CertifiedHours

Prevailing wage rates · Texas · Wage determination

Prevailing wage rates: Cameron, Hidalgo and Webb Counties, Texas

Highway construction · TX20260051 modification 1, published May 18, 2026

The short answer

This sheet sets 33 classifications for highway work in Cameron, Hidalgo and Webb Counties, Texas. Each line is a basic hourly rate plus a fringe rate, and the sum is the minimum you must pay for that work, from $14.56 an hour (flagger) to $29.80 (crane operator, lattice boom 80 tons or less). Your contract may lock an earlier modification.

Rates by classification

Total is the basic rate plus the fringe. Source is the agreement or survey the rate came from; a marker means the group changed in this modification. A dagger (†) means the fringe carries a footnote or percentage the total does not include; read the group’s notes.

ClassificationBasic rateFringeTotalSource
SATX2025-002 · SATX, November 15, 2023
WORK ZONE BARRICADE SERVICER$15.81$0.00$15.81SATX
WELDER$21.35$0.00$21.35SATX
TRUCK DRIVER, TRANSIT-MIX$18.00$0.00$18.00SATX
TRUCK DRIVER, TANDEM AXLE TRACTOR WITH SEMI TRAILER.$ 19.81 0.00 TRUCK DRIVER…
Full text

TRUCK DRIVER, TANDEM AXLE TRACTOR WITH SEMI TRAILER.$ 19.81 0.00 TRUCK DRIVER, SINGLE OR TANDEM AXLE DUMP TRUCK

$18.50$0.00$18.50SATX
TRUCK DRIVER, SINGLE AXLE$17.93$0.00$17.93SATX
TRUCK DRIVER LOWBOY FLOAT$27.10$0.00$27.10SATX
SERVICER$20.03$0.00$20.03SATX
SCRAPER OPERATOR$14.88$0.00$14.88SATX
ROLLER OPERATOR, OTHER$14.88$0.00$14.88SATX
ROLLER OPERATOR, ASPHALT$14.88$0.00$14.88SATX
REINFORCING STEEL WORKER$19.62$0.00$19.62SATX
PIPELAYER$15.48$0.00$15.48SATX
MOTOR GRADER OPERATOR, ROUGH$18.78$0.00$18.78SATX
MOTOR GRADER OPERATOR, FINE GRADE$21.55$0.00$21.55SATX
MILLING MACHINE OPERATOR$18.47$0.00$18.47SATX
MECHANIC$23.80$0.00$23.80SATX
LOADER/BACKHOE OPERATOR$16.37$0.00$16.37SATX
LABORER, UTILITY$16.79$0.00$16.79SATX
LABORER, COMMON$14.88$0.00$14.88SATX
FRONT END LOADER OPERATOR, OVER 3 CY$16.41$0.00$16.41SATX
FRONT END LOADER OPERATOR, 3 CY OR LESS$15.59$0.00$15.59SATX
FORM SETTER, PAVING & CURB$17.31$0.00$17.31SATX
FORM BUILDER/SETTER, STRUCTURES$18.59$0.00$18.59SATX
FLAGGER$14.56$0.00$14.56SATX
EXCAVATOR OPERATOR, OVER 50,000 POUNDS$19.29$0.00$19.29SATX
EXCAVATOR OPERATOR, 50,000 POUNDS OR LESS$18.99$0.00$18.99SATX
CRAWLER TRACTOR OPERATOR$20.27$0.00$20.27SATX
CRANE OPERATOR, LATTICE BOOM 80 TONS OR LESS$29.80$0.00$29.80SATX
CONCRETE FINISHER, PAVING AND STRUCTURES$19.13$0.00$19.13SATX
BROOM OR SWEEPER OPERATOR$15.22$0.00$15.22SATX
ASPHALT RAKER$15.02$0.00$15.02SATX
ASPHALT PAVING MACHINE OPERATOR$15.99$0.00$15.99SATX
ASPHALT DISTRIBUTOR OPERATOR$19.62$0.00$19.62SATX

Modification history

Modification 0January 2, 2026
Modification 1May 18, 2026 (current)

Published by the Wage and Hour Division; read from sam.gov. The sheet is checked for a newer modification each day. Contracts awarded since January 1, 2017 also carry Executive Order 13706 paid sick leave (one hour per 30 worked, up to 56 a year).

Questions people ask

Which rate do I pay on TX20260051?
The line for the classification of work actually performed: the basic rate plus the fringe. You may pay the fringe into benefit plans, as cash on every hour, or a mix. Overtime after 40 hours is 1.5 times the basic rate; fringe is paid on every hour and never multiplied.
My trade is not on this sheet. What do I do?
Do not borrow the nearest name. Ask the contracting agency for a conformance on Standard Form 1444 before the first week of that work, and note it as pending on the payroll.
Does modification 1 apply to my contract?
Only if it was in force when your contract was awarded (generally at bid opening). An earlier modification locked into the contract keeps applying, except on option years, added scope and indefinite-quantity contracts. The number and modification are on the first page of the exhibit in your contract.

How to read a wage determination · Paying the fringe in cash or through plans · Overtime on these rates · Fringe credit calculator