Prevailing wage rates: Galveston County, Texas

Heavy construction · TX20260062 modification 1, published May 18, 2026

The short answer

This sheet sets 19 classifications for heavy work in Galveston County, Texas. Each line is a basic hourly rate plus a fringe rate, and the sum is the minimum you must pay for that work, from $7.35 an hour (laborers: landscape) to $60.62 (sprinkler fitter (fire sprinklers)). Your contract may lock an earlier modification.

Scope

Excludes Flood Control

Rates by classification

Total is the basic rate plus the fringe. Source is the agreement or survey the rate came from; a marker means the group changed in this modification. A dagger (†) means the fringe carries a footnote or percentage the total does not include; read the group’s notes.

ClassificationBasic rateFringeTotalSource
SFTX0669-001 · SFTX, January 1, 2025
SPRINKLER FITTER (FIRE SPRINKLERS)$36.15$24.47$60.62SFTX
SUTX2005-021 · Survey of contractors in TX, August 5, 2005
TRUCK DRIVER (HEAVY INCLUDING WATER AND SEWER LINES (EXCLUDING FLOOD CONTROL))$12.28$0.98$13.26Survey
POWER EQUIPMENT OPERATORS: TRACTOR$12.38$1.51$13.89Survey
POWER EQUIPMENT OPERATORS: GRADER$12.20$1.48$13.68Survey
POWER EQUIPMENT OPERATORS: FRONT END LOADER$11.75$0.92$12.67Survey
POWER EQUIPMENT OPERATORS: EXCAVATOR$16.74$0.00$16.74Survey
POWER EQUIPMENT OPERATORS: CRANE$14.91$0.58$15.49Survey
POWER EQUIPMENT OPERATORS: BULLDOZER$14.00$0.00$14.00Survey
POWER EQUIPMENT OPERATORS: BACKHOE$13.25$0.00$13.25Survey
PIPEFITTER (HEAVY INCLUDING WATER AND SEWER LINES (EXCLUDING FLOOD CONTROL))$17.00$0.04$17.04Survey
LABORERS: PIPELAYER$10.07$0.00$10.07Survey
LABORERS: MASON TENDER CEMENT$9.96$0.00$9.96Survey
LABORERS: LANDSCAPE$7.35$0.00$7.35Survey
LABORERS: COMMON$10.70$0.00$10.70Survey
IRONWORKER, REINFORCING (HEAVY INCLUDING WATER AND SEWER LINES (EXCLUDING FLOOD CONTROL))$11.29$0.00$11.29Survey
FORM BUILDER/FORM SETTER (HEAVY INCLUDING WATER AND SEWER LINES (EXCLUDING FLOOD CONTROL))$13.35$1.17$14.52Survey
ELECTRICIAN (HEAVY INCLUDING WATER AND SEWER LINES (EXCLUDING FLOOD CONTROL))$18.40$1.34$19.74Survey
CEMENT MASON/CONCRETE FINISHER…
Full text

CEMENT MASON/CONCRETE FINISHER (HEAVY INCLUDING WATER AND SEWER LINES (EXCLUDING FLOOD CONTROL))

$11.37$1.13$12.50Survey
CARPENTER (HEAVY INCLUDING WATER AND SEWER LINES (EXCLUDING FLOOD CONTROL))$14.38$0.00$14.38Survey

Modification history

Modification 0January 2, 2026
Modification 1May 18, 2026 (current)

Published by the Wage and Hour Division; read from sam.gov. The sheet is checked for a newer modification each day. Contracts awarded since January 1, 2017 also carry Executive Order 13706 paid sick leave (one hour per 30 worked, up to 56 a year).

Questions people ask

Which rate do I pay on TX20260062?
The line for the classification of work actually performed: the basic rate plus the fringe. You may pay the fringe into benefit plans, as cash on every hour, or a mix. Overtime after 40 hours is 1.5 times the basic rate; fringe is paid on every hour and never multiplied.
My trade is not on this sheet. What do I do?
Do not borrow the nearest name. Ask the contracting agency for a conformance on Standard Form 1444 before the first week of that work, and note it as pending on the payroll.
Does modification 1 apply to my contract?
Only if it was in force when your contract was awarded (generally at bid opening). An earlier modification locked into the contract keeps applying, except on option years, added scope and indefinite-quantity contracts. The number and modification are on the first page of the exhibit in your contract.