Prevailing wage rates · Arkansas · Wage determination
Prevailing wage rates: Randolph County, Arkansas
Residential construction · AR20260097 modification 1, published May 18, 2026
The short answer
This sheet sets 19 classifications for residential work in Randolph County, Arkansas. Each line is a basic hourly rate plus a fringe rate, and the sum is the minimum you must pay for that work, from $7.81 an hour (laborer: common or general) to $15.78 (electrician). Your contract may lock an earlier modification.
Scope
RESIDENTIAL CONSTRUCTION PROJECTS (consisting of single family homes and apartments up to and including 4 stories)
Rates by classification
Total is the basic rate plus the fringe. Source is the agreement or survey the rate came from; a marker means the group changed in this modification. A dagger (†) means the fringe carries a footnote or percentage the total does not include; read the group’s notes.
| Classification | Basic rate | Fringe | Total | Source |
|---|---|---|---|---|
| SUAR2008-208 · Survey of contractors in AR, November 28, 2008 | ||||
| TRUCK DRIVER: DUMP TRUCK | $9.15 | $0.00 | $9.15 | Survey |
| TILE SETTER | $8.00 | $0.00 | $8.00 | Survey |
| SHEET METAL WORKER | $10.54 | $0.00 | $10.54 | Survey |
| ROOFER | $11.72 | $0.00 | $11.72 | Survey |
| PLUMBER | $13.71 | $0.00 | $13.71 | Survey |
| PAINTER: BRUSH AND SPRAY, EXCLUDES DRYWALL FINISHING/TAPING | $10.70 | $0.00 | $10.70 | Survey |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $10.50 | $0.00 | $10.50 | Survey |
| LABORER: MASON TENDER - CEMENT/CONCRETE | $8.07 | $0.00 | $8.07 | Survey |
| LABORER: MASON TENDER - BRICK | $8.00 | $0.00 | $8.00 | Survey |
| LABORER: COMMON OR GENERAL | $7.81 | $0.00 | $7.81 | Survey |
| INSTALLER-SIDING, INCLUDING VINYL | $10.75 | $0.00 | $10.75 | Survey |
HVAC MECHANIC (INSTALLATION OF HVAC UNIT ONLY…Full textHVAC MECHANIC (INSTALLATION OF HVAC UNIT ONLY, EXCLUDES INSTALLATION OF HVAC PIPE AND DUCT) | $10.00 | $0.00 | $10.00 | Survey |
| FENCE ERECTOR | $10.00 | $0.00 | $10.00 | Survey |
| ELECTRICIAN | $15.78 | $0.00 | $15.78 | Survey |
| DRYWALL HANGER | $12.00 | $0.00 | $12.00 | Survey |
| DRYWALL FINISHER/TAPER | $12.00 | $0.00 | $12.00 | Survey |
| CEMENT MASON/CONCRETE FINISHER | $13.00 | $0.00 | $13.00 | Survey |
| CARPENTER, INCLUDES CABINET INSTALLATION, AND FORM WORK (EXCLUDES DRYWALL HANGING) | $12.42 | $0.00 | $12.42 | Survey |
| BRICKLAYER | $11.42 | $0.00 | $11.42 | Survey |
Modification history
| Modification 0 | January 2, 2026 |
| Modification 1 | May 18, 2026 (current) |
Published by the Wage and Hour Division; read from sam.gov. The sheet is checked for a newer modification each day. Contracts awarded since January 1, 2017 also carry Executive Order 13706 paid sick leave (one hour per 30 worked, up to 56 a year).
Questions people ask
- Which rate do I pay on AR20260097?
- The line for the classification of work actually performed: the basic rate plus the fringe. You may pay the fringe into benefit plans, as cash on every hour, or a mix. Overtime after 40 hours is 1.5 times the basic rate; fringe is paid on every hour and never multiplied.
- My trade is not on this sheet. What do I do?
- Do not borrow the nearest name. Ask the contracting agency for a conformance on Standard Form 1444 before the first week of that work, and note it as pending on the payroll.
- Does modification 1 apply to my contract?
- Only if it was in force when your contract was awarded (generally at bid opening). An earlier modification locked into the contract keeps applying, except on option years, added scope and indefinite-quantity contracts. The number and modification are on the first page of the exhibit in your contract.
How to read a wage determination · Paying the fringe in cash or through plans · Overtime on these rates · Fringe credit calculator