Prevailing wage rates: Cameron, Hidalgo and Webb Counties, Texas

Heavy construction · TX20260003 modification 1, published May 18, 2026

The short answer

This sheet sets 32 classifications for heavy work in Cameron, Hidalgo and Webb Counties, Texas. Each line is a basic hourly rate plus a fringe rate, and the sum is the minimum you must pay for that work, from $9.10 an hour (laborer (flagger)) to $16.86 (power equipment operator: foundation drill, truck mounted). Your contract may lock an earlier modification.

Rates by classification

Total is the basic rate plus the fringe. Source is the agreement or survey the rate came from; a marker means the group changed in this modification. A dagger (†) means the fringe carries a footnote or percentage the total does not include; read the group’s notes.

ClassificationBasic rateFringeTotalSource
SUTX2011-003 · Survey of contractors in TX, August 2, 2011
WELDER$14.02$0.00$14.02Survey
TRUCK DRIVER (TANDEM AXLE TRACTOR WITH SEMI TRAILER)$12.12$0.00$12.12Survey
TRUCK DRIVER (SINGLE OR TANDEM AXLE DUMP)$14.53$0.00$14.53Survey
TRUCK DRIVER (SINGLE AXLE)$10.82$0.00$10.82Survey
TRUCK DRIVER (LOWBOY-FLOAT)$13.63$0.00$13.63Survey
STEEL WORKER (REINFORCING)$14.07$0.00$14.07Survey
SERVICER$12.34$0.00$12.34Survey
POWER EQUIPMENT OPERATOR: SCRAPER$11.07$0.00$11.07Survey
POWER EQUIPMENT OPERATOR: MOTOR GRADER, FINE GRADE$16.52$0.00$16.52Survey
POWER EQUIPMENT OPERATOR: MECHANIC$15.47$0.00$15.47Survey
POWER EQUIPMENT OPERATOR: FRONT END LOADER, 3 CY OR LESS$13.49$0.00$13.49Survey
POWER EQUIPMENT OPERATOR: FOUNDATION DRILL, TRUCK MOUNTED$16.86$0.00$16.86Survey
POWER EQUIPMENT OPERATOR: CRAWLER TRACTOR$16.63$0.00$16.63Survey
POWER EQUIPMENT OPERATOR: BROOM OR SWEEPER$10.33$0.00$10.33Survey
POWER EQUIPMENT OPERATOR: ASPHALT DISTRIBUTOR$13.48$0.00$13.48Survey
POWER EQUIPMENT OPERATOR: (MOTOR GRADER OPERATOR, ROUGH)$14.62$0.00$14.62Survey
POWER EQUIPMENT OPERATOR: (MILLING MACHINE)$14.64$0.00$14.64Survey
POWER EQUIPMENT OPERATOR: (LOADER/BACKHOE)$12.77$0.00$12.77Survey
POWER EQUIPMENT OPERATOR: (FRONT END LOADER OPERATOR, OVER 3 CY)$13.69$0.00$13.69Survey
POWER EQUIPMENT OPERATOR: (EXCAVATOR, OVER 50,000 LBS)$15.23$0.00$15.23Survey
POWER EQUIPMENT OPERATOR: (EXCAVATOR, 50,000 LBS OR LESS)$12.56$0.00$12.56Survey
POWER EQUIPMENT OPERATOR: (CRANE, LATTICE BOOM 80 TONS OR LESS)$14.39$0.00$14.39Survey
POWER EQUIPMENT OPERATOR: (ASPHALT PAVING MACHINE)$12.25$0.00$12.25Survey
LABORER: PIPELAYER$11.87$0.00$11.87Survey
LABORER: ASPHALT RAKER$10.61$0.00$10.61Survey
LABORER (WORK ZONE BARRICADE SERVICER)$12.88$0.00$12.88Survey
LABORER (LABORER, UTILITY)$11.53$0.00$11.53Survey
LABORER (LABORER, COMMON)$9.86$0.00$9.86Survey
LABORER (FLAGGER)$9.10$0.00$9.10Survey
FORM SETTER (PAVING & CURB)$12.16$0.00$12.16Survey
FORM BUILDER/FORM SETTER (STRUCTURES)$12.30$0.00$12.30Survey
CEMENT MASON/CONCRETE FINISHER (PAVING & STRUCTURES)$12.46$0.00$12.46Survey

Modification history

Modification 0January 2, 2026
Modification 1May 18, 2026 (current)

Published by the Wage and Hour Division; read from sam.gov. The sheet is checked for a newer modification each day. Contracts awarded since January 1, 2017 also carry Executive Order 13706 paid sick leave (one hour per 30 worked, up to 56 a year).

Questions people ask

Which rate do I pay on TX20260003?
The line for the classification of work actually performed: the basic rate plus the fringe. You may pay the fringe into benefit plans, as cash on every hour, or a mix. Overtime after 40 hours is 1.5 times the basic rate; fringe is paid on every hour and never multiplied.
My trade is not on this sheet. What do I do?
Do not borrow the nearest name. Ask the contracting agency for a conformance on Standard Form 1444 before the first week of that work, and note it as pending on the payroll.
Does modification 1 apply to my contract?
Only if it was in force when your contract was awarded (generally at bid opening). An earlier modification locked into the contract keeps applying, except on option years, added scope and indefinite-quantity contracts. The number and modification are on the first page of the exhibit in your contract.

How to read a wage determination · Paying the fringe in cash or through plans · Overtime on these rates · Fringe credit calculator

Prevailing wage rates: Cameron, Hidalgo and Webb Counties, Texas (Heavy) · TX20260003 Mod 1 · CertifiedHours