CertifiedHours

Prevailing wage rates · Arizona · Wage determination

Prevailing wage rates: Apache, Cochise, Coconino and 7 more counties, Arizona

Heavy construction · AZ20260007 modification 2, published May 18, 2026

The short answer

This sheet sets 32 classifications for heavy work in Apache, Cochise, Coconino and 7 more counties, Arizona. Each line is a basic hourly rate plus a fringe rate, and the sum is the minimum you must pay for that work, from $28.60 an hour (truck driver group 2: 2 or 3 axle dump , water truck under 2500 gal) to $67.90 (plumber/pipefitter apache, coconino,gila, greenlee, la paz, navajo, and yavapai). Your contract may lock an earlier modification.

Scope

Dam Construction Projects

What changed this year

First published January 2, 2026, this sheet is now on modification 2, and its rates have changed in 2 modifications.

Latest change

May 18, 2026 · modification 2

Classification names reworded; 5 fringe formulas changed among the 28 lines we could match

  • Truck driver: 5 fringe formulas changed

SAM.gov reworded this sheet’s classification names in this modification, so not every line can be matched to the one before. Only lines matched with certainty are compared here; nothing is guessed. If your trade is not listed, compare it against your contract’s copy.

Every line that changed (5)
ClassificationWasNowChange
TRUCK DRIVER GROUP 6- 7-AXLE DUMP, 8-AXLE DUMP$29.47 + 1.65+a$29.47 + $1.65changed
TRUCK DRIVER GROUP 5- 6-AXLE DUMP$27.80 + 1.65+a$27.80 + $1.65changed
TRUCK DRIVER GROUP 4- 5 AXLE DUMP, WATER TRUCK 4000 GAL AND OVER$28.68 + 1.65+a$28.68 + $1.65changed
TRUCK DRIVER GROUP 3- 4 AXLE DUMP, WATER TRUCK DRIVE- (2500 GAL BUT LESS THAN 4000 GAL)$27.43 + 1.65+a$27.43 + $1.65changed
TRUCK DRIVER GROUP 2: 2 OR 3 AXLE DUMP , WATER TRUCK UNDER 2500 GAL.$26.95 + 1.65+a$26.95 + $1.65changed

Earlier modifications

  • January 30, 2026 · modification 11 fringe formula changed
    • Electrician: 1 fringe formula changed
    Every line that changed (1)
    ClassificationWasNowChange
    ELECTRICIAN$34.50 + 9.75+13.25%$36.50 + 10.00+13.25%changed

Compared line by line from each modification as published on SAM.gov. A line we could not pair with certainty is left out rather than guessed.

Rates by classification

These are the rates in modification 2 as published on SAM.gov. The determination and modification written into your contract are the ones that bind you; check that number before relying on this table. Total is the basic rate plus the fringe. Source is the agreement or survey the rate came from and its year; a survey year long past means the rate has not been surveyed since. A marker means the group changed in this modification. In the Since column, a dash means SAM.gov reworded the line during the year and it cannot be matched to the first publication with certainty. A dagger (†) means the fringe carries a footnote or percentage the total does not include; read the group’s notes.

ClassificationBasic rateFringeTotalSince Jan 2Source
BOIL0627-003 · Boilermakers agreement, January 1, 2021
BOILERMAKER$36.07$30.59$66.66no changeAgreement, 2021
BRAZ0003-005 · Bricklayers agreement, July 1, 2021
BRICKLAYER ZONE PAY…
Full text

BRICKLAYER ZONE PAY: (RADIUS MILES FROM THE INTERSECTION OF CENTRAL AVE. AND WASHINGTON ST., PHOENIX, AZ) ZONE A: 0-60 MILES- BASE RATE ZONE B: 61-75 MILES- BASE RATE PLUS $2.00 PER HOUR ZONE C: 75-100 MILES- BASE RATE PLUS $3.00 PER HOUR ZONE D: 101-200 MILES- BASE RATE PLUS $3.50 PER HOUR ZONE E: OVER 200 MILES- BASE RATE PLUS $6.50 PER HOUR

$31.68$8.90$40.58no changeAgreement, 2021
BRAZ0003-013 · Bricklayers agreement, July 1, 2023
BRICKLAYER COCHISE AND SANTA CRUZ COUNTIES…
Full text

BRICKLAYER COCHISE AND SANTA CRUZ COUNTIES; AND THE AREA OF GRAHAM AND GREENLEE COUNTIES LOCATED EAST AND SOUTH OF THE SAN FRANCISCO RIVER TO THE GILA RIVER ZONE PAY: (RADIUS MILES FROM THE INTERSECTION OF CENTRAL AVE. AND WASHINGTON ST., PHOENIX, AZ) ZONE A: 0-60 MILES- BASE RATE ZONE B: 61-75 MILES- BASE RATE PLUS $2.00 PER HOUR ZONE C: 75-100 MILES- BASE RATE PLUS $3.00 PER HOUR ZONE D: 101-200 MILES- BASE RATE PLUS $3.50 PER HOUR ZONE E: OVER 200 MILES- BASE RATE PLUS $6.50 PER HOUR

$32.74$9.52$42.26no changeAgreement, 2023
CARP0408-004 · Carpenters agreement, July 1, 2018
PILEDRIVERMAN$27.38$12.44$39.82no changeAgreement, 2018
CARPENTER (INCLUDING FORM WORK)$28.08$12.74$40.82no changeAgreement, 2018
CARP0408-004 · Carpenters agreement, July 1, 2019
PILEDRIVERMAN$27.38$12.44$39.82—Agreement, 2019
CARPENTER (INCLUDING FORM WORK)$28.08$12.74$40.82—Agreement, 2019
CARP1914-001 · Carpenters agreement, September 1, 2019
MILLWRIGHT ZONE DEFINITIONS FOR MILLWRIGHTS…
Full text

MILLWRIGHT ZONE DEFINITIONS FOR MILLWRIGHTS: MILEAGE SHALL BE CALCULATED FROM THE CONSTRUCTION SITE TO THE CITY HALL IN PHOENIX OR TUCSON, OR TO THE WORKMEN'S RESIDENCE, WHICHEVER IS LESS: ZONE 1: 0-30 MILES ZONE 2: 31-49 MILES ZONE 3: 50 MILES AND OVER

$40.61$17.53$58.14no changeAgreement, 2019
CARP1914-002 · Carpenters agreement, September 1, 2003
DIVER (WET): ZONE 3 ZONE DEFINITIONS…
Full text

DIVER (WET): ZONE 3 ZONE DEFINITIONS: MILEAGE SHALL BE CALCULATED FROM THE CONSTRUCTION SITE TO THE CITY HALL IN PHOENIX OR TUCSON, OR TO THE WORKMEN'S RESIDENCE, WHICHEVER IS LESS: ZONE 1: 0-30 MILES ZONE 2: 31-49 MILES ZONE 3: 50 MILES AND OVER

$48.29$8.93$57.22no changeAgreement, 2003
DIVER (WET): ZONE 2 ZONE DEFINITIONS…
Full text

DIVER (WET): ZONE 2 ZONE DEFINITIONS: MILEAGE SHALL BE CALCULATED FROM THE CONSTRUCTION SITE TO THE CITY HALL IN PHOENIX OR TUCSON, OR TO THE WORKMEN'S RESIDENCE, WHICHEVER IS LESS: ZONE 1: 0-30 MILES ZONE 2: 31-49 MILES ZONE 3: 50 MILES AND OVER

$45.17$8.93$54.10no changeAgreement, 2003
DIVER (WET): ZONE 1 ZONE DEFINITIONS…
Full text

DIVER (WET): ZONE 1 ZONE DEFINITIONS: MILEAGE SHALL BE CALCULATED FROM THE CONSTRUCTION SITE TO THE CITY HALL IN PHOENIX OR TUCSON, OR TO THE WORKMEN'S RESIDENCE, WHICHEVER IS LESS: ZONE 1: 0-30 MILES ZONE 2: 31-49 MILES ZONE 3: 50 MILES AND OVER

$43.79$8.93$52.72no changeAgreement, 2003
DIVER (STANDBY): ZONE 3 ZONE DEFINITIONS…
Full text

DIVER (STANDBY): ZONE 3 ZONE DEFINITIONS: MILEAGE SHALL BE CALCULATED FROM THE CONSTRUCTION SITE TO THE CITY HALL IN PHOENIX OR TUCSON, OR TO THE WORKMEN'S RESIDENCE, WHICHEVER IS LESS: ZONE 1: 0-30 MILES ZONE 2: 31-49 MILES ZONE 3: 50 MILES AND OVER

$28.49$8.93$37.42no changeAgreement, 2003
DIVER (STANDBY): ZONE 2 ZONE DEFINITIONS…
Full text

DIVER (STANDBY): ZONE 2 ZONE DEFINITIONS: MILEAGE SHALL BE CALCULATED FROM THE CONSTRUCTION SITE TO THE CITY HALL IN PHOENIX OR TUCSON, OR TO THE WORKMEN'S RESIDENCE, WHICHEVER IS LESS: ZONE 1: 0-30 MILES ZONE 2: 31-49 MILES ZONE 3: 50 MILES AND OVER

$25.37$8.93$34.30no changeAgreement, 2003
DIVER (STANDBY): ZONE 1 ZONE DEFINITIONS…
Full text

DIVER (STANDBY): ZONE 1 ZONE DEFINITIONS: MILEAGE SHALL BE CALCULATED FROM THE CONSTRUCTION SITE TO THE CITY HALL IN PHOENIX OR TUCSON, OR TO THE WORKMEN'S RESIDENCE, WHICHEVER IS LESS: ZONE 1: 0-30 MILES ZONE 2: 31-49 MILES ZONE 3: 50 MILES AND OVER

$22.98$8.93$31.91no changeAgreement, 2003
ELEC0518-001 · Electrical Workers (IBEW) agreement, August 1, 2025
ELECTRICIAN (APACHE COUNTY [SOUTH OF HIGHWAY 66]…
Full text

ELECTRICIAN (APACHE COUNTY [SOUTH OF HIGHWAY 66]; ALL OF GILA COUNTY; NAVAJO COUNTY [SOUTH AND EAST OF BOUNDARY BEGINNING AT A POINT WHERE CLEAR CREEK CROSSES THE COCONINO-NAVAJO COUNTY LINE, EXTENDING NORTHEASTERLY ALONG CLEAR CREEK AND NORTHEASTERLY TO COTTONWOOD WASH, ALONG COTTONWOOD WASH NORTH EASTERLY TO WHERE IT INTERSECTS THE NAVAJO INDIAN RESERVATION, THEN EAST ALONG THE NAVAJO INDIAN RESERVATION BOUNDARY LINE TO A POINT WHERE IT INTERSECTS THE NAVAJO-APACHE COUNTY LINE]; AND PINAL COU

$36.50$14.84$51.34—Agreement, 2025
ELEC0570-004 · Electrical Workers (IBEW) agreement, June 1, 2025
ELECTRICIAN COCHISE…
Full text

ELECTRICIAN COCHISE, GRAHAM, LA PAZ, AND SANTA CRUZ COUNTIES ZONE DEFINITIONS- ZONE A: THE AREA WITHIN A THIRTY-NINE (39) MILE RADIUS FROM A BASING POINT AT THE TUCSON TOWN HALL. ZONE B: 40 TO 74 MILE RADIUS FROM THE TOWN HALL IN TUCSON- AN ADDITIONAL $ 3.50 PER HOUR ZONE C: 75 MILE RADIUS FROM THE TOWN HALL IN TUCSON TO THE OUTER LIMITS OF THE GEOGRAPHIC JURISDICTION- AN ADDITIONAL $ 7.50 PER HOUR

$33.00$13.04$46.04—Agreement, 2025
ELEC0611-005 · Electrical Workers (IBEW) agreement, January 1, 2025
ELECTRICIAN/WIREMAN…
Full text

ELECTRICIAN/WIREMAN: (ZONE 1) APACHE COUNTY [AREA NORTH OF HIGHWAY 66] ZONE 1: 0 TO 10 MILES FROM GALLUP, NM ZONE 2: 10 TO 30 MILES FROM GALLUP - ADD 9% ZONE 3: 30 TO 40 MILES FROM GALLUP - ADD 15% ZONE 4: OVER 40 MILES FROM GALLUP - ADD 26%

$40.30$13.41$53.71no changeAgreement, 2025
ELEC0640-003 · Electrical Workers (IBEW) agreement, January 1, 2021
ELECTRICIAN (COCONINO AND YAVAPAI COUNTIES…
Full text

ELECTRICIAN (COCONINO AND YAVAPAI COUNTIES; AND THE FOLLOWING PORTIONS OF COUNTIES: NAVAJO COUNTY (NORTH AND WEST OF A BOUNDARY BEGINNING AT A POINT WHERE CLEAR CREEK CROSSES THE COCONINO-NAVAJO COUNTY LINE, NORTHEASTERLY ALONG CLEAR CREEK AND NORTHEASTERLY TO COTTONWOOD WASH, ALONG COTTONWOOD WASH NORTHEASTERLY TO WHERE IT INTERSECTS THE NAVAJO INDIAN RESERVATION THEN EASTERLY ALONG THE NAVAJO INDIAN RESERVATION BOUNDARY LINE TO A POINT WHERE IT INTERSECTS THE NAVAJO-APACHE COUNTY LINE); PINAL

$30.30$12.36$42.66no changeAgreement, 2021
ENGI0428-002 · Operating Engineers agreement, June 1, 2020
POWER EQUIPMENT OPERATOR: GROUP 4…
Full text

POWER EQUIPMENT OPERATOR: GROUP 4 CRANE OPERATOR (PNEUMATIC OR CRAWLER-100 TONS HOISTING CAPACITY AND OVER, MRC RATING), SKIP LOADER (ALL TYPES WITH RATED CAPACITY OF 10 CU. YD. OR MORE), UNIVERSAL EQUIPMENT OPERATOR (BACKHOE, CLAMSHELL, DRAGLINE, SHOVEL, ETC., 10 CU. YD. AND OVER) MULTIPLE-UNIT EARTH EQUIPMENT (HOLLAND LOADER ETC.), TRACTOR OPERATOR, PNEUMATIC-TIRED OR TRACK TYPE, TWO UNITS-$0.50 PER HOUR OVER BASE RATE; AND $1.00 PER HOUR FOR EACH ADDITIONAL UNIT ALL OPERATORS, OILERS, AND MOTOR CRANE DRIVERS ON EQUIPMENT WITH BOOMS, EXCEPT CONCRETE PUMPING TRUCK BOOMS, INCLUDING JIBS, SHALL RECEIVE $0.01 PER HOUR PER FOOT OVER 80 FT IN ADDITION TO REGULAR RATE OF PAY

PREMIUM PAY: FOR PERFORMING HAZARDOUS WASTE REMOVAL $0.50 PER HOUR OVER BASE RATE

$32.42$11.72$44.14no changeAgreement, 2020
POWER EQUIPMENT OPERATOR: GROUP 3…
Full text

POWER EQUIPMENT OPERATOR: GROUP 3 ASPHALT OR CONCRETE PLANING, ROTOMILL AND MILLING MACHINE, AUTO GRADE MACHINE (CMI AND SIMILAR EQUIPMENT), BORING MACHINE (INCLUDING MOLE, BADGER AND SIMILAR TYPE), CONCRETE PUMP (TRUCK MOUNTED WITH BOOM), CRANE (CRAWLER AND PNEUMATIC OVER 15 TONS BUT LESS THAN 100 TONS CAPACITY MRC), CRAWLER TYPE TRACTOR WITH BOOM ATTACHMENT AND SLOPE BAR, DERRICK, GRADALL, HEAVY DUTY MECHANIC/WELDER, HELICOPTER HOIST OPERATOR OR PILOT, HIGHLINE CABLEWAY, MASS EXCAVATOR (150 BUCYRUS, ERIE AND SIMILAR TYPE), MECHANICAL HOIST (TWO OR MORE DRUMS), MOTOR GRADER (ANY TYPE POWER BLADE-FINISH), MUCKING MACHINE, OVERHEAD CRANE, GRADE CHECKER, PILEDRIVER ENGINEER (PORTABLE, STATIONARY OR SKID RIG), POWER DRIVEN DITCH LINING OR DITCH TRIMMING MACHINE, REMOTE CONTROL EARTH MOVING MACHINE, SKIP LOADER (ALL TYPES WITH RATED CAPACITY 6 CU. YD. BUT LESS THAN 10 CU. YD.), SLIP FORM PAVING MACHINE (INCLUDING GUNNERT, ZIMMERMAN AND SIMILAR TYPES), TOWER CRANE OR SIMILAR TYPE, UNIVERSAL EQUIPMENT OPERATOR (BACKHOE, CLAMSHELL, DRAGLINE, SHOVEL ETC., UP TO 10 CU. YD.); OPERATING ENGINEERS ELECTRICIAN INCLUDING TOWER ERECTOR, LINEMAN & CABLE SPLICER (LOAD SIDE OF MAIN DISCONNECT)

$31.39$11.72$43.11no changeAgreement, 2020
POWER EQUIPMENT OPERATOR: GROUP 2…
Full text

POWER EQUIPMENT OPERATOR: GROUP 2 AGGREGATE PLANT (INCLUDING CRUSHING, SCREENING AND SAND PLANTS, ETC.), ASPHALT PLANT MIXER, ASPHALT LAYDOWN MACHINE, BACKHOE (RUBBER TIRED OR TRACK, LESS THAN 1 CU. YD. MRC), BEE GEE OPERATOR BORING MACHINE, CONCRETE BATCH PLANT (ALL TYPES AND SIZES), CONCRETE MECHANICAL TAMPING, SPREADING OR FINISHING MACHINE (INCLUDING CLARY, JOHNSON OR SIMILAR TYPES), CONCRETE MIXER (PAVING TYPE AND MOBILE MIXERS), CONCRETE PUMP, CRANE (CRAWLER AND PNEUMATIC LESS THAN 15 TON CAPACITY MRC), DRILLING MACHINE (INCLUDING WATER WELLS), ELEVATING GRADER (ALL TYPES AND SIZES EXCEPT AS OTHERWISE CLASSIFIED), FIELD EQUIPMENT SERVICEMAN, PAVER AND SIMILAR TYPE EQUIPMENT, MOTOR GRADER (ANY TYPE POWER BLADE-ROUGH), OILER DRIVER, OPERATING ENGINEER RIGGER, PNEUMATIC TIRED SCRAPER (ALL SIZES AND TYPES), POWER JUMBO FORM SETTER, ROAD OIL MIXING MACHINE, ROLLER (ON ALL TYPES ASPHALT PAVEMENT), SCREED, SELF-PROPELLED COMPACTOR (WITH BLADE, 815, 825 OR EQUIVALENT-GRADE OPERATION), SKIP LOADER (ALL TYPES WITH A RATED CAPACITY OVER 3 BUT LESS THAN 6 CU. YD.), SLIP FORM (POWER DRIVEN LIFTING DEVICE FOR CONCRETE FORMS), SOIL CEMENT ROAD MIXINGMACHINE (SINGLE PASS TYPE), HEATER AND PLANER, TRACTOR (DOZER, PUSHER-ALL), TRAVELING PIPE-WRAPPING MACHINE, TRENCHING MACHINE, TUGGER (TWO OR MORE)

$30.31$11.72$42.03no changeAgreement, 2020
POWER EQUIPMENT OPERATOR: GROUP 1…
Full text

POWER EQUIPMENT OPERATOR: GROUP 1 A-FRAME BOOM TRUCK, WINCH TRUCK, AIR COMPRESSOR, BELTCRETE, BORING BRIDGE AND TEXTURE, CONCRETE MIXER (SKIP TYPE), CONDUCTOR, BRAKEMAN, HANDLER, CONVEYOR, CROSS TIMING AND PIPE FLOAT, CURING MACHINE, DINKY (UNDER 20 TONS), ELEVATOR HOIST (HUSKY AND SIMILAR), FIREMEN (ALL), FORKLIFT AND ROSS CARRIER, GENERATOR (ALL), HIGHLINE CABLEWAY SIGNALMAN, HYDROGRAPHIC MULCHER, HYDROGRAPHIC SEEDER, JOINT INSERTER, JUMBO FINISHING MACHINE, KOLMAN BELT LOADER, MACHINE CONVEYOR, MULTIPLE POWER CONCRETE SAW, OILER, PAVEMENT BREAKER, POWER GRIZZLY, POWER SWEEPER, PRESSURE GROUT MACHINE, PUMP, ROLLER (EXCEPT AS OTHERWISE CLASSIFIED), SELF-PROPELLED CHIP SPREADING MACHINE, SKIPLOADER (3 CU. YD. AND LESS), SLURRY SEAL MACHINE (MOTO PAVER DRIVER), SMALL SELF-PROPELLED COMPACTOR (WITH BLADE)-BACKFILL, DITCH OPERATION, STRAW BLOWER, TRACTOR (D-5 AND UNDER), TRIPPER, TUGGER, WELDING MACHINE, WHEEL-TYPE TRACTOR (FORD, FERGUSON TYPE WITH ATTACHMENTS, BEE GEE ETC.)

$27.04$11.72$38.76no changeAgreement, 2020
IRON0075-001 · Ironworkers agreement, August 1, 2025
IRONWORKER ZONE 1: 0 TO 50 MILES FROM CITY HALL IN PHOENIX OR TUCSON ZONE 2…
Full text

IRONWORKER ZONE 1: 0 TO 50 MILES FROM CITY HALL IN PHOENIX OR TUCSON ZONE 2: 050 TO 100 MILES - ADD $4.00 ZONE 3: 100 TO 150 MILES - ADD $5.00 ZONE 4: 150 MILES & OVER - ADD $6.50

$33.00$19.91$52.91no changeAgreement, 2025
PAIN0086-004 · Painters and Allied Trades agreement, April 1, 2024
PAINTER$25.47$8.00$33.47no changeAgreement, 2024
PLAS0394-005 · Plasterers and Cement Masons agreement, January 1, 2024
CEMENT MASON/CONCRETE FINISHER$28.78$9.17$37.95no changeAgreement, 2024
PLUM0469-006 · Plumbers and Pipefitters agreement, July 1, 2024
PLUMBER/PIPEFITTER COCHISE AND SANTA CRUZ$48.40$19.50$67.90no changeAgreement, 2024
PLUMBER/PIPEFITTER APACHE, COCONINO,GILA, GREENLEE, LA PAZ, NAVAJO, AND YAVAPAI$48.40$19.50$67.90no changeAgreement, 2024
TEAM0104-002 · Teamsters agreement, July 1, 2024
TRUCK DRIVER GROUP 6- 7-AXLE DUMP, 8-AXLE DUMP

FOOTNOTE: HEALTH & WELFARE $1,330.26 PER MONTH IN ADDITIONAL FRINGE BENEFITS. AS OF SEPTEMBER 1, 2024

$29.47$1.65$31.12changedAgreement, 2024
TRUCK DRIVER GROUP 5- 6-AXLE DUMP

FOOTNOTE: HEALTH & WELFARE $1,330.26 PER MONTH IN ADDITIONAL FRINGE BENEFITS. AS OF SEPTEMBER 1, 2024

$27.80$1.65$29.45changedAgreement, 2024
TRUCK DRIVER GROUP 4- 5 AXLE DUMP, WATER TRUCK 4000 GAL AND OVER

FOOTNOTE: HEALTH & WELFARE $1,330.26 PER MONTH IN ADDITIONAL FRINGE BENEFITS. AS OF SEPTEMBER 1, 2024

$28.68$1.65$30.33changedAgreement, 2024
TRUCK DRIVER GROUP 3- 4 AXLE DUMP, WATER TRUCK DRIVE- (2500 GAL BUT LESS THAN 4000 GAL)

FOOTNOTE: HEALTH & WELFARE $1,330.26 PER MONTH IN ADDITIONAL FRINGE BENEFITS. AS OF SEPTEMBER 1, 2024

$27.43$1.65$29.08changedAgreement, 2024
TRUCK DRIVER GROUP 2: 2 OR 3 AXLE DUMP , WATER TRUCK UNDER 2500 GAL.

FOOTNOTE: HEALTH & WELFARE $1,330.26 PER MONTH IN ADDITIONAL FRINGE BENEFITS. AS OF SEPTEMBER 1, 2024

$26.95$1.65$28.60changedAgreement, 2024

Modification history

Modification 1January 30, 2026
Modification 2May 18, 2026 (current)

Published by the Wage and Hour Division; read from sam.gov. The sheet is checked for a newer modification each day. Contracts awarded since January 1, 2017 also carry Executive Order 13706 paid sick leave (one hour per 30 worked, up to 56 a year).

Questions people ask

Which rate do I pay on AZ20260007?
The line for the classification of work actually performed: the basic rate plus the fringe. You may pay the fringe into benefit plans, as cash on every hour, or a mix. Overtime after 40 hours is 1.5 times the basic rate; fringe is paid on every hour and never multiplied.
My trade is not on this sheet. What do I do?
Do not borrow the nearest name. Ask the contracting agency for a conformance on Standard Form 1444 before the first week of that work, and note it as pending on the payroll.
Does modification 2 apply to my contract?
Only if it was in force when your contract was awarded (generally at bid opening). An earlier modification locked into the contract keeps applying, except on option years, added scope and indefinite-quantity contracts. The number and modification are on the first page of the exhibit in your contract.

How to read a wage determination · Paying the fringe in cash or through plans · Overtime on these rates · Fringe credit calculator

Put these rates on a certified payroll.

Start here and AZ20260007 is already filled in when you set up the job. CertifiedHours loads this sheet, checks every line against it as you type hours, and prints the WH-347. Free for one payroll a month.

Start a payroll on this sheet

On this sheet

  • 32 classifications in 17 rate groups
  • 17 from agreements, 0 from surveys
  • Counties: Apache, Cochise, Coconino, Gila, Graham, Greenlee, La Paz, Navajo, Santa Cruz, Yavapai