Your first Davis-Bacon job: what to get, set up, and do, from bid to final payroll

A checklist for a subcontractor's first federally funded project: what to pull from the bid documents, what to get from the prime before week 1, what to collect from each worker, and the weekly routine.

Download the PDFFree. No email. One page, US Letter.

Most first-job problems trace to something that was not collected at the start. Work the list top to bottom; the weekly section is the only part that repeats.

Before you bid

  • Find the wage determination in the bid documents; note its number, modification number, and type of construction
  • Find the labor standards clauses (FAR 52.222-6 through -15, or 29 CFR 5.5, or HUD-4010)
  • Confirm the prime contract is over $2,000 (Davis-Bacon) and note whether it is over $100,000 (CWHSSA overtime)
  • Check each classification you will use exists on the determination; list any that do not, for a conformance request
  • Price the bid at basic + fringe for each classification, with overtime at 1.5 × basic
  • If the state has a prevailing wage law and state money is in the project, price the higher of the 2 rates

From the prime, before week 1

  • The wage determination with all modifications, and any conformance approvals already issued
  • The prime's payroll cutoff day and how the file is delivered (portal, email, paper)
  • Which identifying number the prime's system expects (last 4 or employee ID)
  • Whether the prime wants a one-time worker information form with full details for its own records
  • The project name, contract number, and site location exactly as the prime files them
  • Who at the prime reviews payrolls, and who to call with a question

Set up once

  • Enter each classification and its basic and fringe rate from the determination, once, to pull from every week
  • Decide how fringe is paid: to plans, cash, or split; compute the hourly plan credit with annualization
  • Set the payroll week ending day and do not change it
  • Submit SF-1444 conformance requests through the prime for any classification not on the determination
  • Register with the state portal too if the project has state money in a state with its own law

For each worker at hire

  • Full legal name, Social Security number, address, phone, and email, kept in your records, never on the payroll
  • Assign the identifying number that will appear on every payroll
  • Classification(s) the worker will perform
  • For apprentices: program registration, the worker's individual registration, current period and percentage, program fringe rule
  • Written authorization for any voluntary deduction (401(k), union dues, insurance)
  • Enrollment in each fringe plan you will take credit for

Every week

  • Collect hours by day, by worker, by classification, from timecards or daily logs
  • Split at 40 for the week counting all jobs; overtime at 1.5 × basic; fringe on every hour
  • Run the pre-signing checklist; sign the Statement of Compliance; deliver by the prime's cutoff
  • File a no-work payroll for any idle week if the prime or portal wants one (the regulation requires payrolls only for weeks with covered work); keep the numbering unbroken either way
  • Keep a copy of every payroll as submitted

Records, for 3 years after the prime finishes

  • Payrolls and statements as submitted; timecards by day, project, and classification
  • Contract, subcontract, wage determination and modifications, conformance approvals
  • Fringe plan documents and remittances; apprenticeship registrations; deduction authorizations
  • Ask the prime for the project completion date at closeout and write it on the folder

Sources

  1. 29 CFR 5.5, contract provisions
  2. 29 CFR 5.5(a)(1)(iii), conformance of additional classifications
  3. SAM.gov wage determinations

Checked against the regulations 2026-09-07. Not legal advice; your contract and the wage determination control.