALL OTHER DATA SYSTEMS OR MULTIPLE SYSTEMS WHICH INCLUDE CONTROL FUNCTION OR POWER SUPPLY; INCLUSION OR EXCLUSION OF TERMINATIONS AND TESTINGS OF CONDUCTORS DETERMINED BY THEIR FUNCTION; EXCLUDING FIRE ALARM WORK WHEN INSTALLED IN RACEWAYS (INCLUDING WIRE AND CABLE PULLING) AND WHEN PERFORMED ON NEW OR MAJOR REMODEL BUILDING PROJECTS OR JOBS FOR WHICH THE CONDUCTORS FOR THE FIRE ALARM SYSTEM ARE INSTALLED IN CONDUIT; EXCLUDING INSTALLATION OF RACEWAY SYSTEMS, LINE VOLTAGE WORK, INDUSTRIAL WORK, LIFE-SAFETY SYSTEMS (ALL BUILDINGS HAVING FLOORS LOCATED MORE THAN 75' ABOVE THE LOWEST FLOOR LEVEL HAVING BUILDING ACCESS); EXCLUDING ENERGY MANAGEMENT SYSTEMS.) (FOOTNOTE: FIRE ALARM WORK WHEN INSTALLED IN RACEWAYS (INCLUDING WIRE AND CABLE PULLING), ON PROJECTS WHICH INVOLVE NEW OR MAJOR REMODEL BUILDING CONSTRUCTION, FOR WHICH THE CONDUCTORS FOR THE FIRE ALARM SYSTEM ARE INSTALLED IN THE CONDUIT, SHALL BE PERFORMED BY THE INSIDE ELECTRICIAN.) (ALAMEDA COUNTY)

$58.33$31.00$89.33Agreement
SOUND & COMMUNICATIONS…
Full text

SOUND & COMMUNICATIONS: TECHNICIAN (SCOPE OF WORK: INCLUDING ANY DATA SYSTEM WHOSE ONLY FUNCTION IS TO TRANSMIT OR RECEIVE INFORMATION; EXCLUDING ALL OTHER DATA SYSTEMS OR MULTIPLE SYSTEMS WHICH INCLUDE CONTROL FUNCTION OR POWER SUPPLY; INCLUSION OR EXCLUSION OF TERMINATIONS AND TESTINGS OF CONDUCTORS DETERMINED BY THEIR FUNCTION; EXCLUDING FIRE ALARM WORK WHEN INSTALLED IN RACEWAYS (INCLUDING WIRE AND CABLE PULLING) AND WHEN PERFORMED ON NEW OR MAJOR REMODEL BUILDING PROJECTS OR JOBS FOR WHICH THE CONDUCTORS FOR THE FIRE ALARM SYSTEM ARE INSTALLED IN CONDUIT; EXCLUDING INSTALLATION OF RACEWAY SYSTEMS, LINE VOLTAGE WORK, INDUSTRIAL WORK, LIFE-SAFETY SYSTEMS (ALL BUILDINGS HAVING FLOORS LOCATED MORE THAN 75' ABOVE THE LOWEST FLOOR LEVEL HAVING BUILDING ACCESS); EXCLUDING ENERGY MANAGEMENT SYSTEMS.) (FOOTNOTE: FIRE ALARM WORK WHEN INSTALLED IN RACEWAYS (INCLUDING WIRE AND CABLE PULLING), ON PROJECTS WHICH INVOLVE NEW OR MAJOR REMODEL BUILDING CONSTRUCTION, FOR WHICH THE CONDUCTORS FOR THE FIRE ALARM SYSTEM ARE INSTALLED IN THE CONDUIT, SHALL BE PERFORMED BY THE INSIDE ELECTRICIAN.) (ALAMEDA COUNTY)

$67.08$31.26$98.34Agreement
ELEC0595-008 · Electrical Workers (IBEW) agreement, December 1, 2024
COMMUNICATIONS SYSTEM…
Full text

COMMUNICATIONS SYSTEM: INSTALLER (SCOPE OF WORK: INCLUDING ANY DATA SYSTEM WHOSE ONLY FUNCTION IS TO TRANSMIT OR RECEIVE INFORMATION; EXCLUDING ALL OTHER DATA SYSTEMS OR MULTIPLE SYSTEMS WHICH INCLUDE CONTROL FUNCTION OR POWER SUPPLY; INCLUSION OR EXCLUSION OF TERMINATIONS AND TESTINGS OF CONDUCTORS DETERMINED BY THEIR FUNCTION; EXCLUDING FIRE ALARM WORK WHEN INSTALLED IN RACEWAYS (INCLUDING WIRE AND CABLE PULLING) AND WHEN PERFORMED ON NEW OR MAJOR REMODEL BUILDING PROJECTS OR JOBS FOR WHICH THE CONDUCTORS FOR THE FIRE ALARM SYSTEM ARE INSTALLED IN CONDUIT; EXCLUDING INSTALLATION OF RACEWAY SYSTEMS, LINE VOLTAGE WORK, INDUSTRIAL WORK, LIFE-SAFETY SYSTEMS (ALL BUILDINGS HAVING FLOORS LOCATED MORE THAN 75' ABOVE THE LOWEST FLOOR LEVEL HAVING BUILDING ACCESS); EXCLUDING ENERGY MANAGEMENT SYSTEMS.) (FOOTNOTE: FIRE ALARM WORK WHEN INSTALLED IN RACEWAYS (INCLUDING WIRE AND CABLE PULLING), ON PROJECTS WHICH INVOLVE NEW OR MAJOR REMODEL BUILDING CONSTRUCTION, FOR WHICH THE CONDUCTORS FOR THE FIRE ALARM SYSTEM ARE INSTALLED IN THE CONDUIT, SHALL BE PERFORMED BY THE INSIDE ELECTRICIAN.) (CALAVERAS AND SAN JOAQUIN COUNTIES)

$45.28$28.01$73.29Agreement
COMMUNICATIONS SYSTEM…
Full text

COMMUNICATIONS SYSTEM: TECHNICIAN (SCOPE OF WORK: INCLUDING ANY DATA SYSTEM WHOSE ONLY FUNCTION IS TO TRANSMIT OR RECEIVE INFORMATION; EXCLUDING ALL OTHER DATA SYSTEMS OR MULTIPLE SYSTEMS WHICH INCLUDE CONTROL FUNCTION OR POWER SUPPLY; INCLUSION OR EXCLUSION OF TERMINATIONS AND TESTINGS OF CONDUCTORS DETERMINED BY THEIR FUNCTION; EXCLUDING FIRE ALARM WORK WHEN INSTALLED IN RACEWAYS (INCLUDING WIRE AND CABLE PULLING) AND WHEN PERFORMED ON NEW OR MAJOR REMODEL BUILDING PROJECTS OR JOBS FOR WHICH THE CONDUCTORS FOR THE FIRE ALARM SYSTEM ARE INSTALLED IN CONDUIT; EXCLUDING INSTALLATION OF RACEWAY SYSTEMS, LINE VOLTAGE WORK, INDUSTRIAL WORK, LIFE-SAFETY SYSTEMS (ALL BUILDINGS HAVING FLOORS LOCATED MORE THAN 75' ABOVE THE LOWEST FLOOR LEVEL HAVING BUILDING ACCESS); EXCLUDING ENERGY MANAGEMENT SYSTEMS.) (FOOTNOTE: FIRE ALARM WORK WHEN INSTALLED IN RACEWAYS (INCLUDING WIRE AND CABLE PULLING), ON PROJECTS WHICH INVOLVE NEW OR MAJOR REMODEL BUILDING CONSTRUCTION, FOR WHICH THE CONDUCTORS FOR THE FIRE ALARM SYSTEM ARE INSTALLED IN THE CONDUIT, SHALL BE PERFORMED BY THE INSIDE ELECTRICIAN.) (CALAVERAS AND SAN JOAQUIN COUNTIES)

$52.07$28.21$80.28Agreement
ELEC0617-001 · Electrical Workers (IBEW) agreement, June 1, 2025
ELECTRICIAN (SAN MATEO COUNTY)$86.00$51.07$137.07Agreement
ELEC0617-003 · Electrical Workers (IBEW) agreement, December 1, 2025
SOUND & COMMUNICATIONS…
Full text

SOUND & COMMUNICATIONS: INSTALLER (SCOPE OF WORK: INCLUDING ANY DATA SYSTEM WHOSE ONLY FUNCTION IS TO TRANSMIT OR RECEIVE INFORMATION; EXCLUDING ALL OTHER DATA SYSTEMS OR MULTIPLE SYSTEMS WHICH INCLUDE CONTROL FUNCTION OR POWER SUPPLY; INCLUSION OR EXCLUSION OF TERMINATIONS AND TESTINGS OF CONDUCTORS DETERMINED BY THEIR FUNCTION; EXCLUDING FIRE ALARM WORK WHEN INSTALLED IN RACEWAYS (INCLUDING WIRE AND CABLE PULLING) AND WHEN PERFORMED ON NEW OR MAJOR REMODEL BUILDING PROJECTS OR JOBS FOR WHICH THE CONDUCTORS FOR THE FIRE ALARM SYSTEM ARE INSTALLED IN CONDUIT; EXCLUDING INSTALLATION OF RACEWAY SYSTEMS, LINE VOLTAGE WORK, INDUSTRIAL WORK, LIFE-SAFETY SYSTEMS (ALL BUILDINGS HAVING FLOORS LOCATED MORE THAN 75' ABOVE THE LOWEST FLOOR LEVEL HAVING BUILDING ACCESS); EXCLUDING ENERGY MANAGEMENT SYSTEMS.) (FOOTNOTE: FIRE ALARM WORK WHEN INSTALLED IN RACEWAYS (INCLUDING WIRE AND CABLE PULLING), ON PROJECTS WHICH INVOLVE NEW OR MAJOR REMODEL BUILDING CONSTRUCTION, FOR WHICH THE CONDUCTORS FOR THE FIRE ALARM SYSTEM ARE INSTALLED IN THE CONDUIT, SHALL BE PERFORMED BY THE INSIDE ELECTRICIAN.) (SAN MATEO COUNTY)

$58.33$31.00$89.33Agreement
SOUND & COMMUNICATIONS…
Full text

SOUND & COMMUNICATIONS: TECHNICIAN (SCOPE OF WORK: INCLUDING ANY DATA SYSTEM WHOSE ONLY FUNCTION IS TO TRANSMIT OR RECEIVE INFORMATION; EXCLUDING ALL OTHER DATA SYSTEMS OR MULTIPLE SYSTEMS WHICH INCLUDE CONTROL FUNCTION OR POWER SUPPLY; INCLUSION OR EXCLUSION OF TERMINATIONS AND TESTINGS OF CONDUCTORS DETERMINED BY THEIR FUNCTION; EXCLUDING FIRE ALARM WORK WHEN INSTALLED IN RACEWAYS (INCLUDING WIRE AND CABLE PULLING) AND WHEN PERFORMED ON NEW OR MAJOR REMODEL BUILDING PROJECTS OR JOBS FOR WHICH THE CONDUCTORS FOR THE FIRE ALARM SYSTEM ARE INSTALLED IN CONDUIT; EXCLUDING INSTALLATION OF RACEWAY SYSTEMS, LINE VOLTAGE WORK, INDUSTRIAL WORK, LIFE-SAFETY SYSTEMS (ALL BUILDINGS HAVING FLOORS LOCATED MORE THAN 75' ABOVE THE LOWEST FLOOR LEVEL HAVING BUILDING ACCESS); EXCLUDING ENERGY MANAGEMENT SYSTEMS.) (FOOTNOTE: FIRE ALARM WORK WHEN INSTALLED IN RACEWAYS (INCLUDING WIRE AND CABLE PULLING), ON PROJECTS WHICH INVOLVE NEW OR MAJOR REMODEL BUILDING CONSTRUCTION, FOR WHICH THE CONDUCTORS FOR THE FIRE ALARM SYSTEM ARE INSTALLED IN THE CONDUIT, SHALL BE PERFORMED BY THE INSIDE ELECTRICIAN.) (SAN MATEO COUNTY)

$67.08$31.26$98.34Agreement
ELEC0684-001 · Electrical Workers (IBEW) agreement, December 1, 2024
ELECTRICIAN (MARIPOSA…
Full text

ELECTRICIAN (MARIPOSA, MERCED, STANISLAUS AND TUOLUMNE COUNTIES) CABLE SPLICER = 110% OF JOURNEYMAN ELECTRICIAN

$48.50$30.09$78.59Agreement
ELEC0684-004 · Electrical Workers (IBEW) agreement, December 1, 2024
COMMUNICATIONS SYSTEM…
Full text

COMMUNICATIONS SYSTEM: INSTALLER (SCOPE OF WORK: INCLUDING ANY DATA SYSTEM WHOSE ONLY FUNCTION IS TO TRANSMIT OR RECEIVE INFORMATION; EXCLUDING ALL OTHER DATA SYSTEMS OR MULTIPLE SYSTEMS WHICH INCLUDE CONTROL FUNCTION OR POWER SUPPLY; INCLUSION OR EXCLUSION OF TERMINATIONS AND TESTINGS OF CONDUCTORS DETERMINED BY THEIR FUNCTION; EXCLUDING FIRE ALARM WORK WHEN INSTALLED IN RACEWAYS (INCLUDING WIRE AND CABLE PULLING) AND WHEN PERFORMED ON NEW OR MAJOR REMODEL BUILDING PROJECTS OR JOBS FOR WHICH THE CONDUCTORS FOR THE FIRE ALARM SYSTEM ARE INSTALLED IN CONDUIT; EXCLUDING INSTALLATION OF RACEWAY SYSTEMS, LINE VOLTAGE WORK, INDUSTRIAL WORK, LIFE-SAFETY SYSTEMS (ALL BUILDINGS HAVING FLOORS LOCATED MORE THAN 75' ABOVE THE LOWEST FLOOR LEVEL HAVING BUILDING ACCESS); EXCLUDING ENERGY MANAGEMENT SYSTEMS.) (FOOTNOTE: FIRE ALARM WORK WHEN INSTALLED IN RACEWAYS (INCLUDING WIRE AND CABLE PULLING), ON PROJECTS WHICH INVOLVE NEW OR MAJOR REMODEL BUILDING CONSTRUCTION, FOR WHICH THE CONDUCTORS FOR THE FIRE ALARM SYSTEM ARE INSTALLED IN THE CONDUIT, SHALL BE PERFORMED BY THE INSIDE ELECTRICIAN.) (MARIPOSA, MERCED, STANISLAUS AND TUOLUMNE COUNTIES)

$45.28$28.01$73.29Agreement
COMMUNICATIONS SYSTEM…
Full text

COMMUNICATIONS SYSTEM: TECHNICIAN (SCOPE OF WORK: INCLUDING ANY DATA SYSTEM WHOSE ONLY FUNCTION IS TO TRANSMIT OR RECEIVE INFORMATION; EXCLUDING ALL OTHER DATA SYSTEMS OR MULTIPLE SYSTEMS WHICH INCLUDE CONTROL FUNCTION OR POWER SUPPLY; INCLUSION OR EXCLUSION OF TERMINATIONS AND TESTINGS OF CONDUCTORS DETERMINED BY THEIR FUNCTION; EXCLUDING FIRE ALARM WORK WHEN INSTALLED IN RACEWAYS (INCLUDING WIRE AND CABLE PULLING) AND WHEN PERFORMED ON NEW OR MAJOR REMODEL BUILDING PROJECTS OR JOBS FOR WHICH THE CONDUCTORS FOR THE FIRE ALARM SYSTEM ARE INSTALLED IN CONDUIT; EXCLUDING INSTALLATION OF RACEWAY SYSTEMS, LINE VOLTAGE WORK, INDUSTRIAL WORK, LIFE-SAFETY SYSTEMS (ALL BUILDINGS HAVING FLOORS LOCATED MORE THAN 75' ABOVE THE LOWEST FLOOR LEVEL HAVING BUILDING ACCESS); EXCLUDING ENERGY MANAGEMENT SYSTEMS.) (FOOTNOTE: FIRE ALARM WORK WHEN INSTALLED IN RACEWAYS (INCLUDING WIRE AND CABLE PULLING), ON PROJECTS WHICH INVOLVE NEW OR MAJOR REMODEL BUILDING CONSTRUCTION, FOR WHICH THE CONDUCTORS FOR THE FIRE ALARM SYSTEM ARE INSTALLED IN THE CONDUIT, SHALL BE PERFORMED BY THE INSIDE ELECTRICIAN.) (MARIPOSA, MERCED, STANISLAUS AND TUOLUMNE COUNTIES)

$52.07$28.21$80.28Agreement
ELEC1245-001 · Electrical Workers (IBEW) agreement, January 1, 2025
LINE CONSTRUCTION…
Full text

LINE CONSTRUCTION: (1) LINEMAN; CABLE SPLICER (HOLIDAYS: NEW YEAR'S DAY, M.L. KING DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS DAY, THANKSGIVING DAY AND DAY AFTER THANKSGIVING, CHRISTMAS DAY)

$70.16$24.71$94.87Agreement
LINE CONSTRUCTION…
Full text

LINE CONSTRUCTION: (2) EQUIPMENT SPECIALIST (OPERATES CRAWLER TRACTORS, COMMERCIAL MOTOR VEHICLES, BACKHOES, TRENCHERS, CRANES (50 TONS AND BELOW), OVERHEAD & UNDERGROUND DISTRIBUTION LINE EQUIPMENT) (HOLIDAYS: NEW YEAR'S DAY, M.L. KING DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS DAY, THANKSGIVING DAY AND DAY AFTER THANKSGIVING, CHRISTMAS DAY)

$53.30$22.26$75.56Agreement
LINE CONSTRUCTION…
Full text

LINE CONSTRUCTION: (3) GROUNDMAN (HOLIDAYS: NEW YEAR'S DAY, M.L. KING DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS DAY, THANKSGIVING DAY AND DAY AFTER THANKSGIVING, CHRISTMAS DAY)

$40.76$21.76$62.52Agreement
ELEV0008-001 · Elevator Constructors agreement, January 1, 2025
ELEVATOR MECHANIC (FOOTNOTE…
Full text

ELEVATOR MECHANIC (FOOTNOTE: ADD TO FRINGE BENEFITS A+B: A. PAID VACATION: EMPLOYER CONTRIBUTES 8% OF REGULAR HOURLY RATE AS VACATION PAY CREDIT FOR EMPLOYEES WITH MORE THAN 5 YEARS OF SERVICE, AND 6% FOR 6 MONTHS TO 5 YEARS OF SERVICE. B.

PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS' DAY, THANKSGIVING DAY, FRIDAY AFTER THANKSGIVING, AND CHRISTMAS DAY.)

$84.05$38.44$122.49Agreement
ENGI0003-001 · Operating Engineers agreement, June 29, 2020
OPERATOR: POWER EQUIPMENT, PILEDRIVING: GROUP 1…
Full text

OPERATOR: POWER EQUIPMENT, PILEDRIVING: GROUP 1 (LIFTING DEVICES)- DERRICK BARGE PEDESTAL MOUNTED OVER 100 TONS; CLAMSHELL OVER 7 CU. YDS.; SELF-PROPELLED BOOM-TYHPE LIFTING DEVICE OVER 100 TONS; TRUCK CRANE OR CRAWLER, LAND OR BARGE MOUNTED OVER 100 TONS

$52.64$31.15$83.79Agreement
OPERATOR: POWER EQUIPMENT, PILEDRIVING: GROUP 1…
Full text

OPERATOR: POWER EQUIPMENT, PILEDRIVING: GROUP 1 (OILER)- DERRICK BARGE PEDESTAL MOUNTED OVER 100 TONS; CLAMSHELL OVER 7 CU. YDS.; SELF-PROPELLED BOOM-TYHPE LIFTING DEVICE OVER 100 TONS; TRUCK CRANE OR CRAWLER, LAND OR BARGE MOUNTED OVER 100 TONS

$43.38$31.15$74.53Agreement
OPERATOR: POWER EQUIPMENT, PILEDRIVING: GROUP 1…
Full text

OPERATOR: POWER EQUIPMENT, PILEDRIVING: GROUP 1 (TRUCK CRANE OILER)- DERRICK BARGE PEDESTAL MOUNTED OVER 100 TONS; CLAMSHELL OVER 7 CU. YDS.; SELF-PROPELLED BOOM-TYHPE LIFTING DEVICE OVER 100 TONS; TRUCK CRANE OR CRAWLER, LAND OR BARGE MOUNTED OVER 100 TONS

$45.66$31.15$76.81Agreement
OPERATOR: POWER EQUIPMENT, PILEDRIVING: GROUP 2…
Full text

OPERATOR: POWER EQUIPMENT, PILEDRIVING: GROUP 2 (LIFTING DEVICES)- DERRICK BARGE PEDESTAL MOUNTED 45 TONS TO AND INCLUDING 100 TONS; CLAMSHELL UP TO AND INCLUDING 7 CU. YDS.; SELF-PROPELLED BOOM-TYPE LIFTING DEVICE OVER 45 TONS; TRUCK CRANE OR CRAWLER, LAND OR BARGE MOUNTED, OVER 45 TONS UP TO AND INCLUDING 100 TONS; FUNDEX F-12 HYDRAULIC PILE RIG

$50.82$31.15$81.97Agreement
OPERATOR: POWER EQUIPMENT, PILEDRIVING: GROUP 2…
Full text

OPERATOR: POWER EQUIPMENT, PILEDRIVING: GROUP 2 (OILER)- DERRICK BARGE PEDESTAL MOUNTED 45 TONS TO AND INCLUDING 100 TONS; CLAMSHELL UP TO AND INCLUDING 7 CU. YDS.; SELF-PROPELLED BOOM-TYPE LIFTING DEVICE OVER 45 TONS; TRUCK CRANE OR CRAWLER, LAND OR BARGE MOUNTED, OVER 45 TONS UP TO AND INCLUDING 100 TONS; FUNDEX F-12 HYDRAULIC PILE RIG

$43.11$31.15$74.26Agreement
OPERATOR: POWER EQUIPMENT, PILEDRIVING: GROUP 2…
Full text

OPERATOR: POWER EQUIPMENT, PILEDRIVING: GROUP 2 (TRUCK CRANE OILER)- DERRICK BARGE PEDESTAL MOUNTED 45 TONS TO AND INCLUDING 100 TONS; CLAMSHELL UP TO AND INCLUDING 7 CU. YDS.; SELF-PROPELLED BOOM-TYPE LIFTING DEVICE OVER 45 TONS; TRUCK CRANE OR CRAWLER, LAND OR BARGE MOUNTED, OVER 45 TONS UP TO AND INCLUDING 100 TONS; FUNDEX F-12 HYDRAULIC PILE RIG

$45.41$31.15$76.56Agreement
OPERATOR: POWER EQUIPMENT, PILEDRIVING: GROUP 3…
Full text

OPERATOR: POWER EQUIPMENT, PILEDRIVING: GROUP 3 (LIFTING DEVICES)- DERRICK BARGE PEDESTAL MOUNTED UNDER 45 TONS; SELF-PROPELLED BOOM-TYPE LIFTING DEVICE 45 TONS AND UNDER; SKID/SCOW PILEDRIVER, ANY TONNAGE; TRUCK CRANE OR CRAWLER, LAND OR BARGE MOUNTED 45 TONS AND UNDER

$49.14$31.15$80.29Agreement
OPERATOR: POWER EQUIPMENT, PILEDRIVING: GROUP 3…
Full text

OPERATOR: POWER EQUIPMENT, PILEDRIVING: GROUP 3 (OILER)- DERRICK BARGE PEDESTAL MOUNTED UNDER 45 TONS; SELF-PROPELLED BOOM-TYPE LIFTING DEVICE 45 TONS AND UNDER; SKID/SCOW PILEDRIVER, ANY TONNAGE; TRUCK CRANE OR CRAWLER, LAND OR BARGE MOUNTED 45 TONS AND UNDER

$42.89$31.15$74.04Agreement
OPERATOR: POWER EQUIPMENT, PILEDRIVING: GROUP 3…
Full text

OPERATOR: POWER EQUIPMENT, PILEDRIVING: GROUP 3 (TRUCK CRANE OILER)- DERRICK BARGE PEDESTAL MOUNTED UNDER 45 TONS; SELF-PROPELLED BOOM-TYPE LIFTING DEVICE 45 TONS AND UNDER; SKID/SCOW PILEDRIVER, ANY TONNAGE; TRUCK CRANE OR CRAWLER, LAND OR BARGE MOUNTED 45 TONS AND UNDER

$45.12$31.15$76.27Agreement
OPERATOR: POWER EQUIPMENT, PILEDRIVING: GROUP 4…
Full text

OPERATOR: POWER EQUIPMENT, PILEDRIVING: GROUP 4 (LIFTING DEVICES)- ASSISTANT OPERATOR IN LIEU OF ASSISTANT TO ENGINEER; FORKLIFT, 10 TONS AND OVER; HEAVY-DUTY REPAIR PERSON/WELDER

$47.37$31.15$78.52Agreement
OPERATOR: POWER EQUIPMENT, PILEDRIVING: GROUP 5 (LIFTING DEVICES)- DECK ENGINEER$44.73$31.15$75.88Agreement
OPERATOR: POWER EQUIPMENT, PILEDRIVING: GROUP 6 (LIFTING DEVICES)- DECKHAND; FIRE TENDER$42.50$31.15$73.65Agreement
ENGI0003-001 · Operating Engineers agreement, June 30, 2025
OPERATOR: POWER EQUIPMENT- CRANES AND ATTACHMENTS - AREA 1: GROUP 1…
Full text

OPERATOR: POWER EQUIPMENT- CRANES AND ATTACHMENTS - AREA 1: GROUP 1 (CRANES)- CLAMSHELL AND DRAGLINE OVER 7 CU. YDS.; CRANE, OVER 100 TONS; DERRICK, OVER 100 TONS; DERRICK BARGE PEDESTAL-MOUNTED, OVER 100 TONS; SELF-PROPELLED BOOM-TYPE LIFTING DEVICE, OVER 100 TONS. (AREA 1: LISTED WAGE RATES. AREA 2: RECEIVES AN ADDITIONAL $2.00 PER HOUR ABOVE AREA 1 RATES.) (AREA 1: ALAMEDA, CALAVERAS (EXCEPT EASTERN PART), CONTRA COSTA, FRESNO (EXCEPT EASTERN PART), KINGS, MADERA (EXCEPT EASTERN PART), MARIPOSA (EXCEPT EASTERN PART), MERCED, MONTEREY (EXCEPT SOUTHWESTERN PART), SAN BENITO, SAN FANCISCO, SAN JOAQUIN, SAN MATEO, SANTA CLARA, SANTA CRUZ, STANISLAUS, TUOLUMNE (EXCEPT EASTERN PART) COUNTIES. AREA 2: CALAVERAS (EASTERN PART), FRESNO (EASTERN PART), MADERA (EASTERN PART), MARIPOSA (EASTERN PART), MONTEREY (SOUTHWESTERN PART), TUOLUMNE (EASTERN PART) COUNTIES)

$68.59$32.53$101.12Agreement
OPERATOR: POWER EQUIPMENT- CRANES AND ATTACHMENTS - AREA 1: GROUP 1…
Full text

OPERATOR: POWER EQUIPMENT- CRANES AND ATTACHMENTS - AREA 1: GROUP 1 (OILER)- CLAMSHELL AND DRAGLINE OVER 7 CU. YDS.; CRANE, OVER 100 TONS; DERRICK, OVER 100 TONS; DERRICK BARGE PEDESTAL-MOUNTED, OVER 100 TONS; SELF-PROPELLED BOOM-TYPE LIFTING DEVICE, OVER 100 TONS. (AREA 1: LISTED WAGE RATES. AREA 2: RECEIVES AN ADDITIONAL $2.00 PER HOUR ABOVE AREA 1 RATES.) (AREA 1: ALAMEDA, CALAVERAS (EXCEPT EASTERN PART), CONTRA COSTA, FRESNO (EXCEPT EASTERN PART), KINGS, MADERA (EXCEPT EASTERN PART), MARIPOSA (EXCEPT EASTERN PART), MERCED, MONTEREY (EXCEPT SOUTHWESTERN PART), SAN BENITO, SAN FANCISCO, SAN JOAQUIN, SAN MATEO, SANTA CLARA, SANTA CRUZ, STANISLAUS, TUOLUMNE (EXCEPT EASTERN PART) COUNTIES. AREA 2: CALAVERAS (EASTERN PART), FRESNO (EASTERN PART), MADERA (EASTERN PART), MARIPOSA (EASTERN PART), MONTEREY (SOUTHWESTERN PART), TUOLUMNE (EASTERN PART) COUNTIES)

$43.79$31.15$74.94Agreement
OPERATOR: POWER EQUIPMENT- CRANES AND ATTACHMENTS - AREA 1: GROUP 1…
Full text

OPERATOR: POWER EQUIPMENT- CRANES AND ATTACHMENTS - AREA 1: GROUP 1 (TRUCK CRANE OILER)- CLAMSHELL AND DRAGLINE OVER 7 CU. YDS.; CRANE, OVER 100 TONS; DERRICK, OVER 100 TONS; DERRICK BARGE PEDESTAL-MOUNTED, OVER 100 TONS; SELF-PROPELLED BOOM-TYPE LIFTING DEVICE, OVER 100 TONS. (AREA 1: LISTED WAGE RATES. AREA 2: RECEIVES AN ADDITIONAL $2.00 PER HOUR ABOVE AREA 1 RATES.) (AREA 1: ALAMEDA, CALAVERAS (EXCEPT EASTERN PART), CONTRA COSTA, FRESNO (EXCEPT EASTERN PART), KINGS, MADERA (EXCEPT EASTERN PART), MARIPOSA (EXCEPT EASTERN PART), MERCED, MONTEREY (EXCEPT SOUTHWESTERN PART), SAN BENITO, SAN FANCISCO, SAN JOAQUIN, SAN MATEO, SANTA CLARA, SANTA CRUZ, STANISLAUS, TUOLUMNE (EXCEPT EASTERN PART) COUNTIES. AREA 2: CALAVERAS (EASTERN PART), FRESNO (EASTERN PART), MADERA (EASTERN PART), MARIPOSA (EASTERN PART), MONTEREY (SOUTHWESTERN PART), TUOLUMNE (EASTERN PART) COUNTIES)

$46.08$31.15$77.23Agreement
OPERATOR: POWER EQUIPMENT- CRANES AND ATTACHMENTS - AREA 1: GROUP 2…
Full text

OPERATOR: POWER EQUIPMENT- CRANES AND ATTACHMENTS - AREA 1: GROUP 2 (CRANES)- CLAMSHELL AND DRAGLINE OVER 1 CU. YD. UP TO AND INCLUDING 7 CU. YDS.; CRANE, OVER 45 TONS UP TO AND INCLUDING 100 TONS; DERRICK BARGE, 100 TONS AND UNDER; SELF-PROPELLED BOOM-TYPE LIFTING DEVICE, OVER 45 TONS; TOWER CRANE. (AREA 1: LISTED WAGE RATES. AREA 2: RECEIVES AN ADDITIONAL $2.00 PER HOUR ABOVE AREA 1 RATES.) (AREA 1: ALAMEDA, CALAVERAS (EXCEPT EASTERN PART), CONTRA COSTA, FRESNO (EXCEPT EASTERN PART), KINGS, MADERA (EXCEPT EASTERN PART), MARIPOSA (EXCEPT EASTERN PART), MERCED, MONTEREY (EXCEPT SOUTHWESTERN PART), SAN BENITO, SAN FANCISCO, SAN JOAQUIN, SAN MATEO, SANTA CLARA, SANTA CRUZ, STANISLAUS, TUOLUMNE (EXCEPT EASTERN PART) COUNTIES. AREA 2: CALAVERAS (EASTERN PART), FRESNO (EASTERN PART), MADERA (EASTERN PART), MARIPOSA (EASTERN PART), MONTEREY (SOUTHWESTERN PART), TUOLUMNE (EASTERN PART) COUNTIES)

$66.08$32.53$98.61Agreement
OPERATOR: POWER EQUIPMENT- CRANES AND ATTACHMENTS - AREA 1: GROUP 2…
Full text

OPERATOR: POWER EQUIPMENT- CRANES AND ATTACHMENTS - AREA 1: GROUP 2 (OILER)- CLAMSHELL AND DRAGLINE OVER 1 CU. YD. UP TO AND INCLUDING 7 CU. YDS.; CRANE, OVER 45 TONS UP TO AND INCLUDING 100 TONS; DERRICK BARGE, 100 TONS AND UNDER; SELF-PROPELLED BOOM-TYPE LIFTING DEVICE, OVER 45 TONS; TOWER CRANE. (AREA 1: LISTED WAGE RATES. AREA 2: RECEIVES AN ADDITIONAL $2.00 PER HOUR ABOVE AREA 1 RATES.) (AREA 1: ALAMEDA, CALAVERAS (EXCEPT EASTERN PART), CONTRA COSTA, FRESNO (EXCEPT EASTERN PART), KINGS, MADERA (EXCEPT EASTERN PART), MARIPOSA (EXCEPT EASTERN PART), MERCED, MONTEREY (EXCEPT SOUTHWESTERN PART), SAN BENITO, SAN FANCISCO, SAN JOAQUIN, SAN MATEO, SANTA CLARA, SANTA CRUZ, STANISLAUS, TUOLUMNE (EXCEPT EASTERN PART) COUNTIES. AREA 2: CALAVERAS (EASTERN PART), FRESNO (EASTERN PART), MADERA (EASTERN PART), MARIPOSA (EASTERN PART), MONTEREY (SOUTHWESTERN PART), TUOLUMNE (EASTERN PART) COUNTIES)

$42.83$31.15$73.98Agreement
OPERATOR: POWER EQUIPMENT- CRANES AND ATTACHMENTS - AREA 1: GROUP 2…
Full text

OPERATOR: POWER EQUIPMENT- CRANES AND ATTACHMENTS - AREA 1: GROUP 2 (TRUCK CRANE OILER)- CLAMSHELL AND DRAGLINE OVER 1 CU. YD. UP TO AND INCLUDING 7 CU. YDS.; CRANE, OVER 45 TONS UP TO AND INCLUDING 100 TONS; DERRICK BARGE, 100 TONS AND UNDER; SELF-PROPELLED BOOM-TYPE LIFTING DEVICE, OVER 45 TONS; TOWER CRANE. (AREA 1: LISTED WAGE RATES. AREA 2: RECEIVES AN ADDITIONAL $2.00 PER HOUR ABOVE AREA 1 RATES.) (AREA 1: ALAMEDA, CALAVERAS (EXCEPT EASTERN PART), CONTRA COSTA, FRESNO (EXCEPT EASTERN PART), KINGS, MADERA (EXCEPT EASTERN PART), MARIPOSA (EXCEPT EASTERN PART), MERCED, MONTEREY (EXCEPT SOUTHWESTERN PART), SAN BENITO, SAN FANCISCO, SAN JOAQUIN, SAN MATEO, SANTA CLARA, SANTA CRUZ, STANISLAUS, TUOLUMNE (EXCEPT EASTERN PART) COUNTIES. AREA 2: CALAVERAS (EASTERN PART), FRESNO (EASTERN PART), MADERA (EASTERN PART), MARIPOSA (EASTERN PART), MONTEREY (SOUTHWESTERN PART), TUOLUMNE (EASTERN PART) COUNTIES)

$45.07$31.15$76.22Agreement
OPERATOR: POWER EQUIPMENT- CRANES AND ATTACHMENTS - AREA 1: GROUP 3…
Full text

OPERATOR: POWER EQUIPMENT- CRANES AND ATTACHMENTS - AREA 1: GROUP 3 (CRANES) CLAMSHELL AND DRAGLINE UP TO AND INCLUDING 1 CU. YD.; CRANES 45 TONS AND UNDER; SELF-PROPELLED BOOM-TYPE LIFTING DEVICE 45 TONS AND UNDER. (AREA 1: LISTED WAGE RATES. AREA 2: RECEIVES AN ADDITIONAL $2.00 PER HOUR ABOVE AREA 1 RATES.) (AREA 1: ALAMEDA, CALAVERAS (EXCEPT EASTERN PART), CONTRA COSTA, FRESNO (EXCEPT EASTERN PART), KINGS, MADERA (EXCEPT EASTERN PART), MARIPOSA (EXCEPT EASTERN PART), MERCED, MONTEREY (EXCEPT SOUTHWESTERN PART), SAN BENITO, SAN FANCISCO, SAN JOAQUIN, SAN MATEO, SANTA CLARA, SANTA CRUZ, STANISLAUS, TUOLUMNE (EXCEPT EASTERN PART) COUNTIES. AREA 2: CALAVERAS (EASTERN PART), FRESNO (EASTERN PART), MADERA (EASTERN PART), MARIPOSA (EASTERN PART), MONTEREY (SOUTHWESTERN PART), TUOLUMNE (EASTERN PART) COUNTIES)

$64.34$32.53$96.87Agreement
OPERATOR: POWER EQUIPMENT- CRANES AND ATTACHMENTS - AREA 1: GROUP 3…
Full text

OPERATOR: POWER EQUIPMENT- CRANES AND ATTACHMENTS - AREA 1: GROUP 3 (HYDRAULIC) CLAMSHELL AND DRAGLINE UP TO AND INCLUDING 1 CU. YD.; CRANES 45 TONS AND UNDER; SELF-PROPELLED BOOM-TYPE LIFTING DEVICE 45 TONS AND UNDER. (AREA 1: LISTED WAGE RATES. AREA 2: RECEIVES AN ADDITIONAL $2.00 PER HOUR ABOVE AREA 1 RATES.) (AREA 1: ALAMEDA, CALAVERAS (EXCEPT EASTERN PART), CONTRA COSTA, FRESNO (EXCEPT EASTERN PART), KINGS, MADERA (EXCEPT EASTERN PART), MARIPOSA (EXCEPT EASTERN PART), MERCED, MONTEREY (EXCEPT SOUTHWESTERN PART), SAN BENITO, SAN FANCISCO, SAN JOAQUIN, SAN MATEO, SANTA CLARA, SANTA CRUZ, STANISLAUS, TUOLUMNE (EXCEPT EASTERN PART) COUNTIES. AREA 2: CALAVERAS (EASTERN PART), FRESNO (EASTERN PART), MADERA (EASTERN PART), MARIPOSA (EASTERN PART), MONTEREY (SOUTHWESTERN PART), TUOLUMNE (EASTERN PART) COUNTIES)

$59.98$32.53$92.51Agreement
OPERATOR: POWER EQUIPMENT- CRANES AND ATTACHMENTS - AREA 1: GROUP 3…
Full text

OPERATOR: POWER EQUIPMENT- CRANES AND ATTACHMENTS - AREA 1: GROUP 3 (OILER) CLAMSHELL AND DRAGLINE UP TO AND INCLUDING 1 CU. YD.; CRANES 45 TONS AND UNDER; SELF-PROPELLED BOOM-TYPE LIFTING DEVICE 45 TONS AND UNDER. (AREA 1: LISTED WAGE RATES. AREA 2: RECEIVES AN ADDITIONAL $2.00 PER HOUR ABOVE AREA 1 RATES.) (AREA 1: ALAMEDA, CALAVERAS (EXCEPT EASTERN PART), CONTRA COSTA, FRESNO (EXCEPT EASTERN PART), KINGS, MADERA (EXCEPT EASTERN PART), MARIPOSA (EXCEPT EASTERN PART), MERCED, MONTEREY (EXCEPT SOUTHWESTERN PART), SAN BENITO, SAN FANCISCO, SAN JOAQUIN, SAN MATEO, SANTA CLARA, SANTA CRUZ, STANISLAUS, TUOLUMNE (EXCEPT EASTERN PART) COUNTIES. AREA 2: CALAVERAS (EASTERN PART), FRESNO (EASTERN PART), MADERA (EASTERN PART), MARIPOSA (EASTERN PART), MONTEREY (SOUTHWESTERN PART), TUOLUMNE (EASTERN PART) COUNTIES)

$42.55$31.15$73.70Agreement
OPERATOR: POWER EQUIPMENT- CRANES AND ATTACHMENTS - AREA 1: GROUP 3…
Full text

OPERATOR: POWER EQUIPMENT- CRANES AND ATTACHMENTS - AREA 1: GROUP 3 (TRUCK CRANE OILER) CLAMSHELL AND DRAGLINE UP TO AND INCLUDING 1 CU. YD.; CRANES 45 TONS AND UNDER; SELF-PROPELLED BOOM-TYPE LIFTING DEVICE 45 TONS AND UNDER. (AREA 1: LISTED WAGE RATES. AREA 2: RECEIVES AN ADDITIONAL $2.00 PER HOUR ABOVE AREA 1 RATES.) (AREA 1: ALAMEDA, CALAVERAS (EXCEPT EASTERN PART), CONTRA COSTA, FRESNO (EXCEPT EASTERN PART), KINGS, MADERA (EXCEPT EASTERN PART), MARIPOSA (EXCEPT EASTERN PART), MERCED, MONTEREY (EXCEPT SOUTHWESTERN PART), SAN BENITO, SAN FANCISCO, SAN JOAQUIN, SAN MATEO, SANTA CLARA, SANTA CRUZ, STANISLAUS, TUOLUMNE (EXCEPT EASTERN PART) COUNTIES. AREA 2: CALAVERAS (EASTERN PART), FRESNO (EASTERN PART), MADERA (EASTERN PART), MARIPOSA (EASTERN PART), MONTEREY (SOUTHWESTERN PART), TUOLUMNE (EASTERN PART) COUNTIES)

$44.83$31.15$75.98Agreement
OPERATOR: POWER EQUIPMENT- CRANES AND ATTACHMENTS - AREA 1: GROUP 4…
Full text

OPERATOR: POWER EQUIPMENT- CRANES AND ATTACHMENTS - AREA 1: GROUP 4 (CRANES)- BOOM TRUCK OR DUAL PURPOSE A-FRAME TRUCK, NON-ROTATING OVER 15 TONS; TRUCK-MOUNTED ROTATING TELESCOPIC BOOM TYPE LIFTING DEVICE, MANITEX OR SIMILAR (BOOM TRUCK) OVER 15 TONS. (AREA 1: LISTED WAGE RATES. AREA 2: RECEIVES AN ADDITIONAL $2.00 PER HOUR ABOVE AREA 1 RATES.) (AREA 1: ALAMEDA, CALAVERAS (EXCEPT EASTERN PART), CONTRA COSTA, FRESNO (EXCEPT EASTERN PART), KINGS, MADERA (EXCEPT EASTERN PART), MARIPOSA (EXCEPT EASTERN PART), MERCED, MONTEREY (EXCEPT SOUTHWESTERN PART), SAN BENITO, SAN FANCISCO, SAN JOAQUIN, SAN MATEO, SANTA CLARA, SANTA CRUZ, STANISLAUS, TUOLUMNE (EXCEPT EASTERN PART) COUNTIES. AREA 2: CALAVERAS (EASTERN PART), FRESNO (EASTERN PART), MADERA (EASTERN PART), MARIPOSA (EASTERN PART), MONTEREY (SOUTHWESTERN PART), TUOLUMNE (EASTERN PART) COUNTIES)

$61.30$32.53$93.83Agreement
OPERATOR: POWER EQUIPMENT, AREA 1: GROUP 2…
Full text

OPERATOR: POWER EQUIPMENT, AREA 1: GROUP 2- HIGHLINE CABLEWAY; HYDRAULIC EXCAVATOR, 3.5 CU. YDS. UP TO 7 CU. YDS.; LICENSED CONSTRUCTION WORK BOAT OPERATOR, ON SITE; POWER BLADE OPERATOR (FINISH); POWER SHOVELS, OVER 1 CU. YD. UP TO AN DINCLUDING 7 CU. YDS. M.R.C. (AREA 1: LISTED WAGE RATES. AREA 2: RECEIVES AN ADDITIONAL $2.00 PER HOUR ABOVE AREA 1 RATES.) (AREA 1: ALAMEDA, CALAVERAS (EXCEPT EASTERN PART), CONTRA COSTA, FRESNO (EXCEPT EASTERN PART), KINGS, MADERA (EXCEPT EASTERN PART), MARIPOSA (EXCEPT EASTERN PART), MERCED, MONTEREY (EXCEPT SOUTHWESTERN PART), SAN BENITO, SAN FANCISCO, SAN JOAQUIN, SAN MATEO, SANTA CLARA, SANTA CRUZ, STANISLAUS, TUOLUMNE (EXCEPT EASTERN PART) COUNTIES. AREA 2: CALAVERAS (EASTERN PART), FRESNO (EASTERN PART), MADERA (EASTERN PART), MARIPOSA (EASTERN PART), MONTEREY (SOUTHWESTERN PART), TUOLUMNE (EASTERN PART) COUNTIES)

$65.43$32.53$97.96Agreement
OPERATOR: POWER EQUIPMENT, AREA 1: GROUP 3…
Full text

OPERATOR: POWER EQUIPMENT, AREA 1: GROUP 3- ASPHALT MILLING MACHINE; CABLE BACKHOE; COMBINATION BACKHOE AND LOADER OVER 3/4 CU. YDS.; CONTINUOUS FLIGHT TIE BACK MACHINE ASSISTNAT TO ENGINEER OR MECHANIC; CRANE MOUNTED CONTINUOUS FLIGHT TIE BACK MACHINE, TONNAGE TO APPLY; CRANE MOUNTED DRILL ATTACHMENT, TONNAGE TO APPLY; DOZER, SLOPE BRD; GRADALL; HYDRAULIC EXCAVATOR, UP TO 3.5 CU. YDS.; LOADER 4 CU. YDS. AND OVER; LONG REACH EXCAVATOR; MULTIPLE ENGINE SCRAPER (WHEN USED AS PUSH PULL); POWER SHOVELS, UP TO AND INCLUDING 1 CU. YD.; PRE-STRESS WIRE WRAPPING MACHINE; SIDE BOOM CAT, 572 OR LARGER; TRACK LOADER 4 CU. YDS. AND OVER; WHEEL EXCAVATOR (UP TO AND INCLUDING 750 CU. YDS. PER HOUR) (AREA 1: LISTED WAGE RATES. AREA 2: RECEIVES AN ADDITIONAL $2.00 PER HOUR ABOVE AREA 1 RATES.) (AREA 1: ALAMEDA, CALAVERAS (EXCEPT EASTERN PART), CONTRA COSTA, FRESNO (EXCEPT EASTERN PART), KINGS, MADERA (EXCEPT EASTERN PART), MARIPOSA (EXCEPT EASTERN PART), MERCED, MONTEREY (EXCEPT SOUTHWESTERN PART), SAN BENITO, SAN FANCISCO, SAN JOAQUIN, SAN MATEO, SANTA CLARA, SANTA CRUZ, STANISLAUS, TUOLUMNE (EXCEPT EASTERN PART) COUNTIES. AREA 2: CALAVERAS (EASTERN PART), FRESNO (EASTERN PART), MADERA (EASTERN PART), MARIPOSA (EASTERN PART), MONTEREY (SOUTHWESTERN PART), TUOLUMNE (EASTERN PART) COUNTIES)

$63.95$32.53$96.48Agreement
OPERATOR: POWER EQUIPMENT, AREA 1: GROUP 4…
Full text

OPERATOR: POWER EQUIPMENT, AREA 1: GROUP 4- ASPHALT PLANT ENGINEER/BOX PERSON; CHICAGO BOOM; COMBINATION BACKHOE AND LOADER UP TO AND INCLUDING .75 CU. YD.; CONCRETE BATCH PLANT (WET OR DRY); DOZER AND/OR PUSH CAT; PULL-TYPE ELEVATING LOADER; GRADESETTER, GRADE CHECKER (GPS, MECHANICAL OR OTHERWISE); GROOVING AND GRINDING MACHINE; HEADING SHIELD OPERATOR; HEAVY-DUTY DRILLING EQUIPMENT, HUGHS, LDH, WATSON 3000 OR SIMILAR; HEAVY-DUTY REPAIRPERSON AND/OR WELDER; LIME SPREADER; LOADER UNDER 4 CU. YDS.; LUBRICATION AND SERVICE ENGINEER (MOBILE AND GREASE RACK); MECHANICAL FINISHERS OR SPREADER MACHINE (ASPHALT, BARBER-GREENE AND SIMILAR); MILLER FORMLESS M-9000 SLOPE PAVER OR SIMILAR; PORTABLE CRUSHING AND SCREENING PLANTS; POWER BLADE SUPPORT; ROLLER OPERATOR, ASPHALT; RUBBER-TIRED SCRAPER, SELF-LOADING (PADDLE-WHEELS, ETC.); RUBBER-TIRED EARTHMOVING EQUIPMENT (SCRAPERS); SLIP FORM PAVER (CONCRETE); SMALL TRACTOR WITH DRAG; SOIL STABILIZER (P&H OR EQUAL); SPIDER PLOW AND SPIDER PULLER; TUBEX PILE RIG; UNLICENSED CONSTRUCTION WORK BOAT OPERATOR, ON SITE; TIMBER SKIDDER; TRACK LOADER UP TO 4 YDS.; TRACTOR-DRAWN SCRAPER; TRACTOR, COMPRESSOR DRILL COMBINATION; WELDER; WOODS-MIXER (AND OTHER SIMILAR PUGMILL EQUIPMENT. (AREA 1: LISTED WAGE RATES. AREA 2: RECEIVES AN ADDITIONAL $2.00 PER HOUR ABOVE AREA 1 RATES.) (AREA 1: ALAMEDA, CALAVERAS (EXCEPT EASTERN PART), CONTRA COSTA, FRESNO (EXCEPT EASTERN PART), KINGS, MADERA (EXCEPT EASTERN PART), MARIPOSA (EXCEPT EASTERN PART), MERCED, MONTEREY (EXCEPT SOUTHWESTERN PART), SAN BENITO, SAN FANCISCO, SAN JOAQUIN, SAN MATEO, SANTA CLARA, SANTA CRUZ, STANISLAUS, TUOLUMNE (EXCEPT EASTERN PART) COUNTIES. AREA 2: CALAVERAS (EASTERN PART), FRESNO (EASTERN PART), MADERA (EASTERN PART), MARIPOSA (EASTERN PART), MONTEREY (SOUTHWESTERN PART), TUOLUMNE (EASTERN PART) COUNTIES)

$62.57$32.53$95.10Agreement
OPERATOR: POWER EQUIPMENT, AREA 1: GROUP 5…
Full text

OPERATOR: POWER EQUIPMENT, AREA 1: GROUP 5- CAST-IN-PLACE PIPE LAYING MACHINE; COMBINATION SLUSHER AND MOTOR OPERATOR; CONCRETE CONVEYOR OR CONCRETE PUMP, TRUCK OR EQUIPMENT MOUNTED; CONCRETE CONVEYOR, BUILDING SITE; CONCRETE PUMP OR PUMPCRETE GUN; DRILLING EQUIPMENT, WATSON 2000, TEXOMA 700 OR SIMILAR; DRILLING AND BORING MACHINERY, HORIZONTAL (NOT TO APPLY TO WATERLINES, WAGON DRILLS, OR JACKHAMMERS); CONCRETE MIXER/ALL; PERSON AND/OR MATERIAL HOIST; MECHANICAL FINISHERS (CONCRETE (CLARY, JOHNSON, BIDWELL BRIDGE DECK, OR SIMILAR TYPES); MECHANICAL BURM, CURB, AND/OR CURB AND GUTTER MACHINE, CONCRETE OR ASPHALT); MINE OR SHAFT HOIST; PORTABLE CRUSHER; POWER JUMBO OPERATOR (SETTING SLIP-FORMS, ETC., IN TUNNELS); SCREED (AUTOMATIC OR MANUAL); SELF-PROPELLED COMPACTOR WITH DOZER; TRACTOR WITH BOOM D6 OR SMALLER; TRENCHING MACHINE, MAXIMUM DIGGING CAPACITY OVER 5 FT. DEPTH; VERMEER T-600B ROCK CUTTER OR SIMILAR. (AREA 1: LISTED WAGE RATES. AREA 2: RECEIVES AN ADDITIONAL $2.00 PER HOUR ABOVE AREA 1 RATES.) (AREA 1: ALAMEDA, CALAVERAS (EXCEPT EASTERN PART), CONTRA COSTA, FRESNO (EXCEPT EASTERN PART), KINGS, MADERA (EXCEPT EASTERN PART), MARIPOSA (EXCEPT EASTERN PART), MERCED, MONTEREY (EXCEPT SOUTHWESTERN PART), SAN BENITO, SAN FANCISCO, SAN JOAQUIN, SAN MATEO, SANTA CLARA, SANTA CRUZ, STANISLAUS, TUOLUMNE (EXCEPT EASTERN PART) COUNTIES. AREA 2: CALAVERAS (EASTERN PART), FRESNO (EASTERN PART), MADERA (EASTERN PART), MARIPOSA (EASTERN PART), MONTEREY (SOUTHWESTERN PART), TUOLUMNE (EASTERN PART) COUNTIES)

$61.30$32.53$93.83Agreement
OPERATOR: POWER EQUIPMENT, AREA 1: GROUP 6…
Full text

OPERATOR: POWER EQUIPMENT, AREA 1: GROUP 6- ARMOR-COATER (OR SIMILAR); BALLAST JACK TAMPER; BOOM-TYPE BACKFILLING MACHINE; ASSISTANT PLANT ENGINEER; BRIDGE AND/OR GANTRY CRANE; CHEMICAL GROUTING MACHINE, TRUCK-MOUNTED; CHIP SPREADING MACHINE OPERATOR; CONCRETE SAW (SELF-PROPELLED UNIT ON STREETS, HIGHWAYS, AIRPORTS, AND CANALS); DECK ENGINEER; DRILLING EQUIPMENT TEXOMA 600, HUGHS 200 SERIES OR SIMILAR UP TO AND INCLUDING 30 FT. M.R.C.; DRILL DOCTOR; HELICOPTER RADIO OPERATOR; HYDRO-HAMMER OR SIMILAR; LINE MASTER; SKIDSTEER LOADER, BOBCAT LARGER THAN 743 SERIES OR SIMILAR (WITH ATTACHMENTS); LOCOMOTIVE; LULL HI-LIFT OR SIMILAR; OILER, TRUCK MOUNTED; PAVEMENT BREAKER, TRUCK-MOUNTED, WITH COMPRESSOR COMBINATION; PAVING FABRIC INSTALLATION AND/OR LAYING MACHINE; PIPE BENDING MACHINE (PIPELINES ONLY); PIPE WRAPPING MACHINE (TRACTOR PRPELLED AND SUPPORTED); SCREED (EXCEPT ASPHALTIC CONCRETE PAVING); SELF-PROPELLED PIPELINE WRAPPING MACHINE; TRACTOR; SELF-LOADING CHIPPER; CONCRETE BARRIER MOVING MACHINE. (AREA 1: LISTED WAGE RATES. AREA 2: RECEIVES AN ADDITIONAL $2.00 PER HOUR ABOVE AREA 1 RATES.) (AREA 1: ALAMEDA, CALAVERAS (EXCEPT EASTERN PART), CONTRA COSTA, FRESNO (EXCEPT EASTERN PART), KINGS, MADERA (EXCEPT EASTERN PART), MARIPOSA (EXCEPT EASTERN PART), MERCED, MONTEREY (EXCEPT SOUTHWESTERN PART), SAN BENITO, SAN FANCISCO, SAN JOAQUIN, SAN MATEO, SANTA CLARA, SANTA CRUZ, STANISLAUS, TUOLUMNE (EXCEPT EASTERN PART) COUNTIES. AREA 2: CALAVERAS (EASTERN PART), FRESNO (EASTERN PART), MADERA (EASTERN PART), MARIPOSA (EASTERN PART), MONTEREY (SOUTHWESTERN PART), TUOLUMNE (EASTERN PART) COUNTIES)

$59.98$32.53$92.51Agreement
OPERATOR: POWER EQUIPMENT, AREA 1: GROUP 7…
Full text

OPERATOR: POWER EQUIPMENT, AREA 1: GROUP 7- BALLAST REGULATOR; BOOM TRUCK OR DUAL-PURPOSE A-FRAME TRUCK, NON-ROTATING-UNDER 15 TONS; CARY IFT OR SIMILAR; COMBINATION SLURRY MIER AND/OR CLEANER; DRILLING EQUIPMENT, 20 FT AND UNDER M.R.C.; FIRETENDER (HOT PLANT); GROUTING MACHINE OPERATOR; HIGHLINE CABLEWAY SIGNALPERSON; STATIONARY BELT LOADER (KOLMAN OR SIMILAR); LIFT SLAB MACHINE (VAGTBORG AND SIMILAR TYPES); MAGINNES INTERNAL FULL SLAB VIBRATOR; MATERIAL HOIST (1 DRUM); MECHANICAL TRENCH SHIELD; PAVEMENT BREAKER WITH OR WITHOUT COMPRESSOR COMBINATION); PIPE CLEANING MACHINE (TRACTOR PROPELLED AND SUPPORTED); POST DRIVER; ROLLER (EXCEPT ASPHALT); CHIP SEAL; SELF-PROPELLED AUTOMATICALLY APPLIED CONCRETE CURING MACHINE (ON STREETS, HIGHWAYS, AIRPORTS, AND CANALS); SELF-PROPELLED COMPACTOR (WITHOUT DOZER); SIGNALPERSON; SLIP-FORM PUMPS (LIFTING DEVICE FOR CONCRETE FORMS); TIE SPACE; TOWER MOBILE; TRENCHING MACHINE, MAXIMUM DIGGING CAPACITY UP TO AND INCLUDING 5 FT. DEPTH; TRUCK-TYPE LOADER. (AREA 1: LISTED WAGE RATES. AREA 2: RECEIVES AN ADDITIONAL $2.00 PER HOUR ABOVE AREA 1 RATES.) (AREA 1: ALAMEDA, CALAVERAS (EXCEPT EASTERN PART), CONTRA COSTA, FRESNO (EXCEPT EASTERN PART), KINGS, MADERA (EXCEPT EASTERN PART), MARIPOSA (EXCEPT EASTERN PART), MERCED, MONTEREY (EXCEPT SOUTHWESTERN PART), SAN BENITO, SAN FANCISCO, SAN JOAQUIN, SAN MATEO, SANTA CLARA, SANTA CRUZ, STANISLAUS, TUOLUMNE (EXCEPT EASTERN PART) COUNTIES. AREA 2: CALAVERAS (EASTERN PART), FRESNO (EASTERN PART), MADERA (EASTERN PART), MARIPOSA (EASTERN PART), MONTEREY (SOUTHWESTERN PART), TUOLUMNE (EASTERN PART) COUNTIES)

$58.84$32.53$91.37Agreement
OPERATOR: POWER EQUIPMENT, AREA 1: GROUP 8…
Full text

OPERATOR: POWER EQUIPMENT, AREA 1: GROUP 8- BIT SHARPENER; BOILER TENDER; BOX OPERATOR; BRAKEPERSON; COMBINATION MIXER AND COMPRESSOR (SHOTCRETE/GUNITE); COMPRESSOR OPERATOR; DECKHAND; FIRE TENDER; FORKLIFT (UNDER 20 FT); GENERATOR; GUNITE/SHOTCRETE EQUIPMENT OPERATOR; HYDRAULIC MONITOR; KEN SEAL MACHINE (OR SIMILAR); MIXERMOBILE; OILER; PUMPOPERATOR; REFRIGERATOR PLANT; RESERVOIR-DEBRIS TUG (SELF-PROPELLED FLOATING); ROSS CARRIER (CONSTRUCTION SITE); ROTOMIST OPERATOR; SELF-PROPELLED TAPE MACHINE; SHUTTLECAR; SELF-PROPELLED POWER SWEEPER OPERATOR (INCLUDES VACUUM SWEEPER); SLUSHER OPERATOR; SURFACE HEATER; SWITCHPERSON; TAR POT FIRETENDER; TUGGER HOIST, SINGLE DRUM; VACUUM COOLING PLANT; WELDING MACHINE (POWERED OTHER THAN BY ELECTRICITY. (AREA 1: LISTED WAGE RATES. AREA 2: RECEIVES AN ADDITIONAL $2.00 PER HOUR ABOVE AREA 1 RATES.) (AREA 1: ALAMEDA, CALAVERAS (EXCEPT EASTERN PART), CONTRA COSTA, FRESNO (EXCEPT EASTERN PART), KINGS, MADERA (EXCEPT EASTERN PART), MARIPOSA (EXCEPT EASTERN PART), MERCED, MONTEREY (EXCEPT SOUTHWESTERN PART), SAN BENITO, SAN FANCISCO, SAN JOAQUIN, SAN MATEO, SANTA CLARA, SANTA CRUZ, STANISLAUS, TUOLUMNE (EXCEPT EASTERN PART) COUNTIES. AREA 2: CALAVERAS (EASTERN PART), FRESNO (EASTERN PART), MADERA (EASTERN PART), MARIPOSA (EASTERN PART), MONTEREY (SOUTHWESTERN PART), TUOLUMNE (EASTERN PART) COUNTIES)

$57.70$32.53$90.23Agreement
OPERATOR: POWER EQUIPMENT, AREA 1: GROUP 8…
Full text

OPERATOR: POWER EQUIPMENT, AREA 1: GROUP 8-A - ELEVATOR OPERATOR; SKIDSTEER LOADER-BOBCAT 743 SERIES OR SMALLER, AND SIMILAR (WITHOUT ATTACHMENTS); MINI EXCAVATOR UNDER 25 H.P. (BACKHOE-TRENCHER); TUB GRINDER WOOD CHIPPER. (AREA 1: LISTED WAGE RATES. AREA 2: RECEIVES AN ADDITIONAL $2.00 PER HOUR ABOVE AREA 1 RATES.) (AREA 1: ALAMEDA, CALAVERAS (EXCEPT EASTERN PART), CONTRA COSTA, FRESNO (EXCEPT EASTERN PART), KINGS, MADERA (EXCEPT EASTERN PART), MARIPOSA (EXCEPT EASTERN PART), MERCED, MONTEREY (EXCEPT SOUTHWESTERN PART), SAN BENITO, SAN FANCISCO, SAN JOAQUIN, SAN MATEO, SANTA CLARA, SANTA CRUZ, STANISLAUS, TUOLUMNE (EXCEPT EASTERN PART) COUNTIES. AREA 2: CALAVERAS (EASTERN PART), FRESNO (EASTERN PART), MADERA (EASTERN PART), MARIPOSA (EASTERN PART), MONTEREY (SOUTHWESTERN PART), TUOLUMNE (EASTERN PART) COUNTIES)

$55.49$32.53$88.02Agreement
OPERATOR: POWER EQUIPMENT, STEEL ERECTION: GROUP 1…
Full text

OPERATOR: POWER EQUIPMENT, STEEL ERECTION: GROUP 1 (CRANES)- CRANE OVER 100 TONS; DERRICK OVER 100 TONS; SELF-PROPELLED BOOM-TYPE LIFTING DEVICE OVER 100 TONS

$68.81$32.53$101.34Agreement
OPERATOR: POWER EQUIPMENT, STEEL ERECTION: GROUP 1…
Full text

OPERATOR: POWER EQUIPMENT, STEEL ERECTION: GROUP 1 (OILER)- CRANE OVER 100 TONS; DERRICK OVER 100 TONS; SELF-PROPELLED BOOM-TYPE LIFTING DEVICE OVER 100 TONS

$43.72$31.15$74.87Agreement
OPERATOR: POWER EQUIPMENT, STEEL ERECTION: GROUP 1…
Full text

OPERATOR: POWER EQUIPMENT, STEEL ERECTION: GROUP 1 (TRUCK CRANE OILER)- CRANE OVER 100 TONS; DERRICK OVER 100 TONS; SELF-PROPELLED BOOM-TYPE LIFTING DEVICE OVER 100 TONS

$45.95$31.15$77.10Agreement
OPERATOR: POWER EQUIPMENT, STEEL ERECTION: GROUP 2…
Full text

OPERATOR: POWER EQUIPMENT, STEEL ERECTION: GROUP 2 (CRANES)- CRANE OVER 45 TONS TO 100 TONS; DERRICK UNDER 100 TONS; SELF-PROPELLED BOOM-TYPE LIFTING DEVICE OVER 45 TONS TO 100 TONS; TOWER CRANE

$67.04$32.53$99.57Agreement
OPERATOR: POWER EQUIPMENT, STEEL ERECTION: GROUP 2…
Full text

OPERATOR: POWER EQUIPMENT, STEEL ERECTION: GROUP 2 (OILER)- CRANE OVER 45 TONS TO 100 TONS; DERRICK UNDER 100 TONS; SELF-PROPELLED BOOM-TYPE LIFTING DEVICE OVER 45 TONS TO 100 TONS; TOWER CRANE

$43.45$31.15$74.60Agreement
OPERATOR: POWER EQUIPMENT, STEEL ERECTION: GROUP 2…
Full text

OPERATOR: POWER EQUIPMENT, STEEL ERECTION: GROUP 2 (TRUCK CRANE OILER)- CRANE OVER 45 TONS TO 100 TONS; DERRICK UNDER 100 TONS; SELF-PROPELLED BOOM-TYPE LIFTING DEVICE OVER 45 TONS TO 100 TONS; TOWER CRANE

$45.73$31.15$76.88Agreement
OPERATOR: POWER EQUIPMENT, STEEL ERECTION: GROUP 3…
Full text

OPERATOR: POWER EQUIPMENT, STEEL ERECTION: GROUP 3 (CRANES)- CRANE, 45 TONS AND UNDER; SELF-PROPELLED BOOM-TYPE LIFTING DEVICE, 45 TONS AND UNDER

$65.56$32.53$98.09Agreement
OPERATOR: POWER EQUIPMENT, STEEL ERECTION: GROUP 3…
Full text

OPERATOR: POWER EQUIPMENT, STEEL ERECTION: GROUP 3 (HYDRAULIC)- CRANE, 45 TONS AND UNDER; SELF-PROPELLED BOOM-TYPE LIFTING DEVICE, 45 TONS AND UNDER

$45.07$31.15$76.22Agreement
OPERATOR: POWER EQUIPMENT, STEEL ERECTION: GROUP 3…
Full text

OPERATOR: POWER EQUIPMENT, STEEL ERECTION: GROUP 3 (OILER)- CRANE, 45 TONS AND UNDER; SELF-PROPELLED BOOM-TYPE LIFTING DEVICE, 45 TONS AND UNDER

$43.23$31.15$74.38Agreement
OPERATOR: POWER EQUIPMENT, STEEL ERECTION: GROUP 3…
Full text

OPERATOR: POWER EQUIPMENT, STEEL ERECTION: GROUP 3 (TRUCK CRANE OILER)- CRANE, 45 TONS AND UNDER; SELF-PROPELLED BOOM-TYPE LIFTING DEVICE, 45 TONS AND UNDER

$45.46$31.15$76.61Agreement
OPERATOR: POWER EQUIPMENT, STEEL ERECTION: GROUP 4…
Full text

OPERATOR: POWER EQUIPMENT, STEEL ERECTION: GROUP 4 (CRANES)- CHICAGO BOOM; FORKLIFT, 10 TONS AND OVER; HEAVY-DUTY REPAIR PERSON/WELDER

$63.54$32.53$96.07Agreement
OPERATOR: POWER EQUIPMENT, STEEL ERECTION: GROUP 5 (CRANES)- BOOM CAT$62.24$32.53$94.77Agreement
OPERATOR: POWER EQUIPMENT…
Full text

OPERATOR: POWER EQUIPMENT, TUNNEL AND UNDERGROUND WORK- SHAFTS, STOPES, RAISES: AREA 1, GROUP 1- HEADING SHIELD OPERATOR; HEAVY-DUTY REPAIRPERSON; MUCKING MACHINE (RUBBER TIRED, RAIL OR TRACK TYPE); RAISED BORE OPERATOR (TUNNELS); TUNNEL MOLE BORE OPERATOR. (AREA 1: LISTED WAGE RATES. AREA 2: RECEIVES AN ADDITIONAL $2.00 PER HOUR ABOVE AREA 1 RATES.) (AREA 1: ALAMEDA, CALAVERAS (EXCEPT EASTERN PART), CONTRA COSTA, FRESNO (EXCEPT EASTERN PART), KINGS, MADERA (EXCEPT EASTERN PART), MARIPOSA (EXCEPT EASTERN PART), MERCED, MONTEREY (EXCEPT SOUTHWESTERN PART), SAN BENITO, SAN FANCISCO, SAN JOAQUIN, SAN MATEO, SANTA CLARA, SANTA CRUZ, STANISLAUS, TUOLUMNE (EXCEPT EASTERN PART) COUNTIES. AREA 2: CALAVERAS (EASTERN PART), FRESNO (EASTERN PART), MADERA (EASTERN PART), MARIPOSA (EASTERN PART), MONTEREY (SOUTHWESTERN PART), TUOLUMNE (EASTERN PART) COUNTIES)

$63.06$32.53$95.59Agreement
OPERATOR: POWER EQUIPMENT…
Full text

OPERATOR: POWER EQUIPMENT, TUNNEL AND UNDERGROUND WORK- SHAFTS, STOPES, RAISES: AREA 1, GROUP 1-A- TUNNEL BORE MACHINE OPERATOR 20' DIAMETER OR MORE. (AREA 1: LISTED WAGE RATES. AREA 2: RECEIVES AN ADDITIONAL $2.00 PER HOUR ABOVE AREA 1 RATES.) (AREA 1: ALAMEDA, CALAVERAS (EXCEPT EASTERN PART), CONTRA COSTA, FRESNO (EXCEPT EASTERN PART), KINGS, MADERA (EXCEPT EASTERN PART), MARIPOSA (EXCEPT EASTERN PART), MERCED, MONTEREY (EXCEPT SOUTHWESTERN PART), SAN BENITO, SAN FANCISCO, SAN JOAQUIN, SAN MATEO, SANTA CLARA, SANTA CRUZ, STANISLAUS, TUOLUMNE (EXCEPT EASTERN PART) COUNTIES. AREA 2: CALAVERAS (EASTERN PART), FRESNO (EASTERN PART), MADERA (EASTERN PART), MARIPOSA (EASTERN PART), MONTEREY (SOUTHWESTERN PART), TUOLUMNE (EASTERN PART) COUNTIES)

$65.53$32.53$98.06Agreement
OPERATOR: POWER EQUIPMENT…
Full text

OPERATOR: POWER EQUIPMENT, TUNNEL AND UNDERGROUND WORK- SHAFTS, STOPES, RAISES: AREA 1, GROUP 2- COMBINATION SLUSHER AND MOTOR OPERATOR; CONCRETE PUMP OR PUMPCRETE GUN; POWER JUMBO OPERATOR. (AREA 1: LISTED WAGE RATES. AREA 2: RECEIVES AN ADDITIONAL $2.00 PER HOUR ABOVE AREA 1 RATES.) (AREA 1: ALAMEDA, CALAVERAS (EXCEPT EASTERN PART), CONTRA COSTA, FRESNO (EXCEPT EASTERN PART), KINGS, MADERA (EXCEPT EASTERN PART), MARIPOSA (EXCEPT EASTERN PART), MERCED, MONTEREY (EXCEPT SOUTHWESTERN PART), SAN BENITO, SAN FANCISCO, SAN JOAQUIN, SAN MATEO, SANTA CLARA, SANTA CRUZ, STANISLAUS, TUOLUMNE (EXCEPT EASTERN PART) COUNTIES. AREA 2: CALAVERAS (EASTERN PART), FRESNO (EASTERN PART), MADERA (EASTERN PART), MARIPOSA (EASTERN PART), MONTEREY (SOUTHWESTERN PART), TUOLUMNE (EASTERN PART) COUNTIES)

$61.80$32.53$94.33Agreement
OPERATOR: POWER EQUIPMENT…
Full text

OPERATOR: POWER EQUIPMENT, TUNNEL AND UNDERGROUND WORK- SHAFTS, STOPES, RAISES: AREA 1, GROUP 3- DRILL DOCTOR; MINE OR SHAFT HOIST. (AREA 1: LISTED WAGE RATES. AREA 2: RECEIVES AN ADDITIONAL $2.00 PER HOUR ABOVE AREA 1 RATES.) (AREA 1: ALAMEDA, CALAVERAS (EXCEPT EASTERN PART), CONTRA COSTA, FRESNO (EXCEPT EASTERN PART), KINGS, MADERA (EXCEPT EASTERN PART), MARIPOSA (EXCEPT EASTERN PART), MERCED, MONTEREY (EXCEPT SOUTHWESTERN PART), SAN BENITO, SAN FANCISCO, SAN JOAQUIN, SAN MATEO, SANTA CLARA, SANTA CRUZ, STANISLAUS, TUOLUMNE (EXCEPT EASTERN PART) COUNTIES. AREA 2: CALAVERAS (EASTERN PART), FRESNO (EASTERN PART), MADERA (EASTERN PART), MARIPOSA (EASTERN PART), MONTEREY (SOUTHWESTERN PART), TUOLUMNE (EASTERN PART) COUNTIES)

$60.47$32.53$93.00Agreement
OPERATOR: POWER EQUIPMENT…
Full text

OPERATOR: POWER EQUIPMENT, TUNNEL AND UNDERGROUND WORK- SHAFTS, STOPES, RAISES: AREA 1, GROUP 4- COMBINATION SLURRY MIXER CLEANER; GROUTING MACHINE OPERATOR; MOTORMAN. (AREA 1: LISTED WAGE RATES. AREA 2: RECEIVES AN ADDITIONAL $2.00 PER HOUR ABOVE AREA 1 RATES.) (AREA 1: ALAMEDA, CALAVERAS (EXCEPT EASTERN PART), CONTRA COSTA, FRESNO (EXCEPT EASTERN PART), KINGS, MADERA (EXCEPT EASTERN PART), MARIPOSA (EXCEPT EASTERN PART), MERCED, MONTEREY (EXCEPT SOUTHWESTERN PART), SAN BENITO, SAN FANCISCO, SAN JOAQUIN, SAN MATEO, SANTA CLARA, SANTA CRUZ, STANISLAUS, TUOLUMNE (EXCEPT EASTERN PART) COUNTIES. AREA 2: CALAVERAS (EASTERN PART), FRESNO (EASTERN PART), MADERA (EASTERN PART), MARIPOSA (EASTERN PART), MONTEREY (SOUTHWESTERN PART), TUOLUMNE (EASTERN PART) COUNTIES)

$59.33$32.53$91.86Agreement
OPERATOR: POWER EQUIPMENT…
Full text

OPERATOR: POWER EQUIPMENT, TUNNEL AND UNDERGROUND WORK- SHAFTS, STOPES, RAISES: AREA 1, GROUP 5- BIT SHARPENER; BRAKEMAN; COMBINATION MIXER AND COMPRESSOR (GUNITE); COMPRESSOR OPERATOR; OILER; PUMP OPERATOR; SLUSHER OPERATOR. (AREA 1: LISTED WAGE RATES. AREA 2: RECEIVES AN ADDITIONAL $2.00 PER HOUR ABOVE AREA 1 RATES.) (AREA 1: ALAMEDA, CALAVERAS (EXCEPT EASTERN PART), CONTRA COSTA, FRESNO (EXCEPT EASTERN PART), KINGS, MADERA (EXCEPT EASTERN PART), MARIPOSA (EXCEPT EASTERN PART), MERCED, MONTEREY (EXCEPT SOUTHWESTERN PART), SAN BENITO, SAN FANCISCO, SAN JOAQUIN, SAN MATEO, SANTA CLARA, SANTA CRUZ, STANISLAUS, TUOLUMNE (EXCEPT EASTERN PART) COUNTIES. AREA 2: CALAVERAS (EASTERN PART), FRESNO (EASTERN PART), MADERA (EASTERN PART), MARIPOSA (EASTERN PART), MONTEREY (SOUTHWESTERN PART), TUOLUMNE (EASTERN PART) COUNTIES)

$58.19$32.53$90.72Agreement
OPERATOR: POWER EQUIPMENT, TUNNEL AND UNDERGROUND WORK- UNDERGOUND: AREA 1, GROUP 1…
Full text

OPERATOR: POWER EQUIPMENT, TUNNEL AND UNDERGROUND WORK- UNDERGOUND: AREA 1, GROUP 1- HEADING SHIELD OPERATOR; HEAVY-DUTY REPAIRPERSON; MUCKING MACHINE (RUBBER TIRED, RAIL OR TRACK TYPE); RAISED BORE OPERATOR (TUNNELS); TUNNEL MOLE BORE OPERATOR. (AREA 1: LISTED WAGE RATES. AREA 2: RECEIVES AN ADDITIONAL $2.00 PER HOUR ABOVE AREA 1 RATES.) (AREA 1: ALAMEDA, CALAVERAS (EXCEPT EASTERN PART), CONTRA COSTA, FRESNO (EXCEPT EASTERN PART), KINGS, MADERA (EXCEPT EASTERN PART), MARIPOSA (EXCEPT EASTERN PART), MERCED, MONTEREY (EXCEPT SOUTHWESTERN PART), SAN BENITO, SAN FANCISCO, SAN JOAQUIN, SAN MATEO, SANTA CLARA, SANTA CRUZ, STANISLAUS, TUOLUMNE (EXCEPT EASTERN PART) COUNTIES. AREA 2: CALAVERAS (EASTERN PART), FRESNO (EASTERN PART), MADERA (EASTERN PART), MARIPOSA (EASTERN PART), MONTEREY (SOUTHWESTERN PART), TUOLUMNE (EASTERN PART) COUNTIES)

$62.96$32.53$95.49Agreement
OPERATOR: POWER EQUIPMENT, TUNNEL AND UNDERGROUND WORK- UNDERGOUND: AREA 1, GROUP 1…
Full text

OPERATOR: POWER EQUIPMENT, TUNNEL AND UNDERGROUND WORK- UNDERGOUND: AREA 1, GROUP 1-A- TUNNEL BORE MACHINE OPERATOR 20' DIAMETER OR MORE. (AREA 1: LISTED WAGE RATES. AREA 2: RECEIVES AN ADDITIONAL $2.00 PER HOUR ABOVE AREA 1 RATES.) (AREA 1: ALAMEDA, CALAVERAS (EXCEPT EASTERN PART), CONTRA COSTA, FRESNO (EXCEPT EASTERN PART), KINGS, MADERA (EXCEPT EASTERN PART), MARIPOSA (EXCEPT EASTERN PART), MERCED, MONTEREY (EXCEPT SOUTHWESTERN PART), SAN BENITO, SAN FANCISCO, SAN JOAQUIN, SAN MATEO, SANTA CLARA, SANTA CRUZ, STANISLAUS, TUOLUMNE (EXCEPT EASTERN PART) COUNTIES. AREA 2: CALAVERAS (EASTERN PART), FRESNO (EASTERN PART), MADERA (EASTERN PART), MARIPOSA (EASTERN PART), MONTEREY (SOUTHWESTERN PART), TUOLUMNE (EASTERN PART) COUNTIES)

$65.43$32.53$97.96Agreement
OPERATOR: POWER EQUIPMENT, TUNNEL AND UNDERGROUND WORK- UNDERGOUND: AREA 1, GROUP 2…
Full text

OPERATOR: POWER EQUIPMENT, TUNNEL AND UNDERGROUND WORK- UNDERGOUND: AREA 1, GROUP 2- COMBINATION SLUSHER AND MOTOR OPERATOR; CONCRETE PUMP OR PUMPCRETE GUN; POWER JUMBO OPERATOR. (AREA 1: LISTED WAGE RATES. AREA 2: RECEIVES AN ADDITIONAL $2.00 PER HOUR ABOVE AREA 1 RATES.) (AREA 1: ALAMEDA, CALAVERAS (EXCEPT EASTERN PART), CONTRA COSTA, FRESNO (EXCEPT EASTERN PART), KINGS, MADERA (EXCEPT EASTERN PART), MARIPOSA (EXCEPT EASTERN PART), MERCED, MONTEREY (EXCEPT SOUTHWESTERN PART), SAN BENITO, SAN FANCISCO, SAN JOAQUIN, SAN MATEO, SANTA CLARA, SANTA CRUZ, STANISLAUS, TUOLUMNE (EXCEPT EASTERN PART) COUNTIES. AREA 2: CALAVERAS (EASTERN PART), FRESNO (EASTERN PART), MADERA (EASTERN PART), MARIPOSA (EASTERN PART), MONTEREY (SOUTHWESTERN PART), TUOLUMNE (EASTERN PART) COUNTIES)

$61.70$32.53$94.23Agreement
OPERATOR: POWER EQUIPMENT, TUNNEL AND UNDERGROUND WORK- UNDERGOUND: AREA 1, GROUP 3…
Full text

OPERATOR: POWER EQUIPMENT, TUNNEL AND UNDERGROUND WORK- UNDERGOUND: AREA 1, GROUP 3- DRILL DOCTOR; MINE OR SHAFT HOIST. (AREA 1: LISTED WAGE RATES. AREA 2: RECEIVES AN ADDITIONAL $2.00 PER HOUR ABOVE AREA 1 RATES.) (AREA 1: ALAMEDA, CALAVERAS (EXCEPT EASTERN PART), CONTRA COSTA, FRESNO (EXCEPT EASTERN PART), KINGS, MADERA (EXCEPT EASTERN PART), MARIPOSA (EXCEPT EASTERN PART), MERCED, MONTEREY (EXCEPT SOUTHWESTERN PART), SAN BENITO, SAN FANCISCO, SAN JOAQUIN, SAN MATEO, SANTA CLARA, SANTA CRUZ, STANISLAUS, TUOLUMNE (EXCEPT EASTERN PART) COUNTIES. AREA 2: CALAVERAS (EASTERN PART), FRESNO (EASTERN PART), MADERA (EASTERN PART), MARIPOSA (EASTERN PART), MONTEREY (SOUTHWESTERN PART), TUOLUMNE (EASTERN PART) COUNTIES)

$60.37$32.53$92.90Agreement
OPERATOR: POWER EQUIPMENT, TUNNEL AND UNDERGROUND WORK- UNDERGOUND: AREA 1, GROUP 4…
Full text

OPERATOR: POWER EQUIPMENT, TUNNEL AND UNDERGROUND WORK- UNDERGOUND: AREA 1, GROUP 4- COMBINATION SLURRY MIXER CLEANER; GROUTING MACHINE OPERATOR; MOTORMAN. (AREA 1: LISTED WAGE RATES. AREA 2: RECEIVES AN ADDITIONAL $2.00 PER HOUR ABOVE AREA 1 RATES.) (AREA 1: ALAMEDA, CALAVERAS (EXCEPT EASTERN PART), CONTRA COSTA, FRESNO (EXCEPT EASTERN PART), KINGS, MADERA (EXCEPT EASTERN PART), MARIPOSA (EXCEPT EASTERN PART), MERCED, MONTEREY (EXCEPT SOUTHWESTERN PART), SAN BENITO, SAN FANCISCO, SAN JOAQUIN, SAN MATEO, SANTA CLARA, SANTA CRUZ, STANISLAUS, TUOLUMNE (EXCEPT EASTERN PART) COUNTIES. AREA 2: CALAVERAS (EASTERN PART), FRESNO (EASTERN PART), MADERA (EASTERN PART), MARIPOSA (EASTERN PART), MONTEREY (SOUTHWESTERN PART), TUOLUMNE (EASTERN PART) COUNTIES)

$59.23$32.53$91.76Agreement
OPERATOR: POWER EQUIPMENT, TUNNEL AND UNDERGROUND WORK- UNDERGOUND: AREA 1, GROUP 5…
Full text

OPERATOR: POWER EQUIPMENT, TUNNEL AND UNDERGROUND WORK- UNDERGOUND: AREA 1, GROUP 5- BIT SHARPENER; BRAKEMAN; COMBINATION MIXER AND COMPRESSOR (GUNITE); COMPRESSOR OPERATOR; OILER; PUMP OPERATOR; SLUSHER OPERATOR. (AREA 1: LISTED WAGE RATES. AREA 2: RECEIVES AN ADDITIONAL $2.00 PER HOUR ABOVE AREA 1 RATES.) (AREA 1: ALAMEDA, CALAVERAS (EXCEPT EASTERN PART), CONTRA COSTA, FRESNO (EXCEPT EASTERN PART), KINGS, MADERA (EXCEPT EASTERN PART), MARIPOSA (EXCEPT EASTERN PART), MERCED, MONTEREY (EXCEPT SOUTHWESTERN PART), SAN BENITO, SAN FANCISCO, SAN JOAQUIN, SAN MATEO, SANTA CLARA, SANTA CRUZ, STANISLAUS, TUOLUMNE (EXCEPT EASTERN PART) COUNTIES. AREA 2: CALAVERAS (EASTERN PART), FRESNO (EASTERN PART), MADERA (EASTERN PART), MARIPOSA (EASTERN PART), MONTEREY (SOUTHWESTERN PART), TUOLUMNE (EASTERN PART) COUNTIES)

$58.09$32.53$90.62Agreement
OPERATOR: POWER EQUIPMENT, AREA 1: GROUP 1…
Full text

OPERATOR: POWER EQUIPMENT, AREA 1: GROUP 1- OPERATOR OF HELICOPTER (WHEN USED IN ERECTION WORK); HYDRAULIC EXCAVATOR, 7 CU. YDS. AND OVER; POWER SHOVELS, OVER 7 CU. YDS. (AREA 1: LISTED WAGE RATES. AREA 2: RECEIVES AN ADDITIONAL $2.00 PER HOUR ABOVE AREA 1 RATES.) (AREA 1: ALAMEDA, CALAVERAS (EXCEPT EASTERN PART), CONTRA COSTA, FRESNO (EXCEPT EASTERN PART), KINGS, MADERA (EXCEPT EASTERN PART), MARIPOSA (EXCEPT EASTERN PART), MERCED, MONTEREY (EXCEPT SOUTHWESTERN PART), SAN BENITO, SAN FANCISCO, SAN JOAQUIN, SAN MATEO, SANTA CLARA, SANTA CRUZ, STANISLAUS, TUOLUMNE (EXCEPT EASTERN PART) COUNTIES. AREA 2: CALAVERAS (EASTERN PART), FRESNO (EASTERN PART), MADERA (EASTERN PART), MARIPOSA (EASTERN PART), MONTEREY (SOUTHWESTERN PART), TUOLUMNE (EASTERN PART) COUNTIES)

$66.96$32.53$99.49Agreement
ENGI0003-008 · Operating Engineers agreement, August 1, 2024
DREDGING: CLAMSHELL & DIPPER DREDGING…
Full text

DREDGING: CLAMSHELL & DIPPER DREDGING; HYDRAULIC SUCTION DREDGING- (1) LEVERMAN. AREA 1: ALAMEDA, CONTRA COSTA, KINGS, MERCED, SAN BENITO, SAN FRANCISCO, SAN JOAQUIN, SAN MATEO, SANTA CLARA, SANTA CRUZ, AND STANISLAUS COUNTIES. CALAVERAS COUNTY-EXCEPT EASTERN PART. FRESNO COUNTY-EXCEPT EASTERN PART. MADERA COUNTY-EXCEPT EASTERN PART. MARIPOSA COUNTY-EXCEPT EASTERN PART. MONTERREY COUNTY-EXCEPT SOUTHWESTERN PART. TUOLUMNE COUNTY-EXCEPT EASTERN PART

$60.61$39.55$100.16Agreement
DREDGING: CLAMSHELL & DIPPER DREDGING…
Full text

DREDGING: CLAMSHELL & DIPPER DREDGING; HYDRAULIC SUCTION DREDGING- (1) LEVERMAN. AREA 2: CALAVERAS COUNTY-EASTERN PART; FRESNO COUNTY-EASTERN PART; MADERA COUNTY-EASTERN PART; MARIPOSA COUNTY-EASTERN PART; MONTERREY COUNTY-SOUTHWESTERN PART; TUOLUMNE COUNTY-EASTERN PART

$62.61$39.55$102.16Agreement
DREDGING: CLAMSHELL & DIPPER DREDGING…
Full text

DREDGING: CLAMSHELL & DIPPER DREDGING; HYDRAULIC SUCTION DREDGING- (2) DREDGE DOZER; HEAVY DUTY REPAIRMAN. AREA 2: CALAVERAS COUNTY-EASTERN PART; FRESNO COUNTY-EASTERN PART; MADERA COUNTY-EASTERN PART; MARIPOSA COUNTY-EASTERN PART; MONTERREY COUNTY-SOUTHWESTERN PART; TUOLUMNE COUNTY-EASTERN PART

$57.65$39.55$97.20Agreement
DREDGING: CLAMSHELL & DIPPER DREDGING…
Full text

DREDGING: CLAMSHELL & DIPPER DREDGING; HYDRAULIC SUCTION DREDGING- (2) DREDGE DOZER; HEAVY DUTY REPAIRMAN. AREA 1: ALAMEDA, CONTRA COSTA, KINGS, MERCED, SAN BENITO, SAN FRANCISCO, SAN JOAQUIN, SAN MATEO, SANTA CLARA, SANTA CRUZ, AND STANISLAUS COUNTIES. CALAVERAS COUNTY-EXCEPT EASTERN PART. FRESNO COUNTY-EXCEPT EASTERN PART. MADERA COUNTY-EXCEPT EASTERN PART. MARIPOSA COUNTY-EXCEPT EASTERN PART. MONTERREY COUNTY-EXCEPT SOUTHWESTERN PART. TUOLUMNE COUNTY-EXCEPT EASTERN PART

$55.65$39.55$95.20Agreement
DREDGING: CLAMSHELL & DIPPER DREDGING…
Full text

DREDGING: CLAMSHELL & DIPPER DREDGING; HYDRAULIC SUCTION DREDGING- (3) BOOSTER PUMP OPERATOR; DECK ENGINEER; DECK MATE; DREDGE TENDER; WINCH OPERATOR. AREA 1: ALAMEDA, CONTRA COSTA, KINGS, MERCED, SAN BENITO, SAN FRANCISCO, SAN JOAQUIN, SAN MATEO, SANTA CLARA, SANTA CRUZ, AND STANISLAUS COUNTIES. CALAVERAS COUNTY-EXCEPT EASTERN PART. FRESNO COUNTY-EXCEPT EASTERN PART. MADERA COUNTY-EXCEPT EASTERN PART. MARIPOSA COUNTY-EXCEPT EASTERN PART. MONTERREY COUNTY-EXCEPT SOUTHWESTERN PART. TUOLUMNE COUNTY-EXCEPT EASTERN PART

$54.53$39.55$94.08Agreement
DREDGING: CLAMSHELL & DIPPER DREDGING…
Full text

DREDGING: CLAMSHELL & DIPPER DREDGING; HYDRAULIC SUCTION DREDGING- (3) BOOSTER PUMP OPERATOR; DECK ENGINEER; DECK MATE; DREDGE TENDER; WINCH OPERATOR. AREA 2: CALAVERAS COUNTY-EASTERN PART; FRESNO COUNTY-EASTERN PART; MADERA COUNTY-EASTERN PART; MARIPOSA COUNTY-EASTERN PART; MONTERREY COUNTY-SOUTHWESTERN PART; TUOLUMNE COUNTY-EASTERN PART

$56.53$39.55$96.08Agreement
DREDGING: CLAMSHELL & DIPPER DREDGING…
Full text

DREDGING: CLAMSHELL & DIPPER DREDGING; HYDRAULIC SUCTION DREDGING- (4) BARGEMAN; DECKHAND; FIREMAN; LEVEEHAND; OILER. AREA 1: ALAMEDA, CONTRA COSTA, KINGS, MERCED, SAN BENITO, SAN FRANCISCO, SAN JOAQUIN, SAN MATEO, SANTA CLARA, SANTA CRUZ, AND STANISLAUS COUNTIES. CALAVERAS COUNTY-EXCEPT EASTERN PART. FRESNO COUNTY-EXCEPT EASTERN PART. MADERA COUNTY-EXCEPT EASTERN PART. MARIPOSA COUNTY-EXCEPT EASTERN PART. MONTERREY COUNTY-EXCEPT SOUTHWESTERN PART. TUOLUMNE COUNTY-EXCEPT EASTERN PART

$51.23$39.55$90.78Agreement
DREDGING: CLAMSHELL & DIPPER DREDGING…
Full text

DREDGING: CLAMSHELL & DIPPER DREDGING; HYDRAULIC SUCTION DREDGING- (4) BARGEMAN; DECKHAND; FIREMAN; LEVEEHAND; OILER. AREA 2: CALAVERAS COUNTY-EASTERN PART; FRESNO COUNTY-EASTERN PART; MADERA COUNTY-EASTERN PART; MARIPOSA COUNTY-EASTERN PART; MONTERREY COUNTY-SOUTHWESTERN PART; TUOLUMNE COUNTY-EASTERN PART

$53.23$39.55$92.78Agreement
ENGI0003-019 · Operating Engineers agreement, June 30, 2025
OPERATOR: POWER EQUIPMENT, LANDSCAPE WORK ONLY: GROUP 1…
Full text

OPERATOR: POWER EQUIPMENT, LANDSCAPE WORK ONLY: GROUP 1- LANDSCAPE FINISH GRADE OPERATOR: ALL FINISH GRADE WORK REGARDLESS OF EQUIPMENT USED, AND ALL EQUIPMENT WITH A RATING MORE THAN 65 HP. (AREA 1: ALAMEDA, CONTRA COSTA, KINGS, MERCED, SAN BENITO, SAN FRANCISCO, SAN JOAQUIN, SAN MATEO, SANTA CLARA, SANTA CRUZ, AND STANISLAUS COUNTIES. CALAVARAS COUNTY-EXCEPT EASTERN PART. FRESNO COUNTY-EXCEPT EASTERN PART. MADERA COUNTY-EXCEPT EASTERN PART. MARIPOSAL-EXCEPT EASTERN PART. MONTEREY COUNTY-EXCEPT SOUTHWESTERN PART. TUOLUMNE COUNTY-EXCEPT EASTERN PART.)

$55.85$28.56$84.41Agreement
OPERATOR: POWER EQUIPMENT, LANDSCAPE WORK ONLY: GROUP 1…
Full text

OPERATOR: POWER EQUIPMENT, LANDSCAPE WORK ONLY: GROUP 1- LANDSCAPE FINISH GRADE OPERATOR: ALL FINISH GRADE WORK REGARDLESS OF EQUIPMENT USED, AND ALL EQUIPMENT WITH A RATING MORE THAN 65 HP. (AREA 2: CALAVERAS COUNTY-EASTERN PART. FRESNO COUNTY-EASTERN PART. MADERA COUNTY-EASTERN PART. MARIPOSA COUNTY-EASTERN PART. MONTEREY COUNTY-SOUTHWESTERN PART. TUOLUMNE COUNTY-EASTERN PART.)

$57.85$28.56$86.41Agreement
OPERATOR: POWER EQUIPMENT, LANDSCAPE WORK ONLY: GROUP 2…
Full text

OPERATOR: POWER EQUIPMENT, LANDSCAPE WORK ONLY: GROUP 2- LANDSCAPE OPERATOR UP TO 65 HP: ALL EQUIPMENT WITH A MANUFACTURER'S RATING OF 65 HP OR LESS EXCEPT EQUIPMENT COVERED BY GROUP 1 OR GROUP 3. THE FOLLOWING EQUIPMENT SHALL BE INCLUDED EXCEPT WHEN USED FOR FINISH WORK AS LONG AS MANUFACTURER'S RATING IS 65 HP OR LESS: A-FRAME AND WINCH TRUCK, BACKHOE, FORKLIFT, HYDRAGRAPHIC SEEDER MACHINE, ROLLER, RUBBER-TIRED AND TRACK EARTHMOVING EQUIPMENT, SKIPLOADER, STRAW BLOWERS, AND TRENCHER 31 HP UP TO 65 HP. (AREA 1: ALAMEDA, CONTRA COSTA, KINGS, MERCED, SAN BENITO, SAN FRANCISCO, SAN JOAQUIN, SAN MATEO, SANTA CLARA, SANTA CRUZ, AND STANISLAUS COUNTIES. CALAVARAS COUNTY-EXCEPT EASTERN PART. FRESNO COUNTY-EXCEPT EASTERN PART. MADERA COUNTY-EXCEPT EASTERN PART. MARIPOSAL-EXCEPT EASTERN PART. MONTEREY COUNTY-EXCEPT SOUTHWESTERN PART. TUOLUMNE COUNTY-EXCEPT EASTERN PART.)

$52.25$28.56$80.81Agreement
OPERATOR: POWER EQUIPMENT, LANDSCAPE WORK ONLY: GROUP 2…
Full text

OPERATOR: POWER EQUIPMENT, LANDSCAPE WORK ONLY: GROUP 2- LANDSCAPE OPERATOR UP TO 65 HP: ALL EQUIPMENT WITH A MANUFACTURER'S RATING OF 65 HP OR LESS EXCEPT EQUIPMENT COVERED BY GROUP 1 OR GROUP 3. THE FOLLOWING EQUIPMENT SHALL BE INCLUDED EXCEPT WHEN USED FOR FINISH WORK AS LONG AS MANUFACTURER'S RATING IS 65 HP OR LESS: A-FRAME AND WINCH TRUCK, BACKHOE, FORKLIFT, HYDRAGRAPHIC SEEDER MACHINE, ROLLER, RUBBER-TIRED AND TRACK EARTHMOVING EQUIPMENT, SKIPLOADER, STRAW BLOWERS, AND TRENCHER 31 HP UP TO 65 HP. (AREA 2: CALAVERAS COUNTY-EASTERN PART. FRESNO COUNTY-EASTERN PART. MADERA COUNTY-EASTERN PART. MARIPOSA COUNTY-EASTERN PART. MONTEREY COUNTY-SOUTHWESTERN PART. TUOLUMNE COUNTY-EASTERN PART.)

$54.25$28.56$82.81Agreement
OPERATOR: POWER EQUIPMENT, LANDSCAPE WORK ONLY: GROUP 3…
Full text

OPERATOR: POWER EQUIPMENT, LANDSCAPE WORK ONLY: GROUP 3- LANDSCAPE UTILITY OPERATOR: SMALL RUBBER-TIRED TRACTOR, TRENCHER UNDER 31 HP. (AREA 1: ALAMEDA, CONTRA COSTA, KINGS, MERCED, SAN BENITO, SAN FRANCISCO, SAN JOAQUIN, SAN MATEO, SANTA CLARA, SANTA CRUZ, AND STANISLAUS COUNTIES. CALAVARAS COUNTY-EXCEPT EASTERN PART. FRESNO COUNTY-EXCEPT EASTERN PART. MADERA COUNTY-EXCEPT EASTERN PART. MARIPOSAL-EXCEPT EASTERN PART. MONTEREY COUNTY-EXCEPT SOUTHWESTERN PART. TUOLUMNE COUNTY-EXCEPT EASTERN PART.)

$47.64$28.56$76.20Agreement
OPERATOR: POWER EQUIPMENT, LANDSCAPE WORK ONLY: GROUP 3…
Full text

OPERATOR: POWER EQUIPMENT, LANDSCAPE WORK ONLY: GROUP 3- LANDSCAPE UTILITY OPERATOR: SMALL RUBBER-TIRED TRACTOR, TRENCHER UNDER 31 HP. (AREA 2: CALAVERAS COUNTY-EASTERN PART. FRESNO COUNTY-EASTERN PART. MADERA COUNTY-EASTERN PART. MARIPOSA COUNTY-EASTERN PART. MONTEREY COUNTY-SOUTHWESTERN PART. TUOLUMNE COUNTY-EASTERN PART.)

$49.64$28.56$78.20Agreement
IRON0377-001 · Ironworkers agreement, January 1, 2025
IRONWORKERS: FENCE ERECTOR (ALAMEDA, CONTRA COSTA, SAN MATEO, SANTA CLARA COUNTIES).

PREMIUM PAY: $6.00 ADDITIONAL PER HOUR AT THE FOLLOWING LOCATIONS: CHINA LAKE NAVAL TEST STATION, CHOCOLATE MOUNTAINS NAVAL RESERVE-NILAND, EDWARDS AFB, FORT IRWIN MILITARY STATION, FORT IRWIN TRAINING CENTER-GOLDSTONE, SAN CLEMENTE ISLAND, SAN NICHOLAS ISLAND, SUSANVILLE FEDERAL PRISON, 29 PALMS-MARINE CORPS, U.S. MARINE BASE-BARSTOW, U.S. NAVAL AIR FACILITY-SEALY, VENDENBERG AFB. $4.00 ADDITIONAL PER HOUR AT THE FOLLOWING LOCATIONS: ARMY DEENSE LANGUAGE INSTITUTE-MONTEREY, FALLON AIR BASE, NAVAL POST GRADUATE SCHOOL-MONTEREY, YERMO MARINE CORPS LOGISTICS CENTER. $2.00 ADDITIONAL PER HOUR AT THE FOLLOWING LOCATIONS: PORT HUENEME, PORT MUGU, U.S. COAST GUARD STATION-TWO ROCK

$45.78$26.51$72.29Agreement
IRONWORKERS: ORNAMENTAL…
Full text

IRONWORKERS: ORNAMENTAL, REINFORCING AND STRUCTURAL (ALAMEDA, CONTRA COSTA, SAN MATEO, SANTA CLARA COUNTIES)

PREMIUM PAY: $6.00 ADDITIONAL PER HOUR AT THE FOLLOWING LOCATIONS: CHINA LAKE NAVAL TEST STATION, CHOCOLATE MOUNTAINS NAVAL RESERVE-NILAND, EDWARDS AFB, FORT IRWIN MILITARY STATION, FORT IRWIN TRAINING CENTER-GOLDSTONE, SAN CLEMENTE ISLAND, SAN NICHOLAS ISLAND, SUSANVILLE FEDERAL PRISON, 29 PALMS-MARINE CORPS, U.S. MARINE BASE-BARSTOW, U.S. NAVAL AIR FACILITY-SEALY, VENDENBERG AFB. $4.00 ADDITIONAL PER HOUR AT THE FOLLOWING LOCATIONS: ARMY DEENSE LANGUAGE INSTITUTE-MONTEREY, FALLON AIR BASE, NAVAL POST GRADUATE SCHOOL-MONTEREY, YERMO MARINE CORPS LOGISTICS CENTER. $2.00 ADDITIONAL PER HOUR AT THE FOLLOWING LOCATIONS: PORT HUENEME, PORT MUGU, U.S. COAST GUARD STATION-TWO ROCK

$55.33$35.15$90.48Agreement
IRON0377-003 · Ironworkers agreement, January 1, 2025
IRONWORKERS: FENCE ERECTOR (SAN FRANCISCO CITY AND COUNTY)

PREMIUM PAY: $6.00 ADDITIONAL PER HOUR AT THE FOLLOWING LOCATIONS: CHINA LAKE NAVAL TEST STATION, CHOCOLATE MOUNTAINS NAVAL RESERVE-NILAND, EDWARDS AFB, FORT IRWIN MILITARY STATION, FORT IRWIN TRAINING CENTER-GOLDSTONE, SAN CLEMENTE ISLAND, SAN NICHOLAS ISLAND, SUSANVILLE FEDERAL PRISON, 29 PALMS-MARINE CORPS, U.S. MARINE BASE-BARSTOW, U.S. NAVAL AIR FACILITY-SEALY, VENDENBERG AFB. $4.00 ADDITIONAL PER HOUR AT THE FOLLOWING LOCATIONS: ARMY DEENSE LANGUAGE INSTITUTE-MONTEREY, FALLON AIR BASE, NAVAL POST GRADUATE SCHOOL-MONTEREY, YERMO MARINE CORPS LOGISTICS CENTER. $2.00 ADDITIONAL PER HOUR AT THE FOLLOWING LOCATIONS: PORT HUENEME, PORT MUGU, U.S. COAST GUARD STATION-TWO ROCK

$45.78$26.51$72.29Agreement
IRONWORKERS: ORNAMENTAL, REINFORCING AND STRUCTURAL (SAN FRANCISCO CITY AND COUNTY)

PREMIUM PAY: $6.00 ADDITIONAL PER HOUR AT THE FOLLOWING LOCATIONS: CHINA LAKE NAVAL TEST STATION, CHOCOLATE MOUNTAINS NAVAL RESERVE-NILAND, EDWARDS AFB, FORT IRWIN MILITARY STATION, FORT IRWIN TRAINING CENTER-GOLDSTONE, SAN CLEMENTE ISLAND, SAN NICHOLAS ISLAND, SUSANVILLE FEDERAL PRISON, 29 PALMS-MARINE CORPS, U.S. MARINE BASE-BARSTOW, U.S. NAVAL AIR FACILITY-SEALY, VENDENBERG AFB. $4.00 ADDITIONAL PER HOUR AT THE FOLLOWING LOCATIONS: ARMY DEENSE LANGUAGE INSTITUTE-MONTEREY, FALLON AIR BASE, NAVAL POST GRADUATE SCHOOL-MONTEREY, YERMO MARINE CORPS LOGISTICS CENTER. $2.00 ADDITIONAL PER HOUR AT THE FOLLOWING LOCATIONS: PORT HUENEME, PORT MUGU, U.S. COAST GUARD STATION-TWO ROCK

$55.83$35.15$90.98Agreement
IRON0433-005 · Ironworkers agreement, January 1, 2025
IRONWORKER: FENCE ERECTOR (REMAINING COUNTIES)

PREMIUM PAY: $6.00 ADDITIONAL PER HOUR AT THE FOLLOWING LOCATIONS: CHINA LAKE NAVAL TEST STATION, CHOCOLATE MOUNTAINS NAVAL RESERVE-NILAND, EDWARDS AFB, FORT IRWIN MILITARY STATION, FORT IRWIN TRAINING CENTER-GOLDSTONE, SAN CLEMENTE ISLAND, SAN NICHOLAS ISLAND, SUSANVILLE FEDERAL PRISON, 29 PALMS-MARINE CORPS, U.S. MARINE BASE-BARSTOW, U.S. NAVAL AIR FACILITY-SEALY, VENDENBERG AFB. $4.00 ADDITIONAL PER HOUR AT THE FOLLOWING LOCATIONS: ARMY DEENSE LANGUAGE INSTITUTE-MONTEREY, FALLON AIR BASE, NAVAL POST GRADUATE SCHOOL-MONTEREY, YERMO MARINE CORPS LOGISTICS CENTER. $2.00 ADDITIONAL PER HOUR AT THE FOLLOWING LOCATIONS: PORT HUENEME, PORT MUGU, U.S. COAST GUARD STATION-TWO ROCK

$45.78$26.51$72.29Agreement
IRONWORKER: ORNAMENTAL, REINFORCING AND STRUCTURAL (REMAINING COUNTIES)

PREMIUM PAY: $6.00 ADDITIONAL PER HOUR AT THE FOLLOWING LOCATIONS: CHINA LAKE NAVAL TEST STATION, CHOCOLATE MOUNTAINS NAVAL RESERVE-NILAND, EDWARDS AFB, FORT IRWIN MILITARY STATION, FORT IRWIN TRAINING CENTER-GOLDSTONE, SAN CLEMENTE ISLAND, SAN NICHOLAS ISLAND, SUSANVILLE FEDERAL PRISON, 29 PALMS-MARINE CORPS, U.S. MARINE BASE-BARSTOW, U.S. NAVAL AIR FACILITY-SEALY, VENDENBERG AFB. $4.00 ADDITIONAL PER HOUR AT THE FOLLOWING LOCATIONS: ARMY DEENSE LANGUAGE INSTITUTE-MONTEREY, FALLON AIR BASE, NAVAL POST GRADUATE SCHOOL-MONTEREY, YERMO MARINE CORPS LOGISTICS CENTER. $2.00 ADDITIONAL PER HOUR AT THE FOLLOWING LOCATIONS: PORT HUENEME, PORT MUGU, U.S. COAST GUARD STATION-TWO ROCK

$50.70$35.15$85.85Agreement
LABO0067-006 · Laborers agreement, June 30, 2025
LABORER: ASBESTOS/MOLD/LEAD LABORER. ASBESTOS REMOVAL-SCOPE OF WORK…
Full text

LABORER: ASBESTOS/MOLD/LEAD LABORER. ASBESTOS REMOVAL-SCOPE OF WORK: SITE MOBILIZATION; INITIAL SITE CLEAN-UP; SITE PREPARATION; REMOVAL OF ASBESTOS-CONTAINING MATERIALS FROM WALLS AND CEILINGS; OR FROM PIPES, BOILERS, AND MECHANICAL SYSTEMS ONLY IF THEY ARE BEING SCRAPPED; ENCAPSULATION, ENCLOSURE AND DISPOSAL OF ASBESTOS-CONTAINING MATERIALS BY HAND OR WITH EQUIPMENT OR MACHINERY; SCAFFOLDING; FABRICATION OF TEMPORARY WOODEN BARRIERS; AND ASSEMBLY OF DECONTAMINATION STATIONS. (AREA 1: ALAMEDA, CONTRA COSTA, SAN FRANCISCO, SAN MATEO, AND SANTA CLARA COUNTIES)

$39.15$30.03$69.18Agreement
LABORER: ASBESTOS/MOLD/LEAD LABORER. ASBESTOS REMOVAL-SCOPE OF WORK…
Full text

LABORER: ASBESTOS/MOLD/LEAD LABORER. ASBESTOS REMOVAL-SCOPE OF WORK: SITE MOBILIZATION; INITIAL SITE CLEAN-UP; SITE PREPARATION; REMOVAL OF ASBESTOS-CONTAINING MATERIALS FROM WALLS AND CEILINGS; OR FROM PIPES, BOILERS, AND MECHANICAL SYSTEMS ONLY IF THEY ARE BEING SCRAPPED; ENCAPSULATION, ENCLOSURE AND DISPOSAL OF ASBESTOS-CONTAINING MATERIALS BY HAND OR WITH EQUIPMENT OR MACHINERY; SCAFFOLDING; FABRICATION OF TEMPORARY WOODEN BARRIERS; AND ASSEMBLY OF DECONTAMINATION STATIONS. (AREA 2: CALAVERAS, FRESNO, KINGS, MADERA, MARIPOSA, MERCED, MONTEREY, SAN BENITO, SAN JOAQUIN, STANISLAUS, AND TUOLUMNE COUNTIES)

$38.15$30.03$68.18Agreement
LABO0073-002 · Laborers agreement, July 1, 2023
LABORER, TRAFFIC CONTROL/LANE CLOSURE…
Full text

LABORER, TRAFFIC CONTROL/LANE CLOSURE: ESCORT DRIVER, FLAG PERSON (CALAVERAS AND SAN JOAQUIN COUNTIES)

$36.26$27.30$63.56Agreement
LABORER, TRAFFIC CONTROL/LANE CLOSURE…
Full text

LABORER, TRAFFIC CONTROL/LANE CLOSURE: TRAFFIC CONTROL PERSON I- LAYOUT OF TRAFFIC CONTROL, CRASH CUSHIONS, CONSTRUCTION AREA AND ROADSIDE SIGNAGE. (CALAVERAS AND SAN JOAQUIN COUNTIES)

$36.56$27.30$63.86Agreement
LABORER, TRAFFIC CONTROL/LANE CLOSURE…
Full text

LABORER, TRAFFIC CONTROL/LANE CLOSURE: TRAFFIC CONTROL PERSON II- INSTALLATION AND REMOVAL OF TEMPORARY/PERMANENT SIGNS, MARKERS, DELINEATORS AND CRASH CUSHIONS. (CALAVERAS AND SAN JOAQUIN COUNTIES)

$34.06$27.30$61.36Agreement
LABO0073-003 · Laborers agreement, July 1, 2023
LABORER: MASON TENDER-BRICK (SAN JOAQUIN COUNTY)$36.29$25.55$61.84Agreement
LABO0073-005 · Laborers agreement, June 26, 2023
TUNNEL AND SHAFT LABORERS: GROUP 1…
Full text

TUNNEL AND SHAFT LABORERS: GROUP 1- DIAMOND DRILLER; GROUNDMEN; GUNITE AND SHOTCRETE NOZZLEMEN

$45.89$27.72$73.61Agreement
TUNNEL AND SHAFT LABORERS: GROUP 2…
Full text

TUNNEL AND SHAFT LABORERS: GROUP 2- RODMEN; SHAFT WORK & RAISE (BELOW ACTUAL OR EXCAVATED GROUND LEVEL)

$45.66$27.72$73.38Agreement
TUNNEL AND SHAFT LABORERS: GROUP 3…
Full text

TUNNEL AND SHAFT LABORERS: GROUP 3- BIT GRINDER; BLASTER, DRILLER, POWDERMEN, HEADING; CHERRY PICKERMEN - WHERE CAR IS LIFTED; CONCRETE FINISHER IN TUNNEL; CONCRETE SCREEDMAN; GROUT PUMPMAN AND POTMAN; GUNITE & SHOTCRETE GUNMAN & POTMAN; HEADERMEN; HIGH PRESSURE NOZZLEMAN; MINER - TUNNEL, INCLUDING TOP AND BOTTOM MAN ON SHAFT AND RAISE WORK; NIPPER; NOZZLEMAN ON SLICK LINE; SANDBLASTER - POTMAN, ROBOTIC SHOTCRETE PLACER, SEGMENT ERECTOR, TUNNEL MUCK HAULER, STEEL FORM RAISER AND SETTER; TIMBERMAN, RETIMBERMAN (WOOD OR STEEL OR SUBSTITUTE MATERIALS THEREFORE); TUGGER (FOR TUNNEL LABORER WORK); CABLE TENDER; CHUCK TENDER; POWDERMAN - PRIMER HOUSE

$45.41$27.72$73.13Agreement
TUNNEL AND SHAFT LABORERS: GROUP 4…
Full text

TUNNEL AND SHAFT LABORERS: GROUP 4- VIBRATOR OPERATOR, PAVEMENT BREAKER; BULL GANG - MUCKERS, TRACKMEN; CONCRETE CREW - INCLUDES RODDING AND SPREADING, DUMPMEN (ANY METHOD)

$44.96$27.72$72.68Agreement
TUNNEL AND SHAFT LABORERS: GROUP 5- GROUT CREW; REBOUNDMAN; SWAMPER/ BRAKEMAN$44.42$27.72$72.14Agreement
TUNNEL AND SHAFT LABORERS: SHOTCRETE SPECIALIST$46.41$27.72$74.13Agreement
LABO0073-007 · Laborers agreement, June 30, 2025
LABORER (CONSTRUCTION CRAFT LABORERS) GROUP 1…
Full text

LABORER (CONSTRUCTION CRAFT LABORERS) GROUP 1-F- WIRE WINDING MACHINE IN CONNECTION WITH GUNITING OR SHOT CRETE.

FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE WAGE RATE. GROUP 1-B: SEWER CLEANERS SHALL RECEIVE $4.00 PER DAY ABOVE GROUP 1 WAGE RATES. ""SEWER CLEANER"" MEANS ANY WORKER WHO HANDLES OR COMES IN CONTACT WITH RAW SEWAGE IN SMALL DIAMETER SEWERS. THOSE WHO WORK INSIDE RECENTLY ACTIVE, LARGE DIAMETER SEWERS, AND ALL RECENTLY ACTIVE SEWER MANHOLES SHAL RECEIVE $5.00 PER DAY ABOVE GROUP 1 WAGE RATES. GROUP 1-D: MAINTENANCE AND REPAIR TRACK AND ROAD BEDS. ALL EMPLOYEES PERFORMING WORK COVERED HEREIN SHALL RECEIVE $0.25 PER HOUR ABOVE THEIR REGULAR RATE FOR ALL WORK PERFORMED ON UNDERGROUND STRUCTURES NOT SPECIFICALLY COVERED HEREIN. THIS PARAGRAPH SHALL NOT BE CONSTRUED TO APPLY TO WORK BELOW GROUND LEVEL IN OPEN CUT. IT SHALL APPLY TO CUT AND COVER WORK OF SUBWAY CONSTRUCTION AFTER THE TEMPORARY COVER HAS BEEN PLACED.(CALAVERAS AND SAN JOAQUIN COUNTIES)

$30.37$29.89$60.26Agreement
LABORER, CONSTRUCTION CRAFT LABORERS…
Full text

LABORER, CONSTRUCTION CRAFT LABORERS: CONSTRUCTION SPECIALIST GROUP- ASPHALT IRONER AND RAKER; CHAINSAW; LASER BEAM IN CONNECTION WITH LABORERS' WORK; CAST-IN- PLACE MANHOLE FORM SETTER; PRESSURE PIPELAYER; DAVIS TRENCHER - 300 OR SIMILAR TYPE (AND ALL SMALL TRENCHERS); BLASTER; DIAMOND DRILLER; MULTIPLE UNIT DRILL; HYDRAULIC DRILL.

FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE WAGE RATE. GROUP 1-B: SEWER CLEANERS SHALL RECEIVE $4.00 PER DAY ABOVE GROUP 1 WAGE RATES. ""SEWER CLEANER"" MEANS ANY WORKER WHO HANDLES OR COMES IN CONTACT WITH RAW SEWAGE IN SMALL DIAMETER SEWERS. THOSE WHO WORK INSIDE RECENTLY ACTIVE, LARGE DIAMETER SEWERS, AND ALL RECENTLY ACTIVE SEWER MANHOLES SHAL RECEIVE $5.00 PER DAY ABOVE GROUP 1 WAGE RATES. GROUP 1-D: MAINTENANCE AND REPAIR TRACK AND ROAD BEDS. ALL EMPLOYEES PERFORMING WORK COVERED HEREIN SHALL RECEIVE $0.25 PER HOUR ABOVE THEIR REGULAR RATE FOR ALL WORK PERFORMED ON UNDERGROUND STRUCTURES NOT SPECIFICALLY COVERED HEREIN. THIS PARAGRAPH SHALL NOT BE CONSTRUED TO APPLY TO WORK BELOW GROUND LEVEL IN OPEN CUT. IT SHALL APPLY TO CUT AND COVER WORK OF SUBWAY CONSTRUCTION AFTER THE TEMPORARY COVER HAS BEEN PLACED. (CALAVERAS AND SAN JOAQUIN COUNTIES)

$38.85$29.89$68.74Agreement
LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 1…
Full text

LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 1- ASPHALT SPREADER BOXES (ALL TYPES); BARKO, WACKER AND SIMILAR TYPE TAMPERS; BUGGYMOBILE; CAULKER, BANDER, PIPEWRAPPER, CONDUIT LAYER, PLASTIC PIPELAYER; CERTIFIED HAZARDOUS WASTE WORKER INCLUDING LEADE ABATEMENT; COMPACTORS OF ALL TYPES; CONCRETE AND MAGNESITE MIXER, 1/2 YD. AND UNDER; CONCRETE PAN WORK; CONCRETE SANDER; CONCRETE SAW; CRIBBER AND/OR SHORING; CUT GRANITE CURB SETTER; DRI-PAK-IT MACHINE; FALLER, LOGLOADER AND BUCKER; FORM RAISER, SLIP FORMS; GREEN CUTTER; HEADERBOARD, HUBSETTER, ALIGNER, BY ANY METHOD; HIGH PRESSURE BLOW PIPE (1-1/2"" OR OVER, 100 LBS. PRESSURE/OVER); HYDRO SEEDER AND SIMILAR TYPE; JACKHAMMER OPERATOR; JACKING OF PIPE OVER 12 INCHES; JACKSON AND SIMILAR TYPE COMPACTOR; KETTLE TENDER, POT AND WORKER APPLYING ASPHALT, LAY-KOLD, CREOSOTE, LIME, CAUSTIC AND SIMILAR TYPE MATERIALS (APPLYING MEANS APPLYING, DIPPING OR HANDLING OF SUCH MATERIALS); LAGGING, SHEETING, WHALING, BRACING, TRENCHJACKING, LAGGING HAMMER; MAGNESITE, EPOXYRESIN, FIBERGLASS, MASTIC WORKER (WET OR DRY); NO JOINT PIPE AND STRIPPING OF SAME, INCLUDING REPAIR OF VOIDS; PAVEMENT BREAKER AND SPADER, INCLUDING TOOL GRINDER; PERMA CURB; PIPELAYER (INCLUDING GRADE CHECKING IN CONNECTION WITH PIPELAYING); PRECAST-MANHOLE SETTER; PRESSURE PIPE TESTER; POST HOLE DIGGER, AIR, GAS AND ELECTRIC; POWER BROOM SWEEPER; POWER TAMPERS OF ALL TYPES (EXCEPT AS SHOWN IN GROUP 2); RAM SET GUN AND STUD GUN; RIPRAP STONEPAVER AND ROCK-SLINGER, INCLUDING PLACING OF SACKED CONCRETE AND/OR SAND (WET OR DRY) AND GABIONS AND SIMILAR TYPE; ROTARY SCARIFIER OR MULTIPLE HEAD CONCRETE CHIPPING SCARIFIER; ROTO AND DITCH WITCH; ROTOTILLER; SANDBLASTER, POT, GUN, NOZZLE OPERATORS; SIGNALLING AND RIGGING; TANK CLEANER; TREE CLIMBER; TURBO BLASTER; VIBRASCREED, BULL FLOAT IN CONNECTION WITH LABORERS' WORK; VIBRATOR; HAZARDOUS WASTE WORKER (LEAD REMOVAL); ASBESTOS AND MOLD REMOVAL WORKER.

FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE WAGE RATE. GROUP 1-B: SEWER CLEANERS SHALL RECEIVE $4.00 PER DAY ABOVE GROUP 1 WAGE RATES. ""SEWER CLEANER"" MEANS ANY WORKER WHO HANDLES OR COMES IN CONTACT WITH RAW SEWAGE IN SMALL DIAMETER SEWERS. THOSE WHO WORK INSIDE RECENTLY ACTIVE, LARGE DIAMETER SEWERS, AND ALL RECENTLY ACTIVE SEWER MANHOLES SHAL RECEIVE $5.00 PER DAY ABOVE GROUP 1 WAGE RATES. GROUP 1-D: MAINTENANCE AND REPAIR TRACK AND ROAD BEDS. ALL EMPLOYEES PERFORMING WORK COVERED HEREIN SHALL RECEIVE $0.25 PER HOUR ABOVE THEIR REGULAR RATE FOR ALL WORK PERFORMED ON UNDERGROUND STRUCTURES NOT SPECIFICALLY COVERED HEREIN. THIS PARAGRAPH SHALL NOT BE CONSTRUED TO APPLY TO WORK BELOW GROUND LEVEL IN OPEN CUT. IT SHALL APPLY TO CUT AND COVER WORK OF SUBWAY CONSTRUCTION AFTER THE TEMPORARY COVER HAS BEEN PLACED. (CALAVERAS AND SAN JOAQUIN COUNTIES)

$38.15$29.89$68.04Agreement
LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 1…
Full text

LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 1-A- JOY DRILL MODEL TWM-2A; GARDNER-DENVER MODEL DH143 AND SIMILAR TYPE DRILLS; TRACK DRILLER; JACK LEG DRILLER; WAGON DRILLER; MECHANICAL DRILLERS, ALL TYPES REGARDLESS OF TYPE OR METHOD OF POWER; MECHANICAL PIPE LAYERS, ALL TYPES REGARDLESS OF TYPE OR METHOD OF POWER; BLASTER AND POWDER; ALL WORK OF LOADING, PLACING AND BLASTING OF ALL POWDER AND EXPLOSIVES OF WHATEVER TYPE REGARDLESS OF METHOD USED FOR SUCH LOADING AND PLACING; HIGH SCALERS (INCLUDING DRILLING OF SAME); TREE TOPPER; BIT GRINDER. GROUP 1-B: SEWER CLEANERS SHALL RECEIVE $4.00 PER DAY ABOVE GROUP 1 WAGE RATES. ""SEWER CLEANER"" MEANS ANY WORKER WHO HANDLES OR COMES IN CONTACT WITH RAW SEWAGE IN SMALL DIAMETER SEWERS. THOSE WHO WORK INSIDE RECENTLY ACTIVE, LARGE DIAMETER SEWERS, AND ALL RECENTLY ACTIVE SEWER MANHOLES SHAL RECEIVE $5.00 PER DAY ABOVE GROUP 1 WAGE RATES. GROUP 1-D: MAINTENANCE AND REPAIR TRACK AND ROAD BEDS. ALL EMPLOYEES PERFORMING WORK COVERED HEREIN SHALL RECEIVE $0.25 PER HOUR ABOVE THEIR REGULAR RATE FOR ALL WORK PERFORMED ON UNDERGROUND STRUCTURES NOT SPECIFICALLY COVERED HEREIN. THIS PARAGRAPH SHALL NOT BE CONSTRUED TO APPLY TO WORK BELOW GROUND LEVEL IN OPEN CUT. IT SHALL APPLY TO CUT AND COVER WORK OF SUBWAY CONSTRUCTION AFTER THE TEMPORARY COVER HAS BEEN PLACED. (CALAVERAS AND SAN JOAQUIN COUNTIES)

$38.37$29.89$68.26Agreement
LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 1…
Full text

LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 1-C- BURNING AND WELDING IN CONNECTION WITH LABORERS' WORK; SYNTHETIC THERMOPLASTICS AND SIMILAR TYPE WELDING.

FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE WAGE RATE. GROUP 1-B: SEWER CLEANERS SHALL RECEIVE $4.00 PER DAY ABOVE GROUP 1 WAGE RATES. ""SEWER CLEANER"" MEANS ANY WORKER WHO HANDLES OR COMES IN CONTACT WITH RAW SEWAGE IN SMALL DIAMETER SEWERS. THOSE WHO WORK INSIDE RECENTLY ACTIVE, LARGE DIAMETER SEWERS, AND ALL RECENTLY ACTIVE SEWER MANHOLES SHAL RECEIVE $5.00 PER DAY ABOVE GROUP 1 WAGE RATES. GROUP 1-D: MAINTENANCE AND REPAIR TRACK AND ROAD BEDS. ALL EMPLOYEES PERFORMING WORK COVERED HEREIN SHALL RECEIVE $0.25 PER HOUR ABOVE THEIR REGULAR RATE FOR ALL WORK PERFORMED ON UNDERGROUND STRUCTURES NOT SPECIFICALLY COVERED HEREIN. THIS PARAGRAPH SHALL NOT BE CONSTRUED TO APPLY TO WORK BELOW GROUND LEVEL IN OPEN CUT. IT SHALL APPLY TO CUT AND COVER WORK OF SUBWAY CONSTRUCTION AFTER THE TEMPORARY COVER HAS BEEN PLACED. (CALAVERAS AND SAN JOAQUIN COUNTIES)

$38.20$29.89$68.09Agreement
LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 1…
Full text

LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 1-E- WORK ON AND/OR IN BELL HOLE FOOTINGS AND SHAFTS THEREOF, AND WORK ON AND IN DEEP FOOTINGS. (A DEEP FOOTING IS A HOLE 15 FEET OR MORE IN DEPTH.) IN THE EVENT THE DEPTH OF THE FOOTING IS UNKNOWN AT THE COMMENCEMENT OF EXCAVATION, AND THE FINAL DEPTH EXCEEDS 15 FEET, THE DEEP FOOTING WAGE RATE WOULD APPLY TO ALL EMPLOYEES FOR EACH AND EVERY DAY WORKED ON OR IN THE EXCAVATION OF THE FOOTING FROM THE DATE OF INCEPTION.

FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE WAGE RATE. GROUP 1-B: SEWER CLEANERS SHALL RECEIVE $4.00 PER DAY ABOVE GROUP 1 WAGE RATES. ""SEWER CLEANER"" MEANS ANY WORKER WHO HANDLES OR COMES IN CONTACT WITH RAW SEWAGE IN SMALL DIAMETER SEWERS. THOSE WHO WORK INSIDE RECENTLY ACTIVE, LARGE DIAMETER SEWERS, AND ALL RECENTLY ACTIVE SEWER MANHOLES SHAL RECEIVE $5.00 PER DAY ABOVE GROUP 1 WAGE RATES. GROUP 1-D: MAINTENANCE AND REPAIR TRACK AND ROAD BEDS. ALL EMPLOYEES PERFORMING WORK COVERED HEREIN SHALL RECEIVE $0.25 PER HOUR ABOVE THEIR REGULAR RATE FOR ALL WORK PERFORMED ON UNDERGROUND STRUCTURES NOT SPECIFICALLY COVERED HEREIN. THIS PARAGRAPH SHALL NOT BE CONSTRUED TO APPLY TO WORK BELOW GROUND LEVEL IN OPEN CUT. IT SHALL APPLY TO CUT AND COVER WORK OF SUBWAY CONSTRUCTION AFTER THE TEMPORARY COVER HAS BEEN PLACED. (CALAVERAS AND SAN JOAQUIN COUNTIES)

$38.70$29.89$68.59Agreement
LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 2…
Full text

LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 2- ASPHALT SHOVELER; CEMENT DUMPER AND HANDLING DRY CEMENT OR GYPSUM; CHOKE-SETTER AND RIGGER (CLEARING WORK); CONCRETE BUCKET DUMPER AND CHUTE; CONCRETE CHIPPING AND GRINDING; CONCRETE LABORER (WET OR DRY); DRILLER TENDER, CHUCK TENDER, NIPPER; GUINEA CHASER (STAKE), GROUT CREW; HIGH PRESSURE NOZZLE, ADDUCTOR; HYDRAULIC MONITOR (OVER 100 LBS. PRESSURE); LOADING AND UNLOADING, CARRYING AND HAULING OF ALL RODS AND MATERIALS FOR USE IN REINFORCING CONCRETE CONSTRUCTION; PITTSBURGH CHIPPER AND SIMILAR TYPE BRUSH SHREDDERS; SLOPER; SINGLE FOOT, HAND-HELD, PNEUMATIC TAMPER; ALL PNEUMATIC, AIR, GAS AND ELECTRIC TOOLS NOT LISTED IN GROUPS 1 THROUGH 1-F; JACKING OF PIPE - UNDER 12 INCHES.

FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE WAGE RATE. GROUP 1-B: SEWER CLEANERS SHALL RECEIVE $4.00 PER DAY ABOVE GROUP 1 WAGE RATES. ""SEWER CLEANER"" MEANS ANY WORKER WHO HANDLES OR COMES IN CONTACT WITH RAW SEWAGE IN SMALL DIAMETER SEWERS. THOSE WHO WORK INSIDE RECENTLY ACTIVE, LARGE DIAMETER SEWERS, AND ALL RECENTLY ACTIVE SEWER MANHOLES SHAL RECEIVE $5.00 PER DAY ABOVE GROUP 1 WAGE RATES. GROUP 1-D: MAINTENANCE AND REPAIR TRACK AND ROAD BEDS. ALL EMPLOYEES PERFORMING WORK COVERED HEREIN SHALL RECEIVE $0.25 PER HOUR ABOVE THEIR REGULAR RATE FOR ALL WORK PERFORMED ON UNDERGROUND STRUCTURES NOT SPECIFICALLY COVERED HEREIN. THIS PARAGRAPH SHALL NOT BE CONSTRUED TO APPLY TO WORK BELOW GROUND LEVEL IN OPEN CUT. IT SHALL APPLY TO CUT AND COVER WORK OF SUBWAY CONSTRUCTION AFTER THE TEMPORARY COVER HAS BEEN PLACED. (CALAVERAS AND SAN JOAQUIN COUNTIES)

$38.00$29.89$67.89Agreement
LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 3…
Full text

LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 3- CONSTRUCTION LABORERS, INCLUDING BRIDGE AND GENERAL LABORER; DUMP, LOAD SPOTTER; FLAG PERSON; FIRE WATCHER; FENCE ERECTOR; GUARDRAIL ERECTOR; GARDENER, HORTICULTURAL AND LANDSCAPE LABORER; JETTING; LIMBER, BRUSH LOADER AND PILER; PAVEMENT MARKER (BUTTON SETTER); MAINTENANCE, REPAIR TRACK AND ROAD BEDS; STREETCAR AND RAILROAD CONSTRUCTION TRACK LABORER; TEMPORARY AIR AND WATER LINES, VICTAULIC OR SIMILAR; TOOL ROOM ATTENDANT (JOBSITE ONLY).

FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE WAGE RATE. GROUP 1-B: SEWER CLEANERS SHALL RECEIVE $4.00 PER DAY ABOVE GROUP 1 WAGE RATES. ""SEWER CLEANER"" MEANS ANY WORKER WHO HANDLES OR COMES IN CONTACT WITH RAW SEWAGE IN SMALL DIAMETER SEWERS. THOSE WHO WORK INSIDE RECENTLY ACTIVE, LARGE DIAMETER SEWERS, AND ALL RECENTLY ACTIVE SEWER MANHOLES SHAL RECEIVE $5.00 PER DAY ABOVE GROUP 1 WAGE RATES. GROUP 1-D: MAINTENANCE AND REPAIR TRACK AND ROAD BEDS. ALL EMPLOYEES PERFORMING WORK COVERED HEREIN SHALL RECEIVE $0.25 PER HOUR ABOVE THEIR REGULAR RATE FOR ALL WORK PERFORMED ON UNDERGROUND STRUCTURES NOT SPECIFICALLY COVERED HEREIN. THIS PARAGRAPH SHALL NOT BE CONSTRUED TO APPLY TO WORK BELOW GROUND LEVEL IN OPEN CUT. IT SHALL APPLY TO CUT AND COVER WORK OF SUBWAY CONSTRUCTION AFTER THE TEMPORARY COVER HAS BEEN PLACED. (CALAVERAS AND SAN JOAQUIN COUNTIES)

$37.90$29.89$67.79Agreement
LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 4…
Full text

LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 4- FINAL CLEAN-UP WORK OF DEBRIS, GROUNDS AND BUILDING INCLUDING BUT NOT LIMITED TO: STREET CLEANER; CLEANING AND WASHING WINDOWS; BRICK CLEANER (JOBSITE ONLY); MATERIAL CLEANER (JOBSITE ONLY). THE CLASSIFICATION ""MATERIAL CLEANER"" IS TO BE UTILIZED UNDER THE FOLLOWING CONDITIONS: A: AT DEMOLITION SITE FOR THE SALVAGE OF THE MATERIAL. B: AT THE CONCLUSION OF A JOB WHERE THE MATERIAL IS TO BE SALVAGED AND STOCKED TO BE REUSED ON ANOTHER JOB. C: FOR THE CLEANING OF SALVAGE MATERIAL AT THE JOBSITE OR TEMPORARY JOBSITE YARD. THE MATERIAL CLEANER CLASSIFICATION SHOULD NOT BE USED IN THE PERFORMANCE OF ""FORM STRIPPING, CLEANING AND OILING AND MOVING TO THE NEXT POINT OF ERECTION"".

FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE WAGE RATE. GROUP 1-B: SEWER CLEANERS SHALL RECEIVE $4.00 PER DAY ABOVE GROUP 1 WAGE RATES. ""SEWER CLEANER"" MEANS ANY WORKER WHO HANDLES OR COMES IN CONTACT WITH RAW SEWAGE IN SMALL DIAMETER SEWERS. THOSE WHO WORK INSIDE RECENTLY ACTIVE, LARGE DIAMETER SEWERS, AND ALL RECENTLY ACTIVE SEWER MANHOLES SHAL RECEIVE $5.00 PER DAY ABOVE GROUP 1 WAGE RATES. GROUP 1-D: MAINTENANCE AND REPAIR TRACK AND ROAD BEDS. ALL EMPLOYEES PERFORMING WORK COVERED HEREIN SHALL RECEIVE $0.25 PER HOUR ABOVE THEIR REGULAR RATE FOR ALL WORK PERFORMED ON UNDERGROUND STRUCTURES NOT SPECIFICALLY COVERED HEREIN. THIS PARAGRAPH SHALL NOT BE CONSTRUED TO APPLY TO WORK BELOW GROUND LEVEL IN OPEN CUT. IT SHALL APPLY TO CUT AND COVER WORK OF SUBWAY CONSTRUCTION AFTER THE TEMPORARY COVER HAS BEEN PLACED. (CALAVERAS AND SAN JOAQUIN COUNTIES)

$31.59$29.89$61.48Agreement
LABORER, GUNITE: GROUP 1- STRUCTURAL NOZZLEMAN.

FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE WAGE RATE. (CALAVERAS AND SAN JOAQUIN COUNTIES)

$39.11$29.89$69.00Agreement
LABORER, GUNITE: GROUP 2- NOZZLEMAN, GUNMAN, POTMAN, GROUNDMAN.

FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE WAGE RATE. (CALAVERAS AND SAN JOAQUIN COUNTIES)

$38.61$29.89$68.50Agreement
LABORER, GUNITE: GROUP 3- REBOUNDMAN.

FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE WAGE RATE. (CALAVERAS AND SAN JOAQUIN COUNTIES)

$38.02$29.89$67.91Agreement
LABORER, GUNITE: GROUP 4- GUINTE LABORER.

FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE WAGE RATE. (CALAVERAS AND SAN JOAQUIN COUNTIES)

$37.90$29.89$67.79Agreement
LABORER, WRECKING: GROUP 1…
Full text

LABORER, WRECKING: GROUP 1- SKILLED WRECKER (REMOVING AND SALVAGING OF SASH, WINDOWS, AND MATERIALS).

FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE WAGE RATE. (CALAVERAS AND SAN JOAQUIN COUNTIES)

$38.15$29.89$68.04Agreement
LABORER, WRECKING: GROUP 2- SEMI-SKILLED WRECKER (SALVAGING OF OTHER BUILDING MATERIALS).

FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE WAGE RATE. (CALAVERAS AND SAN JOAQUIN COUNTIES)

$38.00$29.89$67.89Agreement
LABORER: GARDENERS, HORTICULTURAL & LANDSCAPE LABORERS - (1) New Construction.

FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE WAGE RATE. (CALAVERAS AND SAN JOAQUIN COUNTIES)

$37.90$29.89$67.79Agreement
LABORER: GARDENERS…
Full text

LABORER: GARDENERS, HORTICULTURAL & LANDSCAPE LABORERS - (2) Establishment Warranty Period.

FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE WAGE RATE. (CALAVERAS AND SAN JOAQUIN COUNTIES)

$31.59$29.89$61.48Agreement
LABO0073-009 · Laborers agreement, July 1, 2023
LABORER, PLASTER TENDER. WORK ON A SWING STAGE SCAFFOLD…
Full text

LABORER, PLASTER TENDER. WORK ON A SWING STAGE SCAFFOLD: $1.00 PER HOUR ADDITIONAL. (CALAVERAS AND SAN JOAQUIN COUNTIES)

$39.77$28.54$68.31Agreement
LABO0261-003 · Laborers agreement, July 1, 2023
LABORER, TRAFFIC CONTROL/LANE CLOSURE…
Full text

LABORER, TRAFFIC CONTROL/LANE CLOSURE: ESCORT DRIVER, FLAG PERSON (SAN FRANCISCO AND SAN MATEO COUNTIES)

$37.26$27.30$64.56Agreement
LABORER, TRAFFIC CONTROL/LANE CLOSURE…
Full text

LABORER, TRAFFIC CONTROL/LANE CLOSURE: TRAFFIC CONTROL PERSON I- LAYOUT OF TRAFFIC CONTROL, CRASH CUSHIONS, CONSTRUCTION AREA AND ROADSIDE SIGNAGE. (SAN FRANCISCO AND SAN MATEO COUNTIES)

$37.56$27.30$64.86Agreement
LABORER, TRAFFIC CONTROL/LANE CLOSURE…
Full text

LABORER, TRAFFIC CONTROL/LANE CLOSURE: TRAFFIC CONTROL PERSON II- INSTALLATION AND REMOVAL OF TEMPORARY/PERMANENT SIGNS, MARKERS, DELINEATORS AND CRASH CUSHIONS. (SAN FRANCISCO AND SAN MATEO COUNTIES)

$35.06$27.30$62.36Agreement
LABO0261-005 · Laborers agreement, June 26, 2023
TUNNEL AND SHAFT LABORERS: GROUP 1…
Full text

TUNNEL AND SHAFT LABORERS: GROUP 1- DIAMOND DRILLER; GROUNDMEN; GUNITE AND SHOTCRETE NOZZLEMEN (SAN FRANCISCO AND SAN MATEO COUNTIES)

$45.89$27.72$73.61Agreement
TUNNEL AND SHAFT LABORERS: GROUP 2…
Full text

TUNNEL AND SHAFT LABORERS: GROUP 2- RODMEN; SHAFT WORK & RAISE (BELOW ACTUAL OR EXCAVATED GROUND LEVEL) (SAN FRANCISCO AND SAN MATEO COUNTIES)

$45.66$27.72$73.38Agreement
TUNNEL AND SHAFT LABORERS: GROUP 3…
Full text

TUNNEL AND SHAFT LABORERS: GROUP 3- BIT GRINDER; BLASTER, DRILLER, POWDERMEN, HEADING; CHERRY PICKERMEN - WHERE CAR IS LIFTED; CONCRETE FINISHER IN TUNNEL; CONCRETE SCREEDMAN; GROUT PUMPMAN AND POTMAN; GUNITE & SHOTCRETE GUNMAN & POTMAN; HEADERMEN; HIGH PRESSURE NOZZLEMAN; MINER - TUNNEL, INCLUDING TOP AND BOTTOM MAN ON SHAFT AND RAISE WORK; NIPPER; NOZZLEMAN ON SLICK LINE; SANDBLASTER - POTMAN, ROBOTIC SHOTCRETE PLACER, SEGMENT ERECTOR, TUNNEL MUCK HAULER, STEEL FORM RAISER AND SETTER; TIMBERMAN, RETIMBERMAN (WOOD OR STEEL OR SUBSTITUTE MATERIALS THEREFORE); TUGGER (FOR TUNNEL LABORER WORK); CABLE TENDER; CHUCK TENDER; POWDERMAN - PRIMER HOUSE (SAN FRANCISCO AND SAN MATEO COUNTIES)

$45.41$27.72$73.13Agreement
TUNNEL AND SHAFT LABORERS: GROUP 4…
Full text

TUNNEL AND SHAFT LABORERS: GROUP 4- VIBRATOR OPERATOR, PAVEMENT BREAKER; BULL GANG - MUCKERS, TRACKMEN; CONCRETE CREW - INCLUDES RODDING AND SPREADING, DUMPMEN (ANY METHOD) (SAN FRANCISCO AND SAN MATEO COUNTIES)

$44.96$27.72$72.68Agreement
TUNNEL AND SHAFT LABORERS: GROUP 5…
Full text

TUNNEL AND SHAFT LABORERS: GROUP 5- GROUT CREW; REBOUNDMAN; SWAMPER/ BRAKEMAN (SAN FRANCISCO AND SAN MATEO COUNTIES)

$44.42$27.72$72.14Agreement
TUNNEL AND SHAFT LABORERS: SHOTCRETE SPECIALIST (SAN FRANCISCO AND SAN MATEO COUNTIES)$46.41$27.72$74.13Agreement
LABO0261-009 · Laborers agreement, June 26, 2023
LABORER (CONSTRUCTION CRAFT LABORERS) GROUP 1…
Full text

LABORER (CONSTRUCTION CRAFT LABORERS) GROUP 1-F- WIRE WINDING MACHINE IN CONNECTION WITH GUNITING OR SHOT CRETE.

FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE WAGE RATE. GROUP 1-B: SEWER CLEANERS SHALL RECEIVE $4.00 PER DAY ABOVE GROUP 1 WAGE RATES. ""SEWER CLEANER"" MEANS ANY WORKER WHO HANDLES OR COMES IN CONTACT WITH RAW SEWAGE IN SMALL DIAMETER SEWERS. THOSE WHO WORK INSIDE RECENTLY ACTIVE, LARGE DIAMETER SEWERS, AND ALL RECENTLY ACTIVE SEWER MANHOLES SHAL RECEIVE $5.00 PER DAY ABOVE GROUP 1 WAGE RATES. GROUP 1-D: MAINTENANCE AND REPAIR TRACK AND ROAD BEDS. ALL EMPLOYEES PERFORMING WORK COVERED HEREIN SHALL RECEIVE $0.25 PER HOUR ABOVE THEIR REGULAR RATE FOR ALL WORK PERFORMED ON UNDERGROUND STRUCTURES NOT SPECIFICALLY COVERED HEREIN. THIS PARAGRAPH SHALL NOT BE CONSTRUED TO APPLY TO WORK BELOW GROUND LEVEL IN OPEN CUT. IT SHALL APPLY TO CUT AND COVER WORK OF SUBWAY CONSTRUCTION AFTER THE TEMPORARY COVER HAS BEEN PLACED. (SAN FRANCISCO AND SAN MATEO COUNTIES)

$31.37$23.20$54.57Agreement
LABORER, CONSTRUCTION CRAFT LABORERS…
Full text

LABORER, CONSTRUCTION CRAFT LABORERS: CONSTRUCTION SPECIALIST GROUP- ASPHALT IRONER AND RAKER; CHAINSAW; LASER BEAM IN CONNECTION WITH LABORERS' WORK; CAST-IN- PLACE MANHOLE FORM SETTER; PRESSURE PIPELAYER; DAVIS TRENCHER - 300 OR SIMILAR TYPE (AND ALL SMALL TRENCHERS); BLASTER; DIAMOND DRILLER; MULTIPLE UNIT DRILL; HYDRAULIC DRILL.

FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE WAGE RATE. GROUP 1-B: SEWER CLEANERS SHALL RECEIVE $4.00 PER DAY ABOVE GROUP 1 WAGE RATES. ""SEWER CLEANER"" MEANS ANY WORKER WHO HANDLES OR COMES IN CONTACT WITH RAW SEWAGE IN SMALL DIAMETER SEWERS. THOSE WHO WORK INSIDE RECENTLY ACTIVE, LARGE DIAMETER SEWERS, AND ALL RECENTLY ACTIVE SEWER MANHOLES SHAL RECEIVE $5.00 PER DAY ABOVE GROUP 1 WAGE RATES. GROUP 1-D: MAINTENANCE AND REPAIR TRACK AND ROAD BEDS. ALL EMPLOYEES PERFORMING WORK COVERED HEREIN SHALL RECEIVE $0.25 PER HOUR ABOVE THEIR REGULAR RATE FOR ALL WORK PERFORMED ON UNDERGROUND STRUCTURES NOT SPECIFICALLY COVERED HEREIN. THIS PARAGRAPH SHALL NOT BE CONSTRUED TO APPLY TO WORK BELOW GROUND LEVEL IN OPEN CUT. IT SHALL APPLY TO CUT AND COVER WORK OF SUBWAY CONSTRUCTION AFTER THE TEMPORARY COVER HAS BEEN PLACED. (SAN FRANCISCO AND SAN MATEO COUNTIES)

$37.20$27.30$64.50Agreement
LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 1…
Full text

LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 1- ASPHALT SPREADER BOXES (ALL TYPES); BARKO, WACKER AND SIMILAR TYPE TAMPERS; BUGGYMOBILE; CAULKER, BANDER, PIPEWRAPPER, CONDUIT LAYER, PLASTIC PIPELAYER; CERTIFIED HAZARDOUS WASTE WORKER INCLUDING LEADE ABATEMENT; COMPACTORS OF ALL TYPES; CONCRETE AND MAGNESITE MIXER, 1/2 YD. AND UNDER; CONCRETE PAN WORK; CONCRETE SANDER; CONCRETE SAW; CRIBBER AND/OR SHORING; CUT GRANITE CURB SETTER; DRI-PAK-IT MACHINE; FALLER, LOGLOADER AND BUCKER; FORM RAISER, SLIP FORMS; GREEN CUTTER; HEADERBOARD, HUBSETTER, ALIGNER, BY ANY METHOD; HIGH PRESSURE BLOW PIPE (1-1/2"" OR OVER, 100 LBS. PRESSURE/OVER); HYDRO SEEDER AND SIMILAR TYPE; JACKHAMMER OPERATOR; JACKING OF PIPE OVER 12 INCHES; JACKSON AND SIMILAR TYPE COMPACTOR; KETTLE TENDER, POT AND WORKER APPLYING ASPHALT, LAY-KOLD, CREOSOTE, LIME, CAUSTIC AND SIMILAR TYPE MATERIALS (APPLYING MEANS APPLYING, DIPPING OR HANDLING OF SUCH MATERIALS); LAGGING, SHEETING, WHALING, BRACING, TRENCHJACKING, LAGGING HAMMER; MAGNESITE, EPOXYRESIN, FIBERGLASS, MASTIC WORKER (WET OR DRY); NO JOINT PIPE AND STRIPPING OF SAME, INCLUDING REPAIR OF VOIDS; PAVEMENT BREAKER AND SPADER, INCLUDING TOOL GRINDER; PERMA CURB; PIPELAYER (INCLUDING GRADE CHECKING IN CONNECTION WITH PIPELAYING); PRECAST-MANHOLE SETTER; PRESSURE PIPE TESTER; POST HOLE DIGGER, AIR, GAS AND ELECTRIC; POWER BROOM SWEEPER; POWER TAMPERS OF ALL TYPES (EXCEPT AS SHOWN IN GROUP 2); RAM SET GUN AND STUD GUN; RIPRAP STONEPAVER AND ROCK-SLINGER, INCLUDING PLACING OF SACKED CONCRETE AND/OR SAND (WET OR DRY) AND GABIONS AND SIMILAR TYPE; ROTARY SCARIFIER OR MULTIPLE HEAD CONCRETE CHIPPING SCARIFIER; ROTO AND DITCH WITCH; ROTOTILLER; SANDBLASTER, POT, GUN, NOZZLE OPERATORS; SIGNALLING AND RIGGING; TANK CLEANER; TREE CLIMBER; TURBO BLASTER; VIBRASCREED, BULL FLOAT IN CONNECTION WITH LABORERS' WORK; VIBRATOR; HAZARDOUS WASTE WORKER (LEAD REMOVAL); ASBESTOS AND MOLD REMOVAL WORKER.

FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE WAGE RATE. GROUP 1-B: SEWER CLEANERS SHALL RECEIVE $4.00 PER DAY ABOVE GROUP 1 WAGE RATES. ""SEWER CLEANER"" MEANS ANY WORKER WHO HANDLES OR COMES IN CONTACT WITH RAW SEWAGE IN SMALL DIAMETER SEWERS. THOSE WHO WORK INSIDE RECENTLY ACTIVE, LARGE DIAMETER SEWERS, AND ALL RECENTLY ACTIVE SEWER MANHOLES SHAL RECEIVE $5.00 PER DAY ABOVE GROUP 1 WAGE RATES. GROUP 1-D: MAINTENANCE AND REPAIR TRACK AND ROAD BEDS. ALL EMPLOYEES PERFORMING WORK COVERED HEREIN SHALL RECEIVE $0.25 PER HOUR ABOVE THEIR REGULAR RATE FOR ALL WORK PERFORMED ON UNDERGROUND STRUCTURES NOT SPECIFICALLY COVERED HEREIN. THIS PARAGRAPH SHALL NOT BE CONSTRUED TO APPLY TO WORK BELOW GROUND LEVEL IN OPEN CUT. IT SHALL APPLY TO CUT AND COVER WORK OF SUBWAY CONSTRUCTION AFTER THE TEMPORARY COVER HAS BEEN PLACED. (SAN FRANCISCO AND SAN MATEO COUNTIES)

$36.50$27.30$63.80Agreement
LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 1…
Full text

LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 1-A- JOY DRILL MODEL TWM-2A; GARDNER-DENVER MODEL DH143 AND SIMILAR TYPE DRILLS; TRACK DRILLER; JACK LEG DRILLER; WAGON DRILLER; MECHANICAL DRILLERS, ALL TYPES REGARDLESS OF TYPE OR METHOD OF POWER; MECHANICAL PIPE LAYERS, ALL TYPES REGARDLESS OF TYPE OR METHOD OF POWER; BLASTER AND POWDER; ALL WORK OF LOADING, PLACING AND BLASTING OF ALL POWDER AND EXPLOSIVES OF WHATEVER TYPE REGARDLESS OF METHOD USED FOR SUCH LOADING AND PLACING; HIGH SCALERS (INCLUDING DRILLING OF SAME); TREE TOPPER; BIT GRINDER. GROUP 1-B: SEWER CLEANERS SHALL RECEIVE $4.00 PER DAY ABOVE GROUP 1 WAGE RATES. ""SEWER CLEANER"" MEANS ANY WORKER WHO HANDLES OR COMES IN CONTACT WITH RAW SEWAGE IN SMALL DIAMETER SEWERS. THOSE WHO WORK INSIDE RECENTLY ACTIVE, LARGE DIAMETER SEWERS, AND ALL RECENTLY ACTIVE SEWER MANHOLES SHAL RECEIVE $5.00 PER DAY ABOVE GROUP 1 WAGE RATES. GROUP 1-D: MAINTENANCE AND REPAIR TRACK AND ROAD BEDS. ALL EMPLOYEES PERFORMING WORK COVERED HEREIN SHALL RECEIVE $0.25 PER HOUR ABOVE THEIR REGULAR RATE FOR ALL WORK PERFORMED ON UNDERGROUND STRUCTURES NOT SPECIFICALLY COVERED HEREIN. THIS PARAGRAPH SHALL NOT BE CONSTRUED TO APPLY TO WORK BELOW GROUND LEVEL IN OPEN CUT. IT SHALL APPLY TO CUT AND COVER WORK OF SUBWAY CONSTRUCTION AFTER THE TEMPORARY COVER HAS BEEN PLACED. (SAN FRANCISCO AND SAN MATEO COUNTIES)

$36.72$27.30$64.02Agreement
LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 1…
Full text

LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 1-C- BURNING AND WELDING IN CONNECTION WITH LABORERS' WORK; SYNTHETIC THERMOPLASTICS AND SIMILAR TYPE WELDING.

FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE WAGE RATE. GROUP 1-B: SEWER CLEANERS SHALL RECEIVE $4.00 PER DAY ABOVE GROUP 1 WAGE RATES. ""SEWER CLEANER"" MEANS ANY WORKER WHO HANDLES OR COMES IN CONTACT WITH RAW SEWAGE IN SMALL DIAMETER SEWERS. THOSE WHO WORK INSIDE RECENTLY ACTIVE, LARGE DIAMETER SEWERS, AND ALL RECENTLY ACTIVE SEWER MANHOLES SHAL RECEIVE $5.00 PER DAY ABOVE GROUP 1 WAGE RATES. GROUP 1-D: MAINTENANCE AND REPAIR TRACK AND ROAD BEDS. ALL EMPLOYEES PERFORMING WORK COVERED HEREIN SHALL RECEIVE $0.25 PER HOUR ABOVE THEIR REGULAR RATE FOR ALL WORK PERFORMED ON UNDERGROUND STRUCTURES NOT SPECIFICALLY COVERED HEREIN. THIS PARAGRAPH SHALL NOT BE CONSTRUED TO APPLY TO WORK BELOW GROUND LEVEL IN OPEN CUT. IT SHALL APPLY TO CUT AND COVER WORK OF SUBWAY CONSTRUCTION AFTER THE TEMPORARY COVER HAS BEEN PLACED. (SAN FRANCISCO AND SAN MATEO COUNTIES)

$36.55$27.30$63.85Agreement
LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 1…
Full text

LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 1-E- WORK ON AND/OR IN BELL HOLE FOOTINGS AND SHAFTS THEREOF, AND WORK ON AND IN DEEP FOOTINGS. (A DEEP FOOTING IS A HOLE 15 FEET OR MORE IN DEPTH.) IN THE EVENT THE DEPTH OF THE FOOTING IS UNKNOWN AT THE COMMENCEMENT OF EXCAVATION, AND THE FINAL DEPTH EXCEEDS 15 FEET, THE DEEP FOOTING WAGE RATE WOULD APPLY TO ALL EMPLOYEES FOR EACH AND EVERY DAY WORKED ON OR IN THE EXCAVATION OF THE FOOTING FROM THE DATE OF INCEPTION.

FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE WAGE RATE. GROUP 1-B: SEWER CLEANERS SHALL RECEIVE $4.00 PER DAY ABOVE GROUP 1 WAGE RATES. ""SEWER CLEANER"" MEANS ANY WORKER WHO HANDLES OR COMES IN CONTACT WITH RAW SEWAGE IN SMALL DIAMETER SEWERS. THOSE WHO WORK INSIDE RECENTLY ACTIVE, LARGE DIAMETER SEWERS, AND ALL RECENTLY ACTIVE SEWER MANHOLES SHAL RECEIVE $5.00 PER DAY ABOVE GROUP 1 WAGE RATES. GROUP 1-D: MAINTENANCE AND REPAIR TRACK AND ROAD BEDS. ALL EMPLOYEES PERFORMING WORK COVERED HEREIN SHALL RECEIVE $0.25 PER HOUR ABOVE THEIR REGULAR RATE FOR ALL WORK PERFORMED ON UNDERGROUND STRUCTURES NOT SPECIFICALLY COVERED HEREIN. THIS PARAGRAPH SHALL NOT BE CONSTRUED TO APPLY TO WORK BELOW GROUND LEVEL IN OPEN CUT. IT SHALL APPLY TO CUT AND COVER WORK OF SUBWAY CONSTRUCTION AFTER THE TEMPORARY COVER HAS BEEN PLACED. (SAN FRANCISCO AND SAN MATEO COUNTIES)

$37.05$27.30$64.35Agreement
LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 2…
Full text

LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 2- ASPHALT SHOVELER; CEMENT DUMPER AND HANDLING DRY CEMENT OR GYPSUM; CHOKE-SETTER AND RIGGER (CLEARING WORK); CONCRETE BUCKET DUMPER AND CHUTE; CONCRETE CHIPPING AND GRINDING; CONCRETE LABORER (WET OR DRY); DRILLER TENDER, CHUCK TENDER, NIPPER; GUINEA CHASER (STAKE), GROUT CREW; HIGH PRESSURE NOZZLE, ADDUCTOR; HYDRAULIC MONITOR (OVER 100 LBS. PRESSURE); LOADING AND UNLOADING, CARRYING AND HAULING OF ALL RODS AND MATERIALS FOR USE IN REINFORCING CONCRETE CONSTRUCTION; PITTSBURGH CHIPPER AND SIMILAR TYPE BRUSH SHREDDERS; SLOPER; SINGLE FOOT, HAND-HELD, PNEUMATIC TAMPER; ALL PNEUMATIC, AIR, GAS AND ELECTRIC TOOLS NOT LISTED IN GROUPS 1 THROUGH 1-F; JACKING OF PIPE - UNDER 12 INCHES.

FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE WAGE RATE. GROUP 1-B: SEWER CLEANERS SHALL RECEIVE $4.00 PER DAY ABOVE GROUP 1 WAGE RATES. ""SEWER CLEANER"" MEANS ANY WORKER WHO HANDLES OR COMES IN CONTACT WITH RAW SEWAGE IN SMALL DIAMETER SEWERS. THOSE WHO WORK INSIDE RECENTLY ACTIVE, LARGE DIAMETER SEWERS, AND ALL RECENTLY ACTIVE SEWER MANHOLES SHAL RECEIVE $5.00 PER DAY ABOVE GROUP 1 WAGE RATES. GROUP 1-D: MAINTENANCE AND REPAIR TRACK AND ROAD BEDS. ALL EMPLOYEES PERFORMING WORK COVERED HEREIN SHALL RECEIVE $0.25 PER HOUR ABOVE THEIR REGULAR RATE FOR ALL WORK PERFORMED ON UNDERGROUND STRUCTURES NOT SPECIFICALLY COVERED HEREIN. THIS PARAGRAPH SHALL NOT BE CONSTRUED TO APPLY TO WORK BELOW GROUND LEVEL IN OPEN CUT. IT SHALL APPLY TO CUT AND COVER WORK OF SUBWAY CONSTRUCTION AFTER THE TEMPORARY COVER HAS BEEN PLACED. (SAN FRANCISCO AND SAN MATEO COUNTIES)

$36.35$27.30$63.65Agreement
LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 3…
Full text

LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 3- CONSTRUCTION LABORERS, INCLUDING BRIDGE AND GENERAL LABORER; DUMP, LOAD SPOTTER; FLAG PERSON; FIRE WATCHER; FENCE ERECTOR; GUARDRAIL ERECTOR; GARDENER, HORTICULTURAL AND LANDSCAPE LABORER; JETTING; LIMBER, BRUSH LOADER AND PILER; PAVEMENT MARKER (BUTTON SETTER); MAINTENANCE, REPAIR TRACK AND ROAD BEDS; STREETCAR AND RAILROAD CONSTRUCTION TRACK LABORER; TEMPORARY AIR AND WATER LINES, VICTAULIC OR SIMILAR; TOOL ROOM ATTENDANT (JOBSITE ONLY).

FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE WAGE RATE. GROUP 1-B: SEWER CLEANERS SHALL RECEIVE $4.00 PER DAY ABOVE GROUP 1 WAGE RATES. ""SEWER CLEANER"" MEANS ANY WORKER WHO HANDLES OR COMES IN CONTACT WITH RAW SEWAGE IN SMALL DIAMETER SEWERS. THOSE WHO WORK INSIDE RECENTLY ACTIVE, LARGE DIAMETER SEWERS, AND ALL RECENTLY ACTIVE SEWER MANHOLES SHAL RECEIVE $5.00 PER DAY ABOVE GROUP 1 WAGE RATES. GROUP 1-D: MAINTENANCE AND REPAIR TRACK AND ROAD BEDS. ALL EMPLOYEES PERFORMING WORK COVERED HEREIN SHALL RECEIVE $0.25 PER HOUR ABOVE THEIR REGULAR RATE FOR ALL WORK PERFORMED ON UNDERGROUND STRUCTURES NOT SPECIFICALLY COVERED HEREIN. THIS PARAGRAPH SHALL NOT BE CONSTRUED TO APPLY TO WORK BELOW GROUND LEVEL IN OPEN CUT. IT SHALL APPLY TO CUT AND COVER WORK OF SUBWAY CONSTRUCTION AFTER THE TEMPORARY COVER HAS BEEN PLACED. (SAN FRANCISCO AND SAN MATEO COUNTIES)

$36.25$27.30$63.55Agreement
LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 4…
Full text

LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 4- FINAL CLEAN-UP WORK OF DEBRIS, GROUNDS AND BUILDING INCLUDING BUT NOT LIMITED TO: STREET CLEANER; CLEANING AND WASHING WINDOWS; BRICK CLEANER (JOBSITE ONLY); MATERIAL CLEANER (JOBSITE ONLY). THE CLASSIFICATION ""MATERIAL CLEANER"" IS TO BE UTILIZED UNDER THE FOLLOWING CONDITIONS: A: AT DEMOLITION SITE FOR THE SALVAGE OF THE MATERIAL. B: AT THE CONCLUSION OF A JOB WHERE THE MATERIAL IS TO BE SALVAGED AND STOCKED TO BE REUSED ON ANOTHER JOB. C: FOR THE CLEANING OF SALVAGE MATERIAL AT THE JOBSITE OR TEMPORARY JOBSITE YARD. THE MATERIAL CLEANER CLASSIFICATION SHOULD NOT BE USED IN THE PERFORMANCE OF ""FORM STRIPPING, CLEANING AND OILING AND MOVING TO THE NEXT POINT OF ERECTION"".

FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE WAGE RATE. GROUP 1-B: SEWER CLEANERS SHALL RECEIVE $4.00 PER DAY ABOVE GROUP 1 WAGE RATES. ""SEWER CLEANER"" MEANS ANY WORKER WHO HANDLES OR COMES IN CONTACT WITH RAW SEWAGE IN SMALL DIAMETER SEWERS. THOSE WHO WORK INSIDE RECENTLY ACTIVE, LARGE DIAMETER SEWERS, AND ALL RECENTLY ACTIVE SEWER MANHOLES SHAL RECEIVE $5.00 PER DAY ABOVE GROUP 1 WAGE RATES. GROUP 1-D: MAINTENANCE AND REPAIR TRACK AND ROAD BEDS. ALL EMPLOYEES PERFORMING WORK COVERED HEREIN SHALL RECEIVE $0.25 PER HOUR ABOVE THEIR REGULAR RATE FOR ALL WORK PERFORMED ON UNDERGROUND STRUCTURES NOT SPECIFICALLY COVERED HEREIN. THIS PARAGRAPH SHALL NOT BE CONSTRUED TO APPLY TO WORK BELOW GROUND LEVEL IN OPEN CUT. IT SHALL APPLY TO CUT AND COVER WORK OF SUBWAY CONSTRUCTION AFTER THE TEMPORARY COVER HAS BEEN PLACED. (SAN FRANCISCO AND SAN MATEO COUNTIES)

$29.94$27.30$57.24Agreement
LABORER, GUNITE: GROUP 1- STRUCTURAL NOZZLEMAN.

FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE WAGE RATE. (SAN FRANCISCO AND SAN MATEO COUNTIES)

$37.46$27.30$64.76Agreement
LABORER, GUNITE: GROUP 2- NOZZLEMAN, GUNMAN, POTMAN, GROUNDMAN.

FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE WAGE RATE. (SAN FRANCISCO AND SAN MATEO COUNTIES)

$36.96$27.30$64.26Agreement
LABORER, GUNITE: GROUP 3- REBOUNDMAN.

FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE WAGE RATE. (SAN FRANCISCO AND SAN MATEO COUNTIES)

$36.37$27.30$63.67Agreement
LABORER, GUNITE: GROUP 4- GUINTE LABORER.

FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE WAGE RATE. (SAN FRANCISCO AND SAN MATEO COUNTIES)

$36.25$27.30$63.55Agreement
LABORER, WRECKING: GROUP 1…
Full text

LABORER, WRECKING: GROUP 1- SKILLED WRECKER (REMOVING AND SALVAGING OF SASH, WINDOWS, AND MATERIALS).

FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE WAGE RATE. (SAN FRANCISCO AND SAN MATEO COUNTIES)

$36.50$27.30$63.80Agreement
LABORER, WRECKING: GROUP 2- SEMI-SKILLED WRECKER (SALVAGING OF OTHER BUILDING MATERIALS).

FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE WAGE RATE. (SAN FRANCISCO AND SAN MATEO COUNTIES)

$36.35$27.30$63.65Agreement
LABORER: GARDENERS, HORTICULTURAL & LANDSCAPE LABORERS - (1) New Construction.

FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE WAGE RATE. (SAN FRANCISCO AND SAN MATEO COUNTIES)

$36.25$27.30$63.55Agreement
LABORER: GARDENERS…
Full text

LABORER: GARDENERS, HORTICULTURAL & LANDSCAPE LABORERS - (2) Establishment Warranty Period.

FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE WAGE RATE. (SAN FRANCISCO AND SAN MATEO COUNTIES)

$29.94$27.30$57.24Agreement
LABO0261-011 · Laborers agreement, July 1, 2023
MASON TENDER, BRICK.

FOOTNOTES: UNDERGROUND WORK SUCH AS SEWERS, MANHOLES, CATCH BASINS, SEWER PIPES, TELEPHONE CONDUITS, TUNNELS AND CUT TRENCHES: $5.00 PER DAY ADDITIONAL. WORK IN LIVE SEWAGE: $2.50 PER DAY ADDITIONAL. (SAN FRANCISCO AND SAN MATEO COUNTIES)

$37.05$27.45$64.50Agreement
LABO0261-014 · Laborers agreement, July 1, 2023
PLASTER TENDER. WORK ON A SWING STAGE SCAFFOLD…
Full text

PLASTER TENDER. WORK ON A SWING STAGE SCAFFOLD: $1.00 PER HOUR ADDITIONAL. (SAN FRANCISCO AND SAN MATEO COUNTIES)

$41.93$30.32$72.25Agreement
LABO0270-003 · Laborers agreement, July 1, 2023
LABORER, TRAFFIC CONTROL/LANE CLOSURE…
Full text

LABORER, TRAFFIC CONTROL/LANE CLOSURE: ESCORT DRIVER, FLAG PERSON (MONTEREY, SAN BENITO, AND SANTA CRUZ COUNTIES)

$36.26$27.30$63.56Agreement
LABORER, TRAFFIC CONTROL/LANE CLOSURE: ESCORT DRIVER, FLAG PERSON (SANTA CALARA COUNTY)$37.26$27.30$64.56Agreement
LABORER, TRAFFIC CONTROL/LANE CLOSURE…
Full text

LABORER, TRAFFIC CONTROL/LANE CLOSURE: TRAFFIC CONTROL PERSON I- LAYOUT OF TRAFFIC CONTROL, CRASH CUSHIONS, CONSTRUCTION AREA AND ROADSIDE SIGNAGE. (MONTEREY, SAN BENITO, AND SANTA CRUZ COUNTIES)

$36.56$27.30$63.86Agreement
LABORER, TRAFFIC CONTROL/LANE CLOSURE…
Full text

LABORER, TRAFFIC CONTROL/LANE CLOSURE: TRAFFIC CONTROL PERSON I- LAYOUT OF TRAFFIC CONTROL, CRASH CUSHIONS, CONSTRUCTION AREA AND ROADSIDE SIGNAGE. (SANTA CALARA COUNTY)

$37.56$27.30$64.86Agreement
LABORER, TRAFFIC CONTROL/LANE CLOSURE…
Full text

LABORER, TRAFFIC CONTROL/LANE CLOSURE: TRAFFIC CONTROL PERSON II- INSTALLATION AND REMOVAL OF TEMPORARY/PERMANENT SIGNS, MARKERS, DELINEATORS, AND CRASH CUSHIONS. (MONTEREY, SAN BENITO, AND SANTA CRUZ COUNTIES)

$34.06$27.30$61.36Agreement
LABORER, TRAFFIC CONTROL/LANE CLOSURE…
Full text

LABORER, TRAFFIC CONTROL/LANE CLOSURE: TRAFFIC CONTROL PERSON II- INSTALLATION AND REMOVAL OF TEMPORARY/PERMANENT SIGNS, MARKERS, DELINEATORS, AND CRASH CUSHIONS. (SANTA CALARA COUNTY)

$35.06$27.30$62.36Agreement
LABO0270-004 · Laborers agreement, June 26, 2023
TUNNEL AND SHAFT LABORERS: GROUP 1…
Full text

TUNNEL AND SHAFT LABORERS: GROUP 1- DIAMOND DRILLER; GROUNDMEN; GUNITE AND SHOTCRETE NOZZLEMEN. (MONTEREY, SAN BENITO, SANTA CLARA, AND SANTA CRUZ COUNTIES)

$45.89$27.72$73.61Agreement
TUNNEL AND SHAFT LABORERS: GROUP 2…
Full text

TUNNEL AND SHAFT LABORERS: GROUP 2- RODMEN; SHAFT WORK & RAISE (BELOW ACTUAL OR EXCAVATED GROUND LEVEL). (MONTEREY, SAN BENITO, SANTA CLARA, AND SANTA CRUZ COUNTIES)

$45.66$27.72$73.38Agreement
TUNNEL AND SHAFT LABORERS: GROUP 3…
Full text

TUNNEL AND SHAFT LABORERS: GROUP 3- BIT GRINDER; BLASTER, DRILLER, POWDERMEN, HEADING; CHERRY PICKERMEN - WHERE CAR IS LIFTED; CONCRETE FINISHER IN TUNNEL; CONCRETE SCREEDMAN; GROUT PUMPMAN AND POTMAN; GUNITE & SHOTCRETE GUNMAN & POTMAN; HEADERMEN; HIGH PRESSURE NOZZLEMAN; MINER - TUNNEL, INCLUDING TOP AND BOTTOM MAN ON SHAFT AND RAISE WORK; NIPPER; NOZZLEMAN ON SLICK LINE; SANDBLASTER - POTMAN, ROBOTIC SHOTCRETE PLACER, SEGMENT ERECTOR, TUNNEL MUCK HAULER, STEEL FORM RAISER AND SETTER; TIMBERMAN, RETIMBERMAN (WOOD OR STEEL OR SUBSTITUTE MATERIALS THEREFORE); TUGGER (FOR TUNNEL LABORER WORK); CABLE TENDER; CHUCK TENDER; POWDERMAN - PRIMER HOUSE. (MONTEREY, SAN BENITO, SANTA CLARA, AND SANTA CRUZ COUNTIES)

$45.41$27.72$73.13Agreement
TUNNEL AND SHAFT LABORERS: GROUP 4…
Full text

TUNNEL AND SHAFT LABORERS: GROUP 4- VIBRATOR OPERATOR, PAVEMENT BREAKER; BULL GANG - MUCKERS, TRACKMEN; CONCRETE CREW - INCLUDES RODDING AND SPREADING, DUMPMEN (ANY METHOD). (MONTEREY, SAN BENITO, SANTA CLARA, AND SANTA CRUZ COUNTIES)

$44.96$27.72$72.68Agreement
TUNNEL AND SHAFT LABORERS: GROUP 5…
Full text

TUNNEL AND SHAFT LABORERS: GROUP 5- GROUT CREW; REBOUNDMAN; SWAMPER/ BRAKEMAN. (MONTEREY, SAN BENITO, SANTA CLARA, AND SANTA CRUZ COUNTIES)

$44.42$27.72$72.14Agreement
TUNNEL AND SHAFT LABORERS…
Full text

TUNNEL AND SHAFT LABORERS: SHOTCRETE SPECIALIST. (MONTEREY, SAN BENITO, SANTA CLARA, AND SANTA CRUZ COUNTIES)

$46.41$27.72$74.13Agreement
LABO0270-005 · Laborers agreement, July 1, 2023
LABORER: MASON TENDER-BRICK. (MONTEREY AND SAN BENITO COUNTIES)$36.29$25.55$61.84Agreement
LABO0270-007 · Laborers agreement, June 26, 2023
LABORER (CONSTRUCTION CRAFT LABORERS) GROUP 1…
Full text

LABORER (CONSTRUCTION CRAFT LABORERS) GROUP 1-F- WIRE WINDING MACHINE IN CONNECTION WITH GUNITING OR SHOT CRETE.

FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE WAGE RATE. GROUP 1-B: SEWER CLEANERS SHALL RECEIVE $4.00 PER DAY ABOVE GROUP 1 WAGE RATES. ""SEWER CLEANER"" MEANS ANY WORKER WHO HANDLES OR COMES IN CONTACT WITH RAW SEWAGE IN SMALL DIAMETER SEWERS. THOSE WHO WORK INSIDE RECENTLY ACTIVE, LARGE DIAMETER SEWERS, AND ALL RECENTLY ACTIVE SEWER MANHOLES SHAL RECEIVE $5.00 PER DAY ABOVE GROUP 1 WAGE RATES. GROUP 1-D: MAINTENANCE AND REPAIR TRACK AND ROAD BEDS. ALL EMPLOYEES PERFORMING WORK COVERED HEREIN SHALL RECEIVE $0.25 PER HOUR ABOVE THEIR REGULAR RATE FOR ALL WORK PERFORMED ON UNDERGROUND STRUCTURES NOT SPECIFICALLY COVERED HEREIN. THIS PARAGRAPH SHALL NOT BE CONSTRUED TO APPLY TO WORK BELOW GROUND LEVEL IN OPEN CUT. IT SHALL APPLY TO CUT AND COVER WORK OF SUBWAY CONSTRUCTION AFTER THE TEMPORARY COVER HAS BEEN PLACED. (MONTEREY, SAN BENITO, AND SANTA CRUZ COUNTIES)

$36.08$27.30$63.38Agreement
LABORER, CONSTRUCTION CRAFT LABORERS…
Full text

LABORER, CONSTRUCTION CRAFT LABORERS: CONSTRUCTION SPECIALIST GROUP- ASPHALT IRONER AND RAKER; CHAINSAW; LASER BEAM IN CONNECTION WITH LABORERS' WORK; CAST-IN- PLACE MANHOLE FORM SETTER; PRESSURE PIPELAYER; DAVIS TRENCHER - 300 OR SIMILAR TYPE (AND ALL SMALL TRENCHERS); BLASTER; DIAMOND DRILLER; MULTIPLE UNIT DRILL; HYDRAULIC DRILL.

FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE WAGE RATE. GROUP 1-B: SEWER CLEANERS SHALL RECEIVE $4.00 PER DAY ABOVE GROUP 1 WAGE RATES. ""SEWER CLEANER"" MEANS ANY WORKER WHO HANDLES OR COMES IN CONTACT WITH RAW SEWAGE IN SMALL DIAMETER SEWERS. THOSE WHO WORK INSIDE RECENTLY ACTIVE, LARGE DIAMETER SEWERS, AND ALL RECENTLY ACTIVE SEWER MANHOLES SHAL RECEIVE $5.00 PER DAY ABOVE GROUP 1 WAGE RATES. GROUP 1-D: MAINTENANCE AND REPAIR TRACK AND ROAD BEDS. ALL EMPLOYEES PERFORMING WORK COVERED HEREIN SHALL RECEIVE $0.25 PER HOUR ABOVE THEIR REGULAR RATE FOR ALL WORK PERFORMED ON UNDERGROUND STRUCTURES NOT SPECIFICALLY COVERED HEREIN. THIS PARAGRAPH SHALL NOT BE CONSTRUED TO APPLY TO WORK BELOW GROUND LEVEL IN OPEN CUT. IT SHALL APPLY TO CUT AND COVER WORK OF SUBWAY CONSTRUCTION AFTER THE TEMPORARY COVER HAS BEEN PLACED. (MONTEREY, SAN BENITO, AND SANTA CRUZ COUNTIES)

$36.20$27.30$63.50Agreement
LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 1…
Full text

LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 1- ASPHALT SPREADER BOXES (ALL TYPES); BARKO, WACKER AND SIMILAR TYPE TAMPERS; BUGGYMOBILE; CAULKER, BANDER, PIPEWRAPPER, CONDUIT LAYER, PLASTIC PIPELAYER; CERTIFIED HAZARDOUS WASTE WORKER INCLUDING LEADE ABATEMENT; COMPACTORS OF ALL TYPES; CONCRETE AND MAGNESITE MIXER, 1/2 YD. AND UNDER; CONCRETE PAN WORK; CONCRETE SANDER; CONCRETE SAW; CRIBBER AND/OR SHORING; CUT GRANITE CURB SETTER; DRI-PAK-IT MACHINE; FALLER, LOGLOADER AND BUCKER; FORM RAISER, SLIP FORMS; GREEN CUTTER; HEADERBOARD, HUBSETTER, ALIGNER, BY ANY METHOD; HIGH PRESSURE BLOW PIPE (1-1/2"" OR OVER, 100 LBS. PRESSURE/OVER); HYDRO SEEDER AND SIMILAR TYPE; JACKHAMMER OPERATOR; JACKING OF PIPE OVER 12 INCHES; JACKSON AND SIMILAR TYPE COMPACTOR; KETTLE TENDER, POT AND WORKER APPLYING ASPHALT, LAY-KOLD, CREOSOTE, LIME, CAUSTIC AND SIMILAR TYPE MATERIALS (APPLYING MEANS APPLYING, DIPPING OR HANDLING OF SUCH MATERIALS); LAGGING, SHEETING, WHALING, BRACING, TRENCHJACKING, LAGGING HAMMER; MAGNESITE, EPOXYRESIN, FIBERGLASS, MASTIC WORKER (WET OR DRY); NO JOINT PIPE AND STRIPPING OF SAME, INCLUDING REPAIR OF VOIDS; PAVEMENT BREAKER AND SPADER, INCLUDING TOOL GRINDER; PERMA CURB; PIPELAYER (INCLUDING GRADE CHECKING IN CONNECTION WITH PIPELAYING); PRECAST-MANHOLE SETTER; PRESSURE PIPE TESTER; POST HOLE DIGGER, AIR, GAS AND ELECTRIC; POWER BROOM SWEEPER; POWER TAMPERS OF ALL TYPES (EXCEPT AS SHOWN IN GROUP 2); RAM SET GUN AND STUD GUN; RIPRAP STONEPAVER AND ROCK-SLINGER, INCLUDING PLACING OF SACKED CONCRETE AND/OR SAND (WET OR DRY) AND GABIONS AND SIMILAR TYPE; ROTARY SCARIFIER OR MULTIPLE HEAD CONCRETE CHIPPING SCARIFIER; ROTO AND DITCH WITCH; ROTOTILLER; SANDBLASTER, POT, GUN, NOZZLE OPERATORS; SIGNALLING AND RIGGING; TANK CLEANER; TREE CLIMBER; TURBO BLASTER; VIBRASCREED, BULL FLOAT IN CONNECTION WITH LABORERS' WORK; VIBRATOR; HAZARDOUS WASTE WORKER (LEAD REMOVAL); ASBESTOS AND MOLD REMOVAL WORKER.

FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE WAGE RATE. GROUP 1-B: SEWER CLEANERS SHALL RECEIVE $4.00 PER DAY ABOVE GROUP 1 WAGE RATES. ""SEWER CLEANER"" MEANS ANY WORKER WHO HANDLES OR COMES IN CONTACT WITH RAW SEWAGE IN SMALL DIAMETER SEWERS. THOSE WHO WORK INSIDE RECENTLY ACTIVE, LARGE DIAMETER SEWERS, AND ALL RECENTLY ACTIVE SEWER MANHOLES SHAL RECEIVE $5.00 PER DAY ABOVE GROUP 1 WAGE RATES. GROUP 1-D: MAINTENANCE AND REPAIR TRACK AND ROAD BEDS. ALL EMPLOYEES PERFORMING WORK COVERED HEREIN SHALL RECEIVE $0.25 PER HOUR ABOVE THEIR REGULAR RATE FOR ALL WORK PERFORMED ON UNDERGROUND STRUCTURES NOT SPECIFICALLY COVERED HEREIN. THIS PARAGRAPH SHALL NOT BE CONSTRUED TO APPLY TO WORK BELOW GROUND LEVEL IN OPEN CUT. IT SHALL APPLY TO CUT AND COVER WORK OF SUBWAY CONSTRUCTION AFTER THE TEMPORARY COVER HAS BEEN PLACED. (MONTEREY, SAN BENITO, AND SANTA CRUZ COUNTIES)

$35.50$27.30$62.80Agreement
LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 1…
Full text

LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 1-A- JOY DRILL MODEL TWM-2A; GARDNER-DENVER MODEL DH143 AND SIMILAR TYPE DRILLS; TRACK DRILLER; JACK LEG DRILLER; WAGON DRILLER; MECHANICAL DRILLERS, ALL TYPES REGARDLESS OF TYPE OR METHOD OF POWER; MECHANICAL PIPE LAYERS, ALL TYPES REGARDLESS OF TYPE OR METHOD OF POWER; BLASTER AND POWDER; ALL WORK OF LOADING, PLACING AND BLASTING OF ALL POWDER AND EXPLOSIVES OF WHATEVER TYPE REGARDLESS OF METHOD USED FOR SUCH LOADING AND PLACING; HIGH SCALERS (INCLUDING DRILLING OF SAME); TREE TOPPER; BIT GRINDER. GROUP 1-B: SEWER CLEANERS SHALL RECEIVE $4.00 PER DAY ABOVE GROUP 1 WAGE RATES. ""SEWER CLEANER"" MEANS ANY WORKER WHO HANDLES OR COMES IN CONTACT WITH RAW SEWAGE IN SMALL DIAMETER SEWERS. THOSE WHO WORK INSIDE RECENTLY ACTIVE, LARGE DIAMETER SEWERS, AND ALL RECENTLY ACTIVE SEWER MANHOLES SHAL RECEIVE $5.00 PER DAY ABOVE GROUP 1 WAGE RATES. GROUP 1-D: MAINTENANCE AND REPAIR TRACK AND ROAD BEDS. ALL EMPLOYEES PERFORMING WORK COVERED HEREIN SHALL RECEIVE $0.25 PER HOUR ABOVE THEIR REGULAR RATE FOR ALL WORK PERFORMED ON UNDERGROUND STRUCTURES NOT SPECIFICALLY COVERED HEREIN. THIS PARAGRAPH SHALL NOT BE CONSTRUED TO APPLY TO WORK BELOW GROUND LEVEL IN OPEN CUT. IT SHALL APPLY TO CUT AND COVER WORK OF SUBWAY CONSTRUCTION AFTER THE TEMPORARY COVER HAS BEEN PLACED. (MONTEREY, SAN BENITO, AND SANTA CRUZ COUNTIES)

$35.72$27.30$63.02Agreement
LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 1…
Full text

LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 1-C- BURNING AND WELDING IN CONNECTION WITH LABORERS' WORK; SYNTHETIC THERMOPLASTICS AND SIMILAR TYPE WELDING.

FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE WAGE RATE. GROUP 1-B: SEWER CLEANERS SHALL RECEIVE $4.00 PER DAY ABOVE GROUP 1 WAGE RATES. ""SEWER CLEANER"" MEANS ANY WORKER WHO HANDLES OR COMES IN CONTACT WITH RAW SEWAGE IN SMALL DIAMETER SEWERS. THOSE WHO WORK INSIDE RECENTLY ACTIVE, LARGE DIAMETER SEWERS, AND ALL RECENTLY ACTIVE SEWER MANHOLES SHAL RECEIVE $5.00 PER DAY ABOVE GROUP 1 WAGE RATES. GROUP 1-D: MAINTENANCE AND REPAIR TRACK AND ROAD BEDS. ALL EMPLOYEES PERFORMING WORK COVERED HEREIN SHALL RECEIVE $0.25 PER HOUR ABOVE THEIR REGULAR RATE FOR ALL WORK PERFORMED ON UNDERGROUND STRUCTURES NOT SPECIFICALLY COVERED HEREIN. THIS PARAGRAPH SHALL NOT BE CONSTRUED TO APPLY TO WORK BELOW GROUND LEVEL IN OPEN CUT. IT SHALL APPLY TO CUT AND COVER WORK OF SUBWAY CONSTRUCTION AFTER THE TEMPORARY COVER HAS BEEN PLACED. (MONTEREY, SAN BENITO, AND SANTA CRUZ COUNTIES)

$35.55$27.30$62.85Agreement
LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 1…
Full text

LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 1-E- WORK ON AND/OR IN BELL HOLE FOOTINGS AND SHAFTS THEREOF, AND WORK ON AND IN DEEP FOOTINGS. (A DEEP FOOTING IS A HOLE 15 FEET OR MORE IN DEPTH.) IN THE EVENT THE DEPTH OF THE FOOTING IS UNKNOWN AT THE COMMENCEMENT OF EXCAVATION, AND THE FINAL DEPTH EXCEEDS 15 FEET, THE DEEP FOOTING WAGE RATE WOULD APPLY TO ALL EMPLOYEES FOR EACH AND EVERY DAY WORKED ON OR IN THE EXCAVATION OF THE FOOTING FROM THE DATE OF INCEPTION.

FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE WAGE RATE. GROUP 1-B: SEWER CLEANERS SHALL RECEIVE $4.00 PER DAY ABOVE GROUP 1 WAGE RATES. ""SEWER CLEANER"" MEANS ANY WORKER WHO HANDLES OR COMES IN CONTACT WITH RAW SEWAGE IN SMALL DIAMETER SEWERS. THOSE WHO WORK INSIDE RECENTLY ACTIVE, LARGE DIAMETER SEWERS, AND ALL RECENTLY ACTIVE SEWER MANHOLES SHAL RECEIVE $5.00 PER DAY ABOVE GROUP 1 WAGE RATES. GROUP 1-D: MAINTENANCE AND REPAIR TRACK AND ROAD BEDS. ALL EMPLOYEES PERFORMING WORK COVERED HEREIN SHALL RECEIVE $0.25 PER HOUR ABOVE THEIR REGULAR RATE FOR ALL WORK PERFORMED ON UNDERGROUND STRUCTURES NOT SPECIFICALLY COVERED HEREIN. THIS PARAGRAPH SHALL NOT BE CONSTRUED TO APPLY TO WORK BELOW GROUND LEVEL IN OPEN CUT. IT SHALL APPLY TO CUT AND COVER WORK OF SUBWAY CONSTRUCTION AFTER THE TEMPORARY COVER HAS BEEN PLACED. (MONTEREY, SAN BENITO, AND SANTA CRUZ COUNTIES)

$36.05$27.30$63.35Agreement
LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 2…
Full text

LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 2- ASPHALT SHOVELER; CEMENT DUMPER AND HANDLING DRY CEMENT OR GYPSUM; CHOKE-SETTER AND RIGGER (CLEARING WORK); CONCRETE BUCKET DUMPER AND CHUTE; CONCRETE CHIPPING AND GRINDING; CONCRETE LABORER (WET OR DRY); DRILLER TENDER, CHUCK TENDER, NIPPER; GUINEA CHASER (STAKE), GROUT CREW; HIGH PRESSURE NOZZLE, ADDUCTOR; HYDRAULIC MONITOR (OVER 100 LBS. PRESSURE); LOADING AND UNLOADING, CARRYING AND HAULING OF ALL RODS AND MATERIALS FOR USE IN REINFORCING CONCRETE CONSTRUCTION; PITTSBURGH CHIPPER AND SIMILAR TYPE BRUSH SHREDDERS; SLOPER; SINGLE FOOT, HAND-HELD, PNEUMATIC TAMPER; ALL PNEUMATIC, AIR, GAS AND ELECTRIC TOOLS NOT LISTED IN GROUPS 1 THROUGH 1-F; JACKING OF PIPE - UNDER 12 INCHES.

FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE WAGE RATE. GROUP 1-B: SEWER CLEANERS SHALL RECEIVE $4.00 PER DAY ABOVE GROUP 1 WAGE RATES. ""SEWER CLEANER"" MEANS ANY WORKER WHO HANDLES OR COMES IN CONTACT WITH RAW SEWAGE IN SMALL DIAMETER SEWERS. THOSE WHO WORK INSIDE RECENTLY ACTIVE, LARGE DIAMETER SEWERS, AND ALL RECENTLY ACTIVE SEWER MANHOLES SHAL RECEIVE $5.00 PER DAY ABOVE GROUP 1 WAGE RATES. GROUP 1-D: MAINTENANCE AND REPAIR TRACK AND ROAD BEDS. ALL EMPLOYEES PERFORMING WORK COVERED HEREIN SHALL RECEIVE $0.25 PER HOUR ABOVE THEIR REGULAR RATE FOR ALL WORK PERFORMED ON UNDERGROUND STRUCTURES NOT SPECIFICALLY COVERED HEREIN. THIS PARAGRAPH SHALL NOT BE CONSTRUED TO APPLY TO WORK BELOW GROUND LEVEL IN OPEN CUT. IT SHALL APPLY TO CUT AND COVER WORK OF SUBWAY CONSTRUCTION AFTER THE TEMPORARY COVER HAS BEEN PLACED. (MONTEREY, SAN BENITO, AND SANTA CRUZ COUNTIES)

$35.35$27.30$62.65Agreement
LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 3…
Full text

LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 3- CONSTRUCTION LABORERS, INCLUDING BRIDGE AND GENERAL LABORER; DUMP, LOAD SPOTTER; FLAG PERSON; FIRE WATCHER; FENCE ERECTOR; GUARDRAIL ERECTOR; GARDENER, HORTICULTURAL AND LANDSCAPE LABORER; JETTING; LIMBER, BRUSH LOADER AND PILER; PAVEMENT MARKER (BUTTON SETTER); MAINTENANCE, REPAIR TRACK AND ROAD BEDS; STREETCAR AND RAILROAD CONSTRUCTION TRACK LABORER; TEMPORARY AIR AND WATER LINES, VICTAULIC OR SIMILAR; TOOL ROOM ATTENDANT (JOBSITE ONLY).

FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE WAGE RATE. GROUP 1-B: SEWER CLEANERS SHALL RECEIVE $4.00 PER DAY ABOVE GROUP 1 WAGE RATES. ""SEWER CLEANER"" MEANS ANY WORKER WHO HANDLES OR COMES IN CONTACT WITH RAW SEWAGE IN SMALL DIAMETER SEWERS. THOSE WHO WORK INSIDE RECENTLY ACTIVE, LARGE DIAMETER SEWERS, AND ALL RECENTLY ACTIVE SEWER MANHOLES SHAL RECEIVE $5.00 PER DAY ABOVE GROUP 1 WAGE RATES. GROUP 1-D: MAINTENANCE AND REPAIR TRACK AND ROAD BEDS. ALL EMPLOYEES PERFORMING WORK COVERED HEREIN SHALL RECEIVE $0.25 PER HOUR ABOVE THEIR REGULAR RATE FOR ALL WORK PERFORMED ON UNDERGROUND STRUCTURES NOT SPECIFICALLY COVERED HEREIN. THIS PARAGRAPH SHALL NOT BE CONSTRUED TO APPLY TO WORK BELOW GROUND LEVEL IN OPEN CUT. IT SHALL APPLY TO CUT AND COVER WORK OF SUBWAY CONSTRUCTION AFTER THE TEMPORARY COVER HAS BEEN PLACED. (MONTEREY, SAN BENITO, AND SANTA CRUZ COUNTIES)

$35.25$27.30$62.55Agreement
LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 4…
Full text

LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 4- FINAL CLEAN-UP WORK OF DEBRIS, GROUNDS AND BUILDING INCLUDING BUT NOT LIMITED TO: STREET CLEANER; CLEANING AND WASHING WINDOWS; BRICK CLEANER (JOBSITE ONLY); MATERIAL CLEANER (JOBSITE ONLY). THE CLASSIFICATION ""MATERIAL CLEANER"" IS TO BE UTILIZED UNDER THE FOLLOWING CONDITIONS: A: AT DEMOLITION SITE FOR THE SALVAGE OF THE MATERIAL. B: AT THE CONCLUSION OF A JOB WHERE THE MATERIAL IS TO BE SALVAGED AND STOCKED TO BE REUSED ON ANOTHER JOB. C: FOR THE CLEANING OF SALVAGE MATERIAL AT THE JOBSITE OR TEMPORARY JOBSITE YARD. THE MATERIAL CLEANER CLASSIFICATION SHOULD NOT BE USED IN THE PERFORMANCE OF ""FORM STRIPPING, CLEANING AND OILING AND MOVING TO THE NEXT POINT OF ERECTION"".

FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE WAGE RATE. GROUP 1-B: SEWER CLEANERS SHALL RECEIVE $4.00 PER DAY ABOVE GROUP 1 WAGE RATES. ""SEWER CLEANER"" MEANS ANY WORKER WHO HANDLES OR COMES IN CONTACT WITH RAW SEWAGE IN SMALL DIAMETER SEWERS. THOSE WHO WORK INSIDE RECENTLY ACTIVE, LARGE DIAMETER SEWERS, AND ALL RECENTLY ACTIVE SEWER MANHOLES SHAL RECEIVE $5.00 PER DAY ABOVE GROUP 1 WAGE RATES. GROUP 1-D: MAINTENANCE AND REPAIR TRACK AND ROAD BEDS. ALL EMPLOYEES PERFORMING WORK COVERED HEREIN SHALL RECEIVE $0.25 PER HOUR ABOVE THEIR REGULAR RATE FOR ALL WORK PERFORMED ON UNDERGROUND STRUCTURES NOT SPECIFICALLY COVERED HEREIN. THIS PARAGRAPH SHALL NOT BE CONSTRUED TO APPLY TO WORK BELOW GROUND LEVEL IN OPEN CUT. IT SHALL APPLY TO CUT AND COVER WORK OF SUBWAY CONSTRUCTION AFTER THE TEMPORARY COVER HAS BEEN PLACED. (MONTEREY, SAN BENITO, AND SANTA CRUZ COUNTIES)

$28.94$27.30$56.24Agreement
LABORER, GUNITE: GROUP 1- STRUCTURAL NOZZLEMAN.

FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE WAGE RATE. (MONTEREY, SAN BENITO, AND SANTA CRUZ COUNTIES)

$36.46$27.30$63.76Agreement
LABORER, GUNITE: GROUP 2- NOZZLEMAN, GUNMAN, POTMAN, GROUNDMAN.

FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE WAGE RATE. (MONTEREY, SAN BENITO, AND SANTA CRUZ COUNTIES)

$35.96$27.30$63.26Agreement
LABORER, GUNITE: GROUP 3- REBOUNDMAN.

FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE WAGE RATE. (MONTEREY, SAN BENITO, AND SANTA CRUZ COUNTIES)

$35.37$27.30$62.67Agreement
LABORER, GUNITE: GROUP 4- GUINTE LABORER.

FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE WAGE RATE. (MONTEREY, SAN BENITO, AND SANTA CRUZ COUNTIES)

$35.25$27.30$62.55Agreement
LABORER, WRECKING: GROUP 1…
Full text

LABORER, WRECKING: GROUP 1- SKILLED WRECKER (REMOVING AND SALVAGING OF SASH, WINDOWS, AND MATERIALS).

FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE WAGE RATE. (MONTEREY, SAN BENITO, AND SANTA CRUZ COUNTIES)

$35.50$27.30$62.80Agreement
LABORER, WRECKING: GROUP 2- SEMI-SKILLED WRECKER (SALVAGING OF OTHER BUILDING MATERIALS).

FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE WAGE RATE. (MONTEREY, SAN BENITO, AND SANTA CRUZ COUNTIES)

$35.35$27.30$62.65Agreement
LABORER: GARDENERS, HORTICULTURAL & LANDSCAPE LABORERS - (1) New Construction.

FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE WAGE RATE. (MONTEREY, SAN BENITO, AND SANTA CRUZ COUNTIES)

$35.25$27.30$62.55Agreement
LABORER: GARDENERS…
Full text

LABORER: GARDENERS, HORTICULTURAL & LANDSCAPE LABORERS - (2) Establishment Warranty Period.

FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE WAGE RATE. (MONTEREY, SAN BENITO, AND SANTA CRUZ COUNTIES)

$28.94$27.30$56.24Agreement
LABO0270-010 · Laborers agreement, June 26, 2023
LABORER (CONSTRUCTION CRAFT LABORERS) GROUP 1…
Full text

LABORER (CONSTRUCTION CRAFT LABORERS) GROUP 1-F- WIRE WINDING MACHINE IN CONNECTION WITH GUNITING OR SHOT CRETE.

FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE WAGE RATE. GROUP 1-B: SEWER CLEANERS SHALL RECEIVE $4.00 PER DAY ABOVE GROUP 1 WAGE RATES. ""SEWER CLEANER"" MEANS ANY WORKER WHO HANDLES OR COMES IN CONTACT WITH RAW SEWAGE IN SMALL DIAMETER SEWERS. THOSE WHO WORK INSIDE RECENTLY ACTIVE, LARGE DIAMETER SEWERS, AND ALL RECENTLY ACTIVE SEWER MANHOLES SHAL RECEIVE $5.00 PER DAY ABOVE GROUP 1 WAGE RATES. GROUP 1-D: MAINTENANCE AND REPAIR TRACK AND ROAD BEDS. ALL EMPLOYEES PERFORMING WORK COVERED HEREIN SHALL RECEIVE $0.25 PER HOUR ABOVE THEIR REGULAR RATE FOR ALL WORK PERFORMED ON UNDERGROUND STRUCTURES NOT SPECIFICALLY COVERED HEREIN. THIS PARAGRAPH SHALL NOT BE CONSTRUED TO APPLY TO WORK BELOW GROUND LEVEL IN OPEN CUT. IT SHALL APPLY TO CUT AND COVER WORK OF SUBWAY CONSTRUCTION AFTER THE TEMPORARY COVER HAS BEEN PLACED. (SANTA CLARA COUNTY)

$37.08$27.30$64.38Agreement
LABORER, CONSTRUCTION CRAFT LABORERS…
Full text

LABORER, CONSTRUCTION CRAFT LABORERS: CONSTRUCTION SPECIALIST GROUP- ASPHALT IRONER AND RAKER; CHAINSAW; LASER BEAM IN CONNECTION WITH LABORERS' WORK; CAST-IN- PLACE MANHOLE FORM SETTER; PRESSURE PIPELAYER; DAVIS TRENCHER - 300 OR SIMILAR TYPE (AND ALL SMALL TRENCHERS); BLASTER; DIAMOND DRILLER; MULTIPLE UNIT DRILL; HYDRAULIC DRILL.

FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE WAGE RATE. GROUP 1-B: SEWER CLEANERS SHALL RECEIVE $4.00 PER DAY ABOVE GROUP 1 WAGE RATES. ""SEWER CLEANER"" MEANS ANY WORKER WHO HANDLES OR COMES IN CONTACT WITH RAW SEWAGE IN SMALL DIAMETER SEWERS. THOSE WHO WORK INSIDE RECENTLY ACTIVE, LARGE DIAMETER SEWERS, AND ALL RECENTLY ACTIVE SEWER MANHOLES SHAL RECEIVE $5.00 PER DAY ABOVE GROUP 1 WAGE RATES. GROUP 1-D: MAINTENANCE AND REPAIR TRACK AND ROAD BEDS. ALL EMPLOYEES PERFORMING WORK COVERED HEREIN SHALL RECEIVE $0.25 PER HOUR ABOVE THEIR REGULAR RATE FOR ALL WORK PERFORMED ON UNDERGROUND STRUCTURES NOT SPECIFICALLY COVERED HEREIN. THIS PARAGRAPH SHALL NOT BE CONSTRUED TO APPLY TO WORK BELOW GROUND LEVEL IN OPEN CUT. IT SHALL APPLY TO CUT AND COVER WORK OF SUBWAY CONSTRUCTION AFTER THE TEMPORARY COVER HAS BEEN PLACED. (SANTA CLARA COUNTY)

$37.20$27.30$64.50Agreement
LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 1…
Full text

LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 1- ASPHALT SPREADER BOXES (ALL TYPES); BARKO, WACKER AND SIMILAR TYPE TAMPERS; BUGGYMOBILE; CAULKER, BANDER, PIPEWRAPPER, CONDUIT LAYER, PLASTIC PIPELAYER; CERTIFIED HAZARDOUS WASTE WORKER INCLUDING LEADE ABATEMENT; COMPACTORS OF ALL TYPES; CONCRETE AND MAGNESITE MIXER, 1/2 YD. AND UNDER; CONCRETE PAN WORK; CONCRETE SANDER; CONCRETE SAW; CRIBBER AND/OR SHORING; CUT GRANITE CURB SETTER; DRI-PAK-IT MACHINE; FALLER, LOGLOADER AND BUCKER; FORM RAISER, SLIP FORMS; GREEN CUTTER; HEADERBOARD, HUBSETTER, ALIGNER, BY ANY METHOD; HIGH PRESSURE BLOW PIPE (1-1/2"" OR OVER, 100 LBS. PRESSURE/OVER); HYDRO SEEDER AND SIMILAR TYPE; JACKHAMMER OPERATOR; JACKING OF PIPE OVER 12 INCHES; JACKSON AND SIMILAR TYPE COMPACTOR; KETTLE TENDER, POT AND WORKER APPLYING ASPHALT, LAY-KOLD, CREOSOTE, LIME, CAUSTIC AND SIMILAR TYPE MATERIALS (APPLYING MEANS APPLYING, DIPPING OR HANDLING OF SUCH MATERIALS); LAGGING, SHEETING, WHALING, BRACING, TRENCHJACKING, LAGGING HAMMER; MAGNESITE, EPOXYRESIN, FIBERGLASS, MASTIC WORKER (WET OR DRY); NO JOINT PIPE AND STRIPPING OF SAME, INCLUDING REPAIR OF VOIDS; PAVEMENT BREAKER AND SPADER, INCLUDING TOOL GRINDER; PERMA CURB; PIPELAYER (INCLUDING GRADE CHECKING IN CONNECTION WITH PIPELAYING); PRECAST-MANHOLE SETTER; PRESSURE PIPE TESTER; POST HOLE DIGGER, AIR, GAS AND ELECTRIC; POWER BROOM SWEEPER; POWER TAMPERS OF ALL TYPES (EXCEPT AS SHOWN IN GROUP 2); RAM SET GUN AND STUD GUN; RIPRAP STONEPAVER AND ROCK-SLINGER, INCLUDING PLACING OF SACKED CONCRETE AND/OR SAND (WET OR DRY) AND GABIONS AND SIMILAR TYPE; ROTARY SCARIFIER OR MULTIPLE HEAD CONCRETE CHIPPING SCARIFIER; ROTO AND DITCH WITCH; ROTOTILLER; SANDBLASTER, POT, GUN, NOZZLE OPERATORS; SIGNALLING AND RIGGING; TANK CLEANER; TREE CLIMBER; TURBO BLASTER; VIBRASCREED, BULL FLOAT IN CONNECTION WITH LABORERS' WORK; VIBRATOR; HAZARDOUS WASTE WORKER (LEAD REMOVAL); ASBESTOS AND MOLD REMOVAL WORKER.

FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE WAGE RATE. GROUP 1-B: SEWER CLEANERS SHALL RECEIVE $4.00 PER DAY ABOVE GROUP 1 WAGE RATES. ""SEWER CLEANER"" MEANS ANY WORKER WHO HANDLES OR COMES IN CONTACT WITH RAW SEWAGE IN SMALL DIAMETER SEWERS. THOSE WHO WORK INSIDE RECENTLY ACTIVE, LARGE DIAMETER SEWERS, AND ALL RECENTLY ACTIVE SEWER MANHOLES SHAL RECEIVE $5.00 PER DAY ABOVE GROUP 1 WAGE RATES. GROUP 1-D: MAINTENANCE AND REPAIR TRACK AND ROAD BEDS. ALL EMPLOYEES PERFORMING WORK COVERED HEREIN SHALL RECEIVE $0.25 PER HOUR ABOVE THEIR REGULAR RATE FOR ALL WORK PERFORMED ON UNDERGROUND STRUCTURES NOT SPECIFICALLY COVERED HEREIN. THIS PARAGRAPH SHALL NOT BE CONSTRUED TO APPLY TO WORK BELOW GROUND LEVEL IN OPEN CUT. IT SHALL APPLY TO CUT AND COVER WORK OF SUBWAY CONSTRUCTION AFTER THE TEMPORARY COVER HAS BEEN PLACED. (SANTA CLARA COUNTY)

$36.50$27.30$63.80Agreement
LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 1…
Full text

LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 1-A- JOY DRILL MODEL TWM-2A; GARDNER-DENVER MODEL DH143 AND SIMILAR TYPE DRILLS; TRACK DRILLER; JACK LEG DRILLER; WAGON DRILLER; MECHANICAL DRILLERS, ALL TYPES REGARDLESS OF TYPE OR METHOD OF POWER; MECHANICAL PIPE LAYERS, ALL TYPES REGARDLESS OF TYPE OR METHOD OF POWER; BLASTER AND POWDER; ALL WORK OF LOADING, PLACING AND BLASTING OF ALL POWDER AND EXPLOSIVES OF WHATEVER TYPE REGARDLESS OF METHOD USED FOR SUCH LOADING AND PLACING; HIGH SCALERS (INCLUDING DRILLING OF SAME); TREE TOPPER; BIT GRINDER. GROUP 1-B: SEWER CLEANERS SHALL RECEIVE $4.00 PER DAY ABOVE GROUP 1 WAGE RATES. ""SEWER CLEANER"" MEANS ANY WORKER WHO HANDLES OR COMES IN CONTACT WITH RAW SEWAGE IN SMALL DIAMETER SEWERS. THOSE WHO WORK INSIDE RECENTLY ACTIVE, LARGE DIAMETER SEWERS, AND ALL RECENTLY ACTIVE SEWER MANHOLES SHAL RECEIVE $5.00 PER DAY ABOVE GROUP 1 WAGE RATES. GROUP 1-D: MAINTENANCE AND REPAIR TRACK AND ROAD BEDS. ALL EMPLOYEES PERFORMING WORK COVERED HEREIN SHALL RECEIVE $0.25 PER HOUR ABOVE THEIR REGULAR RATE FOR ALL WORK PERFORMED ON UNDERGROUND STRUCTURES NOT SPECIFICALLY COVERED HEREIN. THIS PARAGRAPH SHALL NOT BE CONSTRUED TO APPLY TO WORK BELOW GROUND LEVEL IN OPEN CUT. IT SHALL APPLY TO CUT AND COVER WORK OF SUBWAY CONSTRUCTION AFTER THE TEMPORARY COVER HAS BEEN PLACED. (SANTA CLARA COUNTY)

$36.72$27.30$64.02Agreement
LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 1…
Full text

LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 1-C- BURNING AND WELDING IN CONNECTION WITH LABORERS' WORK; SYNTHETIC THERMOPLASTICS AND SIMILAR TYPE WELDING.

FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE WAGE RATE. GROUP 1-B: SEWER CLEANERS SHALL RECEIVE $4.00 PER DAY ABOVE GROUP 1 WAGE RATES. ""SEWER CLEANER"" MEANS ANY WORKER WHO HANDLES OR COMES IN CONTACT WITH RAW SEWAGE IN SMALL DIAMETER SEWERS. THOSE WHO WORK INSIDE RECENTLY ACTIVE, LARGE DIAMETER SEWERS, AND ALL RECENTLY ACTIVE SEWER MANHOLES SHAL RECEIVE $5.00 PER DAY ABOVE GROUP 1 WAGE RATES. GROUP 1-D: MAINTENANCE AND REPAIR TRACK AND ROAD BEDS. ALL EMPLOYEES PERFORMING WORK COVERED HEREIN SHALL RECEIVE $0.25 PER HOUR ABOVE THEIR REGULAR RATE FOR ALL WORK PERFORMED ON UNDERGROUND STRUCTURES NOT SPECIFICALLY COVERED HEREIN. THIS PARAGRAPH SHALL NOT BE CONSTRUED TO APPLY TO WORK BELOW GROUND LEVEL IN OPEN CUT. IT SHALL APPLY TO CUT AND COVER WORK OF SUBWAY CONSTRUCTION AFTER THE TEMPORARY COVER HAS BEEN PLACED. (SANTA CLARA COUNTY)

$36.55$27.30$63.85Agreement
LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 1…
Full text

LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 1-E- WORK ON AND/OR IN BELL HOLE FOOTINGS AND SHAFTS THEREOF, AND WORK ON AND IN DEEP FOOTINGS. (A DEEP FOOTING IS A HOLE 15 FEET OR MORE IN DEPTH.) IN THE EVENT THE DEPTH OF THE FOOTING IS UNKNOWN AT THE COMMENCEMENT OF EXCAVATION, AND THE FINAL DEPTH EXCEEDS 15 FEET, THE DEEP FOOTING WAGE RATE WOULD APPLY TO ALL EMPLOYEES FOR EACH AND EVERY DAY WORKED ON OR IN THE EXCAVATION OF THE FOOTING FROM THE DATE OF INCEPTION.

FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE WAGE RATE. GROUP 1-B: SEWER CLEANERS SHALL RECEIVE $4.00 PER DAY ABOVE GROUP 1 WAGE RATES. ""SEWER CLEANER"" MEANS ANY WORKER WHO HANDLES OR COMES IN CONTACT WITH RAW SEWAGE IN SMALL DIAMETER SEWERS. THOSE WHO WORK INSIDE RECENTLY ACTIVE, LARGE DIAMETER SEWERS, AND ALL RECENTLY ACTIVE SEWER MANHOLES SHAL RECEIVE $5.00 PER DAY ABOVE GROUP 1 WAGE RATES. GROUP 1-D: MAINTENANCE AND REPAIR TRACK AND ROAD BEDS. ALL EMPLOYEES PERFORMING WORK COVERED HEREIN SHALL RECEIVE $0.25 PER HOUR ABOVE THEIR REGULAR RATE FOR ALL WORK PERFORMED ON UNDERGROUND STRUCTURES NOT SPECIFICALLY COVERED HEREIN. THIS PARAGRAPH SHALL NOT BE CONSTRUED TO APPLY TO WORK BELOW GROUND LEVEL IN OPEN CUT. IT SHALL APPLY TO CUT AND COVER WORK OF SUBWAY CONSTRUCTION AFTER THE TEMPORARY COVER HAS BEEN PLACED. (SANTA CLARA COUNTY)

$37.05$27.30$64.35Agreement
LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 2…
Full text

LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 2- ASPHALT SHOVELER; CEMENT DUMPER AND HANDLING DRY CEMENT OR GYPSUM; CHOKE-SETTER AND RIGGER (CLEARING WORK); CONCRETE BUCKET DUMPER AND CHUTE; CONCRETE CHIPPING AND GRINDING; CONCRETE LABORER (WET OR DRY); DRILLER TENDER, CHUCK TENDER, NIPPER; GUINEA CHASER (STAKE), GROUT CREW; HIGH PRESSURE NOZZLE, ADDUCTOR; HYDRAULIC MONITOR (OVER 100 LBS. PRESSURE); LOADING AND UNLOADING, CARRYING AND HAULING OF ALL RODS AND MATERIALS FOR USE IN REINFORCING CONCRETE CONSTRUCTION; PITTSBURGH CHIPPER AND SIMILAR TYPE BRUSH SHREDDERS; SLOPER; SINGLE FOOT, HAND-HELD, PNEUMATIC TAMPER; ALL PNEUMATIC, AIR, GAS AND ELECTRIC TOOLS NOT LISTED IN GROUPS 1 THROUGH 1-F; JACKING OF PIPE - UNDER 12 INCHES.

FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE WAGE RATE. GROUP 1-B: SEWER CLEANERS SHALL RECEIVE $4.00 PER DAY ABOVE GROUP 1 WAGE RATES. ""SEWER CLEANER"" MEANS ANY WORKER WHO HANDLES OR COMES IN CONTACT WITH RAW SEWAGE IN SMALL DIAMETER SEWERS. THOSE WHO WORK INSIDE RECENTLY ACTIVE, LARGE DIAMETER SEWERS, AND ALL RECENTLY ACTIVE SEWER MANHOLES SHAL RECEIVE $5.00 PER DAY ABOVE GROUP 1 WAGE RATES. GROUP 1-D: MAINTENANCE AND REPAIR TRACK AND ROAD BEDS. ALL EMPLOYEES PERFORMING WORK COVERED HEREIN SHALL RECEIVE $0.25 PER HOUR ABOVE THEIR REGULAR RATE FOR ALL WORK PERFORMED ON UNDERGROUND STRUCTURES NOT SPECIFICALLY COVERED HEREIN. THIS PARAGRAPH SHALL NOT BE CONSTRUED TO APPLY TO WORK BELOW GROUND LEVEL IN OPEN CUT. IT SHALL APPLY TO CUT AND COVER WORK OF SUBWAY CONSTRUCTION AFTER THE TEMPORARY COVER HAS BEEN PLACED. (SANTA CLARA COUNTY)

$36.35$27.30$63.65Agreement
LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 3…
Full text

LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 3- CONSTRUCTION LABORERS, INCLUDING BRIDGE AND GENERAL LABORER; DUMP, LOAD SPOTTER; FLAG PERSON; FIRE WATCHER; FENCE ERECTOR; GUARDRAIL ERECTOR; GARDENER, HORTICULTURAL AND LANDSCAPE LABORER; JETTING; LIMBER, BRUSH LOADER AND PILER; PAVEMENT MARKER (BUTTON SETTER); MAINTENANCE, REPAIR TRACK AND ROAD BEDS; STREETCAR AND RAILROAD CONSTRUCTION TRACK LABORER; TEMPORARY AIR AND WATER LINES, VICTAULIC OR SIMILAR; TOOL ROOM ATTENDANT (JOBSITE ONLY).

FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE WAGE RATE. GROUP 1-B: SEWER CLEANERS SHALL RECEIVE $4.00 PER DAY ABOVE GROUP 1 WAGE RATES. ""SEWER CLEANER"" MEANS ANY WORKER WHO HANDLES OR COMES IN CONTACT WITH RAW SEWAGE IN SMALL DIAMETER SEWERS. THOSE WHO WORK INSIDE RECENTLY ACTIVE, LARGE DIAMETER SEWERS, AND ALL RECENTLY ACTIVE SEWER MANHOLES SHAL RECEIVE $5.00 PER DAY ABOVE GROUP 1 WAGE RATES. GROUP 1-D: MAINTENANCE AND REPAIR TRACK AND ROAD BEDS. ALL EMPLOYEES PERFORMING WORK COVERED HEREIN SHALL RECEIVE $0.25 PER HOUR ABOVE THEIR REGULAR RATE FOR ALL WORK PERFORMED ON UNDERGROUND STRUCTURES NOT SPECIFICALLY COVERED HEREIN. THIS PARAGRAPH SHALL NOT BE CONSTRUED TO APPLY TO WORK BELOW GROUND LEVEL IN OPEN CUT. IT SHALL APPLY TO CUT AND COVER WORK OF SUBWAY CONSTRUCTION AFTER THE TEMPORARY COVER HAS BEEN PLACED. (SANTA CLARA COUNTY)

$36.25$27.30$63.55Agreement
LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 4…
Full text

LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 4- FINAL CLEAN-UP WORK OF DEBRIS, GROUNDS AND BUILDING INCLUDING BUT NOT LIMITED TO: STREET CLEANER; CLEANING AND WASHING WINDOWS; BRICK CLEANER (JOBSITE ONLY); MATERIAL CLEANER (JOBSITE ONLY). THE CLASSIFICATION ""MATERIAL CLEANER"" IS TO BE UTILIZED UNDER THE FOLLOWING CONDITIONS: A: AT DEMOLITION SITE FOR THE SALVAGE OF THE MATERIAL. B: AT THE CONCLUSION OF A JOB WHERE THE MATERIAL IS TO BE SALVAGED AND STOCKED TO BE REUSED ON ANOTHER JOB. C: FOR THE CLEANING OF SALVAGE MATERIAL AT THE JOBSITE OR TEMPORARY JOBSITE YARD. THE MATERIAL CLEANER CLASSIFICATION SHOULD NOT BE USED IN THE PERFORMANCE OF ""FORM STRIPPING, CLEANING AND OILING AND MOVING TO THE NEXT POINT OF ERECTION"".

FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE WAGE RATE. GROUP 1-B: SEWER CLEANERS SHALL RECEIVE $4.00 PER DAY ABOVE GROUP 1 WAGE RATES. ""SEWER CLEANER"" MEANS ANY WORKER WHO HANDLES OR COMES IN CONTACT WITH RAW SEWAGE IN SMALL DIAMETER SEWERS. THOSE WHO WORK INSIDE RECENTLY ACTIVE, LARGE DIAMETER SEWERS, AND ALL RECENTLY ACTIVE SEWER MANHOLES SHAL RECEIVE $5.00 PER DAY ABOVE GROUP 1 WAGE RATES. GROUP 1-D: MAINTENANCE AND REPAIR TRACK AND ROAD BEDS. ALL EMPLOYEES PERFORMING WORK COVERED HEREIN SHALL RECEIVE $0.25 PER HOUR ABOVE THEIR REGULAR RATE FOR ALL WORK PERFORMED ON UNDERGROUND STRUCTURES NOT SPECIFICALLY COVERED HEREIN. THIS PARAGRAPH SHALL NOT BE CONSTRUED TO APPLY TO WORK BELOW GROUND LEVEL IN OPEN CUT. IT SHALL APPLY TO CUT AND COVER WORK OF SUBWAY CONSTRUCTION AFTER THE TEMPORARY COVER HAS BEEN PLACED. (SANTA CLARA COUNTY)

$29.94$27.30$57.24Agreement
LABORER, GUNITE: GROUP 1- STRUCTURAL NOZZLEMAN.

FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE WAGE RATE. (SANTA CLARA COUNTY)

$37.46$27.30$64.76Agreement
LABORER, GUNITE: GROUP 2- NOZZLEMAN, GUNMAN, POTMAN, GROUNDMAN.

FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE WAGE RATE. (SANTA CLARA COUNTY)

$36.96$27.30$64.26Agreement
LABORER, GUNITE: GROUP 3- REBOUNDMAN.

FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE WAGE RATE. (SANTA CLARA COUNTY)

$36.37$27.30$63.67Agreement
LABORER, GUNITE: GROUP 4- GUINTE LABORER.

FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE WAGE RATE. (SANTA CLARA COUNTY)

$36.25$27.30$63.55Agreement
LABORER, WRECKING: GROUP 1…
Full text

LABORER, WRECKING: GROUP 1- SKILLED WRECKER (REMOVING AND SALVAGING OF SASH, WINDOWS, AND MATERIALS).

FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE WAGE RATE. (SANTA CLARA COUNTY)

$36.50$27.30$63.80Agreement
LABORER, WRECKING: GROUP 2- SEMI-SKILLED WRECKER (SALVAGING OF OTHER BUILDING MATERIALS).

FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE WAGE RATE. (SANTA CLARA COUNTY)

$36.35$27.30$63.65Agreement
LABORER: GARDENERS, HORTICULTURAL & LANDSCAPE LABORERS - (1) New Construction.

FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE WAGE RATE. (SANTA CLARA COUNTY)

$36.25$27.30$63.55Agreement
LABORER: GARDENERS…
Full text

LABORER: GARDENERS, HORTICULTURAL & LANDSCAPE LABORERS - (2) Establishment Warranty Period.

FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE WAGE RATE. (SANTA CLARA COUNTY)

$29.94$27.30$57.24Agreement
LABO0270-011 · Laborers agreement, July 1, 2023
LABORER, PLASTER TENDER. WORK ON A SWING STAGE SCAFFOLD…
Full text

LABORER, PLASTER TENDER. WORK ON A SWING STAGE SCAFFOLD: $1.00 PER HOUR ADDITIONAL. (MONTEREY, SAN BENITO, SANTA CRUZ, SANTA CLARA COUNTIES)

$40.68$29.68$70.36Agreement
LABO0294-001 · Laborers agreement, July 1, 2023
LABORER, BRICK: MASON TENDER-BRICK. (FRESNO, KINGS AND MADERA COUNTIES)$36.29$25.55$61.84Agreement
LABO0294-002 · Laborers agreement, July 1, 2023
LABORER, TRAFFIC CONTROL/LANE CLOSURE…
Full text

LABORER, TRAFFIC CONTROL/LANE CLOSURE: ESCORT DRIVER, FLAG PERSON (FRESNO, KINGS, AND MADERA COUNTIES)

$36.26$27.30$63.56Agreement
LABORER, TRAFFIC CONTROL/LANE CLOSURE…
Full text

LABORER, TRAFFIC CONTROL/LANE CLOSURE: TRAFFIC CONTROL PERSON I- LAYOUT OF TRAFFIC CONTROL, CRASH CUSHIONS, CONSTRUCTION AREA AND ROADSIDE SIGNAGE. (FRESNO, KINGS, AND MADERA COUNTIES)

$36.56$27.30$63.86Agreement
LABORER, TRAFFIC CONTROL/LANE CLOSURE…
Full text

LABORER, TRAFFIC CONTROL/LANE CLOSURE: TRAFFIC CONTROL PERSON II- INSTALLATION AND REMOVAL OF TEMPORARY/PERMANENT SIGNS, MARKERS, DELINEATORS AND CRASH CUSHIONS. (FRESNO, KINGS, AND MADERA COUNTIES)

$34.06$27.30$61.36Agreement
LABO0294-005 · Laborers agreement, June 26, 2023
TUNNEL AND SHAFT LABORERS: GROUP 1…
Full text

TUNNEL AND SHAFT LABORERS: GROUP 1- DIAMOND DRILLER; GROUNDMEN; GUNITE AND SHOTCRETE NOZZLEMEN. (FRESNO, KINGS, AND MADERA COUNTIES)

$45.89$27.72$73.61Agreement
TUNNEL AND SHAFT LABORERS: GROUP 2…
Full text

TUNNEL AND SHAFT LABORERS: GROUP 2- RODMEN; SHAFT WORK & RAISE (BELOW ACTUAL OR EXCAVATED GROUND LEVEL). (FRESNO, KINGS, AND MADERA COUNTIES)

$45.66$27.72$73.38Agreement
TUNNEL AND SHAFT LABORERS: GROUP 3…
Full text

TUNNEL AND SHAFT LABORERS: GROUP 3- BIT GRINDER; BLASTER, DRILLER, POWDERMEN, HEADING; CHERRY PICKERMEN - WHERE CAR IS LIFTED; CONCRETE FINISHER IN TUNNEL; CONCRETE SCREEDMAN; GROUT PUMPMAN AND POTMAN; GUNITE & SHOTCRETE GUNMAN & POTMAN; HEADERMEN; HIGH PRESSURE NOZZLEMAN; MINER - TUNNEL, INCLUDING TOP AND BOTTOM MAN ON SHAFT AND RAISE WORK; NIPPER; NOZZLEMAN ON SLICK LINE; SANDBLASTER - POTMAN, ROBOTIC SHOTCRETE PLACER, SEGMENT ERECTOR, TUNNEL MUCK HAULER, STEEL FORM RAISER AND SETTER; TIMBERMAN, RETIMBERMAN (WOOD OR STEEL OR SUBSTITUTE MATERIALS THEREFORE); TUGGER (FOR TUNNEL LABORER WORK); CABLE TENDER; CHUCK TENDER; POWDERMAN - PRIMER HOUSE. (FRESNO, KINGS, AND MADERA COUNTIES)

$45.41$27.72$73.13Agreement
TUNNEL AND SHAFT LABORERS: GROUP 4…
Full text

TUNNEL AND SHAFT LABORERS: GROUP 4- VIBRATOR OPERATOR, PAVEMENT BREAKER; BULL GANG - MUCKERS, TRACKMEN; CONCRETE CREW - INCLUDES RODDING AND SPREADING, DUMPMEN (ANY METHOD). (FRESNO, KINGS, AND MADERA COUNTIES)

$44.96$27.72$72.68Agreement
TUNNEL AND SHAFT LABORERS: GROUP 5…
Full text

TUNNEL AND SHAFT LABORERS: GROUP 5- GROUT CREW; REBOUNDMAN; SWAMPER/ BRAKEMAN. (FRESNO, KINGS, AND MADERA COUNTIES)

$44.42$27.72$72.14Agreement
TUNNEL AND SHAFT LABORERS: SHOTCRETE SPECIALIST. (FRESNO, KINGS, AND MADERA COUNTIES)$46.41$27.72$74.13Agreement
LABO0294-008 · Laborers agreement, June 26, 2023
LABORER (CONSTRUCTION CRAFT LABORERS) GROUP 1…
Full text

LABORER (CONSTRUCTION CRAFT LABORERS) GROUP 1-F- WIRE WINDING MACHINE IN CONNECTION WITH GUNITING OR SHOT CRETE.

FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE WAGE RATE. GROUP 1-B: SEWER CLEANERS SHALL RECEIVE $4.00 PER DAY ABOVE GROUP 1 WAGE RATES. ""SEWER CLEANER"" MEANS ANY WORKER WHO HANDLES OR COMES IN CONTACT WITH RAW SEWAGE IN SMALL DIAMETER SEWERS. THOSE WHO WORK INSIDE RECENTLY ACTIVE, LARGE DIAMETER SEWERS, AND ALL RECENTLY ACTIVE SEWER MANHOLES SHAL RECEIVE $5.00 PER DAY ABOVE GROUP 1 WAGE RATES. GROUP 1-D: MAINTENANCE AND REPAIR TRACK AND ROAD BEDS. ALL EMPLOYEES PERFORMING WORK COVERED HEREIN SHALL RECEIVE $0.25 PER HOUR ABOVE THEIR REGULAR RATE FOR ALL WORK PERFORMED ON UNDERGROUND STRUCTURES NOT SPECIFICALLY COVERED HEREIN. THIS PARAGRAPH SHALL NOT BE CONSTRUED TO APPLY TO WORK BELOW GROUND LEVEL IN OPEN CUT. IT SHALL APPLY TO CUT AND COVER WORK OF SUBWAY CONSTRUCTION AFTER THE TEMPORARY COVER HAS BEEN PLACED. (FRESNO, KINGS, AND MADERA COUNTIES)

$36.08$27.30$63.38Agreement
LABORER, CONSTRUCTION CRAFT LABORERS…
Full text

LABORER, CONSTRUCTION CRAFT LABORERS: CONSTRUCTION SPECIALIST GROUP- ASPHALT IRONER AND RAKER; CHAINSAW; LASER BEAM IN CONNECTION WITH LABORERS' WORK; CAST-IN- PLACE MANHOLE FORM SETTER; PRESSURE PIPELAYER; DAVIS TRENCHER - 300 OR SIMILAR TYPE (AND ALL SMALL TRENCHERS); BLASTER; DIAMOND DRILLER; MULTIPLE UNIT DRILL; HYDRAULIC DRILL.

FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE WAGE RATE. GROUP 1-B: SEWER CLEANERS SHALL RECEIVE $4.00 PER DAY ABOVE GROUP 1 WAGE RATES. ""SEWER CLEANER"" MEANS ANY WORKER WHO HANDLES OR COMES IN CONTACT WITH RAW SEWAGE IN SMALL DIAMETER SEWERS. THOSE WHO WORK INSIDE RECENTLY ACTIVE, LARGE DIAMETER SEWERS, AND ALL RECENTLY ACTIVE SEWER MANHOLES SHAL RECEIVE $5.00 PER DAY ABOVE GROUP 1 WAGE RATES. GROUP 1-D: MAINTENANCE AND REPAIR TRACK AND ROAD BEDS. ALL EMPLOYEES PERFORMING WORK COVERED HEREIN SHALL RECEIVE $0.25 PER HOUR ABOVE THEIR REGULAR RATE FOR ALL WORK PERFORMED ON UNDERGROUND STRUCTURES NOT SPECIFICALLY COVERED HEREIN. THIS PARAGRAPH SHALL NOT BE CONSTRUED TO APPLY TO WORK BELOW GROUND LEVEL IN OPEN CUT. IT SHALL APPLY TO CUT AND COVER WORK OF SUBWAY CONSTRUCTION AFTER THE TEMPORARY COVER HAS BEEN PLACED. (FRESNO, KINGS, AND MADERA COUNTIES)

$36.20$27.30$63.50Agreement
LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 1…
Full text

LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 1- ASPHALT SPREADER BOXES (ALL TYPES); BARKO, WACKER AND SIMILAR TYPE TAMPERS; BUGGYMOBILE; CAULKER, BANDER, PIPEWRAPPER, CONDUIT LAYER, PLASTIC PIPELAYER; CERTIFIED HAZARDOUS WASTE WORKER INCLUDING LEADE ABATEMENT; COMPACTORS OF ALL TYPES; CONCRETE AND MAGNESITE MIXER, 1/2 YD. AND UNDER; CONCRETE PAN WORK; CONCRETE SANDER; CONCRETE SAW; CRIBBER AND/OR SHORING; CUT GRANITE CURB SETTER; DRI-PAK-IT MACHINE; FALLER, LOGLOADER AND BUCKER; FORM RAISER, SLIP FORMS; GREEN CUTTER; HEADERBOARD, HUBSETTER, ALIGNER, BY ANY METHOD; HIGH PRESSURE BLOW PIPE (1-1/2"" OR OVER, 100 LBS. PRESSURE/OVER); HYDRO SEEDER AND SIMILAR TYPE; JACKHAMMER OPERATOR; JACKING OF PIPE OVER 12 INCHES; JACKSON AND SIMILAR TYPE COMPACTOR; KETTLE TENDER, POT AND WORKER APPLYING ASPHALT, LAY-KOLD, CREOSOTE, LIME, CAUSTIC AND SIMILAR TYPE MATERIALS (APPLYING MEANS APPLYING, DIPPING OR HANDLING OF SUCH MATERIALS); LAGGING, SHEETING, WHALING, BRACING, TRENCHJACKING, LAGGING HAMMER; MAGNESITE, EPOXYRESIN, FIBERGLASS, MASTIC WORKER (WET OR DRY); NO JOINT PIPE AND STRIPPING OF SAME, INCLUDING REPAIR OF VOIDS; PAVEMENT BREAKER AND SPADER, INCLUDING TOOL GRINDER; PERMA CURB; PIPELAYER (INCLUDING GRADE CHECKING IN CONNECTION WITH PIPELAYING); PRECAST-MANHOLE SETTER; PRESSURE PIPE TESTER; POST HOLE DIGGER, AIR, GAS AND ELECTRIC; POWER BROOM SWEEPER; POWER TAMPERS OF ALL TYPES (EXCEPT AS SHOWN IN GROUP 2); RAM SET GUN AND STUD GUN; RIPRAP STONEPAVER AND ROCK-SLINGER, INCLUDING PLACING OF SACKED CONCRETE AND/OR SAND (WET OR DRY) AND GABIONS AND SIMILAR TYPE; ROTARY SCARIFIER OR MULTIPLE HEAD CONCRETE CHIPPING SCARIFIER; ROTO AND DITCH WITCH; ROTOTILLER; SANDBLASTER, POT, GUN, NOZZLE OPERATORS; SIGNALLING AND RIGGING; TANK CLEANER; TREE CLIMBER; TURBO BLASTER; VIBRASCREED, BULL FLOAT IN CONNECTION WITH LABORERS' WORK; VIBRATOR; HAZARDOUS WASTE WORKER (LEAD REMOVAL); ASBESTOS AND MOLD REMOVAL WORKER.

FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE WAGE RATE. GROUP 1-B: SEWER CLEANERS SHALL RECEIVE $4.00 PER DAY ABOVE GROUP 1 WAGE RATES. ""SEWER CLEANER"" MEANS ANY WORKER WHO HANDLES OR COMES IN CONTACT WITH RAW SEWAGE IN SMALL DIAMETER SEWERS. THOSE WHO WORK INSIDE RECENTLY ACTIVE, LARGE DIAMETER SEWERS, AND ALL RECENTLY ACTIVE SEWER MANHOLES SHAL RECEIVE $5.00 PER DAY ABOVE GROUP 1 WAGE RATES. GROUP 1-D: MAINTENANCE AND REPAIR TRACK AND ROAD BEDS. ALL EMPLOYEES PERFORMING WORK COVERED HEREIN SHALL RECEIVE $0.25 PER HOUR ABOVE THEIR REGULAR RATE FOR ALL WORK PERFORMED ON UNDERGROUND STRUCTURES NOT SPECIFICALLY COVERED HEREIN. THIS PARAGRAPH SHALL NOT BE CONSTRUED TO APPLY TO WORK BELOW GROUND LEVEL IN OPEN CUT. IT SHALL APPLY TO CUT AND COVER WORK OF SUBWAY CONSTRUCTION AFTER THE TEMPORARY COVER HAS BEEN PLACED. (FRESNO, KINGS, AND MADERA COUNTIES)

$35.50$27.30$62.80Agreement
LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 1…
Full text

LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 1-A- JOY DRILL MODEL TWM-2A; GARDNER-DENVER MODEL DH143 AND SIMILAR TYPE DRILLS; TRACK DRILLER; JACK LEG DRILLER; WAGON DRILLER; MECHANICAL DRILLERS, ALL TYPES REGARDLESS OF TYPE OR METHOD OF POWER; MECHANICAL PIPE LAYERS, ALL TYPES REGARDLESS OF TYPE OR METHOD OF POWER; BLASTER AND POWDER; ALL WORK OF LOADING, PLACING AND BLASTING OF ALL POWDER AND EXPLOSIVES OF WHATEVER TYPE REGARDLESS OF METHOD USED FOR SUCH LOADING AND PLACING; HIGH SCALERS (INCLUDING DRILLING OF SAME); TREE TOPPER; BIT GRINDER. GROUP 1-B: SEWER CLEANERS SHALL RECEIVE $4.00 PER DAY ABOVE GROUP 1 WAGE RATES. ""SEWER CLEANER"" MEANS ANY WORKER WHO HANDLES OR COMES IN CONTACT WITH RAW SEWAGE IN SMALL DIAMETER SEWERS. THOSE WHO WORK INSIDE RECENTLY ACTIVE, LARGE DIAMETER SEWERS, AND ALL RECENTLY ACTIVE SEWER MANHOLES SHAL RECEIVE $5.00 PER DAY ABOVE GROUP 1 WAGE RATES. GROUP 1-D: MAINTENANCE AND REPAIR TRACK AND ROAD BEDS. ALL EMPLOYEES PERFORMING WORK COVERED HEREIN SHALL RECEIVE $0.25 PER HOUR ABOVE THEIR REGULAR RATE FOR ALL WORK PERFORMED ON UNDERGROUND STRUCTURES NOT SPECIFICALLY COVERED HEREIN. THIS PARAGRAPH SHALL NOT BE CONSTRUED TO APPLY TO WORK BELOW GROUND LEVEL IN OPEN CUT. IT SHALL APPLY TO CUT AND COVER WORK OF SUBWAY CONSTRUCTION AFTER THE TEMPORARY COVER HAS BEEN PLACED. (FRESNO, KINGS, AND MADERA COUNTIES)

$35.72$27.30$63.02Agreement
LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 1…
Full text

LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 1-C- BURNING AND WELDING IN CONNECTION WITH LABORERS' WORK; SYNTHETIC THERMOPLASTICS AND SIMILAR TYPE WELDING.

FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE WAGE RATE. GROUP 1-B: SEWER CLEANERS SHALL RECEIVE $4.00 PER DAY ABOVE GROUP 1 WAGE RATES. ""SEWER CLEANER"" MEANS ANY WORKER WHO HANDLES OR COMES IN CONTACT WITH RAW SEWAGE IN SMALL DIAMETER SEWERS. THOSE WHO WORK INSIDE RECENTLY ACTIVE, LARGE DIAMETER SEWERS, AND ALL RECENTLY ACTIVE SEWER MANHOLES SHAL RECEIVE $5.00 PER DAY ABOVE GROUP 1 WAGE RATES. GROUP 1-D: MAINTENANCE AND REPAIR TRACK AND ROAD BEDS. ALL EMPLOYEES PERFORMING WORK COVERED HEREIN SHALL RECEIVE $0.25 PER HOUR ABOVE THEIR REGULAR RATE FOR ALL WORK PERFORMED ON UNDERGROUND STRUCTURES NOT SPECIFICALLY COVERED HEREIN. THIS PARAGRAPH SHALL NOT BE CONSTRUED TO APPLY TO WORK BELOW GROUND LEVEL IN OPEN CUT. IT SHALL APPLY TO CUT AND COVER WORK OF SUBWAY CONSTRUCTION AFTER THE TEMPORARY COVER HAS BEEN PLACED. (FRESNO, KINGS, AND MADERA COUNTIES)

$35.55$27.30$62.85Agreement
LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 1…
Full text

LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 1-E- WORK ON AND/OR IN BELL HOLE FOOTINGS AND SHAFTS THEREOF, AND WORK ON AND IN DEEP FOOTINGS. (A DEEP FOOTING IS A HOLE 15 FEET OR MORE IN DEPTH.) IN THE EVENT THE DEPTH OF THE FOOTING IS UNKNOWN AT THE COMMENCEMENT OF EXCAVATION, AND THE FINAL DEPTH EXCEEDS 15 FEET, THE DEEP FOOTING WAGE RATE WOULD APPLY TO ALL EMPLOYEES FOR EACH AND EVERY DAY WORKED ON OR IN THE EXCAVATION OF THE FOOTING FROM THE DATE OF INCEPTION.

FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE WAGE RATE. GROUP 1-B: SEWER CLEANERS SHALL RECEIVE $4.00 PER DAY ABOVE GROUP 1 WAGE RATES. ""SEWER CLEANER"" MEANS ANY WORKER WHO HANDLES OR COMES IN CONTACT WITH RAW SEWAGE IN SMALL DIAMETER SEWERS. THOSE WHO WORK INSIDE RECENTLY ACTIVE, LARGE DIAMETER SEWERS, AND ALL RECENTLY ACTIVE SEWER MANHOLES SHAL RECEIVE $5.00 PER DAY ABOVE GROUP 1 WAGE RATES. GROUP 1-D: MAINTENANCE AND REPAIR TRACK AND ROAD BEDS. ALL EMPLOYEES PERFORMING WORK COVERED HEREIN SHALL RECEIVE $0.25 PER HOUR ABOVE THEIR REGULAR RATE FOR ALL WORK PERFORMED ON UNDERGROUND STRUCTURES NOT SPECIFICALLY COVERED HEREIN. THIS PARAGRAPH SHALL NOT BE CONSTRUED TO APPLY TO WORK BELOW GROUND LEVEL IN OPEN CUT. IT SHALL APPLY TO CUT AND COVER WORK OF SUBWAY CONSTRUCTION AFTER THE TEMPORARY COVER HAS BEEN PLACED. (FRESNO, KINGS, AND MADERA COUNTIES)

$36.05$27.30$63.35Agreement
LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 2…
Full text

LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 2- ASPHALT SHOVELER; CEMENT DUMPER AND HANDLING DRY CEMENT OR GYPSUM; CHOKE-SETTER AND RIGGER (CLEARING WORK); CONCRETE BUCKET DUMPER AND CHUTE; CONCRETE CHIPPING AND GRINDING; CONCRETE LABORER (WET OR DRY); DRILLER TENDER, CHUCK TENDER, NIPPER; GUINEA CHASER (STAKE), GROUT CREW; HIGH PRESSURE NOZZLE, ADDUCTOR; HYDRAULIC MONITOR (OVER 100 LBS. PRESSURE); LOADING AND UNLOADING, CARRYING AND HAULING OF ALL RODS AND MATERIALS FOR USE IN REINFORCING CONCRETE CONSTRUCTION; PITTSBURGH CHIPPER AND SIMILAR TYPE BRUSH SHREDDERS; SLOPER; SINGLE FOOT, HAND-HELD, PNEUMATIC TAMPER; ALL PNEUMATIC, AIR, GAS AND ELECTRIC TOOLS NOT LISTED IN GROUPS 1 THROUGH 1-F; JACKING OF PIPE - UNDER 12 INCHES.

FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE WAGE RATE. GROUP 1-B: SEWER CLEANERS SHALL RECEIVE $4.00 PER DAY ABOVE GROUP 1 WAGE RATES. ""SEWER CLEANER"" MEANS ANY WORKER WHO HANDLES OR COMES IN CONTACT WITH RAW SEWAGE IN SMALL DIAMETER SEWERS. THOSE WHO WORK INSIDE RECENTLY ACTIVE, LARGE DIAMETER SEWERS, AND ALL RECENTLY ACTIVE SEWER MANHOLES SHAL RECEIVE $5.00 PER DAY ABOVE GROUP 1 WAGE RATES. GROUP 1-D: MAINTENANCE AND REPAIR TRACK AND ROAD BEDS. ALL EMPLOYEES PERFORMING WORK COVERED HEREIN SHALL RECEIVE $0.25 PER HOUR ABOVE THEIR REGULAR RATE FOR ALL WORK PERFORMED ON UNDERGROUND STRUCTURES NOT SPECIFICALLY COVERED HEREIN. THIS PARAGRAPH SHALL NOT BE CONSTRUED TO APPLY TO WORK BELOW GROUND LEVEL IN OPEN CUT. IT SHALL APPLY TO CUT AND COVER WORK OF SUBWAY CONSTRUCTION AFTER THE TEMPORARY COVER HAS BEEN PLACED. (FRESNO, KINGS, AND MADERA COUNTIES)

$35.35$27.30$62.65Agreement
LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 3…
Full text

LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 3- CONSTRUCTION LABORERS, INCLUDING BRIDGE AND GENERAL LABORER; DUMP, LOAD SPOTTER; FLAG PERSON; FIRE WATCHER; FENCE ERECTOR; GUARDRAIL ERECTOR; GARDENER, HORTICULTURAL AND LANDSCAPE LABORER; JETTING; LIMBER, BRUSH LOADER AND PILER; PAVEMENT MARKER (BUTTON SETTER); MAINTENANCE, REPAIR TRACK AND ROAD BEDS; STREETCAR AND RAILROAD CONSTRUCTION TRACK LABORER; TEMPORARY AIR AND WATER LINES, VICTAULIC OR SIMILAR; TOOL ROOM ATTENDANT (JOBSITE ONLY).

FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE WAGE RATE. GROUP 1-B: SEWER CLEANERS SHALL RECEIVE $4.00 PER DAY ABOVE GROUP 1 WAGE RATES. ""SEWER CLEANER"" MEANS ANY WORKER WHO HANDLES OR COMES IN CONTACT WITH RAW SEWAGE IN SMALL DIAMETER SEWERS. THOSE WHO WORK INSIDE RECENTLY ACTIVE, LARGE DIAMETER SEWERS, AND ALL RECENTLY ACTIVE SEWER MANHOLES SHAL RECEIVE $5.00 PER DAY ABOVE GROUP 1 WAGE RATES. GROUP 1-D: MAINTENANCE AND REPAIR TRACK AND ROAD BEDS. ALL EMPLOYEES PERFORMING WORK COVERED HEREIN SHALL RECEIVE $0.25 PER HOUR ABOVE THEIR REGULAR RATE FOR ALL WORK PERFORMED ON UNDERGROUND STRUCTURES NOT SPECIFICALLY COVERED HEREIN. THIS PARAGRAPH SHALL NOT BE CONSTRUED TO APPLY TO WORK BELOW GROUND LEVEL IN OPEN CUT. IT SHALL APPLY TO CUT AND COVER WORK OF SUBWAY CONSTRUCTION AFTER THE TEMPORARY COVER HAS BEEN PLACED. (FRESNO, KINGS, AND MADERA COUNTIES)

$35.25$27.30$62.55Agreement
LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 4…
Full text

LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 4- FINAL CLEAN-UP WORK OF DEBRIS, GROUNDS AND BUILDING INCLUDING BUT NOT LIMITED TO: STREET CLEANER; CLEANING AND WASHING WINDOWS; BRICK CLEANER (JOBSITE ONLY); MATERIAL CLEANER (JOBSITE ONLY). THE CLASSIFICATION ""MATERIAL CLEANER"" IS TO BE UTILIZED UNDER THE FOLLOWING CONDITIONS: A: AT DEMOLITION SITE FOR THE SALVAGE OF THE MATERIAL. B: AT THE CONCLUSION OF A JOB WHERE THE MATERIAL IS TO BE SALVAGED AND STOCKED TO BE REUSED ON ANOTHER JOB. C: FOR THE CLEANING OF SALVAGE MATERIAL AT THE JOBSITE OR TEMPORARY JOBSITE YARD. THE MATERIAL CLEANER CLASSIFICATION SHOULD NOT BE USED IN THE PERFORMANCE OF ""FORM STRIPPING, CLEANING AND OILING AND MOVING TO THE NEXT POINT OF ERECTION"".

FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE WAGE RATE. GROUP 1-B: SEWER CLEANERS SHALL RECEIVE $4.00 PER DAY ABOVE GROUP 1 WAGE RATES. ""SEWER CLEANER"" MEANS ANY WORKER WHO HANDLES OR COMES IN CONTACT WITH RAW SEWAGE IN SMALL DIAMETER SEWERS. THOSE WHO WORK INSIDE RECENTLY ACTIVE, LARGE DIAMETER SEWERS, AND ALL RECENTLY ACTIVE SEWER MANHOLES SHAL RECEIVE $5.00 PER DAY ABOVE GROUP 1 WAGE RATES. GROUP 1-D: MAINTENANCE AND REPAIR TRACK AND ROAD BEDS. ALL EMPLOYEES PERFORMING WORK COVERED HEREIN SHALL RECEIVE $0.25 PER HOUR ABOVE THEIR REGULAR RATE FOR ALL WORK PERFORMED ON UNDERGROUND STRUCTURES NOT SPECIFICALLY COVERED HEREIN. THIS PARAGRAPH SHALL NOT BE CONSTRUED TO APPLY TO WORK BELOW GROUND LEVEL IN OPEN CUT. IT SHALL APPLY TO CUT AND COVER WORK OF SUBWAY CONSTRUCTION AFTER THE TEMPORARY COVER HAS BEEN PLACED. (FRESNO, KINGS, AND MADERA COUNTIES)

$28.94$27.30$56.24Agreement
LABORER, GUNITE: GROUP 1- STRUCTURAL NOZZLEMAN.

FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE WAGE RATE. (FRESNO, KINGS, AND MADERA COUNTIES)

$36.46$27.30$63.76Agreement
LABORER, GUNITE: GROUP 2- NOZZLEMAN, GUNMAN, POTMAN, GROUNDMAN.

FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE WAGE RATE. (FRESNO, KINGS, AND MADERA COUNTIES)

$35.96$27.30$63.26Agreement
LABORER, GUNITE: GROUP 3- REBOUNDMAN.

FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE WAGE RATE. (FRESNO, KINGS, AND MADERA COUNTIES)

$35.37$27.30$62.67Agreement
LABORER, GUNITE: GROUP 4- GUINTE LABORER.

FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE WAGE RATE. (FRESNO, KINGS, AND MADERA COUNTIES)

$35.25$27.30$62.55Agreement
LABORER, WRECKING: GROUP 1…
Full text

LABORER, WRECKING: GROUP 1- SKILLED WRECKER (REMOVING AND SALVAGING OF SASH, WINDOWS, AND MATERIALS).

FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE WAGE RATE. (FRESNO, KINGS, AND MADERA COUNTIES)

$35.50$27.30$62.80Agreement
LABORER, WRECKING: GROUP 2- SEMI-SKILLED WRECKER (SALVAGING OF OTHER BUILDING MATERIALS).

FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE WAGE RATE. (FRESNO, KINGS, AND MADERA COUNTIES)

$35.35$27.30$62.65Agreement
LABORER: GARDENERS, HORTICULTURAL & LANDSCAPE LABORERS - (1) New Construction.

FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE WAGE RATE. (FRESNO, KINGS, AND MADERA COUNTIES)

$35.25$27.30$62.55Agreement
LABORER: GARDENERS…
Full text

LABORER: GARDENERS, HORTICULTURAL & LANDSCAPE LABORERS - (2) Establishment Warranty Period.

FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE WAGE RATE. (FRESNO, KINGS, AND MADERA COUNTIES)

$28.94$27.30$56.24Agreement
LABO0294-010 · Laborers agreement, July 1, 2023
PLASTERER TENDER. WORK ON A SWING STAGE SCAFFOLD…
Full text

PLASTERER TENDER. WORK ON A SWING STAGE SCAFFOLD: $1.00 PER HOUR ADDITIONAL. (CALAVERAS, FRESNO, KINGS, MADERA, MARIPOSA, MERCED, SAN JOAQUIN, STANISLAUS & TUOLUMNE COUNTIES)

$39.77$28.54$68.31Agreement
LABO0294-011 · Laborers agreement, July 1, 2023
LABORER, PLASTER TENDER. WORK ON A SWING STAGE SCAFFOLD…
Full text

LABORER, PLASTER TENDER. WORK ON A SWING STAGE SCAFFOLD: $1.00 PER HOUR ADDITIONAL. (FRESNO, KINGS, AND MADERA COUNTIES)

$39.77$28.54$68.31Agreement
LABO0304-002 · Laborers agreement, July 1, 2023
LABORER, TRAFFIC CONTROL/LANE CLOSURE: ESCORT DRIVER, FLAG PERSON (ALAMEDA COUNTY)$37.26$27.30$64.56Agreement
LABORER, TRAFFIC CONTROL/LANE CLOSURE…
Full text

LABORER, TRAFFIC CONTROL/LANE CLOSURE: TRAFFIC CONTROL PERSON I- LAYOUT OF TRAFFIC CONTROL, CRASH CUSHIONS, CONSTRUCTION AREA AND ROADSIDE SIGNAGE. (ALAMEDA COUNTY)

$37.56$27.30$64.86Agreement
LABORER, TRAFFIC CONTROL/LANE CLOSURE…
Full text

LABORER, TRAFFIC CONTROL/LANE CLOSURE: TRAFFIC CONTROL PERSON II- INSTALLATION AND REMOVAL OF TEMPORARY/PERMANENT SIGNS, MARKERS, DELINEATORS AND CRASH CUSHIONS. (ALAMEDA COUNTY)

$35.06$27.30$62.36Agreement
LABO0304-003 · Laborers agreement, June 26, 2023
TUNNEL AND SHAFT LABORERS: GROUP 1…
Full text

TUNNEL AND SHAFT LABORERS: GROUP 1- DIAMOND DRILLER; GROUNDMEN; GUNITE AND SHOTCRETE NOZZLEMEN (ALAMEDA COUNTY)

$45.89$27.72$73.61Agreement
TUNNEL AND SHAFT LABORERS: GROUP 2…
Full text

TUNNEL AND SHAFT LABORERS: GROUP 2- RODMEN; SHAFT WORK & RAISE (BELOW ACTUAL OR EXCAVATED GROUND LEVEL) (ALAMEDA COUNTY)

$45.66$27.72$73.38Agreement
TUNNEL AND SHAFT LABORERS: GROUP 3…
Full text

TUNNEL AND SHAFT LABORERS: GROUP 3- BIT GRINDER; BLASTER, DRILLER, POWDERMEN, HEADING; CHERRY PICKERMEN - WHERE CAR IS LIFTED; CONCRETE FINISHER IN TUNNEL; CONCRETE SCREEDMAN; GROUT PUMPMAN AND POTMAN; GUNITE & SHOTCRETE GUNMAN & POTMAN; HEADERMEN; HIGH PRESSURE NOZZLEMAN; MINER - TUNNEL, INCLUDING TOP AND BOTTOM MAN ON SHAFT AND RAISE WORK; NIPPER; NOZZLEMAN ON SLICK LINE; SANDBLASTER - POTMAN, ROBOTIC SHOTCRETE PLACER, SEGMENT ERECTOR, TUNNEL MUCK HAULER, STEEL FORM RAISER AND SETTER; TIMBERMAN, RETIMBERMAN (WOOD OR STEEL OR SUBSTITUTE MATERIALS THEREFORE); TUGGER (FOR TUNNEL LABORER WORK); CABLE TENDER; CHUCK TENDER; POWDERMAN - PRIMER HOUSE (ALAMEDA COUNTY)

$45.41$27.72$73.13Agreement
TUNNEL AND SHAFT LABORERS: GROUP 4…
Full text

TUNNEL AND SHAFT LABORERS: GROUP 4- VIBRATOR OPERATOR, PAVEMENT BREAKER; BULL GANG - MUCKERS, TRACKMEN; CONCRETE CREW - INCLUDES RODDING AND SPREADING, DUMPMEN (ANY METHOD) (ALAMEDA COUNTY)

$44.96$27.72$72.68Agreement
TUNNEL AND SHAFT LABORERS: GROUP 5…
Full text

TUNNEL AND SHAFT LABORERS: GROUP 5- GROUT CREW; REBOUNDMAN; SWAMPER/ BRAKEMAN (ALAMEDA COUNTY)

$44.42$27.72$72.14Agreement
TUNNEL AND SHAFT LABORERS: SHOTCRETE SPECIALIST (ALAMEDA COUNTY)$46.41$27.72$74.13Agreement
LABO0304-004 · Laborers agreement, June 26, 2023
LABORER (CONSTRUCTION CRAFT LABORERS) GROUP 1…
Full text

LABORER (CONSTRUCTION CRAFT LABORERS) GROUP 1-F- WIRE WINDING MACHINE IN CONNECTION WITH GUNITING OR SHOT CRETE.

FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE WAGE RATE. GROUP 1-B: SEWER CLEANERS SHALL RECEIVE $4.00 PER DAY ABOVE GROUP 1 WAGE RATES. ""SEWER CLEANER"" MEANS ANY WORKER WHO HANDLES OR COMES IN CONTACT WITH RAW SEWAGE IN SMALL DIAMETER SEWERS. THOSE WHO WORK INSIDE RECENTLY ACTIVE, LARGE DIAMETER SEWERS, AND ALL RECENTLY ACTIVE SEWER MANHOLES SHAL RECEIVE $5.00 PER DAY ABOVE GROUP 1 WAGE RATES. GROUP 1-D: MAINTENANCE AND REPAIR TRACK AND ROAD BEDS. ALL EMPLOYEES PERFORMING WORK COVERED HEREIN SHALL RECEIVE $0.25 PER HOUR ABOVE THEIR REGULAR RATE FOR ALL WORK PERFORMED ON UNDERGROUND STRUCTURES NOT SPECIFICALLY COVERED HEREIN. THIS PARAGRAPH SHALL NOT BE CONSTRUED TO APPLY TO WORK BELOW GROUND LEVEL IN OPEN CUT. IT SHALL APPLY TO CUT AND COVER WORK OF SUBWAY CONSTRUCTION AFTER THE TEMPORARY COVER HAS BEEN PLACED. (ALAMEDA COUNTY)

$37.08$27.30$64.38Agreement
LABORER, CONSTRUCTION CRAFT LABORERS…
Full text

LABORER, CONSTRUCTION CRAFT LABORERS: CONSTRUCTION SPECIALIST GROUP- ASPHALT IRONER AND RAKER; CHAINSAW; LASER BEAM IN CONNECTION WITH LABORERS' WORK; CAST-IN- PLACE MANHOLE FORM SETTER; PRESSURE PIPELAYER; DAVIS TRENCHER - 300 OR SIMILAR TYPE (AND ALL SMALL TRENCHERS); BLASTER; DIAMOND DRILLER; MULTIPLE UNIT DRILL; HYDRAULIC DRILL.

FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE WAGE RATE. GROUP 1-B: SEWER CLEANERS SHALL RECEIVE $4.00 PER DAY ABOVE GROUP 1 WAGE RATES. ""SEWER CLEANER"" MEANS ANY WORKER WHO HANDLES OR COMES IN CONTACT WITH RAW SEWAGE IN SMALL DIAMETER SEWERS. THOSE WHO WORK INSIDE RECENTLY ACTIVE, LARGE DIAMETER SEWERS, AND ALL RECENTLY ACTIVE SEWER MANHOLES SHAL RECEIVE $5.00 PER DAY ABOVE GROUP 1 WAGE RATES. GROUP 1-D: MAINTENANCE AND REPAIR TRACK AND ROAD BEDS. ALL EMPLOYEES PERFORMING WORK COVERED HEREIN SHALL RECEIVE $0.25 PER HOUR ABOVE THEIR REGULAR RATE FOR ALL WORK PERFORMED ON UNDERGROUND STRUCTURES NOT SPECIFICALLY COVERED HEREIN. THIS PARAGRAPH SHALL NOT BE CONSTRUED TO APPLY TO WORK BELOW GROUND LEVEL IN OPEN CUT. IT SHALL APPLY TO CUT AND COVER WORK OF SUBWAY CONSTRUCTION AFTER THE TEMPORARY COVER HAS BEEN PLACED. (ALAMEDA COUNTY)

$37.20$27.30$64.50Agreement
LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 1…
Full text

LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 1- ASPHALT SPREADER BOXES (ALL TYPES); BARKO, WACKER AND SIMILAR TYPE TAMPERS; BUGGYMOBILE; CAULKER, BANDER, PIPEWRAPPER, CONDUIT LAYER, PLASTIC PIPELAYER; CERTIFIED HAZARDOUS WASTE WORKER INCLUDING LEADE ABATEMENT; COMPACTORS OF ALL TYPES; CONCRETE AND MAGNESITE MIXER, 1/2 YD. AND UNDER; CONCRETE PAN WORK; CONCRETE SANDER; CONCRETE SAW; CRIBBER AND/OR SHORING; CUT GRANITE CURB SETTER; DRI-PAK-IT MACHINE; FALLER, LOGLOADER AND BUCKER; FORM RAISER, SLIP FORMS; GREEN CUTTER; HEADERBOARD, HUBSETTER, ALIGNER, BY ANY METHOD; HIGH PRESSURE BLOW PIPE (1-1/2"" OR OVER, 100 LBS. PRESSURE/OVER); HYDRO SEEDER AND SIMILAR TYPE; JACKHAMMER OPERATOR; JACKING OF PIPE OVER 12 INCHES; JACKSON AND SIMILAR TYPE COMPACTOR; KETTLE TENDER, POT AND WORKER APPLYING ASPHALT, LAY-KOLD, CREOSOTE, LIME, CAUSTIC AND SIMILAR TYPE MATERIALS (APPLYING MEANS APPLYING, DIPPING OR HANDLING OF SUCH MATERIALS); LAGGING, SHEETING, WHALING, BRACING, TRENCHJACKING, LAGGING HAMMER; MAGNESITE, EPOXYRESIN, FIBERGLASS, MASTIC WORKER (WET OR DRY); NO JOINT PIPE AND STRIPPING OF SAME, INCLUDING REPAIR OF VOIDS; PAVEMENT BREAKER AND SPADER, INCLUDING TOOL GRINDER; PERMA CURB; PIPELAYER (INCLUDING GRADE CHECKING IN CONNECTION WITH PIPELAYING); PRECAST-MANHOLE SETTER; PRESSURE PIPE TESTER; POST HOLE DIGGER, AIR, GAS AND ELECTRIC; POWER BROOM SWEEPER; POWER TAMPERS OF ALL TYPES (EXCEPT AS SHOWN IN GROUP 2); RAM SET GUN AND STUD GUN; RIPRAP STONEPAVER AND ROCK-SLINGER, INCLUDING PLACING OF SACKED CONCRETE AND/OR SAND (WET OR DRY) AND GABIONS AND SIMILAR TYPE; ROTARY SCARIFIER OR MULTIPLE HEAD CONCRETE CHIPPING SCARIFIER; ROTO AND DITCH WITCH; ROTOTILLER; SANDBLASTER, POT, GUN, NOZZLE OPERATORS; SIGNALLING AND RIGGING; TANK CLEANER; TREE CLIMBER; TURBO BLASTER; VIBRASCREED, BULL FLOAT IN CONNECTION WITH LABORERS' WORK; VIBRATOR; HAZARDOUS WASTE WORKER (LEAD REMOVAL); ASBESTOS AND MOLD REMOVAL WORKER.

FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE WAGE RATE. GROUP 1-B: SEWER CLEANERS SHALL RECEIVE $4.00 PER DAY ABOVE GROUP 1 WAGE RATES. ""SEWER CLEANER"" MEANS ANY WORKER WHO HANDLES OR COMES IN CONTACT WITH RAW SEWAGE IN SMALL DIAMETER SEWERS. THOSE WHO WORK INSIDE RECENTLY ACTIVE, LARGE DIAMETER SEWERS, AND ALL RECENTLY ACTIVE SEWER MANHOLES SHAL RECEIVE $5.00 PER DAY ABOVE GROUP 1 WAGE RATES. GROUP 1-D: MAINTENANCE AND REPAIR TRACK AND ROAD BEDS. ALL EMPLOYEES PERFORMING WORK COVERED HEREIN SHALL RECEIVE $0.25 PER HOUR ABOVE THEIR REGULAR RATE FOR ALL WORK PERFORMED ON UNDERGROUND STRUCTURES NOT SPECIFICALLY COVERED HEREIN. THIS PARAGRAPH SHALL NOT BE CONSTRUED TO APPLY TO WORK BELOW GROUND LEVEL IN OPEN CUT. IT SHALL APPLY TO CUT AND COVER WORK OF SUBWAY CONSTRUCTION AFTER THE TEMPORARY COVER HAS BEEN PLACED. (ALAMEDA COUNTY)

$36.50$27.30$63.80Agreement
LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 1…
Full text

LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 1-A- JOY DRILL MODEL TWM-2A; GARDNER-DENVER MODEL DH143 AND SIMILAR TYPE DRILLS; TRACK DRILLER; JACK LEG DRILLER; WAGON DRILLER; MECHANICAL DRILLERS, ALL TYPES REGARDLESS OF TYPE OR METHOD OF POWER; MECHANICAL PIPE LAYERS, ALL TYPES REGARDLESS OF TYPE OR METHOD OF POWER; BLASTER AND POWDER; ALL WORK OF LOADING, PLACING AND BLASTING OF ALL POWDER AND EXPLOSIVES OF WHATEVER TYPE REGARDLESS OF METHOD USED FOR SUCH LOADING AND PLACING; HIGH SCALERS (INCLUDING DRILLING OF SAME); TREE TOPPER; BIT GRINDER. GROUP 1-B: SEWER CLEANERS SHALL RECEIVE $4.00 PER DAY ABOVE GROUP 1 WAGE RATES. ""SEWER CLEANER"" MEANS ANY WORKER WHO HANDLES OR COMES IN CONTACT WITH RAW SEWAGE IN SMALL DIAMETER SEWERS. THOSE WHO WORK INSIDE RECENTLY ACTIVE, LARGE DIAMETER SEWERS, AND ALL RECENTLY ACTIVE SEWER MANHOLES SHAL RECEIVE $5.00 PER DAY ABOVE GROUP 1 WAGE RATES. GROUP 1-D: MAINTENANCE AND REPAIR TRACK AND ROAD BEDS. ALL EMPLOYEES PERFORMING WORK COVERED HEREIN SHALL RECEIVE $0.25 PER HOUR ABOVE THEIR REGULAR RATE FOR ALL WORK PERFORMED ON UNDERGROUND STRUCTURES NOT SPECIFICALLY COVERED HEREIN. THIS PARAGRAPH SHALL NOT BE CONSTRUED TO APPLY TO WORK BELOW GROUND LEVEL IN OPEN CUT. IT SHALL APPLY TO CUT AND COVER WORK OF SUBWAY CONSTRUCTION AFTER THE TEMPORARY COVER HAS BEEN PLACED. (ALAMEDA COUNTY)

$36.72$27.30$64.02Agreement
LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 1…
Full text

LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 1-C- BURNING AND WELDING IN CONNECTION WITH LABORERS' WORK; SYNTHETIC THERMOPLASTICS AND SIMILAR TYPE WELDING.

FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE WAGE RATE. GROUP 1-B: SEWER CLEANERS SHALL RECEIVE $4.00 PER DAY ABOVE GROUP 1 WAGE RATES. ""SEWER CLEANER"" MEANS ANY WORKER WHO HANDLES OR COMES IN CONTACT WITH RAW SEWAGE IN SMALL DIAMETER SEWERS. THOSE WHO WORK INSIDE RECENTLY ACTIVE, LARGE DIAMETER SEWERS, AND ALL RECENTLY ACTIVE SEWER MANHOLES SHAL RECEIVE $5.00 PER DAY ABOVE GROUP 1 WAGE RATES. GROUP 1-D: MAINTENANCE AND REPAIR TRACK AND ROAD BEDS. ALL EMPLOYEES PERFORMING WORK COVERED HEREIN SHALL RECEIVE $0.25 PER HOUR ABOVE THEIR REGULAR RATE FOR ALL WORK PERFORMED ON UNDERGROUND STRUCTURES NOT SPECIFICALLY COVERED HEREIN. THIS PARAGRAPH SHALL NOT BE CONSTRUED TO APPLY TO WORK BELOW GROUND LEVEL IN OPEN CUT. IT SHALL APPLY TO CUT AND COVER WORK OF SUBWAY CONSTRUCTION AFTER THE TEMPORARY COVER HAS BEEN PLACED. (ALAMEDA COUNTY)

$36.55$27.30$63.85Agreement
LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 1…
Full text

LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 1-E- WORK ON AND/OR IN BELL HOLE FOOTINGS AND SHAFTS THEREOF, AND WORK ON AND IN DEEP FOOTINGS. (A DEEP FOOTING IS A HOLE 15 FEET OR MORE IN DEPTH.) IN THE EVENT THE DEPTH OF THE FOOTING IS UNKNOWN AT THE COMMENCEMENT OF EXCAVATION, AND THE FINAL DEPTH EXCEEDS 15 FEET, THE DEEP FOOTING WAGE RATE WOULD APPLY TO ALL EMPLOYEES FOR EACH AND EVERY DAY WORKED ON OR IN THE EXCAVATION OF THE FOOTING FROM THE DATE OF INCEPTION.

FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE WAGE RATE. GROUP 1-B: SEWER CLEANERS SHALL RECEIVE $4.00 PER DAY ABOVE GROUP 1 WAGE RATES. ""SEWER CLEANER"" MEANS ANY WORKER WHO HANDLES OR COMES IN CONTACT WITH RAW SEWAGE IN SMALL DIAMETER SEWERS. THOSE WHO WORK INSIDE RECENTLY ACTIVE, LARGE DIAMETER SEWERS, AND ALL RECENTLY ACTIVE SEWER MANHOLES SHAL RECEIVE $5.00 PER DAY ABOVE GROUP 1 WAGE RATES. GROUP 1-D: MAINTENANCE AND REPAIR TRACK AND ROAD BEDS. ALL EMPLOYEES PERFORMING WORK COVERED HEREIN SHALL RECEIVE $0.25 PER HOUR ABOVE THEIR REGULAR RATE FOR ALL WORK PERFORMED ON UNDERGROUND STRUCTURES NOT SPECIFICALLY COVERED HEREIN. THIS PARAGRAPH SHALL NOT BE CONSTRUED TO APPLY TO WORK BELOW GROUND LEVEL IN OPEN CUT. IT SHALL APPLY TO CUT AND COVER WORK OF SUBWAY CONSTRUCTION AFTER THE TEMPORARY COVER HAS BEEN PLACED. (ALAMEDA COUNTY)

$37.05$27.30$64.35Agreement
LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 2…
Full text

LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 2- ASPHALT SHOVELER; CEMENT DUMPER AND HANDLING DRY CEMENT OR GYPSUM; CHOKE-SETTER AND RIGGER (CLEARING WORK); CONCRETE BUCKET DUMPER AND CHUTE; CONCRETE CHIPPING AND GRINDING; CONCRETE LABORER (WET OR DRY); DRILLER TENDER, CHUCK TENDER, NIPPER; GUINEA CHASER (STAKE), GROUT CREW; HIGH PRESSURE NOZZLE, ADDUCTOR; HYDRAULIC MONITOR (OVER 100 LBS. PRESSURE); LOADING AND UNLOADING, CARRYING AND HAULING OF ALL RODS AND MATERIALS FOR USE IN REINFORCING CONCRETE CONSTRUCTION; PITTSBURGH CHIPPER AND SIMILAR TYPE BRUSH SHREDDERS; SLOPER; SINGLE FOOT, HAND-HELD, PNEUMATIC TAMPER; ALL PNEUMATIC, AIR, GAS AND ELECTRIC TOOLS NOT LISTED IN GROUPS 1 THROUGH 1-F; JACKING OF PIPE - UNDER 12 INCHES.

FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE WAGE RATE. GROUP 1-B: SEWER CLEANERS SHALL RECEIVE $4.00 PER DAY ABOVE GROUP 1 WAGE RATES. ""SEWER CLEANER"" MEANS ANY WORKER WHO HANDLES OR COMES IN CONTACT WITH RAW SEWAGE IN SMALL DIAMETER SEWERS. THOSE WHO WORK INSIDE RECENTLY ACTIVE, LARGE DIAMETER SEWERS, AND ALL RECENTLY ACTIVE SEWER MANHOLES SHAL RECEIVE $5.00 PER DAY ABOVE GROUP 1 WAGE RATES. GROUP 1-D: MAINTENANCE AND REPAIR TRACK AND ROAD BEDS. ALL EMPLOYEES PERFORMING WORK COVERED HEREIN SHALL RECEIVE $0.25 PER HOUR ABOVE THEIR REGULAR RATE FOR ALL WORK PERFORMED ON UNDERGROUND STRUCTURES NOT SPECIFICALLY COVERED HEREIN. THIS PARAGRAPH SHALL NOT BE CONSTRUED TO APPLY TO WORK BELOW GROUND LEVEL IN OPEN CUT. IT SHALL APPLY TO CUT AND COVER WORK OF SUBWAY CONSTRUCTION AFTER THE TEMPORARY COVER HAS BEEN PLACED. (ALAMEDA COUNTY)

$36.35$27.30$63.65Agreement
LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 3…
Full text

LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 3- CONSTRUCTION LABORERS, INCLUDING BRIDGE AND GENERAL LABORER; DUMP, LOAD SPOTTER; FLAG PERSON; FIRE WATCHER; FENCE ERECTOR; GUARDRAIL ERECTOR; GARDENER, HORTICULTURAL AND LANDSCAPE LABORER; JETTING; LIMBER, BRUSH LOADER AND PILER; PAVEMENT MARKER (BUTTON SETTER); MAINTENANCE, REPAIR TRACK AND ROAD BEDS; STREETCAR AND RAILROAD CONSTRUCTION TRACK LABORER; TEMPORARY AIR AND WATER LINES, VICTAULIC OR SIMILAR; TOOL ROOM ATTENDANT (JOBSITE ONLY).

FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE WAGE RATE. GROUP 1-B: SEWER CLEANERS SHALL RECEIVE $4.00 PER DAY ABOVE GROUP 1 WAGE RATES. ""SEWER CLEANER"" MEANS ANY WORKER WHO HANDLES OR COMES IN CONTACT WITH RAW SEWAGE IN SMALL DIAMETER SEWERS. THOSE WHO WORK INSIDE RECENTLY ACTIVE, LARGE DIAMETER SEWERS, AND ALL RECENTLY ACTIVE SEWER MANHOLES SHAL RECEIVE $5.00 PER DAY ABOVE GROUP 1 WAGE RATES. GROUP 1-D: MAINTENANCE AND REPAIR TRACK AND ROAD BEDS. ALL EMPLOYEES PERFORMING WORK COVERED HEREIN SHALL RECEIVE $0.25 PER HOUR ABOVE THEIR REGULAR RATE FOR ALL WORK PERFORMED ON UNDERGROUND STRUCTURES NOT SPECIFICALLY COVERED HEREIN. THIS PARAGRAPH SHALL NOT BE CONSTRUED TO APPLY TO WORK BELOW GROUND LEVEL IN OPEN CUT. IT SHALL APPLY TO CUT AND COVER WORK OF SUBWAY CONSTRUCTION AFTER THE TEMPORARY COVER HAS BEEN PLACED. (ALAMEDA COUNTY)

$36.25$27.30$63.55Agreement
LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 4…
Full text

LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 4- FINAL CLEAN-UP WORK OF DEBRIS, GROUNDS AND BUILDING INCLUDING BUT NOT LIMITED TO: STREET CLEANER; CLEANING AND WASHING WINDOWS; BRICK CLEANER (JOBSITE ONLY); MATERIAL CLEANER (JOBSITE ONLY). THE CLASSIFICATION ""MATERIAL CLEANER"" IS TO BE UTILIZED UNDER THE FOLLOWING CONDITIONS: A: AT DEMOLITION SITE FOR THE SALVAGE OF THE MATERIAL. B: AT THE CONCLUSION OF A JOB WHERE THE MATERIAL IS TO BE SALVAGED AND STOCKED TO BE REUSED ON ANOTHER JOB. C: FOR THE CLEANING OF SALVAGE MATERIAL AT THE JOBSITE OR TEMPORARY JOBSITE YARD. THE MATERIAL CLEANER CLASSIFICATION SHOULD NOT BE USED IN THE PERFORMANCE OF ""FORM STRIPPING, CLEANING AND OILING AND MOVING TO THE NEXT POINT OF ERECTION"".

FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE WAGE RATE. GROUP 1-B: SEWER CLEANERS SHALL RECEIVE $4.00 PER DAY ABOVE GROUP 1 WAGE RATES. ""SEWER CLEANER"" MEANS ANY WORKER WHO HANDLES OR COMES IN CONTACT WITH RAW SEWAGE IN SMALL DIAMETER SEWERS. THOSE WHO WORK INSIDE RECENTLY ACTIVE, LARGE DIAMETER SEWERS, AND ALL RECENTLY ACTIVE SEWER MANHOLES SHAL RECEIVE $5.00 PER DAY ABOVE GROUP 1 WAGE RATES. GROUP 1-D: MAINTENANCE AND REPAIR TRACK AND ROAD BEDS. ALL EMPLOYEES PERFORMING WORK COVERED HEREIN SHALL RECEIVE $0.25 PER HOUR ABOVE THEIR REGULAR RATE FOR ALL WORK PERFORMED ON UNDERGROUND STRUCTURES NOT SPECIFICALLY COVERED HEREIN. THIS PARAGRAPH SHALL NOT BE CONSTRUED TO APPLY TO WORK BELOW GROUND LEVEL IN OPEN CUT. IT SHALL APPLY TO CUT AND COVER WORK OF SUBWAY CONSTRUCTION AFTER THE TEMPORARY COVER HAS BEEN PLACED. (ALAMEDA COUNTY)

$29.94$27.30$57.24Agreement
LABORER, GUNITE: GROUP 1- STRUCTURAL NOZZLEMAN.

FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE WAGE RATE. (ALAMEDA COUNTY)

$37.46$27.30$64.76Agreement
LABORER, GUNITE: GROUP 2- NOZZLEMAN, GUNMAN, POTMAN, GROUNDMAN.

FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE WAGE RATE. (ALAMEDA COUNTY)

$36.96$27.30$64.26Agreement
LABORER, GUNITE: GROUP 3- REBOUNDMAN.

FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE WAGE RATE. (ALAMEDA COUNTY)

$36.37$27.30$63.67Agreement
LABORER, GUNITE: GROUP 4- GUINTE LABORER.

FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE WAGE RATE. (ALAMEDA COUNTY)

$36.25$27.30$63.55Agreement
LABORER, WRECKING: GROUP 1…
Full text

LABORER, WRECKING: GROUP 1- SKILLED WRECKER (REMOVING AND SALVAGING OF SASH, WINDOWS, AND MATERIALS).

FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE WAGE RATE. (ALAMEDA COUNTY)

$36.50$27.30$63.80Agreement
LABORER, WRECKING: GROUP 2- SEMI-SKILLED WRECKER (SALVAGING OF OTHER BUILDING MATERIALS).

FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE WAGE RATE. (ALAMEDA COUNTY)

$36.35$27.30$63.65Agreement
LABORER: GARDENERS, HORTICULTURAL & LANDSCAPE LABORERS - (1) New Construction.

FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE WAGE RATE. (ALAMEDA COUNTY)

$36.25$27.30$63.55Agreement
LABORER: GARDENERS…
Full text

LABORER: GARDENERS, HORTICULTURAL & LANDSCAPE LABORERS - (2) Establishment Warranty Period.

FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE WAGE RATE. (ALAMEDA COUNTY)

$29.94$27.30$57.24Agreement
LABO0304-005 · Laborers agreement, July 1, 2023
BRICK TENDER.

FOOTNOTES: WORK ON JOBS WHERE HEAT-PROTECTIVE CLOTHING IS REQUIRED: $2.00 PER HOUR ADDITIONAL. WORK AT GRINDERS: $.25 PER HOUR ADDITIONAL. MANHOLE WORK: $2.00 PER DAY ADDITIONAL. (ALAMEDA COUNTY)

$37.05$27.45$64.50Agreement
LABO0304-008 · Laborers agreement, July 1, 2023
PLASTERER TENDER. WORK ON A SWING STAGE SCAFFOLD…
Full text

PLASTERER TENDER. WORK ON A SWING STAGE SCAFFOLD: $1.00 PER HOUR ADDITIONAL. (ALAMEDA AND CONTRA COSTA COUNTIES)

$41.93$30.32$72.25Agreement
LABO0324-002 · Laborers agreement, July 1, 2023
LABORER, TRAFFIC CONTROL/LANE CLOSURE: ESCORT DRIVER, FLAG PERSON. (CONTRA COSTA COUNTY)$37.26$27.30$64.56Agreement
LABORER, TRAFFIC CONTROL/LANE CLOSURE…
Full text

LABORER, TRAFFIC CONTROL/LANE CLOSURE: TRAFFIC CONTROL PERSON I- LAYOUT OF TRAFFIC CONTROL, CRASH CUSHIONS, CONSTRUCTION AREA AND ROADSIDE SIGNAGE. (CONTRA COSTA COUNTY)

$37.56$27.30$64.86Agreement
LABORER, TRAFFIC CONTROL/LANE CLOSURE…
Full text

LABORER, TRAFFIC CONTROL/LANE CLOSURE: TRAFFIC CONTROL PERSON II- INSTALLATION AND REMOVAL OF TEMPORARY/PERMANENT SIGNS, MARKERS, DELINEATORS AND CRASH CUSHIONS. (CONTRA COSTA COUNTY)

$35.06$27.30$62.36Agreement
LABO0324-006 · Laborers agreement, June 26, 2023
TUNNEL AND SHAFT LABORERS: GROUP 1…
Full text

TUNNEL AND SHAFT LABORERS: GROUP 1- DIAMOND DRILLER; GROUNDMEN; GUNITE AND SHOTCRETE NOZZLEMEN (CONTRA COSTA COUNTY)

$45.89$27.72$73.61Agreement
TUNNEL AND SHAFT LABORERS: GROUP 2…
Full text

TUNNEL AND SHAFT LABORERS: GROUP 2- RODMEN; SHAFT WORK & RAISE (BELOW ACTUAL OR EXCAVATED GROUND LEVEL) (CONTRA COSTA COUNTY)

$45.66$27.72$73.38Agreement
TUNNEL AND SHAFT LABORERS: GROUP 3…
Full text

TUNNEL AND SHAFT LABORERS: GROUP 3- BIT GRINDER; BLASTER, DRILLER, POWDERMEN, HEADING; CHERRY PICKERMEN - WHERE CAR IS LIFTED; CONCRETE FINISHER IN TUNNEL; CONCRETE SCREEDMAN; GROUT PUMPMAN AND POTMAN; GUNITE & SHOTCRETE GUNMAN & POTMAN; HEADERMEN; HIGH PRESSURE NOZZLEMAN; MINER - TUNNEL, INCLUDING TOP AND BOTTOM MAN ON SHAFT AND RAISE WORK; NIPPER; NOZZLEMAN ON SLICK LINE; SANDBLASTER - POTMAN, ROBOTIC SHOTCRETE PLACER, SEGMENT ERECTOR, TUNNEL MUCK HAULER, STEEL FORM RAISER AND SETTER; TIMBERMAN, RETIMBERMAN (WOOD OR STEEL OR SUBSTITUTE MATERIALS THEREFORE); TUGGER (FOR TUNNEL LABORER WORK); CABLE TENDER; CHUCK TENDER; POWDERMAN - PRIMER HOUSE (CONTRA COSTA COUNTY)

$45.41$27.72$73.13Agreement
TUNNEL AND SHAFT LABORERS: GROUP 4…
Full text

TUNNEL AND SHAFT LABORERS: GROUP 4- VIBRATOR OPERATOR, PAVEMENT BREAKER; BULL GANG - MUCKERS, TRACKMEN; CONCRETE CREW - INCLUDES RODDING AND SPREADING, DUMPMEN (ANY METHOD) (CONTRA COSTA COUNTY)

$44.96$27.72$72.68Agreement
TUNNEL AND SHAFT LABORERS: GROUP 5…
Full text

TUNNEL AND SHAFT LABORERS: GROUP 5- GROUT CREW; REBOUNDMAN; SWAMPER/ BRAKEMAN (CONTRA COSTA COUNTY).$ 44.42 27.72 TUNNEL AND SHAFT LABORERS: SHOTCRETE SPECIALIST (CONTRA COSTA COUNTY)

$46.41$27.72$74.13Agreement
LABO0324-012 · Laborers agreement, June 26, 2023
LABORER (CONSTRUCTION CRAFT LABORERS) GROUP 1…
Full text

LABORER (CONSTRUCTION CRAFT LABORERS) GROUP 1-F- WIRE WINDING MACHINE IN CONNECTION WITH GUNITING OR SHOT CRETE.

FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE WAGE RATE. GROUP 1-B: SEWER CLEANERS SHALL RECEIVE $4.00 PER DAY ABOVE GROUP 1 WAGE RATES. ""SEWER CLEANER"" MEANS ANY WORKER WHO HANDLES OR COMES IN CONTACT WITH RAW SEWAGE IN SMALL DIAMETER SEWERS. THOSE WHO WORK INSIDE RECENTLY ACTIVE, LARGE DIAMETER SEWERS, AND ALL RECENTLY ACTIVE SEWER MANHOLES SHAL RECEIVE $5.00 PER DAY ABOVE GROUP 1 WAGE RATES. GROUP 1-D: MAINTENANCE AND REPAIR TRACK AND ROAD BEDS. ALL EMPLOYEES PERFORMING WORK COVERED HEREIN SHALL RECEIVE $0.25 PER HOUR ABOVE THEIR REGULAR RATE FOR ALL WORK PERFORMED ON UNDERGROUND STRUCTURES NOT SPECIFICALLY COVERED HEREIN. THIS PARAGRAPH SHALL NOT BE CONSTRUED TO APPLY TO WORK BELOW GROUND LEVEL IN OPEN CUT. IT SHALL APPLY TO CUT AND COVER WORK OF SUBWAY CONSTRUCTION AFTER THE TEMPORARY COVER HAS BEEN PLACED. (CONTRA COSTA COUNTY)(CONTRA COSTA COUNTY)

$37.08$27.30$64.38Agreement
LABORER, CONSTRUCTION CRAFT LABORERS…
Full text

LABORER, CONSTRUCTION CRAFT LABORERS: CONSTRUCTION SPECIALIST GROUP- ASPHALT IRONER AND RAKER; CHAINSAW; LASER BEAM IN CONNECTION WITH LABORERS' WORK; CAST-IN- PLACE MANHOLE FORM SETTER; PRESSURE PIPELAYER; DAVIS TRENCHER - 300 OR SIMILAR TYPE (AND ALL SMALL TRENCHERS); BLASTER; DIAMOND DRILLER; MULTIPLE UNIT DRILL; HYDRAULIC DRILL.

FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE WAGE RATE. GROUP 1-B: SEWER CLEANERS SHALL RECEIVE $4.00 PER DAY ABOVE GROUP 1 WAGE RATES. ""SEWER CLEANER"" MEANS ANY WORKER WHO HANDLES OR COMES IN CONTACT WITH RAW SEWAGE IN SMALL DIAMETER SEWERS. THOSE WHO WORK INSIDE RECENTLY ACTIVE, LARGE DIAMETER SEWERS, AND ALL RECENTLY ACTIVE SEWER MANHOLES SHAL RECEIVE $5.00 PER DAY ABOVE GROUP 1 WAGE RATES. GROUP 1-D: MAINTENANCE AND REPAIR TRACK AND ROAD BEDS. ALL EMPLOYEES PERFORMING WORK COVERED HEREIN SHALL RECEIVE $0.25 PER HOUR ABOVE THEIR REGULAR RATE FOR ALL WORK PERFORMED ON UNDERGROUND STRUCTURES NOT SPECIFICALLY COVERED HEREIN. THIS PARAGRAPH SHALL NOT BE CONSTRUED TO APPLY TO WORK BELOW GROUND LEVEL IN OPEN CUT. IT SHALL APPLY TO CUT AND COVER WORK OF SUBWAY CONSTRUCTION AFTER THE TEMPORARY COVER HAS BEEN PLACED. (CONTRA COSTA COUNTY)

$37.20$27.30$64.50Agreement
LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 1…
Full text

LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 1- ASPHALT SPREADER BOXES (ALL TYPES); BARKO, WACKER AND SIMILAR TYPE TAMPERS; BUGGYMOBILE; CAULKER, BANDER, PIPEWRAPPER, CONDUIT LAYER, PLASTIC PIPELAYER; CERTIFIED HAZARDOUS WASTE WORKER INCLUDING LEADE ABATEMENT; COMPACTORS OF ALL TYPES; CONCRETE AND MAGNESITE MIXER, 1/2 YD. AND UNDER; CONCRETE PAN WORK; CONCRETE SANDER; CONCRETE SAW; CRIBBER AND/OR SHORING; CUT GRANITE CURB SETTER; DRI-PAK-IT MACHINE; FALLER, LOGLOADER AND BUCKER; FORM RAISER, SLIP FORMS; GREEN CUTTER; HEADERBOARD, HUBSETTER, ALIGNER, BY ANY METHOD; HIGH PRESSURE BLOW PIPE (1-1/2"" OR OVER, 100 LBS. PRESSURE/OVER); HYDRO SEEDER AND SIMILAR TYPE; JACKHAMMER OPERATOR; JACKING OF PIPE OVER 12 INCHES; JACKSON AND SIMILAR TYPE COMPACTOR; KETTLE TENDER, POT AND WORKER APPLYING ASPHALT, LAY-KOLD, CREOSOTE, LIME, CAUSTIC AND SIMILAR TYPE MATERIALS (APPLYING MEANS APPLYING, DIPPING OR HANDLING OF SUCH MATERIALS); LAGGING, SHEETING, WHALING, BRACING, TRENCHJACKING, LAGGING HAMMER; MAGNESITE, EPOXYRESIN, FIBERGLASS, MASTIC WORKER (WET OR DRY); NO JOINT PIPE AND STRIPPING OF SAME, INCLUDING REPAIR OF VOIDS; PAVEMENT BREAKER AND SPADER, INCLUDING TOOL GRINDER; PERMA CURB; PIPELAYER (INCLUDING GRADE CHECKING IN CONNECTION WITH PIPELAYING); PRECAST-MANHOLE SETTER; PRESSURE PIPE TESTER; POST HOLE DIGGER, AIR, GAS AND ELECTRIC; POWER BROOM SWEEPER; POWER TAMPERS OF ALL TYPES (EXCEPT AS SHOWN IN GROUP 2); RAM SET GUN AND STUD GUN; RIPRAP STONEPAVER AND ROCK-SLINGER, INCLUDING PLACING OF SACKED CONCRETE AND/OR SAND (WET OR DRY) AND GABIONS AND SIMILAR TYPE; ROTARY SCARIFIER OR MULTIPLE HEAD CONCRETE CHIPPING SCARIFIER; ROTO AND DITCH WITCH; ROTOTILLER; SANDBLASTER, POT, GUN, NOZZLE OPERATORS; SIGNALLING AND RIGGING; TANK CLEANER; TREE CLIMBER; TURBO BLASTER; VIBRASCREED, BULL FLOAT IN CONNECTION WITH LABORERS' WORK; VIBRATOR; HAZARDOUS WASTE WORKER (LEAD REMOVAL); ASBESTOS AND MOLD REMOVAL WORKER.

FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE WAGE RATE. GROUP 1-B: SEWER CLEANERS SHALL RECEIVE $4.00 PER DAY ABOVE GROUP 1 WAGE RATES. ""SEWER CLEANER"" MEANS ANY WORKER WHO HANDLES OR COMES IN CONTACT WITH RAW SEWAGE IN SMALL DIAMETER SEWERS. THOSE WHO WORK INSIDE RECENTLY ACTIVE, LARGE DIAMETER SEWERS, AND ALL RECENTLY ACTIVE SEWER MANHOLES SHAL RECEIVE $5.00 PER DAY ABOVE GROUP 1 WAGE RATES. GROUP 1-D: MAINTENANCE AND REPAIR TRACK AND ROAD BEDS. ALL EMPLOYEES PERFORMING WORK COVERED HEREIN SHALL RECEIVE $0.25 PER HOUR ABOVE THEIR REGULAR RATE FOR ALL WORK PERFORMED ON UNDERGROUND STRUCTURES NOT SPECIFICALLY COVERED HEREIN. THIS PARAGRAPH SHALL NOT BE CONSTRUED TO APPLY TO WORK BELOW GROUND LEVEL IN OPEN CUT. IT SHALL APPLY TO CUT AND COVER WORK OF SUBWAY CONSTRUCTION AFTER THE TEMPORARY COVER HAS BEEN PLACED. (CONTRA COSTA COUNTY)

$36.50$27.30$63.80Agreement
LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 1…
Full text

LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 1-A- JOY DRILL MODEL TWM-2A; GARDNER-DENVER MODEL DH143 AND SIMILAR TYPE DRILLS; TRACK DRILLER; JACK LEG DRILLER; WAGON DRILLER; MECHANICAL DRILLERS, ALL TYPES REGARDLESS OF TYPE OR METHOD OF POWER; MECHANICAL PIPE LAYERS, ALL TYPES REGARDLESS OF TYPE OR METHOD OF POWER; BLASTER AND POWDER; ALL WORK OF LOADING, PLACING AND BLASTING OF ALL POWDER AND EXPLOSIVES OF WHATEVER TYPE REGARDLESS OF METHOD USED FOR SUCH LOADING AND PLACING; HIGH SCALERS (INCLUDING DRILLING OF SAME); TREE TOPPER; BIT GRINDER. GROUP 1-B: SEWER CLEANERS SHALL RECEIVE $4.00 PER DAY ABOVE GROUP 1 WAGE RATES. ""SEWER CLEANER"" MEANS ANY WORKER WHO HANDLES OR COMES IN CONTACT WITH RAW SEWAGE IN SMALL DIAMETER SEWERS. THOSE WHO WORK INSIDE RECENTLY ACTIVE, LARGE DIAMETER SEWERS, AND ALL RECENTLY ACTIVE SEWER MANHOLES SHAL RECEIVE $5.00 PER DAY ABOVE GROUP 1 WAGE RATES. GROUP 1-D: MAINTENANCE AND REPAIR TRACK AND ROAD BEDS. ALL EMPLOYEES PERFORMING WORK COVERED HEREIN SHALL RECEIVE $0.25 PER HOUR ABOVE THEIR REGULAR RATE FOR ALL WORK PERFORMED ON UNDERGROUND STRUCTURES NOT SPECIFICALLY COVERED HEREIN. THIS PARAGRAPH SHALL NOT BE CONSTRUED TO APPLY TO WORK BELOW GROUND LEVEL IN OPEN CUT. IT SHALL APPLY TO CUT AND COVER WORK OF SUBWAY CONSTRUCTION AFTER THE TEMPORARY COVER HAS BEEN PLACED. (CONTRA COSTA COUNTY)

$36.72$27.30$64.02Agreement
LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 1…
Full text

LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 1-C- BURNING AND WELDING IN CONNECTION WITH LABORERS' WORK; SYNTHETIC THERMOPLASTICS AND SIMILAR TYPE WELDING.

FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE WAGE RATE. GROUP 1-B: SEWER CLEANERS SHALL RECEIVE $4.00 PER DAY ABOVE GROUP 1 WAGE RATES. ""SEWER CLEANER"" MEANS ANY WORKER WHO HANDLES OR COMES IN CONTACT WITH RAW SEWAGE IN SMALL DIAMETER SEWERS. THOSE WHO WORK INSIDE RECENTLY ACTIVE, LARGE DIAMETER SEWERS, AND ALL RECENTLY ACTIVE SEWER MANHOLES SHAL RECEIVE $5.00 PER DAY ABOVE GROUP 1 WAGE RATES. GROUP 1-D: MAINTENANCE AND REPAIR TRACK AND ROAD BEDS. ALL EMPLOYEES PERFORMING WORK COVERED HEREIN SHALL RECEIVE $0.25 PER HOUR ABOVE THEIR REGULAR RATE FOR ALL WORK PERFORMED ON UNDERGROUND STRUCTURES NOT SPECIFICALLY COVERED HEREIN. THIS PARAGRAPH SHALL NOT BE CONSTRUED TO APPLY TO WORK BELOW GROUND LEVEL IN OPEN CUT. IT SHALL APPLY TO CUT AND COVER WORK OF SUBWAY CONSTRUCTION AFTER THE TEMPORARY COVER HAS BEEN PLACED. (CONTRA COSTA COUNTY)

$36.55$27.30$63.85Agreement
LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 1…
Full text

LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 1-E- WORK ON AND/OR IN BELL HOLE FOOTINGS AND SHAFTS THEREOF, AND WORK ON AND IN DEEP FOOTINGS. (A DEEP FOOTING IS A HOLE 15 FEET OR MORE IN DEPTH.) IN THE EVENT THE DEPTH OF THE FOOTING IS UNKNOWN AT THE COMMENCEMENT OF EXCAVATION, AND THE FINAL DEPTH EXCEEDS 15 FEET, THE DEEP FOOTING WAGE RATE WOULD APPLY TO ALL EMPLOYEES FOR EACH AND EVERY DAY WORKED ON OR IN THE EXCAVATION OF THE FOOTING FROM THE DATE OF INCEPTION.

FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE WAGE RATE. GROUP 1-B: SEWER CLEANERS SHALL RECEIVE $4.00 PER DAY ABOVE GROUP 1 WAGE RATES. ""SEWER CLEANER"" MEANS ANY WORKER WHO HANDLES OR COMES IN CONTACT WITH RAW SEWAGE IN SMALL DIAMETER SEWERS. THOSE WHO WORK INSIDE RECENTLY ACTIVE, LARGE DIAMETER SEWERS, AND ALL RECENTLY ACTIVE SEWER MANHOLES SHAL RECEIVE $5.00 PER DAY ABOVE GROUP 1 WAGE RATES. GROUP 1-D: MAINTENANCE AND REPAIR TRACK AND ROAD BEDS. ALL EMPLOYEES PERFORMING WORK COVERED HEREIN SHALL RECEIVE $0.25 PER HOUR ABOVE THEIR REGULAR RATE FOR ALL WORK PERFORMED ON UNDERGROUND STRUCTURES NOT SPECIFICALLY COVERED HEREIN. THIS PARAGRAPH SHALL NOT BE CONSTRUED TO APPLY TO WORK BELOW GROUND LEVEL IN OPEN CUT. IT SHALL APPLY TO CUT AND COVER WORK OF SUBWAY CONSTRUCTION AFTER THE TEMPORARY COVER HAS BEEN PLACED. (CONTRA COSTA COUNTY)

$37.05$27.30$64.35Agreement
LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 1…
Full text

LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 1-G- PIPELAYER (INCLUDING GRADE CHECKING IN CONNECTION WITH PIPELAYING); CAULKER; BANDER; PIPEWRAPPER; CONDUIT LAYER; PLASTIC PIPE LAYER; PRESSURE PIPE TESTER; NO JOINT PIPE AND STRIPPING OF SAME, INCLUDING REPAIR OF VOIDS; PRECAST MANHOLE SETTERS, CAST IN PLACE MANHOLE FORM SETTERS.

FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE WAGE RATE. GROUP 1-B: SEWER CLEANERS SHALL RECEIVE $4.00 PER DAY ABOVE GROUP 1 WAGE RATES. ""SEWER CLEANER"" MEANS ANY WORKER WHO HANDLES OR COMES IN CONTACT WITH RAW SEWAGE IN SMALL DIAMETER SEWERS. THOSE WHO WORK INSIDE RECENTLY ACTIVE, LARGE DIAMETER SEWERS, AND ALL RECENTLY ACTIVE SEWER MANHOLES SHAL RECEIVE $5.00 PER DAY ABOVE GROUP 1 WAGE RATES. GROUP 1-D: MAINTENANCE AND REPAIR TRACK AND ROAD BEDS. ALL EMPLOYEES PERFORMING WORK COVERED HEREIN SHALL RECEIVE $0.25 PER HOUR ABOVE THEIR REGULAR RATE FOR ALL WORK PERFORMED ON UNDERGROUND STRUCTURES NOT SPECIFICALLY COVERED HEREIN. THIS PARAGRAPH SHALL NOT BE CONSTRUED TO APPLY TO WORK BELOW GROUND LEVEL IN OPEN CUT. IT SHALL APPLY TO CUT AND COVER WORK OF SUBWAY CONSTRUCTION AFTER THE TEMPORARY COVER HAS BEEN PLACED. (CONTRA COSTA COUNTY)

$36.70$27.30$64.00Agreement
LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 2…
Full text

LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 2- ASPHALT SHOVELER; CEMENT DUMPER AND HANDLING DRY CEMENT OR GYPSUM; CHOKE-SETTER AND RIGGER (CLEARING WORK); CONCRETE BUCKET DUMPER AND CHUTE; CONCRETE CHIPPING AND GRINDING; CONCRETE LABORER (WET OR DRY); DRILLER TENDER, CHUCK TENDER, NIPPER; GUINEA CHASER (STAKE), GROUT CREW; HIGH PRESSURE NOZZLE, ADDUCTOR; HYDRAULIC MONITOR (OVER 100 LBS. PRESSURE); LOADING AND UNLOADING, CARRYING AND HAULING OF ALL RODS AND MATERIALS FOR USE IN REINFORCING CONCRETE CONSTRUCTION; PITTSBURGH CHIPPER AND SIMILAR TYPE BRUSH SHREDDERS; SLOPER; SINGLE FOOT, HAND-HELD, PNEUMATIC TAMPER; ALL PNEUMATIC, AIR, GAS AND ELECTRIC TOOLS NOT LISTED IN GROUPS 1 THROUGH 1-F; JACKING OF PIPE - UNDER 12 INCHES.

FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE WAGE RATE. GROUP 1-B: SEWER CLEANERS SHALL RECEIVE $4.00 PER DAY ABOVE GROUP 1 WAGE RATES. ""SEWER CLEANER"" MEANS ANY WORKER WHO HANDLES OR COMES IN CONTACT WITH RAW SEWAGE IN SMALL DIAMETER SEWERS. THOSE WHO WORK INSIDE RECENTLY ACTIVE, LARGE DIAMETER SEWERS, AND ALL RECENTLY ACTIVE SEWER MANHOLES SHAL RECEIVE $5.00 PER DAY ABOVE GROUP 1 WAGE RATES. GROUP 1-D: MAINTENANCE AND REPAIR TRACK AND ROAD BEDS. ALL EMPLOYEES PERFORMING WORK COVERED HEREIN SHALL RECEIVE $0.25 PER HOUR ABOVE THEIR REGULAR RATE FOR ALL WORK PERFORMED ON UNDERGROUND STRUCTURES NOT SPECIFICALLY COVERED HEREIN. THIS PARAGRAPH SHALL NOT BE CONSTRUED TO APPLY TO WORK BELOW GROUND LEVEL IN OPEN CUT. IT SHALL APPLY TO CUT AND COVER WORK OF SUBWAY CONSTRUCTION AFTER THE TEMPORARY COVER HAS BEEN PLACED. (CONTRA COSTA COUNTY)

$36.35$27.30$63.65Agreement
LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 3…
Full text

LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 3- CONSTRUCTION LABORERS, INCLUDING BRIDGE AND GENERAL LABORER; DUMP, LOAD SPOTTER; FLAG PERSON; FIRE WATCHER; FENCE ERECTOR; GUARDRAIL ERECTOR; GARDENER, HORTICULTURAL AND LANDSCAPE LABORER; JETTING; LIMBER, BRUSH LOADER AND PILER; PAVEMENT MARKER (BUTTON SETTER); MAINTENANCE, REPAIR TRACK AND ROAD BEDS; STREETCAR AND RAILROAD CONSTRUCTION TRACK LABORER; TEMPORARY AIR AND WATER LINES, VICTAULIC OR SIMILAR; TOOL ROOM ATTENDANT (JOBSITE ONLY).

FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE WAGE RATE. GROUP 1-B: SEWER CLEANERS SHALL RECEIVE $4.00 PER DAY ABOVE GROUP 1 WAGE RATES. ""SEWER CLEANER"" MEANS ANY WORKER WHO HANDLES OR COMES IN CONTACT WITH RAW SEWAGE IN SMALL DIAMETER SEWERS. THOSE WHO WORK INSIDE RECENTLY ACTIVE, LARGE DIAMETER SEWERS, AND ALL RECENTLY ACTIVE SEWER MANHOLES SHAL RECEIVE $5.00 PER DAY ABOVE GROUP 1 WAGE RATES. GROUP 1-D: MAINTENANCE AND REPAIR TRACK AND ROAD BEDS. ALL EMPLOYEES PERFORMING WORK COVERED HEREIN SHALL RECEIVE $0.25 PER HOUR ABOVE THEIR REGULAR RATE FOR ALL WORK PERFORMED ON UNDERGROUND STRUCTURES NOT SPECIFICALLY COVERED HEREIN. THIS PARAGRAPH SHALL NOT BE CONSTRUED TO APPLY TO WORK BELOW GROUND LEVEL IN OPEN CUT. IT SHALL APPLY TO CUT AND COVER WORK OF SUBWAY CONSTRUCTION AFTER THE TEMPORARY COVER HAS BEEN PLACED. (CONTRA COSTA COUNTY)

$36.25$27.30$63.55Agreement
LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 4…
Full text

LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 4- FINAL CLEAN-UP WORK OF DEBRIS, GROUNDS AND BUILDING INCLUDING BUT NOT LIMITED TO: STREET CLEANER; CLEANING AND WASHING WINDOWS; BRICK CLEANER (JOBSITE ONLY); MATERIAL CLEANER (JOBSITE ONLY). THE CLASSIFICATION ""MATERIAL CLEANER"" IS TO BE UTILIZED UNDER THE FOLLOWING CONDITIONS: A: AT DEMOLITION SITE FOR THE SALVAGE OF THE MATERIAL. B: AT THE CONCLUSION OF A JOB WHERE THE MATERIAL IS TO BE SALVAGED AND STOCKED TO BE REUSED ON ANOTHER JOB. C: FOR THE CLEANING OF SALVAGE MATERIAL AT THE JOBSITE OR TEMPORARY JOBSITE YARD. THE MATERIAL CLEANER CLASSIFICATION SHOULD NOT BE USED IN THE PERFORMANCE OF ""FORM STRIPPING, CLEANING AND OILING AND MOVING TO THE NEXT POINT OF ERECTION"".

FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE WAGE RATE. GROUP 1-B: SEWER CLEANERS SHALL RECEIVE $4.00 PER DAY ABOVE GROUP 1 WAGE RATES. ""SEWER CLEANER"" MEANS ANY WORKER WHO HANDLES OR COMES IN CONTACT WITH RAW SEWAGE IN SMALL DIAMETER SEWERS. THOSE WHO WORK INSIDE RECENTLY ACTIVE, LARGE DIAMETER SEWERS, AND ALL RECENTLY ACTIVE SEWER MANHOLES SHAL RECEIVE $5.00 PER DAY ABOVE GROUP 1 WAGE RATES. GROUP 1-D: MAINTENANCE AND REPAIR TRACK AND ROAD BEDS. ALL EMPLOYEES PERFORMING WORK COVERED HEREIN SHALL RECEIVE $0.25 PER HOUR ABOVE THEIR REGULAR RATE FOR ALL WORK PERFORMED ON UNDERGROUND STRUCTURES NOT SPECIFICALLY COVERED HEREIN. THIS PARAGRAPH SHALL NOT BE CONSTRUED TO APPLY TO WORK BELOW GROUND LEVEL IN OPEN CUT. IT SHALL APPLY TO CUT AND COVER WORK OF SUBWAY CONSTRUCTION AFTER THE TEMPORARY COVER HAS BEEN PLACED. (CONTRA COSTA COUNTY)

$29.94$27.30$57.24Agreement
LABORER, GUNITE: GROUP 1- STRUCTURAL NOZZLEMAN.

FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE WAGE RATE. (CONTRA COSTA COUNTY)

$37.46$27.30$64.76Agreement
LABORER, GUNITE: GROUP 2- NOZZLEMAN, GUNMAN, POTMAN, GROUNDMAN.

FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE WAGE RATE. (CONTRA COSTA COUNTY)

$36.96$27.30$64.26Agreement
LABORER, GUNITE: GROUP 3- REBOUNDMAN.

FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE WAGE RATE. (CONTRA COSTA COUNTY)

$36.37$27.30$63.67Agreement
LABORER, GUNITE: GROUP 4- GUINTE LABORER.

FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE WAGE RATE. (CONTRA COSTA COUNTY)

$36.25$27.30$63.55Agreement
LABORER, WRECKING: GROUP 1…
Full text

LABORER, WRECKING: GROUP 1- SKILLED WRECKER (REMOVING AND SALVAGING OF SASH, WINDOWS, AND MATERIALS).

FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE WAGE RATE. (CONTRA COSTA COUNTY)

$36.50$27.30$63.80Agreement
LABORER, WRECKING: GROUP 2- SEMI-SKILLED WRECKER (SALVAGING OF OTHER BUILDING MATERIALS).

FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE WAGE RATE. (CONTRA COSTA COUNTY)

$36.35$27.30$63.65Agreement
LABORER: GARDENERS, HORTICULTURAL & LANDSCAPE LABORERS - (1) New Construction.

FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE WAGE RATE. (CONTRA COSTA COUNTY)

$36.25$27.30$63.55Agreement
LABORER: GARDENERS…
Full text

LABORER: GARDENERS, HORTICULTURAL & LANDSCAPE LABORERS - (2) Establishment Warranty Period.

FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE WAGE RATE. (CONTRA COSTA COUNTY)

$29.94$27.30$57.24Agreement
LABO0324-014 · Laborers agreement, July 1, 2023
BRICK TENDER.

FOOTNOTES: WORK ON JOBS WHERE HEAT-PROTECTIVE CLOTHING IS REQUIRED: $2.00 PER HOUR ADDITIONAL. WORK AT GRINDERS: $.25 PER HOUR ADDITIONAL. MANHOLE WORK: $2.00 PER DAY ADDITIONAL. (CONTRA COSTA COUNTY)

$37.05$27.45$64.50Agreement
LABO0324-018 · Laborers agreement, July 1, 2023
PLASTER TENDER. WORK ON A SWING STAGE SCAFFOLD…
Full text

PLASTER TENDER. WORK ON A SWING STAGE SCAFFOLD: $1.00 PER HOUR ADDITIONAL. (ALAMEDA AND CONTRA COSTA COUNTIES)

$41.93$30.32$72.25Agreement
LABO1130-002 · Laborers agreement, July 1, 2023
LABORER, TRAFFIC CONTROL/LANE CLOSURE…
Full text

LABORER, TRAFFIC CONTROL/LANE CLOSURE: ESCORT DRIVER, FLAG PERSON (MARIPOSA, MERCED, STANISLAUS, AND TUOLUMNE COUNTIES)

$36.26$27.30$63.56Agreement
LABORER, TRAFFIC CONTROL/LANE CLOSURE…
Full text

LABORER, TRAFFIC CONTROL/LANE CLOSURE: TRAFFIC CONTROL PERSON I- LAYOUT OF TRAFFIC CONTROL, CRASH CUSHIONS, CONSTRUCTION AREA AND ROADSIDE SIGNAGE. (MARIPOSA, MERCED, STANISLAUS, AND TUOLUMNE COUNTIES)

$36.56$27.30$63.86Agreement
LABORER, TRAFFIC CONTROL/LANE CLOSURE…
Full text

LABORER, TRAFFIC CONTROL/LANE CLOSURE: TRAFFIC CONTROL PERSON II- INSTALLATION AND REMOVAL OF TEMPORARY/PERMANENT SIGNS, MARKERS, DELINEATORS AND CRASH CUSHIONS. (MARIPOSA, MERCED, STANISLAUS, AND TUOLUMNE COUNTIES)

$34.06$27.30$61.36Agreement
LABO1130-003 · Laborers agreement, June 26, 2023
TUNNEL AND SHAFT LABORERS: GROUP 1…
Full text

TUNNEL AND SHAFT LABORERS: GROUP 1- DIAMOND DRILLER; GROUNDMEN; GUNITE AND SHOTCRETE NOZZLEMEN (MARIPOSA, MERCED, STANISLAUS, AND TUOLUMNE COUNTIES)

$45.89$27.72$73.61Agreement
TUNNEL AND SHAFT LABORERS: GROUP 2…
Full text

TUNNEL AND SHAFT LABORERS: GROUP 2- RODMEN; SHAFT WORK & RAISE (BELOW ACTUAL OR EXCAVATED GROUND LEVEL) (MARIPOSA, MERCED, STANISLAUS, AND TUOLUMNE COUNTIES)

$45.66$27.72$73.38Agreement
TUNNEL AND SHAFT LABORERS: GROUP 3…
Full text

TUNNEL AND SHAFT LABORERS: GROUP 3- BIT GRINDER; BLASTER, DRILLER, POWDERMEN, HEADING; CHERRY PICKERMEN - WHERE CAR IS LIFTED; CONCRETE FINISHER IN TUNNEL; CONCRETE SCREEDMAN; GROUT PUMPMAN AND POTMAN; GUNITE & SHOTCRETE GUNMAN & POTMAN; HEADERMEN; HIGH PRESSURE NOZZLEMAN; MINER - TUNNEL, INCLUDING TOP AND BOTTOM MAN ON SHAFT AND RAISE WORK; NIPPER; NOZZLEMAN ON SLICK LINE; SANDBLASTER - POTMAN, ROBOTIC SHOTCRETE PLACER, SEGMENT ERECTOR, TUNNEL MUCK HAULER, STEEL FORM RAISER AND SETTER; TIMBERMAN, RETIMBERMAN (WOOD OR STEEL OR SUBSTITUTE MATERIALS THEREFORE); TUGGER (FOR TUNNEL LABORER WORK); CABLE TENDER; CHUCK TENDER; POWDERMAN - PRIMER HOUSE (MARIPOSA, MERCED, STANISLAUS, AND TUOLUMNE COUNTIES)

$45.41$27.72$73.13Agreement
TUNNEL AND SHAFT LABORERS: GROUP 4…
Full text

TUNNEL AND SHAFT LABORERS: GROUP 4- VIBRATOR OPERATOR, PAVEMENT BREAKER; BULL GANG - MUCKERS, TRACKMEN; CONCRETE CREW - INCLUDES RODDING AND SPREADING, DUMPMEN (ANY METHOD) (MARIPOSA, MERCED, STANISLAUS, AND TUOLUMNE COUNTIES)

$44.96$27.72$72.68Agreement
TUNNEL AND SHAFT LABORERS: GROUP 5…
Full text

TUNNEL AND SHAFT LABORERS: GROUP 5- GROUT CREW; REBOUNDMAN; SWAMPER/ BRAKEMAN (MARIPOSA, MERCED, STANISLAUS, AND TUOLUMNE COUNTIES)

$44.42$27.72$72.14Agreement
TUNNEL AND SHAFT LABORERS…
Full text

TUNNEL AND SHAFT LABORERS: SHOTCRETE SPECIALIST (MARIPOSA, MERCED, STANISLAUS, AND TUOLUMNE COUNTIES)

$46.41$27.72$74.13Agreement
LABO1130-005 · Laborers agreement, July 1, 2023
LABORER: MASON TENDER-BRICK (MARIPOSA, MERCED, STANISLAUS AND TUOLUMNE COUNTIES)$36.29$25.55$61.84Agreement
LABO1130-007 · Laborers agreement, June 26, 2023
LABORER (CONSTRUCTION CRAFT LABORERS) GROUP 1…
Full text

LABORER (CONSTRUCTION CRAFT LABORERS) GROUP 1-F- WIRE WINDING MACHINE IN CONNECTION WITH GUNITING OR SHOT CRETE.

FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE WAGE RATE. GROUP 1-B: SEWER CLEANERS SHALL RECEIVE $4.00 PER DAY ABOVE GROUP 1 WAGE RATES. ""SEWER CLEANER"" MEANS ANY WORKER WHO HANDLES OR COMES IN CONTACT WITH RAW SEWAGE IN SMALL DIAMETER SEWERS. THOSE WHO WORK INSIDE RECENTLY ACTIVE, LARGE DIAMETER SEWERS, AND ALL RECENTLY ACTIVE SEWER MANHOLES SHAL RECEIVE $5.00 PER DAY ABOVE GROUP 1 WAGE RATES. GROUP 1-D: MAINTENANCE AND REPAIR TRACK AND ROAD BEDS. ALL EMPLOYEES PERFORMING WORK COVERED HEREIN SHALL RECEIVE $0.25 PER HOUR ABOVE THEIR REGULAR RATE FOR ALL WORK PERFORMED ON UNDERGROUND STRUCTURES NOT SPECIFICALLY COVERED HEREIN. THIS PARAGRAPH SHALL NOT BE CONSTRUED TO APPLY TO WORK BELOW GROUND LEVEL IN OPEN CUT. IT SHALL APPLY TO CUT AND COVER WORK OF SUBWAY CONSTRUCTION AFTER THE TEMPORARY COVER HAS BEEN PLACED. (MARIPOSA, MERCED, STANISLAUS, AND TUOLUMNE COUNTIES)

$36.08$27.30$63.38Agreement
LABORER, CONSTRUCTION CRAFT LABORERS…
Full text

LABORER, CONSTRUCTION CRAFT LABORERS: CONSTRUCTION SPECIALIST GROUP- ASPHALT IRONER AND RAKER; CHAINSAW; LASER BEAM IN CONNECTION WITH LABORERS' WORK; CAST-IN- PLACE MANHOLE FORM SETTER; PRESSURE PIPELAYER; DAVIS TRENCHER - 300 OR SIMILAR TYPE (AND ALL SMALL TRENCHERS); BLASTER; DIAMOND DRILLER; MULTIPLE UNIT DRILL; HYDRAULIC DRILL.

FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE WAGE RATE. GROUP 1-B: SEWER CLEANERS SHALL RECEIVE $4.00 PER DAY ABOVE GROUP 1 WAGE RATES. ""SEWER CLEANER"" MEANS ANY WORKER WHO HANDLES OR COMES IN CONTACT WITH RAW SEWAGE IN SMALL DIAMETER SEWERS. THOSE WHO WORK INSIDE RECENTLY ACTIVE, LARGE DIAMETER SEWERS, AND ALL RECENTLY ACTIVE SEWER MANHOLES SHAL RECEIVE $5.00 PER DAY ABOVE GROUP 1 WAGE RATES. GROUP 1-D: MAINTENANCE AND REPAIR TRACK AND ROAD BEDS. ALL EMPLOYEES PERFORMING WORK COVERED HEREIN SHALL RECEIVE $0.25 PER HOUR ABOVE THEIR REGULAR RATE FOR ALL WORK PERFORMED ON UNDERGROUND STRUCTURES NOT SPECIFICALLY COVERED HEREIN. THIS PARAGRAPH SHALL NOT BE CONSTRUED TO APPLY TO WORK BELOW GROUND LEVEL IN OPEN CUT. IT SHALL APPLY TO CUT AND COVER WORK OF SUBWAY CONSTRUCTION AFTER THE TEMPORARY COVER HAS BEEN PLACED. (MARIPOSA, MERCED, STANISLAUS, AND TUOLUMNE COUNTIES)

$36.20$27.30$63.50Agreement
LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 1…
Full text

LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 1- ASPHALT SPREADER BOXES (ALL TYPES); BARKO, WACKER AND SIMILAR TYPE TAMPERS; BUGGYMOBILE; CAULKER, BANDER, PIPEWRAPPER, CONDUIT LAYER, PLASTIC PIPELAYER; CERTIFIED HAZARDOUS WASTE WORKER INCLUDING LEADE ABATEMENT; COMPACTORS OF ALL TYPES; CONCRETE AND MAGNESITE MIXER, 1/2 YD. AND UNDER; CONCRETE PAN WORK; CONCRETE SANDER; CONCRETE SAW; CRIBBER AND/OR SHORING; CUT GRANITE CURB SETTER; DRI-PAK-IT MACHINE; FALLER, LOGLOADER AND BUCKER; FORM RAISER, SLIP FORMS; GREEN CUTTER; HEADERBOARD, HUBSETTER, ALIGNER, BY ANY METHOD; HIGH PRESSURE BLOW PIPE (1-1/2"" OR OVER, 100 LBS. PRESSURE/OVER); HYDRO SEEDER AND SIMILAR TYPE; JACKHAMMER OPERATOR; JACKING OF PIPE OVER 12 INCHES; JACKSON AND SIMILAR TYPE COMPACTOR; KETTLE TENDER, POT AND WORKER APPLYING ASPHALT, LAY-KOLD, CREOSOTE, LIME, CAUSTIC AND SIMILAR TYPE MATERIALS (APPLYING MEANS APPLYING, DIPPING OR HANDLING OF SUCH MATERIALS); LAGGING, SHEETING, WHALING, BRACING, TRENCHJACKING, LAGGING HAMMER; MAGNESITE, EPOXYRESIN, FIBERGLASS, MASTIC WORKER (WET OR DRY); NO JOINT PIPE AND STRIPPING OF SAME, INCLUDING REPAIR OF VOIDS; PAVEMENT BREAKER AND SPADER, INCLUDING TOOL GRINDER; PERMA CURB; PIPELAYER (INCLUDING GRADE CHECKING IN CONNECTION WITH PIPELAYING); PRECAST-MANHOLE SETTER; PRESSURE PIPE TESTER; POST HOLE DIGGER, AIR, GAS AND ELECTRIC; POWER BROOM SWEEPER; POWER TAMPERS OF ALL TYPES (EXCEPT AS SHOWN IN GROUP 2); RAM SET GUN AND STUD GUN; RIPRAP STONEPAVER AND ROCK-SLINGER, INCLUDING PLACING OF SACKED CONCRETE AND/OR SAND (WET OR DRY) AND GABIONS AND SIMILAR TYPE; ROTARY SCARIFIER OR MULTIPLE HEAD CONCRETE CHIPPING SCARIFIER; ROTO AND DITCH WITCH; ROTOTILLER; SANDBLASTER, POT, GUN, NOZZLE OPERATORS; SIGNALLING AND RIGGING; TANK CLEANER; TREE CLIMBER; TURBO BLASTER; VIBRASCREED, BULL FLOAT IN CONNECTION WITH LABORERS' WORK; VIBRATOR; HAZARDOUS WASTE WORKER (LEAD REMOVAL); ASBESTOS AND MOLD REMOVAL WORKER.

FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE WAGE RATE. GROUP 1-B: SEWER CLEANERS SHALL RECEIVE $4.00 PER DAY ABOVE GROUP 1 WAGE RATES. ""SEWER CLEANER"" MEANS ANY WORKER WHO HANDLES OR COMES IN CONTACT WITH RAW SEWAGE IN SMALL DIAMETER SEWERS. THOSE WHO WORK INSIDE RECENTLY ACTIVE, LARGE DIAMETER SEWERS, AND ALL RECENTLY ACTIVE SEWER MANHOLES SHAL RECEIVE $5.00 PER DAY ABOVE GROUP 1 WAGE RATES. GROUP 1-D: MAINTENANCE AND REPAIR TRACK AND ROAD BEDS. ALL EMPLOYEES PERFORMING WORK COVERED HEREIN SHALL RECEIVE $0.25 PER HOUR ABOVE THEIR REGULAR RATE FOR ALL WORK PERFORMED ON UNDERGROUND STRUCTURES NOT SPECIFICALLY COVERED HEREIN. THIS PARAGRAPH SHALL NOT BE CONSTRUED TO APPLY TO WORK BELOW GROUND LEVEL IN OPEN CUT. IT SHALL APPLY TO CUT AND COVER WORK OF SUBWAY CONSTRUCTION AFTER THE TEMPORARY COVER HAS BEEN PLACED. (MARIPOSA, MERCED, STANISLAUS, AND TUOLUMNE COUNTIES)

$35.50$27.30$62.80Agreement
LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 1…
Full text

LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 1-A- JOY DRILL MODEL TWM-2A; GARDNER-DENVER MODEL DH143 AND SIMILAR TYPE DRILLS; TRACK DRILLER; JACK LEG DRILLER; WAGON DRILLER; MECHANICAL DRILLERS, ALL TYPES REGARDLESS OF TYPE OR METHOD OF POWER; MECHANICAL PIPE LAYERS, ALL TYPES REGARDLESS OF TYPE OR METHOD OF POWER; BLASTER AND POWDER; ALL WORK OF LOADING, PLACING AND BLASTING OF ALL POWDER AND EXPLOSIVES OF WHATEVER TYPE REGARDLESS OF METHOD USED FOR SUCH LOADING AND PLACING; HIGH SCALERS (INCLUDING DRILLING OF SAME); TREE TOPPER; BIT GRINDER. GROUP 1-B: SEWER CLEANERS SHALL RECEIVE $4.00 PER DAY ABOVE GROUP 1 WAGE RATES. ""SEWER CLEANER"" MEANS ANY WORKER WHO HANDLES OR COMES IN CONTACT WITH RAW SEWAGE IN SMALL DIAMETER SEWERS. THOSE WHO WORK INSIDE RECENTLY ACTIVE, LARGE DIAMETER SEWERS, AND ALL RECENTLY ACTIVE SEWER MANHOLES SHAL RECEIVE $5.00 PER DAY ABOVE GROUP 1 WAGE RATES. GROUP 1-D: MAINTENANCE AND REPAIR TRACK AND ROAD BEDS. ALL EMPLOYEES PERFORMING WORK COVERED HEREIN SHALL RECEIVE $0.25 PER HOUR ABOVE THEIR REGULAR RATE FOR ALL WORK PERFORMED ON UNDERGROUND STRUCTURES NOT SPECIFICALLY COVERED HEREIN. THIS PARAGRAPH SHALL NOT BE CONSTRUED TO APPLY TO WORK BELOW GROUND LEVEL IN OPEN CUT. IT SHALL APPLY TO CUT AND COVER WORK OF SUBWAY CONSTRUCTION AFTER THE TEMPORARY COVER HAS BEEN PLACED. (MARIPOSA, MERCED, STANISLAUS, AND TUOLUMNE COUNTIES)

$35.72$27.30$63.02Agreement
LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 1…
Full text

LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 1-C- BURNING AND WELDING IN CONNECTION WITH LABORERS' WORK; SYNTHETIC THERMOPLASTICS AND SIMILAR TYPE WELDING.

FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE WAGE RATE. GROUP 1-B: SEWER CLEANERS SHALL RECEIVE $4.00 PER DAY ABOVE GROUP 1 WAGE RATES. ""SEWER CLEANER"" MEANS ANY WORKER WHO HANDLES OR COMES IN CONTACT WITH RAW SEWAGE IN SMALL DIAMETER SEWERS. THOSE WHO WORK INSIDE RECENTLY ACTIVE, LARGE DIAMETER SEWERS, AND ALL RECENTLY ACTIVE SEWER MANHOLES SHAL RECEIVE $5.00 PER DAY ABOVE GROUP 1 WAGE RATES. GROUP 1-D: MAINTENANCE AND REPAIR TRACK AND ROAD BEDS. ALL EMPLOYEES PERFORMING WORK COVERED HEREIN SHALL RECEIVE $0.25 PER HOUR ABOVE THEIR REGULAR RATE FOR ALL WORK PERFORMED ON UNDERGROUND STRUCTURES NOT SPECIFICALLY COVERED HEREIN. THIS PARAGRAPH SHALL NOT BE CONSTRUED TO APPLY TO WORK BELOW GROUND LEVEL IN OPEN CUT. IT SHALL APPLY TO CUT AND COVER WORK OF SUBWAY CONSTRUCTION AFTER THE TEMPORARY COVER HAS BEEN PLACED. (MARIPOSA, MERCED, STANISLAUS, AND TUOLUMNE COUNTIES)

$35.55$27.30$62.85Agreement
LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 1…
Full text

LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 1-E- WORK ON AND/OR IN BELL HOLE FOOTINGS AND SHAFTS THEREOF, AND WORK ON AND IN DEEP FOOTINGS. (A DEEP FOOTING IS A HOLE 15 FEET OR MORE IN DEPTH.) IN THE EVENT THE DEPTH OF THE FOOTING IS UNKNOWN AT THE COMMENCEMENT OF EXCAVATION, AND THE FINAL DEPTH EXCEEDS 15 FEET, THE DEEP FOOTING WAGE RATE WOULD APPLY TO ALL EMPLOYEES FOR EACH AND EVERY DAY WORKED ON OR IN THE EXCAVATION OF THE FOOTING FROM THE DATE OF INCEPTION.

FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE WAGE RATE. GROUP 1-B: SEWER CLEANERS SHALL RECEIVE $4.00 PER DAY ABOVE GROUP 1 WAGE RATES. ""SEWER CLEANER"" MEANS ANY WORKER WHO HANDLES OR COMES IN CONTACT WITH RAW SEWAGE IN SMALL DIAMETER SEWERS. THOSE WHO WORK INSIDE RECENTLY ACTIVE, LARGE DIAMETER SEWERS, AND ALL RECENTLY ACTIVE SEWER MANHOLES SHAL RECEIVE $5.00 PER DAY ABOVE GROUP 1 WAGE RATES. GROUP 1-D: MAINTENANCE AND REPAIR TRACK AND ROAD BEDS. ALL EMPLOYEES PERFORMING WORK COVERED HEREIN SHALL RECEIVE $0.25 PER HOUR ABOVE THEIR REGULAR RATE FOR ALL WORK PERFORMED ON UNDERGROUND STRUCTURES NOT SPECIFICALLY COVERED HEREIN. THIS PARAGRAPH SHALL NOT BE CONSTRUED TO APPLY TO WORK BELOW GROUND LEVEL IN OPEN CUT. IT SHALL APPLY TO CUT AND COVER WORK OF SUBWAY CONSTRUCTION AFTER THE TEMPORARY COVER HAS BEEN PLACED. (MARIPOSA, MERCED, STANISLAUS, AND TUOLUMNE COUNTIES)

$36.05$27.30$63.35Agreement
LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 2…
Full text

LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 2- ASPHALT SHOVELER; CEMENT DUMPER AND HANDLING DRY CEMENT OR GYPSUM; CHOKE-SETTER AND RIGGER (CLEARING WORK); CONCRETE BUCKET DUMPER AND CHUTE; CONCRETE CHIPPING AND GRINDING; CONCRETE LABORER (WET OR DRY); DRILLER TENDER, CHUCK TENDER, NIPPER; GUINEA CHASER (STAKE), GROUT CREW; HIGH PRESSURE NOZZLE, ADDUCTOR; HYDRAULIC MONITOR (OVER 100 LBS. PRESSURE); LOADING AND UNLOADING, CARRYING AND HAULING OF ALL RODS AND MATERIALS FOR USE IN REINFORCING CONCRETE CONSTRUCTION; PITTSBURGH CHIPPER AND SIMILAR TYPE BRUSH SHREDDERS; SLOPER; SINGLE FOOT, HAND-HELD, PNEUMATIC TAMPER; ALL PNEUMATIC, AIR, GAS AND ELECTRIC TOOLS NOT LISTED IN GROUPS 1 THROUGH 1-F; JACKING OF PIPE - UNDER 12 INCHES.

FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE WAGE RATE. GROUP 1-B: SEWER CLEANERS SHALL RECEIVE $4.00 PER DAY ABOVE GROUP 1 WAGE RATES. ""SEWER CLEANER"" MEANS ANY WORKER WHO HANDLES OR COMES IN CONTACT WITH RAW SEWAGE IN SMALL DIAMETER SEWERS. THOSE WHO WORK INSIDE RECENTLY ACTIVE, LARGE DIAMETER SEWERS, AND ALL RECENTLY ACTIVE SEWER MANHOLES SHAL RECEIVE $5.00 PER DAY ABOVE GROUP 1 WAGE RATES. GROUP 1-D: MAINTENANCE AND REPAIR TRACK AND ROAD BEDS. ALL EMPLOYEES PERFORMING WORK COVERED HEREIN SHALL RECEIVE $0.25 PER HOUR ABOVE THEIR REGULAR RATE FOR ALL WORK PERFORMED ON UNDERGROUND STRUCTURES NOT SPECIFICALLY COVERED HEREIN. THIS PARAGRAPH SHALL NOT BE CONSTRUED TO APPLY TO WORK BELOW GROUND LEVEL IN OPEN CUT. IT SHALL APPLY TO CUT AND COVER WORK OF SUBWAY CONSTRUCTION AFTER THE TEMPORARY COVER HAS BEEN PLACED. (MARIPOSA, MERCED, STANISLAUS, AND TUOLUMNE COUNTIES)

$35.35$27.30$62.65Agreement
LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 3…
Full text

LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 3- CONSTRUCTION LABORERS, INCLUDING BRIDGE AND GENERAL LABORER; DUMP, LOAD SPOTTER; FLAG PERSON; FIRE WATCHER; FENCE ERECTOR; GUARDRAIL ERECTOR; GARDENER, HORTICULTURAL AND LANDSCAPE LABORER; JETTING; LIMBER, BRUSH LOADER AND PILER; PAVEMENT MARKER (BUTTON SETTER); MAINTENANCE, REPAIR TRACK AND ROAD BEDS; STREETCAR AND RAILROAD CONSTRUCTION TRACK LABORER; TEMPORARY AIR AND WATER LINES, VICTAULIC OR SIMILAR; TOOL ROOM ATTENDANT (JOBSITE ONLY).

FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE WAGE RATE. GROUP 1-B: SEWER CLEANERS SHALL RECEIVE $4.00 PER DAY ABOVE GROUP 1 WAGE RATES. ""SEWER CLEANER"" MEANS ANY WORKER WHO HANDLES OR COMES IN CONTACT WITH RAW SEWAGE IN SMALL DIAMETER SEWERS. THOSE WHO WORK INSIDE RECENTLY ACTIVE, LARGE DIAMETER SEWERS, AND ALL RECENTLY ACTIVE SEWER MANHOLES SHAL RECEIVE $5.00 PER DAY ABOVE GROUP 1 WAGE RATES. GROUP 1-D: MAINTENANCE AND REPAIR TRACK AND ROAD BEDS. ALL EMPLOYEES PERFORMING WORK COVERED HEREIN SHALL RECEIVE $0.25 PER HOUR ABOVE THEIR REGULAR RATE FOR ALL WORK PERFORMED ON UNDERGROUND STRUCTURES NOT SPECIFICALLY COVERED HEREIN. THIS PARAGRAPH SHALL NOT BE CONSTRUED TO APPLY TO WORK BELOW GROUND LEVEL IN OPEN CUT. IT SHALL APPLY TO CUT AND COVER WORK OF SUBWAY CONSTRUCTION AFTER THE TEMPORARY COVER HAS BEEN PLACED. (MARIPOSA, MERCED, STANISLAUS, AND TUOLUMNE COUNTIES)

$35.25$27.30$62.55Agreement
LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 4…
Full text

LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 4- FINAL CLEAN-UP WORK OF DEBRIS, GROUNDS AND BUILDING INCLUDING BUT NOT LIMITED TO: STREET CLEANER; CLEANING AND WASHING WINDOWS; BRICK CLEANER (JOBSITE ONLY); MATERIAL CLEANER (JOBSITE ONLY). THE CLASSIFICATION ""MATERIAL CLEANER"" IS TO BE UTILIZED UNDER THE FOLLOWING CONDITIONS: A: AT DEMOLITION SITE FOR THE SALVAGE OF THE MATERIAL. B: AT THE CONCLUSION OF A JOB WHERE THE MATERIAL IS TO BE SALVAGED AND STOCKED TO BE REUSED ON ANOTHER JOB. C: FOR THE CLEANING OF SALVAGE MATERIAL AT THE JOBSITE OR TEMPORARY JOBSITE YARD. THE MATERIAL CLEANER CLASSIFICATION SHOULD NOT BE USED IN THE PERFORMANCE OF ""FORM STRIPPING, CLEANING AND OILING AND MOVING TO THE NEXT POINT OF ERECTION"".

FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE WAGE RATE. GROUP 1-B: SEWER CLEANERS SHALL RECEIVE $4.00 PER DAY ABOVE GROUP 1 WAGE RATES. ""SEWER CLEANER"" MEANS ANY WORKER WHO HANDLES OR COMES IN CONTACT WITH RAW SEWAGE IN SMALL DIAMETER SEWERS. THOSE WHO WORK INSIDE RECENTLY ACTIVE, LARGE DIAMETER SEWERS, AND ALL RECENTLY ACTIVE SEWER MANHOLES SHAL RECEIVE $5.00 PER DAY ABOVE GROUP 1 WAGE RATES. GROUP 1-D: MAINTENANCE AND REPAIR TRACK AND ROAD BEDS. ALL EMPLOYEES PERFORMING WORK COVERED HEREIN SHALL RECEIVE $0.25 PER HOUR ABOVE THEIR REGULAR RATE FOR ALL WORK PERFORMED ON UNDERGROUND STRUCTURES NOT SPECIFICALLY COVERED HEREIN. THIS PARAGRAPH SHALL NOT BE CONSTRUED TO APPLY TO WORK BELOW GROUND LEVEL IN OPEN CUT. IT SHALL APPLY TO CUT AND COVER WORK OF SUBWAY CONSTRUCTION AFTER THE TEMPORARY COVER HAS BEEN PLACED. (MARIPOSA, MERCED, STANISLAUS, AND TUOLUMNE COUNTIES)

$28.94$27.30$56.24Agreement
LABORER, GUNITE: GROUP 1- STRUCTURAL NOZZLEMAN.

FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE WAGE RATE. (MARIPOSA, MERCED, STANISLAUS, AND TUOLUMNE COUNTIES)

$36.46$27.30$63.76Agreement
LABORER, GUNITE: GROUP 2- NOZZLEMAN, GUNMAN, POTMAN, GROUNDMAN.

FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE WAGE RATE. (MARIPOSA, MERCED, STANISLAUS, AND TUOLUMNE COUNTIES)

$35.96$27.30$63.26Agreement
LABORER, GUNITE: GROUP 3- REBOUNDMAN.

FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE WAGE RATE. (MARIPOSA, MERCED, STANISLAUS, AND TUOLUMNE COUNTIES)

$35.37$27.30$62.67Agreement
LABORER, GUNITE: GROUP 4- GUINTE LABORER.

FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE WAGE RATE. (MARIPOSA, MERCED, STANISLAUS, AND TUOLUMNE COUNTIES)

$35.25$27.30$62.55Agreement
LABORER, WRECKING: GROUP 1…
Full text

LABORER, WRECKING: GROUP 1- SKILLED WRECKER (REMOVING AND SALVAGING OF SASH, WINDOWS, AND MATERIALS).

FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE WAGE RATE. (MARIPOSA, MERCED, STANISLAUS, AND TUOLUMNE COUNTIES)

$35.50$27.30$62.80Agreement
LABORER, WRECKING: GROUP 2- SEMI-SKILLED WRECKER (SALVAGING OF OTHER BUILDING MATERIALS).

FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE WAGE RATE. (MARIPOSA, MERCED, STANISLAUS, AND TUOLUMNE COUNTIES)

$35.35$27.30$62.65Agreement
LABORER: GARDENERS, HORTICULTURAL & LANDSCAPE LABORERS - (1) New Construction.

FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE WAGE RATE. (MARIPOSA, MERCED, STANISLAUS, AND TUOLUMNE COUNTIES)

$35.25$27.30$62.55Agreement
LABORER: GARDENERS…
Full text

LABORER: GARDENERS, HORTICULTURAL & LANDSCAPE LABORERS - (2) Establishment Warranty Period.

FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE WAGE RATE. (MARIPOSA, MERCED, STANISLAUS, AND TUOLUMNE COUNTIES)

$28.94$27.30$56.24Agreement
LABO1130-008 · Laborers agreement, July 1, 2023
LABORER, PLASTER TENDER. WORK ON A SWING STAGE SCAFFOLD…
Full text

LABORER, PLASTER TENDER. WORK ON A SWING STAGE SCAFFOLD: $1.00 PER HOUR ADDITIONAL. (CALAVERAS, FRESNO, KINGS, MADERA, MARIPOSA, MERCED, SAN JOAQUIN, STANISLAUS, & TUOLUMNE COUNTIES)

$39.77$28.54$68.31Agreement
LABO1130-009 · Laborers agreement, July 1, 2023
LABORER, PLASTER TENDER. WORK ON A SWING STAGE SCAFFOLD…
Full text

LABORER, PLASTER TENDER. WORK ON A SWING STAGE SCAFFOLD: $1.00 PER HOUR ADDITIONAL. (MARIPOSA, MERCED, STANISLAUS, AND TUOLUMNE COUNTIES)

$39.77$28.54$68.31Agreement
PAIN0016-001 · Painters and Allied Trades agreement, January 1, 2025
PAINTERS. PREMIUMS…
Full text

PAINTERS. PREMIUMS: EXOTIC MATERIALS - $1.25 ADDITIONAL PER HOUR. SPRAY WORK: - $0.50 ADDITIONAL PER HOUR. INDUSTRIAL PAINTING - $0.25 ADDITIONAL PER HOUR [WORK ON INDUSTRIAL BUILDINGS USED FOR THE MANUFACTURE AND PROCESSING OF GOODS FOR SALE OR SERVICE; STEEL CONSTRUCTION (BRIDGES), STACKS, TOWERS, TANKS, AND SIMILAR STRUCTURES]. HIGH WORK: OVER 50 FEET - $2.00 PER HOUR ADDITIONAL 100 TO 180 FEET - $4.00 PER HOUR ADDITIONAL OVER 180 FEET - $6.00 PER HOUIR ADDITIONAL (ALAMEDA, CONTRA COSTA, MONTEREY, SAN BENITO, SAN MATEO, SANTA CLARA, AND SANTA CRUZ COUNTIES)

$53.38$28.04$81.42Agreement
PAIN0016-003 · Painters and Allied Trades agreement, January 1, 2025
DRYWALL FINISHER/TAPER.…
Full text

DRYWALL FINISHER/TAPER. (ALAMDEA, CONTRA COSTA, SAN FRANCISCO, SAN MATEO, & SANTA CLARA COUNTIES)

$63.76$32.69$96.45Agreement
DRYWALL FINISHER/TAPER.…
Full text

DRYWALL FINISHER/TAPER. (CALAVERAS, MARIPOSA, MERCED, MONTEREY, SAN BENITO, SAN JOAQUIN, SANTA CRUZ, STANISLAUS, & TUOLUMNE COUNTIES)

$59.63$31.29$90.92Agreement
PAIN0016-012 · Painters and Allied Trades agreement, January 1, 2024
SOFT FLOOR LAYER (ALAMEDA…
Full text

SOFT FLOOR LAYER (ALAMEDA, CONTRA COSTA, MARIPOSA, MERCED, MONTEREY, SAN BENITO, SAN FRANCISCO, SAN MATEO, SANTA CLARA AND SANTA CRUZ COUNTIES)

$59.00$33.03$92.03Agreement
PAIN0016-015 · Painters and Allied Trades agreement, January 1, 2025
PAINTER: BRUSH.

FOOTNOTES: SPRAY/SANDBLAST: $0.50 ADDITIONAL PER HOUR. EXOTIC MATERIALS: $1.25 ADDITIONAL PER HOUR. HIGH TIME: OVER 50 FT ABOVE GROUND OR WATER LEVEL $2.00 ADDITIONAL PER HOUR. 100 TO 180 FT ABOVE GROUND OR WATER LEVEL $4.00 ADDITIONAL PER HOUR. OVER 180 FT ABOVE GROUND OR WATER LEVEL $6.00 ADDITIONAL PER HOUR. (CALAVERAS, MARIPOSA, MERCED, SAN JOAQUIN, STANISLAUS & TUOLUMNE COUNTIES)

$43.45$22.80$66.25Agreement
PAIN0016-022 · Painters and Allied Trades agreement, January 1, 2025
PAINTER (SAN FRANCISCO COUNTY)$57.00$28.04$85.04Agreement
PAIN0169-001 · Painters and Allied Trades agreement, January 1, 2023
GLAZIER (FRESNO, KINGS, MADERA, MARIPOSA AND MERCED COUNTIES)$44.33$28.88$73.21Agreement
PAIN0169-005 · Painters and Allied Trades agreement, January 1, 2024
GLAZIER (ALAMEDA CONTRA COSTA…
Full text

GLAZIER (ALAMEDA CONTRA COSTA, MONTEREY, SAN BENITO, SAN FRANCISCO, SAN MATEO, SANTA CLARA & SANTA CRUZ COUNTIES)

$56.22$34.00$90.22Agreement
PAIN0294-004 · Painters and Allied Trades agreement, July 1, 2023
PAINTER: BRUSH, ROLLER.

FOOTNOTE: SPRAY PAINTERS & PAPERHANGERS RECIVE $1.00 ADDITIONAL PER HOUR. PAINTERS DOING DRYWALL PATCHING RECEIVE $1.25 ADDITIONAL PER HOUR. LEAD ABATERS & SANDBLASTERS RECEIVE $1.50 ADDITIONAL PER HOUR. HIGH TIME - OVER 30 FEET (DOES NOT INCLUDE WORK FROM A LIFT) $0.75 PER HOUR ADDITIONAL. (FRESNO, KINGS AND MADERA COUNTIES)

$34.49$21.80$56.29Agreement
PAINTER: DRYWALL FINISHER/TAPER.

FOOTNOTE: SPRAY PAINTERS & PAPERHANGERS RECIVE $1.00 ADDITIONAL PER HOUR. PAINTERS DOING DRYWALL PATCHING RECEIVE $1.25 ADDITIONAL PER HOUR. LEAD ABATERS & SANDBLASTERS RECEIVE $1.50 ADDITIONAL PER HOUR. HIGH TIME - OVER 30 FEET (DOES NOT INCLUDE WORK FROM A LIFT) $0.75 PER HOUR ADDITIONAL. (FRESNO, KINGS AND MADERA COUNTIES)

$35.74$21.80$57.54Agreement
PAIN0294-005 · Painters and Allied Trades agreement, January 1, 2023
SOFT FLOOR LAYER (FRESNO, KINGS & MADERA COUNTIES)$38.53$23.19$61.72Agreement
PAIN0767-001 · Painters and Allied Trades agreement, January 1, 2024
GLAZIER.

PAID HOLIDAYS: NEW YEAR'S DAY, MARTIN LUTHER KING, JR. DAY, PRESIDENT'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERAN'S DAY, THANKSGIVING DAY, AND CHRISTMAS DAY. EMPLOYEE REQUIRED TO WEAR A BODY HARNESS SHALL RECEIVE $1.50 PER HOUR ABOVE THE BASIC HOURLY RATE AT ANY ELEVATION. (CALAVERAS, SAN JOAQUIN, STANISLAUS AND TUOLUMNE COUNTIES)

$43.25$35.62$78.87Agreement
PAIN1176-001 · Painters and Allied Trades agreement, July 1, 2022
PARKING LOT STRIPING/HIGHWAY MARKING: HIGHWAY IMPROVEMEMT: GROUP 2…
Full text

PARKING LOT STRIPING/HIGHWAY MARKING: HIGHWAY IMPROVEMEMT: GROUP 2- GAMECOURT & PLAYGROUND INSTALLER

$34.71$17.62$52.33Agreement
PARKING LOT STRIPING/HIGHWAY MARKING: HIGHWAY IMPROVEMENT: GROUP 1…
Full text

PARKING LOT STRIPING/HIGHWAY MARKING: HIGHWAY IMPROVEMENT: GROUP 1- STRIPER: LAYOUT AND APPLICATION OF PAINTED TRAFFIC STRIPES AND MARKING; HOT THERMO PLASTIC; TAPE, TRAFFIC STRIPES AND MARKINGS

$40.83$17.62$58.45Agreement
PARKING LOT STRIPING/HIGHWAY MARKING: HIGHWAY IMPROVEMENT: GROUP 3…
Full text

PARKING LOT STRIPING/HIGHWAY MARKING: HIGHWAY IMPROVEMENT: GROUP 3- PROTECTIVE COATING, PAVEMENT SEALING

$35.11$17.62$52.73Agreement
PAIN1237-003 · Painters and Allied Trades agreement, January 1, 2024
SOFT FLOOR LAYER (CALAVERAS; SAN JOAQUIN COUNTIES; STANISLAUS AND TUOLUMNE COUNTIES)$48.54$26.59$75.13Agreement
PLAS0066-002 · Plasterers and Cement Masons agreement, July 1, 2019
PLASTERER (ALAMEDA, CONTRA COSTA, SAN MATEO AND SAN FRANCISCO COUNTIES)$42.41$30.73$73.14Agreement
PLAS0300-001 · Plasterers and Cement Masons agreement, July 1, 2018
PLASTERER (AREA 188: FRESNO)$32.70$31.68$64.38Agreement
PLASTERER (AREA 224: SAN BENITO, SANTA CLARA, SANTA CRUZ)$32.88$31.68$64.56Agreement
PLASTERER (AREA 295: CALAVERAS & SAN JOAQUIN COUNTIES)$32.70$31.68$64.38Agreement
PLASTERER (AREA 337: MONTEREY COUNTY)$32.88$31.68$64.56Agreement
PLASTERER (AREA 429: MARIPOSA, MERCED, STANISLAUS, TUOLUMNE COUNTIES)$32.70$31.68$64.38Agreement
PLAS0300-005 · Plasterers and Cement Masons agreement, July 1, 2016
CEMENT MASON/CONCRETE FINISHER$32.15$23.27$55.42Agreement
PLUM0038-001 · Plumbers and Pipefitters agreement, July 1, 2023
PLUMBER (PLUMBER, STEAMFITTER, REFRIGERATION FITTER) (SAN FRANCISCO COUNTY)$85.50$48.98$134.48Agreement
PLUM0038-005 · Plumbers and Pipefitters agreement, July 1, 2025
LANDSCAPE/IRRIGATION FITTER: UNDERGROUND/UTILITY FITTER (SAN FRANCISCO COUNTY)$77.35$36.53$113.88Agreement
PLUM0062-001 · Plumbers and Pipefitters agreement, January 1, 2026
PLUMBER & STEAMFITTER (MONTEREY AND SANTA CRUZ COUNTIES)$57.75$43.60$101.35Agreement
PLUM0159-001 · Plumbers and Pipefitters agreement, July 1, 2025
PLUMBER AND STEAMFITTER: (1) REFRIGERATION (CONTRA COSTA COUNTY)$67.68$49.04$116.72Agreement
PLUMBER AND STEAMFITTER: (2) ALL OTHER WORK (CONTRA COSTA COUNTY)$68.57$49.04$117.61Agreement
PLUM0246-001 · Plumbers and Pipefitters agreement, January 1, 2026
PLUMBER & STEAMFITTER (FRESNO, KINGS & MADERA COUNTIES)$54.50$42.54$97.04Agreement
PLUM0246-004 · Plumbers and Pipefitters agreement, January 1, 2017
PLUMBER: PIPE TRADESMAN. (PIPE TRADESMAN

SCOPE OF WORK: INSTALLATION OF CORRUGATED METAL PIPING FOR DRAINAGE, AS WELL AS INSTALLATION OF CORRUGATED METAL PIPING FOR CULVERTS IN CONNECTION WITH STORM SEWERS AND DRAINS; GROUTING, DRY PACKING AND DIAPERING OF JOINTS, HOLES OR CHASES INCLUDING PAVING OVER JOINTS, IN PIPING; TEMPORARY PIPING FOR DIRT WORK FOR BUILDING SITE PREPARATION; OPERATING JACK HAMMERS, PAVEMENT BREAKERS, CHIPPING GUNS, CONCRETE SAWS AND SPADES TO CUT HOLES, CHASES AND CHANNELS FOR PIPING SYSTEMS; DIGGING, GRADING, BACKFILLING AND GROUND PREPARATION FOR ALL TYPES OF PIPE TO ALL POINTS OF THE JOBSITE; GROUND PREPARATION INCLUDING GROUND LEVELING, LAYOUT AND PLANTING OF SHRUBBERY, TREES AND GROUND COVER, INCLUDING WATERING, MOWING, EDGING, PRUNING AND FERTILIZING, THE BREAKING OF CONCRETE, DIGGING, BACKFILLING AND TAMPING FOR THE PREPARATION AND COMPLETION OF ALL WORK IN CONNECTION WITH LAWN SPRINKLER AND LANDSCAPING; LOADING, UNLOADING AND DISTRIBUTING MATERIALS AT JOBSITE; PUTTING AWAY MATERIALS IN STORAGE BINS IN JOBSITE SECURE STORAGE AREA; DEMOLITION OF PIPING AND FIXTURES FOR REMODELING AND ADDITIONS; SETTING UP AND TEARING DOWN WORK BENCHES, LADDERS AND JOB SHACKS; CLEAN-UP AND SWEEPING OF JOBSITE; PIPE WRAPPING AND WATERPROOFING WHERE TAR OR SIMILAR MATERIAL IS APPLIED FOR PROTECTION OF BURIED PIPING; FLAGMAN) (FRESNO, MERCED, & SAN JOAQUIN COUNTIES)

$13.00$10.74$23.74Agreement
PLUM0342-001 · Plumbers and Pipefitters agreement, July 1, 2025
PIPEFITTER (CONTRA COSTA COUNTY)$80.50$50.45$130.95Agreement
PLUMBER, PIPEFITTER, STEAMFITTER (ALAMEDA COUNTY)$80.50$50.45$130.95Agreement
PLUM0355-004 · Plumbers and Pipefitters agreement, July 1, 2025
UNDERGROUND UTILITY WORKER /LANDSCAPE FITTER…
Full text

UNDERGROUND UTILITY WORKER /LANDSCAPE FITTER (ALAMEDA, CALAVERAS, CONTRA COSTA, FRESNO, KINGS, MADERA, MARIPOSA, MERCED, MONTEREY, SAN BENITO, SAN JOAQUIN, SAN MATEO, SANTA CLARA, SANTA CRUZ, STANISLAUS, AND TUOLUMNE COUNTIES)

$36.01$18.50$54.51Agreement
PLUM0393-001 · Plumbers and Pipefitters agreement, July 1, 2021
PLUMBER/PIPEFITTER (SAN BENITO AND SANTA CLARA COUNTIES)$68.76$46.63$115.39Agreement
PLUM0442-001 · Plumbers and Pipefitters agreement, January 1, 2026
PLUMBER & STEAMFITTER…
Full text

PLUMBER & STEAMFITTER (CALAVERAS, MARIPOSA, MERCED, SAN JOAQUIN, STANISLAUS & TUOLUMNE COUNTIES)

$58.45$38.74$97.19Agreement
PLUM0467-001 · Plumbers and Pipefitters agreement, July 1, 2025
PLUMBER/PIPEFITTER/STEAMFITTER (SAN MATEO COUNTY)$87.75$41.44$129.19Agreement
ROOF0027-002 · Roofers agreement, September 1, 2024
ROOFER.

FOOTNOTE: WORK WITH PITCH, PITCH BASE OF PITCH IMPREGNANTED PRODUCTS OR ANY MATERIAL CONTAINING COAL TAR PITCH, ON ANY BUILDING OLD OR NEW, WHERE BOTH ASPHALT AND PITCHERS ARE USED IN THE APPLICATION OF A BUILT-UP ROOF OR TEAR OFF: $2.00 PER HOUR ADDITIONAL. (FRESNO, KINGS, AND MADERA COUNTIES)

$45.76$16.86$62.62Agreement
ROOF0040-002 · Roofers agreement, August 1, 2024
ROOFER (SAN FRANCISCO & SAN MATEO COUNTIES)$55.30$22.97$78.27Agreement
ROOF0081-001 · Roofers agreement, August 1, 2024
ROOFER (ALAMEDA AND CONTRA COSTA COUNTIES)$54.94$23.34$78.28Agreement
ROOF0081-004 · Roofers agreement, August 1, 2024
ROOFER (CALAVERAS, MARIPOSA, MERCED, SAN JOAQUIN, STANISLAUS AND TUOLUMNE COUNTIES)$49.65$22.19$71.84Agreement
ROOF0095-002 · Roofers agreement, August 1, 2023
ROOFER: BITUMASTIC…
Full text

ROOFER: BITUMASTIC, ENAMELER, COAL TAR, PITCH AND MASTIC WORKER (MONTEREY, SAN BENITO, SANTA CLARA, AND SANTA CRUZ COUNTIES)

$57.17$21.51$78.68Agreement
ROOFER: JOURNEYMAN (MONTEREY, SAN BENITO, SANTA CLARA, AND SANTA CRUZ COUNTIES)$53.17$21.51$74.68Agreement
ROOFER: KETTLE PERSON…
Full text

ROOFER: KETTLE PERSON (2 KETTLES) (MONTEREY, SAN BENITO, SANTA CLARA, AND SANTA CRUZ COUNTIES:)

$55.17$21.51$76.68Agreement
SFCA0483-001 · SFCA, January 1, 2026
SPRINKLER FITTER: FIRE…
Full text

SPRINKLER FITTER: FIRE (ALAMEDA, CONTRA COSTA, SAN FRANCISCO, SAN MATEO AND SANTA CLARA COUNTIES)

$81.54$41.35$122.89SFCA
SFCA0669-011 · SFCA, January 1, 2026
SPRINKLER FITTER (CALAVERAS…
Full text

SPRINKLER FITTER (CALAVERAS, FRESNO, KINGS, MADERA, MARIPOSA, MERCED, MONTEREY, SAN BENITO, SAN JOAQUIN, SANTA CRUZ, STANISLAUS AND TUOLUMNE COUNTIES)

$49.69$29.72$79.41SFCA
SHEE0104-001 · Sheet Metal Workers agreement, June 29, 2026
SHEET METAL WORKER (MONTEREY & SAN BENITO COUNTIES)$65.02$37.47$102.49Agreement
SHEET METAL WORKER (SANTA CRUZ COUNTY)$66.18$36.93$103.11Agreement
SHEET METAL WORKER…
Full text

SHEET METAL WORKER: ALL OTHER WORK (ALAMEDA, CONTRA COSTA, SAN FRANSICO, SAN MATEO, SANTA CLARA COUNTIES))

$86.31$46.75$133.06Agreement
SHEET METAL WORKER…
Full text

SHEET METAL WORKER: MECHANICAL CONTRACTS UNDER $200,000 (ALAMEDA, CONTRA COSTA, SAN FRANCISCO, SAN MATEO, SANTA CLARA COUNTIES))

$73.19$46.00$119.19Agreement
SHEE0104-003 · Sheet Metal Workers agreement, June 29, 2026
SHEET METAL WORKER (CALAVERAS AND SAN JOAQUIN COUNTIES)$56.96$38.63$95.59Agreement
SHEE0104-005 · Sheet Metal Workers agreement, June 29, 2026
SHEET METAL WORKER…
Full text

SHEET METAL WORKER: EXCLUDING METAL DECK AND SIDING (MARIPOSA, MERCED, STANISLAUS AND TUOLUMNE COUNTIES)

$57.06$42.15$99.21Agreement
SHEE0104-007 · Sheet Metal Workers agreement, June 29, 2026
SHEET METAL WORKER (FRESNO, KINGS, AND MADERA COUNTIES)$54.49$42.39$96.88Agreement
SHEE0104-015 · Sheet Metal Workers agreement, July 1, 2024
SHEET METAL WORKER…
Full text

SHEET METAL WORKER: METAL DECKING AND SIDING ONLY. (ALAMEDA, CONTRA COSTA, MONTEREY, SAN BENITO, SAN FRANCISCO, SAN MATEO, SANTA CLARA AND SANTA CRUZ COUNTIES)

$56.23$37.52$93.75Agreement
SHEE0104-018 · Sheet Metal Workers agreement, July 1, 2024
SHEET METAL WORKER…
Full text

SHEET METAL WORKER: METAL DECKING AND SIDING ONLY. (CALAVERAS, FRESNO, KINGS, MADERA, MARIPOSA, MERCED, SAN JOAQUIN, STANISLAUS AND TUOLUMNE COUNTIES)

$56.23$37.52$93.75Agreement
TEAM0094-001 · Teamsters agreement, July 1, 2025
TRUCK DRIVERS: GROUP 1…
Full text

TRUCK DRIVERS: GROUP 1: DUMP TRUCKS, UNDER 6 YDS.; SINGLE UNIT FLAT RACK (2- AXLE UNIT); NIPPER TRUCK (WHEN FLAT RACK TRUCK IS USED APPROPRIATE FLAT RACK SHALL APPLY); CONCRETE PUMP TRUCK (WHEN FLAT RACK TRUCK IS USED APPROPRIATE FLAT RACK SHALL APPLY); CONCRETE PUMP MACHINE; FORK LIFT AND LIFT JITNEYS; FUEL AND/OR GREASE TRUCK DRIVER OR FUEL PERSON; SNOW BUGGY; STEAM CLEANING; BUS OR PERSONHAUL DRIVER; ESCORT OR PILOT CAR DRIVER; PICKUP TRUCK; TEAMSTER OILER/GREASER AND/OR SERVICEPERSON; HOOK TENDER (INCLUDING LOADING AND UNLOADING); TEAM DRIVER; TOOL ROOM ATTENDANT (REFINERIES).

FOOTNOTES: ARTICULATED DUMP TRUCK; BULK CEMENT SPREADER (WITH OR WITHOUT AUGER); DUMPCRETE TRUCK; SKID TRUCK (DEBRIS BOX); DRY PRE-BATCH CONCRETE MIX TRUCKS; DUMPSTER OR SIMILAR TYPE; SLURRY TRUCK: USE DUMP TRUCK YARDAGE RATE. HEATER PLANER; ASPHALT BURNER; SCARIFIER BURNER; INDUSTRIAL LIFT TRUCK (MECHANICAL TAILGATE); UTILITY AND CLEAN-UP TRUCK: USE APPROPRIATE RATE FOR THE POWER UNIT OR THE EQUIPMENT UTILIZED.

$43.26$34.28$77.54Agreement
TRUCK DRIVERS: GROUP 2…
Full text

TRUCK DRIVERS: GROUP 2: DUMP TRUCKS, 6 YDS. AND UNDER 8 YDS.; TRANSIT MIXERS, THROUGH 10 YDS.; WATER TRUCKS, UNDER 7,000 GALS.; JETTING TRUCKS, UNDER 7,000 GALS.; SINGLE-UNIT FLAT RACK (3-AXLE UNIT); HIGHBED HEAVY DUTY TRANSPORT; SCISSOR TRUCK; RUBBER-TIRED MUCK CAR (NOT SELF-LOADED); RUBBER-TIRED TRUCK JUMBO; WINCH TRUCK AND ""A"" FRAME DRIVERS; COMBINATION WINCH TRUCK WITH HOIST; ROAD OIL TRUCK OR BOOTPERSON; BUGGYMOBILE; ROSS, HYSTER AND SIMILAR STRADDLE CARRIERS; SMALL RUBBER-TIRED TRACTOR.

FOOTNOTES: ARTICULATED DUMP TRUCK; BULK CEMENT SPREADER (WITH OR WITHOUT AUGER); DUMPCRETE TRUCK; SKID TRUCK (DEBRIS BOX); DRY PRE-BATCH CONCRETE MIX TRUCKS; DUMPSTER OR SIMILAR TYPE; SLURRY TRUCK: USE DUMP TRUCK YARDAGE RATE. HEATER PLANER; ASPHALT BURNER; SCARIFIER BURNER; INDUSTRIAL LIFT TRUCK (MECHANICAL TAILGATE); UTILITY AND CLEAN-UP TRUCK: USE APPROPRIATE RATE FOR THE POWER UNIT OR THE EQUIPMENT UTILIZED.

$43.56$34.28$77.84Agreement
TRUCK DRIVERS: GROUP 3…
Full text

TRUCK DRIVERS: GROUP 3: DUMP TRUCKS, 8 YDS. AND INCLUDING 24 YDS.; TRANSIT MIXERS, OVER 10 YDS.; WATER TRUCKS, 7,000 GALS. AND OVER; JETTING TRUCKS, 7,000 GALS. AND OVER; VACUUM TRUCKS UNDER 7500 GALS. TRUCKS TOWING TILT BED OR FLAT BED PULL TRAILERS; LOWBED HEAVY DUTY TRANSPORT; HEAVY DUTY TRANSPORT TILLER PERSON; SELF- PROPELLED STREET SWEEPER WITH SELF-CONTAINED REFUSE BIN; BOOM TRUCK - HYDRO-LIFT OR SWEDISH TYPE EXTENSION OR RETRACTING CRANE; P.B. OR SIMILAR TYPE SELF-LOADING TRUCK; TIRE REPAIRPERSON; COMBINATION BOOTPERSON AND ROAD OILER; DRY DISTRIBUTION TRUCK (A BOOTPERSON WHEN EMPLOYED ON SUCH EQUIPMENT, SHALL RECEIVE THE RATE SPECIFIED FOR THE CLASSIFICATION OF ROAD OIL TRUCKS OR BOOTPERSON); AMMONIA NITRATE DISTRIBUTOR, DRIVER AND MIXER; SNOW GO AND/OR PLOW.

FOOTNOTES: ARTICULATED DUMP TRUCK; BULK CEMENT SPREADER (WITH OR WITHOUT AUGER); DUMPCRETE TRUCK; SKID TRUCK (DEBRIS BOX); DRY PRE-BATCH CONCRETE MIX TRUCKS; DUMPSTER OR SIMILAR TYPE; SLURRY TRUCK: USE DUMP TRUCK YARDAGE RATE. HEATER PLANER; ASPHALT BURNER; SCARIFIER BURNER; INDUSTRIAL LIFT TRUCK (MECHANICAL TAILGATE); UTILITY AND CLEAN-UP TRUCK: USE APPROPRIATE RATE FOR THE POWER UNIT OR THE EQUIPMENT UTILIZED.

$43.86$34.28$78.14Agreement
TRUCK DRIVERS: GROUP 4…
Full text

TRUCK DRIVERS: GROUP 4: DUMP TRUCKS, OVER 25 YDS. AND UNDER 65 YDS.; WATER PULLS - DW 10'S, 20'S, 21'S AND OTHER SIMILAR EQUIPMENT WHEN PULLING AQUA/PAK OR WATER TANK TRAILERS; HELICOPTER PILOTS (WHEN TRANSPORTING MEN AND MATERIALS); LOWBEDK HEAVY DUTY TRANSPORT UP TO INCLUDING 7 AXLES; DW10'S, 20'S, 21'S AND OTHER SIMILAR CAT TYPE, TERRA COBRA, LETOURNEAU PULLS, TOURNOROCKER, EUCLID AND SIMILAR TYPE EQUIPMENT WHEN PULLING FUEL AND/OR GREASE TANK TRAILERS OR OTHER MISCELLANEOUS TRAILERS; VACUUM TRUCKS 7500 GALS AND OVER AND TRUCK REPAIRMAN.

FOOTNOTES: ARTICULATED DUMP TRUCK; BULK CEMENT SPREADER (WITH OR WITHOUT AUGER); DUMPCRETE TRUCK; SKID TRUCK (DEBRIS BOX); DRY PRE-BATCH CONCRETE MIX TRUCKS; DUMPSTER OR SIMILAR TYPE; SLURRY TRUCK: USE DUMP TRUCK YARDAGE RATE. HEATER PLANER; ASPHALT BURNER; SCARIFIER BURNER; INDUSTRIAL LIFT TRUCK (MECHANICAL TAILGATE); UTILITY AND CLEAN-UP TRUCK: USE APPROPRIATE RATE FOR THE POWER UNIT OR THE EQUIPMENT UTILIZED.

$44.21$34.28$78.49Agreement
TRUCK DRIVERS: GROUP 5…
Full text

TRUCK DRIVERS: GROUP 5: DUMP TRUCKS, 65 YDS. AND OVER; HOLLAND HAULER; LOW BED HEAVY DUTY TRANSPORT OVER 7 AXLES.

FOOTNOTES: ARTICULATED DUMP TRUCK; BULK CEMENT SPREADER (WITH OR WITHOUT AUGER); DUMPCRETE TRUCK; SKID TRUCK (DEBRIS BOX); DRY PRE-BATCH CONCRETE MIX TRUCKS; DUMPSTER OR SIMILAR TYPE; SLURRY TRUCK: USE DUMP TRUCK YARDAGE RATE. HEATER PLANER; ASPHALT BURNER; SCARIFIER BURNER; INDUSTRIAL LIFT TRUCK (MECHANICAL TAILGATE); UTILITY AND CLEAN-UP TRUCK: USE APPROPRIATE RATE FOR THE POWER UNIT OR THE EQUIPMENT UTILIZED.

$44.56$34.28$78.84Agreement

Modification history

Modification 4January 30, 2026
Modification 5May 18, 2026
Modification 6July 14, 2026
Modification 7September 3, 2026 (current)

Published by the Wage and Hour Division; read from sam.gov. The sheet is checked for a newer modification each day. Contracts awarded since January 1, 2017 also carry Executive Order 13706 paid sick leave (one hour per 30 worked, up to 56 a year).

Questions people ask

Which rate do I pay on CA20260018?
The line for the classification of work actually performed: the basic rate plus the fringe. You may pay the fringe into benefit plans, as cash on every hour, or a mix. Overtime after 40 hours is 1.5 times the basic rate; fringe is paid on every hour and never multiplied.
My trade is not on this sheet. What do I do?
Do not borrow the nearest name. Ask the contracting agency for a conformance on Standard Form 1444 before the first week of that work, and note it as pending on the payroll.
Does modification 7 apply to my contract?
Only if it was in force when your contract was awarded (generally at bid opening). An earlier modification locked into the contract keeps applying, except on option years, added scope and indefinite-quantity contracts. The number and modification are on the first page of the exhibit in your contract.

How to read a wage determination · Paying the fringe in cash or through plans · Overtime on these rates · Fringe credit calculator