Prevailing wage rates: Drew County, Arkansas

Highway construction · AR20260136 modification 1, published May 18, 2026

The short answer

This sheet sets 33 classifications for highway work in Drew County, Arkansas. Each line is a basic hourly rate plus a fringe rate, and the sum is the minimum you must pay for that work, from $10.08 an hour (laborer: common or general) to $22.57 (operator: paver (asphalt, aggregate, and concrete)). Your contract may lock an earlier modification.

Rates by classification

Total is the basic rate plus the fringe. Source is the agreement or survey the rate came from; a marker means the group changed in this modification. A dagger (†) means the fringe carries a footnote or percentage the total does not include; read the group’s notes.

ClassificationBasic rateFringeTotalSource
SUAR2014-008 · Survey of contractors in AR, July 21, 2014
TRUCK DRIVER: SEMI/TRAILER TRUCK$10.75$0.00$10.75Survey
TRUCK DRIVER: WATER TRUCK$19.00$0.00$19.00Survey
TRUCK DRIVER: LOWBOY TRUCK$18.50$0.00$18.50Survey
TRUCK DRIVER: FLATBED TRUCK$12.75$0.00$12.75Survey
TRUCK DRIVER: DUMP TRUCK$16.63$0.00$16.63Survey
TRAFFIC CONTROL: LABORER-CONES/ BARRICADES/BARRELS - SETTER/MOVER/SWEEPER$11.15$0.00$11.15Survey
TRAFFIC CONTROL: FLAGGER$10.75$0.00$10.75Survey
OPERATOR: SCREED$17.20$0.00$17.20Survey
OPERATOR: SCRAPER$14.22$0.00$14.22Survey
OPERATOR: ROLLER$14.96$0.00$14.96Survey
OPERATOR: POST DRIVER (GUARDRAIL/FENCES)$18.49$0.00$18.49Survey
OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE)$22.57$0.00$22.57Survey
OPERATOR: OILER$16.99$0.00$16.99Survey
OPERATOR: MILLING MACHINE$20.95$0.00$20.95Survey
OPERATOR: MECHANIC$19.88$0.00$19.88Survey
OPERATOR: LOADER$18.50$0.00$18.50Survey
OPERATOR: GRADER/BLADE$17.98$0.00$17.98Survey
OPERATOR: GRADE CHECKER$16.71$0.00$16.71Survey
OPERATOR: CRANE$20.08$0.00$20.08Survey
OPERATOR: BULLDOZER$16.90$0.00$16.90Survey
OPERATOR: BROOM/SWEEPER$14.94$0.00$14.94Survey
OPERATOR: BOBCAT/SKID STEER/SKID LOADER$21.60$0.00$21.60Survey
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE$16.95$0.00$16.95Survey
OPERATOR: ASPHALT PLANT$17.67$0.00$17.67Survey
LABORER: MASON TENDER - CEMENT/CONCRETE$11.41$0.00$11.41Survey
LABORER: COMMON OR GENERAL$10.08$0.00$10.08Survey
LABORER: ASPHALT, INCLUDES RAKER, SHOVELER, SPREADER AND DISTRIBUTOR$13.42$0.00$13.42Survey
IRONWORKER, STRUCTURAL$17.21$0.00$17.21Survey
IRONWORKER, REINFORCING$15.31$0.00$15.31Survey
HIGHWAY/PARKING LOT STRIPING: OPERATOR (STRIPING MACHINE)$12.96$0.00$12.96Survey
FORM WORKER$16.16$0.00$16.16Survey
CEMENT MASON/CONCRETE FINISHER$16.60$0.00$16.60Survey
CARPENTER, EXCLUDES FORM WORK$15.78$0.00$15.78Survey

Modification history

Modification 0January 2, 2026
Modification 1May 18, 2026 (current)

Published by the Wage and Hour Division; read from sam.gov. The sheet is checked for a newer modification each day. Contracts awarded since January 1, 2017 also carry Executive Order 13706 paid sick leave (one hour per 30 worked, up to 56 a year).

Questions people ask

Which rate do I pay on AR20260136?
The line for the classification of work actually performed: the basic rate plus the fringe. You may pay the fringe into benefit plans, as cash on every hour, or a mix. Overtime after 40 hours is 1.5 times the basic rate; fringe is paid on every hour and never multiplied.
My trade is not on this sheet. What do I do?
Do not borrow the nearest name. Ask the contracting agency for a conformance on Standard Form 1444 before the first week of that work, and note it as pending on the payroll.
Does modification 1 apply to my contract?
Only if it was in force when your contract was awarded (generally at bid opening). An earlier modification locked into the contract keeps applying, except on option years, added scope and indefinite-quantity contracts. The number and modification are on the first page of the exhibit in your contract.

How to read a wage determination · Paying the fringe in cash or through plans · Overtime on these rates · Fringe credit calculator