This sheet sets 42 classifications for building work in Leavenworth County, Kansas. Each line is a basic hourly rate plus a fringe rate, and the sum is the minimum you must pay for that work, from $12.48 an hour (laborer: landscape) to $99.13 (elevator mechanic a. vacation pay). Your contract may lock an earlier modification.

Rates by classification

Total is the basic rate plus the fringe. Source is the agreement or survey the rate came from; a marker means the group changed in this modification. A dagger (†) means the fringe carries a footnote or percentage the total does not include; read the group’s notes.

ClassificationBasic rateFringeTotalSource
ASBE0027-005 · Asbestos Workers and Heat & Frost Insulators agreement, October 6, 2025
ASBESTOS WORKER/HEAT & FROST INSULATOR…
Full text

ASBESTOS WORKER/HEAT & FROST INSULATOR (MECHANICAL (DUCT, PIPE & MECHANICAL SYSTEM INSULATION))

$45.60$35.47$81.07Agreement
BRKS0015-011 · Bricklayers agreement, June 1, 2025
TILE SETTER$42.73$18.39$61.12Agreement
BRKS0015-012 · Bricklayers agreement, April 1, 2025
BRICKLAYER$43.57$23.02$66.59Agreement
BRKS0015-014 · Bricklayers agreement, June 1, 2025
TILE FINISHER$20.74$1.46$22.20Agreement
CARP0315-003 · Carpenters agreement, May 1, 2023
CARPENTER (ACOUSTICAL CEILING INSTALLATION ONLY)$43.28$21.25$64.53Agreement
CARP0315-004 · Carpenters agreement, May 1, 2024
CARPENTER (EXCLUDES ACOUSTICAL CEILING INSTALLATION…
Full text

CARPENTER (EXCLUDES ACOUSTICAL CEILING INSTALLATION, DRYWALL HANGING AND FLOOR LAYING CARPET)

$44.63$22.40$67.03Agreement
CARP1181-001 · Carpenters agreement, May 1, 2023
CARPENTER (FLOOR LAYING-CARPET ONLY)$40.94$21.25$62.19Agreement
ELEC0124-011 · Electrical Workers (IBEW) agreement, August 26, 2024
ELECTRICIAN (EXCLUDES LOW VOLTAGE WIRING)$51.01$26.25$77.26Agreement
ELEV0012-004 · Elevator Constructors agreement, January 1, 2025
ELEVATOR MECHANIC A. VACATION PAY…
Full text

ELEVATOR MECHANIC A. VACATION PAY: 6% FOR 6 MONTHS TO 5 YEARS SERVICE; 8% WITH 5 OR MORE YEARS OF SERVICE. B.

PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS DAY, THANKSGIVING DAY AND FRIDAY AFTER, AND CHRISTMAS DAY

$60.69$38.44$99.13Agreement
ENGI0101-043 · Operating Engineers agreement, April 1, 2025
POWER EQUIPMENT OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE)$45.48$22.42$67.90Agreement
POWER EQUIPMENT OPERATOR: OILER$39.93$22.42$62.35Agreement
POWER EQUIPMENT OPERATOR: GRADER/BLADE$45.48$22.42$67.90Agreement
POWER EQUIPMENT OPERATOR: FORKLIFT$44.14$22.42$66.56Agreement
POWER EQUIPMENT OPERATOR: CRANE$47.29$22.42$69.71Agreement
IRON0010-032 · Ironworkers agreement, April 1, 2025
IRONWORKER: ORNAMENTAL, REINFORCING AND STRUCTURAL$39.00$34.25$73.25Agreement
LABO1290-011 · Laborers agreement, April 1, 2019
LABORERS: ASPHALT, INCLUDES RAKER, SHOVELER, SPREADER AND DISTRIBUTOR$31.99$16.03$48.02Agreement
LABO1290-015 · Laborers agreement, April 1, 2023
LABORER: MASON TENDER - BRICK$31.25$18.25$49.50Agreement
PAIN0558-006 · Painters and Allied Trades agreement, April 1, 2025
GLAZIER$39.32$22.34$61.66Agreement
PAIN2012-009 · Painters and Allied Trades agreement, April 1, 2025
PAINTER (SPRAY)$36.18$19.97$56.15Agreement
PAIN2012-010 · Painters and Allied Trades agreement, April 1, 2025
PAINTER: DRYWALL FINISHING/TAPING$36.18$19.97$56.15Agreement
PLAS0518-017 · Plasterers and Cement Masons agreement, April 1, 2025
PLASTERER$37.92$18.83$56.75Agreement
PLUM0008-020 · Plumbers and Pipefitters agreement, June 1, 2023
PLUMBER$54.28$23.79$78.07Agreement
PLUM0533-013 · Plumbers and Pipefitters agreement, June 1, 2024
PIPEFITTER (INCLUDING HVAC PIPE…
Full text

PIPEFITTER (INCLUDING HVAC PIPE, UNIT, AND INSTALLATION OF HVAC ELECTRICIAL/TEMPERATURE CONTROLS)

$55.56$25.80$81.36Agreement
ROOF0020-021 · Roofers agreement, June 1, 2024
ROOFER$38.45$22.29$60.74Agreement
SFKS0314-002 · SFKS, October 1, 2021
SPRINKLER FITTER (FIRE SPRINKLERS)$40.74$22.15$62.89SFKS
SHEE0002-011 · Sheet Metal Workers agreement, July 1, 2024
SHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY)$52.18$27.15$79.33Agreement
SUKS2015-022 · Survey of contractors in KS, July 8, 2015
TRUCK DRIVER: DUMP (ALL TYPES)$28.58$11.22$39.80Survey
SHEET METAL WORKER…
Full text

SHEET METAL WORKER, EXCLUDES HVAC DUCT INSTALLATION.$ 38.39 17.73 PAINTER (BRUSH AND ROLLER)

$23.69$9.39$33.08Survey
OPERATOR: ROLLER$32.18$13.49$45.67Survey
OPERATOR: LOADER$30.35$12.04$42.39Survey
OPERATOR: BULLDOZER$33.12$13.96$47.08Survey
OPERATOR: BOBCAT/SKID STEER/SKID LOADER$33.53$13.66$47.19Survey
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE$33.85$13.87$47.72Survey
LABORER: MASON TENDER - CEMENT/CONCRETE$17.86$1.01$18.87Survey
LABORER: LANDSCAPE$12.48$0.00$12.48Survey
LABORER: CONCRETE SAW (HAND HELD/WALK BEHIND)$28.44$11.60$40.04Survey
LABORER: COMMON OR GENERAL$25.49$12.95$38.44Survey
ELECTRICIAN (LOW VOLTAGE WIRING ONLY)$32.91$18.15$51.06Survey
CEMENT MASON/CONCRETE FINISHER$25.93$11.62$37.55Survey
CARPENTER (DRYWALL HANGING ONLY)$30.00$1.62$31.62Survey
TEAM0541-010 · Teamsters agreement, April 1, 2025
TRUCK DRIVER: LOWBOY TRUCK$39.89$15.85$55.74Agreement
TEAM0541-011 · Teamsters agreement, April 1, 2025
TRUCK DRIVER: SEMI-TRAILER TRUCK$39.89$15.85$55.74Agreement

Modification history

Modification 0January 2, 2026
Modification 1May 18, 2026 (current)

Published by the Wage and Hour Division; read from sam.gov. The sheet is checked for a newer modification each day. Contracts awarded since January 1, 2017 also carry Executive Order 13706 paid sick leave (one hour per 30 worked, up to 56 a year).

Questions people ask

Which rate do I pay on KS20260053?
The line for the classification of work actually performed: the basic rate plus the fringe. You may pay the fringe into benefit plans, as cash on every hour, or a mix. Overtime after 40 hours is 1.5 times the basic rate; fringe is paid on every hour and never multiplied.
My trade is not on this sheet. What do I do?
Do not borrow the nearest name. Ask the contracting agency for a conformance on Standard Form 1444 before the first week of that work, and note it as pending on the payroll.
Does modification 1 apply to my contract?
Only if it was in force when your contract was awarded (generally at bid opening). An earlier modification locked into the contract keeps applying, except on option years, added scope and indefinite-quantity contracts. The number and modification are on the first page of the exhibit in your contract.

How to read a wage determination · Paying the fringe in cash or through plans · Overtime on these rates · Fringe credit calculator