Prevailing wage rates · Texas · Wage determination
Prevailing wage rates: Atascosa, Bandera, Bastrop and 17 more counties, Texas
Heavy construction · TX20260007 modification 1, published May 18, 2026
The short answer
This sheet sets 50 classifications for heavy work in Atascosa, Bandera, Bastrop and 17 more counties, Texas. Each line is a basic hourly rate plus a fringe rate, and the sum is the minimum you must pay for that work, from $9.45 an hour (laborer (flagger)) to $26.35 (electrician). Your contract may lock an earlier modification.
Scope
HEAVY (excluding tunnels and dams, not to be used for work on Sewage or Water Treatment Plants or Lift / Pump Stations in Bell, Coryell, McLennan and Williamson Counties) Construction Projects
Rates by classification
Total is the basic rate plus the fringe. Source is the agreement or survey the rate came from; a marker means the group changed in this modification. A dagger (†) means the fringe carries a footnote or percentage the total does not include; read the group’s notes.
| Classification | Basic rate | Fringe | Total | Source |
|---|---|---|---|---|
| SUTX2011-006 · Survey of contractors in TX, August 3, 2011 | ||||
| WELDER | $15.97 | $0.00 | $15.97 | Survey |
| TRUCK DRIVER: TANDEM AXLE TRACTOR W/SEMI TRAILER | $12.81 | $0.00 | $12.81 | Survey |
| TRUCK DRIVER: SINGLE OR TANDEM AXLE DUMP TRUCK | $11.68 | $0.00 | $11.68 | Survey |
| TRUCK DRIVER (SINGLE AXLE) | $11.79 | $0.00 | $11.79 | Survey |
| TRUCK DRIVER (OFF ROAD HAULER) | $11.88 | $0.00 | $11.88 | Survey |
| TRUCK DRIVER (LOWBOY-FLOAT) | $15.66 | $0.00 | $15.66 | Survey |
| TRAFFIC SIGNALIZATION: TRAFFIC SIGNAL INSTALLATION, (TRAFFIC SIGNAL/LIGHT POLE WORKER) | $16.00 | $0.00 | $16.00 | Survey |
| STEEL WORKER (STRUCTURAL) | $19.29 | $0.00 | $19.29 | Survey |
| STEEL WORKER (REINFORCING) | $14.00 | $0.00 | $14.00 | Survey |
| SERVICER | $14.51 | $0.00 | $14.51 | Survey |
| POWER EQUIPMENT OPERATOR: SCRAPER | $12.27 | $0.00 | $12.27 | Survey |
| POWER EQUIPMENT OPERATOR: MOTOR GRADER, ROUGH | $14.63 | $0.00 | $14.63 | Survey |
| POWER EQUIPMENT OPERATOR: MOTOR GRADER, FINE GRADE | $18.51 | $0.00 | $18.51 | Survey |
| POWER EQUIPMENT OPERATOR: MECHANIC | $17.10 | $0.00 | $17.10 | Survey |
| POWER EQUIPMENT OPERATOR: FRONT END LOADER, 3 CY OR LESS | $13.04 | $0.00 | $13.04 | Survey |
| POWER EQUIPMENT OPERATOR: FOUNDATION DRILL, TRUCK MOUNTED | $16.93 | $0.00 | $16.93 | Survey |
| POWER EQUIPMENT OPERATOR: CRAWLER TRACTOR | $15.67 | $0.00 | $15.67 | Survey |
| POWER EQUIPMENT OPERATOR: BROOM OR SWEEPER | $11.04 | $0.00 | $11.04 | Survey |
| POWER EQUIPMENT OPERATOR: BOOM TRUCK | $18.36 | $0.00 | $18.36 | Survey |
| POWER EQUIPMENT OPERATOR: ASPHALT DISTRIBUTOR | $15.55 | $0.00 | $15.55 | Survey |
| POWER EQUIPMENT OPERATOR: (TRENCHING MACHINE, HEAVY) | $18.48 | $0.00 | $18.48 | Survey |
| POWER EQUIPMENT OPERATOR: (SPREADER BOX) | $14.04 | $0.00 | $14.04 | Survey |
| POWER EQUIPMENT OPERATOR: (ROLLER, OTHER) | $10.50 | $0.00 | $10.50 | Survey |
| POWER EQUIPMENT OPERATOR: (ROLLER, ASPHALT) | $12.78 | $0.00 | $12.78 | Survey |
| POWER EQUIPMENT OPERATOR: (RECLAIMER/PULVERIZER) | $12.88 | $0.00 | $12.88 | Survey |
| POWER EQUIPMENT OPERATOR: (PAVEMENT MARKING MACHINE) | $19.17 | $0.00 | $19.17 | Survey |
| POWER EQUIPMENT OPERATOR: (MILLING MACHINE) | $14.18 | $0.00 | $14.18 | Survey |
| POWER EQUIPMENT OPERATOR: (LOADER/BACKHOE) | $14.12 | $0.00 | $14.12 | Survey |
| POWER EQUIPMENT OPERATOR: (FRONT END LOADER, OVER 3 CY) | $13.21 | $0.00 | $13.21 | Survey |
| POWER EQUIPMENT OPERATOR: (EXCAVATOR OVER 50,000 LBS) | $17.71 | $0.00 | $17.71 | Survey |
| POWER EQUIPMENT OPERATOR: (EXCAVATOR 50,000 LBS OR LESS) | $12.88 | $0.00 | $12.88 | Survey |
| POWER EQUIPMENT OPERATOR: (DIRECTIONAL DRILLING OPERATOR) | $17.24 | $0.00 | $17.24 | Survey |
| POWER EQUIPMENT OPERATOR: (DIRECTIONAL DRILLING LOCATOR) | $11.67 | $0.00 | $11.67 | Survey |
| POWER EQUIPMENT OPERATOR: (CRANE, LATTICE BOOM OVER 80 TONS) | $19.38 | $0.00 | $19.38 | Survey |
| POWER EQUIPMENT OPERATOR: (CRANE, LATTICE BOOM 80 TONS OR LESS) | $15.87 | $0.00 | $15.87 | Survey |
| POWER EQUIPMENT OPERATOR: (CRANE, HYDRAULIC 80 TONS OR LESS) | $18.36 | $0.00 | $18.36 | Survey |
| POWER EQUIPMENT OPERATOR: (CONCRETE PAVEMENT FINISHING MACHINE) | $15.48 | $0.00 | $15.48 | Survey |
| POWER EQUIPMENT OPERATOR: (ASPHALT PAVING MACHINE) | $14.36 | $0.00 | $14.36 | Survey |
| POWER EQUIPMENT OPERATOR: (AGRICULTURAL TRACTOR) | $12.69 | $0.00 | $12.69 | Survey |
| PAINTER (STRUCTURES) | $18.34 | $0.00 | $18.34 | Survey |
| LABORER: PIPELAYER | $12.79 | $0.00 | $12.79 | Survey |
| LABORER: ASPHALT RAKER | $12.12 | $0.00 | $12.12 | Survey |
| LABORER (WORK ZONE BARRICADE SERVICER) | $11.85 | $0.00 | $11.85 | Survey |
| LABORER (LABORER, UTILITY) | $12.27 | $0.00 | $12.27 | Survey |
| LABORER (LABORER, COMMON) | $10.50 | $0.00 | $10.50 | Survey |
| LABORER (FLAGGER) | $9.45 | $0.00 | $9.45 | Survey |
| FORM BUILDER/FORM SETTER (STRUCTURES) | $12.87 | $0.00 | $12.87 | Survey |
| FORM BUILDER/FORM SETTER (PAVING & CURB) | $12.94 | $0.00 | $12.94 | Survey |
| ELECTRICIAN | $26.35 | $0.00 | $26.35 | Survey |
| CEMENT MASON/CONCRETE FINISHER (PAVING AND STRUCTURES) | $12.56 | $0.00 | $12.56 | Survey |
Modification history
| Modification 0 | January 2, 2026 |
| Modification 1 | May 18, 2026 (current) |
Published by the Wage and Hour Division; read from sam.gov. The sheet is checked for a newer modification each day. Contracts awarded since January 1, 2017 also carry Executive Order 13706 paid sick leave (one hour per 30 worked, up to 56 a year).
Questions people ask
- Which rate do I pay on TX20260007?
- The line for the classification of work actually performed: the basic rate plus the fringe. You may pay the fringe into benefit plans, as cash on every hour, or a mix. Overtime after 40 hours is 1.5 times the basic rate; fringe is paid on every hour and never multiplied.
- My trade is not on this sheet. What do I do?
- Do not borrow the nearest name. Ask the contracting agency for a conformance on Standard Form 1444 before the first week of that work, and note it as pending on the payroll.
- Does modification 1 apply to my contract?
- Only if it was in force when your contract was awarded (generally at bid opening). An earlier modification locked into the contract keeps applying, except on option years, added scope and indefinite-quantity contracts. The number and modification are on the first page of the exhibit in your contract.
How to read a wage determination · Paying the fringe in cash or through plans · Overtime on these rates · Fringe credit calculator