Prevailing wage rates: Aransas, Austin, Calhoun and Goliad Counties, Texas

Heavy construction · TX20260045 modification 1, published May 18, 2026

The short answer

This sheet sets 35 classifications for heavy work in Aransas, Austin, Calhoun and Goliad Counties, Texas. Each line is a basic hourly rate plus a fringe rate, and the sum is the minimum you must pay for that work, from $8.60 an hour (flagger) to $15.15 (motor grader operator fine grade). Your contract may lock an earlier modification.

Rates by classification

Total is the basic rate plus the fringe. Source is the agreement or survey the rate came from; a marker means the group changed in this modification. A dagger (†) means the fringe carries a footnote or percentage the total does not include; read the group’s notes.

ClassificationBasic rateFringeTotalSource
SUTX2005-023 · Survey of contractors in TX, November 9, 2011
WORK ZONE BARRICADE SERVICER$9.63$0.00$9.63Survey
TRUCK DRIVER, TANDEM AXLE, SEMI-TRAILER$10.05$0.00$10.05Survey
TRUCK DRIVER, LOWBOY-FLOAT$13.70$0.00$13.70Survey
TRUCK DRIVER SINGLE AXLE, LIGHT$10.85$0.00$10.85Survey
TRUCK DRIVER SINGLE AXLE HEAVY$10.87$0.00$10.87Survey
TRAVELING MIXER OPERATOR$12.67$0.00$12.67Survey
SPREADER BOX OPERATOR$13.00$0.00$13.00Survey
SERVICER$11.18$0.00$11.18Survey
SCRAPER OPERATOR$9.85$0.00$9.85Survey
ROLLER OPERATOR, STEEL WHEEL, PLANT MIX PAVEMENT$10.59$0.00$10.59Survey
ROLLER OPERATOR, STEEL WHEEL, FLAT WHEEL/TAMPING$9.30$0.00$9.30Survey
ROLLER OPERATOR, PNEUMATIC, SELF-PROPELLED$8.90$0.00$8.90Survey
PIPELAYER$9.71$0.00$9.71Survey
PAVEMENT MARKING MACHINE OPERATOR$13.32$0.00$13.32Survey
MOTOR GRADER OPERATOR ROUGH$12.95$0.00$12.95Survey
MOTOR GRADER OPERATOR FINE GRADE$15.15$0.00$15.15Survey
MECHANIC (UNDEFINED)$12.18$0.00$12.18Survey
LABORER, UTILITY$9.21$0.00$9.21Survey
LABORER, COMMON$8.91$0.00$8.91Survey
FRONT END LOADER OPERATOR$10.62$0.00$10.62Survey
FOUNDATION DRILL OPERATOR, TRUCK MOUNTED$14.58$0.00$14.58Survey
FORM SETTER, PAVING & CURB$9.48$0.00$9.48Survey
FORM BUILDER/SETTER, STRUCTURES$10.51$0.00$10.51Survey
FLAGGER$8.60$0.00$8.60Survey
CRANE, CLAMSHELL, BACKHOE, DERRICK, DRAGLINE, SHOVEL OPERATOR$12.00$0.00$12.00Survey
CONCRETE RUBBER$9.00$0.00$9.00Survey
CONCRETE FINISHER, STRUCTURES$10.23$0.00$10.23Survey
CONCRETE FINISHER, PAVING$11.64$0.00$11.64Survey
CARPENTER$11.70$0.00$11.70Survey
BULLDOZER OPERATOR$11.69$0.00$11.69Survey
BROOM OR SWEEPER OPERATOR$9.32$0.00$9.32Survey
ASPHALT SHOVELER$9.23$0.00$9.23Survey
ASPHALT RAKER$10.63$0.00$10.63Survey
ASPHALT PAVING MACHINE OPERATOR$11.60$0.00$11.60Survey
ASPHALT DISTRIBUTOR OPERATOR$12.57$0.00$12.57Survey

Modification history

Modification 0January 2, 2026
Modification 1May 18, 2026 (current)

Published by the Wage and Hour Division; read from sam.gov. The sheet is checked for a newer modification each day. Contracts awarded since January 1, 2017 also carry Executive Order 13706 paid sick leave (one hour per 30 worked, up to 56 a year).

Questions people ask

Which rate do I pay on TX20260045?
The line for the classification of work actually performed: the basic rate plus the fringe. You may pay the fringe into benefit plans, as cash on every hour, or a mix. Overtime after 40 hours is 1.5 times the basic rate; fringe is paid on every hour and never multiplied.
My trade is not on this sheet. What do I do?
Do not borrow the nearest name. Ask the contracting agency for a conformance on Standard Form 1444 before the first week of that work, and note it as pending on the payroll.
Does modification 1 apply to my contract?
Only if it was in force when your contract was awarded (generally at bid opening). An earlier modification locked into the contract keeps applying, except on option years, added scope and indefinite-quantity contracts. The number and modification are on the first page of the exhibit in your contract.

How to read a wage determination · Paying the fringe in cash or through plans · Overtime on these rates · Fringe credit calculator