Prevailing wage rates · Arizona · Wage determination
Prevailing wage rates: Apache, Graham, Greenlee and Navajo Counties, Arizona
Heavy construction · AZ20260054 modification 1, published May 18, 2026
The short answer
This sheet sets 21 classifications for heavy work in Apache, Graham, Greenlee and Navajo Counties, Arizona. Each line is a basic hourly rate plus a fringe rate, and the sum is the minimum you must pay for that work, from $27.38 an hour (power equipment operator: backhoe/backhoe & loader combo/track backhoe) to $84.57 (electrician: lineperson). Your contract may lock an earlier modification.
Scope
Excludes Dam Construction
Rates by classification
Total is the basic rate plus the fringe. Source is the agreement or survey the rate came from; a marker means the group changed in this modification. A dagger (†) means the fringe carries a footnote or percentage the total does not include; read the group’s notes.
| Classification | Basic rate | Fringe | Total | Source |
|---|---|---|---|---|
| ELEC0570-014 · Electrical Workers (IBEW) agreement, June 1, 2025 | ||||
| ELECTRICIAN | $33.00 | $13.04 | $46.04 | Agreement |
| ELEC0769-001 · Electrical Workers (IBEW) agreement, August 4, 2025 | ||||
| ELECTRICIAN: LINEPERSON | $62.08 | $22.49 | $84.57 | Agreement |
| ELEC0769-003 · Electrical Workers (IBEW) agreement, August 4, 2025 | ||||
| ELECTRICIAN: GROUNDPERSON | $36.00 | $16.88 | $52.88 | Agreement |
| ELEC0769-004 · Electrical Workers (IBEW) agreement, August 4, 2025 | ||||
| ELECTRICIAN: LINE EQUIPMENT OPERATOR | $46.56 | $19.15 | $65.71 | Agreement |
| ENGI0012-042 · Operating Engineers agreement, December 1, 2024 | ||||
| POWER EQUIPMENT OPERATOR: CRANE/DERRICK | $36.64 | $18.12 | $54.76 | Agreement |
| ENGI0012-049 · Operating Engineers agreement, December 1, 2024 | ||||
| POWER EQUIPMENT OPERATOR: LOADER/FRONT END LOADER | $35.56 | $18.12 | $53.68 | Agreement |
| ENGI0012-062 · Operating Engineers agreement, December 1, 2024 | ||||
| TRUCK DRIVER: HYDROVAC | $32.29 | $18.12 | $50.41 | Agreement |
| LABO1184-012 · Laborers agreement, June 1, 2025 | ||||
| LABORER: GENERAL | $27.41 | $9.26 | $36.67 | Agreement |
| LABO1184-013 · Laborers agreement, June 1, 2025 | ||||
| LABORER: JACKHAMMER | $29.05 | $9.26 | $38.31 | Agreement |
| LABO1184-014 · Laborers agreement, June 1, 2025 | ||||
| LABORER: PIPELAYER | $29.91 | $9.26 | $39.17 | Agreement |
| LABO1184-015 · Laborers agreement, June 1, 2025 | ||||
| POWER EQUIPMENT OPERATOR: FORKLIFT | $30.88 | $9.26 | $40.14 | Agreement |
| LABO1184-019 · Laborers agreement, June 1, 2025 | ||||
| LABORER: MASON TENDER | $27.41 | $9.26 | $36.67 | Agreement |
| LABO1184-022 · Laborers agreement, June 1, 2025 | ||||
| LABORER: ASPHALT, INCLUDES RAKER, SHOVELER, SPREADER AND DISTRIBUTOR | $29.05 | $9.26 | $38.31 | Agreement |
| LABO1184-028 · Laborers agreement, June 1, 2025 | ||||
| LABORER: GRADE SETTER | $29.91 | $9.26 | $39.17 | Agreement |
| LABO1184-034 · Laborers agreement, June 1, 2025 | ||||
| TRUCK DRIVER: CONCRETE | $30.88 | $9.26 | $40.14 | Agreement |
| LABO1184-035 · Laborers agreement, June 1, 2025 | ||||
| TRUCK DRIVER: DUMP | $30.88 | $9.26 | $40.14 | Agreement |
| LABO1184-036 · Laborers agreement, June 1, 2025 | ||||
| TRUCK DRIVER: WATER | $30.88 | $9.26 | $40.14 | Agreement |
| LABO1184-040 · Laborers agreement, June 1, 2025 | ||||
| LABORER: FENCE ERECTOR | $27.41 | $9.26 | $36.67 | Agreement |
| LABO1184-050 · Laborers agreement, June 1, 2025 | ||||
| CARPENTER: FORMWORK CONCRETE | $31.98 | $9.26 | $41.24 | Agreement |
| PLUM0469-011 · Plumbers and Pipefitters agreement, July 1, 2024 | ||||
| PIPEFITTER-STEAMFITTER | $54.15 | $19.80 | $73.95 | Agreement |
| SUAZ2023-004 · Survey of contractors in AZ, November 19, 2024 | ||||
| POWER EQUIPMENT OPERATOR: BACKHOE/BACKHOE & LOADER COMBO/TRACK BACKHOE | $27.38 | $0.00 | $27.38 | Survey |
Modification history
| Modification 0 | January 2, 2026 |
| Modification 1 | May 18, 2026 (current) |
Published by the Wage and Hour Division; read from sam.gov. The sheet is checked for a newer modification each day. Contracts awarded since January 1, 2017 also carry Executive Order 13706 paid sick leave (one hour per 30 worked, up to 56 a year).
Questions people ask
- Which rate do I pay on AZ20260054?
- The line for the classification of work actually performed: the basic rate plus the fringe. You may pay the fringe into benefit plans, as cash on every hour, or a mix. Overtime after 40 hours is 1.5 times the basic rate; fringe is paid on every hour and never multiplied.
- My trade is not on this sheet. What do I do?
- Do not borrow the nearest name. Ask the contracting agency for a conformance on Standard Form 1444 before the first week of that work, and note it as pending on the payroll.
- Does modification 1 apply to my contract?
- Only if it was in force when your contract was awarded (generally at bid opening). An earlier modification locked into the contract keeps applying, except on option years, added scope and indefinite-quantity contracts. The number and modification are on the first page of the exhibit in your contract.
How to read a wage determination · Paying the fringe in cash or through plans · Overtime on these rates · Fringe credit calculator