This sheet sets 46 classifications for highway work in Yavapai County, Arizona. Each line is a basic hourly rate plus a fringe rate, and the sum is the minimum you must pay for that work, from $18.03 an hour (painter: sign and display erector) to $55.79 (power equipment operator: mechanic). Your contract may lock an earlier modification.

Rates by classification

Total is the basic rate plus the fringe. Source is the agreement or survey the rate came from; a marker means the group changed in this modification. A dagger (†) means the fringe carries a footnote or percentage the total does not include; read the group’s notes.

ClassificationBasic rateFringeTotalSource
CARP1912-002 · Carpenters agreement, July 1, 2024
CARPENTER$35.89$14.98$50.87Agreement
ENGI0012-046 · Operating Engineers agreement, December 1, 2024
POWER EQUIPMENT OPERATOR: BULLDOZER$35.56$18.12$53.68Agreement
ENGI0012-051 · Operating Engineers agreement, December 1, 2024
POWER EQUIPMENT OPERATOR: PAVER/SPREADER/FINISH EQUIPMENT (ASPHALT, AGGREGATE, & CONCRETE)$35.56$18.12$53.68Agreement
ENGI0012-052 · Operating Engineers agreement, December 1, 2024
POWER EQUIPMENT OPERATOR: SCRAPER$35.56$18.12$53.68Agreement
ENGI0012-053 · Operating Engineers agreement, December 1, 2024
POWER EQUIPMENT OPERATOR: TRACTOR$35.56$18.12$53.68Agreement
ENGI0012-057 · Operating Engineers agreement, December 1, 2024
POWER EQUIPMENT OPERATOR: (DRILL RIG/AUGER)$36.64$18.12$54.76Agreement
ENGI0012-064 · Operating Engineers agreement, December 1, 2024
POWER EQUIPMENT OPERATOR: BOBCAT/SKID STEER/SKID LOADER$32.29$18.12$50.41Agreement
ENGI0012-066 · Operating Engineers agreement, December 1, 2024
POWER EQUIPMENT OPERATOR: BACKHOE/BACKHOE & LOADER COMBO/TRACK BACKHOE$35.56$18.12$53.68Agreement
ENGI0012-067 · Operating Engineers agreement, December 1, 2024
POWER EQUIPMENT OPERATOR: COMPACTOR/ROLLER$35.56$18.12$53.68Agreement
ENGI0012-069 · Operating Engineers agreement, December 1, 2024
POWER EQUIPMENT OPERATOR: LOADER/FRONT END LOADER$35.56$18.12$53.68Agreement
ENGI0012-070 · Operating Engineers agreement, December 1, 2024
TRUCK DRIVER: OFF ROAD TRUCK$35.56$18.12$53.68Agreement
ENGI0012-071 · Operating Engineers agreement, December 1, 2024
POWER EQUIPMENT OPERATOR: CRANE/DERRICK$36.64$18.12$54.76Agreement
ENGI0012-072 · Operating Engineers agreement, December 1, 2024
POWER EQUIPMENT OPERATOR: EXCAVATOR/TRACKHOE (GREATER THAN 1/2 CUBIC YARD)$36.64$18.12$54.76Agreement
POWER EQUIPMENT OPERATOR: EXCAVATOR/TRACKHOE (1/2 CUBIC YARD OR SMALLER)$35.56$18.12$53.68Agreement
ENGI0012-074 · Operating Engineers agreement, December 1, 2024
POWER EQUIPMENT OPERATOR: MOTOR GRADER/BLADE$36.64$18.12$54.76Agreement
ENGI0012-075 · Operating Engineers agreement, December 1, 2024
POWER EQUIPMENT OPERATOR: MECHANIC$37.67$18.12$55.79Agreement
LABO1184-016 · Laborers agreement, June 1, 2025
POWER EQUIPMENT OPERATOR: HORIZONTAL DIRECTIONAL DRILL$31.98$9.26$41.24Agreement
LABO1184-017 · Laborers agreement, June 1, 2025
LABORER: FENCE ERECTOR$27.41$9.26$36.67Agreement
LABO1184-018 · Laborers agreement, June 1, 2025
LABORER: GRADE SETTER$27.41$9.26$36.67Agreement
LABO1184-021 · Laborers agreement, June 1, 2025
TRAFFIC CONTROL$27.41$9.26$36.67Agreement
LABO1184-025 · Laborers agreement, June 1, 2025
LABORER: ASPHALT, INCLUDES RAKER, SHOVELER, SPREADER AND DISTRIBUTOR$29.91$9.26$39.17Agreement
LABO1184-033 · Laborers agreement, June 1, 2025
POWER EQUIPMENT OPERATOR: TRENCHER$30.88$9.26$40.14Agreement
LABO1184-039 · Laborers agreement, June 1, 2025
LABORER: GENERAL$27.41$9.26$36.67Agreement
LABO1184-041 · Laborers agreement, June 1, 2025
LABORER: MASON TENDER$27.41$9.26$36.67Agreement
LABO1184-044 · Laborers agreement, June 1, 2025
POWER EQUIPMENT OPERATOR: FORKLIFT$30.88$9.26$40.14Agreement
LABO1184-047 · Laborers agreement, June 1, 2025
TRUCK DRIVER: CONCRETE$30.88$9.26$40.14Agreement
LABO1184-048 · Laborers agreement, June 1, 2025
TRUCK DRIVER: DUMP$30.88$9.26$40.14Agreement
LABO1184-049 · Laborers agreement, June 1, 2025
TRUCK DRIVER: WATER$30.88$9.26$40.14Agreement
SUAZ2023-026 · Survey of contractors in AZ, November 19, 2024
TRUCK DRIVER: SWEEPER$20.24$5.48$25.72Survey
TRUCK DRIVER: OIL DISTRIBUTOR$29.75$8.04$37.79Survey
POWER EQUIPMENT OPERATOR: OILER$31.56$10.69$42.25Survey
POWER EQUIPMENT OPERATOR: MILLING MACHINE$30.09$6.45$36.54Survey
POWER EQUIPMENT OPERATOR: GRADE CHECKER$29.74$13.07$42.81Survey
POWER EQUIPMENT OPERATOR: FIELD EQUIPMENT SERVICEPERSON$35.39$11.50$46.89Survey
POWER EQUIPMENT OPERATOR: CONCRETE SCREED$25.70$7.15$32.85Survey
POWER EQUIPMENT OPERATOR: CONCRETE PUMP TRUCK$43.11$10.87$53.98Survey
POWER EQUIPMENT OPERATOR: BROOM/SWEEPER$26.47$7.26$33.73Survey
POWER EQUIPMENT OPERATOR: BOOM/CRANE TRUCK$43.11$10.87$53.98Survey
PAINTER: SIGN AND DISPLAY ERECTOR$18.03$0.00$18.03Survey
PAINTER: PAVEMENT MARKING$24.60$6.34$30.94Survey
LABORER: PIPELAYER$25.85$7.09$32.94Survey
LABORER: LANDSCAPE LABORER$18.03$0.00$18.03Survey
LABORER: CONCRETE SAW (HAND HELD/WALK BEHIND)$25.22$5.08$30.30Survey
IRONWORKER$33.15$18.57$51.72Survey
ELECTRICIAN$29.00$7.58$36.58Survey
CEMENT MASON/CONCRETE FINISHER$30.09$0.00$30.09Survey

Modification history

Modification 0January 2, 2026
Modification 1May 18, 2026 (current)

Published by the Wage and Hour Division; read from sam.gov. The sheet is checked for a newer modification each day. Contracts awarded since January 1, 2017 also carry Executive Order 13706 paid sick leave (one hour per 30 worked, up to 56 a year).

Questions people ask

Which rate do I pay on AZ20260049?
The line for the classification of work actually performed: the basic rate plus the fringe. You may pay the fringe into benefit plans, as cash on every hour, or a mix. Overtime after 40 hours is 1.5 times the basic rate; fringe is paid on every hour and never multiplied.
My trade is not on this sheet. What do I do?
Do not borrow the nearest name. Ask the contracting agency for a conformance on Standard Form 1444 before the first week of that work, and note it as pending on the payroll.
Does modification 1 apply to my contract?
Only if it was in force when your contract was awarded (generally at bid opening). An earlier modification locked into the contract keeps applying, except on option years, added scope and indefinite-quantity contracts. The number and modification are on the first page of the exhibit in your contract.

How to read a wage determination · Paying the fringe in cash or through plans · Overtime on these rates · Fringe credit calculator