CertifiedHours

Prevailing wage rates · California · Wage determination

Prevailing wage rates: San Diego County, California

Building, Heavy, Highway, Residential construction · CA20260001 modification 3, published May 18, 2026

The short answer

This sheet sets 145 classifications for building, heavy, highway, residential work in San Diego County, California. Each line is a basic hourly rate plus a fringe rate, and the sum is the minimum you must pay for that work, from $30.78 an hour (drywall: drywall stocker/scrapper) to $928.10 (diver: (1) wet amounts in ""rates' column are per day). Your contract may lock an earlier modification.

Scope

Building Construction Projects Dredging Projects-Includes Dredging Projects (does not include hopper dredge work) Heavy Construction Projects (excludes water well drilling) Highway Construction Projects Residential Construction Projects (Consisting of single family homes and apartments up to and including 4 stories).

Rates by classification

Total is the basic rate plus the fringe. Source is the agreement or survey the rate came from; a marker means the group changed in this modification. A dagger (†) means the fringe carries a footnote or percentage the total does not include; read the group’s notes.

ClassificationBasic rateFringeTotalSource
ASBE0005-002 · Asbestos Workers and Heat & Frost Insulators agreement, July 1, 2024
ASBESTOS WORKERS/INSULATOR…
Full text

ASBESTOS WORKERS/INSULATOR (INCLUDES THE APPLICATION OF ALL INSULATING MATERIALS, PROTECTIVE COVERINGS, COATINGS, AND FINISHES TO ALL TYPES OF MECHANICAL SYSTEMS)

$56.32$26.52$82.84Agreement
FIRE STOP TECHNICIAN…
Full text

FIRE STOP TECHNICIAN (APPLICATION OF FIRESTOPPING MATERIALS FOR WALL OPENINGS AND PENETRATIONS IN WALLS, FLOORS, CEILINGS AND CURTAIN WALLS)

$39.94$20.65$60.59Agreement
ASBE0005-002 · Asbestos Workers and Heat & Frost Insulators agreement, September 1, 2024
ASBESTOS WORKERS/INSULATOR…
Full text

ASBESTOS WORKERS/INSULATOR (INCLUDES THE APPLICATION OF ALL INSULATING MATERIALS, PROTECTIVE COVERINGS, COATINGS, AND FINISHES TO ALL TYPES OF MECHANICAL SYSTEMS)

$56.32$26.52$82.84Agreement
FIRE STOP TECHNICIAN…
Full text

FIRE STOP TECHNICIAN (APPLICATION OF FIRESTOPPING MATERIALS FOR WALL OPENINGS AND PENETRATIONS IN WALLS, FLOORS, CEILINGS AND CURTAIN WALLS)

$39.94$20.65$60.59Agreement
ASBE0005-004 · Asbestos Workers and Heat & Frost Insulators agreement, July 4, 2022
ASBESTOS REMOVAL WORKER/HAZARDOUS MATERIAL HANDLER…
Full text

ASBESTOS REMOVAL WORKER/HAZARDOUS MATERIAL HANDLER (INCLUDES PREPARATION, WETTING, STRIPPING, REMOVAL, SCRAPPING, VACUUMING, BAGGING AND DISPOSING OF ALL INSULATION MATERIALS FROM MECHANICAL SYSTEMS, WHETHER THEY CONTAIN ASBESTOS OR NOT)

$23.52$13.37$36.89Agreement
BOIL0092-003 · Boilermakers agreement, January 1, 2024
BOILERMAKER$51.98$42.11$94.09Agreement
BRCA0004-008 · Bricklayers agreement, November 1, 2023
BRICKLAYER; MARBLE SETTER$46.73$19.02$65.75Agreement
BRCA0018-004 · Bricklayers agreement, June 1, 2024
TILE LAYER$51.82$19.32$71.14Agreement
TILE FINISHER$37.96$13.77$51.73Agreement
MARBLE FINISHER$43.38$15.36$58.74Agreement
BRCA0018-010 · Bricklayers agreement, September 1, 2024
TERRAZZO WORKER/SETTER$49.62$15.26$64.88Agreement
TERRAZZO FINISHER$42.11$14.67$56.78Agreement
CARP0213-003 · Carpenters agreement, July 1, 2021
DRYWALL: DRYWALL STOCKER/SCRAPPER…
Full text

DRYWALL: DRYWALL STOCKER/SCRAPPER ((1) WORK ON WOOD FRAMED CONSTRUCTION OF SINGLE FAMILY RESIDENCES, APARTMENTS OR CONDOMINIUMS UNDER FOUR STORIES)

$22.16$8.62$30.78Agreement
DRYWALL: DRYWALL INSTALLER/LATHER…
Full text

DRYWALL: DRYWALL INSTALLER/LATHER ((1) WORK ON WOOD FRAMED CONSTRUCTION OF SINGLE FAMILY RESIDENCES, APARTMENTS OR CONDOMINIUMS UNDER FOUR STORIES)

$32.14$16.28$48.42Agreement
CARP0619-002 · Carpenters agreement, July 1, 2025
DRYWALL: DRYWALL STOCKER/SCRAPPER (2) ALL OTHER WORK$21.45$12.18$33.63Agreement
DRYWALL: DRYWALL INSTALLER/LATHER (2) ALL OTHER WORK$44.53$27.09$71.62Agreement
CARP0619-003 · Carpenters agreement, July 1, 2025
PILEDRIVERMAN$52.37$26.18$78.55Agreement
CARPENTER: (5) RESIDENTIAL INSULATION INSTALLER$24.16$15.76$39.92Agreement
CARPENTER: (4) RESIDENTIAL CARPENTER$39.15$26.18$65.33Agreement
CARPENTER: (3) HEAVY & HIGHWAY$51.40$16.28$67.68Agreement
CARPENTER: (2) COMMERCIAL BUILDING$48.94$26.18$75.12Agreement
CARPENTER: (1) BRIDGE$52.37$26.18$78.55Agreement
CARP0619-004 · Carpenters agreement, July 1, 2025
DIVER: (4) ASSISTANT TENDER AMOUNTS IN ""RATES' COLUMN ARE PER DAY$418.96$26.18$445.14Agreement
DIVER: (3) TENDER AMOUNTS IN ""RATES' COLUMN ARE PER DAY$442.96$26.18$469.14Agreement
DIVER: (2) STANDBY AMOUNTS IN ""RATES' COLUMN ARE PER DAY$450.96$26.18$477.14Agreement
DIVER: (1) WET AMOUNTS IN ""RATES' COLUMN ARE PER DAY$901.92$26.18$928.10Agreement
CARP0721-001 · Carpenters agreement, July 1, 2025
MODULAR FURNITURE INSTALLER$25.00$13.06$38.06Agreement
CARP1607-004 · Carpenters agreement, July 1, 2025
MILLWRIGHT$52.24$26.68$78.92Agreement
ELEC0569-001 · Electrical Workers (IBEW) agreement, June 2, 2025
ELECTRICIAN: (ALL OTHER WORK, INCLUDING 4 STORIES RESIDENTIAL)$58.95$18.85$77.80Agreement
ELECTRICIAN: (TUNNEL WORK) CABLE SPLICER$67.16$19.09$86.25Agreement
ELECTRICIAN: (ALL OTHER WORK, INCLUDING 4 STORIES RESIDENTIAL) CABLE SPLICER$59.70$18.87$78.57Agreement
ELECTRICIAN: (TUNNEL WORK)$66.32$19.07$85.39Agreement
ELEC0569-004 · Electrical Workers (IBEW) agreement, June 3, 2024
ELECTRICIAN: SOUND & COMMUNICATIONS SOUND TECHNICIAN

SCOPE OF WORK: ASSEMBLY, INSTALLATION, OPERATION, SERVICE AND MAINTENANCE OF COMPONENTS OR SYSTEMS AS USED IN CLOSED CIRCUIT TELEVISION, AMPLIFIED MASTER TELEVISION DISTRIBUTION, CATV ON PRIVATE PROPERTY, INTERCOMMUNICATION, BURGLAR ALARM, FIRE ALARM, LIFE SUPPORT AND ALL SECURITY ALARMS, PRIVATE AND PUBLIC TELEPHONE AND RELATED TELEPHONE INTERCONNECT, PUBLIC ADDRESS, PAGING, AUDIO, LANGUAGE, ELECTRONIC, BACKGROUND MUSIC SYSTEM LESS THAN LINE VOLTAGE OR ANY SYSTEM ACCEPTABLE FOR CLASS TWO WIRING FOR PRIVATE, COMMERCIAL, OR INDUSTRIAL USE FURNISHED BY LEASED WIRE, FREUENCY MODULATION OR OTHER RECORDING DEVICES, ELECTRICAL APPARATUS BY MEANS OF WHICH ELECTRICITY IS APPLIED TO THE AMPLIFICATION, TRANSMISSION, TRANSFERENCE, RECORDING OR REPRODUCTION OF VOICE, MUSIC, SOUND, IMPULSES AND VIDEO. EXCLUDED FROM THIS SCOPE OF WORK - TRANSMISSION, SERVICE AND MAINTENANCE OF BACKGROUND MUSIC. ALL OF THE ABOVE SHALL INCLUDE THE INSTALLATION AND TRANSMISSION OVER FIBER OPTICS

$43.78$15.39$59.17Agreement
ELEC0569-005 · Electrical Workers (IBEW) agreement, June 3, 2024
SOUND & COMMUNICATIONS…
Full text

SOUND & COMMUNICATIONS: SOUND TECHNICIAN TERMINATING, OPERATING AND PERFORMING FINAL CHECK-OUT

SCOPE OF WORK: ASSEMBLY, INSTALLATION, OPERATION, SERVICE AND MAINTENANCE OF COMPONENTS OR SYSTEMS AS USED IN CLOSED CIRCUIT TELEVISION, AMPLIFIED MASTER TELEVISION DISTRIBUTION, CATV ON PRIVATE PROPERTY, INTERCOMMUNICATION, BURGLAR ALARM, FIRE ALARM, LIFE SUPPORT AND ALL SECURITY ALARMS, PRIVATE AND PUBLIC TELEPHONE AND RELATED TELEPHONE INTERCONNECT, PUBLIC ADDRESS, PAGING, AUDIO, LANGUAGE, ELECTRONIC, BACKGROUND MUSIC SYSTEM LESS THAN LINE VOLTAGE OR ANY SYSTEM ACCEPTABLE FOR CLASS TWO WIRING FOR PRIVATE, COMMERCIAL, OR INDUSTRIAL USE FURNISHED BY LEASED WIRE, FREUENCY MODULATION OR OTHER RECORDING DEVICES, ELECTRICAL APPARATUS BY MEANS OF WHICH ELECTRICITY IS APPLIED TO THE AMPLIFICATION, TRANSMISSION, TRANSFERENCE, RECORDING OR REPRODUCTION OF VOICE, MUSIC, SOUND, IMPULSES AND VIDEO. EXCLUDED FROM THIS SCOPE OF WORK - TRANSMISSION, SERVICE AND MAINTENANCE OF BACKGROUND MUSIC. ALL OF THE ABOVE SHALL INCLUDE THE INSTALLATION AND TRANSMISSION OVER FIBER OPTICS

$43.78$15.39$59.17Agreement
ELEC0569-006 · Electrical Workers (IBEW) agreement, June 2, 2025
TRAFFIC SIGNAL, STREET LIGHT AND UNDERGROUND WORK…
Full text

TRAFFIC SIGNAL, STREET LIGHT AND UNDERGROUND WORK: UTILITY TECHNICIAN #2 WORK ON STREET LIGHTING; TRAFFIC SIGNALS; AND UNDERGROUND SYSTEMS AND/OR ESTABLISHED EASEMENTS OUTSIDE OF BUILDINGS STREET LIGHT & TRAFFIC SIGNAL WORK: UTILITY TECHNICIAN #2: DISTRIBUTION OF MATERIAL AT JOBSITE, INSTALLATION OF UNDERGROUND DUCTS FOR ELECTRICAL, TELEPHONE, CABLE TV LAND COMMUNICATION SYSTEMS. THE SETTING, LEVELING, GROUNDING AND RACKING OF PRECAST MANHOLES, HANDHOLES AND TRANSFORMER PADS

$33.10$14.09$47.19Agreement
TRAFFIC SIGNAL, STREET LIGHT AND UNDERGROUND WORK…
Full text

TRAFFIC SIGNAL, STREET LIGHT AND UNDERGROUND WORK: UTILITY TECHNICIAN #1 WORK ON STREET LIGHTING; TRAFFIC SIGNALS; AND UNDERGROUND SYSTEMS AND/OR ESTABLISHED EASEMENTS OUTSIDE OF BUILDINGS STREET LIGHT & TRAFFIC SIGNAL WORK: UTILITY TECHNICIAN #1: INSTALLATION OF STREET LIGHTS AND TRAFFIC SIGNALS, INCLUDING ELECTRICAL CIRCUITRY, PROGRAMMABLE CONTROLLER, PEDESTAL-MOUNTED ELECTRICAL METER ENCLOSURES AND LAYING OF PRE-ASSEMBLED CABLE IN DUCTS. THE LAYOUT OF ELECTRICAL SYSTEMS AND COMMUNICATION INSTALLATION INCLUDING PROPER POSITION OF TRENCH DEPTHS, AND RADIUS AT DUCT BANKS, LOCATION FOR MANHOLES, STREET LIGHTS AND TRAFFIC SIGNALS

$43.62$14.41$58.03Agreement
ELEC0569-008 · Electrical Workers (IBEW) agreement, June 1, 2024
ELECTRICIAN (RESIDENTIAL, 1-3 STORIES)$40.50$8.18$48.68Agreement
ELEC1245-001 · Electrical Workers (IBEW) agreement, January 1, 2025
LINE CONSTRUCTION…
Full text

LINE CONSTRUCTION: (4) POWDERMAN HOLIDAYS: NEW YEAR'S DAY, M.L. KING DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS DAY, THANKSGIVING DAY AND DAY AFTER THANKSGIVING, CHRISTMAS DAY

$51.87$18.79$70.66Agreement
LINE CONSTRUCTION…
Full text

LINE CONSTRUCTION: (3) GROUNDMAN HOLIDAYS: NEW YEAR'S DAY, M.L. KING DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS DAY, THANKSGIVING DAY AND DAY AFTER THANKSGIVING, CHRISTMAS DAY

$40.76$21.76$62.52Agreement
LINE CONSTRUCTION…
Full text

LINE CONSTRUCTION: (2) EQUIPMENT SPECIALIST (OPERATES CRAWLER TRACTORS, COMMERCIAL MOTOR VEHICLES, BACKHOES, TRENCHERS, CRANES (50 TONS AND BELOW), OVERHEAD & UNDERGROUND DISTRIBUTION LINE EQUIPMENT) HOLIDAYS: NEW YEAR'S DAY, M.L. KING DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS DAY, THANKSGIVING DAY AND DAY AFTER THANKSGIVING, CHRISTMAS DAY

$53.30$22.26$75.56Agreement
LINE CONSTRUCTION…
Full text

LINE CONSTRUCTION: (1) LINEMAN; CABLE SPLICER HOLIDAYS: NEW YEAR'S DAY, M.L. KING DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS DAY, THANKSGIVING DAY AND DAY AFTER THANKSGIVING, CHRISTMAS DAY

$70.16$24.71$94.87Agreement
ELEV0018-001 · Elevator Constructors agreement, January 1, 2025
ELEVATOR MECHANIC

FOOTNOTE: A. PAID VACATION: EMPLOYER CONTRIBUTES 8% OF REGULAR HOURLY RATE AS VACATION PAY CREDIT FOR EMPLOYEES WITH MORE THAN 5 YEARS OF SERVICE, AND 6% FOR 6 MONTHS TO 5 YEARS OF SERVICE. B. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS' DAY, THANKSGIVING DAY, FRIDAY AFTER THANKSGIVING, AND CHRISTMAS DAY

$69.43$38.44$107.87Agreement
ENGI0012-004 · Operating Engineers agreement, August 1, 2025
OPERATOR: POWER EQUIPMENT: (6) BARGE MATE (DREDGING)$61.34$40.95$102.29Agreement
OPERATOR: POWER EQUIPMENT: (5) FIREMAN-OILER, DECKHAND, BARGEMAN, LEVEEHAND (DREDGING)$60.73$40.95$101.68Agreement
OPERATOR: POWER EQUIPMENT: (4) WINCH OPERATOR (STERN WINCH ON DREDGE) (DREDGING)$61.27$40.95$102.22Agreement
OPERATOR: POWER EQUIPMENT: (3) DECKMATE (DREDGING)$61.82$40.95$102.77Agreement
OPERATOR: POWER EQUIPMENT: (2) DREDGE DOZER (DREDGING)$61.93$40.95$102.88Agreement
OPERATOR: POWER EQUIPMENT: (1) LEVERMAN (DREDGING)$67.90$40.95$108.85Agreement
ENGI0012-024 · Operating Engineers agreement, July 1, 2025
OPERATOR: POWER EQUIPMENT, TUNNEL WORK: GROUP 7- Tunnel mole boring machine operator

PREMIUM PAY: $10.00 per hour shall be paid on all Power Equipment Operator work on the followng Military Bases: China Lake Naval Reserve, Vandenberg AFB, Point Arguello, Seely Naval Base, Fort Irwin, Nebo Annex Marine Base, Marine Corp Logistics Base Yermo, Edwards AFB, 29 Palms Marine Base and Camp Pendleton Workers required to suit up and work in a hazardous material environment: $2.00 per hour additional. Combination mixer and compressor operator on gunite work shall be classified as a concrete mobile mixer operator

$66.91$33.20$100.11Agreement
OPERATOR: POWER EQUIPMENT, TUNNEL WORK: GROUP 6- Heavy Duty Repairman

PREMIUM PAY: $10.00 per hour shall be paid on all Power Equipment Operator work on the followng Military Bases: China Lake Naval Reserve, Vandenberg AFB, Point Arguello, Seely Naval Base, Fort Irwin, Nebo Annex Marine Base, Marine Corp Logistics Base Yermo, Edwards AFB, 29 Palms Marine Base and Camp Pendleton Workers required to suit up and work in a hazardous material environment: $2.00 per hour additional. Combination mixer and compressor operator on gunite work shall be classified as a concrete mobile mixer operator

$66.79$33.20$99.99Agreement
OPERATOR: POWER EQUIPMENT, TUNNEL WORK: GROUP 5…
Full text

OPERATOR: POWER EQUIPMENT, TUNNEL WORK: GROUP 5- Backhoe operator (up to and including 3/4 yd.); Small Ford, Case or similar; Drill doctor; Grouting machine operator; Heading shield operator; Heavy-duty repairperson; Loader operator (Athey, Euclid, Sierra and similar types); Mucking machine operator (1/4 yd., rubber-tired, rail or track type); Pneumatic concrete placing machine operator (Hackley-Presswell or similar type); Pneumatic heading shield (tunnel); Pumpcrete gun operator; Tractor compressor drill combination operator; Tugger hoist operator (2 drum); Tunnel locomotive operator (over 30 tons)

PREMIUM PAY: $10.00 per hour shall be paid on all Power Equipment Operator work on the followng Military Bases: China Lake Naval Reserve, Vandenberg AFB, Point Arguello, Seely Naval Base, Fort Irwin, Nebo Annex Marine Base, Marine Corp Logistics Base Yermo, Edwards AFB, 29 Palms Marine Base and Camp Pendleton Workers required to suit up and work in a hazardous material environment: $2.00 per hour additional. Combination mixer and compressor operator on gunite work shall be classified as a concrete mobile mixer operator

$66.68$33.20$99.88Agreement
OPERATOR: POWER EQUIPMENT, TUNNEL WORK: GROUP 4…
Full text

OPERATOR: POWER EQUIPMENT, TUNNEL WORK: GROUP 4- Bit sharpener; Equipment greaser (grease truck); Slip form pump operator (power-driven hydraulic lifting device for concrete forms); Tugger hoist operator (1 drum); Tunnel locomotive operator (over 10 and up to and including 30 tons)

PREMIUM PAY: $10.00 per hour shall be paid on all Power Equipment Operator work on the followng Military Bases: China Lake Naval Reserve, Vandenberg AFB, Point Arguello, Seely Naval Base, Fort Irwin, Nebo Annex Marine Base, Marine Corp Logistics Base Yermo, Edwards AFB, 29 Palms Marine Base and Camp Pendleton Workers required to suit up and work in a hazardous material environment: $2.00 per hour additional. Combination mixer and compressor operator on gunite work shall be classified as a concrete mobile mixer operator

$66.46$33.20$99.66Agreement
OPERATOR: POWER EQUIPMENT, TUNNEL WORK: GROUP 3…
Full text

OPERATOR: POWER EQUIPMENT, TUNNEL WORK: GROUP 3- Dinkey locomotive or motorperson (up to and including 10 tons)

PREMIUM PAY: $10.00 per hour shall be paid on all Power Equipment Operator work on the followng Military Bases: China Lake Naval Reserve, Vandenberg AFB, Point Arguello, Seely Naval Base, Fort Irwin, Nebo Annex Marine Base, Marine Corp Logistics Base Yermo, Edwards AFB, 29 Palms Marine Base and Camp Pendleton Workers required to suit up and work in a hazardous material environment: $2.00 per hour additional. Combination mixer and compressor operator on gunite work shall be classified as a concrete mobile mixer operator

$66.32$33.20$99.52Agreement
OPERATOR: POWER EQUIPMENT, TUNNEL WORK: GROUP 2- Power-driven jumbo form setter operator

PREMIUM PAY: $10.00 per hour shall be paid on all Power Equipment Operator work on the followng Military Bases: China Lake Naval Reserve, Vandenberg AFB, Point Arguello, Seely Naval Base, Fort Irwin, Nebo Annex Marine Base, Marine Corp Logistics Base Yermo, Edwards AFB, 29 Palms Marine Base and Camp Pendleton Workers required to suit up and work in a hazardous material environment: $2.00 per hour additional. Combination mixer and compressor operator on gunite work shall be classified as a concrete mobile mixer operator

$66.03$33.20$99.23Agreement
OPERATOR: POWER EQUIPMENT, TUNNEL WORK: GROUP 1…
Full text

OPERATOR: POWER EQUIPMENT, TUNNEL WORK: GROUP 1- Skiploader (wheel type up to 3/4 yd. without attachment)

PREMIUM PAY: $10.00 per hour shall be paid on all Power Equipment Operator work on the followng Military Bases: China Lake Naval Reserve, Vandenberg AFB, Point Arguello, Seely Naval Base, Fort Irwin, Nebo Annex Marine Base, Marine Corp Logistics Base Yermo, Edwards AFB, 29 Palms Marine Base and Camp Pendleton Workers required to suit up and work in a hazardous material environment: $2.00 per hour additional. Combination mixer and compressor operator on gunite work shall be classified as a concrete mobile mixer operator

$65.25$33.20$98.45Agreement
OPERATOR: POWER EQUIPMENT, CRANES, PILEDRIVING & HOISTING: GROUP 13…
Full text

OPERATOR: POWER EQUIPMENT, CRANES, PILEDRIVING & HOISTING: GROUP 13- Crane operator (over 300 tons); Derrick barge operator (over 300 tons); Helicopter pilot; Hoist operator, stiff legs, Guy derrick or similar type (over 300 tons); Mobile tower crane operator (over 300 tons)

$70.75$33.20$103.95Agreement
OPERATOR: POWER EQUIPMENT, CRANES, PILEDRIVING & HOISTING: GROUP 12…
Full text

OPERATOR: POWER EQUIPMENT, CRANES, PILEDRIVING & HOISTING: GROUP 12- Crane operator (over 200 tons up to and including 300 tons mrc); Derrick barge operator (over 200 tons up to and including 300 tons mrc); Hoist operator, stiff legs, Guy derrick or similar type (over 200 tons, up to and including 300 tons mrc); Mobile tower crane operator (over 200 tons, up to and including 300 tons mrc)

PREMIUM PAY: $10.00 PER HOUR SHALL BE PAID ON ALL POWER EQUIPMENT OPERATOR WORK ON THE FOLLOWNG MILITARY BASES: CHINA LAKE NAVAL RESERVE, VANDENBERG AFB, POINT ARGUELLO, SEELY NAVAL BASE, FORT IRWIN, NEBO ANNEX MARINE BASE, MARINE CORP LOGISTICS BASE YERMO, EDWARDS AFB, 29 PALMS MARINE BASE AND CAMP PENDLETON WORKERS REQUIRED TO SUIT UP AND WORK IN A HAZARDOUS MATERIAL ENVIRONMENT: $2.00 PER HOUR ADDITIONAL. COMBINATION MIXER AND COMPRESSOR OPERATOR ON GUNITE WORK SHALL BE CLASSIFIED AS A CONCRETE MOBILE MIXER OPERATOR

$69.75$33.20$102.95Agreement
OPERATOR: POWER EQUIPMENT, CRANES, PILEDRIVING & HOISTING: GROUP 11…
Full text

OPERATOR: POWER EQUIPMENT, CRANES, PILEDRIVING & HOISTING: GROUP 11- Crane operator (over 100 tons and up to and including 200 tons mrc); Derrick barge operator (over 100 tons up to and including 200 tons mrc); Hoist operator, stiff legs, Guy derrick or similar type (over 100 tons up to and including 200 tons mrc); Mobile tower crane operator (over 100 tons up to and including 200 tons mrc) ; Tower crane operator and tower gantry

PREMIUM PAY: $10.00 PER HOUR SHALL BE PAID ON ALL POWER EQUIPMENT OPERATOR WORK ON THE FOLLOWNG MILITARY BASES: CHINA LAKE NAVAL RESERVE, VANDENBERG AFB, POINT ARGUELLO, SEELY NAVAL BASE, FORT IRWIN, NEBO ANNEX MARINE BASE, MARINE CORP LOGISTICS BASE YERMO, EDWARDS AFB, 29 PALMS MARINE BASE AND CAMP PENDLETON WORKERS REQUIRED TO SUIT UP AND WORK IN A HAZARDOUS MATERIAL ENVIRONMENT: $2.00 PER HOUR ADDITIONAL. COMBINATION MIXER AND COMPRESSOR OPERATOR ON GUNITE WORK SHALL BE CLASSIFIED AS A CONCRETE MOBILE MIXER OPERATOR

$68.75$33.20$101.95Agreement
OPERATOR: POWER EQUIPMENT, CRANES, PILEDRIVING & HOISTING: GROUP 10…
Full text

OPERATOR: POWER EQUIPMENT, CRANES, PILEDRIVING & HOISTING: GROUP 10- Crane operator (over 50 tons and up to and including 100 tons mrc); Derrick barge operator (over 50 tons up to and including 100 tons mrc); Hoist operator, stiff legs, Guy derrick or similar type (over 50 tons up to and including 100 tons mrc), Mobile tower crane operator (over 50 tons, up to and including 100 tons M.R.C.)

PREMIUM PAY: $10.00 PER HOUR SHALL BE PAID ON ALL POWER EQUIPMENT OPERATOR WORK ON THE FOLLOWNG MILITARY BASES: CHINA LAKE NAVAL RESERVE, VANDENBERG AFB, POINT ARGUELLO, SEELY NAVAL BASE, FORT IRWIN, NEBO ANNEX MARINE BASE, MARINE CORP LOGISTICS BASE YERMO, EDWARDS AFB, 29 PALMS MARINE BASE AND CAMP PENDLETON WORKERS REQUIRED TO SUIT UP AND WORK IN A HAZARDOUS MATERIAL ENVIRONMENT: $2.00 PER HOUR ADDITIONAL. COMBINATION MIXER AND COMPRESSOR OPERATOR ON GUNITE WORK SHALL BE CLASSIFIED AS A CONCRETE MOBILE MIXER OPERATOR

$67.75$33.20$100.95Agreement
OPERATOR: POWER EQUIPMENT, CRANES, PILEDRIVING & HOISTING: GROUP 9…
Full text

OPERATOR: POWER EQUIPMENT, CRANES, PILEDRIVING & HOISTING: GROUP 9- Crane operator (over 25 tons and up to and including 50 tons mrc); Derrick barge operator (over 25 tons up to and including 50 tons mrc); Highline cableway operator; Hoist operator, stiff legs, Guy derrick or similar type (over 25 tons up to and including 50 tons mrc); K-crane operator; Polar crane operator; Self erecting tower crane operator maximum lifting capacity ten tons

PREMIUM PAY: $10.00 PER HOUR SHALL BE PAID ON ALL POWER EQUIPMENT OPERATOR WORK ON THE FOLLOWNG MILITARY BASES: CHINA LAKE NAVAL RESERVE, VANDENBERG AFB, POINT ARGUELLO, SEELY NAVAL BASE, FORT IRWIN, NEBO ANNEX MARINE BASE, MARINE CORP LOGISTICS BASE YERMO, EDWARDS AFB, 29 PALMS MARINE BASE AND CAMP PENDLETON WORKERS REQUIRED TO SUIT UP AND WORK IN A HAZARDOUS MATERIAL ENVIRONMENT: $2.00 PER HOUR ADDITIONAL. COMBINATION MIXER AND COMPRESSOR OPERATOR ON GUNITE WORK SHALL BE CLASSIFIED AS A CONCRETE MOBILE MIXER OPERATOR

$66.75$33.20$99.95Agreement
OPERATOR: POWER EQUIPMENT, CRANES, PILEDRIVING & HOISTING: GROUP 8…
Full text

OPERATOR: POWER EQUIPMENT, CRANES, PILEDRIVING & HOISTING: GROUP 8- Crane operator (up to and including 25 ton capacity); Crawler transporter operator; Derrick barge operator (up to and including 25 ton capacity); Hoist operator, stiff legs, Guy derrick or similar type (up to and including 25 ton capacity); Shovel, backhoe, dragline, clamshell operator (over 7 cu. yds., M.R.C.)

PREMIUM PAY: $10.00 PER HOUR SHALL BE PAID ON ALL POWER EQUIPMENT OPERATOR WORK ON THE FOLLOWNG MILITARY BASES: CHINA LAKE NAVAL RESERVE, VANDENBERG AFB, POINT ARGUELLO, SEELY NAVAL BASE, FORT IRWIN, NEBO ANNEX MARINE BASE, MARINE CORP LOGISTICS BASE YERMO, EDWARDS AFB, 29 PALMS MARINE BASE AND CAMP PENDLETON WORKERS REQUIRED TO SUIT UP AND WORK IN A HAZARDOUS MATERIAL ENVIRONMENT: $2.00 PER HOUR ADDITIONAL. COMBINATION MIXER AND COMPRESSOR OPERATOR ON GUNITE WORK SHALL BE CLASSIFIED AS A CONCRETE MOBILE MIXER OPERATOR

$66.58$33.20$99.78Agreement
OPERATOR: POWER EQUIPMENT, CRANES, PILEDRIVING & HOISTING: GROUP 7…
Full text

OPERATOR: POWER EQUIPMENT, CRANES, PILEDRIVING & HOISTING: GROUP 7- PEDESTAL CRANE OPERATOR; SHOVEL, BACKHOE, DRAGLINE, CLAMSHELL OPERATOR (OVER 5 CU. YDS. MRC); TOWER CRANE REPAIR; TUGGER HOIST OPERATOR (3 DRUM)

PREMIUM PAY: $10.00 PER HOUR SHALL BE PAID ON ALL POWER EQUIPMENT OPERATOR WORK ON THE FOLLOWNG MILITARY BASES: CHINA LAKE NAVAL RESERVE, VANDENBERG AFB, POINT ARGUELLO, SEELY NAVAL BASE, FORT IRWIN, NEBO ANNEX MARINE BASE, MARINE CORP LOGISTICS BASE YERMO, EDWARDS AFB, 29 PALMS MARINE BASE AND CAMP PENDLETON WORKERS REQUIRED TO SUIT UP AND WORK IN A HAZARDOUS MATERIAL ENVIRONMENT: $2.00 PER HOUR ADDITIONAL. COMBINATION MIXER AND COMPRESSOR OPERATOR ON GUNITE WORK SHALL BE CLASSIFIED AS A CONCRETE MOBILE MIXER OPERATOR

$66.41$33.20$99.61Agreement
OPERATOR: POWER EQUIPMENT, CRANES, PILEDRIVING & HOISTING: GROUP 6…
Full text

OPERATOR: POWER EQUIPMENT, CRANES, PILEDRIVING & HOISTING: GROUP 6- Bridge crane operator; Cretor crane operator; Hoist operator (Chicago boom and similar type); Lift mobile operator; Lift slab machine operator (Vagtborg and similar types); Material hoist and/or manlift operator; Polar gantry crane operator; Self Climbing scaffold (or similar type); Shovel, backhoe, dragline, clamshell operator (over 3/4 yd. and up to 5 cu. yds. mrc); Tugger hoist operator

PREMIUM PAY: $10.00 PER HOUR SHALL BE PAID ON ALL POWER EQUIPMENT OPERATOR WORK ON THE FOLLOWNG MILITARY BASES: CHINA LAKE NAVAL RESERVE, VANDENBERG AFB, POINT ARGUELLO, SEELY NAVAL BASE, FORT IRWIN, NEBO ANNEX MARINE BASE, MARINE CORP LOGISTICS BASE YERMO, EDWARDS AFB, 29 PALMS MARINE BASE AND CAMP PENDLETON WORKERS REQUIRED TO SUIT UP AND WORK IN A HAZARDOUS MATERIAL ENVIRONMENT: $2.00 PER HOUR ADDITIONAL. COMBINATION MIXER AND COMPRESSOR OPERATOR ON GUNITE WORK SHALL BE CLASSIFIED AS A CONCRETE MOBILE MIXER OPERATOR

$66.29$33.20$99.49Agreement
OPERATOR: POWER EQUIPMENT, CRANES, PILEDRIVING & HOISTING: GROUP 5…
Full text

OPERATOR: POWER EQUIPMENT, CRANES, PILEDRIVING & HOISTING: GROUP 5- HYDRAULIC BOOM TRUCK; STINGER CRANE (AUSTIN-WESTERN OR SIMILAR TYPE); TUGGER HOIST OPERATOR (1 DRUM)

PREMIUM PAY: $10.00 PER HOUR SHALL BE PAID ON ALL POWER EQUIPMENT OPERATOR WORK ON THE FOLLOWNG MILITARY BASES: CHINA LAKE NAVAL RESERVE, VANDENBERG AFB, POINT ARGUELLO, SEELY NAVAL BASE, FORT IRWIN, NEBO ANNEX MARINE BASE, MARINE CORP LOGISTICS BASE YERMO, EDWARDS AFB, 29 PALMS MARINE BASE AND CAMP PENDLETON WORKERS REQUIRED TO SUIT UP AND WORK IN A HAZARDOUS MATERIAL ENVIRONMENT: $2.00 PER HOUR ADDITIONAL. COMBINATION MIXER AND COMPRESSOR OPERATOR ON GUNITE WORK SHALL BE CLASSIFIED AS A CONCRETE MOBILE MIXER OPERATOR

$66.18$33.20$99.38Agreement
OPERATOR: POWER EQUIPMENT, CRANES, PILEDRIVING & HOISTING: GROUP 4…
Full text

OPERATOR: POWER EQUIPMENT, CRANES, PILEDRIVING & HOISTING: GROUP 4- Bridge-type unloader and turntable operator; Helicopter hoist operator

PREMIUM PAY: $10.00 PER HOUR SHALL BE PAID ON ALL POWER EQUIPMENT OPERATOR WORK ON THE FOLLOWNG MILITARY BASES: CHINA LAKE NAVAL RESERVE, VANDENBERG AFB, POINT ARGUELLO, SEELY NAVAL BASE, FORT IRWIN, NEBO ANNEX MARINE BASE, MARINE CORP LOGISTICS BASE YERMO, EDWARDS AFB, 29 PALMS MARINE BASE AND CAMP PENDLETON WORKERS REQUIRED TO SUIT UP AND WORK IN A HAZARDOUS MATERIAL ENVIRONMENT: $2.00 PER HOUR ADDITIONAL. COMBINATION MIXER AND COMPRESSOR OPERATOR ON GUNITE WORK SHALL BE CLASSIFIED AS A CONCRETE MOBILE MIXER OPERATOR

$65.96$33.20$99.16Agreement
OPERATOR: POWER EQUIPMENT, CRANES, PILEDRIVING & HOISTING: GROUP 3…
Full text

OPERATOR: POWER EQUIPMENT, CRANES, PILEDRIVING & HOISTING: GROUP 3- A-frame or winch truck operator; Ross carrier operator (jobsite)

PREMIUM PAY: $10.00 PER HOUR SHALL BE PAID ON ALL POWER EQUIPMENT OPERATOR WORK ON THE FOLLOWNG MILITARY BASES: CHINA LAKE NAVAL RESERVE, VANDENBERG AFB, POINT ARGUELLO, SEELY NAVAL BASE, FORT IRWIN, NEBO ANNEX MARINE BASE, MARINE CORP LOGISTICS BASE YERMO, EDWARDS AFB, 29 PALMS MARINE BASE AND CAMP PENDLETON WORKERS REQUIRED TO SUIT UP AND WORK IN A HAZARDOUS MATERIAL ENVIRONMENT: $2.00 PER HOUR ADDITIONAL. COMBINATION MIXER AND COMPRESSOR OPERATOR ON GUNITE WORK SHALL BE CLASSIFIED AS A CONCRETE MOBILE MIXER OPERATOR

$65.82$33.20$99.02Agreement
OPERATOR: POWER EQUIPMENT, CRANES, PILEDRIVING & HOISTING: GROUP 2- Truck crane oiler

PREMIUM PAY: $10.00 PER HOUR SHALL BE PAID ON ALL POWER EQUIPMENT OPERATOR WORK ON THE FOLLOWNG MILITARY BASES: CHINA LAKE NAVAL RESERVE, VANDENBERG AFB, POINT ARGUELLO, SEELY NAVAL BASE, FORT IRWIN, NEBO ANNEX MARINE BASE, MARINE CORP LOGISTICS BASE YERMO, EDWARDS AFB, 29 PALMS MARINE BASE AND CAMP PENDLETON WORKERS REQUIRED TO SUIT UP AND WORK IN A HAZARDOUS MATERIAL ENVIRONMENT: $2.00 PER HOUR ADDITIONAL. COMBINATION MIXER AND COMPRESSOR OPERATOR ON GUNITE WORK SHALL BE CLASSIFIED AS A CONCRETE MOBILE MIXER OPERATOR

$65.53$33.20$98.73Agreement
OPERATOR: POWER EQUIPMENT, CRANES, PILEDRIVING & HOISTING: GROUP 1…
Full text

OPERATOR: POWER EQUIPMENT, CRANES, PILEDRIVING & HOISTING: GROUP 1- Engineer oiler; Fork lift operator (includes loed, lull or similar types)

PREMIUM PAY: $10.00 PER HOUR SHALL BE PAID ON ALL POWER EQUIPMENT OPERATOR WORK ON THE FOLLOWNG MILITARY BASES: CHINA LAKE NAVAL RESERVE, VANDENBERG AFB, POINT ARGUELLO, SEELY NAVAL BASE, FORT IRWIN, NEBO ANNEX MARINE BASE, MARINE CORP LOGISTICS BASE YERMO, EDWARDS AFB, 29 PALMS MARINE BASE AND CAMP PENDLETON WORKERS REQUIRED TO SUIT UP AND WORK IN A HAZARDOUS MATERIAL ENVIRONMENT: $2.00 PER HOUR ADDITIONAL. COMBINATION MIXER AND COMPRESSOR OPERATOR ON GUNITE WORK SHALL BE CLASSIFIED AS A CONCRETE MOBILE MIXER OPERATOR.

$64.75$33.20$97.95Agreement
OPERATOR: POWER EQUIPMENT, ALL OTHER WORK: GROUP 25…
Full text

OPERATOR: POWER EQUIPMENT, ALL OTHER WORK: GROUP 25- CONCRETE PUMP OPERATOR-TRUCK MOUNTED; RUBBER-TIRED EARTH-MOVING EQUIPMENT OPERATOR, OPERATING EQUIPMENT WITH THE TANDEM PUSH-PULL SYSTEM (MULTIPLE ENGINE, EUCLID, CATERPILLAR AND SIMILAR TYPE, OVER 50 CU. YDS. STRUCK); SPYDER EXCAVATOR OPERATOR, WITH ALL ATTACHMENTS

PREMIUM PAY: $10.00 PER HOUR SHALL BE PAID ON ALL POWER EQUIPMENT OPERATOR WORK ON THE FOLLOWNG MILITARY BASES: CHINA LAKE NAVAL RESERVE, VANDENBERG AFB, POINT ARGUELLO, SEELY NAVAL BASE, FORT IRWIN, NEBO ANNEX MARINE BASE, MARINE CORP LOGISTICS BASE YERMO, EDWARDS AFB, 29 PALMS MARINE BASE AND CAMP PENDLETON WORKERS REQUIRED TO SUIT UP AND WORK IN A HAZARDOUS MATERIAL ENVIRONMENT: $2.00 PER HOUR ADDITIONAL. COMBINATION MIXER AND COMPRESSOR OPERATOR ON GUNITE WORK SHALL BE CLASSIFIED AS A CONCRETE MOBILE MIXER OPERATOR. $ 68.08 33.20 OPERATOR: POWER EQUIPMENT, ALL OTHER WORK: GROUP 24- RUBBER-TIRED EARTH-MOVING EQUIPMENT OPERATOR, OPERATING EQUIPMENT WITH THE TANDEM PUSH-PULL SYSTEM (SINGLE ENGINE, OVER 50 YDS. STRUCK); RUBBER-TIRED EARTH-MOVING EQUIPMENT OPERATOR, OPERATING EQUIPMENT WITH THE TANDEM PUSH-PULL SYSTEM (MULTIPLE ENGINE, EUCLID, CATERPILLAR AND SIMILAR, OVER 25 YDS. AND UP TO 50 YDS. STRUCK) PREMIUM PAY: $10.00 PER HOUR SHALL BE PAID ON ALL POWER EQUIPMENT OPERATOR WORK ON THE FOLLOWNG MILITARY BASES: CHINA LAKE NAVAL RESERVE, VANDENBERG AFB, POINT ARGUELLO, SEELY NAVAL BASE, FORT IRWIN, NEBO ANNEX MARINE BASE, MARINE CORP LOGISTICS BASE YERMO, EDWARDS AFB, 29 PALMS MARINE BASE AND CAMP PENDLETON WORKERS REQUIRED TO SUIT UP AND WORK IN A HAZARDOUS MATERIAL ENVIRONMENT: $2.00 PER HOUR ADDITIONAL. COMBINATION MIXER AND COMPRESSOR OPERATOR ON GUNITE WORK SHALL BE CLASSIFIED AS A CONCRETE MOBILE MIXER OPERATOR

$67.91$33.20$101.11Agreement
OPERATOR: POWER EQUIPMENT, ALL OTHER WORK: GROUP 23…
Full text

OPERATOR: POWER EQUIPMENT, ALL OTHER WORK: GROUP 23- RUBBER-TIRED EARTH-MOVING EQUIPMENT OPERATOR, OPERATING EQUIPMENT WITH THE TANDEM PUSH-PULL SYSTEM (SINGLE ENGINE, CATERPILLAR, EUCLID, ATHEY WAGON AND SIMILAR TYPES WITH ANY AND ALL ATTACHMENTS OVER 25 YDS. AND UP TO AND INCLUDING 50 YDS. STRUCK); RUBBER-TIRED EARTH-MOVING EQUIPMENT OPERATOR, OPERATING WITH THE TANDEM PUSH-PULL SYSTEM (MULTIPLE ENGINE, UP TO AND INCLUDING 25 YDS. STRUCK)

PREMIUM PAY: $10.00 PER HOUR SHALL BE PAID ON ALL POWER EQUIPMENT OPERATOR WORK ON THE FOLLOWNG MILITARY BASES: CHINA LAKE NAVAL RESERVE, VANDENBERG AFB, POINT ARGUELLO, SEELY NAVAL BASE, FORT IRWIN, NEBO ANNEX MARINE BASE, MARINE CORP LOGISTICS BASE YERMO, EDWARDS AFB, 29 PALMS MARINE BASE AND CAMP PENDLETON WORKERS REQUIRED TO SUIT UP AND WORK IN A HAZARDOUS MATERIAL ENVIRONMENT: $2.00 PER HOUR ADDITIONAL. COMBINATION MIXER AND COMPRESSOR OPERATOR ON GUNITE WORK SHALL BE CLASSIFIED AS A CONCRETE MOBILE MIXER OPERATOR

$67.79$33.20$100.99Agreement
OPERATOR: POWER EQUIPMENT, ALL OTHER WORK: GROUP 22…
Full text

OPERATOR: POWER EQUIPMENT, ALL OTHER WORK: GROUP 22- RUBBER-TIRED EARTH-MOVING EQUIPMENT OPERATOR, OPERATING EQUIPMENT WITH THE TANDEM PUSH-PULL SYSTEM (SINGLE ENGINE, UP TO AND INCLUDING 25 YDS. STRUCK)

PREMIUM PAY: $10.00 PER HOUR SHALL BE PAID ON ALL POWER EQUIPMENT OPERATOR WORK ON THE FOLLOWNG MILITARY BASES: CHINA LAKE NAVAL RESERVE, VANDENBERG AFB, POINT ARGUELLO, SEELY NAVAL BASE, FORT IRWIN, NEBO ANNEX MARINE BASE, MARINE CORP LOGISTICS BASE YERMO, EDWARDS AFB, 29 PALMS MARINE BASE AND CAMP PENDLETON WORKERS REQUIRED TO SUIT UP AND WORK IN A HAZARDOUS MATERIAL ENVIRONMENT: $2.00 PER HOUR ADDITIONAL. COMBINATION MIXER AND COMPRESSOR OPERATOR ON GUNITE WORK SHALL BE CLASSIFIED AS A CONCRETE MOBILE MIXER OPERATOR

$67.68$33.20$100.88Agreement
OPERATOR: POWER EQUIPMENT, ALL OTHER WORK: GROUP 21…
Full text

OPERATOR: POWER EQUIPMENT, ALL OTHER WORK: GROUP 21- RUBBER-TIRED EARTH-MOVING EQUIPMENT OPERATOR, OPERATING IN TANDEM (SCRAPERS, BELLY DUMPS AND SIMILAR TYPES IN ANY COMBINATION, EXCLUDING COMPACTION UNITS - MULTIPLE ENGINE, EUCLID, CATERPILLAR AND SIMILAR TYPE, OVER 50 CU. YDS. STRUCK)

PREMIUM PAY: $10.00 PER HOUR SHALL BE PAID ON ALL POWER EQUIPMENT OPERATOR WORK ON THE FOLLOWNG MILITARY BASES: CHINA LAKE NAVAL RESERVE, VANDENBERG AFB, POINT ARGUELLO, SEELY NAVAL BASE, FORT IRWIN, NEBO ANNEX MARINE BASE, MARINE CORP LOGISTICS BASE YERMO, EDWARDS AFB, 29 PALMS MARINE BASE AND CAMP PENDLETON WORKERS REQUIRED TO SUIT UP AND WORK IN A HAZARDOUS MATERIAL ENVIRONMENT: $2.00 PER HOUR ADDITIONAL. COMBINATION MIXER AND COMPRESSOR OPERATOR ON GUNITE WORK SHALL BE CLASSIFIED AS A CONCRETE MOBILE MIXER OPERATOR

$67.58$33.20$100.78Agreement
OPERATOR: POWER EQUIPMENT, ALL OTHER WORK: GROUP 20…
Full text

OPERATOR: POWER EQUIPMENT, ALL OTHER WORK: GROUP 20- RUBBER-TIRED EARTH-MOVING EQUIPMENT OPERATOR, OPERATING IN TANDEM (SCRAPERS, BELLY DUMPS AND SIMILAR TYPES IN ANY COMBINATION, EXCLUDING COMPACTION UNITS - SINGLE ENGINE, OVER 50 YDS. STRUCK); RUBBER-TIRED EARTH-MOVING EQUIPMENT OPERATOR, OPERATING IN TANDEM (SCRAPERS, BELLY DUMPS, AND SIMILAR TYPES IN ANY COMBINATION, EXCLUDING COMPACTION UNITS - MULTIPLE ENGINE, EUCLID, CATERPILLAR AND SIMILAR, OVER 25 YDS. AND UP TO 50 YDS. STRUCK)

PREMIUM PAY: $10.00 PER HOUR SHALL BE PAID ON ALL POWER EQUIPMENT OPERATOR WORK ON THE FOLLOWNG MILITARY BASES: CHINA LAKE NAVAL RESERVE, VANDENBERG AFB, POINT ARGUELLO, SEELY NAVAL BASE, FORT IRWIN, NEBO ANNEX MARINE BASE, MARINE CORP LOGISTICS BASE YERMO, EDWARDS AFB, 29 PALMS MARINE BASE AND CAMP PENDLETON WORKERS REQUIRED TO SUIT UP AND WORK IN A HAZARDOUS MATERIAL ENVIRONMENT: $2.00 PER HOUR ADDITIONAL. COMBINATION MIXER AND COMPRESSOR OPERATOR ON GUNITE WORK SHALL BE CLASSIFIED AS A CONCRETE MOBILE MIXER OPERATOR

$67.41$33.20$100.61Agreement
OPERATOR: POWER EQUIPMENT, ALL OTHER WORK: GROUP 19…
Full text

OPERATOR: POWER EQUIPMENT, ALL OTHER WORK: GROUP 19- ROTEX CONCRETE BELT OPERATOR (OR SIMILAR TYPES); RUBBER-TIRED EARTH-MOVING EQUIPMENT OPERATOR, OPERATING IN TANDEM (SCRAPERS, BELLY DUMPS AND SIMILAR TYPES IN ANY COMBINATION, EXCLUDING COMPACTION UNITS - SINGLE ENGINE, CATERPILLAR, EUCLID, ATHEY WAGON AND SIMILAR TYPES WITH ANY AND ALL ATTACHMENTS OVER 25 YDS.AND UP TO AND INCLUDING 50 CU. YDS. STRUCK); RUBBER-TIRED EARTH-MOVING EQUIPMENT OPERATOR, OPERATING IN TANDEM (SCRAPERS, BELLY DUMPS AND SIMILAR TYPES IN ANY COMBINATION, EXCLUDING COMPACTION UNITS - MULTIPLE ENGINE, UP TO AND INCLUDING 25 YDS. STRUCK)

PREMIUM PAY: $10.00 PER HOUR SHALL BE PAID ON ALL POWER EQUIPMENT OPERATOR WORK ON THE FOLLOWNG MILITARY BASES: CHINA LAKE NAVAL RESERVE, VANDENBERG AFB, POINT ARGUELLO, SEELY NAVAL BASE, FORT IRWIN, NEBO ANNEX MARINE BASE, MARINE CORP LOGISTICS BASE YERMO, EDWARDS AFB, 29 PALMS MARINE BASE AND CAMP PENDLETON WORKERS REQUIRED TO SUIT UP AND WORK IN A HAZARDOUS MATERIAL ENVIRONMENT: $2.00 PER HOUR ADDITIONAL. COMBINATION MIXER AND COMPRESSOR OPERATOR ON GUNITE WORK SHALL BE CLASSIFIED AS A CONCRETE MOBILE MIXER OPERATOR

$67.29$33.20$100.49Agreement
OPERATOR: POWER EQUIPMENT, ALL OTHER WORK: GROUP 18…
Full text

OPERATOR: POWER EQUIPMENT, ALL OTHER WORK: GROUP 18- RUBBER-TIRED EARTH-MOVING EQUIPMENT OPERATOR, OPERATING IN TANDEM (SCRAPERS, BELLY DUMPS AND SIMILAR TYPES IN ANY COMBINATION, EXCLUDING COMPACTION UNITS - SINGLE ENGINE, UP TO AND INCLUDING 25 YDS. STRUCK)

PREMIUM PAY: $10.00 PER HOUR SHALL BE PAID ON ALL POWER EQUIPMENT OPERATOR WORK ON THE FOLLOWNG MILITARY BASES: CHINA LAKE NAVAL RESERVE, VANDENBERG AFB, POINT ARGUELLO, SEELY NAVAL BASE, FORT IRWIN, NEBO ANNEX MARINE BASE, MARINE CORP LOGISTICS BASE YERMO, EDWARDS AFB, 29 PALMS MARINE BASE AND CAMP PENDLETON WORKERS REQUIRED TO SUIT UP AND WORK IN A HAZARDOUS MATERIAL ENVIRONMENT: $2.00 PER HOUR ADDITIONAL. COMBINATION MIXER AND COMPRESSOR OPERATOR ON GUNITE WORK SHALL BE CLASSIFIED AS A CONCRETE MOBILE MIXER OPERATOR

$67.18$33.20$100.38Agreement
OPERATOR: POWER EQUIPMENT, ALL OTHER WORK: GROUP 17…
Full text

OPERATOR: POWER EQUIPMENT, ALL OTHER WORK: GROUP 17- RUBBER-TIRED EARTH-MOVING EQUIPMENT OPERATOR, OPERATING EQUIPMENT WITH PUSH-PULL SYSTEM (MULTIPLE ENGINE, EUCLID, CATERPILLAR AND SIMILAR, OVER 50 CU. YDS. STRUCK); TANDEM TRACTOR OPERATOR (OPERATING CRAWLER TYPE TRACTORS IN TANDEM - QUAD 9 AND SIMILAR TYPE)

PREMIUM PAY: $10.00 PER HOUR SHALL BE PAID ON ALL POWER EQUIPMENT OPERATOR WORK ON THE FOLLOWNG MILITARY BASES: CHINA LAKE NAVAL RESERVE, VANDENBERG AFB, POINT ARGUELLO, SEELY NAVAL BASE, FORT IRWIN, NEBO ANNEX MARINE BASE, MARINE CORP LOGISTICS BASE YERMO, EDWARDS AFB, 29 PALMS MARINE BASE AND CAMP PENDLETON WORKERS REQUIRED TO SUIT UP AND WORK IN A HAZARDOUS MATERIAL ENVIRONMENT: $2.00 PER HOUR ADDITIONAL. COMBINATION MIXER AND COMPRESSOR OPERATOR ON GUNITE WORK SHALL BE CLASSIFIED AS A CONCRETE MOBILE MIXER OPERATOR

$67.08$33.20$100.28Agreement
OPERATOR: POWER EQUIPMENT, ALL OTHER WORK: GROUP 16…
Full text

OPERATOR: POWER EQUIPMENT, ALL OTHER WORK: GROUP 16- RUBBER-TIRED EARTH-MOVING EQUIPMENT OPERATOR, OPERATING EQUIPMENT WITH PUSH-PULL SYSTEM (SINGLE ENGINE, OVER 50 YDS. STRUCK); RUBBER-TIRED EARTH-MOVING EQUIPMENT OPERATOR, OPERATING EQUIPMENT WITH PUSH-PULL SYSTEM (MULTIPLE ENGINE, EUCLID, CATERPILLAR AND SIMILAR, OVER 25 YDS. AND UP TO 50 YDS. STRUCK)

PREMIUM PAY: $10.00 PER HOUR SHALL BE PAID ON ALL POWER EQUIPMENT OPERATOR WORK ON THE FOLLOWNG MILITARY BASES: CHINA LAKE NAVAL RESERVE, VANDENBERG AFB, POINT ARGUELLO, SEELY NAVAL BASE, FORT IRWIN, NEBO ANNEX MARINE BASE, MARINE CORP LOGISTICS BASE YERMO, EDWARDS AFB, 29 PALMS MARINE BASE AND CAMP PENDLETON WORKERS REQUIRED TO SUIT UP AND WORK IN A HAZARDOUS MATERIAL ENVIRONMENT: $2.00 PER HOUR ADDITIONAL. COMBINATION MIXER AND COMPRESSOR OPERATOR ON GUNITE WORK SHALL BE CLASSIFIED AS A CONCRETE MOBILE MIXER OPERATOR

$66.91$33.20$100.11Agreement
OPERATOR: POWER EQUIPMENT, ALL OTHER WORK: GROUP 15…
Full text

OPERATOR: POWER EQUIPMENT, ALL OTHER WORK: GROUP 15- RUBBER-TIRED EARTH-MOVING EQUIPMENT OPERATOR, OPERATING EQUIPMENT WITH PUSH-PULL SYSTEM (SINGLE ENGINE, CATERPILLAR, EUCLID, ATHEY WAGON AND SIMILAR TYPES WITH ANY AND ALL ATTACHMENTS OVER 25 YDS. AND UP TO AND INCLUDING 50 YDS. STRUCK); RUBBER-TIRED EARTH-MOVING EQUIPMENT OPERATOR, OPERATING EQUIPMENT WITH PUSH-PULL SYSTEM (MULTIPLE ENGINE-UP TO AND INCLUDING 25 YDS. STRUCK)

PREMIUM PAY: $10.00 PER HOUR SHALL BE PAID ON ALL POWER EQUIPMENT OPERATOR WORK ON THE FOLLOWNG MILITARY BASES: CHINA LAKE NAVAL RESERVE, VANDENBERG AFB, POINT ARGUELLO, SEELY NAVAL BASE, FORT IRWIN, NEBO ANNEX MARINE BASE, MARINE CORP LOGISTICS BASE YERMO, EDWARDS AFB, 29 PALMS MARINE BASE AND CAMP PENDLETON WORKERS REQUIRED TO SUIT UP AND WORK IN A HAZARDOUS MATERIAL ENVIRONMENT: $2.00 PER HOUR ADDITIONAL. COMBINATION MIXER AND COMPRESSOR OPERATOR ON GUNITE WORK SHALL BE CLASSIFIED AS A CONCRETE MOBILE MIXER OPERATOR

$66.79$33.20$99.99Agreement
OPERATOR: POWER EQUIPMENT, ALL OTHER WORK: GROUP 14…
Full text

OPERATOR: POWER EQUIPMENT, ALL OTHER WORK: GROUP 14- CANAL LINER OPERATOR; CANAL TRIMMER OPERATOR; REMOTE- CONTROL EARTH-MOVING EQUIPMENT OPERATOR (OPERATING A SECOND PIECE OF EQUIPMENT: $1.00 PER HOUR ADDITIONAL); WHEEL EXCAVATOR OPERATOR (OVER 750 CU. YDS.)

PREMIUM PAY: $10.00 PER HOUR SHALL BE PAID ON ALL POWER EQUIPMENT OPERATOR WORK ON THE FOLLOWNG MILITARY BASES: CHINA LAKE NAVAL RESERVE, VANDENBERG AFB, POINT ARGUELLO, SEELY NAVAL BASE, FORT IRWIN, NEBO ANNEX MARINE BASE, MARINE CORP LOGISTICS BASE YERMO, EDWARDS AFB, 29 PALMS MARINE BASE AND CAMP PENDLETON WORKERS REQUIRED TO SUIT UP AND WORK IN A HAZARDOUS MATERIAL ENVIRONMENT: $2.00 PER HOUR ADDITIONAL. COMBINATION MIXER AND COMPRESSOR OPERATOR ON GUNITE WORK SHALL BE CLASSIFIED AS A CONCRETE MOBILE MIXER OPERATOR

$66.71$33.20$99.91Agreement
OPERATOR: POWER EQUIPMENT, ALL OTHER WORK: GROUP 13…
Full text

OPERATOR: POWER EQUIPMENT, ALL OTHER WORK: GROUP 13- RUBBER-TIRED EARTH-MOVING EQUIPMENT OPERATOR OPERATING EQUIPMENT WITH PUSH-PULL SYSTEM (SINGLE ENGINE, UP TO AND INCLUDING 25 YDS. STRUCK)

PREMIUM PAY: $10.00 PER HOUR SHALL BE PAID ON ALL POWER EQUIPMENT OPERATOR WORK ON THE FOLLOWNG MILITARY BASES: CHINA LAKE NAVAL RESERVE, VANDENBERG AFB, POINT ARGUELLO, SEELY NAVAL BASE, FORT IRWIN, NEBO ANNEX MARINE BASE, MARINE CORP LOGISTICS BASE YERMO, EDWARDS AFB, 29 PALMS MARINE BASE AND CAMP PENDLETON WORKERS REQUIRED TO SUIT UP AND WORK IN A HAZARDOUS MATERIAL ENVIRONMENT: $2.00 PER HOUR ADDITIONAL. COMBINATION MIXER AND COMPRESSOR OPERATOR ON GUNITE WORK SHALL BE CLASSIFIED AS A CONCRETE MOBILE MIXER OPERATOR

$66.68$33.20$99.88Agreement
OPERATOR: POWER EQUIPMENT, ALL OTHER WORK: GROUP 12…
Full text

OPERATOR: POWER EQUIPMENT, ALL OTHER WORK: GROUP 12- AUTO GRADER OPERATOR; AUTOMATIC SLIP FORM OPERATOR; DRILLING MACHINE OPERATOR, BUCKET OR AUGER TYPES (CALWELD, AUGER 200 CA OR SIMILAR TYPES - WATSON, AUGER 6000 OR SIMILAR TYPES - HUGHES SUPER DUTY, AUGER 200 OR SIMILAR TYPES - DRILLING DEPTH OF 175' MAXIMUM); HOE RAM OR SIMILAR WITH COMPRESSOR; MASS EXCAVATOR OPERATOR LESS THA 750 CU. YARDS; MECHANICAL FINISHING MACHINE OPERATOR; MOBILE FORM TRAVELER OPERATOR; MOTOR PATROL OPERATOR (MULTI-ENGINE); PIPE MOBILE MACHINE OPERATOR; RUBBER-TIRED EARTH- MOVING EQUIPMENT OPERATOR (MULTIPLE ENGINE, EUCLID, CATERPILLAR AND SIMILAR TYPE, OVER 50 CU. YDS. STRUCK); RUBBER-TIRED SELF- LOADING SCRAPER OPERATOR (PADDLE-WHEEL-AUGER TYPE SELF-LOADING - TWO (2) OR MORE UNITS)

PREMIUM PAY: $10.00 PER HOUR SHALL BE PAID ON ALL POWER EQUIPMENT OPERATOR WORK ON THE FOLLOWNG MILITARY BASES: CHINA LAKE NAVAL RESERVE, VANDENBERG AFB, POINT ARGUELLO, SEELY NAVAL BASE, FORT IRWIN, NEBO ANNEX MARINE BASE, MARINE CORP LOGISTICS BASE YERMO, EDWARDS AFB, 29 PALMS MARINE BASE AND CAMP PENDLETON WORKERS REQUIRED TO SUIT UP AND WORK IN A HAZARDOUS MATERIAL ENVIRONMENT: $2.00 PER HOUR ADDITIONAL. COMBINATION MIXER AND COMPRESSOR OPERATOR ON GUNITE WORK SHALL BE CLASSIFIED AS A CONCRETE MOBILE MIXER OPERATOR

$66.58$33.20$99.78Agreement
OPERATOR: POWER EQUIPMENT, ALL OTHER WORK: GROUP 10…
Full text

OPERATOR: POWER EQUIPMENT, ALL OTHER WORK: GROUP 10- DRILLING MACHINE OPERATOR, BUCKET OR AUGER TYPES (CALWELD 200 B BUCKET OR SIMILAR TYPES-WATSON 3000 OR 5000 AUGER OR SIMILAR TYPES-TEXOMA 900 AUGER OR SIMILAR TYPES-DRILLING DEPTH OF 105' MAXIMUM); DUAL DRUM MIXER, DYNAMIC COMPACTOR LDC350 (OR SIMILAR TYPES); MONORAIL LOCOMOTIVE OPERATOR (DIESEL, GAS OR ELECTRIC); MOTOR PATROL-BLADE OPERATOR (SINGLE ENGINE); MULTIPLE ENGINE TRACTOR OPERATOR (EUCLID AND SIMILAR TYPE-EXCEPT QUAD 9 CAT.); RUBBER-TIRED EARTH-MOVING EQUIPMENT OPERATOR (SINGLE ENGINE, OVER 50 YDS. STRUCK); PNEUMATIC PIPE RAMMING TOOL AND SIMILAR TYPES; PRESTRESSED WRAPPING MACHINE OPERATOR; RUBBER-TIRED EARTH-MOVING EQUIPMENT OPERATOR (SINGLE ENGINE, OVER 50 YDS. STRUCK); RUBBER TIRED EARTH MOVING EQUIPMENT OPERATOR (MULTIPLE ENGINE, EUCLID, CATERPILLAR AND SIMILAR OVER 25 YDS. AND UP TO 50 YDS. STRUCK), TOWER CRANE REPAIRMAN; TRACTOR LOADER OPERATOR (CRAWLER AND WHEEL TYPE OVER 6-1/2 YDS.); WOODS MIXER OPERATOR (AND SIMILAR PUGMILL EQUIPMENT)

PREMIUM PAY: $10.00 PER HOUR SHALL BE PAID ON ALL POWER EQUIPMENT OPERATOR WORK ON THE FOLLOWNG MILITARY BASES: CHINA LAKE NAVAL RESERVE, VANDENBERG AFB, POINT ARGUELLO, SEELY NAVAL BASE, FORT IRWIN, NEBO ANNEX MARINE BASE, MARINE CORP LOGISTICS BASE YERMO, EDWARDS AFB, 29 PALMS MARINE BASE AND CAMP PENDLETON WORKERS REQUIRED TO SUIT UP AND WORK IN A HAZARDOUS MATERIAL ENVIRONMENT: $2.00 PER HOUR ADDITIONAL. COMBINATION MIXER AND COMPRESSOR OPERATOR ON GUNITE WORK SHALL BE CLASSIFIED AS A CONCRETE MOBILE MIXER OPERATOR

$66.41$33.20$99.61Agreement
OPERATOR: POWER EQUIPMENT, ALL OTHER WORK: GROUP 8…
Full text

OPERATOR: POWER EQUIPMENT, ALL OTHER WORK: GROUP 8- ASPHALT OR CONCRETE SPREADING OPERATOR (TAMPING OR FINISHING); ASPHALT PAVING MACHINE OPERATOR (BARBER GREENE OR SIMILAR TYPE); ASPHALT-RUBBER DISTRIBUTION OPERATOR; BACKHOE OPERATOR (UP TO AND INCLUDING 3/4 YD.), SMALL FORD, CASE OR SIMILAR TYPES; CABLE BUNDLING MACHINE OPERATOR (EXCLUDING HANDHELD); CABLE TRENCHING MACHINE OPERATOR (SPIDER PLOW OR SIMILAR TYPES) CAST-IN-PLACE PIPE LAYING MACHINE OPERATOR; COMBINATION MIXER AND COMPRESSOR OPERATOR (GUNITE WORK); COMPACTOR OPERATOR (SELF-PROPELLED); CONCRETE MIXER OPERATOR (PAVING); CRUSHING PLANT OPERATOR; DRILL DOCTOR; DRILLING MACHINE OPERATOR, BUCKET OR AUGER TYPES (CALWELD 150 BUCKET OR SIMILAR TYPES - WATSON 1500, 2000 2500 AUGER OR SIMILAR TYPES - TEXOMA 700, 800 AUGER OR SIMILAR TYPES - DRILLING DEPTH OF 60' MAXIMUM); ELEVATING GRADER OPERATOR; GRADE CHECKER; GRADALL OPERATOR; GROUTING MACHINE OPERATOR; HEAVY-DUTY REPAIRMAN; HEAVY EQUIPMENT ROBOTICS OPERATOR; KALAMAZOO BALLISTE REGULATOR OR SIMILAR TYPE; KOLMAN BELT LOADER AND SIMILAR TYPE; LE TOURNEAU BLOB COMPACTOR OR SIMILAR TYPE; LOADER OPERATOR (ATHEY, EUCLID, SIERRA AND SIMILAR TYPES); MOBARK CHIPPER OR SIMILAR; OZZIE PADDER OR SIMILAR TYPES; P.C. SLOT SAW; PNEUMATIC CONCRETE PLACING MACHINE OPERATOR (HACKLEY-PRESSWELL OR SIMILAR TYPE); PUMPCRETE GUN OPERATOR; RCM CEMENTING UNIT OPERATOR, RAIL/SWITCH GRINDER OPERATOR (HARSCO OR SIMILAR TYPES) ROCK DRILL OR SIMILAR TYPES; ROTARY DRILL OPERATOR (EXCLUDING CAISSON TYPE); RUBBER-TIRED EARTH-MOVING EQUIPMENT OPERATOR (SINGLE ENGINE, CATERPILLAR, EUCLID, ATHEY WAGON AND SIMILAR TYPES WITH ANY AND ALL ATTACHMENTS OVER 25 YDS. UP TO AND INCLUDING 50 CU. YDS. STRUCK); RUBBER-TIRED EARTH-MOVING EQUIPMENT OPERATOR (MULTIPLE ENGINE UP TO AND INCLUDING 25 YDS. STRUCK); RUBBER-TIRED SCRAPER OPERATOR (SELF-LOADING PADDLE WHEEL TYPE-JOHN DEERE, 1040 AND SIMILAR SINGLE UNIT); SELF- PROPELLED CURB AND GUTTER MACHINE OPERATOR; SHUTTLE BUGGY; SKIPLOADER OPERATOR (CRAWLER AND WHEEL TYPE OVER 1-1/2 YDS. UP TO AND INCLUDING 6-1/2 YDS.); SOIL REMEDIATION PLANT OPERATOR; SURFACE HEATERS AND PLANER OPERATOR; TRACTOR COMPRESSOR DRILL COMBINATION OPERATOR; TRACTOR OPERATOR (ANY TYPE LARGER THAN D-5 - 100 FLYWHEEL H.P. AND OVER, OR SIMILAR-BULLDOZER, TAMPER, SCRAPER AND PUSH TRACTOR SINGLE ENGINE); TRACTOR OPERATOR (BOOM ATTACHMENTS), TRAVELING PIPE WRAPPING, CLEANING AND BENDNG MACHINE OPERATOR; TRENCHING MACHINE OPERATOR (OVER 6 FT. DEPTH CAPACITY, MANUFACTURER'S RATING); TRENCHING MACHINE WITH ROAD MINER ATTACHMENT (OVER 6 FT DEPTH CAPACITY): ULTRA HIGH PRESSURE WATERJET CUTTING TOOL SYSTEM MECHANIC; WATER PULL (COMPACTION) OPERATOR

PREMIUM PAY: $10.00 PER HOUR SHALL BE PAID ON ALL POWER EQUIPMENT OPERATOR WORK ON THE FOLLOWNG MILITARY BASES: CHINA LAKE NAVAL RESERVE, VANDENBERG AFB, POINT ARGUELLO, SEELY NAVAL BASE, FORT IRWIN, NEBO ANNEX MARINE BASE, MARINE CORP LOGISTICS BASE YERMO, EDWARDS AFB, 29 PALMS MARINE BASE AND CAMP PENDLETON WORKERS REQUIRED TO SUIT UP AND WORK IN A HAZARDOUS MATERIAL ENVIRONMENT: $2.00 PER HOUR ADDITIONAL. COMBINATION MIXER AND COMPRESSOR OPERATOR ON GUNITE WORK SHALL BE CLASSIFIED AS A CONCRETE MOBILE MIXER OPERATOR

$66.29$33.20$99.49Agreement
OPERATOR: POWER EQUIPMENT, ALL OTHER WORK: GROUP 6…
Full text

OPERATOR: POWER EQUIPMENT, ALL OTHER WORK: GROUP 6- ARTICULATING MATERIAL HAULER; ASPHALT PLANT ENGINEER; BATCH PLANT OPERATOR; BIT SHARPENER; CONCRETE JOINT MACHINE OPERATOR (CANAL AND SIMILAR TYPE); CONCRETE PLANER OPERATOR; DANDY DIGGER; DECK ENGINE OPERATOR; DERRICKMAN (OILFIELD TYPE); DRILLING MACHINE OPERATOR, BUCKET OR AUGER TYPES (CALWELD 100 BUCKET OR SIMILAR TYPES - WATSON 1000 AUGER OR SIMILAR TYPES - TEXOMA 330, 500 OR 600 AUGER OR SIMILAR TYPES - DRILLING DEPTH OF 45' MAXIMUM); DRILLING MACHINE OPERATOR; HYDROGRAPHIC SEEDER MACHINE OPERATOR (STRAW, PULP OR SEED), JACKSON TRACK MAINTAINER, OR SIMILAR TYPE; KALAMAZOO SWITCH TAMPER, OR SIMILAR TYPE; MACHINE TOOL OPERATOR; MAGINNIS INTERNAL FULL SLAB VIBRATOR, MECHANICAL BERM, CURB OR GUTTER(CONCRETE OR ASPHALT); MECHANICAL FINISHER OPERATOR (CONCRETE, CLARY-JOHNSON-BIDWELL OR SIMILAR); MICRO TUNNEL SYSTEM (BELOW GROUND); PAVEMENT BREAKER OPERATOR (TRUCK MOUNTED); ROAD OIL MIXING MACHINE OPERATOR; ROLLER OPERATOR (ASPHALT OR FINISH), RUBBER-TIRED EARTH MOVING EQUIPMENT (SINGLE ENGINE, UP TO AND INCLUDING 25 YDS. STRUCK); SELF-PROPELLED TAR PIPELINING MACHINE OPERATOR; SKIPLOADER OPERATOR (CRAWLER AND WHEEL TYPE, OVER 3/4 YD. AND UP TO AND INCLUDING 1-1/2 YDS.); SLIP FORM PUMP OPERATOR (POWER DRIVEN HYDRAULIC LIFTING DEVICE FOR CONCRETE FORMS); TRACTOR OPERATOR-BULLDOZER, TAMPER-SCRAPER (SINGLE ENGINE, UP TO 100 H.P. FLYWHEEL AND SIMILAR TYPES, UP TO AND INCLUDING D-5 AND SIMILAR TYPES); TUGGER HOIST OPERATOR (1 DRUM); ULTRA HIGH PRESSURE WATERJET CUTTING TOOL SYSTEM OPERATOR; VACUUM BLASTING MACHINE OPERATOR

PREMIUM PAY: $10.00 PER HOUR SHALL BE PAID ON ALL POWER EQUIPMENT OPERATOR WORK ON THE FOLLOWNG MILITARY BASES: CHINA LAKE NAVAL RESERVE, VANDENBERG AFB, POINT ARGUELLO, SEELY NAVAL BASE, FORT IRWIN, NEBO ANNEX MARINE BASE, MARINE CORP LOGISTICS BASE YERMO, EDWARDS AFB, 29 PALMS MARINE BASE AND CAMP PENDLETON WORKERS REQUIRED TO SUIT UP AND WORK IN A HAZARDOUS MATERIAL ENVIRONMENT: $2.00 PER HOUR ADDITIONAL. COMBINATION MIXER AND COMPRESSOR OPERATOR ON GUNITE WORK SHALL BE CLASSIFIED AS A CONCRETE MOBILE MIXER OPERATOR

$66.18$33.20$99.38Agreement
OPERATOR: POWER EQUIPMENT, ALL OTHER WORK: GROUP 4…
Full text

OPERATOR: POWER EQUIPMENT, ALL OTHER WORK: GROUP 4- ASPHALT PLANT FIREMAN; BACKHOE OPERATOR (MINI-MAX OR SIMILAR TYPE); BORING MACHINE OPERATOR; BOXMAN OR MIXERMAN (ASPHALT OR CONCRETE); CHIP SPREADING MACHINE OPERATOR; CONCRETE CLEANING DECONTAMINATION MACHINE OPERATOR; CONCRETE PUMP OPERATOR (SMALL PORTABLE);DIRECT PUSH OPERATOR (GEOPROBE OR SIMILAR TYPES) DRILLING MACHINE OPERATOR, SMALL AUGER TYPES (TEXOMA SUPER ECONOMATIC OR SIMILAR TYPES - HUGHES 100 OR 200 OR SIMILAR TYPES - DRILLING DEPTH OF 30' MAXIMUM); EQUIPMENT GREASER (GREASE TRUCK); GUARD RAIL POST DRIVER OPERATOR; HIGHLINE CABLEWAY SIGNALMAN; HYDRA-HAMMER-AERO STOMPER; MICRO TUNNELING (ABOVE GROUND TUNNEL); POWER CONCRETE CURING MACHINE OPERATOR; POWER CONCRETE SAW OPERATOR; POWER-DRIVEN JUMBO FORM SETTER OPERATOR; POWER SWEEPER OPERATOR; ROCK WHEEL SAW/TRENCHER; ROLLER OPERATOR (COMPACTING); SCREED OPERATOR (ASPHALT OR CONCRETE); TRENCHING MACHINE OPERATOR (UP TO 6 FT.); VACUUM OR MUCH TRUCK

PREMIUM PAY: $10.00 PER HOUR SHALL BE PAID ON ALL POWER EQUIPMENT OPERATOR WORK ON THE FOLLOWNG MILITARY BASES: CHINA LAKE NAVAL RESERVE, VANDENBERG AFB, POINT ARGUELLO, SEELY NAVAL BASE, FORT IRWIN, NEBO ANNEX MARINE BASE, MARINE CORP LOGISTICS BASE YERMO, EDWARDS AFB, 29 PALMS MARINE BASE AND CAMP PENDLETON WORKERS REQUIRED TO SUIT UP AND WORK IN A HAZARDOUS MATERIAL ENVIRONMENT: $2.00 PER HOUR ADDITIONAL. COMBINATION MIXER AND COMPRESSOR OPERATOR ON GUNITE WORK SHALL BE CLASSIFIED AS A CONCRETE MOBILE MIXER OPERATOR

$65.96$33.20$99.16Agreement
OPERATOR: POWER EQUIPMENT, ALL OTHER WORK: GROUP 3…
Full text

OPERATOR: POWER EQUIPMENT, ALL OTHER WORK: GROUP 3- ASPHALT-RUBBER BLEND OPERATOR; BOBCAT OR SIMILAR TYPE (SKID STEER); EQUIPMENT GREASER (RACK); FORD FERGUSON (WITH DRAGTYPE ATTACHMENTS); HELICOPTER RADIOMAN (GROUND); STATIONARY PIPE WRAPPING AND CLEANING MACHINE OPERATOR

PREMIUM PAY: $10.00 PER HOUR SHALL BE PAID ON ALL POWER EQUIPMENT OPERATOR WORK ON THE FOLLOWNG MILITARY BASES: CHINA LAKE NAVAL RESERVE, VANDENBERG AFB, POINT ARGUELLO, SEELY NAVAL BASE, FORT IRWIN, NEBO ANNEX MARINE BASE, MARINE CORP LOGISTICS BASE YERMO, EDWARDS AFB, 29 PALMS MARINE BASE AND CAMP PENDLETON WORKERS REQUIRED TO SUIT UP AND WORK IN A HAZARDOUS MATERIAL ENVIRONMENT: $2.00 PER HOUR ADDITIONAL. COMBINATION MIXER AND COMPRESSOR OPERATOR ON GUNITE WORK SHALL BE CLASSIFIED AS A CONCRETE MOBILE MIXER OPERATOR

$64.67$33.20$97.87Agreement
OPERATOR: POWER EQUIPMENT, ALL OTHER WORK: GROUP 2…
Full text

OPERATOR: POWER EQUIPMENT, ALL OTHER WORK: GROUP 2- ASPHALT-RUBBER PLANT OPERATOR (NURSE TANK OPERATOR);COIL TUBING RIG OPERATOR, CONCRETE MIXER OPERATOR-SKIP TYPE; CONVEYOR OPERATOR; FIREMAN; FORKLIFT OPERATOR (INCLUDES LOED, LULL OR SIMILAR TYPES OVER 5 TONS; HYDROSTATIC PUMP OPERATOR; OILER CRUSHER (ASPHALT OR CONCRETE PLANT); PETROMAT LAYDOWN MACHINE; PJU SIDE DUM JACK; SCREENING AND CONVEYOR MACHINE OPERATOR (OR SIMILAR TYPES); SKIPLOADER (WHEEL TYPE UP TO 3/4 YD. WITHOUT ATTACHMENT); TAR POT FIREMAN; TEMPORARY HEATING PLANT OPERATOR; TRENCHING MACHINE OILER

PREMIUM PAY: $10.00 PER HOUR SHALL BE PAID ON ALL POWER EQUIPMENT OPERATOR WORK ON THE FOLLOWNG MILITARY BASES: CHINA LAKE NAVAL RESERVE, VANDENBERG AFB, POINT ARGUELLO, SEELY NAVAL BASE, FORT IRWIN, NEBO ANNEX MARINE BASE, MARINE CORP LOGISTICS BASE YERMO, EDWARDS AFB, 29 PALMS MARINE BASE AND CAMP PENDLETON WORKERS REQUIRED TO SUIT UP AND WORK IN A HAZARDOUS MATERIAL ENVIRONMENT: $2.00 PER HOUR ADDITIONAL. COMBINATION MIXER AND COMPRESSOR OPERATOR ON GUNITE WORK SHALL BE CLASSIFIED AS A CONCRETE MOBILE MIXER OPERATOR

$64.18$33.20$97.38Agreement
OPERATOR: POWER EQUIPMENT, ALL OTHER WORK: GROUP 1…
Full text

OPERATOR: POWER EQUIPMENT, ALL OTHER WORK: GROUP 1- BARGEMAN; BRAKEMAN; COMPRESSOR OPERATOR; DITCH WITCH, WITH SEAT OR SIMILAR TYPE EQUIPMENT; ELEVATOR OPERATOR-INSIDE; ENGINEER OILER; FORKLIFT OPERATOR (INCLUDES LOED, LULL OR SIMILAR TYPES UNDER 5 TONS; GENERATOR OPERATOR; GENERATOR, PUMP OR COMPRESSOR PLANT OPERATOR; PUMP OPERATOR; SIGNALMAN; SWITCHMAN

PREMIUM PAY: $10.00 PER HOUR SHALL BE PAID ON ALL POWER EQUIPMENT OPERATOR WORK ON THE FOLLOWNG MILITARY BASES: CHINA LAKE NAVAL RESERVE, VANDENBERG AFB, POINT ARGUELLO, SEELY NAVAL BASE, FORT IRWIN, NEBO ANNEX MARINE BASE, MARINE CORP LOGISTICS BASE YERMO, EDWARDS AFB, 29 PALMS MARINE BASE AND CAMP PENDLETON WORKERS REQUIRED TO SUIT UP AND WORK IN A HAZARDOUS MATERIAL ENVIRONMENT: $2.00 PER HOUR ADDITIONAL. COMBINATION MIXER AND COMPRESSOR OPERATOR ON GUNITE WORK SHALL BE CLASSIFIED AS A CONCRETE MOBILE MIXER OPERATOR

$63.40$33.20$96.60Agreement
IRON0229-001 · Ironworkers agreement, January 1, 2025
IRONWORKER (ORNAMENTAL, REINFORCING AND

PREMIUM PAY: $6.00 additional per hour at the following locations:China Lake Naval Test Station, Chocolate Mountains Naval Reserve-Niland, Edwards AFB, Fort Irwin Military Station, Fort Irwin Training Center-Goldstone, San Clemente Island, San Nicholas Island, Susanville Federal Prison, 29 Palms - Marine Corps, U.S. Marine Base - Barstow, U.S. Naval Air Facility - Sealey, Vandenberg $4.00 additional per hour at the following locations:Army Defense Language Institute - Monterey, Fallon Air Base, Naval Post Graduate School - Monterey, Yermo Marine Corps Logistics $2.00 additional per hour at the following locations: Port Hueneme, Port Mugu, U.S. Coast Guard Station - Two Rock

$50.70$35.15$85.85Agreement
IRONWORKER (FENCE

PREMIUM PAY: $6.00 additional per hour at the following locations:China Lake Naval Test Station, Chocolate Mountains Naval Reserve-Niland, Edwards AFB, Fort Irwin Military Station, Fort Irwin Training Center-Goldstone, San Clemente Island, San Nicholas Island, Susanville Federal Prison, 29 Palms - Marine Corps, U.S. Marine Base - Barstow, U.S. Naval Air Facility - Sealey, Vandenberg $4.00 additional per hour at the following locations:Army Defense Language Institute - Monterey, Fallon Air Base, Naval Post Graduate School - Monterey, Yermo Marine Corps Logistics $2.00 additional per hour at the following locations: Port Hueneme, Port Mugu, U.S. Coast Guard Station - Two Rock

$45.78$26.51$72.29Agreement
LABO0089-001 · Laborers agreement, July 1, 2025
LABORER, BUILDING AND ALL OTHER RESIDENTIAL CONSTRUCTION: GROUP 5…
Full text

LABORER, BUILDING AND ALL OTHER RESIDENTIAL CONSTRUCTION: GROUP 5 BLASTERS POWDERMAN-ALL WORK OF LOADING HOLES, PLACING AND BLASTING OF ALL PWDER AND EXPLOSIVES OF WHATEVER TYPE, REGARDLESS OF METHOD USED FOR SUCH LOADING AND PLACING; DRILLER-ALL POWER DRILLS, EXCLUDING JACKHAMMER, WHETHER CORE, DIAMOND, WAGON, TRACK, MULTIPLE UNIT, AND ANY AND ALL OTHER TYPES OF MECHANICAL DRILLS WITHOUT REGARD TO THE FORM OF MOTIVE POWER

$48.16$25.09$73.25Agreement
LABORER, BUILDING AND ALL OTHER RESIDENTIAL CONSTRUCTION: GROUP 4…
Full text

LABORER, BUILDING AND ALL OTHER RESIDENTIAL CONSTRUCTION: GROUP 4 ASPHALT RAKER, LUTERMAN, IRONER, APSHALT DUMPMAN AND ASPHALT SPREADER BOXES (ALL TYPES); CONCRETE CORE CUTTER (WALLS, FLOORS OR CEILINGS), GRINDER OR SANDER; CONCRETE SAW MAN; CUTTING WALLS OR FLAT WORK, SCORING OLD OR NEW CONCRETE; CRIBBER, SHORER, LAGGING, SHEETING AND TRENCH BRACING, HAND-GUIDED LAGGING HAMMER; LASER BEAM IN CONNECTION WITH LABORER'S WORK; OVERSIZE CONCRETE VIBRATOR OPERATOR 70 POUNDS AND OVER; PIPELAYER PERFORMING ALL SERVICES IN THE LAYING, INSTALLATION AND ALL FORMS OF CONNECTION OF PIPE FROM THE POINT OF RECEIVING PIPE IN THE DITCH UNTIL COMPLETION OF OEPRATION, INCLUDING ANY AND ALL FORMS OF TUBULAR MATERIAL, WHETHER PIPE, METALLIC OR NON-METALLIC, CONDUIT, AND ANY OTHER STATIONARY TYPE OF TUBULAR DEVICE USED FOR THE CONVEYING OF ANY SUBSTANCE OR ELEMENT, WHETHER WATER, SEWAGE, SOLID, GAS, AIR OR OTHER PRODUCT WHATSOEVER AND WITHOUT REGARD TO THE NATURE OF MATERIAL FROM WHICH THE TUBULAR MATERIAL IS FABRICATED; NO JOINT PIPE AND STRIPPING OF SAME; PREFABRICATED MANHOLE INSTALLER; SANDBLASTER (NOZZLEMAN), PORTA SHOT-BLAST, WATER BLASTING

$48.64$25.09$73.73Agreement
LABORER, BUILDING AND ALL OTHER RESIDENTIAL CONSTRUCTION: GROUP 3…
Full text

LABORER, BUILDING AND ALL OTHER RESIDENTIAL CONSTRUCTION: GROUP 3 BUGGYMOBILE; CONCRETE CUTTING TORCH; CONCRETE CUTTING TORCH; CONCRETE PILE CUTTER; DRILLER, JACKHAMMER, 2 1/2 FEET DRILL STEEL OR LONGER; DRI PAK-IT MACHINE; HIGH SEALER (INCLUDING DRILLING OF SAME); HYDRO SEEDER AND SIMILAR TYPE; IMPACT WRENCH, MULT-PLATE; KETTLEMEN, POTMEN AND MEAN APPLYING ASPHALT, LAY-KOLD, CREOSOTE, LINE CAUSTIC AND SIMILAR TYPE MATERIALS (APPLYING MEANS APPLYING, DIPPING, BRUSHING OR HANDLING OF SUCH MATERIALS FOR PIPE WRAPPING AND WATERPROOFING); OPERATORS OF PNEUMATIC, GAS, ELECTRIC TOOLS, VIBRATRING MACHINES, PAVEMENT BREAKERS, AIR BLASTING, COME-ALONG, AND SIMILAR MECHANICAL TOOLS NOT SEPARATELY CLASSIFIED HEREIN; PIPELAYERS BACK UP MAN COATING, GROUTING, MAKING OF JOINTS, SEALING, CAULKING, DIAPERING AND INCLDUING RUBBER GASKET JOINTS, POINTING AND ANY AND ALL OTHER SERVICES; ROTARY SCARIFIER OR MULTIPLE HEAD CONCRETE CHIPPING SCAARIFIER; STEEL HEADER BOARD MAN AND GUIDELINE SETTER; TAMPERS, BARKO, WACKER AND SIMILAR TYPE; TRENCHING MACHINE, HANDPROPELLED

$47.16$25.09$72.25Agreement
LABORER, BUILDING AND ALL OTHER RESIDENTIAL CONSTRUCTION: GROUP 2…
Full text

LABORER, BUILDING AND ALL OTHER RESIDENTIAL CONSTRUCTION: GROUP 2 ASPHALT SHOVELER; CEMENT DUMPER (ON 1 YARD OR LARGER MIXER AND HANDLING BULK CEMENT); CESSPOOL DIGGER AND INSTALLER; CHUCKTENDER; CHUTE MAN, POURING CONCRETE, THE HANDLING OF THE CUTE FROM READY MIX TRUCKS, SUCH AS WALLS, SLABS, DECKS, FLOORS, FOUNDATIONS, FOOTINGS, CURBS, GUTTERS AND SIDEWALKS; CONCRETE CURER-IMPERVIOUS MEMBRANE AND FORM OILER; CUTTING TORCH OPERATOR (DEMOLITON); GUINEA CHASER; HEADBOARD MAN-ASPHLT; LABORER, PACKING ROD STEEL AND PANS; MEMBRANE VAPOR BARRIER INSTALLER; POWER BROOM SWEEPERS (SMALL); RIIPRAP, STONEPAVER, PLACING STONE OR WET SACKED CONCRETE; ROTO SCRAPER AND TILLER; TANK SEALER AND CLEANER; TREE CLIMBER, FALLER, CHAIN SAW OPERATOR, PITTSBURGH CHIPPER AND SIMILAR TYPE BRUSH SHREDDERS; UNDERGROUND LABORERS, INCLUDING CAISSON BELLOWER

$46.30$25.09$71.39Agreement
LABORER, BUILDING AND ALL OTHER RESIDENTIAL CONSTRUCTION: GROUP 1…
Full text

LABORER, BUILDING AND ALL OTHER RESIDENTIAL CONSTRUCTION: GROUP 1 CLEANING AND HANDLING OF PANEL FORMS; CONCRETE SCREEDING FOR ROUGHT STRIKE-OFF; CONCRETE, WATER CURING; DEMOLITION LABORER; FLAGMAN; GAS, OIL AND/OR WATER PIPELINE LABORER; GENERAL LABORER; GENERAL CLEAN-UP LABORER; LANDSCAPE LABORER; JETTING LABORER; TEMPORARY WATER AND AIR LINES LABORER; MATERIAL HOSEMAN (WALLS, SLABS, FLOORS AND DECKS); PLUGGING, FILLING OF SHEE-BOLT HOLES; DRY PACKING OF CONCRETE; RAILROAD MAINTENANCE, REPAIR TRACKMAN AND ROAD BEDS, STREETCAR AND RAILROAD CONSTRUCTION TRAC LABORERS; SLIP FORM RAISERS; SLURRY SEAL CREWS (MIXER OPERATOR, APPLICATOR OPERATOR, SQUEEGEE MAN, SHUTTLE MAN, TOP MAN), FILLING OF CRACKS BY ANY METHOD ON ANY SURFACE; TARMAN AND MORTAR MAN; TOOL CRIB OR TOOL HOUSE LABORER; WINDOW CLEANER; WIRE MESH PULING-ALL CONCRETE POURING OPERATIONS

$45.54$25.09$70.63Agreement
LABORER (RESIDENTIAL CONSTRUCTION)…
Full text

LABORER (RESIDENTIAL CONSTRUCTION): (2) CLEANUP, LANDSCAPE, FENCING (CHAIN LINK & WOOD) RESIDENTIAL DEFINITION: WOOD OR METAL FRAME CONSTRUCTION OF SINGLE FAMILY RESIDENCES, APARTMENTS AND CONDOMINUMS - EXCLUDING (A) PROJECTS THAT EXCEED THREE STORIES OVER A GARAGE LEVEL, (B) ANY UTILITY WORK SUCH AS TELEPHONE, GAS, WATER, SEWER AND OTHER UTILITIES AND (C) ANY FINE GRADING WORK, UTILITY WORK OR PAVING WORK IN THE FUTURE STREET AND PUBLIC RIGHT-OF-WAY; BUT INCLUDING ALL ROUGH GRADING WORK AT THE JOB SITE BEHIND THE EXISTING RIGHT OF WAY

$43.44$23.42$66.86Agreement
LABORER (RESIDENTIAL CONSTRUCTION)…
Full text

LABORER (RESIDENTIAL CONSTRUCTION) (1) LABORER RESIDENTIAL DEFINITION: WOOD OR METAL FRAME CONSTRUCTION OF SINGLE FAMILY RESIDENCES, APARTMENTS AND CONDOMINUMS - EXCLUDING (A) PROJECTS THAT EXCEED THREE STORIES OVER A GARAGE LEVEL, (B) ANY UTILITY WORK SUCH AS TELEPHONE, GAS, WATER, SEWER AND OTHER UTILITIES AND (C) ANY FINE GRADING WORK, UTILITY WORK OR PAVING WORK IN THE FUTURE STREET AND PUBLIC RIGHT-OF-WAY; BUT INCLUDING ALL ROUGH GRADING WORK AT THE JOB SITE BEHIND THE EXISTING RIGHT OF WAY

$42.15$23.42$65.57Agreement
LABO0089-002 · Laborers agreement, November 1, 2025
LABORER: MASON TENDER$42.60$22.13$64.73Agreement
LABO0089-004 · Laborers agreement, July 1, 2025
LABORERS: GROUP 5…
Full text

LABORERS: GROUP 5 (HEAVY AND HIGHWAY CONSTRUCTION) BLASTERS POWDERMAN-ALL WORK OF LOADING HOLES, PLACING AND BLASTING OF ALL POWDER AND EXPLOSIVES OF WHATEVER TYPE, REGARDLESS OF METHOD USED FOR SUCH LOADING AND PLACING; HORIZONTAL DIRECTIONAL DRILLER, BORING SYSTEM, ELECTRONIC TRAKING, DRILLER: ALL POWER DRILLS EXCLUDING JACKHAMMER, WHETHER CORE, DIAMOND, WAGON, TRACK, MULTIPLE UNIT, AND ALL OTHER TYPES OF MECHANICAL DRILLS WITHOUT REGARD TO FORM OF MOTIVE POWER. ENVIRONMENTAL REMEDIATION, MONITORING WELL, TOXIC WASTE AND GEOTECHNICAL DRILLER, TOXIC WASTE REMOVAL. WELDING IN CONNECTION WITH LABORER'S WORK

$50.14$25.09$75.23Agreement
LABORERS: GROUP 4…
Full text

LABORERS: GROUP 4 (HEAVY AND HIGHWAY CONSTRUCTION) ANY WORKER EXPOSED TO RAW SEWAGE. ASPHALT RAKER, LUTEMAN, ASPHALT DUMPMAN, ASPHALT SPREADER BOXES, CONCRETE CORE CUTTER, CONCRETE SAW MAN, CRIBBER, SHORER, HEAD ROCK SLINGER. INSTALLATION OF SUBSURFACE INSTRUMENTATION, MONITORING WELLS OR POINTS, REMEDIATION SYSTEM INSTALLER; LABORER, ASPHALT-RUBBER DISTRIBUTOR BOOTMAN; OVERSIZE CONCRETE VIBRATOR OPERATORS, 70 POUNDS OR OVER. PIPELAYER, PRFEFABRICATED MANHOLE INSTALLER, SANDBLAST NOZZLEMAN (WATER BALSTING-PORTA SHOT BLAST), TRAFFIC LANE CLOSURE

$49.28$25.09$74.37Agreement
LABORERS: GROUP 3…
Full text

LABORERS: GROUP 3 (HEAVY AND HIGHWAY CONSTRUCTION) ASPHALT, INSTALLATION OF ALL FRABRICS; BUGGY MOBILE MAN, BUSHING HAMMER; COMPACTOR (ALL TYPES), CONCRETE CURER - IMPERVIOUS MEMBRANE, FORM OILER, CONCRETE CUTTING TORCH, CONCRETE PILE CUTTER,DRILLER/JACKHAMMER WITH DRILL STEEL 2 1/2 FT OR LONGER, DRY PAK-IT MACHINE, FENCE ERECTOR INCLUDING MANUAL POST HOLE DIGGING, GAS OIL OR WATER PIPELINE WRAPPER - 6 FT PIPE AND OVER, GURADRAIL ERECTOR, HYDRO SEEDER, IMPACT WRENCH MAN (MULTI PLATE), KETTLEMAN-POTMAN HOT MOP INCLUDES APPLYING ASPHALT, LAY-KOLD, CREOSOTE, LIME CAUSTIC AND SIMILAR TYPES OF MATERIALS (DIPPING, BRUSHING OR HANDLING) AND WATERPROOFING. LASER BEAM IN CONNECTION WITH LABORER WORK. HIGH SCALER, OPERATORS OF PNEUMATIC GAS OR ELECTRIC TOOLS, VIBRATING MACHINES, PAVEMENT BREAKERS, AIR BLASTING, COME-ALONGS AND SIMILAR MECHANICAL TOOLS, REMOTE-CONTROLLED ROBOTIC TOOLS IN CONNECTION WITH LABORERS WORK. PIPELAYER BACKUP MAN (COATING, GROUTING,M MAKEING OF JOINTS, SEALING, CAULKING, DIAPERING INCLUDING RUBBER GASKET JOINTS, POINTING AND OTHER SERVICES). POWER POST HOLE DIGGER, ROTARY SCARIFIER (MULTIPLE HEAD CONCRETE CHIPPER SCARIFIER), ROCK SLINGER, SHOT BLAST EQUIPMENT (8 TO 48 INCHES), STEEL HEADERBOARD MAN AND GUIDELINE SETTER, TAMPER/WACKER OPERATOR AND SIMILAR TYPES, TRENCHING MACHINE HAND PROPELLED

$47.76$25.09$72.85Agreement
LABORERS: GROUP 2…
Full text

LABORERS: GROUP 2 (HEAVY AND HIGHWAY CONSTRUCTION) ASPHALT ABATEMENT; BUGGYMOBILE; CEMENT DUMPER (ON 1 YD. OR LARGER MIXERS AND HANDLING BULK CEMENT); CONCRETE CURER, IMPERVIOUS MEMBRANE AND FORM OILER; CHUTE MAN, POURING CONCRETE; CONCRETE CUTTING TORCH; CONCRETE PILE CUTTER; DRILLER/JACKHAMMER, WITH DRILL STEEL 2 1/'2 FEET OR LONGER; DRY PAK-IT MACHINE; FENCE ERECTOR; PIPELINE WRAPPER, GAS, OIL, WATER, POT TENDER & FORM MAN; GROUT MAN; INSTALLATION OF ALL ASPHALT OVERLAY FABRIC AND MATERIALS USED FOR REINFORCING ASPHALT; IRRIGATION LABORER; KETTLEMAN-POTMAN HOT MOP, INCLUDES APPLYING ASPHALT, LAY-KLOLD, CREOSOTE, LIME CAUSTIC AND SIMILAR TYHPES OF MATERIALS (DIPPING, BRUSHING, HANDLING) AND WATERPROOFING; MEMBRANE VAPOR BARRIER INSTALLER; PIPELAYER BACKUP MAN (COATING, GROUTING, MAKING OF JOINTS, SEALING CAULKIING, DIAPERING INCLUDING RUBBER BASKET JOINTS, POINTING); ROTARY SCARIFIER, MULTIPLE HEAD CONCRETE CHIPPER; ROCK SLINGER; ROTO SCRAPER & TILLER; SANDBLASTER POT TENDER; SEPTIC TANK DIGGER/INSTALLER; TAMPER/WACKER OPERATOR; TANK SCALER & CLEANER; TAR MAN & MORTAR MAN; TREE CLIMBER/FALLER, CHAINB SAW OPERATOR, PITTSBURGH CHIPPER & SIMILAR TYPE BRUSH SHREDDERS

$47.20$25.09$72.29Agreement
LABORERS: GROUP 1…
Full text

LABORERS: GROUP 1 (HEAVY AND HIGHWAY CONSTRUCTION) LABORER: GENERAL OR CONSTRUCTION LABORER, LANDSCAPE LABORER. ASPHALT RUBBER MATERIAL LOADER. BORING MACHINE TENDER (OUTSIDE), CARPENTER LABORER (CLEANING, HANDLING, OILING & BLOWING OF PANEL FORMS AND LUMBER), CONCRETE LABORER, CONCRETE SCREEDING FOR ROUGH STRIKE-OFF, CONCRETE WATER CURING. CONCRETE CURB & GUTTER LABORER, CERTIFIED CONFINED SPACE LABORER, DEMOLITION LABORER & CLEANING OF BRICK AND LUMBER,EXPANSION JOINT CAULKING; ENVIRONMENTAL REMEDIATION, MONITORING WELL, TOXIC WASTE AND GEOTECHNICAL DRILL TENDER, FINE GRADER, FIRE WATCHER, LIMBERS, BRUSH LOADER, PILERS AND DEBRIS HANDLERS. FLAGMAN. GAS OIL AND WATER PIPELINE LABORER. MATERIAL HOSEMAN (SLABS, WALLS, FLOORS, DECKS); PLUGGING, FILLING OF SHEE BOLT HOLES; DRY PACKING OF CONCRETE AND PATCHING; POST HOLER DIGGER (MANUAL); RAILROAD MAINTENANCE, REPAIR TRACKMAN, ROAD BEDS; RIGGING & SIGNALING; SCALER, SLIP-FORM RAISERS, FILLING CRACKS ON ANY SURFACE, TOOL CRIB OR TOOL HOUSE LABORER, TRAFFIC CONTROL (SIGNS, BARRIERS, BARRICADES, DELINEATOR, CONES ETC.), WINDOW CLEANER

$46.66$25.09$71.75Agreement
LABO0300-005 · Laborers agreement, July 1, 2025
ASBESTOS REMOVAL LABORER

SCOPE OF WORK: INCLUDES SITE MOBILIZATION, INITIAL SITE CLEANUP, SITE PREPARATION, REMOVAL OF ASBESTOS-CONTAINING MATERIAL AND TOXIC WASTE, ENCAPSULATION, ENCLOSURE AND DISPOSAL OF ASBESTOS- CONTAINING MATERIALS AND TOXIC WASTE BY HAND OR WITH EQUIPMENT OR MACHINERY; SCAFFOLDING, FABRICATION OF TEMPORARY WOODEN BARRIERS AND ASSEMBLY OF DECONTAMINATION STATIONS

$46.48$25.93$72.41Agreement
LABO0345-001 · Laborers agreement, July 1, 2025
LABORER, GUNITE: GROUP 3 REBOUNDMEN

FOOTNOTE: GUNITE PREMIUM PAY: WORKERS WORKING FROM A BOSN'N'S CHAIR OR SUSPENDED FROM A ROPE OR CABLE SHALL RECEIVE 40 CENTS PER HOUR ABOVE THE FOREGOING APPLICABLE CLASSIFICATION RATES. WORKERS DOING GUNITE AND/OR SHOTCRETE WORK IN A TUNNEL SHALL RECEIVE 35 CENTS PER HOUR ABOVE THE FOREGOING APPLICABLE CLASSIFICATION RATES, PAID ON A PORTAL-TO-PORTAL BASIS. ANY WORK PERFORMED ON, IN OR ABOVE ANY SMOKE STACK, SILO, STORAGE ELEVATOR OR SIMILAR TYPE OF STRUCTURE, WHEN SUCH STRUCTURE IS IN EXCESS OF 75'-0"" ABOVE BASE LEVEL AND WHICH WORK MUST BE PERFORMED IN WHOLE OR IN PART MORE THAN 75'-0"" ABOVE BASE LEVEL, THAT WORK PERFORMED ABOVE THE 75'-0"" LEVEL SHALL BE COMPENSATED FOR AT 35 CENTS PER HOUR ABOVE THE APPLICABLE CLASSIFICATION WAGE RATE

$51.39$23.77$75.16Agreement
LABORER, GUNITE: GROUP 2 GUNMEN

FOOTNOTE: GUNITE PREMIUM PAY: WORKERS WORKING FROM A BOSN'N'S CHAIR OR SUSPENDED FROM A ROPE OR CABLE SHALL RECEIVE 40 CENTS PER HOUR ABOVE THE FOREGOING APPLICABLE CLASSIFICATION RATES. WORKERS DOING GUNITE AND/OR SHOTCRETE WORK IN A TUNNEL SHALL RECEIVE 35 CENTS PER HOUR ABOVE THE FOREGOING APPLICABLE CLASSIFICATION RATES, PAID ON A PORTAL-TO-PORTAL BASIS. ANY WORK PERFORMED ON, IN OR ABOVE ANY SMOKE STACK, SILO, STORAGE ELEVATOR OR SIMILAR TYPE OF STRUCTURE, WHEN SUCH STRUCTURE IS IN EXCESS OF 75'-0"" ABOVE BASE LEVEL AND WHICH WORK MUST BE PERFORMED IN WHOLE OR IN PART MORE THAN 75'-0"" ABOVE BASE LEVEL, THAT WORK PERFORMED ABOVE THE 75'-0"" LEVEL SHALL BE COMPENSATED FOR AT 35 CENTS PER HOUR ABOVE THE APPLICABLE CLASSIFICATION WAGE RATE

$54.93$23.77$78.70Agreement
LABORER, GUNITE: GROUP 1 RODMEN, NOZZLEMEN

FOOTNOTE: GUNITE PREMIUM PAY: WORKERS WORKING FROM A BOSN'N'S CHAIR OR SUSPENDED FROM A ROPE OR CABLE SHALL RECEIVE 40 CENTS PER HOUR ABOVE THE FOREGOING APPLICABLE CLASSIFICATION RATES. WORKERS DOING GUNITE AND/OR SHOTCRETE WORK IN A TUNNEL SHALL RECEIVE 35 CENTS PER HOUR ABOVE THE FOREGOING APPLICABLE CLASSIFICATION RATES, PAID ON A PORTAL-TO-PORTAL BASIS. ANY WORK PERFORMED ON, IN OR ABOVE ANY SMOKE STACK, SILO, STORAGE ELEVATOR OR SIMILAR TYPE OF STRUCTURE, WHEN SUCH STRUCTURE IS IN EXCESS OF 75'-0"" ABOVE BASE LEVEL AND WHICH WORK MUST BE PERFORMED IN WHOLE OR IN PART MORE THAN 75'-0"" ABOVE BASE LEVEL, THAT WORK PERFORMED ABOVE THE 75'-0"" LEVEL SHALL BE COMPENSATED FOR AT 35 CENTS PER HOUR ABOVE THE APPLICABLE CLASSIFICATION WAGE RATE

$55.88$23.77$79.65Agreement
LABO1184-001 · Laborers agreement, July 1, 2025
LABORERS: STRIPING/SLURRY SEAL: GROUP 4…
Full text

LABORERS: STRIPING/SLURRY SEAL: GROUP 4 STRIPER: LAYOUT AND APPLICATION OF TRAFFIC STRIPES AND MARKINGS; HOT THERMO PLASTIC; TAPE TRAFFIC STRIPES AND MARKINGS, INCLUDING TRAFFIC CONTROL; OPERATION OF ALL RELATED MACHINERY AND EQUIPMENT

$54.35$23.97$78.32Agreement
LABORERS: STRIPING/SLURRY SEAL: GROUP 3…
Full text

LABORERS: STRIPING/SLURRY SEAL: GROUP 3 TRAFFIC DELINEATING DEVICE APPLICATOR: LAYOUT AND APPLICATION OF PAVEMENT MARKERS, DELINEATING SIGNS, RUMBLE AND TRAFFIC BARS, ADHESIVES, GUIDE MARKERS, OTHER TRAFFIC DELINEATING DEVICES INCLUDING TRAFFIC CONTROL. THIS CATEGORY INCLUDES ALL TRAFFIC RELATED SURFACE PREPARATION (SANDBLASTING, WATERBLASTING, GRINDING) AS PART OF THE APPLICATION PROCESS. TRAFFIC PROTECTIVE DELINEATING SYSTEM INSTALLER: REMOVES, RELOCATES, INSTALLS, PERMANENTLY AFFIXED ROADSIDE AND PARKING DELINEATION BARRICADES, FENCING, CABLE ANCHOR, GUARD RAIL, REFERENCE SIGNS, MONUMENT MARKERS; OPERATION OF ALL RELATED MACHINERY AND EQUIPMENT; POWER BROOM SWEEPER

$52.61$23.97$76.58Agreement
LABORERS: STRIPING/SLURRY SEAL: GROUP 2…
Full text

LABORERS: STRIPING/SLURRY SEAL: GROUP 2 TRAFFIC SURFACE ABRASIVE BLASTER; POT TENDER - REMOVAL OF ALL TRAFFIC LINES AND MARKINGS BY ANY METHOD (SANDBLASTING, WATERBLASTING, GRINDING, ETC.) AND PREPARATION OF SURFACE FOR COATINGS. TRAFFIC CONTROL PERSON: CONTROLLING AND DIRECTING TRAFFIC THROUGH BOTH CONVENTIONAL AND MOVING LANE CLOSURES; OPERATION OF ALL RELATED MACHINERY AND EQUIPMENT

$50.60$23.97$74.57Agreement
LABORERS: STRIPING/SLURRY SEAL: GROUP 1…
Full text

LABORERS: STRIPING/SLURRY SEAL: GROUP 1 PROTECTIVE COATING, PAVEMENT SEALING, INCLUDING REPAIR AND FILLING OF CRACKS BY ANY METHOD ON ANY SURFACE IN PARKING LOTS, GAME COURTS AND PLAYGROUNDS; CARSTOPS; OPERATION OF ALL RELATED MACHINERY AND EQUIPMENT; EQUIPMENT REPAIR TECHNICIAN

$49.30$23.97$73.27Agreement
LABORERS: HORIZONTAL DIRECTIONAL DRILLING: (4) ELECTRONIC TRACKING LOCATOR$51.96$20.86$72.82Agreement
LABORERS: HORIZONTAL DIRECTIONAL DRILLING: (3) HORIZONTAL DIRECTIONAL DRILL OPERATOR$49.96$20.86$70.82Agreement
LABORERS: HORIZONTAL DIRECTIONAL DRILLING: (2) VEHICLE OPERATOR/HAULER$48.11$20.86$68.97Agreement
LABORERS: HORIZONTAL DIRECTIONAL DRILLING: (1) DRILLING CREW LABORER$47.94$20.86$68.80Agreement
LABO1414-003 · Laborers agreement, August 6, 2025
LABORER: PLASTER TENDER WORK ON A SWING STAGE SCAFFOLD…
Full text

LABORER: PLASTER TENDER WORK ON A SWING STAGE SCAFFOLD: $1.00 PER HOUR ADDITIONAL. WORK AT MILITARY BASES - $3.00 ADDITIONAL PER HOUR: CORONADO NAVAL AMPHIBIOUS BASE, FORT IRWIN, MARINE CORPS AIR STATION-29 PALMS, IMPERIAL BEACH NAVAL AIR STATION, MARINE CORPS LOGISTICS SUPPLY BASE, MARINE CORPS PICKLE MEADOWS, MOUNTAIN WARFARE TRAINING CENTER, NAVAL AIR FACILITY-SEELEY, NORTH ISLAND NAVAL AIR STATION, VANDENBERG AFB

$48.72$25.97$74.69Agreement
LABORER: PLASTER CLEAN-UP LABORER WORK ON A SWING STAGE SCAFFOLD…
Full text

LABORER: PLASTER CLEAN-UP LABORER WORK ON A SWING STAGE SCAFFOLD: $1.00 PER HOUR ADDITIONAL. WORK AT MILITARY BASES - $3.00 ADDITIONAL PER HOUR: CORONADO NAVAL AMPHIBIOUS BASE, FORT IRWIN, MARINE CORPS AIR STATION-29 PALMS, IMPERIAL BEACH NAVAL AIR STATION, MARINE CORPS LOGISTICS SUPPLY BASE, MARINE CORPS PICKLE MEADOWS, MOUNTAIN WARFARE TRAINING CENTER, NAVAL AIR FACILITY-SEELEY, NORTH ISLAND NAVAL AIR STATION, VANDENBERG AFB

$46.17$25.97$72.14Agreement
PAIN0036-001 · Painters and Allied Trades agreement, July 1, 2023
PAINTERS: INCLUDING LEAD ABATEMENT: (2) ALL OTHER WORK$38.52$18.64$57.16Agreement
PAIN0036-010 · Painters and Allied Trades agreement, September 1, 2024
DRYWALL FINISHER/TAPER (1) BUILDING & HEAVY CONSTRUCTION$43.59$24.80$68.39Agreement
DRYWALL FINISHER/TAPER…
Full text

DRYWALL FINISHER/TAPER (2) Residential Construction (Wood frame apartments, single family homes and multi-duplexes up to and including four stories)

$32.27$14.70$46.97Agreement
PAIN0036-012 · Painters and Allied Trades agreement, October 1, 2024
GLAZIER$52.90$22.16$75.06Agreement
PAIN0036-019 · Painters and Allied Trades agreement, January 1, 2025
SOFT FLOOR LAYER$40.77$19.37$60.14Agreement
PLAS0200-005 · Plasterers and Cement Masons agreement, August 3, 2022
PLASTERER NORTH ISLAND NAVAL AIR STATION…
Full text

PLASTERER NORTH ISLAND NAVAL AIR STATION, COLORADO NAVAL AMPHIBIOUS BASE, IMPERIAL BEACH NAVAL AIR STATION: $3.00 ADDITIONAL PER HOUR

$47.37$19.64$67.01Agreement
PLAS0500-001 · Plasterers and Cement Masons agreement, July 1, 2018
CEMENT MASON/CONCRETE FINISHER GROUP 3: ALL OTHER WORK$30.07$21.12$51.19Agreement
CEMENT MASON/CONCRETE FINISHER GROUP 2: Work classified as type I and II construction$27.99$19.77$47.76Agreement
CEMENT MASON/CONCRETE FINISHER GROUP 1…
Full text

CEMENT MASON/CONCRETE FINISHER GROUP 1: Residential wood frame project of any size; work classified as Type III, IV or Type V construction; interior tenant improvement work regardless the size of the project; any wood frame project of four stories or less

$26.34$19.77$46.11Agreement
PLUM0016-006 · Plumbers and Pipefitters agreement, September 1, 2025
PLUMBER, PIPEFITTER…
Full text

PLUMBER, PIPEFITTER, STEAMFITTER: WORK ONLY ON STRIP MALLS, LIGHT COMMERCIAL, TENANT IMPROVEMENT AND REMODEL WORK

$44.29$24.16$68.45Agreement
PLUMBER, PIPEFITTER…
Full text

PLUMBER, PIPEFITTER, STEAMFITTER : ALL OTHER WORK EXCEPT WORK ON NEW ADDITIONS AND REMODELING OF BARS, RESTAURANT, STORES AND COMMERCIAL BUILDINGS NOT TO EXCEED 5,000 SQ. FT. OF FLOOR SPACE AND WORK ON STRIP MALLS, LIGHT COMMERCIAL, TENANT IMPROVEMENT AND REMODEL WORK

$61.73$26.81$88.54Agreement
PLUMBER, PIPEFITTER…
Full text

PLUMBER, PIPEFITTER, STEAMFITTER: WORK ONLY ON NEW ADDITIONS AND REMODELING OF COMMERCIAL BUILDINGS, BARS, RESTAURANTS, AND STORES NOT TO EXCEED 5,000 SQ. FT. OF FLOOR SPACE

$59.85$25.83$85.68Agreement
PLUMBER, PIPEFITTER, STEAMFITTER: CAMP PENDLETON; VANDENBERG AIR FORCE BASE$66.23$26.81$93.04Agreement
PLUM0016-011 · Plumbers and Pipefitters agreement, September 1, 2025
PLUMBER/PIPEFITTER (RESIDENTIAL)$48.83$22.73$71.56Agreement
PLUM0345-001 · Plumbers and Pipefitters agreement, September 1, 2025
PLUMBER (SEWER & STORM DRAIN WORK)$48.84$23.58$72.42Agreement
PLUMBER (LANDSCAPE/IRRIGATION FITTER)$44.75$26.20$70.95Agreement
ROOF0045-001 · Roofers agreement, July 1, 2024
ROOFER$42.80$12.64$55.44Agreement
SFCA0669-001 · SFCA, January 1, 2026
SPRINKLER FITTER$52.53$28.19$80.72SFCA
SHEE0206-001 · Sheet Metal Workers agreement, January 1, 2025
SHEET METAL WORKER…
Full text

SHEET METAL WORKER (SHEET METAL TECHNICIAN) SHEET METAL TECHNICIAN - SCOPE: a. Existing residential buildings, both single and multi-family, where each unit is heated and/or cooled by a separate system b. New single family residential buildings including tracts. c. New multi-family residential buildings, not exceeding five stories of living space in height, provided each unit is heated or cooled by a separate system. Hotels and motels are excluded. d. LIGHT COMMERCIAL WORK: Any sheet metal, heating and air conditioning work performed on a project where the total construction cost, excluding land, is under $1,000,000 e. TENANT IMPROVEMENT WORK: Any work necessary to finish interior spaces to conform to the occupants of commercial buildings, after completion of the building shell

$38.65$10.31$48.96Agreement
SHEET METAL WORKER (EXCEPT CAMP PENDLETON)$51.45$30.92$82.37Agreement
SHEET METAL WORKER (CAMP PENDLETON)$53.45$30.92$84.37Agreement
TEAM0166-001 · Teamsters agreement, July 1, 2025
TRUCK DRIVERS: GROUP 7 REPAIRMAN

FOOTNOTE: HAZMAT PAY: WORK ON A HAZMAT JOB, WHERE HAZMAT CERTIFICATION IS REQUIRED, SHALL BE PAID, IN ADDITION TO THE CLASSIFICATION WORKING IN, AS FOLLOWS: LEVELS A, B AND C - +$1.00 PER HOUR. WORKERS SHALL BE PAID HAZMAT PAY IN INCREMENTS OF FOUR (4) AND EIGHT (8) HOURS

$45.31$27.07$72.38Agreement
TRUCK DRIVERS: GROUP 6…
Full text

TRUCK DRIVERS: GROUP 6 OFF-ROAD SPECIAL EQUIPMENT (INCLUDING BUT NOT LIMITED TO WATER PULL TANKERS, ATHEY WAGONS, DJB, B70 WUCLIDS OR LIKE EQUIPMENT)

FOOTNOTE: HAZMAT PAY: WORK ON A HAZMAT JOB, WHERE HAZMAT CERTIFICATION IS REQUIRED, SHALL BE PAID, IN ADDITION TO THE CLASSIFICATION WORKING IN, AS FOLLOWS: LEVELS A, B AND C - +$1.00 PER HOUR. WORKERS SHALL BE PAID HAZMAT PAY IN INCREMENTS OF FOUR (4) AND EIGHT (8) HOURS

$43.80$27.07$70.87Agreement
TRUCK DRIVERS: GROUP 5…
Full text

TRUCK DRIVERS: GROUP 5 OFF-ROAD DUMP TRUCK 35 TONS AND OVER, 7-AXLES OR MORE, TRANSIT MIX TRUCKS 8 YD AND OVER, A-FRAME TRUCK, SWEDISH CRANES

FOOTNOTE: HAZMAT PAY: WORK ON A HAZMAT JOB, WHERE HAZMAT CERTIFICATION IS REQUIRED, SHALL BE PAID, IN ADDITION TO THE CLASSIFICATION WORKING IN, AS FOLLOWS: LEVELS A, B AND C - +$1.00 PER HOUR. WORKERS SHALL BE PAID HAZMAT PAY IN INCREMENTS OF FOUR (4) AND EIGHT (8) HOURS

$43.31$27.07$70.38Agreement
TRUCK DRIVERS: GROUP 4…
Full text

TRUCK DRIVERS: GROUP 4 OFF-ROAD DUMP TRUCK UNDER 35 TONS 4-AXLES BUT LESS THAN 7-AXLES, LOW-BED TRUCK & TRAILER, TRANSIT MIX TRUCKS UNDER 8 YD, 3-AXLE WATER TRUCK, EROSION CONTROL DRIVER, GROUT MIXER TRUCK, DUMP CRETE 6.5YD AND OVER, DUMPSTER TRUCKS, DW 10, DW 20 AND OVER, FUEL TRUCK AND DYNAMITE, TRUCK GREASER, TRUCK MOUNTED MOBILE SWEEPER 2-AXLE WINCH TRUCK

FOOTNOTE: HAZMAT PAY: WORK ON A HAZMAT JOB, WHERE HAZMAT CERTIFICATION IS REQUIRED, SHALL BE PAID, IN ADDITION TO THE CLASSIFICATION WORKING IN, AS FOLLOWS: LEVELS A, B AND C - +$1.00 PER HOUR. WORKERS SHALL BE PAID HAZMAT PAY IN INCREMENTS OF FOUR (4) AND EIGHT (8) HOURS

$43.11$27.07$70.18Agreement
TRUCK DRIVERS: GROUP 3…
Full text

TRUCK DRIVERS: GROUP 3- 2-AXLE WATER TRUCK, 3-AXLE DUMP TRUCK, 3-AXLE FLAT BED, EROSION CONTROL NOZZLEMAN, DUMP CRETE TRUCK UNDER 6.5 YD, FORKLIFT 15,000 LBS AND OVER, PRELL TRUCK, PIPELINE WORK TRUCK DRIVER, ROAD OIL SPREADER, CEMENT DISTRIBUTOR OR SLURRY DRIVER, BOOTMAN, ROSS CARRIER

FOOTNOTE: HAZMAT PAY: WORK ON A HAZMAT JOB, WHERE HAZMAT CERTIFICATION IS REQUIRED, SHALL BE PAID, IN ADDITION TO THE CLASSIFICATION WORKING IN, AS FOLLOWS: LEVELS A, B AND C - +$1.00 PER HOUR. WORKERS SHALL BE PAID HAZMAT PAY IN INCREMENTS OF FOUR (4) AND EIGHT (8) HOURS

$42.91$27.07$69.98Agreement
TRUCK DRIVERS: GROUP 2…
Full text

TRUCK DRIVERS: GROUP 2- 2-AXLE DUMP TRUCK, 2-AXLE FLAT BED,CONCRETE PUMPING TRUCK, INDUSTRIAL LIFT TRUCK, MOTORIZED TRAFFIC CONTROL, PICKUP TRUCK ON JOBSITE

FOOTNOTE: HAZMAT PAY: WORK ON A HAZMAT JOB, WHERE HAZMAT CERTIFICATION IS REQUIRED, SHALL BE PAID, IN ADDITION TO THE CLASSIFICATION WORKING IN, AS FOLLOWS: LEVELS A, B AND C - +$1.00 PER HOUR. WORKERS SHALL BE PAID HAZMAT PAY IN INCREMENTS OF FOUR (4) AND EIGHT (8) HOURS

$42.71$27.07$69.78Agreement
TRUCK DRIVERS: GROUP 1 FUEL MAN, SWAMPER

FOOTNOTE: HAZMAT PAY: WORK ON A HAZMAT JOB, WHERE HAZMAT CERTIFICATION IS REQUIRED, SHALL BE PAID, IN ADDITION TO THE CLASSIFICATION WORKING IN, AS FOLLOWS: LEVELS A, B AND C - +$1.00 PER HOUR. WORKERS SHALL BE PAID HAZMAT PAY IN INCREMENTS OF FOUR (4) AND EIGHT (8) HOURS

$32.12$27.07$59.19Agreement

Modification history

Modification 2January 23, 2026
Modification 3May 18, 2026 (current)

Published by the Wage and Hour Division; read from sam.gov. The sheet is checked for a newer modification each day. Contracts awarded since January 1, 2017 also carry Executive Order 13706 paid sick leave (one hour per 30 worked, up to 56 a year).

Questions people ask

Which rate do I pay on CA20260001?
The line for the classification of work actually performed: the basic rate plus the fringe. You may pay the fringe into benefit plans, as cash on every hour, or a mix. Overtime after 40 hours is 1.5 times the basic rate; fringe is paid on every hour and never multiplied.
My trade is not on this sheet. What do I do?
Do not borrow the nearest name. Ask the contracting agency for a conformance on Standard Form 1444 before the first week of that work, and note it as pending on the payroll.
Does modification 3 apply to my contract?
Only if it was in force when your contract was awarded (generally at bid opening). An earlier modification locked into the contract keeps applying, except on option years, added scope and indefinite-quantity contracts. The number and modification are on the first page of the exhibit in your contract.

How to read a wage determination · Paying the fringe in cash or through plans · Overtime on these rates · Fringe credit calculator