Prevailing wage rates · Texas · Wage determination
Prevailing wage rates: Bowie, Gregg, Rusk and 2 more counties, Texas
Heavy construction · TX20260004 modification 1, published May 18, 2026
The short answer
This sheet sets 37 classifications for heavy work in Bowie, Gregg, Rusk and 2 more counties, Texas. Each line is a basic hourly rate plus a fringe rate, and the sum is the minimum you must pay for that work, from $8.50 an hour (laborer (flagger)) to $22.05 (power equipment operator: foundation drill, truck mounted). Your contract may lock an earlier modification.
Rates by classification
Total is the basic rate plus the fringe. Source is the agreement or survey the rate came from; a marker means the group changed in this modification. A dagger (†) means the fringe carries a footnote or percentage the total does not include; read the group’s notes.
| Classification | Basic rate | Fringe | Total | Source |
|---|---|---|---|---|
| SUTX2011-004 · Survey of contractors in TX, August 2, 2011 | ||||
| TRUCK DRIVER: TANDEM AXLE TRACTOR W/SEMI TRAILER | $12.50 | $0.00 | $12.50 | Survey |
| TRUCK DRIVER: OFF-ROAD HAULER | $10.08 | $0.00 | $10.08 | Survey |
| TRUCK DRIVER (SINGLE OR TANDEM AXLE DUMP) | $11.95 | $0.00 | $11.95 | Survey |
| TRUCK DRIVER (SINGLE AXLE) | $10.75 | $0.00 | $10.75 | Survey |
| TRUCK DRIVER (LOWBOY-FLOAT) | $13.41 | $0.00 | $13.41 | Survey |
| STEEL WORKER (REINFORCING) | $17.53 | $0.00 | $17.53 | Survey |
| SERVICER | $14.11 | $0.00 | $14.11 | Survey |
| POWER EQUIPMENT OPERATOR: SCRAPER | $10.85 | $0.00 | $10.85 | Survey |
| POWER EQUIPMENT OPERATOR: MOTOR GRADER, ROUGH | $15.83 | $0.00 | $15.83 | Survey |
| POWER EQUIPMENT OPERATOR: MOTOR GRADER, FINE GRADE | $16.88 | $0.00 | $16.88 | Survey |
| POWER EQUIPMENT OPERATOR: MECHANIC | $17.47 | $0.00 | $17.47 | Survey |
| POWER EQUIPMENT OPERATOR: FRONT END LOADER, 3 CY OR LESS | $13.40 | $0.00 | $13.40 | Survey |
| POWER EQUIPMENT OPERATOR: FRONT END LOADER , OVER 3 CY | $12.33 | $0.00 | $12.33 | Survey |
| POWER EQUIPMENT OPERATOR: FOUNDATION DRILL, TRUCK MOUNTED | $22.05 | $0.00 | $22.05 | Survey |
| POWER EQUIPMENT OPERATOR: EXCAVATOR OPERATOR OVER 50,000 POUNDS | $13.52 | $0.00 | $13.52 | Survey |
| POWER EQUIPMENT OPERATOR: EXCAVATOR 50,000 POUNDS OR LESS | $13.67 | $0.00 | $13.67 | Survey |
| POWER EQUIPMENT OPERATOR: CRAWLER TRACTOR | $13.62 | $0.00 | $13.62 | Survey |
| POWER EQUIPMENT OPERATOR: BROOM OR SWEEPER | $10.08 | $0.00 | $10.08 | Survey |
| POWER EQUIPMENT OPERATOR: ASPHALT DISTRIBUTOR | $13.88 | $0.00 | $13.88 | Survey |
| POWER EQUIPMENT OPERATOR: (SPREADER BOX) | $13.12 | $0.00 | $13.12 | Survey |
| POWER EQUIPMENT OPERATOR: (ROLLER, OTHER) | $10.44 | $0.00 | $10.44 | Survey |
| POWER EQUIPMENT OPERATOR: (ROLLER, ASPHALT) | $11.96 | $0.00 | $11.96 | Survey |
| POWER EQUIPMENT OPERATOR: (PAVEMENT MARKING MACHINE) | $13.10 | $0.00 | $13.10 | Survey |
| POWER EQUIPMENT OPERATOR: (MILLING MACHINE) | $12.22 | $0.00 | $12.22 | Survey |
| POWER EQUIPMENT OPERATOR: (LOADER/BACKHOE) | $12.97 | $0.00 | $12.97 | Survey |
| POWER EQUIPMENT OPERATOR: (CRANE, LATTICE BOOM 80 TONS OR LESS) | $13.85 | $0.00 | $13.85 | Survey |
| POWER EQUIPMENT OPERATOR: (ASPHALT PAVING MACHINE) | $12.35 | $0.00 | $12.35 | Survey |
| LABORER: PIPELAYER | $14.64 | $0.00 | $14.64 | Survey |
| LABORER: ASPHALT RAKER | $12.02 | $0.00 | $12.02 | Survey |
| LABORER (WORK ZONE BARRICADE SERVICER) | $11.46 | $0.00 | $11.46 | Survey |
| LABORER (LABORER, UTILITY) | $12.70 | $0.00 | $12.70 | Survey |
| LABORER (LABORER, COMMON) | $10.08 | $0.00 | $10.08 | Survey |
| LABORER (FLAGGER) | $8.50 | $0.00 | $8.50 | Survey |
| FORM BUILDER/FORM SETTER (STRUCTURES) | $13.38 | $0.00 | $13.38 | Survey |
| FORM BUILDER/FORM SETTER (PAVING & CURB) | $13.93 | $0.00 | $13.93 | Survey |
| ELECTRICIAN | $19.87 | $0.00 | $19.87 | Survey |
| CEMENT MASON/CONCRETE FINISHER (PAVING AND STRUCTURES) | $13.16 | $0.00 | $13.16 | Survey |
Modification history
| Modification 0 | January 2, 2026 |
| Modification 1 | May 18, 2026 (current) |
Published by the Wage and Hour Division; read from sam.gov. The sheet is checked for a newer modification each day. Contracts awarded since January 1, 2017 also carry Executive Order 13706 paid sick leave (one hour per 30 worked, up to 56 a year).
Questions people ask
- Which rate do I pay on TX20260004?
- The line for the classification of work actually performed: the basic rate plus the fringe. You may pay the fringe into benefit plans, as cash on every hour, or a mix. Overtime after 40 hours is 1.5 times the basic rate; fringe is paid on every hour and never multiplied.
- My trade is not on this sheet. What do I do?
- Do not borrow the nearest name. Ask the contracting agency for a conformance on Standard Form 1444 before the first week of that work, and note it as pending on the payroll.
- Does modification 1 apply to my contract?
- Only if it was in force when your contract was awarded (generally at bid opening). An earlier modification locked into the contract keeps applying, except on option years, added scope and indefinite-quantity contracts. The number and modification are on the first page of the exhibit in your contract.
How to read a wage determination · Paying the fringe in cash or through plans · Overtime on these rates · Fringe credit calculator